Lightning Protection System
Lightning Protection System
PART 1 - GENERAL
1.2 SUMMARY
A. This Section includes lightning protection for buildings and associated structures
and includes requirements for lightning protection systems components including,
but not limited to, the following:
1.3 SUBMITTALS
A. Product Data: Submit data for air terminals, fasteners, test links ground point and
rods, connectors, wall inserts and bolts and any accessories forming part of the
lightning protective system.
E. Qualification Data: For firms and persons specified in "Quality Assurance" Article
to demonstrate their capabilities and experience. Include lists of completed
projects with project names and addresses, names and addresses of
architects/engineers and owners, and other information specified or required by the
Engineer.
1.5 COORDINATION
A. The following terms used on the Drawings and in the Specification are
synonymous and may be used interchangeably:
PART 2 - PRODUCTS
A. Provide lightning protection system materials and components, that comply with
approved manufacturer's standard design, in accordance with published product
information and the Standards specified in this Section.
G. Accessories: Supports, joints, fasteners, clamps, bonds, test links, etc., are to be
copper or copper alloy and specially manufactured for the purpose. Clamps and
connectors are to be specifically designed and sized for clamping and connecting
to the various shapes and surfaces of bonded metalwork. Provide bimetallic
connectors between different materials. Galvanized or plated steel nails, screws
and bolts will not be accepted on copper installations.
H. Flexible Bonding Straps: Flexible annealed copper braid, 25 x 3.5 mm, suitable
for bonding flat surfaces, cut to length required and with drilled flat terminals for
bolted connections. Provide special bimetallic alloy terminals for joining to
aluminum conductive parts.
J. Test Links: Two-bolt split-coupling, copper alloy, made to join 2 ends of down
conductor specified. Plate indicating position and number of electrodes is to be
fitted above each test link.
C. Ground Termination: Provide exposed ground bonding points, inset into concrete
base of every column above ground level, bonded internally to reinforcing bars and
externally to ground ring at a ground pit (refer to Division 16 Section "Grounding
and Bonding"). Securely bond ground bonding points to reinforcing bars using bar
clamps, and provide high quality copper terminal plate with at least 4 threaded
studs for bonding and for isolating foundation system for testing.
F. Bond metal leaving or entering a structure (having system continuity such as water
piping, etc.), as follows:
PART 3 - EXECUTION
3.1 INSTALLATION
B. Install conductors with direct paths from air terminals to ground connections.
Avoid sharp bends and narrow loops.
1. System conductors.
2. Down conductors.
3. Interior conductors.
4. Conductors within normal view from exterior locations at grade within 60 m
of building.
5. Notify the Engineer at least 48 hours in advance of inspection before
concealing lightning protection components.
F. Bends in conductors are not to be less than 200 mm radius and are not to exceed 90
degree turn.
I. Joints and Bonds: Clean and treat contact surfaces with non-corrosive compound.
Protect joints between dissimilar metals from moisture by inert, tenacious material,
K. Inspection (Ground) Pit: Extend 150 mm below top of ground rod. Cover ground
rod connector with suitable protective compound, which can be easily removed for
inspection. Connector is not to be covered with backfill material and is to remain
clean.
A. Do not combine materials that can form an electrolytic couple that will accelerate
corrosion in the presence of moisture unless moisture is permanently excluded
from junction of such materials.