0% found this document useful (0 votes)
163 views6 pages

Risk Assessment of Electrical Installation Risk Assessment

Risk Assessment of Electrical Installation Risk Assessment

Uploaded by

debruynbeer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
163 views6 pages

Risk Assessment of Electrical Installation Risk Assessment

Risk Assessment of Electrical Installation Risk Assessment

Uploaded by

debruynbeer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

DELHI METRO RAIL

CORPORATION
SHE MANAGEMENT SYSTEM LIMITED – CC-04
HAZARD IDENTIFICATION, RISK ASSESSMENT
& CONTROL MEASURES OF
CEC-CICI JV Electrical Installation/ Operations

ELECTRICAL INSTALLATION/OPERATIONS
Sl no Activity Hazard/Im Associated Risk rating Risk Risk Risk/Impact Control measures Final Risk Residu Risk
pact Risk/Imapct(po Level Required Rating al Accept
(source or ssible Probabilit Severity Probabili Severity Factor able
y ty
situation consequences of
with a exposure to
potential hazard)
for harm)
Electrical a) Short a) Can cause 3 3 H 9 1) Depute only licensed 2 3 6 LOW
Installati circuiting electrocutio electrician to perform on
on/Oper n or fire electrical
ations facilities/Operations.
2) Use one socket for one
Operation.
3) Ensure usage of only fully
insulated wires or cables.
4) Do not place bare wire ends
in a socket.
5) Do not use damaged cords
and avoid temporary
connections.
6) Ensure proper earthing of
all machines/equipments.
7) Provide all connections
through ELCB.
DELHI METRO RAIL
CORPORATION
SHE MANAGEMENT SYSTEM LIMITED – CC-04
HAZARD IDENTIFICATION, RISK ASSESSMENT
& CONTROL MEASURES OF
CEC-CICI JV Electrical Installation/ Operations

8) Protect all electrical


cables/instruments from
water and naked flames/fire
source.
ELECTRICAL INSTALLATION/OPERATIONS
Sl Activit Hazard/Impact Associated Risk rating Risk Risk Risk/Impact Control Final Risk Residu Risk
no y (source or situation Risk/Imapct(possible Level measures Required Rating al Accept
with a potential for consequences of Factor able
harm) exposure to hazard) Probabili Severit Probabil Severity
ty y ity

9) Check all connections


before energizing.
10) Do not allow any
electrical cable to lying
on the ground and
prone to damage.
11) Do not lay wire
under carpets, mats or
doorways.
12) Regular inspection
of all electrical
cables/installations
13) Use PPE like Safety
Glove, Goggle, Shoe etc.
while handling with
electrical installations.
DELHI METRO RAIL
CORPORATION
SHE MANAGEMENT SYSTEM LIMITED – CC-04
HAZARD IDENTIFICATION, RISK ASSESSMENT
& CONTROL MEASURES OF
CEC-CICI JV Electrical Installation/ Operations

b) Overloading a) Bursting of 3 3 H 9 1) Display Voltage and 1 3 3 LOW


of Electrical system can occur Current ratings
System which leads to prominently with "
fire DANGER" Signs.
2) Ensure approved
cable size, voltage
grade and type.

ELECTRICAL INSTALLATION/OPERATIONS
Sl Activit Hazard/Impact Associated Risk rating Risk Risk Risk/Impact Control Final Risk Rating Residual Risk
n y (source or Risk/Imapct(possibl Level measures Required Factor Acceptab
e consequences of Probabi Severity Probability Severity
o situation with a lity
le
potential for exposure to hazard)
harm)
3) Switch off the
electrical utilities when
not in use.
4) Do not allow un
authorized connections.
5) Ensure grid wise
distribution of power.
6) Ensure proper
permissions from
competent authorities
for electrical
installations.
DELHI METRO RAIL
CORPORATION
SHE MANAGEMENT SYSTEM LIMITED – CC-04
HAZARD IDENTIFICATION, RISK ASSESSMENT
& CONTROL MEASURES OF
CEC-CICI JV Electrical Installation/ Operations

c) General a) 3 3 H 9 1) Run all the electrical 1 3 3 LOW


Electrical Electrocution/F cables/wires at higher
Hazards, if not ire accidents level and fix them
protected properly to wall
properly hangers etc.
2) Protect all electrical
installations i.e
distribution panel
boards etc. from direct
exposure to rain &
persons.
ELECTRICAL INSTALLATION/OPERATIONS
Sl Activit Hazard/Impact Associated Risk rating Risk Risk Risk/Impact Control Final Risk Rating Residu Risk
n y (source or situation Risk/Imapct(possib Level Factor measures Required al Accepta
Probabili Severity Probabilit Severity
o with a potential for le consequences of Probability Factor ble
ty y
harm) exposure to
hazard)
3) Ensure all cable
joints are not exposed
and waterproof.
4) Provide " DANGER
" boards at electrical
installation points.
DELHI METRO RAIL
CORPORATION
SHE MANAGEMENT SYSTEM LIMITED – CC-04
HAZARD IDENTIFICATION, RISK ASSESSMENT
& CONTROL MEASURES OF
CEC-CICI JV Electrical Installation/ Operations

5) Wherever possible,
provide temporary
fencing all-around the
transformer &
switchgear areas.
6) Mark the path of
U/G electrical cables
to avoid damage
during excavation
operation.
7) Do not allow
excavation activity
without intimation to
electrical authorities.
8) Use PPE while
handling with
electrical installations.
DELHI METRO RAIL
CORPORATION
SHE MANAGEMENT SYSTEM LIMITED – CC-04
HAZARD IDENTIFICATION, RISK ASSESSMENT
& CONTROL MEASURES OF
CEC-CICI JV Electrical Installation/ Operations

RISK FACTOR MATRIX


Probability METHODOLOGY
Probability RISK PRIORITY
4 -Probable-Likely to occur immediately or shortly 1. Identify hazards
3 -Reasonably probable-Probably will occur in time 4 3 2 1 8 - 16 High Risk 2. List hazard event
2 -Remote- May occur in time 3. Calculate risk factor
4 16 12 8 4 5-7 Medium Risk
1 -Extremely remote–Unlikely to occur with initial risk rating
i.e. Probability ×
s Severity
e 4. Detail controls
v 3 12 9 6 3 1-4 Low Risk 5. Calculate residual risk
e factor with final risk
r rating
i 6. Enter risk priority
t 7. Evaluate acceptability
y of risk
2 8 6 4 2

1 4 3 2 1

Severity

4 - Catastrophic – Imminent dangers exist, hazard capable of causing death and illness on a wide scale.
3 - Critical – Hazard can result in serious illness, severe injury, and property and equipment damage.
2 - Marginal – Hazard can cause illness, injury or equipment damage, but the results would not be expected to be serious.
1- Negligible – Hazard will not result in serious injury or illness, remote possibility of damage beyond minor First-aid case.