Accomplishment Report Project Grade 2
Accomplishment Report Project Grade 2
Department of Education
REGION IX
SCHOOLS DIVISION OF ZAMBOANGA SIBUGAY
GUINTOLAN ELEMENTARY SCHOOL
P2, GUINTOLAN, IMELDA, ZAMBOANGA SIBUGAY
Introduction
In pursuit of creating a safer and more comfortable environment for our school
community, we propose a project aimed at installing window grills and window blinds
throughout the premises. Our school's commitment to ensuring the well-being and
security of students, faculty, and staff motivates us to undertake this initiative.
Through this proposal, we aim not only to enhance safety and comfort but also to
uphold our responsibility to provide a nurturing and secure atmosphere conducive to
learning and growth.
Rationale
The installation of window grills and window blinds is essential to address critical
safety and environmental concerns within our school community. The primary
rationale behind this project encompasses several key factors:
Window grills provide a crucial safety barrier, particularly for younger students in
Grade 2 who may be curious or unaware of potential dangers associated with open
windows. By installing grills, we mitigate the risk of accidents such as falls, thereby
creating a secure learning environment.
Window blinds play a significant role in regulating natural light and maintaining a
comfortable indoor temperature. This contributes to a conducive learning
atmosphere by reducing glare, controlling heat during warmer months, and providing
privacy during instructional activities.
The well-being of our school community, including students, teachers, and staff, is a
priority. By addressing safety and environmental concerns through the installation of
grills and blinds, we demonstrate our commitment to fostering a supportive and
secure environment where everyone can thrive.
Objectives
Scope of Work
Preparation Phase
Procurement of Materials
Installation Process
Quality Assurance
4. Project Timeline
Budget Estimate
Item Quantity Cost per Item Total Cost
Window Blinds 1 pc 650.00 650.00
Rope 13 mtrs 7.00 100.00
Steel Matting 3 pcs 790.00 2,370.00
2mm Square bars 2 length 175.00 350.00
labor 1 day 1000 1,000.00
Total P4,470.00
Key Stakeholders
Conclusion
The installation of window grills and window blinds represents a significant step
forward in enhancing the safety, security, and environmental comfort of our school
community, particularly within Grade 2 classrooms and administrative areas. By
undertaking this project, we have addressed critical concerns related to
Noted by:
GABRIEL T GALLEPOSO,PhD
School Principal IV
Introduction
In response to the evolving needs of enhancing both security and aesthetics within
our residential and commercial spaces, the installation of window grills and window
blinds has emerged as a crucial aspect of our property management strategy. This
report outlines the comprehensive process and outcomes of our recent endeavors in
successfully implementing these enhancements across various locations. By
integrating sturdy window grills and stylish blinds, we aimed to achieve not only
heightened security measures but also a more refined and appealing interior
environment. This report details the methodologies, challenges faced, and the
ultimate successes achieved in this vital aspect of property improvement.
Objectives Achieved
Budget Estimate
Item Quantity Cost per Item Total Cost
Item Quantity Cost per Item Total Cost
Window Blinds 1 pc 650.00 650.00
Rope 13 mtrs 7.00 100.00
Steel Matting 3 pcs 790.00 2,370.00
2mm Square bars 2 length 175.00 350.00
labor 1 day 1000 1,000.00
Total P4,470.00
Challenge: Aligning installation activities with the school's academic calendar and
activities presented logistical challenges.
Solution: We collaborated closely with school administrators to schedule installation
during breaks and non-teaching hours to minimize disruption to classroom activities.
This proactive approach ensured smooth execution while respecting the school's
operational needs.
Stakeholder Feedback
Conclusion
The installation of window grills and blinds in the Grade 2 classrooms of Guintolan
Elementary School marks a significant milestone in our commitment to enhancing
safety and comfort within educational environments. Throughout this project, we
As a result of our collaborative efforts with school stakeholders and the local
community, this project stands as a testament to what can be achieved through
collective action and shared vision. Moving forward, we remain committed to
sustaining these improvements and exploring new opportunities to support
educational excellence and student well-being.
Recommendations
T-I MT-1
Noted by:
GABRIEL T GALLEPOSO,PhD
School Principal IV