0% found this document useful (0 votes)
19 views

4001.10 Issue 1

Uploaded by

ingesuministros
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

4001.10 Issue 1

Uploaded by

ingesuministros
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Test Code

Sheet 4 0 0 1 10
Number

WRAS TEST & ACCEPTANCE CRITERIA Issue No: 1


Date of issue: June 2010

Sheet 1 of 1

TEST CODE SHEET

1. TYPE OF TEST

Leak tightness of waste outlet with push down pop-up waste mechanism (non-adjustable click type)

2. WATER REGULATIONS REQUIREMENTS FOR FITTINGS

Schedule 2.28

(1) Subject to paragraph (2), every bath, wash basin, sink or similar appliance shall be provided with a watertight
and readily accessible plug or other device capable of closing the waste outlet.

3. TEST PROCEDURE

Note Unless otherwise stated the temperature of the test water shall be 20 ± 10°C

3.1 Tests applicable to the following:-

Waste outlet with push down pop-up waste mechanism


NOTE: Not applicable to pop up wastes operated via a linkage mechanism

____________________________________________________________________________________________________

Waste outlets with push down pop up waste


(Derived from BS EN 274-2 2002, Clause 6.1)

TEST METHOD

(i) Fit the waste outlet to the bottom of a test tank with pop-up waste in the closed position (size of test tank base -
400mm x 100 mm minimum)
(ii) Fill the test tank with the water to a height of at least 120mm and collect any water, which flows through the waste
outlet during a period of 1 hour.
(iii) Measure the quantity of water collected
(iv) Place the outlet and pop waste on a rig capable of operating the mechanism, actuate the pop-up waste for 50,000
cycles ensuring the mechanism is kept wet for the duration of the test.
CLOSED-OPEN-CLOSED constitutes 1 cycle
(v) Repeat steps (i) to (iii)

4. ACCEPTANCE CRITERIA

The leakage rate shall be less than 1 litre/hour before and after endurance when tested in accordance with items (i)