0% found this document useful (0 votes)
8 views4 pages

BLK Detente

cc

Uploaded by

zaydin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views4 pages

BLK Detente

cc

Uploaded by

zaydin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 4

Air System Sizing Summary for VRV

Project Name: Batiment de congrès CHU Dakhla 07/16/2024


Prepared by: douaa 04:12

Air System Information


Air System Name:................................................VRV Number of zones:......................................................1
Air System Type:.............................Single Zone CAV Floor Area:............................................................45,0 sqm
Location:..........................................Dakhla, Morocco

Sizing Calculation Information


Calculation Months:...................................Jan to Dec Calculation method:.........Transfer Function Method

Central Cooling Coil Sizing Data


Total coil load:.........................................................4,8 kW Load occurs at:..............................................Jul 1700
Total coil load:.........................................................4,8 kW OA DB / WB:.................................................31,4/19,8
Sensible coil load:...................................................4,3 kW Entering DB / WB:.........................................25,0/18,0
Coil airflow:............................................................335 L/s Leaving DB / WB:.........................................14,4/13,7
Sensible heat ratio:.............................................0,894 Coil ADP:..............................................................13,2 C
Area per unit load:...................................................9,3 sqm/kW Bypass Factor:....................................................0,100
Load per unit area:..............................................107,2 W/sqm Resulting RH:..........................................................57 %
Design supply temp:.............................................14,0 C

Central Heating Coil Sizing Data


Max coil load:..........................................................0,0 kW Load occurs at:...............................................Des Htg
Coil airflow:................................................................0 L/s Ent DB / Lvg DB:........................................-17,8/-17,8
Load per unit area:..................................................0,0 W/sqm
Supply Fan Sizing Data
Actual max airflow:.................................................335 L/s Fan motor BHP:....................................................0,00 BHP
Standard airflow:....................................................334 L/s Fan motor kW:......................................................0,00 kW
Actual max airflow per unit area:...........................7,44 L/(s-sqm) Fan static:.............................................................0,00 Pa

Outdoor Ventilation Air Data


Design airflow:.........................................................77 L/s Airflow per person:................................................7,00 L/s/person
Airflow per unit floor area:.....................................1,71 L/(s-sqm)
Space Sizing Data

Space Name Maximum Design Time of Peak Maximum Space Space


Cooling Airflow Load Heating Floor L/(s-sqm)
Sensible kW L/s Load kW Area
sqm
RC-01-Détente 3,6 335 Jun 1800 0,0 45,0 7,44

Block Load 4.15 Page 1 of 4


System Design Load Summary for VRV
Project Name: Batiment de congrès CHU Dakhla 07/16/2024
Prepared by: douaa 04:12

DESIGN COOLING DESIGN HEATING


Jul 1700 Design Heating Day
OA DB / WB 31,4 C / 19,8 C OA DB / WB 22,4 C / 7,1 C
Zone Loads based on TFM Details Sensible W Latent W Details Sensible W Latent W
Window and Skylight Solar Loads 4 sqm 281 - 4 sqm - -
Wall Transmission 47 sqm 1006 - 47 sqm 0 -
Roof Transmission 0 sqm 0 - 0 sqm 0 -
Window Transmission 4 sqm 141 - 4 sqm 0 -
Skylight Transmission 0 sqm 0 - 0 sqm 0 -
Door Loads 0 sqm 0 - 0 sqm 0 -
Floor Transmission 45 sqm 0 - 45 sqm 0 -
Partitions/Ceilings 45 sqm 25 - 45 sqm 0 -
Overhead Lighting 360 W 360 - 0W 0 -
Electric Equipment 900 W 900 - 0W 0 -
People 11 825 605 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>>Total Zone Loads - 3539 605 - 0 0
Thermostat and Pulldown Adjustment - 8 0 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Ventilation Load 77 L/s 766 -93 77 L/s -409 0
Supply Fan Load 335 L/s 0 - 335 L/s 0 -
>> Total System Loads - 4312 511 - -409 0
Central Cooling Coil - 4312 512 - -409 0
Central Heating Coil - 0 - - 0 -
>> Total Coil Loads - 4312 512 - -409 0
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Block Load 4.15 Page 2 of 4


Zone Design Load Summary for VRV
Project Name: Batiment de congrès CHU Dakhla 07/16/2024
Prepared by: douaa 04:12

RC-01-Détente DESIGN COOLING DESIGN HEATING


Jun 1800 Design Heating Day
OA DB / WB 30,2 C / 19,6 C OA DB / WB 22,4 C / 7,1 C
Thermostat Setpoint 23,0 C Thermostat Setpoint 18,0 C
Zone Loads based on TFM Details Sensible W Latent W Details Sensible W Latent W
Window and Skylight Solar Loads 4 sqm 335 - 4 sqm - -
Wall Transmission 47 sqm 1085 - 47 sqm 0 -
Roof Transmission 0 sqm 0 - 0 sqm 0 -
Window Transmission 4 sqm 123 - 4 sqm 0 -
Skylight Transmission 0 sqm 0 - 0 sqm 0 -
Door Loads 0 sqm 0 - 0 sqm 0 -
Floor Transmission 45 sqm 0 - 45 sqm 0 -
Partitions/Ceilings 45 sqm 5 - 45 sqm 0 -
Overhead Lighting 360 W 360 - 0W 0 -
Electric Equipment 900 W 900 - 0W 0 -
People 11 825 605 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 3633 605 - 0 0

Block Load 4.15 Page 3 of 4


System PsychrometricsforVRV
Project Name: Batiment de congrès CHU Dakhla 07/16/2024
Prepared by: douaa 04:12

Location: Dakhla, Morocco


Altitude: 11,0 m
Data for: Jul DESIGN COOLING DAY, 1700
0,020
1. Outdoor Air
2. Mixed Air
3. Central Cooling Coil Outlet
4. Supply Fan Outlet 0,018
5. Room Air

0,016

0,014

Specific Humidity ( kg/kg )


0,012

5 2 0,010
4
3 1

0,008

0,006

0,004

0,002

0,000
0 10 20 30
Temperature (C)

Block Load 4.15 Page 4 of 4