Working Method - Wave Trap 2
Working Method - Wave Trap 2
Substation Equipment:
NP
Wave Trap Service - WTS
Wave Trap:
i 𝑿𝑳 = 𝟐𝝅𝒇 𝑯𝒛 𝑳(𝑯)
VL= j* 𝑿
𝑳
J= (−𝟏)
Wave Trap Service - WTS
Wave Trap Service - WTS
The table hereafter informs the recommended tightening torque according to the bolt
diameter and type of connection:
Passo
1. Assemble both MS1:
andMontar
scaffoldo; andaime com a chave seccionadora
2. Clean both conductors Source and load;
3. Connect the jumpers of MS at the side Source;
4. Connect the jumpers of MS at the side load;
5. Install the jumper (bridge pole) at the side source ;
6. Close the MS;
7. Install the bridge pole jumpers at the load side;
8. Open the MS;
9. Open the connector at the load side to increase the insulating distance;
10. Disconnect the jumper of the MS at the load side;
11. Install the jumper at the MS connector at the source side;
12. Close the MS, while energize the WTS and the PT in parallel;
13. Open the conductor at the source side and move it to increase the insulating distance;
14. Open the MS;
15. Disconnect the MS jumpers from the connector source at WTS;
16. Disconnect the MS jumpers from conductor at source side;
17. Disassemble both MS and scaffold.
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora