Struct Calcs May 2021
Struct Calcs May 2021
May 2021
DESIGN CODES AND STANDARDS
The Structural design for the residential house has been carried out on the basis of the
design codes and standards listed below:
DESIGN SOFTWARE
DESIGN PARAMETERS
Assumed ground bearing pressure (Rock) -300KN/m2
Concrete class -C25
COLUMN BASES
COLUMN BASE F1-2300X2300X600
Columns: 1C3, 1C12
bx = 300.0 mm by =
300.0 mm
Effects: Column = 1C12 - Critical Combination
= 7 ((G+Q)P32 *F)
N = -1980.2 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 2300.0 mm Ly =
2300.0 mm
h = 600.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 401.750 kN/m2 S-min =
401.750 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
1200.00 mm2/m
X Dir: Footing Design: M =
200.9 kN.m/m
K/K' = 0.17 < 1.0
As = 1200.00 mm2/m H16-150
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.73 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.33 N/mm2 < vc =
0.39 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 2089.1 kN V-eff =
2089.1 kN
v = 3.20 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 625.7 kN V-eff =
625.7 kN
v = 0.15 N/mm2 < vc =
0.39 N/mm2
Y Dir: Footing Design: M =
200.9 kN.m/m
K/K' = 0.18 < 1.0
As = 1200.00 mm2/m H16-150
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
1
v = 0.75 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.35 N/mm2 < vc =
0.40 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 2089.1 kN V-eff =
2089.1 kN
v = 3.20 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 625.7 kN V-eff =
625.7 kN
v = 0.15 N/mm2 < vc =
0.40 N/mm2
2
COLUMN BASE F2 -2000X2000X500
Columns: 1C9, 1C21, 1C20, 1C18, 1C19
bx = 300.0 mm by =
300.0 mm
Effects: Column = 1C21 - Critical Combination
= 1 (G+Q *F)
N = -1322.9 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 2000.0 mm Ly =
2000.0 mm
h = 550.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 356.877 kN/m2 S-min =
356.877 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
1100.00 mm2/m
X Dir: Footing Design: M =
128.9 kN.m/m
K/K' = 0.13 < 1.0
As = 1100.00 mm2/m H16-175
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.60 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.25 N/mm2 < vc =
0.39 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1395.4 kN V-eff =
1395.4 kN
v = 2.35 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 294.2 kN V-eff =
294.2 kN
v = 0.08 N/mm2 < vc =
0.39 N/mm2
Y Dir: Footing Design: M =
128.9 kN.m/m
K/K' = 0.14 < 1.0
As = 1100.00 mm2/m H16-175
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
1
v = 0.62 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.27 N/mm2 < vc =
0.39 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1395.4 kN V-eff =
1395.4 kN
v = 2.35 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 294.2 kN V-eff =
294.2 kN
v = 0.08 N/mm2 < vc =
0.39 N/mm2
2
COLUMN BASE F3 -1700X1700X500
Columns: 1C8, 1C15
bx = 300.0 mm by =
300.0 mm
Effects: Column = 1C15 - Critical Combination
= 10 ((G+Q)P51 *F)
N = -1112.6 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 1700.0 mm Ly =
1700.0 mm
h = 450.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 408.648 kN/m2 S-min =
408.648 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
900.00 mm2/m
X Dir: Footing Design: M =
100.1 kN.m/m
K/K' = 0.16 < 1.0
As = 900.00 mm2/m H16-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.71 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.30 N/mm2 < vc =
0.40 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1144.2 kN V-eff =
1144.2 kN
v = 2.42 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 283.5 kN V-eff =
283.5 kN
v = 0.12 N/mm2 < vc =
0.40 N/mm2
Y Dir: Footing Design: M =
100.1 kN.m/m
K/K' = 0.17 < 1.0
As = 900.00 mm2/m H16-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
1
v = 0.74 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.33 N/mm2 < vc =
0.41 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1144.2 kN V-eff =
1144.2 kN
v = 2.42 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 283.5 kN V-eff =
283.5 kN
v = 0.12 N/mm2 < vc =
0.41 N/mm2
2
COLUMN BASE F4 -1600X1600X450
Column: 1C13
bx = 200.0 mm by =
400.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -988.4 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 1600.0 mm Ly =
1600.0 mm
h = 450.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 409.757 kN/m2 S-min =
409.757 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
900.00 mm2/m
X Dir: Footing Design: M =
100.4 kN.m/m
K/K' = 0.16 < 1.0
As = 900.00 mm2/m H16-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.71 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.30 N/mm2 < vc =
0.40 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1016.2 kN V-eff =
1016.2 kN
v = 2.15 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 153.1 kN V-eff =
153.1 kN
v = 0.07 N/mm2 < vc =
0.40 N/mm2
Y Dir: Footing Design: M =
73.8 kN.m/m
K/K' = 0.13 < 1.0
As = 900.00 mm2/m H16-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.64 N/mm2 < v-max =
1
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.23 N/mm2 < vc =
0.41 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1016.2 kN V-eff =
1016.2 kN
v = 2.15 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 153.1 kN V-eff =
153.1 kN
v = 0.07 N/mm2 < vc =
0.41 N/mm2
2
COLUMN BASE F5 -1400X1400X400
Columns: 1C6, 1C2
bx = 300.0 mm by =
300.0 mm
Effects: Column = 1C6 - Critical Combination
= 8 ((G+Q)P41 *F)
N = -762.6 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly =
1400.0 mm
h = 350.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 410.270 kN/m2 S-min =
410.270 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
700.00 mm2/m
X Dir: Footing Design: M =
62.1 kN.m/m
K/K' = 0.17 < 1.0
As = 700.00 mm2/m H12-150
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.74 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.33 N/mm2 < vc =
0.43 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 767.2 kN V-eff =
767.2 kN
v = 2.15 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 219.2 kN V-eff =
219.2 kN
v = 0.15 N/mm2 < vc =
0.43 N/mm2
Y Dir: Footing Design: M =
62.1 kN.m/m
K/K' = 0.19 < 1.0
As = 700.00 mm2/m H12-150
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
1
v = 0.77 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.36 N/mm2 < vc =
0.44 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 767.2 kN V-eff =
767.2 kN
v = 2.15 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 219.2 kN V-eff =
219.2 kN
v = 0.15 N/mm2 < vc =
0.44 N/mm2
2
COLUMN BASE F6 -1200X1200X300
Column: 1C1
bx = 300.0 mm by =
300.0 mm
Effects: Critical Combination = 3 ((G+Q)P12
*F)
N = -357.9 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly =
1200.0 mm
h = 300.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 268.462 kN/m2 S-min =
268.462 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
600.00 mm2/m
X Dir: Footing Design: M =
27.2 kN.m/m
K/K' = 0.11 < 1.0
As = 600.00 mm2/m H12-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.48 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.21 N/mm2 < vc =
0.45 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 362.4 kN V-eff =
362.4 kN
v = 1.22 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 94.0 kN V-eff =
94.0 kN
v = 0.09 N/mm2 < vc =
0.45 N/mm2
Y Dir: Footing Design: M =
27.2 kN.m/m
K/K' = 0.12 < 1.0
As = 600.00 mm2/m H12-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.50 N/mm2 < v-max =
4.00 N/mm2
1
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.23 N/mm2 < vc =
0.46 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 362.4 kN V-eff =
362.4 kN
v = 1.22 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 94.0 kN V-eff =
94.0 kN
v = 0.09 N/mm2 < vc =
0.46 N/mm2
2
COLUMNS
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-1
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-2
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-3
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-4
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-5
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-6
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-7
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-8
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-9
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-10
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-11
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-12
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-13
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-14
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-15
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-16
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-17
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-18
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-19
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-20
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-21
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-22
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-23
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-24
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-25
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-26
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-27
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-28
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-29
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-30
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-31
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-32
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-33
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-34
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-35
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-36
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-37
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-38
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-39
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-40
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-41
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-42
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-43
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-44
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-45
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-46
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-47
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-48
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-49
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-50
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-51
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-52
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-53
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-54
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-55
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-56
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-57
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-58
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-59
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-60
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-61
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-62
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-63
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-64
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-65
Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
STAIRCASE
Job Number Sheet
QL-21-01 ST-01
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Continuous Beam: STAIRCASE (Code of Practice : BS8110 - 1997)
5/31/2021 11:44:12 AM C01
Input Tables
fcu (MPa) 20
fy (MPa) 500
fyv (MPa) 500
% Redistribution 0
Downward/Optimized redistr. D
Cover to centre top steel(mm) 25
Cover to centre bot.steel(mm) 25
Dead Load Factor 1.4
Live Load Factor 1.6
Density of concrete (kN/m3) 24
% Live load permanent 25
Ø (Creep coefficient) 2
Ecs (Free shrinkage strain) 300E-6
1 1150 175
1 3.65 1
D 1 3.5
L 1 2
Sections
1150
175
SECTION 1
Beam Elevation
SPAN 1
1 2
Live
2.00
Dead+
8.33
Own W
3.650
Job Number Sheet
QL-21-01 ST-03
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
.400
.600
.800
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
.500
1.00
1.50
Long-term Deflections (All spans loaded - using entered reinforcement) Def max = 13.94mm @ 1.82m
.200
.400
.600
.800
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
2.00
4.00
6.00
8.00
10.0
12.0
14.0
20.0
10.0
.200
.400
.600
.800
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
-10.0
-20.0
.400
.600
.800
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
5.00
10.0
15.0
20.0
25.0
.800
.600
.400
.200
.200
.400
.600
.800
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
.400
.600
.800
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
100
200
300
400
Job Number Sheet
QL-21-01 ST-04
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
=====================================================================
C O N T I N U O U S B E A M Ver W3.0.24 - 03 Oct 2017
Title : STAIRCASE
Data File : E:\QUEST LINKS ENGINEERING\2021\QL-21-01- JUJA APARTMENTS_GT\STRUCTURAL\CALCULATIO
Date/Time : 5/31/2021
Code of Practice : BS8110 - 1997
=====================================================================
SPAN 1
---------------------------------------------------------------------
SPAN 1
Job Number Sheet
QL-21-01 ST-05
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Position(m) Minimum Maximum Shear Asv/Sv Asv/Sv(nom)
Shear(kN) Shear(kN) Capacity(kN) (mm2/mm) (mm2/mm)
---------------------------------------------------------------------
COLUMN REACTIONS
---------------------------------------------------------------------
Columns below
Columns above
---------------------------------------------------------------------
SPAN 1
---------------------------------------------------------------------
Job Number Sheet
QL-21-01 ST-07
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
SPAN 1
---------------------------------------------------------------------
QUANTITIES
Section Area(m²)
1 0.201
COLUMN REACTIONS
---------------------------------------------------------------------
Columns below
Columns above
---------------------------------------------------------------------
Job Number Sheet
QL-21-01 ST-09
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcing Tables
Beam type (1-5) 2
Maximum bar length (m) 12
TOP: Minimum bar diameter (mm) 12
Maximum bar diameter (mm) 16
BOTTOM: Minimum bar diameter (mm) 12
Maximum bar diameter (mm) 16
STIRRUP: Minimum diameter (mm) 8
Maximum diameter (mm) 16
Stirrup shape code 72
First bar mark - top A
First bar mark - mid.[optional]
First bar mark - bot.[optional]
Cover to stirrups - top (mm) 30
Cover to stirrups - bot (mm) 30
Cover to stirrups - sides (mm) 25
Minimum stirrups as % of nominal 100
Loose method of detailing (Y/N) N
Exploded elevation (Y/N) Y
Bending schedule scale 1: Auto
Number bars from left to right (Y/N) Y
Middle bar diameter (mm) Auto
Target Padds
Stirrup Length
Number Spacing Span Offset (m)
Section positions
Label Span Offset(m)
A 1 2.0
SPAN 1 - 3.650
6Y10-A
.400
.600
.800
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
100
200
300
400
SPAN 1 - 3.650
.800
.600
.400
.200
.200
.400
.600
.800
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
TYPICAL FLOOR
BEAMS
TYPICAL FLOOR SLAB
Job Number Sheet
QL-21-01 S1-01
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Rectangular Slab Panel Design : TYPICAL FLOOR SLAB (5.2X3.2) -GRIDS (C-B)/ (1-2)
C04
Input Data
Lx (m) 5.2
Ly (m) 3.2
Slab depth (mm) 150
deff X-dir (mm) 124
deff Y-dir (mm) 114
Poisson's ratio 0.2
fcu (MPa) 20
fy (MPa) 500
Density (kN/m3) 24
Self weight LF 1.4
e - time factor 2
(ACI318 :9.5.2.5)
Load Cases
1 1.4 1.5
1.6 2
Sketch of slab
BS8110 - 1997
Y
Lx=5.20
Ly=3.20
Total UDL =
LOAD CASE 1
Position Wood-Armer Moments (kNm/m) Reinforcement (mm²/m)
Top Bottom Top Bottom
X (m) Y(m) X Y X Y X Y X Y
Deflections
0.04
0.04
0.06
0.02
0.06 0.08
0 .1
0.16 0.1 0
0.18 2
0.0 4
0.1 0.14
6
0.0
2
0.20 6
0.0
0.22
20 0.24
0.06
18 0. 22
0.08
0.26
0.10
0.
0.04
0.
0.22
0.06
6
0.04
0.02
0.1
0.12
0.10 0.12
0.08 0.10 0 2
0.06 0.
BS8110 - 1997
Top:LC 1 (kNm/m)
1.00
0.50
0
0.50 1.5
50
00
0.
1.
1.50
1.00
0.50
0.50
1.00
0.50
1.
50
1.00
1.00
1.50 1.5
0
BS8110 - 1997
Top:LC 1 (kNm/m)
4.00 4.00
3.00 3.00
2.00 2.00
0 0
1.
1.
00
1.00 1.00
5.00 4.0
6.00 5.0 0
7.00 0
0
6
0
7.0 .00
2. 0
3. 0
0
8.00 0
1. 0
BS8110 - 1997
Bot:LC 1 (kNm/m)
00.4.20
0.20.400
100.8.600
0..680
1.6 .4020 00
1
0
0 .00
1 .
1 0
. 0 0
1..240
1 .60
0.2
1 .80
1
0
0.8 1.60
1.0 0
1.200
2.20
1.80
2.00
1.40
1.80
0.20
0
0.40
2 .0
1.6
0 0 1.80
1.8 2.0 .20
40
1.
1.0
0.8 0
0.600
0.20.4600
0
60 . 4 0 0
0..80
0.20.40
0 .00
0
1 0
1. 1 1.2.00
1..240
1 .60
1 .80
1
1
0
0.4 .20
0
BS8110 - 1997
Bot:LC 1 (kNm/m)
0.50
0.50
1.00
1.00
1.50 2.00
2.00 2.50
00
2.50
3.00 3.00
2.
4.0
0.50
0
0
1.00
3.5
1.50
3.50
0
3.00
2. 0
1.50
1.00
1.000.50
BS8110 - 1997
Top:LC 1 (mm²/m)
10
10 30
10
20
30
20
10
10
20
10
30
20
20
30 30
BS8110 - 1997
Top:LC 1 (mm²/m)
80 80
60 60
40 40
20
20
20 20
100 80
120 1 00
140 1 20
60
160 1 40
40
20
BS8110 - 1997
Bot:LC 1 (mm²/m)
15
150
5
2
10
2 0
15
30 5
20
25
5
30
35
15
20
25 35
40
30
35
5
40
20
35
35 40
30
25
15
30 5 10
5 0
1
15
2 0 5
20
25
30
2
5 35
BS8110 - 1997
Bot:LC 1 (mm²/m)
10
20
10
20
30 40
40 50
50
40
60 60
70 70
50
80
10
90
20
70
30
40
70
50
70
30
20
20 10
0.04
0.04
0.06
0.02
0.06 0.08
0.1
0.16 0.1 0
0.18 2
0.0 4
0.1 0.14
6
0.0
2
0.20 6
0.0
0.22
20 0.24
0.06
18 0. 22
0.08
0.26
0.10
0.
0.04
0.
0.22
0.06
6
0.04
0.02
0.1
0.12
0.10 0.12
0.08 0.10 0 2
0.06 0.
Wood-Armer Moments:
BS8110 - 1997
Envelope : Max. Top (kNm/m)
1.00
0.50
0
0.50 1.5
50
00
0.
1.
1.50
1.00
0.50
0.50
1.00
0.50
1.
50
1.00
1.00
1.50 1.5
0
BS8110 - 1997
Envelope : Max. Top (kNm/m)
4.00 4.00
3.00 3.00
2.00 2.00
0 0
1.
1.
00
1.00 1.00
5.00 4.0
6.00 5.0 0
7.00 0
0
6
0
7.0 .00
2. 0
3. 0
0
8.00 0
1. 0
BS8110 - 1997
Envelope : Max. Bot (kNm/m)
00.4.20
0.20.400
100.8.600
0..680
1.61.410.20.000
0
0 .00
1 0
0
1..240
1 .60
0.2
1 .80
1
0.8 1.60
1.0 0
1.200
2.20
1.80
2.00
1.40
1.80
0.20
0
0.40
2 .0
1.6
0 0 1.80
1.8 2.0 .20
40
1.
1.0
0.8 0
0.6 0
0.20.4600
0
60 . 4 0 0.400
0..80
0 .00
0
1 0
1. 1 1.2.00 0.20
1..240
1 .60
1 . 80
1
0
0.4 .20
0
BS8110 - 1997
Envelope : Max. Bot (kNm/m)
0.50
0.50
1.00
1.00
1.50 2.00
2.00 2.50
00
2.50
3.00 3.00
2.
4.0
0.50
0
1.00
3.5
1.50
3.50
0
3.00
2. 0
1.50
1.00
. 0 0
1 0.50
BS8110 - 1997
Envelope : Max. Top (mm²/m)
10
10 30
10
20
30
20
10
10
20
10
30
20
20
30 30
BS8110 - 1997
Envelope : Max. Top (mm²/m)
80 80
60 60
40 40
20
20
20 20
100 80
120 1 00
140 1 20
60
160 1 40
40
20
BS8110 - 1997
Envelope : Max. Bot (mm²/m)
15
150
5
30 25 20
10
15
20
25
5
30
35
15
20
25 35
40
30
35
5
40
20
35
35 40
30
25
15
30 5 10
5 0
1
15
2 0 5
20
25
30
2
35
BS8110 - 1997
Envelope : Max. Bot (mm²/m)
10
20
10
20
30 40
40 50
50
40
60 60
70 70
50
80
10
90
20
70
30
40
70
50
70
30
20
20 10
0.04
0.04
0.06
0.02
0.06 0.08
0.1
0.16 0.1 0
0.18 2
0.0 4
0
6
0.1 .14
0.0
2
0.20 6
0.0
0.22
20 0.24
0.06
18 0. 22
0.08
0.26
0.10
0.
0.04
0.
0.22
0.06
6
0.04
0.02
0.1
0.12
0.10 0.12
0.08 0.10 0 2
0.06 0.
BS8110 - 1997
Envelope : Min. Top (kNm/m)
1.00
0.50
0
0.50 1.5
50
00
0.
1.
1.50
1.00
0.50
0.50
1.00
0.50
1.
50
1.00
1.00
1.50 1.5
0
BS8110 - 1997
Envelope : Min. Top (kNm/m)
4.00 4.00
3.00 3.00
2.00 2.00
0 0
1.
1.
00
1.00 1.00
5.00 4.0
6.00 5.0 0
7.00 0
0
6
0
7.0 .00
2. 0
3. 0
0
8.00 0
1. 0
BS8110 - 1997
Envelope : Min. Bot (kNm/m)
00.4.20
0.20.400
100.8.600
0..680
1.6 .4020 00
1
0
0 .00
1 .
1 0
. 0 0
1..240
1 .60
0.2
1 .80
1
0
0.8 1.60
1.0 0
1.200
2.20
1.80
2.00
1.40
1.80
0.20
0
0.40
2 .0
1.6
0 0 1.80
1.8 2.0 .20
40
1.
1.0
0.8 0
0.600
0.20.4600
0
60 . 4 0 0
0..80
0.20.40
0 .00
0
1 0
1. 1 1.2.00
1..240
1 .60
1 .80
1
1
0
0.4 .20
0
BS8110 - 1997
Envelope : Min. Bot (kNm/m)
0.50
0.50
1.00
1.00
1.50 2.00
2.00 2.50
00
2.50
3.00 3.00
2.
4.0
0.50
0
0
1.00
3.5
1.50
3.50
0
3.00
2. 0
1.50
1.00
1.000.50
BS8110 - 1997
Envelope : Min. Top (mm²/m)
10
10 30
10
20
30
20
10
10
20
10
30
20
20
30 30
BS8110 - 1997
Envelope : Min. Top (mm²/m)
80 80
60 60
40 40
20
20
20 20
100 80
120 1 00
140 1 20
60
160 1 40
40
20
BS8110 - 1997
Envelope : Min. Bot (mm²/m)
15
150
5
2
10
2 0
15
30 5
20
25
5
30
35
15
20
25 35
40
30
35
5
40
20
35
35 40
30
25
15
30 5 10
5 0
1
15
2 0 5
20
25
30
2
5 35
BS8110 - 1997
Envelope : Min. Bot (mm²/m)
10
20
10
20
30 40
40 50
50
40
60 60
70 70
50
80
10
90
20
70
30
40
70
50
70
30
20
20 10
Offset
ability and layout.
Offset
Rebar Excess:
Offset
-150 -150
9Y10-E-400 (B1) (Bar 1)
-250
-200
Offset -10
0
0
-50
- 15
-50
Offset
Offset
ability and layout.
-1 9
0 Offset
-19
-
-17 180
-18
-17
0
0
-160
-180
60
-1 -160
70
-1
-180
-19
7 0
-18
-1 -190
-17
0
0
0
Offset
0
- 19
Offset
Rebar Excess:
Offset
-180
-180
-160
-140 -140
06
-1
-180
0
-160
- 12
-120
60
-1
-160
-180
Offset
Offset
Lx (m) 8.2
Ly (m) 3.2
Slab depth (mm) 150
deff X-dir (mm) 124
deff Y-dir (mm) 114
Poisson's ratio 0.2
fcu (MPa) 20
fy (MPa) 500
Density (kN/m3) 24
Self weight LF 1.4
e - time factor 2
(ACI318 :9.5.2.5)
Load Cases
1 1.4 1.5
1.6 2
Sketch of slab
BS8110 - 1997
Y
Lx=8.20
Ly=3.20
Total UDL =
LOAD CASE 1
Position Wood-Armer Moments (kNm/m) Reinforcement (mm²/m)
Top Bottom Top Bottom
X (m) Y(m) X Y X Y X Y X Y
Deflections
0.0
0.06 0 2
0.06 0.08 0.0 .04
0.08 6
0.16 0.16
4 06 8 0.18 0.18
02 .0 0. .010 0.20
0. 0 00. 0.22 0.22 0.20
0
0.26 0 .1
4
0.20.26 0.28 0. 0.20. 10.1 .142
22 0 8 6
0.24
0.10
0.08
0.06
0.22
0.04
0.02
0.1
0.12 4 0.14
0.12 6
0.08 0.10 0.10 0.0
BS8110 - 1997
Top:LC 1 (kNm/m)
0.80 0.80
0.60
1.00
0.60
0.80
0.40
0.60
0.40
0 0
80 .6 .4 20
0. 0 0 0.
0.20 0
0.40 0.20 0.06.8.000
1
1.00 1.00
1.20 1.20
1.40 1.40
1.00
0.80
1.60 1.60
0.60
BS8110 - 1997
Top:LC 1 (kNm/m)
00
1.
5.00
6.00 5.00
7.00 6.00
7.00
4. .00
8.00
00
8.00
00
00
3
2.
1.
BS8110 - 1997
Bot:LC 1 (kNm/m)
0
0.600.40.20
00
0.20
1.8
0.40
10.0
0.60
0 00
0.80
.2
1.4 1.6
0 0.40
2.0 0.60 0 .00 0
0.8 1 1.2
1.40
0
0 1.8 .60
1.60
1.80
2 .0
2.00
1.00 1
0.80
1. 2 0
2.00
1. 0 0
0. 8 0
1
0 1 .8
0.08.6.04020 1. 1.2 1.4 .60 0
00. 00 0 0
0.20
BS8110 - 1997
Bot:LC 1 (kNm/m)
0.510.00
1.50 1.50
2.00
0 2.00 2.50
2.0 .50 2.50
3.00 3.00
2
4.00
4.00
2.50
3.00
4.50
3.50
4.00
0
3.50 3.50
0
2 .5
2 .0
1.00 1.5
0.50 0.5 1.00 0
0
BS8110 - 1997
Top:LC 1 (mm²/m)
15 15
10
20
10
15
5
10
0
15 1 5
5 1015
20
20 20
25 25
30 30
20
15
10
BS8110 - 1997
Top:LC 1 (mm²/m)
100
80 100 60
80
4060 4060 40
20
20 20
20
120
140 120
160 140
180160
800
180
40
6
20
BS8110 - 1997
Bot:LC 1 (mm²/m)
105
21025530
10
5
15
5
10
40 15 20 25
35 0
30
40
35
3
40
25
40 15
20
3
1510 3 5
5 20 25 0
5
BS8110 - 1997
Bot:LC 1 (mm²/m)
10 20
30 4030
40 0 40
50 50
5 70 60 60
70
90
60
90
50
70
80
80 80
50
70
40
20 30
10 10 20
0.0
0.06 0 2
0.06 0.08 0.0 .04
0.08 6
0.16 0.16
4 06 8 0.18 0.18
02 .0 0. .010 0.20
0. 0 00. 0.22 0.22 0.20
0
0.26 0 .1
4
0.20.26 0.28 0. 0.20.10.1 . 142
22 0 8 6
0.24
0.10
0.08
0.06
0.22
0.04
0.02
0.1
0.12 4 0.14
0.12 6
0.08 0.10 0.10 0.0
Wood-Armer Moments:
BS8110 - 1997
0.80 0.80
0.60
1.00
0.60
0.80
0.40
0.60
0.40
0 0
80 .6 .4 20
0. 0 0 0.
0.20 0
0.40 0.20 0.06.8.000
1
1.00 1.00
1.20 1.20
1.40 1.40
1.00
0.80
1.60 1.60
0.60
BS8110 - 1997
00
1.
5.00
6.00 5.00
7.00 6.00
7.00
4. .00
8.00
00
8.00
00
00
3
2.
1.
BS8110 - 1997
0.600.40.200
00
0.20
1.8
0.40
10.0
0.60
0 00
0.80
.2
1.4 1.6
0 0.40
2.0 0.60 0 .00 0
0.8 1 1.2
1.40
0
0 1.8 .60
1.60
1.80
2 .0
2.00
1.00 1
0.80
1. 2 0
2.00
1. 0 0
0. 8 0
1
0 1 .8
0.08.6.04020 1. 1.2 1.4 .60 0
00. 00 0 0
0.20
BS8110 - 1997
0.510.00
1.50 1.50
2.00
0 2.00 2.50
2.0 .50 2.50
3.00 3.00
2
4.00
4.00
2.50
3.00
4.50
3.50
4.00
0
3.50 3.50
0
2 .5
2 .0
1.00 1.5
0.50 0.5 1.00 0
0
BS8110 - 1997
15 15
10
20
10
15
5
10
0
15 1 5
5 1015
20
20 20
25 25
30 30
20
15
10
BS8110 - 1997
100
80 100 60
80
4060 4060 40
20
20 20
20
120
140 120
160 140
180160
800
180
40
6
20
BS8110 - 1997
105
21025530
10
5
15
5
10
40 15 20 25
35 0
30
40
35
3
40
25
40 15
20
3
1510 3 5
5 20 25 0
5
BS8110 - 1997
10 20
30 4030
40 0 40
50 50
5 70 60 60
70
90
60
90
50
70
80
80 80
50
70
40
20 30
10 10 20
0.0
0.06 0 2
0.06 0.08 0.0 .04
0.08 6
0.16 0.16
4 06 8 0.18 0.18
02 .0 0. .010 0.20
0. 0 00. 0.22 0.22 0.20
0
0.26 0 .1
4
0.20.26 0.28 0. 0.20.10.1 . 142
22 0 8 6
0.24
0.10
0.08
0.06
0.22
0.04
0.02
0.1
0.12 4 0.14
0.12 6
0.08 0.10 0.10 0.0
BS8110 - 1997
0.80 0.80
0.60
1.00
0.60
0.80
0.40
0.60
0.40
0 0
80 .6 .4 20
0. 0 0 0.
0.20 0
0.40 0.20 0.06.8.000
1
1.00 1.00
1.20 1.20
1.40 1.40
1.00
0.80
1.60 1.60
0.60
BS8110 - 1997
00
1.
5.00
6.00 5.00
7.00 6.00
7.00
4. .00
8.00
00
8.00
00
00
3
2.
1.
BS8110 - 1997
0
0.600.40.20
00
0.20
1.8
0.40
10.0
0.60
0 00
0.80
.2
1.4 1.6
0 0.40
2.0 0.60 0 .00 0
0.8 1 1.2
1.40
0
0 1.8 .60
1.60
1.80
2 .0
2.00
1.00 1
0.80
1. 2 0
2.00
1. 0 0
0. 8 0
1
0 1 .8
0.08.6.04020 1. 1.2 1.4 .60 0
00. 00 0 0
0.20
BS8110 - 1997
0.510.00
1.50 1.50
2.00
0 2.00 2.50
2.0 .50 2.50
3.00 3.00
2
4.00
4.00
2.50
3.00
4.50
3.50
4.00
0
3.50 3.50
0
2 .5
2 .0
1.00 1.5
0.50 0.5 1.00 0
0
BS8110 - 1997
15 15
10
20
10
15
5
10
0
15 1 5
5 1015
20
20 20
25 25
30 30
20
15
10
BS8110 - 1997
100
80 100 60
80
4060 4060 40
20
20 20
20
120
140 120
160 140
180160
800
180
40
6
20
BS8110 - 1997
105
21025530
10
5
15
5
10
40 15 20 25
35 0
30
40
35
3
40
25
40 15
20
3
1510 3 5
5 20 25 0
5
BS8110 - 1997
10 20
30 4030
40 0 40
50 50
5 70 60 60
70
90
60
90
50
70
80
80 80
50
70
40
20 30
10 10 20
15 15
10
Offset
20
10
15
5
10
0
15 1 5
5 1015
20
Offset 25
20
25
20
30 30
20
15
Offset
10
Rebar Excess:
-20
0
Offset
-50 -50
05
Offset
-1
10 Offset
20 30
10
10
40
30 20
40 30
40
40
20
30
10 20
Offset
Offset
Rebar Excess:
-160 -160
0 -140 -140
-16
-140
-100
-120
-120 -120
0
-16
-16
-180 0
-18
0
Offset
Offset
========== S p a c e - F r a m e A n a l y s i s - P R O K O N =========================
Ver W3.0.33 - 15 Nov 2017
TITLE :
Prescribed displacements
Node Fixity X Y Z X-Rot Y-Rot Z-Rot Orien node
m m m rad. rad. rad.
Spring constants
Node Fixity X Y Z X-Rot Y-Rot Z-Rot
kN/m kN/m kN/m kNm/rad kNm/rad kNm/rad
D
L
Node Fx Fy Fz Mx My Mz Stage
kN kN kN kNm kNm kNm
Node Fx Fy Fz Mx My Mz Stage
kN kN kN kNm kNm kNm
D+L
Comb. Load factor for each load case: Ultimate Limit State
D L
Job Number Sheet
QL-21-01 T-04
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
D+L 1.40 1.60
Comb. Load factor for each load case: Serviceability Limit State
D L
Sum of: Px Py Mz
================= BEAM ELEMENT END FORCES IN LOCAL ELEMENT AXES at ULS ==================
Task: Task 1
Element 1-2 Select lightest section
Lx Eff = 0.838 m
MOMENTS: X-X M max = .2000kNm @ .986m
Ly Eff = 0.986 m
.100
.200
.300
.400
.500
.600
.700
.800
.900
Le Eff = 1.893 m
.050 Critical Load Case : D+L
.00100 ----------------------------------------------------------
.100
.200
.300
.400
.500
.600
.700
.800
.900
.200
.300
.400
.500
.600
.700
.800
.900
-2.00
-4.00
-6.00
-8.00
Job Number Sheet
QL-21-01 TM-02
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 0.836 m
MOMENTS: X-X M max = .2000kNm @ 0.00m Ly Eff = 0.983 m
.100
.200
.300
.400
.500
.600
.700
.800
.900
Le Eff = 1.887 m
.050 Critical Load Case : D+L
.00100 ----------------------------------------------------------
.100
.200
.300
.400
.500
.600
.700
.800
.900
.200
.300
.400
.500
.600
.700
.800
.900
-2.00
-4.00
-6.00
-8.00
-10.0
Lx Eff = 0.621 m
MOMENTS: X-X M max = .0025kNm @ .365m Ly Eff = 0.731 m
.100
.200
.300
.400
.500
.600
.700
Le Eff = 1.404 m
.00050 Critical Load Case : D+L
.00100
Section 38 x 75
.00150
k7=1.16(x-x), 1.17(y-y)
.00200 k14=1.17
.00250
BS5268-1991 paragraph 16.3
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -2.70 0.07 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.73 OK
.00400 st,adm smx,adm sby,adm -3.74 6.17 6.20
.00300
.00100 ----------------------------------------------------------
.100
.200
.300
.400
.500
.600
.700
.200
.300
.400
.500
.600
.700
-2.00
-4.00
-6.00
Job Number Sheet
QL-21-01 TM-03
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 1.051 m
MOMENTS: X-X M max = .0072kNm @ .619m
Ly Eff = 1.237 m
.200
.400
.600
.800
1.00
1.20
.00100 Le Eff = 2.375 m
.00200
Critical Load Case : D+L
.00300
Section 38 x 75
.00400
.00500 k7=1.16(x-x), 1.17(y-y)
.00600 k14=1.17
.00700
BS5268-1991 paragraph 16.3
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -1.65 0.20 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.47 OK
.00400 st,adm smx,adm sby,adm -3.74 6.13 6.20
.00300
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
1.20
.400
.600
.800
1.00
1.20
-1.00
-2.00
-3.00
-4.00
Lx Eff = 1.052 m
MOMENTS: X-X M max = -.2000kNm @ 1.24m
-.200
Ly Eff = 1.238 m
Le Eff = 2.377 m
-.150 Critical Load Case : D+L
-.100
-.050
Section 38 x 100
.200
.400
.600
.800
1.00
1.20
k7=1.13(x-x), 1.17(y-y)
.050 k14=1.17
.100
BS5268-1991 paragraph 15.6
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 0.66 3.16 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.94 OK
.00400 sc,adm smx,adm sby,adm 1.60 5.91 6.20
.00300
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
1.20
2.00
1.50
1.00
.500
.200
.400
.600
.800
1.00
1.20
Job Number Sheet
QL-21-01 TM-04
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 0.621 m
MOMENTS: X-X M max = -.1000kNm @ 0.00m
Ly Eff = 0.731 m
-.100
Le Eff = 1.404 m
-.080 Critical Load Case : D+L
-.060 Section 38 x 75
-.040
k7=1.16(x-x), 1.17(y-y)
-.020 k14=1.17
.100
.200
.300
.400
.500
.600
.700
.00100 ----------------------------------------------------------
.100
.200
.300
.400
.500
.600
.700
2.00
1.50
1.00
.500
.100
.200
.300
.400
.500
.600
.700
Lx Eff = 0.836 m
MOMENTS: X-X M max = .0045kNm @ .492m
Ly Eff = 0.983 m
.100
.200
.300
.400
.500
.600
.700
.800
.900
Le Eff = 1.887 m
.00100 Critical Load Case : D+L
.00200 Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400
k14=1.17
.00100 ----------------------------------------------------------
.100
.200
.300
.400
.500
.600
.700
.800
.900
.200
.300
.400
.500
.600
.700
.800
.900
-.100
-.200
-.300
-.400
Job Number Sheet
QL-21-01 TM-05
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 0.838 m
MOMENTS: X-X M max = .0046kNm @ .493m
Ly Eff = 0.986 m
.100
.200
.300
.400
.500
.600
.700
.800
.900
Le Eff = 1.893 m
.00100 Critical Load Case : D+L
.00200 Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400
k14=1.17
.00100 ----------------------------------------------------------
.100
.200
.300
.400
.500
.600
.700
.800
.900
.200
.300
.400
.500
.600
.700
.800
.900
-.100
-.200
-.300
-.400
-.500
-.600
Lx Eff = 0.907 m
MOMENTS: X-X M max = .2000kNm @ 1.07m
Ly Eff = 1.067 m
.200
.400
.600
.800
1.00
Le Eff = 2.049 m
.050 Critical Load Case : D+L
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
10.0
8.00
6.00
4.00
2.00
.200
.400
.600
.800
1.00
Job Number Sheet
QL-21-01 TM-06
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 0.904 m
MOMENTS: X-X M max = .2000kNm @ 0.00m Ly Eff = 1.064 m
.200
.400
.600
.800
1.00
Le Eff = 2.043 m
.050 Critical Load Case : D+L
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
8.00
6.00
4.00
2.00
.200
.400
.600
.800
1.00
Lx Eff = 0.906 m
MOMENTS: X-X M max = .0049kNm @ .533m Ly Eff = 1.066 m
.200
.400
.600
.800
1.00
Le Eff = 2.047 m
.00100 Critical Load Case : D+L
.00200
Section 47 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
5.00
4.00
3.00
2.00
1.00
.200
.400
.600
.800
1.00
Job Number Sheet
QL-21-01 TM-07
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 0.904 m
MOMENTS: X-X M max = .0049kNm @ .532m
Ly Eff = 1.064 m
.200
.400
.600
.800
1.00
Le Eff = 2.043 m
.00100 Critical Load Case : D+L
.00200
Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
.400
.600
.800
1.00
Lx Eff = 0.905 m
MOMENTS: X-X M max = .0049kNm @ .533m
Ly Eff = 1.065 m
.200
.400
.600
.800
1.00
Le Eff = 2.045 m
.00100 Critical Load Case : D+L
.00200
Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
.400
.600
.800
1.00
Job Number Sheet
QL-21-01 TM-08
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 0.906 m
MOMENTS: X-X M max = .0049kNm @ .533m
Ly Eff = 1.066 m
.200
.400
.600
.800
1.00
Le Eff = 2.047 m
.00100 Critical Load Case : D+L
.00200
Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
.400
.600
.800
1.00
-1.00
-2.00
-3.00
-4.00
-5.00
Lx Eff = 0.904 m
MOMENTS: X-X M max = -.1000kNm @ 0.00m
Ly Eff = 1.064 m
-.100
Le Eff = 2.043 m
-.080 Critical Load Case : D+L
-.060 Section 38 x 75
-.040
k7=1.16(x-x), 1.17(y-y)
-.020 k14=1.17
.200
.400
.600
.800
1.00
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
.400
.600
.800
1.00
-.500
-1.00
-1.50
-2.00
Job Number Sheet
QL-21-01 TM-09
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 0.907 m
MOMENTS: X-X M max = .0049kNm @ .533m
Ly Eff = 1.067 m
.200
.400
.600
.800
1.00
Le Eff = 2.049 m
.00100 Critical Load Case : D+L
.00200
Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17
.00500
BS5268-1991 paragraph 15.6
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 0.25 0.14 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.16 OK
.00400 sc,adm smx,adm sby,adm 1.76 6.14 6.20
.00300
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
.400
.600
.800
1.00
Job Number Sheet
QL-21-01 TM-10
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 0.347 m
MOMENTS: X-X M max = 0.000kNm @ .532m Ly Eff = 0.408 m
.00500
Le Eff = 0.783 m
.00400 Critical Load Case : D+L
.00300
Section 38 x 75
.00200
k7=1.16(x-x), 1.17(y-y)
.00100 k14=1.17
.050
.100
.150
.200
.250
.300
.350
.400
.00100 ----------------------------------------------------------
.050
.100
.150
.200
.250
.300
.350
.400
.300
.200
.100
.050
.100
.150
.200
.250
.300
.350
.400
Lx Eff = 0.904 m
MOMENTS: X-X M max = .0033kNm @ .532m Ly Eff = 1.064 m
.200
.400
.600
.800
1.00
.00050
Le Eff = 2.043 m
Critical Load Case : D+L
.00100
.00150 Section 38 x 75
.00200
.00250
k7=1.16(x-x), 1.17(y-y)
k14=1.17
.00300
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
1.50
1.00
.500
.200
.400
.600
.800
1.00
Job Number Sheet
QL-21-01 TM-11
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 0.693 m
MOMENTS: X-X M max = 0.000kNm @ .532m
.00500 Ly Eff = 0.815 m
Le Eff = 1.565 m
.00400 Critical Load Case : D+L
.00300
Section 38 x 75
.00200
k7=1.16(x-x), 1.17(y-y)
.00100 k14=1.17
.100
.200
.300
.400
.500
.600
.700
.800
.00100 ----------------------------------------------------------
.100
.200
.300
.400
.500
.600
.700
.800
.200
.300
.400
.500
.600
.700
.800
-.200
-.400
-.600
-.800
-1.00
Lx Eff = 0.931 m
MOMENTS: X-X M max = .0025kNm @ .548m
Ly Eff = 1.095 m
.200
.400
.600
.800
1.00
Le Eff = 2.102 m
.00050 Critical Load Case : D+L
.00100
Section 38 x 75
.00150
k7=1.16(x-x), 1.17(y-y)
.00200
k14=1.17
.00250
BS5268-1991 paragraph 15.6
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 1.26 0.07 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.74 OK
.00400 sc,adm smx,adm sby,adm 1.74 6.14 6.20
.00300
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
.400
.600
.800
1.00
Job Number Sheet
QL-21-01 TM-12
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 1.062 m
MOMENTS: X-X M max = .0010kNm @ .625m
Ly Eff = 1.249 m
.200
.400
.600
.800
1.00
1.20
Le Eff = 2.398 m
.00020 Critical Load Case : D+L
.00040
Section 38 x 75
.00060
k7=1.16(x-x), 1.17(y-y)
.00080 k14=1.17
.00100
BS5268-1991 paragraph 16.3
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -0.98 0.03 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.27 OK
.00400 st,adm smx,adm sby,adm -3.74 6.13 6.20
.00300
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
1.20
.400
.600
.800
1.00
1.20
-.500
-1.00
-1.50
-2.00
-2.50
Lx Eff = 1.334 m
MOMENTS: X-X M max = .0048kNm @ .785m
Ly Eff = 1.569 m
.200
.400
.600
.800
1.00
1.20
1.40
Le Eff = 3.012 m
.00100 Critical Load Case : D+L
.00200
Section 47 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
1.20
1.40
4.00
3.00
2.00
1.00
.200
.400
.600
.800
1.00
1.20
1.40
Job Number Sheet
QL-21-01 TM-13
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 1.386 m
MOMENTS: X-X M max = 0.000kNm @ .785m
.00500 Ly Eff = 1.631 m
Le Eff = 3.132 m
.00400 Critical Load Case : D+L
.00300
Section 38 x 75
.00200
k7=1.16(x-x), 1.17(y-y)
.00100 k14=1.17
.200
.400
.600
.800
1.00
1.20
1.40
1.60
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
1.20
1.40
1.60
1.00
.800
.600
.400
.200
.200
.400
.600
.800
1.00
1.20
1.40
1.60
Lx Eff = 1.335 m
MOMENTS: X-X M max = .0048kNm @ .785m
Ly Eff = 1.570 m
.200
.400
.600
.800
1.00
1.20
1.40
Le Eff = 3.014 m
.00100 Critical Load Case : D+L
.00200
Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
1.20
1.40
.400
.600
.800
1.00
1.20
1.40
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
Job Number Sheet
QL-21-01 TM-14
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 0.931 m
MOMENTS: X-X M max = .0025kNm @ .548m Ly Eff = 1.095 m
.200
.400
.600
.800
1.00
Le Eff = 2.102 m
.00050 Critical Load Case : D+L
.00100
Section 38 x 75
.00150
k7=1.16(x-x), 1.17(y-y)
.00200 k14=1.17
.00250
BS5268-1991 paragraph 15.6
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 1.26 0.07 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.74 OK
.00400 sc,adm smx,adm sby,adm 1.74 6.14 6.20
.00300
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
.400
.600
.800
1.00
Lx Eff = 0.693 m
MOMENTS: X-X M max = 0.000kNm @ .548m Ly Eff = 0.815 m
.00500
Le Eff = 1.565 m
.00400 Critical Load Case : D+L
.00300
Section 38 x 75
.00200
k7=1.16(x-x), 1.17(y-y)
.00100 k14=1.17
.100
.200
.300
.400
.500
.600
.700
.800
.00100 ----------------------------------------------------------
.100
.200
.300
.400
.500
.600
.700
.800
.200
.300
.400
.500
.600
.700
.800
-.200
-.400
-.600
-.800
Job Number Sheet
QL-21-01 TM-15
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Lx Eff = 0.904 m
MOMENTS: X-X M max = .0033kNm @ .532m
Ly Eff = 1.064 m
.200
.400
.600
.800
1.00
.00050
Le Eff = 2.043 m
Critical Load Case : D+L
.00100
.00150 Section 38 x 75
.00200
.00250
k7=1.16(x-x), 1.17(y-y)
k14=1.17
.00300
.00100 ----------------------------------------------------------
.200
.400
.600
.800
1.00
2.50
2.00
1.50
1.00
.500
.200
.400
.600
.800
1.00
Lx Eff = 0.347 m
MOMENTS: X-X M max = 0.000kNm @ .532m
.00500 Ly Eff = 0.408 m
Le Eff = 0.783 m
.00400 Critical Load Case : D+L
.00300
Section 38 x 75
.00200
k7=1.16(x-x), 1.17(y-y)
.00100 k14=1.17
.050
.100
.150
.200
.250
.300
.350
.400
.00100 ----------------------------------------------------------
.050
.100
.150
.200
.250
.300
.350
.400
.00400
.00300
.00200
.00100
.050
.100
.150
.200
.250
.300
.350
.400
Job Number Sheet
QL-21-01 TM-16
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021