0% found this document useful (0 votes)
9 views

15 - Daywork

Uploaded by

Lai Kok Uei
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

15 - Daywork

Uploaded by

Lai Kok Uei
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

DAYWORK SOR 1

SCHEDULE OF RATES

DAYWORK

S/N DESCRIPTION UNIT RATE ($)

Rates for the following items do not include establishment charges


and profit :-

1 Bricklayer. hr 5.90

2 Blocklayer. hr 5.90

3 Carpenter. hr 5.90

4 Concretor. hr 4.80

5 Construction Equipment Operator. hr 6.90

6 Crane Driver. hr 8.40

7 Drainlayer. hr 5.80

8 Excavator hr 5.90

9 Fitter. hr 6.40

10 Glazier. hr 5.80

11 Ironmonger. hr 6.10

12 Joiner. hr 6.20

13 Labourer. hr 3.20

14 Lorry Driver. hr 6.60

15 Mason. hr 5.90

16 Mechanic. hr 6.40

17 Painter. hr 5.40

18 Pavior. hr 5.80

19 Piler. hr 6.20
DAYWORK SOR 2

SCHEDULE OF RATES

DAYWORK

S/N DESCRIPTION UNIT RATE ($)

Rates for the following items do not include establishment charges


and profit : - (Cont’d)

20 Plasterer. hr 6.20

21 Plumber. hr 5.80

22 Roller Driver. hr 6.90

23 Roofer. hr 5.90

24 Scaffolder. hr 5.50

25 Steel Bender & Fixer. hr 5.40

26 Steel Worker. hr 5.80

27 Tiler. hr 6.30

28 Tractor Driver. hr 6.90

29 Watchman. hr 3.20

30 Welder. hr 6.20

31 Wireman. hr 4.90

32 Air compressor with air delivery capacity not less than 4.5 cu m per hr 13.50
minute including pneumatic and sharpening tools, power supply and
fuel (operator measured separately).

33 Concrete mixer 200/140 litres including fuel. hr 8.00

34 Concrete mixer 300/200 litres including fuel. hr 9.00

35 Concrete mixer 600/400 litres including fuel. hr 10.60

36 Diesel powered field welding machine with minimum 300 amp. hr 7.50

37 Mechanical lawn mover with blade not exceeding 500mm and engine hr 2.50
power not exceeding 150cc.
DAYWORK SOR 3

SCHEDULE OF RATES

DAYWORK

S/N DESCRIPTION UNIT RATE ($)

Rates for the following items do not include establishment charges


and profit :- (Cont’d)

38 Motor crane including fuel and driver (3 tonne lifting capacity). hr 21.50

39 Motor crane including fuel and driver (8 – 13 tonne lifting capacity). hr 34.50

40 Crane (KATO KR20H) including fuel and driver. hr 45.00

41 Motor lorry 2.5 - 3 tonne size including fuel and driver. hr 16.80

42 Motor lorry 5.5 - 7 tonne size including fuel and driver. hr 18.50

43 Motor lorry 10 tonne size including fuel and driver. hr 32.00

44 Power driven pump 50mm size including fuel and driver. hr 7.90

45 Power driven pump 75mm size including fuel and driver. hr 12.30

46 Power loader on rubber-tyred wheels 1.20 cu m bucket capacity hr 34.50


(flywheel horsepower 60 kw range) including fuel and driver.

47 Road roller 6 tonne capacity including fuel and driver. hr 18.20

48 Road roller 8 to 10 tonne capacity including fuel and driver. hr 18.50

49 Traxacavator 1.0 cu m capacity including fuel and driver. hr 25.00

50 Traxacavator 1.5 cu m capacity including fuel and driver. hr 30.00

51 Traxacavator 2.0 cu m capacity including fuel and driver. hr 35.00

52 Wheel or crawler shovel or excavator loaders with back hoe bucket hr 35.00
not exceeding 0.4 cu m or 1.3 cu m loader bucket capacity including
fuel and driver.
DAYWORK SOR 4

SCHEDULE OF RATES

DAYWORK

S/N DESCRIPTION UNIT RATE ($)

MECHANICAL SUSPENDED CRADLES

53 Submit drawings and roof plans by Professional Engineer to the Block 300.00
relevant Authorities for approval (building having similar roof
plans/design shall be included in this rate and shall NOT be paid
separately under one operation)

54 Carry out testing of mechanical suspended cradles by (M & E) Test 165.00


Professional Engineer and obtain approval the relevant Authorities

55 Supply and install mechanical suspended cradle not exceeding 5 Unit 230.00
metres length to the roof including PE endorsement certifying the
proper installation of suspended cradle according to the PE's design
calculations, drawings and roof plans (hiring charges and shifting
shall be paid separately)

56 Hiring charge of approved mechanical suspended cradle not Day 25.00


exceeding 5m length including all accessories and safety precautions

57 Labour for shifting approved mechanical suspended cradle within Shift 30.00
the same block by one gang

58 Labour for shifting approved mechanical suspended cradle within Per Job 50.00
the same block by one gang for more than one shift per day (Per Job
means Multiple Shift per Day)

SCAFFOLDING / STAGING

Erect of tubular steel staging including platform board, swivel


castors or base plate etc and taking down after use
59 Per stage of exceeding 6 metres and not exceeding 8 metres high. No 75.50

60 Add for item (59) above for labour in dismantling, shifting to new No 41.60
location and re-erection

61 Per stage of exceeding 8 metres and not exceeding 10 metres high. No 90.00

62 Add for Item (61) above for labour in dismantling, shifting to new No. 52.00
location and re-erection

63 Erect metal scaffolding not exceeding 15 metre height including m2 $11.50


taking down after use
DAYWORK SOR 5

SCHEDULE OF RATES

DAYWORK

S/N DESCRIPTION UNIT RATE ($)

64 Erect metal scaffolding exceeding 15 metre height but not exceeding m2 $12.70
35 metre height including taking down after use

65 Erect single layer timber scaffolding including taking down after use m2 $3.00
(minimum of 5 metre width shall be paid)

66 Erect double layer timber scaffolding including taking down after m2 $4.60
use (irrespective of height of building, a minimum of 5 metre width
shall be paid)

HIRING CHARGE OF MOBILE LIFTING PLAFORM

67 Submit drawings and design calculations by Professional Engineer Blk 402.50


to the relevant Authorities for approval to install mobile lifting
platform (building having similar plans/designs shall be included in
this rate and shall NOT be paid separately under one operation)

68 Submit the certification of supervision by Professional Engineer Test 207.00


certifying the proper installation of mobile lifting platform according
to the Professional Engineer's design calculations and drawings

69 Carry out test of mobile lifting platform by approved person (PE Test 345.00
Structural Engineer and PE Mechanical Engineer) from the relevant
authorities

70 Supply and install Single Mast Mobile Lifting platform not Unit 920.00
exceeding 11 metres length including subsequent removal off site
upon completion of work, making good to affected area (hiring
changes shall be paid separately)

Hiring charge of Single Mast Mobile Lifting Platform including all


accessories and safety precautions (subject to a minimum of one
week rental.) :

71 For one month month 1380.00

72 For one day day 53.10


73 Labour for shifting approved Drive Unit Mast Platform including Shift 690.00
supervision by Professional Engineer
DAYWORK SOR 6

SCHEDULE OF RATES

DAYWORK

S/N DESCRIPTION UNIT RATE ($)

HIRING OF SELF-PROPELLED AERIAL


PLATFORM/BOOMLIFT
* Note
The Hiring charge for Self-propelled Aerial Platform/Boomlift for
the following items to be paid will be based on the minimum amount
calculated using daily, weekly and monthly rates

74 Transportation and installation of self-propelled Aerial no. 276.00


Platform/Boom lift on site and subsequent removal off site upon
completion of work including make good to affected area (Hiring
charge shall be paid separately)

Hiring of Self-propelled Aerial Platform/ Boomlift of maximum


platform height of 12m :

75 For daily day 294.00

76 For weekly week 1196.00

77 For monthly month 2944.00

Hiring of Self-propelled Aerial Platform/ Boomlift of maximum


platform height of 18m :
78 For daily day 386.40

79 For weekly week 1518.00

80 For monthly month 3680.00

Hiring of Self-propelled Aerial Platform/ Boomlift of maximum


platform height of 25m :

81 For daily day 598.00

82 For weekly week 2392.00

83 For monthly month 5520.00

TESTING OF MATERIALS

84 Pull out test for plaster (Per point for external) point 92.00

85 Pull out test for plaster (Per point for internal) point 92.00

86 Pull out test for brick tile (Per point for 200 x 200mm) point 115.00
DAYWORK SOR 7

SCHEDULE OF RATES

DAYWORK

S/N DESCRIPTION UNIT RATE ($)

87 Polymer Modified Sand Cement Mortar : Compressive Strength Test age 345.00
(Test Method : ASTM C109 : 1992)

88 Polymer Modified Sand Cement Mortar : Setting Time Test test 345.00
(Test Method : BS4550 : Part 3 Section3.6 : 1987)

89 Polymer Modified Sand Cement Mortar : Shrinkage Test test 690.00


(Test Method : ASTM C531 : 1995)

90 Polymer Modified Sand Cement Mortar : Bond Strength Test age 517.50
(Test Method : ASTM C190 : 1985)

91 Polymer Modified Sand Cement Mortar : Polymer Solid Content test 920.00
Test (Test Method : Chemical Analysis)

92 Polymer Modified Sand Cement Mortar : Air Permeability Test test 690.00
(Test Method : Modified Figg Air Test)

93 Non-shrink Pressure Grout Flow Consistency Test (Test Method : test 115.00
ASTM C939 - 93)

94 Non-shrink Pressure Grout Epansion/ Shrinking Test (Test Method : test 345.00
ASTM C940 - 89)

95 Non-shrink Pressure Grout Bleeding Test (Test Method : ASTM test 172.50
C940 - 89)

96 Non-shrink Pressure Grout Setting Time Test (Test Method : ASTM test 172.50
C953 - 87)

97 Non-shrink Pressure Grout Compressive Strength Test [Test Method test 230.00
: ASTM C942 - 88 (1991)]

98 Services rendered by licensed cable detection worker for site hr 69.00


excavation including preparation of cable detection report (purchase
of drawings shall be paid separately) (A minimum of 3 hours shall
be paid per job per site)

99 Submission to the relevant authority for approval to commence job 103.50


earthworks for excavation around high tension cable