0% found this document useful (0 votes)
12 views

Working Method - Wave Trap 2

Uploaded by

YudhaAprilian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Working Method - Wave Trap 2

Uploaded by

YudhaAprilian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

Working Method - Wave Trap - WT

Substation Equipment:

Lightning Arrester Unit


Current Transformers
Power Transformers

NP
Wave Trap Service - WTS

Wave Trap:

• It can be defined as an inductance serial device installed at the HV line;


• It possess a line (RC) in parallel;
• Resonant circuit presenting high impedance for Carrier frequency;
• Negligible impedance face of the frequency from the system (50 or 60
Hz);
• Avoid the energy dissipation toward the substation, in other words,
encloses the flowing energy area at the line;
• Short circuits or alien operations may cause damages;
• Due to the serial line, the equipment must withstand continuously load,
besides it presents thermic and dynamic load current compatible with
short circuit currents.
• Inductance may vary from 0,1 mH to 2,0 mH, depending on the threshold
of frequencies which shall be blocked.
Wave Trap Service - WTS

i 𝑿𝑳 = 𝟐𝝅𝒇 𝑯𝒛 𝑳(𝑯)

VL= j* 𝑿
𝑳

J= (−𝟏)
Wave Trap Service - WTS
Wave Trap Service - WTS

The table hereafter informs the recommended tightening torque according to the bolt
diameter and type of connection:

Torque of bolts (daN*m):

Diameter Eletrical Insulators Other


of the Connections and Connections
bolts Pedestals
M10 3.0 – 4.0 - 2.0 – 3.0
M12 4.5 – 5.0 4.5 – 5.0 3.0 – 4.0
M16 7.0 – 8.0 12.0 – 14.0 4.0 – 6.0
M20 10.0 – 12.0 16.0 – 18.0 5.0 – 6.0
Wave Trap Service - WTS

Torque of bolts (ft*lbs):

Diameter Eletrical Insulators Other


of the Connections and Connections
bolts Pedestals
3/8” 22 – 29.5 - 15 - 22
1/2” 33 – 37 33 – 40.5 22 – 29.5
5/8” 52 – 59 88.5 – 103 29.5 - 37
3/4” 74 – 88.5 118 - 133 37 - 44
Wave Trap Service - WTS

DISCONNECTING THE EQUIPMENT FROM THE SUBSTATION


Wave Trap Service - WTS
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Passo 1: Montar o andaime com a chave seccionadora
Wave Trap Service - WTS
Working Method

Passo
1. Assemble both MS1:
andMontar
scaffoldo; andaime com a chave seccionadora
2. Clean both conductors Source and load;
3. Connect the jumpers of MS at the side Source;
4. Connect the jumpers of MS at the side load;
5. Install the jumper (bridge pole) at the side source ;
6. Close the MS;
7. Install the bridge pole jumpers at the load side;
8. Open the MS;
9. Open the connector at the load side to increase the insulating distance;
10. Disconnect the jumper of the MS at the load side;
11. Install the jumper at the MS connector at the source side;
12. Close the MS, while energize the WTS and the PT in parallel;
13. Open the conductor at the source side and move it to increase the insulating distance;
14. Open the MS;
15. Disconnect the MS jumpers from the connector source at WTS;
16. Disconnect the MS jumpers from conductor at source side;
17. Disassemble both MS and scaffold.