15 - Daywork
15 - Daywork
SCHEDULE OF RATES
DAYWORK
1 Bricklayer. hr 5.90
2 Blocklayer. hr 5.90
3 Carpenter. hr 5.90
4 Concretor. hr 4.80
7 Drainlayer. hr 5.80
8 Excavator hr 5.90
9 Fitter. hr 6.40
10 Glazier. hr 5.80
11 Ironmonger. hr 6.10
12 Joiner. hr 6.20
13 Labourer. hr 3.20
15 Mason. hr 5.90
16 Mechanic. hr 6.40
17 Painter. hr 5.40
18 Pavior. hr 5.80
19 Piler. hr 6.20
DAYWORK SOR 2
SCHEDULE OF RATES
DAYWORK
20 Plasterer. hr 6.20
21 Plumber. hr 5.80
23 Roofer. hr 5.90
24 Scaffolder. hr 5.50
27 Tiler. hr 6.30
29 Watchman. hr 3.20
30 Welder. hr 6.20
31 Wireman. hr 4.90
32 Air compressor with air delivery capacity not less than 4.5 cu m per hr 13.50
minute including pneumatic and sharpening tools, power supply and
fuel (operator measured separately).
36 Diesel powered field welding machine with minimum 300 amp. hr 7.50
37 Mechanical lawn mover with blade not exceeding 500mm and engine hr 2.50
power not exceeding 150cc.
DAYWORK SOR 3
SCHEDULE OF RATES
DAYWORK
38 Motor crane including fuel and driver (3 tonne lifting capacity). hr 21.50
39 Motor crane including fuel and driver (8 – 13 tonne lifting capacity). hr 34.50
41 Motor lorry 2.5 - 3 tonne size including fuel and driver. hr 16.80
42 Motor lorry 5.5 - 7 tonne size including fuel and driver. hr 18.50
44 Power driven pump 50mm size including fuel and driver. hr 7.90
45 Power driven pump 75mm size including fuel and driver. hr 12.30
52 Wheel or crawler shovel or excavator loaders with back hoe bucket hr 35.00
not exceeding 0.4 cu m or 1.3 cu m loader bucket capacity including
fuel and driver.
DAYWORK SOR 4
SCHEDULE OF RATES
DAYWORK
53 Submit drawings and roof plans by Professional Engineer to the Block 300.00
relevant Authorities for approval (building having similar roof
plans/design shall be included in this rate and shall NOT be paid
separately under one operation)
55 Supply and install mechanical suspended cradle not exceeding 5 Unit 230.00
metres length to the roof including PE endorsement certifying the
proper installation of suspended cradle according to the PE's design
calculations, drawings and roof plans (hiring charges and shifting
shall be paid separately)
57 Labour for shifting approved mechanical suspended cradle within Shift 30.00
the same block by one gang
58 Labour for shifting approved mechanical suspended cradle within Per Job 50.00
the same block by one gang for more than one shift per day (Per Job
means Multiple Shift per Day)
SCAFFOLDING / STAGING
60 Add for item (59) above for labour in dismantling, shifting to new No 41.60
location and re-erection
61 Per stage of exceeding 8 metres and not exceeding 10 metres high. No 90.00
62 Add for Item (61) above for labour in dismantling, shifting to new No. 52.00
location and re-erection
SCHEDULE OF RATES
DAYWORK
64 Erect metal scaffolding exceeding 15 metre height but not exceeding m2 $12.70
35 metre height including taking down after use
65 Erect single layer timber scaffolding including taking down after use m2 $3.00
(minimum of 5 metre width shall be paid)
66 Erect double layer timber scaffolding including taking down after m2 $4.60
use (irrespective of height of building, a minimum of 5 metre width
shall be paid)
69 Carry out test of mobile lifting platform by approved person (PE Test 345.00
Structural Engineer and PE Mechanical Engineer) from the relevant
authorities
70 Supply and install Single Mast Mobile Lifting platform not Unit 920.00
exceeding 11 metres length including subsequent removal off site
upon completion of work, making good to affected area (hiring
changes shall be paid separately)
SCHEDULE OF RATES
DAYWORK
TESTING OF MATERIALS
84 Pull out test for plaster (Per point for external) point 92.00
85 Pull out test for plaster (Per point for internal) point 92.00
86 Pull out test for brick tile (Per point for 200 x 200mm) point 115.00
DAYWORK SOR 7
SCHEDULE OF RATES
DAYWORK
87 Polymer Modified Sand Cement Mortar : Compressive Strength Test age 345.00
(Test Method : ASTM C109 : 1992)
88 Polymer Modified Sand Cement Mortar : Setting Time Test test 345.00
(Test Method : BS4550 : Part 3 Section3.6 : 1987)
90 Polymer Modified Sand Cement Mortar : Bond Strength Test age 517.50
(Test Method : ASTM C190 : 1985)
91 Polymer Modified Sand Cement Mortar : Polymer Solid Content test 920.00
Test (Test Method : Chemical Analysis)
92 Polymer Modified Sand Cement Mortar : Air Permeability Test test 690.00
(Test Method : Modified Figg Air Test)
93 Non-shrink Pressure Grout Flow Consistency Test (Test Method : test 115.00
ASTM C939 - 93)
94 Non-shrink Pressure Grout Epansion/ Shrinking Test (Test Method : test 345.00
ASTM C940 - 89)
95 Non-shrink Pressure Grout Bleeding Test (Test Method : ASTM test 172.50
C940 - 89)
96 Non-shrink Pressure Grout Setting Time Test (Test Method : ASTM test 172.50
C953 - 87)
97 Non-shrink Pressure Grout Compressive Strength Test [Test Method test 230.00
: ASTM C942 - 88 (1991)]