GYANODAYA SECONDARY SCHOOL

KHAJURA -3, BANKE


Terminal Examination-2081
Sub: Estimation Costing and Supervision I
Grade: 10 (Civil Engineering) F.M: 50
Time: 2Hrs. P.M:
Attempt all the questions. The figure in the margin indicates full marks.

Group A

Choose the best alternative to the given questions and write in answer sheet. [9*1=9]

1) In which basis preliminary estimate is prepared?

A) Cost of similar work C) Government rate

B) District rate D) Plinth area of building

2) What is unit of measurement of “Door Shutter”?

A) m B) m2 C) m3 D) m4

3) What is unit of measurement of “earthwork” is

A) m B) m2 C) m3 D) m4

4) What is volume of rectangular trench having length, width, and depth 75m, 15m and 3m
respectively?

A) 1125 m3 B) 1125cm3 C) 1225m3 D) 1300 m3

5) Deduction in centerline for “T junction” of wall is?

thickness of wall
A) thickness of wall B) C) 2∗(thickness of wall) D) none
2

6) Supplementary and revised estimate is………. than actual estimate?

A) more B) less C) equal D) 5 times

7) Choose the correct Prismoidal formula:

1
A) Amean = ∗( A 1+ A 2+ 4∗Am)
6

1
B) Amean = ∗( A 1+ A 2+4∗Am)
3

1
C) Amean = ∗( A 1+ A 2+ Am)
3

1
D) Amean = ∗( A 1+ A 2+ Am)
6

8) Which estimate is most accurate estimate?

A) Preliminary B) Detail C) Plinth Area D) All


9) Deduction in centerline for “Cross junction” of wall is?

thickness of wall
A) thickness of wall B) C) 2∗(thickness of wall) D) none
2

Group B

Give short answer to the following question. [5*5=25]

10) What is estimation. Write down importance of estimation.

11) Write down different type of estimate and explain any three of them.

12) What are three different formulas used in quantity calculation of regular trench. Write in brief.

13) What are different methods used in building estimate. Explain long wall-short wall and centerline
method.

14) Draw the section of wall showing roof to foundation and show different item.

Group C

Give long answer to following question.

15) Based on following figure calculate different quantity of work


Note: Size of Door (1m*2.1m) Size of Window (W1) 1.5m*1.5m Size of Window (W2) 2m*2m

a) Earthwork in Excavation and filling in foundation [2]

b) Filling of earth up to plinth level and floor finishing work [2]

c) Brick soiling and PCC work in foundation [2]

d) Brickwork in foundation up to plinth level [2]

e) Size of opening and RCC quantity for slab [2]

f) Brickwork in superstructure with parapet and deduction for Door and Windows [3]

g) Plaster in super structure with deduction [3]