Contract No. NPP-03C-2019: TDA D3 3 12
Contract No. NPP-03C-2019: TDA D3 3 12
14
7/18/2024 13:46
Contract No. NPP-03C-2019
Tower Type TDA
Foundations Type: D3
No. of Towers 3 Tower # 135,271/272 & 273
Total footings ordered 12
Grade 60 (420 Mpa)
Drawing No. NPP-03C-2019/K2K3-PQMTL/ICC008
CREW: M/s Global Linker Construction Co.
CHIMNEY
Quantity Total
No. of
Bar Cut of bars for Length
Mark Unit weight Bar length Bars per Approx. weight
Size Length 3 of
No. Tower
Towers Bars
# (Kg/m) m (m) (No.s) (Nos.) (m) (Kg)
2 8 3.973 5.363 10.726 6.00 18.0 193.068 767.059
Bars Chimney
Longitudinal
5 8 3.973 5.411 10.822 12.00 36.0 389.592 1547.849
8 8 3.973 5.492 10.984 12.00 36.0 395.424 1571.020
11 8 3.973 5.561 11.122 12.00 36.0 400.392 1590.757
13 8 3.973 5.581 11.162 8.00 24.0 267.888 1064.319
14 3 0.560 3.290 6.580 32.00 96.0 631.68 353.741 Ties
Total Reinforcement Steel (GRADE 60) for Chimney (KG) = 6894.745
PAD
Bottom
15 6 2.235 5.350 10.700 112.0 336.0 3595.200 8035.272
Bars
Top Bars
16 6 2.235 5.447 10.894 44.0 132.0 1438.008 3213.948 (Central
Portion)
19 6 2.235 5.418 10.836 16.0 48.0 520.128 1162.486
Bars Pad
21 6 2.235 5.399 10.798 16.0 48.0 518.304 1158.409 Top
23 6 2.235 5.379 10.758 24.0 72.0 774.576 1731.177
Total Reinforcement Steel (GRADE 60) for Pad (KG) = 15,301.29
Total Reinforcemet steel (GRADE 60) for Chimney + PAD (KG) = 22,196.04
Page 2 of 3