0% found this document useful (0 votes)
9 views

Struct Calcs May 2021

STRUCTURAL ANALYSIS AND DESIGN CALCULATIONS

Uploaded by

opulithe
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Struct Calcs May 2021

STRUCTURAL ANALYSIS AND DESIGN CALCULATIONS

Uploaded by

opulithe
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 192

Structural Design calculations

Project Title: Proposed Residential apartments on Lr.


No. Juja/ Kalimoni Block 14/215, Juja Town, Kiambu
County.

Client: Trenibra Investments Ltd.

Designed by: Kipsang Mark


Approved by: Eng. Mark F. Omondi
(A3123)

May 2021
DESIGN CODES AND STANDARDS

The Structural design for the residential house has been carried out on the basis of the
design codes and standards listed below:

1. B.S. 8110: Parts 1, 2 and 3: Structural use of concrete, 1997;


2. B.S. 6399 Part 1,Loadings for buildings, 1996;
3. B.S. 4449: Specification for carbon steel bars for the reinforcement of concrete.

DESIGN SOFTWARE

1. Prokon structural analysis


2. RCC Spreadsheets
3. CSC Orion

DESIGN PARAMETERS
 Assumed ground bearing pressure (Rock) -300KN/m2
 Concrete class -C25
COLUMN BASES
COLUMN BASE F1-2300X2300X600
Columns: 1C3, 1C12
bx = 300.0 mm by =
300.0 mm
Effects: Column = 1C12 - Critical Combination
= 7 ((G+Q)P32 *F)
N = -1980.2 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 2300.0 mm Ly =
2300.0 mm
h = 600.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 401.750 kN/m2 S-min =
401.750 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =

420.000 kN/m2
As-min (Both Dir's) =
1200.00 mm2/m
X Dir: Footing Design: M =
200.9 kN.m/m
K/K' = 0.17 < 1.0
As = 1200.00 mm2/m H16-150
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.73 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.33 N/mm2 < vc =
0.39 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 2089.1 kN V-eff =
2089.1 kN
v = 3.20 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 625.7 kN V-eff =
625.7 kN
v = 0.15 N/mm2 < vc =
0.39 N/mm2
Y Dir: Footing Design: M =
200.9 kN.m/m
K/K' = 0.18 < 1.0
As = 1200.00 mm2/m H16-150
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)

1
v = 0.75 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.35 N/mm2 < vc =
0.40 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 2089.1 kN V-eff =
2089.1 kN
v = 3.20 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 625.7 kN V-eff =
625.7 kN
v = 0.15 N/mm2 < vc =
0.40 N/mm2

2
COLUMN BASE F2 -2000X2000X500
Columns: 1C9, 1C21, 1C20, 1C18, 1C19
bx = 300.0 mm by =
300.0 mm
Effects: Column = 1C21 - Critical Combination
= 1 (G+Q *F)
N = -1322.9 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 2000.0 mm Ly =
2000.0 mm
h = 550.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 356.877 kN/m2 S-min =
356.877 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =

420.000 kN/m2
As-min (Both Dir's) =
1100.00 mm2/m
X Dir: Footing Design: M =
128.9 kN.m/m
K/K' = 0.13 < 1.0
As = 1100.00 mm2/m H16-175
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.60 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.25 N/mm2 < vc =
0.39 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1395.4 kN V-eff =
1395.4 kN
v = 2.35 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 294.2 kN V-eff =
294.2 kN
v = 0.08 N/mm2 < vc =
0.39 N/mm2
Y Dir: Footing Design: M =
128.9 kN.m/m
K/K' = 0.14 < 1.0
As = 1100.00 mm2/m H16-175
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)

1
v = 0.62 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.27 N/mm2 < vc =
0.39 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1395.4 kN V-eff =
1395.4 kN
v = 2.35 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 294.2 kN V-eff =
294.2 kN
v = 0.08 N/mm2 < vc =
0.39 N/mm2

2
COLUMN BASE F3 -1700X1700X500
Columns: 1C8, 1C15
bx = 300.0 mm by =
300.0 mm
Effects: Column = 1C15 - Critical Combination
= 10 ((G+Q)P51 *F)
N = -1112.6 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 1700.0 mm Ly =
1700.0 mm
h = 450.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 408.648 kN/m2 S-min =
408.648 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =

420.000 kN/m2
As-min (Both Dir's) =
900.00 mm2/m
X Dir: Footing Design: M =
100.1 kN.m/m
K/K' = 0.16 < 1.0
As = 900.00 mm2/m H16-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.71 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.30 N/mm2 < vc =
0.40 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1144.2 kN V-eff =
1144.2 kN
v = 2.42 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 283.5 kN V-eff =
283.5 kN
v = 0.12 N/mm2 < vc =
0.40 N/mm2
Y Dir: Footing Design: M =
100.1 kN.m/m
K/K' = 0.17 < 1.0
As = 900.00 mm2/m H16-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)

1
v = 0.74 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.33 N/mm2 < vc =
0.41 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1144.2 kN V-eff =
1144.2 kN
v = 2.42 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 283.5 kN V-eff =
283.5 kN
v = 0.12 N/mm2 < vc =
0.41 N/mm2

2
COLUMN BASE F4 -1600X1600X450
Column: 1C13
bx = 200.0 mm by =
400.0 mm
Effects: Critical Combination = 1 (G+Q *F)
N = -988.4 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 1600.0 mm Ly =
1600.0 mm
h = 450.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 409.757 kN/m2 S-min =
409.757 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =

420.000 kN/m2
As-min (Both Dir's) =
900.00 mm2/m
X Dir: Footing Design: M =
100.4 kN.m/m
K/K' = 0.16 < 1.0
As = 900.00 mm2/m H16-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.71 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.30 N/mm2 < vc =
0.40 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1016.2 kN V-eff =
1016.2 kN
v = 2.15 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 153.1 kN V-eff =
153.1 kN
v = 0.07 N/mm2 < vc =
0.40 N/mm2
Y Dir: Footing Design: M =
73.8 kN.m/m
K/K' = 0.13 < 1.0
As = 900.00 mm2/m H16-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.64 N/mm2 < v-max =

1
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.23 N/mm2 < vc =
0.41 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 1016.2 kN V-eff =
1016.2 kN
v = 2.15 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 153.1 kN V-eff =
153.1 kN
v = 0.07 N/mm2 < vc =
0.41 N/mm2

2
COLUMN BASE F5 -1400X1400X400
Columns: 1C6, 1C2
bx = 300.0 mm by =
300.0 mm
Effects: Column = 1C6 - Critical Combination
= 8 ((G+Q)P41 *F)
N = -762.6 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 1400.0 mm Ly =
1400.0 mm
h = 350.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 410.270 kN/m2 S-min =
410.270 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =

420.000 kN/m2
As-min (Both Dir's) =
700.00 mm2/m
X Dir: Footing Design: M =
62.1 kN.m/m
K/K' = 0.17 < 1.0
As = 700.00 mm2/m H12-150
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.74 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.33 N/mm2 < vc =
0.43 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 767.2 kN V-eff =
767.2 kN
v = 2.15 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 219.2 kN V-eff =
219.2 kN
v = 0.15 N/mm2 < vc =
0.43 N/mm2
Y Dir: Footing Design: M =
62.1 kN.m/m
K/K' = 0.19 < 1.0
As = 700.00 mm2/m H12-150
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)

1
v = 0.77 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.36 N/mm2 < vc =
0.44 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 767.2 kN V-eff =
767.2 kN
v = 2.15 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 219.2 kN V-eff =
219.2 kN
v = 0.15 N/mm2 < vc =
0.44 N/mm2

2
COLUMN BASE F6 -1200X1200X300
Column: 1C1
bx = 300.0 mm by =
300.0 mm
Effects: Critical Combination = 3 ((G+Q)P12
*F)
N = -357.9 kN Mx =
0.0 kN.m
My =
0.0 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly =
1200.0 mm
h = 300.0 mm h-Tap =
0.0 mm
Soil Stresses:
S-max = 268.462 kN/m2 S-min =
268.462 kN/m2
Allowable Soil Stress will be
amplified by the factor (x1.4) =

420.000 kN/m2
As-min (Both Dir's) =
600.00 mm2/m
X Dir: Footing Design: M =
27.2 kN.m/m
K/K' = 0.11 < 1.0
As = 600.00 mm2/m H12-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.48 N/mm2 < v-max =
4.00 N/mm2
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.21 N/mm2 < vc =
0.45 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 362.4 kN V-eff =
362.4 kN
v = 1.22 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 94.0 kN V-eff =
94.0 kN
v = 0.09 N/mm2 < vc =
0.45 N/mm2
Y Dir: Footing Design: M =
27.2 kN.m/m
K/K' = 0.12 < 1.0
As = 600.00 mm2/m H12-200
Shear Check (At Column Face):
(BS8110-Cl.3.4.5.2)
v = 0.50 N/mm2 < v-max =
4.00 N/mm2

1
Shear Check (At 'd' from Column):
(BS8110-Cl.3.4.5.2)
v = 0.23 N/mm2 < vc =
0.46 N/mm2
Punching Check (At Column Face):
(BS8110-Cl.3.7.6.4)
Vt = 362.4 kN V-eff =
362.4 kN
v = 1.22 N/mm2 < v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-
Cl.3.7.6.4)
Vt = 94.0 kN V-eff =
94.0 kN
v = 0.09 N/mm2 < vc =
0.46 N/mm2

2
COLUMNS
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-1

1C1 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 337.2 0.0 0.0 327.7 -1.1 0.9
2 343.9 0.0 0.0 334.4 -1.2 1.0
3 357.9 0.0 0.0 348.4 -1.3 1.1
4 254.9 0.0 0.0 245.4 -0.8 0.6
5 305.8 0.0 0.0 296.4 -1.0 0.8
6 335.9 0.0 0.0 326.5 -1.2 0.9
7 302.9 0.0 0.0 293.5 -1.0 0.8
8 257.2 0.0 0.0 247.8 -0.8 0.6
9 340.4 0.0 0.0 330.9 -1.2 0.9
10 342.8 0.0 0.0 333.3 -1.1 1.0
11 357.9 0.0 0.0 348.4 -1.3 1.1
12 270.7 0.0 0.0 262.6 -16.0 0.2
13 302.8 0.0 0.0 294.7 14.1 1.3
14 323.7 0.0 0.0 315.6 -1.5 -11.6
15 249.8 0.0 0.0 241.7 -0.4 13.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 337.2 - 337.2
M1 (kN.m) -1.1 -5.1 0.0 300
M2 (kN.m) 0.9 5.1 9.2
N-max (kN) 0.0
Concrete Cover = 40.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.150 Le1/b1 = 7.9 < 15.0 300
Beta = 0.83 Le2/b2 = 7.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.3 / 4.4 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.82 / 0.81 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.07 / 0.06 N/mm2
Links = H8-225

2C1 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 273.3 1.6 -1.8 263.8 -2.1 1.2
2 278.4 1.7 -1.8 269.0 -2.1 1.2
3 285.5 1.9 -2.1 276.1 -2.2 1.5
4 207.2 1.1 -1.3 197.7 -1.5 0.9
5 249.6 1.3 -1.6 240.2 -1.8 1.1
6 272.3 1.6 -1.8 262.9 -2.1 1.2
7 247.2 1.3 -1.6 237.7 -1.8 1.0
8 209.0 1.1 -1.3 199.5 -1.5 0.9
9 276.0 1.6 -1.8 266.6 -2.1 1.3
10 277.6 1.7 -1.8 268.1 -2.1 1.3
11 285.5 1.9 -2.1 276.1 -2.2 1.5
12 222.8 -14.0 -1.8 214.7 -3.5 1.7
13 242.0 16.7 -1.3 233.9 0.0 0.3
14 253.1 1.6 -14.7 245.0 -1.9 -0.9
15 211.7 1.1 11.6 203.6 -1.6 3.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 273.3 - 273.3
M1 (kN.m) -2.1 -4.1 0.0 300
M2 (kN.m) -1.8 -4.1 -7.6
N-max (kN) 0.0
Concrete Cover = 40.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.121 Le1/b1 = 7.3 < 15.0 300
Beta = 0.86 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.5 / 2.9 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.77 / 0.77 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.05 / 0.04 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-2

3C1 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 201.5 1.1 -1.9 192.0 -1.5 2.1
2 204.8 1.1 -2.0 195.4 -1.7 2.2
3 208.3 1.2 -1.9 198.8 -1.5 2.0
4 153.3 0.8 -1.4 143.8 -1.0 1.5
5 185.3 0.9 -1.7 175.9 -1.4 1.8
6 200.8 1.0 -1.9 191.4 -1.5 2.0
7 183.5 0.9 -1.7 174.1 -1.4 1.9
8 154.5 0.8 -1.4 145.0 -1.0 1.6
9 203.4 1.1 -1.9 194.0 -1.6 2.1
10 204.3 1.1 -1.9 194.8 -1.6 2.2
11 208.3 1.2 -1.9 198.8 -1.5 2.0
12 166.6 -1.1 -0.7 158.5 -3.6 2.0
13 176.1 2.9 -2.5 168.0 1.1 1.6
14 180.8 1.3 -4.1 172.7 -1.4 -0.3
15 161.9 0.5 0.9 153.8 -1.2 3.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 201.5 - 201.5
M1 (kN.m) -1.5 -3.0 0.0 300
M2 (kN.m) 2.1 3.0 5.7
N-max (kN) 0.0
Concrete Cover = 40.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.090 Le1/b1 = 7.3 < 15.0 300
Beta = 0.89 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 1.0 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.74 / 0.75 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = H8-225

4C1 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 127.3 1.7 -1.1 117.8 -3.2 -0.1
2 128.9 1.6 -1.1 119.4 -2.4 -0.6
3 129.3 2.0 -1.5 119.9 -3.3 0.8
4 97.4 1.3 -0.8 87.9 -3.0 0.1
5 118.7 1.5 -1.0 109.3 -2.5 -0.1
6 126.9 1.7 -1.2 117.4 -3.1 0.1
7 117.6 1.5 -1.0 108.1 -2.5 0.0
8 98.0 1.3 -0.7 88.5 -3.0 -0.2
9 128.5 1.7 -1.2 119.1 -2.8 0.0
10 128.6 1.7 -1.1 119.2 -2.5 -0.5
11 129.3 2.0 -1.5 119.9 -3.3 0.8
12 106.3 -1.0 -0.6 98.2 -4.7 0.3
13 110.3 4.0 -1.3 102.2 -0.7 -0.4
14 111.7 1.7 -3.4 103.6 -2.8 -2.5
15 104.9 1.3 1.4 96.8 -2.6 2.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 127.3 - 127.3
M1 (kN.m) -3.2 -1.9 -5.0 300
M2 (kN.m) -1.1 -1.9 0.0
N-max (kN) 0.0
Concrete Cover = 40.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.057 Le1/b1 = 7.3 < 15.0 300
Beta = 0.93 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.2 / 0.3 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.72 / 0.70 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.02 / 0.00 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-3

5C1 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 54.4 0.0 -3.3 44.9 -2.2 2.3
2 54.7 0.9 -3.9 45.2 -2.2 2.3
3 50.7 0.2 -2.7 41.3 -2.1 2.1
4 42.1 -0.7 -2.2 32.7 -1.6 1.6
5 53.6 0.3 -2.9 44.1 -2.2 2.2
6 54.2 0.0 -3.0 44.7 -2.2 2.2
7 53.0 0.2 -2.8 43.5 -2.2 2.2
8 42.4 -0.7 -2.5 32.9 -1.6 1.7
9 55.0 0.4 -3.3 45.6 -2.3 2.3
10 54.6 0.7 -3.7 45.2 -2.2 2.3
11 50.7 0.2 -2.7 41.3 -2.1 2.1
12 45.8 -2.1 -2.3 37.7 -1.9 1.9
13 46.9 2.0 -3.2 38.8 -1.9 1.9
14 46.9 0.1 -5.3 38.8 -1.9 1.9
15 45.8 -0.1 -0.3 37.7 -1.9 1.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 54.4 - 54.4
M1 (kN.m) -2.2 -0.8 0.0 300
M2 (kN.m) -3.3 -0.8 -5.4
N-max (kN) 0.0
Concrete Cover =40.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.024 Le1/b1 = 6.9 < 15.0 300
Beta = 0.97 Le2/b2 = 6.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 2.4 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.69 / 0.72 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.00 / 0.03 N/mm2
Links = H8-225

1C2 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 624.5 0.0 0.0 615.0 -11.1 2.1
2 585.6 0.0 0.0 576.2 -9.5 1.9
3 672.7 0.0 0.0 663.2 -10.0 2.4
4 487.4 0.0 0.0 478.0 -8.8 1.5
5 588.0 0.0 0.0 578.6 -10.4 1.9
6 625.4 0.0 0.0 616.0 -10.5 2.1
7 586.9 0.0 0.0 577.5 -10.6 1.9
8 488.3 0.0 0.0 478.9 -9.0 1.5
9 627.7 0.0 0.0 618.2 -9.9 2.1
10 583.8 0.0 0.0 574.3 -9.8 1.9
11 672.7 0.0 0.0 663.2 -10.0 2.4
12 499.9 0.0 0.0 491.8 -51.4 1.3
13 561.2 0.0 0.0 553.1 32.6 2.2
14 567.5 0.0 0.0 559.4 -9.2 -10.4
15 493.6 0.0 0.0 485.5 -9.6 13.9
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 499.9 - 499.9
M1 (kN.m) -51.4 -7.5 -57.0 300
M2 (kN.m) 1.3 7.5 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.222 Le1/b1 = 7.4 < 15.0 300
Beta = 0.74 Le2/b2 = 7.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 17.1 / 4.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.94 / 0.94 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.22 / 0.06 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-4

2C2 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 497.1 20.3 -3.8 487.7 -20.0 3.3
2 466.6 17.5 -3.6 457.2 -17.4 3.1
3 529.9 18.6 -4.3 520.4 -18.3 3.6
4 388.7 15.9 -2.9 379.3 -15.5 2.5
5 469.6 19.0 -3.6 460.1 -18.7 3.0
6 497.8 19.2 -3.9 488.3 -19.0 3.3
7 468.8 19.3 -3.6 459.3 -19.0 3.0
8 389.5 16.5 -2.9 380.1 -16.0 2.5
9 499.5 18.1 -3.9 490.1 -18.0 3.3
10 465.2 18.1 -3.5 455.7 -17.9 3.1
11 529.9 18.6 -4.3 520.4 -18.3 3.6
12 404.6 42.5 -3.1 396.5 -46.7 3.0
13 440.3 -8.1 -3.4 432.2 12.9 2.6
14 443.2 16.1 -16.2 435.1 -15.9 0.7
15 401.7 18.3 9.7 393.6 -17.9 4.8
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 404.6 - 404.6
M1 (kN.m) -46.7 -6.1 -51.5 300
M2 (kN.m) -3.1 -6.1 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.180 Le1/b1 = 6.4 < 15.0 300
Beta = 0.79 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 29.8 / 1.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.09 / 0.77 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.39 / 0.02 N/mm2
Links = H8-225

3C2 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 359.4 18.4 -3.1 350.0 -19.1 2.9
2 338.1 15.9 -2.9 328.6 -16.6 2.7
3 382.3 17.2 -3.3 372.8 -17.8 3.3
4 281.3 14.3 -2.4 271.9 -14.7 2.3
5 340.5 17.2 -2.9 331.0 -17.8 2.7
6 359.8 17.3 -3.1 350.4 -18.0 3.0
7 340.1 17.4 -2.9 330.7 -18.0 2.7
8 281.9 14.8 -2.4 272.4 -15.2 2.2
9 360.8 16.6 -3.2 351.4 -17.3 3.0
10 337.1 16.5 -2.9 327.7 -17.1 2.6
11 382.3 17.2 -3.3 372.8 -17.8 3.3
12 296.6 28.6 -2.0 288.5 -32.4 2.6
13 314.9 2.6 -3.2 306.8 0.2 2.4
14 315.3 15.3 -5.2 307.2 -15.7 0.2
15 296.3 15.9 0.0 288.2 -16.6 4.8
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 296.6 - 296.6
M1 (kN.m) -32.4 -4.4 -36.2 300
M2 (kN.m) 2.6 4.4 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.132 Le1/b1 = 6.4 < 15.0 300
Beta = 0.84 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 20.4 / 1.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.97 / 0.83 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.26 / 0.02 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-5

4C2 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 219.6 19.3 -3.6 210.2 -20.5 5.0
2 207.7 16.9 -3.4 198.3 -17.9 4.7
3 234.1 18.4 -3.7 224.6 -19.5 4.5
4 171.9 14.6 -2.7 162.5 -15.7 3.9
5 209.3 18.2 -3.3 199.9 -19.2 4.3
6 219.8 18.2 -3.6 210.3 -19.4 4.8
7 209.4 18.3 -3.4 199.9 -19.3 4.9
8 172.2 15.2 -2.8 162.8 -16.2 4.0
9 220.2 17.6 -3.6 210.7 -18.7 4.5
10 207.3 17.5 -3.4 197.8 -18.5 4.8
11 234.1 18.4 -3.7 224.6 -19.5 4.5
12 183.2 24.5 -2.7 175.1 -27.5 4.1
13 191.5 8.2 -3.4 183.4 -7.3 4.2
14 190.9 16.3 -5.6 182.8 -17.3 2.3
15 183.8 16.4 -0.4 175.7 -17.5 6.0
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 183.2 - 183.2
M1 (kN.m) -27.5 -2.7 -31.2 300
M2 (kN.m) 4.1 2.7 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.081 Le1/b1 = 6.4 < 15.0 300
Beta = 0.90 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 17.3 / 2.1 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.85 / 0.77 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.22 / 0.03 N/mm2
Links = H8-225

5C2 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 77.0 13.2 -1.6 67.6 -11.5 3.4
2 75.6 12.6 -1.4 66.1 -9.9 3.3
3 84.8 12.7 -2.5 75.4 -10.8 3.8
4 59.1 9.3 -1.3 49.7 -9.8 2.5
5 76.0 13.3 -1.8 66.5 -11.4 3.3
6 77.1 12.2 -1.8 67.6 -10.3 3.4
7 75.9 13.3 -1.3 66.5 -11.3 3.3
8 59.1 10.1 -1.1 49.7 -10.5 2.5
9 77.2 12.6 -2.1 67.7 -10.6 3.4
10 75.5 12.9 -1.3 66.1 -10.3 3.3
11 84.8 12.7 -2.5 75.4 -10.8 3.8
12 65.5 14.5 -1.4 57.4 -14.7 2.9
13 67.9 8.0 -1.5 59.8 -5.1 3.0
14 67.3 11.3 -3.4 59.2 -9.9 2.9
15 66.1 11.2 0.5 58.0 -9.9 2.9
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 65.5 - 65.5
M1 (kN.m) -14.7 -1.0 -17.4 300
M2 (kN.m) 2.9 1.0 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.029 Le1/b1 = 6.3 < 15.0 300
Beta = 0.97 Le2/b2 = 6.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 9.7 / 0.8 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.72 / 0.69 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.13 / 0.01 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-6

1C3 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 243.3 0.0 0.0 233.9 0.6 0.7
2 193.6 0.0 0.0 184.1 0.4 0.5
3 242.5 0.0 0.0 233.0 0.6 0.7
4 265.9 0.0 0.0 256.4 0.7 0.8
5 204.3 0.0 0.0 194.8 0.4 0.6
6 241.2 0.0 0.0 231.7 0.6 0.7
7 240.7 0.0 0.0 231.2 0.6 0.7
8 267.0 0.0 0.0 257.6 0.8 0.8
9 204.0 0.0 0.0 194.5 0.4 0.6
10 194.6 0.0 0.0 185.1 0.4 0.5
11 242.5 0.0 0.0 233.0 0.6 0.7
12 242.5 0.0 0.0 234.4 -14.4 0.8
13 172.3 0.0 0.0 164.2 15.4 0.4
14 207.5 0.0 0.0 199.4 0.3 -11.7
15 207.3 0.0 0.0 199.2 0.8 13.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 243.3 - 243.3
M1 (kN.m) 0.6 3.6 0.0 300
M2 (kN.m) 0.7 3.6 6.8
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.108 Le1/b1 = 7.9 < 15.0 300
Beta = 0.87 Le2/b2 = 7.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.1 / 4.3 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.75 / 0.77 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.07 / 0.06 N/mm2
Links = H8-225

2C3 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 191.4 -1.5 -1.4 182.0 0.7 1.2
2 152.6 -1.2 -1.1 143.2 0.4 0.9
3 191.2 -1.5 -1.4 181.7 0.8 1.2
4 207.9 -1.7 -1.6 198.5 1.0 1.3
5 161.9 -1.2 -1.1 152.4 0.5 0.9
6 189.7 -1.5 -1.4 180.3 0.7 1.1
7 189.2 -1.5 -1.4 179.8 0.7 1.1
8 208.9 -1.7 -1.6 199.4 1.0 1.3
9 161.8 -1.2 -1.1 152.4 0.5 0.9
10 153.4 -1.2 -1.1 144.0 0.5 0.9
11 191.2 -1.5 -1.4 181.7 0.8 1.2
12 182.4 -16.9 -1.8 174.3 -1.0 1.6
13 144.1 14.3 -0.6 136.0 2.2 0.4
14 163.5 -1.5 -13.5 155.4 0.8 -1.5
15 162.9 -1.1 11.2 154.8 0.4 3.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 191.4 - 191.4
M1 (kN.m) -1.5 -2.9 0.0 300
M2 (kN.m) -1.4 -2.9 -5.5
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.085 Le1/b1 = 7.0 < 15.0 300
Beta = 0.90 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.1 / 2.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.73 / 0.72 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.05 / 0.03 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-7

3C3 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 136.8 -1.5 -1.1 127.3 1.2 1.0
2 109.1 -1.3 -0.8 99.7 0.8 0.7
3 136.9 -1.5 -1.1 127.5 1.3 1.0
4 148.0 -1.5 -1.2 138.6 1.4 1.2
5 116.8 -1.3 -0.9 107.4 1.0 0.8
6 135.5 -1.6 -1.1 126.1 1.2 1.0
7 135.2 -1.5 -1.1 125.8 1.2 1.0
8 148.8 -1.5 -1.2 139.3 1.4 1.1
9 116.9 -1.3 -0.9 107.4 1.0 0.8
10 109.6 -1.3 -0.8 100.2 0.9 0.7
11 136.9 -1.5 -1.1 127.5 1.3 1.0
12 125.8 -3.4 -0.9 117.7 -1.2 1.1
13 107.5 0.8 -1.0 99.4 3.3 0.6
14 117.1 -1.1 -3.4 109.0 1.2 -1.7
15 116.2 -1.5 1.5 108.1 1.0 3.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 136.8 - 136.8
M1 (kN.m) -1.5 -2.1 0.0 300
M2 (kN.m) -1.1 -2.1 -4.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.061 Le1/b1 = 7.0 < 15.0 300
Beta = 0.93 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.9 / 0.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.70 / 0.69 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = H8-225

4C3 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 81.3 -1.0 -1.3 71.9 -0.5 2.6
2 64.8 -0.9 -1.1 55.3 0.0 2.2
3 81.6 -1.0 -1.3 72.2 -0.4 2.2
4 87.8 -1.1 -1.4 78.3 -0.7 2.5
5 70.9 -0.8 -1.0 61.5 -0.4 1.8
6 80.6 -1.0 -1.3 71.1 -0.5 2.5
7 80.5 -1.1 -1.3 71.1 -0.1 2.6
8 88.2 -1.1 -1.4 78.8 -0.6 2.5
9 71.0 -0.8 -1.0 61.6 -0.4 1.8
10 65.0 -0.9 -1.1 55.6 -0.1 2.3
11 81.6 -1.0 -1.3 72.2 -0.4 2.2
12 73.0 -3.4 -1.1 64.9 -2.4 2.3
13 65.8 1.7 -1.1 57.7 1.5 2.1
14 69.8 -0.8 -3.7 61.7 -0.4 0.2
15 69.0 -1.0 1.4 60.9 -0.5 4.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 81.3 - 81.3
M1 (kN.m) -1.0 -1.2 0.0 300
M2 (kN.m) 2.6 1.2 3.8
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.036 Le1/b1 = 7.0 < 15.0 300
Beta = 0.96 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 0.9 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.66 / 0.68 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.00 / 0.01 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-8

5C3 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 26.5 -2.8 0.4 17.0 0.8 0.9
2 20.6 -1.7 0.5 11.2 0.6 0.6
3 26.8 -2.7 -0.1 17.3 0.8 0.9
4 28.2 -3.2 0.0 18.7 0.9 0.9
5 25.4 -2.2 0.0 15.9 0.8 0.8
6 26.2 -2.7 0.2 16.8 0.8 0.8
7 26.2 -2.4 0.3 16.7 0.8 0.8
8 28.4 -3.1 0.0 18.9 0.9 0.9
9 25.5 -2.2 0.0 16.0 0.8 0.8
10 20.7 -1.8 0.6 11.3 0.6 0.6
11 26.8 -2.7 -0.1 17.3 0.8 0.9
12 23.4 -4.5 0.2 15.3 0.7 0.8
13 21.9 -0.3 0.3 13.8 0.7 0.7
14 22.9 -2.4 -1.7 14.8 0.7 0.7
15 22.5 -2.4 2.2 14.4 0.7 0.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 26.5 - 26.5
M1 (kN.m) -2.8 -0.4 -3.7 300
M2 (kN.m) 0.9 0.4 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.012 Le1/b1 = 6.6 < 15.0 300
Beta = 0.99 Le2/b2 = 6.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.7 / 0.0 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.67 / 0.66 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.02 / 0.00 N/mm2
Links = H8-225

1C4 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 368.9 0.0 0.0 360.5 -0.1 2.5
2 372.9 0.0 0.0 364.5 -0.1 2.5
3 362.7 0.0 0.0 354.3 -0.1 2.4
4 311.7 0.0 0.0 303.3 -0.1 2.1
5 293.0 0.0 0.0 284.6 -0.1 2.0
6 369.8 0.0 0.0 361.4 -0.1 2.4
7 356.8 0.0 0.0 348.4 -0.1 2.4
8 312.5 0.0 0.0 304.1 -0.1 2.1
9 304.6 0.0 0.0 296.2 -0.1 2.0
10 371.2 0.0 0.0 362.8 -0.1 2.5
11 362.7 0.0 0.0 354.3 -0.1 2.4
12 296.8 0.0 0.0 289.6 -6.1 1.9
13 324.8 0.0 0.0 317.6 6.0 2.3
14 344.0 0.0 0.0 336.8 -0.2 -16.5
15 277.6 0.0 0.0 270.4 0.0 20.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 368.9 - 368.9
M1 (kN.m) -0.1 -3.7 -6.3 400
M2 (kN.m) 2.5 7.4 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.184 Le1/b1 = 11.2 < 15.0 200
Beta = 0.79 Le2/b2 = 6.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.0 / 6.9 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.90 / 0.86 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.03 / 0.10 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-9

2C4 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 293.4 -0.1 -4.2 285.0 -0.1 3.6
2 295.7 -0.1 -4.4 287.3 -0.1 3.6
3 287.6 -0.1 -4.2 279.2 -0.1 3.6
4 247.1 0.0 -3.6 238.7 -0.1 3.0
5 231.2 -0.1 -3.4 222.8 -0.1 2.8
6 294.7 -0.1 -4.2 286.3 -0.2 3.5
7 282.5 -0.1 -4.2 274.1 -0.1 3.4
8 247.1 0.0 -3.6 238.7 -0.1 3.0
9 241.4 -0.1 -3.5 233.0 -0.1 2.9
10 294.4 -0.1 -4.3 286.0 -0.1 3.6
11 287.6 -0.1 -4.2 279.2 -0.1 3.6
12 236.9 -6.0 -3.3 229.7 -0.9 2.9
13 256.4 5.9 -3.9 249.2 0.6 3.2
14 264.9 -0.1 -23.7 257.7 0.0 -0.5
15 228.4 0.0 16.5 221.2 -0.2 6.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 293.4 - 293.4
M1 (kN.m) -0.1 -2.9 -5.1 400
M2 (kN.m) -4.2 -5.9 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.147 Le1/b1 = 9.5 < 15.0 200
Beta = 0.83 Le2/b2 = 5.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 3.3 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.83 / 0.74 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.00 / 0.05 N/mm2
Links = H8-175

3C4 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 217.1 -0.1 -3.2 208.7 -0.2 3.5
2 218.2 -0.1 -3.3 209.8 -0.2 3.5
3 212.3 -0.1 -3.1 203.9 -0.1 3.4
4 181.9 -0.1 -2.7 173.5 -0.1 2.9
5 168.6 -0.1 -2.6 160.2 -0.2 2.8
6 218.4 -0.1 -3.2 210.0 -0.1 3.5
7 208.3 -0.1 -3.1 199.9 -0.2 3.4
8 181.6 -0.1 -2.7 173.2 -0.1 2.9
9 176.8 -0.1 -2.7 168.4 -0.2 2.9
10 217.3 -0.1 -3.3 208.9 -0.2 3.5
11 212.3 -0.1 -3.1 203.9 -0.1 3.4
12 176.2 -0.8 -2.5 169.0 -1.1 2.8
13 187.8 0.6 -3.0 180.6 0.8 3.0
14 191.3 0.0 -7.2 184.1 -0.1 -0.8
15 172.7 -0.2 1.7 165.5 -0.2 6.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 217.1 - 217.1
M1 (kN.m) -0.2 -2.2 -3.9 400
M2 (kN.m) 3.5 4.3 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.109 Le1/b1 = 9.5 < 15.0 200
Beta = 0.87 Le2/b2 = 5.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 1.7 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.78 / 0.72 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.00 / 0.02 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-10

4C4 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 139.2 -0.1 -3.5 130.8 0.1 5.0
2 139.3 -0.2 -3.5 130.9 0.5 4.6
3 135.7 -0.1 -3.4 127.3 0.1 4.5
4 115.3 0.0 -2.9 106.9 -0.3 4.3
5 104.9 -0.2 -2.8 96.5 0.3 3.5
6 140.2 -0.1 -3.5 131.8 0.0 4.9
7 133.0 -0.2 -3.3 124.6 0.3 4.6
8 114.8 -0.1 -2.9 106.4 -0.2 4.2
9 110.5 -0.1 -2.9 102.1 0.2 3.8
10 138.8 -0.2 -3.5 130.4 0.4 4.8
11 135.7 -0.1 -3.4 127.3 0.1 4.5
12 112.8 -1.1 -2.8 105.6 -0.8 4.0
13 119.0 0.8 -3.1 111.8 1.0 4.3
14 120.0 -0.1 -7.2 112.8 0.1 1.2
15 111.8 -0.2 1.3 104.6 0.0 7.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 139.2 - 139.2
M1 (kN.m) -0.1 -1.4 0.0 400
M2 (kN.m) 5.0 2.8 7.8
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.070 Le1/b1 = 9.5 < 15.0 200
Beta = 0.92 Le2/b2 = 5.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 1.9 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.79 / 0.69 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.00 / 0.03 N/mm2
Links = H8-175

5C4 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 59.4 0.1 -2.2 51.0 0.0 5.1
2 59.1 0.5 -2.6 50.7 0.0 5.1
3 57.9 0.1 -2.5 49.5 0.0 5.0
4 47.0 -0.2 -1.7 38.6 0.0 3.9
5 39.7 0.3 -2.2 31.3 0.0 3.1
6 60.2 0.0 -2.3 51.8 0.0 5.2
7 56.4 0.3 -2.3 48.0 0.0 4.8
8 46.4 -0.1 -1.8 38.0 0.0 3.8
9 42.4 0.2 -2.2 34.0 0.0 3.4
10 58.9 0.4 -2.4 50.5 0.0 5.1
11 57.9 0.1 -2.5 49.5 0.0 5.0
12 47.1 -0.8 -1.8 39.9 0.0 4.0
13 49.5 1.0 -2.0 42.3 0.0 4.2
14 49.6 0.1 -5.1 42.4 0.0 4.2
15 47.1 0.1 1.3 39.9 0.0 4.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 59.4 - 59.4
M1 (kN.m) 0.1 0.6 0.0 400
M2 (kN.m) 5.1 1.2 6.4
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.030 Le1/b1 = 9.3 < 15.0 200
Beta = 0.96 Le2/b2 = 5.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 0.9 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.80 / 0.64 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.00 / 0.01 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-11

1C5 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 556.5 0.0 0.0 548.1 -0.3 3.8
2 515.3 0.0 0.0 506.9 0.7 3.5
3 572.9 0.0 0.0 564.5 0.4 4.0
4 473.9 0.0 0.0 465.5 -1.6 3.3
5 470.4 0.0 0.0 462.0 0.3 3.2
6 566.6 0.0 0.0 558.2 0.2 4.0
7 473.3 0.0 0.0 464.9 -0.1 3.1
8 472.0 0.0 0.0 463.6 -1.9 3.2
9 558.5 0.0 0.0 550.1 0.6 3.9
10 507.1 0.0 0.0 498.7 0.5 3.4
11 572.9 0.0 0.0 564.5 0.4 4.0
12 422.5 0.0 0.0 415.3 -22.8 2.4
13 517.2 0.0 0.0 510.0 22.2 4.0
14 490.7 0.0 0.0 483.5 -0.2 -15.5
15 449.0 0.0 0.0 441.8 -0.3 21.9
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 517.2 - 517.2
M1 (kN.m) 22.2 5.2 25.5 400
M2 (kN.m) 4.0 10.3 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.259 Le1/b1 = 10.9 < 15.0 200
Beta = 0.70 Le2/b2 = 6.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 7.6 / 7.3 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.95 / 1.01 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.12 / 0.10 N/mm2
Links = H8-175

2C5 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 445.1 -0.1 -6.5 436.7 0.4 5.8
2 411.4 -2.1 -6.1 403.0 2.4 5.3
3 455.2 -1.5 -6.9 446.8 1.8 6.0
4 377.4 2.5 -5.6 369.0 -2.2 4.9
5 375.4 -1.3 -5.5 367.0 1.6 4.9
6 450.3 -1.0 -6.8 441.9 1.2 5.9
7 379.2 -0.6 -5.4 370.8 1.0 4.8
8 377.1 3.1 -5.5 368.7 -2.6 4.9
9 444.3 -1.9 -6.7 435.9 2.2 5.9
10 406.4 -1.7 -5.9 398.0 2.0 5.2
11 455.2 -1.5 -6.9 446.8 1.8 6.0
12 352.5 20.0 -3.9 345.3 -19.9 3.7
13 398.3 -20.2 -7.1 391.1 20.6 6.1
14 387.4 -0.5 -25.1 380.2 0.8 1.0
15 363.4 0.4 14.1 356.2 -0.1 8.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 445.1 - 445.1
M1 (kN.m) 0.4 4.5 7.4 400
M2 (kN.m) -6.5 -8.9 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.223 Le1/b1 = 9.1 < 15.0 200
Beta = 0.74 Le2/b2 = 5.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 13.3 / 1.8 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 1.06 / 0.74 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.21 / 0.02 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-12

3C5 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 326.4 -1.6 -5.3 318.0 1.7 5.8
2 300.7 -3.5 -4.9 292.3 3.5 5.5
3 332.7 -2.8 -5.4 324.3 2.9 5.9
4 275.3 1.3 -4.5 266.9 -1.2 4.9
5 272.8 -2.8 -4.6 264.4 3.0 5.1
6 329.0 -2.2 -5.3 320.6 2.3 5.9
7 276.7 -2.2 -4.6 268.3 2.3 5.1
8 275.3 1.5 -4.5 266.9 -1.4 4.9
9 323.9 -3.4 -5.3 315.5 3.6 5.9
10 298.0 -3.1 -4.8 289.6 3.2 5.4
11 332.7 -2.8 -5.4 324.3 2.9 5.9
12 266.3 9.6 -4.2 259.1 -9.9 4.4
13 283.1 -12.3 -4.7 275.9 12.8 5.5
14 280.5 -1.6 -9.0 273.3 1.7 1.0
15 269.0 -1.1 0.0 261.8 1.2 8.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 326.4 - 326.4
M1 (kN.m) 1.7 3.3 5.6 400
M2 (kN.m) 5.8 6.5 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.163 Le1/b1 = 9.1 < 15.0 200
Beta = 0.81 Le2/b2 = 5.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 8.4 / 2.9 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 1.00 / 0.85 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.13 / 0.04 N/mm2
Links = H8-175

4C5 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 206.0 -2.5 -5.3 197.6 2.5 6.4
2 188.7 -4.2 -4.9 180.3 4.2 5.5
3 209.6 -3.5 -5.6 201.2 3.6 6.4
4 171.7 0.5 -4.6 163.3 -0.5 5.7
5 168.7 -3.7 -4.5 160.3 3.8 4.6
6 207.1 -3.0 -5.5 198.7 3.0 6.5
7 172.0 -3.0 -4.6 163.6 3.1 5.4
8 171.2 0.6 -4.6 162.8 -0.5 5.6
9 202.8 -4.3 -5.4 194.4 4.4 5.6
10 188.1 -3.8 -4.7 179.7 3.8 5.5
11 209.6 -3.5 -5.6 201.2 3.6 6.4
12 171.2 4.4 -4.4 164.0 -4.6 5.1
13 174.2 -8.7 -4.7 167.0 8.9 5.6
14 175.0 -2.2 -8.8 167.8 2.2 2.3
15 170.4 -2.1 -0.3 163.2 2.1 8.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 206.0 - 206.0
M1 (kN.m) 2.5 2.1 0.0 400
M2 (kN.m) 6.4 4.1 11.4
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.103 Le1/b1 = 9.1 < 15.0 200
Beta = 0.88 Le2/b2 = 5.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.9 / 2.9 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.91 / 0.76 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.09 / 0.04 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-13

5C5 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 86.0 -2.6 -4.8 77.6 2.8 7.8
2 77.5 -3.1 -4.8 69.1 3.6 6.9
3 87.4 -3.7 -5.0 79.0 4.0 7.9
4 67.8 -0.8 -3.8 59.4 1.0 5.9
5 65.1 -3.1 -4.9 56.7 3.4 5.7
6 86.0 -3.1 -4.7 77.6 3.3 7.8
7 67.4 -2.4 -4.3 59.0 2.7 5.9
8 66.1 -0.6 -4.1 57.7 0.9 5.8
9 82.7 -4.0 -5.6 74.3 4.3 7.4
10 79.1 -2.8 -4.6 70.7 3.3 7.1
11 87.4 -3.7 -5.0 79.0 4.0 7.9
12 71.9 0.6 -4.1 64.7 -0.5 6.5
13 70.1 -5.0 -4.1 62.9 5.5 6.3
14 71.5 -2.2 -7.3 64.3 2.4 6.4
15 70.4 -2.3 -0.9 63.2 2.5 6.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 86.0 - 86.0
M1 (kN.m) 2.8 0.9 0.0 400
M2 (kN.m) 7.8 1.7 13.8
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.043 Le1/b1 = 9.1 < 15.0 200
Beta = 0.95 Le2/b2 = 5.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.5 / 2.4 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.83 / 0.68 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.06 / 0.03 N/mm2
Links = H8-175

1C6 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 749.0 0.0 0.0 739.6 12.4 2.9
2 665.7 0.0 0.0 656.2 17.0 2.6
3 746.9 0.0 0.0 737.4 13.7 2.9
4 635.2 0.0 0.0 625.8 4.1 2.4
5 694.0 0.0 0.0 684.5 12.4 2.7
6 621.6 0.0 0.0 612.1 8.0 2.4
7 734.3 0.0 0.0 724.9 13.2 2.9
8 762.6 0.0 0.0 753.2 8.8 3.0
9 704.6 0.0 0.0 695.2 12.7 2.8
10 665.8 0.0 0.0 656.3 16.7 2.6
11 746.9 0.0 0.0 737.4 13.7 2.9
12 681.5 0.0 0.0 673.4 -33.4 3.1
13 588.7 0.0 0.0 580.6 54.5 1.8
14 638.2 0.0 0.0 630.1 10.6 -9.6
15 632.0 0.0 0.0 623.9 10.4 14.6
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 588.7 - 588.7
M1 (kN.m) 54.5 8.8 60.6 300
M2 (kN.m) 1.8 8.8 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.262 Le1/b1 = 7.5 < 15.0 300
Beta = 0.70 Le2/b2 = 9.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 18.2 / 4.9 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.99 / 1.02 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.24 / 0.06 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-14

2C6 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 581.0 -24.0 -4.9 571.6 22.4 4.2
2 516.5 -32.3 -4.3 507.1 30.3 3.7
3 579.7 -26.1 -4.9 570.2 24.4 4.2
4 493.6 -8.3 -4.0 484.2 7.6 3.5
5 538.5 -24.0 -4.5 529.0 22.5 3.8
6 483.8 -15.6 -3.9 474.4 14.3 3.4
7 568.0 -25.5 -4.8 558.6 24.0 4.1
8 590.8 -17.2 -5.0 581.4 16.3 4.3
9 548.3 -24.4 -4.5 538.9 22.8 3.9
10 516.5 -31.7 -4.3 507.1 29.8 3.7
11 579.7 -26.1 -4.9 570.2 24.4 4.2
12 517.3 8.2 -4.6 509.2 -13.4 3.6
13 468.4 -48.7 -3.7 460.3 51.3 3.5
14 494.8 -21.2 -16.0 486.7 20.0 0.7
15 490.9 -19.3 7.7 482.8 18.0 6.4
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 468.4 - 468.4
M1 (kN.m) 51.3 7.0 56.6 300
M2 (kN.m) -3.7 -7.0 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.208 Le1/b1 = 6.4 < 15.0 300
Beta = 0.76 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 33.3 / 0.5 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.17 / 0.71 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.43 / 0.01 N/mm2
Links = H8-225

3C6 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 415.7 -22.5 -3.5 406.2 22.3 4.0
2 370.6 -30.2 -3.1 361.1 29.9 3.6
3 415.1 -24.2 -3.5 405.6 24.0 3.8
4 353.2 -8.0 -2.9 343.8 7.8 3.2
5 386.2 -22.9 -3.3 376.8 22.7 3.8
6 347.2 -14.6 -2.8 337.8 14.2 3.2
7 405.5 -24.3 -3.5 396.0 24.2 4.0
8 421.8 -16.5 -3.6 412.3 16.5 4.0
9 394.4 -22.8 -3.3 384.9 22.5 3.8
10 370.5 -29.6 -3.1 361.0 29.4 3.6
11 415.1 -24.2 -3.5 405.6 24.0 3.8
12 363.1 -4.5 -3.6 355.0 1.3 3.4
13 342.6 -33.7 -2.3 334.5 36.4 3.3
14 354.3 -19.5 -5.7 346.2 19.5 0.6
15 351.4 -18.6 -0.2 343.3 18.3 6.1
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 342.6 - 342.6
M1 (kN.m) 36.4 5.1 40.7 300
M2 (kN.m) 3.3 5.1 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.152 Le1/b1 = 6.4 < 15.0 300
Beta = 0.82 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 23.4 / 2.1 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.03 / 0.86 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.30 / 0.03 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-15

4C6 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 251.3 -23.8 -3.6 241.9 24.0 4.4
2 225.4 -31.5 -3.1 215.9 32.0 3.5
3 251.1 -25.1 -3.8 241.7 25.3 4.7
4 213.7 -8.8 -3.1 204.3 8.7 3.9
5 235.2 -24.2 -3.3 225.8 24.5 3.2
6 210.9 -15.3 -2.9 201.4 15.2 3.8
7 244.5 -25.8 -3.5 235.1 26.2 4.0
8 254.3 -18.0 -3.8 244.9 18.1 4.3
9 241.0 -23.8 -3.3 231.5 24.0 3.6
10 225.2 -30.9 -3.1 215.8 31.4 3.6
11 251.1 -25.1 -3.8 241.7 25.3 4.7
12 216.7 -11.2 -3.4 208.6 9.5 3.8
13 210.8 -29.1 -2.7 202.7 31.1 3.6
14 214.6 -20.4 -5.7 206.5 20.6 1.8
15 212.8 -19.9 -0.4 204.7 20.0 5.6
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 210.8 - 210.8
M1 (kN.m) 31.1 3.2 34.3 300
M2 (kN.m) 3.6 3.2 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.094 Le1/b1 = 6.4 < 15.0 300
Beta = 0.89 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 20.1 / 2.0 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.88 / 0.79 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.26 / 0.03 N/mm2
Links = H8-225

5C6 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 86.9 -20.8 -3.1 77.4 18.1 3.8
2 79.4 -25.9 -3.2 69.9 23.6 3.4
3 87.1 -22.4 -3.0 77.6 19.9 3.8
4 74.9 -8.8 -2.4 65.4 6.4 3.2
5 84.1 -20.5 -3.8 74.7 18.9 3.7
6 74.2 -13.5 -2.3 64.8 11.9 3.1
7 83.6 -21.8 -3.5 74.2 19.5 3.7
8 87.7 -16.6 -3.4 78.2 13.2 3.8
9 87.1 -20.5 -3.5 77.7 18.7 3.8
10 79.3 -25.4 -3.1 69.8 23.0 3.4
11 87.1 -22.4 -3.0 77.6 19.9 3.8
12 74.5 -14.7 -2.7 66.4 11.1 3.2
13 74.7 -20.6 -2.6 66.6 19.8 3.3
14 75.0 -17.7 -4.6 66.9 15.6 3.2
15 74.2 -17.6 -0.8 66.1 15.3 3.3
Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 79.4 - 79.4
M1 (kN.m) -25.9 -1.2 -29.2 300
M2 (kN.m) 3.4 1.2 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.035 Le1/b1 = 6.3 < 15.0 300
Beta = 0.96 Le2/b2 = 8.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 16.5 / 1.4 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.74 / 0.71 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.21 / 0.02 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-16

1C7 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 292.8 0.0 0.0 284.4 -0.1 1.6
2 307.1 0.0 0.0 298.7 -0.1 1.9
3 321.6 0.0 0.0 313.2 -0.1 2.1
4 220.3 0.0 0.0 211.9 -0.1 1.0
5 251.4 0.0 0.0 243.0 -0.1 1.3
6 213.9 0.0 0.0 205.5 -0.1 1.0
7 251.3 0.0 0.0 242.9 -0.1 1.3
8 325.7 0.0 0.0 317.3 -0.1 2.1
9 285.2 0.0 0.0 276.8 -0.1 1.6
10 280.5 0.0 0.0 272.1 -0.1 1.5
11 321.6 0.0 0.0 313.2 -0.1 2.1
12 265.8 0.0 0.0 258.6 -6.1 2.3
13 233.2 0.0 0.0 226.0 6.0 0.5
14 287.4 0.0 0.0 280.2 -0.2 -16.5
15 211.6 0.0 0.0 204.4 0.0 19.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 292.8 - 292.8
M1 (kN.m) -0.1 -2.9 -5.1 400
M2 (kN.m) 1.6 5.9 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.146 Le1/b1 = 11.2 < 15.0 200
Beta = 0.83 Le2/b2 = 6.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.0 / 6.4 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.87 / 0.80 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.03 / 0.09 N/mm2
Links = H8-175

2C7 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 242.9 -0.1 -2.5 234.5 -0.1 2.6
2 249.2 -0.1 -3.1 240.8 -0.1 3.0
3 258.4 -0.1 -3.3 250.0 -0.1 3.2
4 187.3 -0.1 -1.4 178.9 -0.1 1.6
5 210.6 -0.1 -1.9 202.2 -0.1 2.1
6 182.1 -0.1 -1.3 173.7 -0.1 1.6
7 210.4 -0.1 -2.0 202.0 -0.1 2.1
8 264.8 -0.1 -3.2 256.4 -0.1 3.0
9 236.2 -0.1 -2.4 227.8 -0.1 2.6
10 232.4 -0.1 -2.5 224.0 -0.1 2.5
11 258.4 -0.1 -3.3 250.0 -0.1 3.2
12 216.6 -6.1 -1.9 209.4 -0.8 1.3
13 197.1 6.0 -2.4 189.9 0.6 3.1
14 228.5 -0.2 -21.6 221.3 0.0 -1.8
15 185.2 0.0 17.3 178.0 -0.2 6.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 242.9 - 242.9
M1 (kN.m) -0.1 -2.4 -4.3 400
M2 (kN.m) 2.6 4.9 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.121 Le1/b1 = 9.7 < 15.0 200
Beta = 0.86 Le2/b2 = 5.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 3.7 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.80 / 0.72 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.00 / 0.05 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-17

3C7 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 182.0 -0.1 -2.6 173.6 -0.2 4.2
2 184.0 -0.1 -2.7 175.6 -0.2 4.1
3 189.3 -0.1 -2.9 180.9 -0.1 4.2
4 142.6 -0.1 -2.0 134.2 -0.1 3.4
5 159.3 -0.1 -2.2 150.9 -0.2 3.4
6 138.9 -0.2 -1.8 130.5 -0.1 3.4
7 159.2 -0.1 -2.2 150.8 -0.2 3.5
8 195.4 -0.1 -3.1 187.0 -0.1 4.5
9 176.6 -0.1 -2.6 168.2 -0.2 4.1
10 174.3 -0.1 -2.4 165.9 -0.2 3.8
11 189.3 -0.1 -2.9 180.9 -0.1 4.2
12 160.0 -0.8 -3.6 152.8 -1.1 3.2
13 150.1 0.6 -0.8 142.9 0.8 3.8
14 164.8 0.0 -7.4 157.6 -0.1 -0.1
15 145.2 -0.2 3.0 138.0 -0.2 7.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 182.0 - 182.0
M1 (kN.m) -0.2 -1.8 0.0 400
M2 (kN.m) 4.2 3.6 7.8
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.091 Le1/b1 = 9.7 < 15.0 200
Beta = 0.89 Le2/b2 = 5.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 1.4 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.78 / 0.68 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.00 / 0.02 N/mm2
Links = H8-175

4C7 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 117.9 -0.2 -1.3 109.5 0.1 0.1
2 116.6 -0.2 -1.8 108.2 0.5 1.3
3 118.4 -0.1 -2.0 110.0 0.1 0.9
4 94.5 -0.1 -0.6 86.1 -0.2 -1.3
5 105.2 -0.2 -1.1 96.8 0.3 -0.5
6 92.1 -0.1 -0.4 83.7 0.1 -1.2
7 105.2 -0.2 -1.1 96.8 0.3 0.0
8 123.5 -0.1 -1.9 115.1 -0.1 0.1
9 114.2 -0.2 -1.3 105.8 0.2 -0.8
10 113.4 -0.2 -1.5 105.0 0.5 1.2
11 118.4 -0.1 -2.0 110.0 0.1 0.9
12 102.6 -1.1 -1.8 95.4 -0.8 -0.4
13 98.3 0.8 -0.6 91.1 1.0 0.6
14 103.8 -0.1 -5.4 96.6 0.1 -4.1
15 97.1 -0.2 3.0 89.9 0.1 4.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 117.9 - 117.9
M1 (kN.m) -0.2 -1.2 -2.2 400
M2 (kN.m) -1.3 -2.4 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.059 Le1/b1 = 9.7 < 15.0 200
Beta = 0.93 Le2/b2 = 5.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 0.4 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.79 / 0.63 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.00 / 0.01 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-18

5C7 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 56.2 0.1 -5.2 47.8 0.0 4.8
2 50.5 0.5 -4.4 42.1 0.0 4.2
3 49.1 0.1 -5.2 40.7 0.0 4.1
4 49.0 -0.3 -5.0 40.6 0.0 4.0
5 53.8 0.3 -4.8 45.4 0.0 4.5
6 47.8 0.0 -4.7 39.4 0.0 3.9
7 53.6 0.3 -4.3 45.2 0.0 4.5
8 53.4 -0.2 -6.1 45.0 0.0 4.5
9 54.7 0.2 -5.9 46.3 0.0 4.6
10 54.5 0.5 -3.8 46.1 0.0 4.6
11 49.1 0.1 -5.2 40.7 0.0 4.1
12 48.5 -0.8 -5.0 41.3 0.0 4.1
13 47.3 1.0 -3.8 40.1 0.0 4.0
14 48.3 0.1 -8.9 41.1 0.0 4.1
15 47.5 0.1 0.1 40.3 0.0 4.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 56.2 - 56.2
M1 (kN.m) 0.1 0.6 0.0 400
M2 (kN.m) -5.2 -1.1 -6.4
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.028 Le1/b1 = 9.5 < 15.0 200
Beta = 0.97 Le2/b2 = 5.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 4.3 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.80 / 0.68 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.01 / 0.06 N/mm2
Links = H8-175

1C8 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1044.1 0.0 0.0 1034.6 -4.8 -26.3
2 1047.7 0.0 0.0 1038.2 -4.8 -27.6
3 837.1 0.0 0.0 827.7 -3.7 -15.1
4 836.2 0.0 0.0 826.7 -3.8 -19.9
5 1003.1 0.0 0.0 993.7 -4.6 -27.2
6 1047.7 0.0 0.0 1038.2 -4.8 -25.9
7 1002.3 0.0 0.0 992.9 -4.6 -26.3
8 832.5 0.0 0.0 823.0 -3.8 -20.6
9 1045.9 0.0 0.0 1036.5 -4.8 -26.9
10 1047.8 0.0 0.0 1038.3 -4.8 -27.3
11 837.1 0.0 0.0 827.7 -3.7 -15.1
12 873.6 0.0 0.0 865.5 -19.1 -19.8
13 891.1 0.0 0.0 883.0 11.0 -24.5
14 870.7 0.0 0.0 862.6 -4.1 -62.4
15 893.9 0.0 0.0 885.8 -4.0 18.1
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 870.7 - 870.7
M1 (kN.m) -4.1 -13.1 0.0 300
M2 (kN.m) -62.4 -13.1 -69.5
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.387 Le1/b1 = 7.9 < 15.0 300
Beta = 0.55 Le2/b2 = 7.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 6.4 / 20.8 kN As (Required): %1.66 1489.57 mm2 8H16
vc'(1/2)= 1.21 / 1.21 N/mm2 As (Provided): %1.79 1608.50 mm2
v (1/2)= 0.08 / 0.27 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-19

2C8 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 785.3 7.7 49.7 775.8 -6.9 -48.6
2 788.1 7.7 52.3 778.6 -6.9 -51.1
3 632.3 6.0 28.7 622.9 -5.5 -28.3
4 629.8 6.1 37.7 620.3 -5.5 -36.9
5 754.1 7.4 51.4 744.6 -6.7 -50.1
6 788.3 7.7 49.0 778.8 -7.0 -47.9
7 753.8 7.4 49.8 744.4 -6.6 -48.6
8 626.8 6.0 39.0 617.3 -5.4 -38.2
9 786.4 7.7 50.9 777.0 -7.0 -49.7
10 788.1 7.7 51.8 778.7 -6.9 -50.6
11 632.3 6.0 28.7 622.9 -5.5 -28.3
12 658.0 -8.7 36.6 649.9 -7.9 -35.7
13 669.6 21.7 47.3 661.5 -3.8 -46.4
14 657.9 6.2 71.8 649.8 -5.6 -73.9
15 669.6 6.8 12.1 661.5 -6.1 -8.1
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 657.9 - 657.9
M1 (kN.m) 6.2 9.9 0.0 300
M2 (kN.m) -73.9 -9.9 -80.4
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.292 Le1/b1 = 7.3 < 15.0 300
Beta = 0.66 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 48.6 kN As (Required): %1.31 1178.30 mm2 4H20
vc'(1/2)= 0.70 / 1.39 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.00 / 0.63 N/mm2
Links = H8-225

3C8 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 533.5 5.2 47.5 524.0 -5.8 -48.5
2 535.6 5.2 49.8 526.1 -6.0 -50.9
3 431.5 4.1 27.7 422.1 -4.6 -28.4
4 429.0 4.1 36.2 419.6 -4.5 -37.0
5 512.3 5.0 48.9 502.8 -5.6 -49.9
6 535.8 5.2 46.8 526.3 -5.8 -47.8
7 512.2 5.0 47.5 502.8 -5.6 -48.5
8 426.7 4.1 37.4 417.3 -4.5 -38.2
9 534.1 5.2 48.4 524.7 -5.8 -49.5
10 535.6 5.2 49.4 526.1 -6.0 -50.4
11 431.5 4.1 27.7 422.1 -4.6 -28.4
12 447.5 2.3 37.5 439.4 -7.3 -37.9
13 454.8 6.5 42.6 446.7 -2.5 -44.0
14 449.1 4.5 55.3 441.0 -4.8 -59.0
15 453.1 4.3 24.8 445.0 -5.0 -22.9
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 449.1 - 449.1
M1 (kN.m) -4.8 -6.7 0.0 300
M2 (kN.m) -59.0 -6.7 -64.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.200 Le1/b1 = 7.3 < 15.0 300
Beta = 0.77 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.2 / 38.1 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.99 / 1.15 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.04 / 0.49 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-20

4C8 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 282.5 6.2 51.6 273.1 -7.5 -53.6
2 284.0 6.1 53.8 274.6 -6.6 -56.0
3 231.1 4.9 30.2 221.6 -5.7 -31.3
4 229.0 5.0 39.6 219.6 -6.7 -41.1
5 271.3 5.9 52.7 261.8 -6.8 -54.8
6 284.1 6.3 50.7 274.7 -7.6 -52.7
7 271.4 5.9 51.6 262.0 -6.8 -53.6
8 227.4 5.0 40.8 218.0 -6.5 -42.4
9 282.7 6.3 52.2 273.2 -7.2 -54.3
10 284.0 6.2 53.4 274.6 -6.7 -55.6
11 231.1 4.9 30.2 221.6 -5.7 -31.3
12 237.1 2.8 42.1 229.0 -8.5 -43.5
13 241.3 7.8 44.8 233.2 -4.1 -46.9
14 239.0 5.3 52.6 230.9 -6.2 -56.3
15 239.3 5.3 34.3 231.2 -6.4 -34.1
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 239.0 - 239.0
M1 (kN.m) -6.2 -3.6 0.0 300
M2 (kN.m) -56.3 -3.6 -61.7
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.106 Le1/b1 = 7.3 < 15.0 300
Beta = 0.87 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.8 / 36.3 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.83 / 0.91 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.05 / 0.47 N/mm2
Links = H8-225

5C8 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 28.9 4.7 39.3 19.5 -1.0 -28.2
2 29.9 5.6 40.0 20.5 -1.0 -29.3
3 29.0 3.9 23.6 19.5 -1.0 -17.7
4 27.2 3.0 31.1 17.8 -0.9 -22.5
5 27.5 4.9 40.5 18.1 -0.9 -28.6
6 29.9 4.7 39.2 20.5 -1.0 -28.0
7 28.0 4.9 39.7 18.5 -0.9 -27.9
8 26.3 3.1 31.3 16.8 -0.9 -22.8
9 28.6 5.0 40.0 19.1 -1.0 -28.8
10 29.9 5.5 40.0 20.4 -1.0 -29.1
11 29.0 3.9 23.6 19.5 -1.0 -17.7
12 24.1 1.8 32.8 16.0 -0.8 -23.3
13 25.9 6.2 33.5 17.8 -0.9 -24.3
14 25.4 4.1 35.5 17.3 -0.9 -27.4
15 24.7 3.9 30.8 16.6 -0.8 -20.2
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 27.5 - 27.5
M1 (kN.m) 4.9 0.4 0.0 300
M2 (kN.m) 40.5 0.4 45.3
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.012 Le1/b1 = 6.9 < 15.0 300
Beta = 0.99 Le2/b2 = 6.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.4 / 23.0 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.68 / 0.68 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.03 / 0.30 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-21

1C9 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1744.1 0.0 0.0 1734.7 -19.5 -41.8
2 1624.4 0.0 0.0 1615.0 -17.4 -39.7
3 1393.3 0.0 0.0 1383.9 -17.3 -24.1
4 1406.4 0.0 0.0 1397.0 -14.5 -33.5
5 1700.5 0.0 0.0 1691.0 -18.6 -43.1
6 1743.6 0.0 0.0 1734.2 -18.9 -41.2
7 1701.8 0.0 0.0 1692.4 -18.8 -42.0
8 1409.4 0.0 0.0 1399.9 -14.7 -34.5
9 1749.5 0.0 0.0 1740.0 -18.2 -42.9
10 1622.0 0.0 0.0 1612.5 -17.7 -39.3
11 1393.3 0.0 0.0 1383.9 -17.3 -24.1
12 1377.1 0.0 0.0 1369.0 -64.0 -33.7
13 1554.0 0.0 0.0 1545.9 31.2 -36.6
14 1459.6 0.0 0.0 1451.5 -16.0 -76.0
15 1471.4 0.0 0.0 1463.3 -16.7 5.7
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 1459.6 - 1459.6
M1 (kN.m) -16.0 -21.9 0.0 300
M2 (kN.m) -76.0 -21.9 -82.6
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.649 Le1/b1 = 7.4 < 15.0 300
Beta = 0.30 Le2/b2 = 7.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 21.3 / 25.3 kN As (Required): %3.53 3173.38 mm2 12H20
vc'(1/2)= 1.73 / 1.78 N/mm2 As (Provided): %4.19 3769.91 mm2
v (1/2)= 0.28 / 0.33 N/mm2
Links = H8-225

2C9 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1316.7 37.1 79.5 1307.3 -37.1 -77.3
2 1220.5 33.2 75.4 1211.1 -33.3 -73.3
3 1047.8 33.0 45.8 1038.3 -32.8 -44.7
4 1070.9 27.4 63.7 1061.5 -27.3 -62.1
5 1283.5 35.5 81.8 1274.1 -35.5 -79.5
6 1316.2 36.0 78.3 1306.8 -36.1 -76.2
7 1285.7 35.8 79.9 1276.3 -35.7 -77.7
8 1073.5 27.9 65.7 1064.0 -27.7 -63.9
9 1319.6 34.8 81.3 1310.2 -34.9 -79.0
10 1218.5 33.8 74.6 1209.0 -33.8 -72.5
11 1047.8 33.0 45.8 1038.3 -32.8 -44.7
12 1062.9 65.7 63.6 1054.8 -68.2 -61.7
13 1149.0 -3.4 70.0 1140.9 6.0 -68.2
14 1103.6 30.1 98.4 1095.5 -30.1 -99.5
15 1108.3 32.2 35.2 1100.2 -32.1 -30.5
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 1103.6 - 1103.6
M1 (kN.m) 30.1 16.6 0.0 300
M2 (kN.m) -99.5 -16.6 -112.4
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.490 Le1/b1 = 6.4 < 15.0 300
Beta = 0.43 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 44.7 / 66.0 kN As (Required): %3.75 3378.51 mm2 12H20
vc'(1/2)= 2.13 / 2.20 N/mm2 As (Provided): %4.19 3769.91 mm2
v (1/2)= 0.58 / 0.86 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-22

3C9 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 915.4 36.5 76.4 906.0 -37.7 -78.1
2 840.2 32.9 72.2 830.8 -34.2 -73.8
3 720.8 32.2 44.2 711.4 -33.2 -45.2
4 756.0 26.8 61.5 746.5 -27.6 -62.9
5 892.7 34.9 78.3 883.3 -36.2 -80.0
6 915.0 35.5 75.2 905.5 -36.8 -76.9
7 895.0 35.1 76.7 885.6 -36.2 -78.4
8 757.9 27.1 63.3 748.5 -27.9 -64.8
9 916.4 34.6 77.9 906.9 -35.8 -79.5
10 838.7 33.5 71.5 829.3 -34.7 -73.0
11 720.8 32.2 44.2 711.4 -33.2 -45.2
12 752.3 47.7 62.4 744.2 -51.3 -63.6
13 784.2 13.5 65.9 776.1 -12.0 -67.5
14 768.0 30.1 80.4 759.9 -31.0 -84.7
15 768.5 31.2 47.9 760.4 -32.3 -46.4
Critical Combination:9 - ((G+Q)P42 *F)
Min Design
N (kN) 916.4 - 916.4
M1 (kN.m) -35.8 -13.7 0.0 300
M2 (kN.m) -79.5 -13.7 -98.3
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.407 Le1/b1 = 6.4 < 15.0 300
Beta = 0.52 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 33.0 / 55.0 kN As (Required): %2.77 2488.80 mm2 8H20
vc'(1/2)= 1.65 / 1.68 N/mm2 As (Provided): %2.79 2513.27 mm2
v (1/2)= 0.43 / 0.71 N/mm2
Links = H8-225

4C9 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 524.7 39.3 80.6 515.3 -41.1 -80.9
2 470.3 35.8 76.0 460.9 -37.4 -76.5
3 401.9 35.0 46.9 392.5 -36.8 -47.2
4 448.7 28.4 65.0 439.3 -29.8 -65.0
5 512.7 37.8 82.4 503.2 -39.5 -83.0
6 524.6 38.5 79.4 515.2 -40.4 -79.9
7 514.6 37.8 81.0 505.2 -39.5 -81.3
8 449.8 28.6 66.8 440.4 -29.9 -66.8
9 524.4 37.6 81.9 515.0 -39.4 -82.4
10 469.3 36.4 75.3 459.9 -38.0 -75.8
11 401.9 35.0 46.9 392.5 -36.8 -47.2
12 436.4 42.9 66.6 428.3 -46.0 -66.9
13 442.5 23.1 68.7 434.4 -23.0 -69.1
14 440.0 32.6 77.3 431.9 -34.1 -79.4
15 439.0 33.3 58.0 430.9 -34.9 -56.6
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 512.7 - 512.7
M1 (kN.m) -39.5 -7.7 0.0 300
M2 (kN.m) -83.0 -7.7 -112.1
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.228 Le1/b1 = 6.4 < 15.0 300
Beta = 0.74 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 29.6 / 52.2 kN As (Required): %2.45 2208.63 mm2 8H20
vc'(1/2)= 1.30 / 1.32 N/mm2 As (Provided): %2.79 2513.27 mm2
v (1/2)= 0.38 / 0.68 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-23

5C9 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 139.5 31.0 85.0 130.1 -18.8 -82.1
2 106.0 30.1 78.4 96.6 -17.9 -73.3
3 86.7 26.3 47.7 77.2 -13.3 -43.7
4 145.8 21.6 71.0 136.4 -15.1 -72.2
5 138.4 30.7 84.9 128.9 -18.4 -81.2
6 139.8 29.9 83.1 130.4 -17.5 -80.2
7 140.0 30.5 85.1 130.5 -18.2 -81.5
8 146.0 22.3 73.5 136.6 -15.8 -74.8
9 138.3 30.1 84.7 128.9 -17.8 -81.7
10 105.5 30.6 77.9 96.0 -18.4 -72.7
11 86.7 26.3 47.7 77.2 -13.3 -43.7
12 116.4 29.2 69.7 108.3 -20.2 -66.7
13 113.9 22.9 71.8 105.8 -11.6 -69.1
14 115.7 25.9 75.2 107.6 -15.6 -73.7
15 114.5 26.3 66.3 106.4 -16.1 -62.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 139.5 - 139.5
M1 (kN.m) 31.0 2.1 0.0 300
M2 (kN.m) 85.0 2.1 113.6
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.062 Le1/b1 = 6.3 < 15.0 300
Beta = 0.93 Le2/b2 = 6.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 16.3 / 55.7 kN As (Required): %2.65 2380.92 mm2 8H20
vc'(1/2)= 0.93 / 0.98 N/mm2 As (Provided): %2.79 2513.27 mm2
v (1/2)= 0.21 / 0.72 N/mm2
Links = H8-225

1C10 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 770.7 0.0 0.0 761.2 2.2 -0.5
2 639.7 0.0 0.0 630.3 6.8 -0.5
3 591.2 0.0 0.0 581.7 2.0 -0.4
4 761.1 0.0 0.0 751.6 -2.2 -0.5
5 727.3 0.0 0.0 717.9 2.9 -0.5
6 743.8 0.0 0.0 734.3 2.3 -0.5
7 767.5 0.0 0.0 758.1 2.9 -0.5
8 789.3 0.0 0.0 779.8 -2.0 -0.5
9 724.6 0.0 0.0 715.1 3.2 -0.5
10 638.4 0.0 0.0 628.9 6.5 -0.5
11 591.2 0.0 0.0 581.7 2.0 -0.4
12 735.0 0.0 0.0 726.9 -41.6 -0.5
13 562.1 0.0 0.0 554.0 45.3 -0.4
14 646.9 0.0 0.0 638.8 2.2 -13.1
15 650.2 0.0 0.0 642.1 1.5 12.2
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 735.0 - 735.0
M1 (kN.m) -41.6 -11.0 -48.4 300
M2 (kN.m) -0.5 -11.0 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.327 Le1/b1 = 7.3 < 15.0 300
Beta = 0.62 Le2/b2 = 7.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 15.1 / 4.4 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.98 / 1.02 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.20 / 0.06 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-24

2C10 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 626.3 -1.9 0.8 616.8 -1.6 -0.7
2 520.9 -10.4 0.7 511.5 6.4 -0.7
3 477.7 -2.0 0.5 468.3 -0.9 -0.5
4 610.4 5.4 0.7 600.9 -7.3 -0.7
5 592.7 -3.2 0.8 583.3 -0.3 -0.7
6 604.3 -2.2 0.7 594.8 -1.4 -0.7
7 623.5 -3.3 0.8 614.0 -0.2 -0.7
8 633.7 5.1 0.8 624.3 -7.0 -0.7
9 590.6 -3.6 0.8 581.2 -0.2 -0.7
10 519.5 -9.8 0.7 510.1 5.9 -0.7
11 477.7 -2.0 0.5 468.3 -0.9 -0.5
12 568.6 26.0 0.5 560.5 -32.8 -0.3
13 483.8 -29.3 0.8 475.7 30.2 -0.9
14 524.4 -2.7 -11.3 516.3 -0.3 -3.3
15 528.0 -0.6 12.6 519.9 -2.3 2.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 626.3 - 626.3
M1 (kN.m) -1.9 -9.4 0.0 300
M2 (kN.m) 0.8 9.4 15.7
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.278 Le1/b1 = 6.0 < 15.0 300
Beta = 0.68 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 2.7 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.71 / 0.87 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.00 / 0.03 N/mm2
Links = H8-225

3C10 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 471.0 4.8 0.6 461.5 -6.4 -0.9
2 392.2 -2.8 0.6 382.8 1.3 -0.8
3 354.9 3.7 0.4 345.5 -5.0 -0.5
4 452.0 9.2 0.5 442.6 -10.4 -0.7
5 448.2 3.7 0.6 438.8 -5.3 -0.8
6 453.7 4.6 0.5 444.2 -6.3 -0.8
7 469.4 3.3 0.6 459.9 -4.8 -0.9
8 470.6 8.8 0.6 461.1 -9.9 -0.8
9 446.7 3.7 0.6 437.2 -5.4 -0.8
10 391.0 -2.2 0.6 381.6 0.7 -0.8
11 354.9 3.7 0.4 345.5 -5.0 -0.5
12 410.9 17.3 0.7 402.8 -21.7 -0.6
13 378.7 -9.3 0.3 370.6 11.0 -0.9
14 393.5 3.5 -1.9 385.4 -4.8 -3.4
15 396.0 4.5 2.9 387.9 -5.9 1.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 471.0 - 471.0
M1 (kN.m) -6.4 -7.1 0.0 300
M2 (kN.m) -0.9 -7.1 -12.4
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.209 Le1/b1 = 6.0 < 15.0 300
Beta = 0.76 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 13.0 / 0.3 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.07 / 0.73 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.17 / 0.00 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-25

4C10 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 309.4 6.4 0.5 299.9 -6.2 0.9
2 257.1 -1.2 0.4 247.7 1.6 0.8
3 227.2 4.9 0.3 217.7 -4.3 0.6
4 289.6 10.3 0.5 280.2 -10.5 0.7
5 297.7 5.4 0.5 288.2 -5.1 0.4
6 296.6 6.3 0.5 287.1 -6.1 0.8
7 309.2 4.8 0.5 299.8 -4.5 0.9
8 303.4 9.7 0.5 293.9 -9.9 0.7
9 296.5 5.6 0.5 287.0 -5.4 0.4
10 256.2 -0.6 0.4 246.7 1.0 0.9
11 227.2 4.9 0.3 217.7 -4.3 0.6
12 261.6 12.8 0.5 253.5 -14.6 0.7
13 254.6 -2.1 0.3 246.5 4.3 0.7
14 257.3 5.0 -2.0 249.2 -4.8 -1.3
15 258.9 5.6 2.9 250.8 -5.5 2.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 309.4 - 309.4
M1 (kN.m) 6.4 4.6 10.3 300
M2 (kN.m) 0.9 4.6 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.138 Le1/b1 = 6.0 < 15.0 300
Beta = 0.84 Le2/b2 = 6.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 9.1 / 0.0 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.93 / 0.67 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.12 / 0.00 N/mm2
Links = H8-225

5C10 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 145.7 11.5 2.3 136.2 -17.5 -1.5
2 119.0 5.4 2.1 109.5 -10.0 -1.3
3 97.5 10.8 1.5 88.0 -17.9 -0.7
4 126.2 12.6 1.9 116.7 -18.0 -1.2
5 144.8 11.5 1.8 135.4 -17.2 -1.5
6 137.1 11.6 2.1 127.7 -18.0 -1.3
7 146.8 10.7 2.3 137.3 -16.3 -1.5
8 135.3 12.0 2.0 125.9 -16.9 -1.4
9 144.1 11.6 1.8 134.7 -17.4 -1.5
10 118.4 5.9 2.2 109.0 -10.6 -1.3
11 97.5 10.8 1.5 88.0 -17.9 -0.7
12 118.7 11.2 1.9 110.6 -17.6 -1.2
13 120.4 8.3 1.9 112.3 -12.3 -1.3
14 119.1 9.6 0.0 111.0 -14.8 -1.3
15 119.9 9.9 3.8 111.8 -15.1 -1.2
Critical Combination:3 - ((G+Q)P12 *F)
Min Design
N (kN) 97.5 - 97.5
M1 (kN.m) -17.9 -1.5 -19.3 300
M2 (kN.m) 1.5 1.5 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.043 Le1/b1 = 6.0 < 15.0 300
Beta = 0.95 Le2/b2 = 6.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 9.6 / 0.4 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.74 / 0.72 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.12 / 0.01 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-26

1C11 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1180.8 0.0 0.0 1171.4 15.9 -0.3
2 957.8 0.0 0.0 948.3 9.6 -0.3
3 912.1 0.0 0.0 902.6 7.5 -0.1
4 1038.3 0.0 0.0 1028.9 16.0 -0.3
5 769.0 0.0 0.0 759.5 10.8 -0.2
6 1178.6 0.0 0.0 1169.2 16.4 -0.3
7 811.9 0.0 0.0 802.4 11.7 -0.2
8 1035.0 0.0 0.0 1025.5 15.5 -0.3
9 925.1 0.0 0.0 915.7 7.0 -0.2
10 963.3 0.0 0.0 953.9 9.7 -0.2
11 912.1 0.0 0.0 902.6 7.5 -0.1
12 1009.6 0.0 0.0 1001.5 -28.4 0.0
13 971.2 0.0 0.0 963.1 55.2 -0.4
14 996.9 0.0 0.0 988.8 11.8 -12.4
15 983.8 0.0 0.0 975.7 14.9 11.9
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 971.2 - 971.2
M1 (kN.m) 55.2 14.6 62.4 300
M2 (kN.m) -0.4 -14.6 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.432 Le1/b1 = 7.5 < 15.0 300
Beta = 0.50 Le2/b2 = 9.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 18.4 / 0.1 kN As (Required): %1.63 1466.22 mm2 8H16
vc'(1/2)= 1.27 / 1.15 N/mm2 As (Provided): %1.79 1608.50 mm2
v (1/2)= 0.24 / 0.00 N/mm2
Links = H8-175

2C11 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 929.3 -29.8 -0.3 919.8 27.3 1.3
2 761.1 -18.0 -0.3 751.6 16.2 1.3
3 714.6 -14.1 -0.2 705.2 12.8 0.8
4 817.1 -29.9 -0.2 807.7 27.5 1.2
5 615.1 -20.2 -0.3 605.7 18.2 1.3
6 927.3 -30.8 -0.2 917.8 28.3 1.3
7 647.2 -21.9 -0.3 637.8 19.8 1.3
8 813.6 -28.8 -0.2 804.2 26.6 1.2
9 738.4 -13.0 -0.3 728.9 11.3 1.3
10 766.5 -18.0 -0.3 757.1 16.1 1.2
11 714.6 -14.1 -0.2 705.2 12.8 0.8
12 789.9 0.3 0.0 781.8 -7.2 0.7
13 768.2 -50.3 -0.4 760.1 53.0 1.4
14 783.4 -22.9 -12.0 775.3 21.3 -1.8
15 774.7 -27.1 11.6 766.6 24.5 3.9
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 768.2 - 768.2
M1 (kN.m) 53.0 11.5 60.0 300
M2 (kN.m) 1.4 11.5 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.341 Le1/b1 = 6.4 < 15.0 300
Beta = 0.60 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 34.5 / 2.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.51 / 0.95 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.45 / 0.03 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-27

3C11 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 677.7 -26.1 1.3 668.3 25.7 -4.6
2 564.2 -15.8 1.2 554.7 15.3 -4.3
3 517.3 -12.4 0.8 507.8 12.0 -2.5
4 595.6 -26.0 1.3 586.2 25.6 -4.6
5 460.1 -17.5 1.3 450.6 17.0 -4.5
6 676.2 -27.3 1.4 666.8 26.8 -4.6
7 481.7 -19.0 1.3 472.2 18.6 -4.5
8 592.6 -25.3 1.3 583.1 25.0 -4.6
9 550.3 -10.9 1.3 540.9 10.3 -4.6
10 568.8 -15.4 1.2 559.3 14.8 -4.3
11 517.3 -12.4 0.8 507.8 12.0 -2.5
12 573.2 -8.8 0.7 565.1 4.8 -4.0
13 562.2 -35.1 1.5 554.1 38.3 -3.5
14 570.5 -20.7 -1.5 562.4 20.6 -6.7
15 564.9 -23.2 3.7 556.8 22.5 -0.8
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 562.2 - 562.2
M1 (kN.m) 38.3 8.4 44.3 300
M2 (kN.m) -3.5 -8.4 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.250 Le1/b1 = 6.4 < 15.0 300
Beta = 0.71 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 24.5 / 1.7 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.27 / 0.91 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.32 / 0.02 N/mm2
Links = H8-225

4C11 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 426.0 -28.0 -4.5 416.6 29.4 18.9
2 367.1 -16.9 -4.4 357.7 17.9 18.1
3 319.9 -13.5 -2.5 310.5 14.5 10.7
4 373.7 -27.7 -4.6 364.3 28.9 18.7
5 304.3 -18.6 -4.5 294.9 19.4 18.2
6 425.0 -29.2 -4.6 415.6 30.6 19.1
7 315.5 -20.2 -4.6 306.1 21.1 18.7
8 371.4 -27.1 -4.5 362.0 28.2 18.5
9 361.6 -11.8 -4.6 352.2 12.6 18.7
10 370.4 -16.4 -4.4 361.0 17.5 18.1
11 319.9 -13.5 -2.5 310.5 14.5 10.7
12 358.6 -15.0 -3.9 350.5 14.0 15.6
13 353.8 -32.0 -3.5 345.7 35.4 15.4
14 358.1 -22.7 -6.6 350.0 24.2 14.4
15 354.3 -24.3 -0.9 346.2 25.3 16.6
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 353.8 - 353.8
M1 (kN.m) 35.4 5.3 48.0 300
M2 (kN.m) 15.4 5.3 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.157 Le1/b1 = 6.4 < 15.0 300
Beta = 0.82 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 22.5 / 7.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.04 / 0.87 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.29 / 0.10 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-28

5C11 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 173.4 -15.6 19.1 163.9 -0.4 -70.9
2 169.3 -7.5 18.3 159.9 -1.4 -69.5
3 122.1 -5.5 10.8 112.6 -4.7 -38.4
4 151.0 -17.3 19.0 141.5 0.6 -69.9
5 147.9 -11.0 18.4 138.5 2.7 -71.7
6 173.1 -17.2 19.4 163.6 1.2 -71.0
7 148.6 -12.2 18.8 139.1 3.2 -71.7
8 149.4 -16.5 18.8 139.9 0.5 -70.3
9 172.2 -3.7 18.9 162.7 -5.7 -72.5
10 171.2 -6.7 18.3 161.8 -2.8 -69.0
11 122.1 -5.5 10.8 112.6 -4.7 -38.4
12 144.6 -9.8 15.8 136.5 -5.3 -58.7
13 143.2 -16.8 15.6 135.1 5.2 -57.8
14 145.3 -12.8 14.7 137.2 -0.4 -62.0
15 142.5 -13.8 16.7 134.4 0.3 -54.5
Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 151.0 - 151.0
M1 (kN.m) -17.3 -2.3 0.0 300
M2 (kN.m) -69.9 -2.3 -85.8
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.067 Le1/b1 = 6.3 < 15.0 300
Beta = 0.92 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 30.2 kN As (Required): %1.75 1575.57 mm2 8H16
vc'(1/2)= 0.72 / 0.81 N/mm2 As (Provided): %1.79 1608.50 mm2
v (1/2)= 0.00 / 0.39 N/mm2
Links = H8-175

1C12 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1238.9 0.0 0.0 1229.4 5.5 -36.0
2 954.9 0.0 0.0 945.5 4.1 -25.3
3 836.8 0.0 0.0 827.4 3.6 -21.6
4 1236.1 0.0 0.0 1226.7 5.5 -36.9
5 1089.9 0.0 0.0 1080.5 4.8 -37.0
6 1231.9 0.0 0.0 1222.4 5.5 -36.3
7 1093.3 0.0 0.0 1083.8 4.8 -35.7
8 1071.1 0.0 0.0 1061.6 4.7 -27.6
9 1127.2 0.0 0.0 1117.7 5.0 -37.6
10 1127.0 0.0 0.0 1117.6 5.0 -34.3
11 836.8 0.0 0.0 827.4 3.6 -21.6
12 1054.5 0.0 0.0 1046.4 -10.4 -32.8
13 1036.3 0.0 0.0 1028.2 19.6 -27.8
14 1034.1 0.0 0.0 1026.0 4.4 -71.2
15 1056.7 0.0 0.0 1048.6 4.9 10.6
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 1034.1 - 1034.1
M1 (kN.m) 4.4 15.5 0.0 300
M2 (kN.m) -71.2 -15.5 -78.4
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.460 Le1/b1 = 7.9 < 15.0 300
Beta = 0.46 Le2/b2 = 7.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.2 / 23.7 kN As (Required): %2.34 2107.80 mm2 8H20
vc'(1/2)= 1.30 / 1.42 N/mm2 As (Provided): %2.79 2513.27 mm2
v (1/2)= 0.02 / 0.31 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-29

2C12 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 923.7 -9.8 69.0 914.3 7.7 -66.8
2 715.0 -7.4 48.4 705.6 5.8 -46.8
3 628.0 -6.4 41.5 618.5 5.0 -40.1
4 920.4 -9.8 70.7 910.9 7.8 -68.6
5 812.5 -8.6 70.6 803.0 6.7 -68.2
6 917.5 -9.8 69.7 908.0 7.7 -67.7
7 815.5 -8.6 68.1 806.0 6.8 -65.9
8 801.4 -8.3 53.0 791.9 6.7 -51.4
9 840.5 -8.9 71.7 831.1 7.0 -69.2
10 840.3 -8.9 65.3 830.9 7.0 -63.2
11 628.0 -6.4 41.5 618.5 5.0 -40.1
12 784.9 -23.4 63.5 776.8 4.5 -61.5
13 774.3 7.0 52.5 766.2 8.5 -50.9
14 773.8 -8.2 92.0 765.7 6.6 -93.2
15 785.4 -8.3 24.0 777.3 6.5 -19.2
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 773.8 - 773.8
M1 (kN.m) -8.2 -11.6 0.0 300
M2 (kN.m) -93.2 -11.6 -100.1
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.344 Le1/b1 = 7.3 < 15.0 300
Beta = 0.60 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 61.7 kN As (Required): %2.54 2287.27 mm2 8H20
vc'(1/2)= 0.91 / 1.70 N/mm2 As (Provided): %2.79 2513.27 mm2
v (1/2)= 0.01 / 0.80 N/mm2
Links = H8-225

3C12 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 620.9 -6.9 66.5 611.4 6.4 -67.4
2 483.6 -5.3 46.7 474.1 4.6 -47.2
3 425.4 -4.6 40.1 416.0 4.2 -40.5
4 617.6 -6.8 68.3 608.1 6.5 -69.4
5 546.9 -6.1 67.6 537.5 5.5 -68.4
6 615.9 -6.9 67.6 606.4 6.3 -68.6
7 549.2 -6.1 65.4 539.7 5.5 -66.2
8 541.0 -5.9 51.2 531.5 5.6 -51.9
9 565.5 -6.3 68.6 556.1 5.7 -69.4
10 565.2 -6.3 62.7 555.7 5.6 -63.5
11 425.4 -4.6 40.1 416.0 4.2 -40.5
12 527.1 -7.9 58.5 519.0 2.9 -59.7
13 521.3 -3.7 53.4 513.2 7.8 -53.7
14 522.3 -5.6 73.5 514.2 5.4 -77.5
15 526.1 -6.0 38.4 518.0 5.4 -35.9
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 522.3 - 522.3
M1 (kN.m) -5.6 -7.8 0.0 300
M2 (kN.m) -77.5 -7.8 -83.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.232 Le1/b1 = 7.3 < 15.0 300
Beta = 0.73 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.6 / 50.3 kN As (Required): %1.17 1054.84 mm2 4H20
vc'(1/2)= 1.07 / 1.23 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.05 / 0.65 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-30

4C12 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 321.0 -8.2 72.8 311.5 9.2 -75.5
2 254.0 -6.4 51.4 244.6 7.7 -53.1
3 224.1 -5.4 44.0 214.7 6.1 -45.6
4 318.1 -8.0 74.7 308.7 8.4 -77.6
5 283.9 -7.2 73.2 274.5 8.4 -76.1
6 317.6 -8.1 74.2 308.2 9.0 -77.0
7 285.4 -7.2 71.3 276.0 8.4 -74.0
8 282.8 -6.9 56.0 273.3 7.1 -58.2
9 293.2 -7.4 74.4 283.7 8.6 -77.3
10 292.7 -7.5 68.6 283.3 9.1 -71.0
11 224.1 -5.4 44.0 214.7 6.1 -45.6
12 272.8 -9.4 62.6 264.7 5.5 -65.1
13 269.9 -4.4 59.8 261.8 9.9 -61.8
14 271.3 -6.8 71.8 263.2 7.8 -76.2
15 271.4 -7.0 50.7 263.3 7.7 -50.7
Critical Combination:9 - ((G+Q)P42 *F)
Min Design
N (kN) 293.2 - 293.2
M1 (kN.m) 8.6 4.4 0.0 300
M2 (kN.m) -77.3 -4.4 -84.6
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.130 Le1/b1 = 7.3 < 15.0 300
Beta = 0.85 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.8 / 49.3 kN As (Required): %1.30 1170.28 mm2 4H20
vc'(1/2)= 0.87 / 0.95 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.06 / 0.64 N/mm2
Links = H8-225

5C12 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 18.0 -5.5 55.6 8.6 0.4 -36.8
2 22.3 -3.4 39.8 12.8 0.6 -26.8
3 20.8 -3.6 33.0 11.3 0.6 -22.6
4 15.7 -6.3 56.5 6.3 0.3 -37.6
5 17.6 -4.4 55.3 8.2 0.4 -35.6
6 16.5 -5.5 56.6 7.0 0.4 -38.0
7 18.4 -4.5 54.3 9.0 0.5 -34.5
8 22.3 -5.4 42.1 12.9 0.6 -29.4
9 17.5 -4.7 55.7 8.0 0.4 -36.9
10 17.3 -4.2 53.3 7.8 0.4 -33.9
11 20.8 -3.6 33.0 11.3 0.6 -22.6
12 16.3 -6.9 47.2 8.2 0.4 -31.5
13 15.3 -2.4 46.4 7.2 0.4 -30.4
14 16.2 -4.6 49.8 8.1 0.4 -35.5
15 15.4 -4.7 43.9 7.3 0.4 -26.5
Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 15.7 - 15.7
M1 (kN.m) -6.3 -0.2 0.0 300
M2 (kN.m) 56.5 0.2 62.7
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.007 Le1/b1 = 6.9 < 15.0 300
Beta = 0.99 Le2/b2 = 6.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.4 / 31.5 kN As (Required): %1.39 1247.70 mm2 4H20
vc'(1/2)= 0.67 / 0.67 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.03 / 0.41 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-31

1C13 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 988.4 0.0 0.0 980.0 -7.0 8.6
2 862.3 0.0 0.0 853.9 -5.0 8.7
3 707.0 0.0 0.0 698.6 -3.7 9.7
4 900.2 0.0 0.0 891.8 -8.5 9.1
5 807.7 0.0 0.0 799.3 -7.5 4.6
6 958.2 0.0 0.0 949.8 -6.0 8.9
7 892.9 0.0 0.0 884.5 -7.7 9.5
8 910.9 0.0 0.0 902.5 -9.7 8.4
9 828.4 0.0 0.0 820.0 -6.9 3.9
10 881.9 0.0 0.0 873.5 -4.7 9.1
11 707.0 0.0 0.0 698.6 -3.7 9.7
12 798.1 0.0 0.0 790.9 -28.9 7.5
13 858.0 0.0 0.0 850.8 17.0 7.1
14 812.6 0.0 0.0 805.4 -6.4 -33.4
15 843.5 0.0 0.0 836.3 -5.4 48.0
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 798.1 - 798.1
M1 (kN.m) -28.9 -8.0 -32.7 400
M2 (kN.m) 7.5 16.0 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.399 Le1/b1 = 10.9 < 15.0 200
Beta = 0.53 Le2/b2 = 6.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 9.6 / 16.0 kN As (Required): %1.23 980.50 mm2 6H16
vc'(1/2)= 1.10 / 1.36 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.15 / 0.22 N/mm2
Links = H8-175

2C13 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 791.0 12.5 -14.4 782.6 -11.4 11.9
2 686.1 8.6 -14.8 677.7 -7.7 12.4
3 559.2 6.3 -16.7 550.8 -5.7 14.4
4 718.3 15.6 -15.2 709.9 -14.6 12.6
5 643.7 13.7 -7.5 635.3 -12.8 5.8
6 765.8 10.5 -14.9 757.4 -9.5 12.4
7 711.3 14.0 -16.1 702.9 -13.1 13.5
8 726.1 18.1 -14.1 717.7 -17.2 11.6
9 662.6 12.3 -6.1 654.2 -11.3 4.6
10 703.5 8.0 -15.4 695.1 -7.0 12.9
11 559.2 6.3 -16.7 550.8 -5.7 14.4
12 647.2 31.8 -12.5 640.0 -31.2 10.4
13 675.4 -10.6 -11.9 668.2 11.7 9.7
14 654.8 11.4 0.1 647.6 -10.3 -15.0
15 667.9 9.8 -24.5 660.7 -9.2 35.1
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 647.2 - 647.2
M1 (kN.m) 31.8 6.5 35.4 400
M2 (kN.m) -12.5 -12.9 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.324 Le1/b1 = 9.1 < 15.0 200
Beta = 0.62 Le2/b2 = 5.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 21.0 / 5.0 kN As (Required): %1.04 831.30 mm2 6H16
vc'(1/2)= 1.29 / 1.20 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.33 / 0.07 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-32

3C13 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 591.0 9.5 -9.3 582.6 -9.3 8.9
2 507.2 6.0 -10.2 498.8 -5.8 10.0
3 408.2 4.4 -12.3 399.8 -4.2 12.4
4 533.9 13.0 -10.1 525.5 -12.7 9.8
5 476.4 11.1 -4.0 468.0 -11.0 3.5
6 570.7 7.6 -9.9 562.3 -7.4 9.6
7 527.3 11.6 -11.1 518.9 -11.5 10.9
8 540.4 15.9 -9.1 532.0 -15.7 8.8
9 491.6 9.3 -2.7 483.2 -9.1 2.2
10 520.9 5.0 -10.6 512.5 -4.7 10.4
11 408.2 4.4 -12.3 399.8 -4.2 12.4
12 488.4 20.1 -8.0 481.2 -20.2 7.8
13 496.3 -3.8 -7.8 489.1 4.4 7.4
14 490.0 8.6 -1.3 482.8 -8.2 -6.8
15 494.7 7.7 -14.4 487.5 -7.6 21.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 591.0 - 591.0
M1 (kN.m) 9.5 5.9 13.0 400
M2 (kN.m) -9.3 -11.8 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.295 Le1/b1 = 9.1 < 15.0 200
Beta = 0.66 Le2/b2 = 5.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 13.4 / 1.8 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 1.16 / 0.96 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.21 / 0.03 N/mm2
Links = H8-175

4C13 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 389.4 8.3 -8.1 381.0 -8.0 9.2
2 327.2 5.0 -9.3 318.8 -4.7 10.2
3 255.6 3.6 -11.9 247.2 -3.6 12.7
4 347.6 11.9 -9.0 339.2 -11.8 9.9
5 306.8 10.3 -3.2 298.4 -10.1 4.3
6 374.3 6.4 -8.8 365.9 -6.2 9.9
7 342.2 10.8 -10.1 333.8 -10.6 11.0
8 353.7 15.0 -8.0 345.3 -14.8 8.9
9 317.3 8.1 -2.0 308.9 -7.9 3.3
10 336.2 3.7 -9.6 327.8 -3.4 10.6
11 255.6 3.6 -11.9 247.2 -3.6 12.7
12 322.5 14.4 -7.1 315.3 -14.5 8.1
13 321.7 -0.2 -6.9 314.5 0.6 7.8
14 321.6 7.3 -3.0 314.4 -7.1 -1.0
15 322.5 6.9 -10.9 315.3 -6.8 16.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 389.4 - 389.4
M1 (kN.m) 8.3 3.9 11.4 400
M2 (kN.m) 9.2 7.8 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.195 Le1/b1 = 9.1 < 15.0 200
Beta = 0.78 Le2/b2 = 5.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 9.7 / 0.7 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 1.03 / 0.81 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.15 / 0.01 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-33

5C13 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 187.9 8.2 -2.7 179.5 -8.8 1.8
2 147.0 5.8 -5.3 138.6 -6.3 5.0
3 102.1 2.2 -8.8 93.7 -0.8 9.6
4 160.8 9.9 -4.4 152.4 -9.6 3.9
5 136.7 11.4 2.1 128.3 -12.6 -7.0
6 177.8 5.7 -3.7 169.4 -5.7 3.2
7 157.0 11.9 -5.9 148.6 -13.2 5.8
8 166.8 13.8 -3.4 158.4 -14.1 2.4
9 141.5 8.9 4.0 133.1 -10.1 -9.2
10 151.0 4.4 -5.2 142.6 -4.9 5.0
11 102.1 2.2 -8.8 93.7 -0.8 9.6
12 153.2 10.4 -2.5 146.0 -10.9 1.3
13 150.4 3.2 -2.2 143.2 -3.3 1.0
14 151.8 6.9 -1.4 144.6 -7.1 -3.1
15 151.7 6.7 -3.3 144.5 -7.1 5.4
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 136.7 - 136.7
M1 (kN.m) -12.6 -1.4 -15.5 400
M2 (kN.m) -7.0 -2.7 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.068 Le1/b1 = 9.1 < 15.0 200
Beta = 0.92 Le2/b2 = 5.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 8.0 / 0.6 kN As (Required): %1.00 (min) 800.00 mm2 6H16
vc'(1/2)= 0.88 / 0.69 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.13 / 0.01 N/mm2
Links = H8-175

1C14 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1441.8 0.0 0.0 1433.4 3.3 -33.3
2 1207.2 0.0 0.0 1198.8 5.1 -21.4
3 1037.6 0.0 0.0 1029.2 2.9 -14.0
4 1339.2 0.0 0.0 1330.8 1.1 -32.9
5 1202.6 0.0 0.0 1194.2 4.4 -39.1
6 1394.0 0.0 0.0 1385.6 3.3 -30.6
7 1211.3 0.0 0.0 1202.9 3.9 -37.7
8 1200.9 0.0 0.0 1192.5 0.8 -25.0
9 1379.2 0.0 0.0 1370.8 5.1 -34.1
10 1393.3 0.0 0.0 1384.9 5.5 -32.0
11 1037.6 0.0 0.0 1029.2 2.9 -14.0
12 1232.5 0.0 0.0 1225.3 -17.7 -30.1
13 1181.8 0.0 0.0 1174.6 23.3 -25.9
14 1217.8 0.0 0.0 1210.6 3.3 -82.8
15 1196.6 0.0 0.0 1189.4 2.4 26.8
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 1217.8 - 1217.8
M1 (kN.m) 3.3 12.2 0.0 400
M2 (kN.m) -82.8 -24.4 -91.1
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.609 Le1/b1 = 5.7 < 15.0 200
Beta = 0.30 Le2/b2 = 11.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 7.8 / 27.6 kN As (Required): %3.26 2604.41 mm2 10H20
vc'(1/2)= 1.54 / 1.93 N/mm2 As (Provided): %3.93 3141.59 mm2
v (1/2)= 0.12 / 0.39 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-34

2C14 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1119.0 -7.2 60.3 1110.6 7.4 -56.1
2 941.8 -10.5 38.8 933.4 10.5 -36.3
3 800.6 -6.3 25.4 792.2 6.4 -23.5
4 1036.6 -2.8 59.7 1028.2 3.2 -55.5
5 923.8 -9.1 70.9 915.4 9.2 -66.0
6 1080.5 -7.1 55.4 1072.1 7.3 -51.5
7 932.6 -8.2 68.4 924.2 8.1 -63.8
8 940.2 -1.9 45.4 931.8 2.1 -42.2
9 1063.5 -10.8 61.9 1055.1 11.1 -57.6
10 1076.7 -11.5 58.1 1068.3 11.7 -54.2
11 800.6 -6.3 25.4 792.2 6.4 -23.5
12 948.7 10.8 54.7 941.5 -11.3 -50.6
13 922.1 -22.9 46.7 914.9 23.8 -43.8
14 940.8 -7.0 86.0 933.6 7.1 -90.1
15 929.9 -5.1 15.4 922.7 5.4 -4.3
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 940.8 - 940.8
M1 (kN.m) 7.1 9.4 0.0 400
M2 (kN.m) -90.1 -18.8 -99.8
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.470 Le1/b1 = 9.3 < 15.0 200
Beta = 0.45 Le2/b2 = 5.1 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 15.6 / 58.7 kN As (Required): %2.77 2212.20 mm2 8H20
vc'(1/2)= 1.71 / 2.41 N/mm2 As (Provided): %3.14 2513.27 mm2
v (1/2)= 0.25 / 0.82 N/mm2
Links = H8-225

3C14 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 802.9 -8.6 53.1 794.5 9.0 -53.7
2 682.3 -11.5 34.6 673.9 11.8 -35.2
3 568.2 -7.4 22.2 559.8 7.7 -22.2
4 739.8 -4.4 52.5 731.4 4.8 -53.1
5 652.0 -10.3 62.5 643.6 10.7 -63.3
6 773.3 -8.6 48.6 764.9 9.0 -49.1
7 659.6 -9.0 60.4 651.2 9.2 -61.3
8 682.8 -2.9 40.1 674.4 3.2 -40.6
9 757.2 -12.6 54.6 748.8 13.1 -55.2
10 768.9 -13.0 51.5 760.5 13.5 -52.2
11 568.2 -7.4 22.2 559.8 7.7 -22.2
12 673.5 1.6 46.7 666.3 -2.0 -47.1
13 664.8 -16.1 42.6 657.6 17.2 -43.1
14 671.3 -7.9 62.5 664.1 8.3 -69.3
15 667.0 -6.6 26.7 659.8 7.0 -20.9
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 671.3 - 671.3
M1 (kN.m) 8.3 6.7 0.0 400
M2 (kN.m) -69.3 -13.4 -80.6
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.336 Le1/b1 = 9.3 < 15.0 200
Beta = 0.61 Le2/b2 = 5.1 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 11.1 / 44.0 kN As (Required): %1.36 1088.45 mm2 6H16
vc'(1/2)= 1.29 / 1.75 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.17 / 0.61 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-35

4C14 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 491.6 -10.0 57.2 483.2 10.1 -58.2
2 426.5 -12.6 37.4 418.1 12.7 -37.3
3 339.1 -8.5 24.8 330.7 8.6 -26.1
4 448.1 -5.8 56.4 439.7 5.8 -57.7
5 384.4 -11.4 66.3 376.0 11.5 -67.4
6 470.6 -9.9 52.6 462.2 10.0 -53.9
7 390.1 -9.9 64.5 381.7 9.8 -65.2
8 429.3 -3.9 42.7 420.9 4.0 -42.6
9 456.7 -14.2 58.3 448.3 14.3 -59.7
10 466.3 -14.5 55.7 457.9 14.6 -56.7
11 339.1 -8.5 24.8 330.7 8.6 -26.1
12 407.3 -3.3 49.3 400.1 2.8 -50.2
13 406.7 -13.6 46.8 399.5 14.1 -47.9
14 407.6 -8.9 59.0 400.4 9.0 -63.7
15 406.4 -7.9 37.2 399.2 8.0 -34.3
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 384.4 - 384.4
M1 (kN.m) 11.5 3.8 0.0 400
M2 (kN.m) -67.4 -7.7 -87.6
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.192 Le1/b1 = 9.3 < 15.0 200
Beta = 0.78 Le2/b2 = 5.1 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 9.2 / 44.6 kN As (Required): %1.19 954.33 mm2 6H16
vc'(1/2)= 1.09 / 1.28 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.15 / 0.62 N/mm2
Links = H8-175

5C14 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 184.1 -11.3 53.2 175.7 12.2 -41.2
2 173.9 -13.3 38.0 165.5 14.8 -35.2
3 112.5 -9.1 18.9 104.1 9.4 -4.6
4 160.5 -7.4 51.1 152.1 7.6 -37.3
5 119.5 -12.8 61.6 111.1 14.4 -53.6
6 171.4 -11.0 47.1 163.0 11.6 -32.5
7 122.9 -11.1 61.6 114.5 12.5 -53.4
8 180.0 -5.5 43.8 171.6 5.8 -41.0
9 160.1 -16.2 52.5 151.7 18.1 -41.4
10 167.2 -15.5 51.3 158.8 17.1 -40.1
11 112.5 -9.1 18.9 104.1 9.4 -4.6
12 147.1 -7.5 45.0 139.9 7.8 -34.4
13 148.8 -11.4 43.2 141.6 12.5 -32.5
14 148.0 -9.9 49.2 140.8 10.5 -41.4
15 147.9 -9.0 39.1 140.7 9.7 -25.5
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 119.5 - 119.5
M1 (kN.m) 14.4 1.2 0.0 400
M2 (kN.m) 61.6 2.4 91.8
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.060 Le1/b1 = 9.2 < 15.0 200
Beta = 0.93 Le2/b2 = 4.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 11.4 / 38.4 kN As (Required): %1.49 1193.42 mm2 6H16
vc'(1/2)= 0.90 / 0.81 N/mm2 As (Provided): %1.51 1206.37 mm2
v (1/2)= 0.18 / 0.53 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-36

1C15 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1106.3 0.0 0.0 1096.8 -4.9 19.6
2 1112.6 0.0 0.0 1103.2 -4.9 18.5
3 908.4 0.0 0.0 899.0 -4.0 10.5
4 895.6 0.0 0.0 886.2 -3.9 15.8
5 1038.2 0.0 0.0 1028.7 -4.6 21.6
6 1109.3 0.0 0.0 1099.8 -4.9 20.1
7 1106.8 0.0 0.0 1097.4 -4.9 20.4
8 892.6 0.0 0.0 883.1 -3.9 15.0
9 1038.4 0.0 0.0 1029.0 -4.6 21.0
10 1112.6 0.0 0.0 1103.2 -4.9 18.8
11 908.4 0.0 0.0 899.0 -4.0 10.5
12 921.9 0.0 0.0 913.8 -18.9 18.7
13 946.8 0.0 0.0 938.7 10.6 14.2
14 931.2 0.0 0.0 923.1 -4.0 -22.4
15 937.6 0.0 0.0 929.5 -4.3 55.3
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 937.6 - 937.6
M1 (kN.m) -4.3 -14.1 0.0 300
M2 (kN.m) 55.3 14.1 62.5
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.417 Le1/b1 = 7.9 < 15.0 300
Beta = 0.51 Le2/b2 = 7.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 6.3 / 18.4 kN As (Required): %1.36 1224.54 mm2 4H20
vc'(1/2)= 1.18 / 1.19 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.08 / 0.24 N/mm2
Links = H8-225

2C15 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 836.6 8.1 -37.4 827.2 -7.2 35.8
2 841.5 8.2 -35.3 832.0 -7.3 33.8
3 688.5 6.6 -20.5 679.0 -5.8 19.7
4 678.3 6.5 -30.4 668.8 -5.8 29.1
5 785.2 7.6 -41.2 775.8 -6.8 39.4
6 839.2 8.1 -38.5 829.7 -7.3 36.8
7 836.9 8.1 -38.8 827.4 -7.3 37.2
8 675.7 6.5 -28.8 666.3 -5.7 27.6
9 785.6 7.6 -40.2 776.2 -6.8 38.5
10 841.5 8.2 -35.8 832.0 -7.3 34.3
11 688.5 6.6 -20.5 679.0 -5.8 19.7
12 699.5 -8.2 -36.6 691.4 -8.5 35.2
13 714.1 21.9 -26.4 706.0 -3.7 25.1
14 704.5 6.9 -3.8 696.4 -6.1 -1.0
15 709.1 6.7 -59.2 701.0 -6.1 61.3
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 709.1 - 709.1
M1 (kN.m) 6.7 10.6 0.0 300
M2 (kN.m) 61.3 10.6 68.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.315 Le1/b1 = 7.3 < 15.0 300
Beta = 0.63 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 40.2 kN As (Required): %1.06 954.73 mm2 4H20
vc'(1/2)= 0.68 / 1.45 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.00 / 0.52 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-37

3C15 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 570.1 5.6 -35.9 560.6 -5.9 36.6
2 573.5 5.6 -34.0 564.1 -6.0 34.6
3 470.3 4.6 -20.2 460.9 -4.9 20.6
4 463.3 4.5 -29.2 453.9 -4.7 29.8
5 535.4 5.2 -39.3 525.9 -5.5 39.9
6 572.1 5.6 -37.0 562.6 -6.0 37.6
7 570.1 5.6 -37.2 560.7 -5.9 37.8
8 461.3 4.5 -27.7 451.8 -4.6 28.3
9 535.8 5.2 -38.4 526.4 -5.5 39.1
10 573.5 5.6 -34.4 564.1 -6.0 35.1
11 470.3 4.6 -20.2 460.9 -4.9 20.6
12 478.0 2.1 -32.6 469.9 -7.6 33.6
13 485.6 7.3 -28.0 477.5 -2.4 28.0
14 480.3 4.7 -16.0 472.2 -5.0 13.5
15 483.3 4.8 -44.5 475.2 -5.0 48.1
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 483.3 - 483.3
M1 (kN.m) -5.0 -7.2 0.0 300
M2 (kN.m) 48.1 7.2 53.6
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.215 Le1/b1 = 7.3 < 15.0 300
Beta = 0.75 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.3 / 30.9 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.00 / 1.18 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.04 / 0.40 N/mm2
Links = H8-225

4C15 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 303.3 6.9 -38.2 293.9 -8.6 39.4
2 305.5 6.9 -36.3 296.1 -8.0 37.3
3 251.9 5.6 -21.5 242.5 -6.5 22.0
4 248.2 5.6 -30.9 238.8 -7.5 31.9
5 285.3 6.5 -41.9 275.8 -8.0 43.3
6 304.8 6.9 -39.4 295.3 -8.4 40.6
7 303.2 7.0 -39.5 293.7 -8.6 40.7
8 246.8 5.6 -29.3 237.3 -7.6 30.2
9 285.6 6.5 -41.1 276.2 -7.8 42.4
10 305.5 7.0 -36.7 296.1 -8.0 37.7
11 251.9 5.6 -21.5 242.5 -6.5 22.0
12 254.8 3.1 -33.4 246.7 -9.4 34.8
13 258.4 8.6 -31.0 250.3 -5.0 31.6
14 255.7 5.8 -23.4 247.6 -7.2 22.3
15 257.5 5.9 -41.0 249.4 -7.2 44.1
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 257.5 - 257.5
M1 (kN.m) -7.2 -3.9 0.0 300
M2 (kN.m) 44.1 3.9 50.3
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.114 Le1/b1 = 7.3 < 15.0 300
Beta = 0.86 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.2 / 28.4 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.85 / 0.93 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.05 / 0.37 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-38

5C15 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 34.4 4.4 -33.9 24.9 -1.3 21.7
2 35.6 5.0 -33.5 26.1 -1.3 21.1
3 32.1 4.0 -20.1 22.6 -1.1 14.4
4 31.6 2.9 -27.3 22.2 -1.1 18.5
5 32.9 4.2 -36.1 23.4 -1.2 22.6
6 35.3 4.6 -34.5 25.9 -1.3 22.6
7 34.1 4.4 -34.3 24.7 -1.2 22.2
8 30.7 2.8 -26.5 21.2 -1.1 17.5
9 33.2 4.3 -35.7 23.8 -1.2 22.1
10 35.6 5.0 -33.6 26.2 -1.3 21.3
11 32.1 4.0 -20.1 22.6 -1.1 14.4
12 29.1 1.5 -28.9 21.0 -1.1 18.9
13 30.2 6.0 -28.4 22.1 -1.1 17.9
14 29.2 3.7 -26.2 21.1 -1.1 14.4
15 30.1 3.7 -31.1 22.0 -1.1 22.4
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 32.9 - 32.9
M1 (kN.m) 4.2 0.5 0.0 300
M2 (kN.m) -36.1 -0.5 -40.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.015 Le1/b1 = 6.9 < 15.0 300
Beta = 0.98 Le2/b2 = 6.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.4 / 19.5 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.68 / 0.69 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.03 / 0.25 N/mm2
Links = H8-225

1C16 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1978.6 0.0 0.0 1969.1 -16.5 35.8
2 1811.0 0.0 0.0 1801.5 -16.0 32.0
3 1609.0 0.0 0.0 1599.5 -16.0 18.9
4 1644.5 0.0 0.0 1635.0 -10.1 29.1
5 1890.7 0.0 0.0 1881.2 -15.9 38.6
6 1973.0 0.0 0.0 1963.5 -16.3 35.9
7 1980.2 0.0 0.0 1970.7 -16.1 36.7
8 1650.8 0.0 0.0 1641.3 -10.2 28.7
9 1890.4 0.0 0.0 1881.0 -15.7 37.8
10 1810.2 0.0 0.0 1800.8 -16.1 32.4
11 1609.0 0.0 0.0 1599.5 -16.0 18.9
12 1641.1 0.0 0.0 1633.0 -56.6 31.2
13 1681.2 0.0 0.0 1673.1 28.9 29.0
14 1661.5 0.0 0.0 1653.4 -13.9 -8.6
15 1660.9 0.0 0.0 1652.8 -13.8 68.8
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 1660.9 - 1660.9
M1 (kN.m) -13.8 -24.9 0.0 300
M2 (kN.m) 68.8 24.9 76.3
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.738 Le1/b1 = 7.5 < 15.0 300
Beta = 0.30 Le2/b2 = 7.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 18.9 / 22.9 kN As (Required): %3.80 3422.78 mm2 12H20
vc'(1/2)= 1.88 / 1.89 N/mm2 As (Provided): %4.19 3769.91 mm2
v (1/2)= 0.24 / 0.30 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-39

2C16 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1514.7 30.8 -67.5 1505.3 -29.8 64.5
2 1380.6 29.9 -60.4 1371.2 -29.0 57.7
3 1225.5 30.0 -35.8 1216.0 -29.0 34.2
4 1266.7 18.6 -55.0 1257.3 -18.0 52.6
5 1448.8 29.6 -72.6 1439.3 -28.7 69.2
6 1510.2 30.3 -67.7 1500.7 -29.4 64.6
7 1515.9 30.0 -69.1 1506.4 -29.0 65.9
8 1272.0 18.9 -54.1 1262.5 -18.1 51.7
9 1448.7 29.2 -71.2 1439.2 -28.3 67.9
10 1379.9 30.1 -61.1 1370.5 -29.2 58.4
11 1225.5 30.0 -35.8 1216.0 -29.0 34.2
12 1260.0 53.4 -59.2 1251.9 -57.4 56.6
13 1282.5 -1.9 -54.2 1274.4 7.5 51.6
14 1271.2 26.2 -28.6 1263.1 -25.3 22.5
15 1271.4 25.3 -84.8 1263.3 -24.6 85.8
Critical Combination:7 - ((G+Q)P32 *F)
Min Design
N (kN) 1515.9 - 1515.9
M1 (kN.m) 30.0 22.7 0.0 300
M2 (kN.m) -69.1 -22.7 -78.1
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.674 Le1/b1 = 6.4 < 15.0 300
Beta = 0.30 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.1 / 56.9 kN As (Required): %3.50 3151.36 mm2 12H20
vc'(1/2)= 1.86 / 2.39 N/mm2 As (Provided): %4.19 3769.91 mm2
v (1/2)= 0.04 / 0.74 N/mm2
Links = H8-225

3C16 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1063.5 28.2 -63.1 1054.0 -28.7 64.3
2 961.8 27.5 -56.5 952.4 -28.0 57.5
3 851.3 27.7 -33.7 841.9 -28.1 34.2
4 898.8 16.9 -51.6 889.3 -17.2 52.7
5 1019.4 27.2 -67.6 1009.9 -27.6 68.7
6 1060.0 27.9 -63.3 1050.5 -28.5 64.4
7 1064.3 27.5 -64.5 1054.9 -28.0 65.6
8 902.9 17.0 -50.8 893.4 -17.2 51.9
9 1019.3 26.7 -66.4 1009.8 -27.2 67.5
10 961.2 27.8 -57.1 951.8 -28.2 58.1
11 851.3 27.7 -33.7 841.9 -28.1 34.2
12 886.4 37.7 -54.0 878.3 -42.0 55.2
13 897.3 9.6 -52.0 889.2 -6.1 52.6
14 891.6 23.9 -38.6 883.5 -24.3 36.2
15 892.1 23.4 -67.4 884.0 -23.8 71.6
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 1019.4 - 1019.4
M1 (kN.m) -27.6 -15.3 0.0 300
M2 (kN.m) 68.7 15.3 81.7
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.453 Le1/b1 = 6.4 < 15.0 300
Beta = 0.47 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 26.6 / 46.3 kN As (Required): %2.42 2179.60 mm2 8H20
vc'(1/2)= 1.78 / 1.81 N/mm2 As (Provided): %2.79 2513.27 mm2
v (1/2)= 0.34 / 0.60 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-40

4C16 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 617.2 30.4 -66.0 607.8 -32.5 67.3
2 547.5 29.9 -59.5 538.1 -31.7 61.0
3 481.3 29.9 -35.4 471.9 -31.8 36.3
4 534.8 17.9 -53.6 525.4 -19.4 54.2
5 594.9 29.3 -70.8 585.4 -31.4 72.1
6 614.9 30.1 -66.2 605.5 -32.2 67.4
7 617.8 29.7 -67.4 608.3 -31.8 68.7
8 537.6 17.9 -52.9 528.1 -19.4 53.6
9 594.8 28.9 -69.6 585.3 -30.9 70.9
10 547.1 30.1 -60.1 537.6 -32.0 61.6
11 481.3 29.9 -35.4 471.9 -31.8 36.3
12 514.4 34.2 -55.9 506.3 -38.3 57.1
13 518.9 16.6 -55.0 510.8 -16.0 56.0
14 516.5 25.5 -46.7 508.4 -27.3 45.9
15 516.9 25.4 -64.2 508.8 -27.1 67.3
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 594.9 - 594.9
M1 (kN.m) -31.4 -8.9 0.0 300
M2 (kN.m) 72.1 8.9 93.9
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.264 Le1/b1 = 6.4 < 15.0 300
Beta = 0.69 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 24.2 / 43.8 kN As (Required): %2.00 1801.97 mm2 8H20
vc'(1/2)= 1.38 / 1.40 N/mm2 As (Provided): %2.79 2513.27 mm2
v (1/2)= 0.31 / 0.57 N/mm2
Links = H8-225

5C16 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 172.5 17.0 -60.5 163.1 -1.6 58.8
2 134.4 18.2 -52.0 124.9 -2.6 47.6
3 112.2 18.3 -30.7 102.8 -2.8 27.9
4 172.6 8.5 -52.8 163.1 -0.3 55.8
5 171.8 16.2 -65.1 162.3 -0.5 61.6
6 171.5 17.3 -61.3 162.1 -1.8 59.8
7 172.8 16.3 -61.7 163.4 -0.8 60.2
8 173.9 8.1 -51.6 164.5 0.1 54.6
9 171.7 16.1 -64.0 162.3 -0.3 60.4
10 134.0 18.4 -52.3 124.6 -2.9 47.9
11 112.2 18.3 -30.7 102.8 -2.8 27.9
12 142.2 18.2 -51.1 134.1 -7.2 49.2
13 143.2 10.6 -50.1 135.1 4.1 48.0
14 142.6 14.5 -46.5 134.5 -1.6 43.0
15 142.8 14.3 -54.7 134.7 -1.5 54.2
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 171.8 - 171.8
M1 (kN.m) 16.2 2.6 0.0 300
M2 (kN.m) -65.1 -2.6 -79.8
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.076 Le1/b1 = 6.3 < 15.0 300
Beta = 0.91 Le2/b2 = 6.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 7.0 / 42.2 kN As (Required): %1.55 1397.10 mm2 8H16
vc'(1/2)= 0.79 / 0.90 N/mm2 As (Provided): %1.79 1608.50 mm2
v (1/2)= 0.09 / 0.54 N/mm2
Links = H8-175

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-41

1C17 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1128.1 0.0 0.0 1118.6 4.1 24.1
2 979.8 0.0 0.0 970.3 3.5 20.9
3 833.7 0.0 0.0 824.2 3.1 13.1
4 1101.1 0.0 0.0 1091.7 4.1 22.8
5 1056.7 0.0 0.0 1047.3 3.8 26.3
6 1074.6 0.0 0.0 1065.1 3.9 22.0
7 1127.3 0.0 0.0 1117.8 4.1 25.0
8 1156.1 0.0 0.0 1146.6 4.3 24.6
9 1056.4 0.0 0.0 1046.9 3.8 25.5
10 978.3 0.0 0.0 968.9 3.5 21.3
11 833.7 0.0 0.0 824.2 3.1 13.1
12 972.2 0.0 0.0 964.1 -11.2 20.2
13 925.9 0.0 0.0 917.8 18.1 20.6
14 963.9 0.0 0.0 955.8 3.7 -16.6
15 934.1 0.0 0.0 926.0 3.2 57.4
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 934.1 - 934.1
M1 (kN.m) 3.2 14.0 0.0 300
M2 (kN.m) 57.4 14.0 64.6
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.415 Le1/b1 = 7.9 < 15.0 300
Beta = 0.51 Le2/b2 = 7.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 6.0 / 19.1 kN As (Required): %1.62 1458.21 mm2 8H16
vc'(1/2)= 1.24 / 1.25 N/mm2 As (Provided): %1.79 1608.50 mm2
v (1/2)= 0.08 / 0.25 N/mm2
Links = H8-175

2C17 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 893.5 -7.2 -45.8 884.0 5.7 44.1
2 773.7 -6.3 -39.7 764.3 4.9 38.3
3 653.0 -5.5 -25.0 643.5 4.4 24.2
4 865.9 -7.2 -43.2 856.5 5.8 41.5
5 839.0 -6.6 -49.7 829.5 5.2 47.7
6 849.6 -6.9 -41.8 840.1 5.4 40.2
7 892.7 -7.2 -47.4 883.2 5.7 45.6
8 911.0 -7.5 -46.6 901.5 6.0 44.8
9 838.7 -6.6 -48.2 829.2 5.2 46.2
10 772.5 -6.3 -40.4 763.1 4.9 38.9
11 653.0 -5.5 -25.0 643.5 4.4 24.2
12 762.4 -21.3 -38.6 754.3 2.5 37.3
13 738.3 9.1 -38.7 730.2 7.1 37.1
14 758.3 -6.2 -13.1 750.2 4.9 7.6
15 742.4 -6.0 -64.3 734.3 4.7 66.9
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 742.4 - 742.4
M1 (kN.m) -6.0 -11.1 0.0 300
M2 (kN.m) 66.9 11.1 73.7
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.330 Le1/b1 = 7.0 < 15.0 300
Beta = 0.61 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.7 / 43.7 kN As (Required): %1.27 1146.99 mm2 4H20
vc'(1/2)= 0.75 / 1.48 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.01 / 0.57 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-42

3C17 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 659.0 -5.6 -43.8 649.5 5.8 45.0
2 567.3 -4.9 -38.1 557.9 5.0 39.2
3 470.8 -4.2 -24.2 461.3 4.3 24.8
4 632.4 -5.4 -41.1 622.9 5.7 42.2
5 621.8 -5.2 -47.1 612.4 5.4 48.3
6 624.1 -5.4 -40.1 614.7 5.5 41.2
7 658.4 -5.6 -45.3 648.9 5.8 46.5
8 668.0 -5.6 -44.3 658.6 6.0 45.5
9 621.6 -5.2 -45.7 612.2 5.4 46.9
10 566.6 -4.9 -38.6 557.1 5.0 39.7
11 470.8 -4.2 -24.2 461.3 4.3 24.8
12 557.1 -7.3 -36.6 549.0 2.3 37.8
13 546.6 -2.1 -37.4 538.5 7.5 38.1
14 555.2 -4.8 -24.0 547.1 4.9 21.4
15 548.5 -4.6 -49.9 540.4 4.9 54.5
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 548.5 - 548.5
M1 (kN.m) 4.9 8.2 0.0 300
M2 (kN.m) 54.5 8.2 60.4
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.244 Le1/b1 = 7.0 < 15.0 300
Beta = 0.72 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.2 / 34.8 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.05 / 1.25 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.04 / 0.45 N/mm2
Links = H8-225

4C17 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 424.0 -5.5 -45.2 414.5 4.0 45.0
2 360.4 -4.9 -39.5 350.9 4.2 39.5
3 287.7 -4.4 -25.5 278.3 4.1 26.1
4 398.9 -5.4 -42.5 389.4 3.8 42.6
5 404.2 -5.0 -48.7 394.8 3.6 48.4
6 397.9 -5.3 -41.5 388.4 4.1 41.6
7 423.6 -5.4 -46.6 414.1 4.0 46.4
8 425.3 -5.6 -45.7 415.8 3.7 45.6
9 404.2 -5.0 -47.2 394.7 3.7 46.9
10 360.0 -4.8 -39.9 350.6 4.2 40.0
11 287.7 -4.4 -25.5 278.3 4.1 26.1
12 354.5 -7.4 -37.8 346.4 1.3 37.9
13 351.2 -1.9 -38.6 343.1 5.7 38.4
14 353.8 -4.7 -30.3 345.7 3.5 28.2
15 351.9 -4.6 -46.1 343.8 3.4 48.2
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 351.9 - 351.9
M1 (kN.m) -4.6 -5.3 0.0 300
M2 (kN.m) 48.2 5.3 52.5
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.156 Le1/b1 = 7.0 < 15.0 300
Beta = 0.82 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.9 / 31.4 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.90 / 1.04 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.04 / 0.41 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-43

5C17 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 191.6 -7.1 -51.6 182.1 9.1 64.2
2 155.6 -5.6 -44.0 146.1 7.3 53.7
3 105.9 -4.5 -24.6 96.4 4.8 26.4
4 167.4 -7.3 -46.5 158.0 7.8 54.9
5 189.5 -6.7 -55.6 180.0 9.0 66.7
6 173.8 -6.6 -46.2 164.4 8.2 56.0
7 191.5 -7.1 -53.4 182.0 9.1 66.2
8 185.1 -7.8 -51.7 175.6 8.8 62.7
9 189.6 -6.5 -53.9 180.1 9.0 64.9
10 155.7 -5.6 -44.3 146.3 7.3 54.1
11 105.9 -4.5 -24.6 96.4 4.8 26.4
12 155.9 -8.2 -42.7 147.8 7.4 52.1
13 156.0 -3.7 -43.2 147.9 7.4 52.6
14 155.8 -5.9 -39.2 147.7 7.4 46.9
15 156.1 -5.9 -46.6 148.0 7.4 57.8
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 189.5 - 189.5
M1 (kN.m) 9.0 2.8 0.0 300
M2 (kN.m) 66.7 2.8 74.8
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.084 Le1/b1 = 6.7 < 15.0 300
Beta = 0.90 Le2/b2 = 6.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.1 / 40.8 kN As (Required): %1.27 1142.22 mm2 4H20
vc'(1/2)= 0.77 / 0.85 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.04 / 0.53 N/mm2
Links = H8-225

1C18 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1022.5 0.0 0.0 1013.0 -4.1 19.7
2 946.8 0.0 0.0 937.4 -3.7 13.6
3 765.6 0.0 0.0 756.1 -3.0 9.2
4 909.0 0.0 0.0 899.5 -3.6 18.9
5 950.9 0.0 0.0 941.5 -3.8 21.4
6 995.0 0.0 0.0 985.5 -4.0 18.6
7 1021.9 0.0 0.0 1012.5 -4.1 20.6
8 839.8 0.0 0.0 830.4 -3.2 13.6
9 949.0 0.0 0.0 939.6 -3.7 20.1
10 1043.4 0.0 0.0 1034.0 -4.2 19.9
11 765.6 0.0 0.0 756.1 -3.0 9.2
12 831.9 0.0 0.0 823.8 -18.1 16.6
13 888.1 0.0 0.0 880.0 11.2 16.4
14 838.0 0.0 0.0 829.9 -3.1 -25.0
15 882.0 0.0 0.0 873.9 -3.8 58.0
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 882.0 - 882.0
M1 (kN.m) -3.8 -13.2 0.0 300
M2 (kN.m) 58.0 13.2 65.1
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.392 Le1/b1 = 7.9 < 15.0 300
Beta = 0.54 Le2/b2 = 7.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 6.0 / 19.3 kN As (Required): %1.31 1179.26 mm2 4H20
vc'(1/2)= 1.13 / 1.16 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.08 / 0.25 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-44

2C18 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 798.3 6.7 -37.6 788.8 -6.0 36.6
2 740.5 6.1 -26.2 731.0 -5.5 25.7
3 594.9 5.0 -17.8 585.5 -4.5 17.6
4 707.3 6.0 -36.0 697.8 -5.3 35.1
5 743.2 6.1 -40.5 733.7 -5.5 39.1
6 775.8 6.5 -35.6 766.4 -5.9 34.7
7 796.5 6.7 -39.0 787.0 -6.0 37.7
8 658.2 5.4 -26.2 648.8 -4.8 25.8
9 742.7 6.1 -38.3 733.3 -5.5 37.3
10 812.0 6.9 -38.0 802.5 -6.1 37.0
11 594.9 5.0 -17.8 585.5 -4.5 17.6
12 655.3 -9.6 -31.3 647.2 -7.3 30.4
13 686.0 20.8 -31.7 677.9 -2.8 31.0
14 658.7 5.4 2.2 650.6 -4.9 -5.7
15 682.5 5.8 -65.3 674.4 -5.2 67.1
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 682.5 - 682.5
M1 (kN.m) 5.8 10.2 0.0 300
M2 (kN.m) 67.1 10.2 73.8
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.303 Le1/b1 = 7.0 < 15.0 300
Beta = 0.65 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 44.1 kN As (Required): %1.17 1055.16 mm2 4H20
vc'(1/2)= 0.75 / 1.42 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.01 / 0.57 N/mm2
Links = H8-225

3C18 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 573.8 4.8 -36.7 564.3 -5.3 37.9
2 534.4 4.3 -26.1 525.0 -4.9 27.1
3 421.9 3.6 -17.9 412.4 -4.0 18.6
4 505.4 4.3 -35.2 495.9 -4.6 36.3
5 536.2 4.3 -38.7 526.8 -4.9 39.8
6 556.1 4.6 -34.8 546.6 -5.2 35.9
7 572.0 4.7 -37.4 562.6 -5.3 38.4
8 475.6 3.9 -26.2 466.2 -4.2 27.2
9 536.1 4.3 -37.2 526.6 -4.9 38.4
10 581.9 4.9 -37.0 572.4 -5.4 38.2
11 421.9 3.6 -17.9 412.4 -4.0 18.6
12 474.1 1.3 -30.8 466.0 -7.0 31.7
13 488.0 6.7 -30.7 479.9 -1.9 31.8
14 475.5 3.9 -13.4 467.4 -4.4 11.3
15 486.6 4.2 -48.2 478.5 -4.5 52.2
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 486.6 - 486.6
M1 (kN.m) -4.5 -7.3 0.0 300
M2 (kN.m) 52.2 7.3 57.7
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.216 Le1/b1 = 7.0 < 15.0 300
Beta = 0.75 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.8 / 33.5 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.98 / 1.18 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.04 / 0.43 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-45

4C18 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 348.3 5.5 -39.0 338.9 -6.0 40.2
2 328.0 4.9 -27.5 318.6 -4.8 28.0
3 247.8 4.2 -19.4 238.3 -4.5 20.6
4 302.4 5.0 -37.6 292.9 -6.1 38.8
5 328.8 5.0 -40.9 319.3 -5.3 41.7
6 335.3 5.4 -37.1 325.9 -5.9 38.4
7 347.2 5.5 -39.2 337.7 -6.0 40.1
8 292.0 4.5 -27.8 282.5 -5.5 28.4
9 328.5 5.0 -39.7 319.1 -5.2 40.8
10 351.5 5.6 -39.1 342.0 -5.6 40.2
11 247.8 4.2 -19.4 238.3 -4.5 20.6
12 288.1 1.9 -33.0 280.0 -7.3 33.9
13 293.2 7.4 -32.5 285.1 -2.9 33.6
14 288.5 4.5 -22.2 280.4 -5.1 21.5
15 292.7 4.8 -43.2 284.6 -5.2 46.1
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 292.7 - 292.7
M1 (kN.m) -5.2 -4.4 0.0 300
M2 (kN.m) 46.1 4.4 50.5
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.130 Le1/b1 = 7.0 < 15.0 300
Beta = 0.85 Le2/b2 = 6.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.0 / 29.8 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.86 / 0.97 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.04 / 0.39 N/mm2
Links = H8-225

5C18 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 123.1 4.7 -36.9 113.7 -5.6 35.7
2 122.3 5.0 -28.8 112.8 -5.6 31.2
3 73.8 3.7 -15.5 64.3 -3.2 12.1
4 99.3 3.5 -34.8 89.8 -4.5 32.7
5 122.1 4.5 -40.1 112.7 -5.6 37.8
6 114.6 4.7 -34.0 105.2 -5.2 31.7
7 123.4 4.7 -38.0 113.9 -5.7 37.2
8 108.9 3.2 -28.9 99.4 -4.9 31.4
9 121.2 4.6 -38.1 111.8 -5.5 35.4
10 121.2 5.4 -37.6 111.7 -5.5 36.6
11 73.8 3.7 -15.5 64.3 -3.2 12.1
12 100.1 1.7 -31.0 92.0 -4.6 29.5
13 100.7 6.2 -30.5 92.6 -4.6 29.0
14 100.0 3.9 -25.5 91.9 -4.6 22.6
15 100.8 4.0 -35.9 92.7 -4.6 35.9
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 122.1 - 122.1
M1 (kN.m) -5.6 -1.8 0.0 300
M2 (kN.m) -40.1 -1.8 -45.3
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.054 Le1/b1 = 6.7 < 15.0 300
Beta = 0.93 Le2/b2 = 6.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.1 / 26.0 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.73 / 0.79 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.03 / 0.34 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-46

1C19 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1322.9 0.0 0.0 1313.5 17.9 -7.8
2 1072.1 0.0 0.0 1062.7 10.9 -8.0
3 1249.7 0.0 0.0 1240.2 18.6 -8.2
4 1192.6 0.0 0.0 1183.2 17.3 -8.0
5 1233.6 0.0 0.0 1224.2 18.5 -4.5
6 1320.9 0.0 0.0 1311.4 18.4 -7.7
7 1318.1 0.0 0.0 1308.7 18.4 -7.2
8 1190.5 0.0 0.0 1181.0 17.1 -8.5
9 1236.9 0.0 0.0 1227.4 18.8 -5.3
10 1076.3 0.0 0.0 1066.9 10.7 -7.5
11 1249.7 0.0 0.0 1240.2 18.6 -8.2
12 1130.0 0.0 0.0 1121.9 -27.8 -7.2
13 1087.4 0.0 0.0 1079.3 57.8 -5.9
14 1140.7 0.0 0.0 1132.6 15.1 -38.3
15 1076.7 0.0 0.0 1068.6 14.9 25.2
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 1087.4 - 1087.4
M1 (kN.m) 57.8 16.3 64.9 300
M2 (kN.m) -5.9 -16.3 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.483 Le1/b1 = 7.5 < 15.0 300
Beta = 0.44 Le2/b2 = 7.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 19.3 / 12.8 kN As (Required): %2.01 1808.40 mm2 8H20
vc'(1/2)= 1.45 / 1.48 N/mm2 As (Provided): %2.79 2513.27 mm2
v (1/2)= 0.25 / 0.17 N/mm2
Links = H8-225

2C19 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1037.8 -34.1 13.7 1028.3 32.4 -11.8
2 850.5 -20.9 14.1 841.0 19.7 -12.3
3 965.4 -35.4 14.5 956.0 33.7 -12.7
4 935.1 -32.8 14.1 925.6 31.3 -12.4
5 969.9 -35.2 7.8 960.4 33.4 -6.4
6 1036.1 -35.0 13.6 1026.6 33.2 -11.7
7 1033.7 -34.9 12.6 1024.2 33.2 -10.9
8 932.9 -32.4 15.1 923.4 30.9 -13.3
9 972.5 -35.7 9.2 963.1 33.9 -7.7
10 854.5 -20.5 13.2 845.0 19.3 -11.5
11 965.4 -35.4 14.5 956.0 33.7 -12.7
12 881.3 -0.8 13.2 873.2 -5.4 -11.7
13 857.5 -56.3 9.8 849.4 59.6 -8.3
14 886.0 -28.4 29.6 877.9 27.0 -33.7
15 852.8 -28.7 -6.5 844.7 27.2 13.7
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 857.5 - 857.5
M1 (kN.m) 59.6 12.9 66.7 300
M2 (kN.m) 9.8 12.9 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.381 Le1/b1 = 6.4 < 15.0 300
Beta = 0.55 Le2/b2 = 6.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.5 / 6.7 kN As (Required): %1.30 1173.53 mm2 4H20
vc'(1/2)= 1.08 / 1.37 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.02 / 0.09 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-47

3C19 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 755.2 -31.9 9.5 745.7 32.0 -8.3
2 630.2 -19.6 10.1 620.7 19.6 -9.0
3 684.1 -33.2 10.8 674.6 33.4 -10.1
4 679.6 -30.6 10.1 670.1 30.8 -9.1
5 708.9 -32.8 4.5 699.5 32.9 -3.4
6 753.9 -32.9 9.4 744.4 32.9 -8.2
7 751.8 -32.6 8.5 742.4 32.7 -7.4
8 677.5 -30.2 10.9 668.1 30.3 -9.9
9 710.9 -33.3 5.8 701.5 33.4 -4.7
10 633.6 -19.1 9.3 624.1 19.1 -8.2
11 684.1 -33.2 10.8 674.6 33.4 -10.1
12 637.7 -12.6 8.6 629.6 8.8 -8.0
13 626.5 -40.8 7.4 618.4 44.7 -6.1
14 639.0 -26.7 16.7 630.9 26.8 -20.2
15 625.2 -26.6 -0.6 617.1 26.7 6.1
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 626.5 - 626.5
M1 (kN.m) 44.7 9.4 51.1 300
M2 (kN.m) 7.4 9.4 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.278 Le1/b1 = 6.4 < 15.0 300
Beta = 0.68 Le2/b2 = 6.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 28.5 / 2.2 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.33 / 1.05 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.37 / 0.03 N/mm2
Links = H8-225

4C19 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 473.8 -34.1 12.0 464.4 35.4 -15.4
2 410.6 -20.7 12.9 401.2 21.4 -16.6
3 404.5 -35.6 12.1 395.0 37.2 -13.6
4 425.2 -33.0 12.6 415.7 34.1 -15.9
5 449.1 -35.0 6.7 439.7 36.3 -10.3
6 473.0 -35.2 11.9 463.6 36.5 -15.2
7 471.2 -34.8 11.1 461.8 36.1 -14.7
8 423.5 -32.5 13.5 414.0 33.6 -17.0
9 450.5 -35.4 7.9 441.1 36.8 -11.3
10 413.1 -20.1 12.2 403.7 20.8 -15.8
11 404.5 -35.6 12.1 395.0 37.2 -13.6
12 398.0 -19.8 10.4 389.9 18.5 -13.4
13 393.8 -37.3 9.9 385.7 40.7 -12.6
14 397.5 -28.7 15.2 389.4 29.8 -20.7
15 394.3 -28.4 5.1 386.2 29.5 -5.3
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 393.8 - 393.8
M1 (kN.m) 40.7 5.9 50.8 300
M2 (kN.m) -12.6 -5.9 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.175 Le1/b1 = 6.4 < 15.0 300
Beta = 0.80 Le2/b2 = 6.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 26.0 / 12.0 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.08 / 1.05 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.34 / 0.16 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-48

5C19 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 196.7 -25.2 -8.9 187.2 10.4 39.9
2 195.7 -15.5 -9.3 186.3 8.2 40.5
3 126.9 -25.3 1.8 117.4 10.9 14.9
4 174.8 -25.1 -7.6 165.4 9.7 38.2
5 193.7 -25.8 -14.5 184.2 11.2 42.5
6 196.3 -26.0 -8.6 186.9 11.5 39.7
7 195.0 -25.8 -10.8 185.6 11.2 41.5
8 173.7 -24.8 -7.3 164.3 9.4 37.5
9 194.2 -26.0 -12.2 184.7 11.5 40.0
10 197.2 -14.9 -9.9 187.7 7.5 41.5
11 126.9 -25.3 1.8 117.4 10.9 14.9
12 163.5 -17.3 -6.8 155.4 3.3 32.2
13 162.8 -24.9 -7.6 154.7 14.5 33.4
14 162.0 -21.3 -4.6 153.9 9.1 27.4
15 164.3 -21.0 -9.7 156.2 8.7 38.1
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 193.7 - 193.7
M1 (kN.m) -25.8 -2.9 0.0 300
M2 (kN.m) 42.5 2.9 65.7
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.086 Le1/b1 = 6.3 < 15.0 300
Beta = 0.90 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 12.1 / 19.0 kN As (Required): %1.04 933.30 mm2 4H20
vc'(1/2)= 0.76 / 0.80 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.16 / 0.25 N/mm2
Links = H8-225

1C20 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1282.1 0.0 0.0 1272.7 5.6 33.9
2 995.2 0.0 0.0 985.8 4.2 24.2
3 1002.5 0.0 0.0 993.0 4.3 17.6
4 1288.0 0.0 0.0 1278.6 5.6 33.5
5 1209.1 0.0 0.0 1199.7 5.3 35.5
6 1282.7 0.0 0.0 1273.3 5.6 33.9
7 1278.3 0.0 0.0 1268.9 5.6 34.7
8 1132.5 0.0 0.0 1123.1 4.9 22.6
9 1208.5 0.0 0.0 1199.0 5.3 34.1
10 1150.1 0.0 0.0 1140.7 5.0 35.1
11 1002.5 0.0 0.0 993.0 4.3 17.6
12 1094.0 0.0 0.0 1085.9 -10.0 26.6
13 1068.9 0.0 0.0 1060.8 19.5 30.4
14 1079.4 0.0 0.0 1071.3 4.8 -11.2
15 1083.6 0.0 0.0 1075.5 4.6 68.2
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 1083.6 - 1083.6
M1 (kN.m) 4.6 16.3 0.0 300
M2 (kN.m) 68.2 16.3 75.4
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.482 Le1/b1 = 7.9 < 15.0 300
Beta = 0.44 Le2/b2 = 7.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 6.5 / 22.7 kN As (Required): %2.35 2113.52 mm2 8H20
vc'(1/2)= 1.44 / 1.44 N/mm2 As (Provided): %2.79 2513.27 mm2
v (1/2)= 0.08 / 0.29 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-49

2C20 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 964.4 -9.8 -63.3 955.0 8.0 60.6
2 750.1 -7.5 -45.3 740.6 6.0 43.4
3 755.6 -7.6 -32.7 746.1 6.2 31.3
4 968.8 -9.8 -62.5 959.3 8.1 59.8
5 908.7 -9.3 -66.2 899.3 7.5 63.2
6 965.0 -9.8 -63.3 955.6 8.0 60.6
7 960.9 -9.8 -64.7 951.4 8.0 61.8
8 853.5 -8.6 -42.2 844.1 7.0 40.5
9 908.4 -9.3 -63.6 898.9 7.5 60.8
10 864.7 -8.8 -65.6 855.3 7.1 62.7
11 755.6 -7.6 -32.7 746.1 6.2 31.3
12 820.8 -23.3 -48.6 812.7 4.3 46.3
13 806.4 6.7 -57.9 798.3 9.1 55.6
14 812.2 -8.1 -21.3 804.1 6.7 15.7
15 815.1 -8.4 -85.2 807.0 6.8 86.2
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 815.1 - 815.1
M1 (kN.m) -8.4 -12.2 0.0 300
M2 (kN.m) 86.2 12.2 93.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.362 Le1/b1 = 7.3 < 15.0 300
Beta = 0.58 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 57.1 kN As (Required): %2.39 2149.75 mm2 8H20
vc'(1/2)= 0.95 / 1.75 N/mm2 As (Provided): %2.79 2513.27 mm2
v (1/2)= 0.01 / 0.74 N/mm2
Links = H8-225

3C20 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 652.8 -7.1 -58.1 643.3 6.9 59.2
2 509.4 -5.5 -41.6 500.0 5.3 42.5
3 512.6 -5.5 -29.9 503.1 5.3 30.6
4 655.6 -7.1 -57.5 646.2 7.0 58.6
5 614.8 -6.7 -60.4 605.3 6.5 61.4
6 653.3 -7.1 -58.1 643.9 6.9 59.2
7 649.8 -7.1 -59.1 640.4 6.9 60.2
8 579.2 -6.2 -39.0 569.8 6.2 39.9
9 614.6 -6.7 -58.1 605.2 6.5 59.1
10 585.3 -6.4 -60.0 575.8 6.2 61.1
11 512.6 -5.5 -29.9 503.1 5.3 30.6
12 554.6 -8.6 -46.6 546.5 3.2 47.1
13 547.2 -3.4 -51.0 539.1 8.5 52.4
14 549.9 -6.0 -32.3 541.8 5.8 29.8
15 551.9 -6.0 -65.3 543.8 5.9 69.7
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 551.9 - 551.9
M1 (kN.m) -6.0 -8.3 0.0 300
M2 (kN.m) 69.7 8.3 75.7
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.245 Le1/b1 = 7.3 < 15.0 300
Beta = 0.72 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.0 / 45.0 kN As (Required): %1.02 919.97 mm2 4H20
vc'(1/2)= 1.09 / 1.26 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.05 / 0.58 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-50

4C20 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 342.1 -8.1 -60.6 332.6 8.7 63.0
2 269.6 -6.2 -43.1 260.1 7.0 44.8
3 270.4 -6.3 -30.8 260.9 7.1 32.0
4 343.4 -8.1 -60.3 334.0 8.2 62.6
5 321.8 -7.6 -63.5 312.4 8.3 65.9
6 342.5 -8.2 -60.6 333.1 8.8 62.9
7 340.0 -8.1 -61.8 330.5 8.7 64.3
8 305.7 -7.0 -40.6 296.2 6.9 42.1
9 321.9 -7.6 -60.9 312.4 8.4 63.2
10 306.9 -7.3 -62.7 297.4 8.2 65.4
11 270.4 -6.3 -30.8 260.9 7.1 32.0
12 290.6 -9.6 -49.8 282.5 5.1 51.5
13 287.3 -4.1 -52.2 279.2 9.5 54.5
14 288.4 -6.9 -40.8 280.3 7.3 40.5
15 289.5 -6.8 -61.2 281.4 7.3 65.6
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 289.5 - 289.5
M1 (kN.m) 7.3 4.3 0.0 300
M2 (kN.m) 65.6 4.3 71.8
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.129 Le1/b1 = 7.3 < 15.0 300
Beta = 0.85 Le2/b2 = 6.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.5 / 42.3 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.89 / 0.97 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.06 / 0.55 N/mm2
Links = H8-225

5C20 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 29.2 -6.5 -49.5 19.8 1.0 29.2
2 28.4 -4.6 -35.6 18.9 1.0 22.1
3 26.7 -4.6 -26.3 17.2 0.9 15.1
4 29.1 -7.0 -50.0 19.7 1.0 29.3
5 26.7 -6.0 -51.3 17.2 0.9 29.6
6 29.6 -6.4 -50.3 20.1 1.0 30.0
7 28.0 -6.4 -49.9 18.5 1.0 29.6
8 30.6 -6.4 -35.3 21.2 1.1 21.2
9 26.8 -5.9 -50.0 17.4 0.9 27.9
10 26.5 -5.3 -49.5 17.1 0.9 29.5
11 26.7 -4.6 -26.3 17.2 0.9 15.1
12 25.7 -7.7 -41.3 17.6 0.9 24.1
13 24.7 -3.2 -42.1 16.6 0.9 25.2
14 24.9 -5.4 -38.6 16.8 0.9 19.8
15 25.5 -5.5 -44.8 17.4 0.9 29.5
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 26.7 - 26.7
M1 (kN.m) -6.0 -0.4 0.0 300
M2 (kN.m) -51.3 -0.4 -57.3
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.012 Le1/b1 = 6.9 < 15.0 300
Beta = 0.99 Le2/b2 = 6.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.9 / 27.0 kN As (Required): %1.23 1106.74 mm2 4H20
vc'(1/2)= 0.68 / 0.68 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.04 / 0.35 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-51

1C21 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 401.5 0.0 0.0 392.1 -1.4 -1.4
2 404.0 0.0 0.0 394.6 -1.4 -1.4
3 420.6 0.0 0.0 411.1 -1.5 -1.6
4 313.1 0.0 0.0 303.7 -1.0 -1.1
5 354.6 0.0 0.0 345.1 -1.2 -1.2
6 402.6 0.0 0.0 393.1 -1.4 -1.5
7 403.7 0.0 0.0 394.2 -1.4 -1.4
8 311.7 0.0 0.0 302.2 -1.0 -1.1
9 353.5 0.0 0.0 344.0 -1.2 -1.2
10 404.4 0.0 0.0 395.0 -1.4 -1.4
11 420.6 0.0 0.0 411.1 -1.5 -1.6
12 330.9 0.0 0.0 322.8 -15.8 -1.5
13 350.5 0.0 0.0 342.4 13.5 -0.9
14 317.3 0.0 0.0 309.2 -0.7 -13.7
15 364.2 0.0 0.0 356.1 -1.6 11.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 401.5 - 401.5
M1 (kN.m) -1.4 -6.0 0.0 300
M2 (kN.m) -1.4 -6.0 -10.8
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.178 Le1/b1 = 7.9 < 15.0 300
Beta = 0.79 Le2/b2 = 7.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.3 / 4.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.84 / 0.84 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.07 / 0.06 N/mm2
Links = H8-225

2C21 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 317.6 2.3 2.3 308.2 -2.4 -2.4
2 319.5 2.3 2.3 310.1 -2.4 -2.5
3 330.4 2.6 2.5 320.9 -2.5 -2.5
4 247.9 1.8 1.7 238.4 -1.8 -1.8
5 282.2 2.0 1.9 272.7 -2.1 -2.1
6 318.5 2.3 2.3 309.0 -2.4 -2.4
7 319.4 2.3 2.3 309.9 -2.4 -2.4
8 246.7 1.8 1.7 237.3 -1.8 -1.8
9 281.2 2.0 1.9 271.8 -2.1 -2.1
10 319.8 2.3 2.4 310.4 -2.4 -2.4
11 330.4 2.6 2.5 320.9 -2.5 -2.5
12 264.1 -12.9 1.4 256.0 -4.7 -1.1
13 275.1 16.8 2.5 267.0 0.6 -3.0
14 256.3 1.9 -11.0 248.2 -2.0 -4.1
15 282.9 2.0 14.9 274.8 -2.1 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 317.6 - 317.6
M1 (kN.m) -2.4 -4.8 0.0 300
M2 (kN.m) -2.4 -4.8 -8.7
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.141 Le1/b1 = 7.3 < 15.0 300
Beta = 0.83 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.7 / 2.3 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.75 / 0.75 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.04 / 0.03 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-52

3C21 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 229.8 1.5 1.5 220.3 -1.2 -1.5
2 231.1 1.5 1.5 221.7 -1.4 -1.5
3 237.7 1.6 1.7 228.2 -1.3 -1.8
4 179.4 1.1 1.1 169.9 -0.9 -1.1
5 205.6 1.2 1.3 196.1 -1.0 -1.4
6 230.3 1.5 1.5 220.8 -1.3 -1.6
7 231.0 1.5 1.5 221.5 -1.3 -1.6
8 178.7 1.1 1.1 169.2 -0.8 -1.0
9 204.9 1.2 1.3 195.4 -1.0 -1.3
10 231.3 1.5 1.5 221.9 -1.3 -1.5
11 237.7 1.6 1.7 228.2 -1.3 -1.8
12 192.1 -1.5 2.1 184.0 -3.8 -0.9
13 198.1 4.1 0.5 190.0 1.7 -1.6
14 188.7 1.0 -1.1 180.6 -1.0 -3.4
15 201.5 1.5 3.7 193.4 -1.1 0.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 229.8 - 229.8
M1 (kN.m) 1.5 3.4 0.0 300
M2 (kN.m) 1.5 3.4 6.5
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.102 Le1/b1 = 7.3 < 15.0 300
Beta = 0.88 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 0.8 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.72 / 0.73 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = H8-225

4C21 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 140.6 2.7 2.5 131.1 -5.1 -3.4
2 141.4 2.7 2.6 132.0 -4.2 -4.0
3 143.9 2.9 2.4 134.5 -5.0 -3.0
4 109.8 2.1 1.9 100.4 -4.5 -2.3
5 127.7 2.4 2.0 118.3 -4.6 -2.9
6 140.8 2.7 2.4 131.3 -4.9 -3.2
7 141.3 2.7 2.4 131.8 -5.0 -3.1
8 109.5 2.1 2.0 100.1 -4.7 -2.7
9 127.3 2.4 2.1 117.8 -4.5 -3.0
10 141.5 2.7 2.6 132.0 -4.3 -3.9
11 143.9 2.9 2.4 134.5 -5.0 -3.0
12 118.0 -0.5 2.4 109.9 -6.6 -2.5
13 121.0 5.2 1.8 112.9 -2.1 -3.3
14 117.0 2.2 -0.3 108.9 -4.3 -5.3
15 122.0 2.5 4.4 113.9 -4.3 -0.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 140.6 - 140.6
M1 (kN.m) -5.1 -2.1 -8.3 300
M2 (kN.m) -3.4 -2.1 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.062 Le1/b1 = 7.3 < 15.0 300
Beta = 0.93 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.0 / 1.7 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.72 / 0.72 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.03 / 0.02 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-53

5C21 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 51.0 -1.1 0.6 41.5 -2.1 -2.1
2 51.2 -0.2 0.0 41.8 -2.1 -2.1
3 49.5 -0.7 1.3 40.0 -2.0 -2.0
4 40.0 -1.5 0.7 30.5 -1.5 -1.5
5 49.7 -1.2 0.6 40.3 -2.0 -2.0
6 50.9 -0.9 0.8 41.5 -2.1 -2.1
7 51.3 -1.0 0.9 41.8 -2.1 -2.1
8 40.0 -1.6 0.3 30.6 -1.5 -1.5
9 49.5 -1.1 0.4 40.1 -2.0 -2.0
10 51.3 -0.2 0.2 41.8 -2.1 -2.1
11 49.5 -0.7 1.3 40.0 -2.0 -2.0
12 43.1 -3.2 0.9 35.0 -1.7 -1.7
13 44.1 1.4 0.1 36.0 -1.8 -1.8
14 43.1 -1.0 -2.0 35.0 -1.7 -1.7
15 44.1 -0.8 3.0 36.0 -1.8 -1.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 51.0 - 51.0
M1 (kN.m) -2.1 -0.8 0.0 300
M2 (kN.m) -2.1 -0.8 -4.1
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.023 Le1/b1 = 6.9 < 15.0 300
Beta = 0.97 Le2/b2 = 6.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.1 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.66 / 0.66 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = H8-225

1C22 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 765.6 0.0 0.0 756.1 -10.7 -3.0
2 702.8 0.0 0.0 693.3 -9.0 -2.7
3 802.3 0.0 0.0 792.8 -10.5 -3.2
4 617.3 0.0 0.0 607.8 -8.2 -2.4
5 706.5 0.0 0.0 697.1 -10.1 -2.7
6 767.8 0.0 0.0 758.3 -10.4 -3.0
7 768.1 0.0 0.0 758.7 -10.2 -3.0
8 614.3 0.0 0.0 604.8 -8.5 -2.3
9 705.0 0.0 0.0 695.6 -10.0 -2.7
10 703.5 0.0 0.0 694.1 -9.0 -2.7
11 802.3 0.0 0.0 792.8 -10.5 -3.2
12 631.2 0.0 0.0 623.1 -52.3 -2.6
13 666.1 0.0 0.0 658.0 34.3 -2.5
14 623.4 0.0 0.0 615.3 -9.1 -14.8
15 673.9 0.0 0.0 665.8 -8.9 9.7
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 631.2 - 631.2
M1 (kN.m) -52.3 -9.5 -58.6 300
M2 (kN.m) -2.6 -9.5 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.281 Le1/b1 = 7.5 < 15.0 300
Beta = 0.67 Le2/b2 = 7.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 17.4 / 4.9 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.02 / 1.01 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.23 / 0.06 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-54

2C22 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 598.0 20.0 4.9 588.6 -19.5 -4.4
2 549.2 16.8 4.5 539.7 -16.5 -4.0
3 624.7 19.8 5.2 615.2 -19.3 -4.6
4 482.9 15.3 3.9 473.4 -14.8 -3.5
5 553.7 18.9 4.5 544.3 -18.5 -4.0
6 599.8 19.3 4.9 590.4 -18.9 -4.4
7 600.1 19.1 4.9 590.7 -18.7 -4.4
8 480.5 15.8 3.9 471.0 -15.3 -3.4
9 552.4 18.6 4.5 543.0 -18.2 -4.0
10 549.8 16.9 4.5 540.3 -16.6 -4.0
11 624.7 19.8 5.2 615.2 -19.3 -4.6
12 497.6 45.7 3.7 489.5 -50.1 -3.1
13 516.4 -12.1 4.6 508.3 17.3 -4.3
14 492.4 17.8 -8.6 484.3 -17.3 -5.9
15 521.6 15.8 17.0 513.5 -15.5 -1.5
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 497.6 - 497.6
M1 (kN.m) -50.1 -7.5 -55.7 300
M2 (kN.m) 3.7 7.5 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.221 Le1/b1 = 6.4 < 15.0 300
Beta = 0.74 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 32.0 / 0.9 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.19 / 0.75 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.41 / 0.01 N/mm2
Links = H8-225

3C22 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 426.0 18.6 3.8 416.5 -19.0 -4.2
2 391.6 15.8 3.4 382.1 -16.1 -3.9
3 445.5 18.5 3.9 436.0 -18.8 -4.3
4 344.4 14.1 3.0 335.0 -14.4 -3.3
5 396.1 17.6 3.4 386.7 -17.9 -3.9
6 427.3 17.9 3.7 417.8 -18.3 -4.2
7 427.4 17.8 3.8 418.0 -18.2 -4.3
8 342.7 14.7 3.0 333.2 -14.9 -3.3
9 395.1 17.3 3.4 385.7 -17.7 -3.9
10 392.0 15.8 3.4 382.5 -16.2 -3.9
11 445.5 18.5 3.9 436.0 -18.8 -4.3
12 357.2 30.2 3.5 349.1 -34.6 -3.3
13 365.8 1.1 2.8 357.7 2.7 -3.9
14 354.3 16.2 0.6 346.2 -16.6 -6.0
15 368.8 15.1 5.7 360.7 -15.3 -1.2
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 357.2 - 357.2
M1 (kN.m) -34.6 -5.4 -39.0 300
M2 (kN.m) 3.5 5.4 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.159 Le1/b1 = 6.4 < 15.0 300
Beta = 0.82 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 21.6 / 2.2 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.03 / 0.88 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.28 / 0.03 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-55

4C22 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 253.5 20.5 3.9 244.1 -22.3 -2.5
2 233.6 17.9 3.5 224.2 -19.4 -2.2
3 266.4 20.5 4.2 257.0 -22.2 -3.3
4 205.5 15.2 3.2 196.0 -16.6 -2.1
5 238.1 19.5 3.5 228.7 -21.2 -2.5
6 254.4 19.8 4.0 244.9 -21.5 -2.8
7 254.4 19.7 3.9 244.9 -21.5 -2.4
8 204.3 15.8 3.1 194.9 -17.2 -2.0
9 237.5 19.3 3.5 228.0 -21.0 -2.6
10 233.9 18.0 3.5 224.5 -19.5 -2.1
11 266.4 20.5 4.2 257.0 -22.2 -3.3
12 214.2 26.3 3.5 206.1 -30.2 -2.1
13 217.3 8.3 3.1 209.2 -7.4 -2.3
14 212.7 17.6 0.7 204.6 -19.2 -4.0
15 218.9 16.9 5.9 210.8 -18.4 -0.4
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 214.2 - 214.2
M1 (kN.m) -30.2 -3.2 -33.3 300
M2 (kN.m) 3.5 3.2 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.095 Le1/b1 = 6.4 < 15.0 300
Beta = 0.89 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 18.8 / 2.1 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.88 / 0.79 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.24 / 0.03 N/mm2
Links = H8-225

5C22 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 80.5 10.3 5.6 71.1 -8.0 -3.6
2 75.7 9.1 5.3 66.3 -5.2 -3.3
3 87.3 11.1 5.2 77.9 -8.7 -3.9
4 65.4 7.4 4.4 55.9 -8.1 -2.8
5 79.6 9.6 5.0 70.2 -7.1 -3.5
6 80.9 10.1 5.4 71.4 -7.6 -3.6
7 80.8 9.7 5.8 71.4 -7.2 -3.6
8 64.9 7.6 4.5 55.4 -8.3 -2.8
9 79.3 9.7 4.9 69.9 -7.2 -3.5
10 75.9 9.1 5.4 66.4 -5.3 -3.3
11 87.3 11.1 5.2 77.9 -8.7 -3.9
12 69.4 12.7 4.7 61.3 -12.7 -3.1
13 69.9 4.7 4.7 61.8 -1.0 -3.1
14 68.8 8.9 2.8 60.7 -7.2 -3.0
15 70.4 8.4 6.7 62.3 -6.5 -3.1
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 69.4 - 69.4
M1 (kN.m) -12.7 -1.0 -17.2 300
M2 (kN.m) 4.7 1.0 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.031 Le1/b1 = 6.3 < 15.0 300
Beta = 0.96 Le2/b2 = 6.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 8.5 / 3.3 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.73 / 0.72 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.11 / 0.04 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-56

1C23 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 229.9 0.0 0.0 220.4 0.6 -0.7
2 174.6 0.0 0.0 165.2 0.4 -0.5
3 260.2 0.0 0.0 250.7 0.8 -0.8
4 260.8 0.0 0.0 251.3 0.8 -0.8
5 180.6 0.0 0.0 171.1 0.4 -0.5
6 236.3 0.0 0.0 226.8 0.6 -0.7
7 230.5 0.0 0.0 221.1 0.6 -0.7
8 253.0 0.0 0.0 243.5 0.8 -0.8
9 178.2 0.0 0.0 168.8 0.4 -0.5
10 176.0 0.0 0.0 166.6 0.4 -0.5
11 260.2 0.0 0.0 250.7 0.8 -0.8
12 231.2 0.0 0.0 223.1 -13.9 -1.0
13 161.9 0.0 0.0 153.8 15.0 -0.2
14 169.7 0.0 0.0 161.6 0.6 -12.7
15 223.3 0.0 0.0 215.2 0.5 11.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 229.9 - 229.9
M1 (kN.m) 0.6 3.4 0.0 300
M2 (kN.m) -0.7 -3.4 -6.5
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.102 Le1/b1 = 7.9 < 15.0 300
Beta = 0.88 Le2/b2 = 7.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.0 / 4.2 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.75 / 0.75 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.06 / 0.05 N/mm2
Links = H8-225

2C23 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 182.6 -1.3 1.2 173.2 0.8 -1.2
2 139.4 -0.9 0.8 130.0 0.5 -0.9
3 206.6 -1.4 1.4 197.1 1.0 -1.3
4 206.4 -1.5 1.4 196.9 1.1 -1.4
5 145.5 -0.9 0.8 136.0 0.5 -0.9
6 187.8 -1.3 1.2 178.3 0.8 -1.2
7 183.2 -1.3 1.2 173.8 0.8 -1.2
8 200.2 -1.4 1.4 190.7 1.1 -1.3
9 143.6 -0.9 0.8 134.2 0.5 -0.9
10 140.5 -0.9 0.8 131.1 0.5 -0.9
11 206.6 -1.4 1.4 197.1 1.0 -1.3
12 176.0 -16.3 1.4 167.9 -1.8 -1.1
13 136.6 14.1 0.6 128.5 3.1 -0.9
14 141.2 -0.5 -11.7 133.1 0.3 -3.3
15 171.4 -1.7 13.7 163.3 1.1 1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 182.6 - 182.6
M1 (kN.m) -1.3 -2.7 0.0 300
M2 (kN.m) 1.2 2.7 5.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.081 Le1/b1 = 7.0 < 15.0 300
Beta = 0.90 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.7 / 2.8 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.72 / 0.72 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.05 / 0.04 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-57

3C23 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 127.9 -1.5 1.1 118.5 1.8 -1.2
2 97.6 -1.1 0.8 88.2 1.4 -0.9
3 147.5 -1.5 1.2 138.1 1.9 -1.3
4 145.4 -1.5 1.2 136.0 1.8 -1.3
5 102.8 -1.2 0.8 93.3 1.5 -0.9
6 132.2 -1.5 1.1 122.8 1.8 -1.2
7 128.4 -1.5 1.1 118.9 1.8 -1.2
8 140.4 -1.5 1.2 130.9 1.8 -1.3
9 101.5 -1.2 0.8 92.0 1.5 -0.9
10 98.4 -1.2 0.8 88.9 1.4 -0.9
11 147.5 -1.5 1.2 138.1 1.9 -1.3
12 119.5 -4.2 1.3 111.4 -1.1 -1.1
13 100.1 1.7 0.5 92.0 4.2 -1.0
14 102.5 -1.3 -1.7 94.4 1.3 -3.5
15 117.1 -1.2 3.5 109.0 1.7 1.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 127.9 - 127.9
M1 (kN.m) 1.8 1.9 0.0 300
M2 (kN.m) -1.2 -1.9 -3.7
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.057 Le1/b1 = 7.0 < 15.0 300
Beta = 0.93 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 0.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.69 / 0.69 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = H8-225

4C23 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 70.9 -0.6 1.2 61.4 -1.6 -0.1
2 53.6 -0.3 0.8 44.2 -1.1 0.1
3 86.5 -0.6 1.3 77.1 -1.4 -0.4
4 82.6 -0.8 1.3 73.2 -1.4 -0.5
5 57.8 -0.3 0.9 48.3 -1.8 -0.3
6 74.5 -0.6 1.2 65.1 -1.4 -0.2
7 71.2 -0.6 1.2 61.8 -1.5 -0.2
8 78.6 -0.8 1.3 69.2 -1.5 -0.5
9 57.0 -0.3 0.9 47.6 -1.7 -0.2
10 54.0 -0.3 0.8 44.5 -1.1 0.2
11 86.5 -0.6 1.3 77.1 -1.4 -0.4
12 65.5 -3.4 1.2 57.4 -3.6 -0.2
13 57.2 2.4 0.8 49.1 0.8 0.0
14 58.3 -0.5 -1.6 50.2 -1.5 -2.0
15 64.4 -0.5 3.6 56.3 -1.3 1.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 70.9 - 70.9
M1 (kN.m) -1.6 -1.1 -2.7 300
M2 (kN.m) 1.2 1.1 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.032 Le1/b1 = 7.0 < 15.0 300
Beta = 0.96 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.1 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.66 / 0.66 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-58

5C23 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 13.0 -4.0 2.3 3.5 0.2 -0.2
2 8.8 -2.9 1.9 -0.6 0.0 0.0
3 25.9 -3.9 2.1 16.5 0.8 -0.8
4 19.2 -4.1 2.2 9.8 0.5 -0.5
5 11.7 -3.7 1.5 2.3 0.1 -0.1
6 16.2 -3.9 2.3 6.7 0.4 -0.3
7 13.1 -4.0 2.3 3.6 0.2 -0.2
8 16.0 -4.2 2.2 6.5 0.3 -0.3
9 11.4 -3.5 1.6 2.0 0.1 -0.1
10 8.9 -2.9 2.0 -0.5 0.0 0.0
11 25.9 -3.9 2.1 16.5 0.8 -0.8
12 13.4 -5.8 2.0 5.3 0.3 -0.3
13 11.1 -1.1 1.9 3.0 0.2 -0.2
14 11.6 -3.4 -0.1 3.5 0.2 -0.2
15 12.9 -3.4 3.9 4.8 0.3 -0.2
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 13.4 - 13.4
M1 (kN.m) -5.8 -0.2 -7.7 300
M2 (kN.m) 2.0 0.2 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.006 Le1/b1 = 6.7 < 15.0 300
Beta = 0.99 Le2/b2 = 6.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.0 / 0.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.67 / 0.66 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.03 / 0.01 N/mm2
Links = H8-225

1C24 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 258.3 0.0 0.0 248.8 -0.9 -0.7
2 289.4 0.0 0.0 280.0 -1.1 -0.9
3 279.2 0.0 0.0 269.7 -1.0 -0.9
4 198.8 0.0 0.0 189.3 -0.6 -0.5
5 213.6 0.0 0.0 204.1 -0.7 -0.5
6 262.6 0.0 0.0 253.1 -0.9 -0.8
7 263.0 0.0 0.0 253.6 -0.9 -0.8
8 202.9 0.0 0.0 193.5 -0.7 -0.6
9 210.8 0.0 0.0 201.3 -0.7 -0.5
10 281.0 0.0 0.0 271.5 -1.0 -0.9
11 279.2 0.0 0.0 269.7 -1.0 -0.9
12 186.0 0.0 0.0 177.9 -15.2 -0.2
13 254.6 0.0 0.0 246.5 13.7 -1.0
14 195.8 0.0 0.0 187.7 -0.3 -12.6
15 244.8 0.0 0.0 236.7 -1.2 11.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 258.3 - 258.3
M1 (kN.m) -0.9 -3.9 0.0 300
M2 (kN.m) -0.7 -3.9 -7.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.115 Le1/b1 = 7.9 < 15.0 300
Beta = 0.86 Le2/b2 = 7.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.1 / 4.2 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.76 / 0.77 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.07 / 0.05 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-59

2C24 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 206.5 1.2 1.4 197.0 -1.2 -1.2
2 228.7 1.5 1.6 219.3 -1.5 -1.5
3 221.7 1.4 1.5 212.2 -1.3 -1.3
4 159.8 0.9 1.0 150.4 -0.8 -0.9
5 173.1 0.9 1.0 163.6 -0.9 -1.0
6 209.8 1.2 1.4 200.4 -1.2 -1.3
7 210.7 1.2 1.4 201.2 -1.2 -1.3
8 161.9 0.9 1.0 152.4 -0.8 -0.9
9 170.5 0.9 1.0 161.0 -0.9 -0.9
10 223.3 1.4 1.6 213.8 -1.4 -1.4
11 221.7 1.4 1.5 212.2 -1.3 -1.3
12 156.6 -14.1 0.8 148.5 -3.5 -0.9
13 195.7 16.2 1.5 187.6 1.4 -1.2
14 161.2 1.0 -11.2 153.1 -0.9 -3.5
15 191.1 1.1 13.6 183.0 -1.1 1.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 206.5 - 206.5
M1 (kN.m) 1.2 3.1 0.0 300
M2 (kN.m) 1.4 3.1 5.9
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.092 Le1/b1 = 7.0 < 15.0 300
Beta = 0.89 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.6 / 2.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.73 / 0.72 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.05 / 0.03 N/mm2
Links = H8-225

3C24 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 147.8 1.3 1.2 138.4 -2.2 -1.1
2 162.9 1.4 1.4 153.4 -2.2 -1.2
3 159.2 1.4 1.3 149.7 -2.3 -1.3
4 114.6 1.0 0.9 105.2 -1.7 -0.8
5 125.4 1.0 0.9 116.0 -2.0 -0.8
6 150.5 1.3 1.2 141.0 -2.3 -1.2
7 151.1 1.3 1.2 141.6 -2.3 -1.1
8 115.3 1.0 0.9 105.9 -1.7 -0.8
9 123.4 1.0 1.0 113.9 -2.0 -0.8
10 159.5 1.3 1.3 150.1 -2.1 -1.2
11 159.2 1.4 1.3 149.7 -2.3 -1.3
12 116.6 -1.9 0.7 108.5 -4.5 -0.9
13 136.0 4.0 1.4 127.9 0.8 -1.0
14 118.6 0.8 -1.8 110.5 -1.8 -3.4
15 134.0 1.4 3.8 125.9 -2.0 1.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 147.8 - 147.8
M1 (kN.m) -2.2 -2.2 -4.3 300
M2 (kN.m) 1.2 2.2 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.066 Le1/b1 = 7.0 < 15.0 300
Beta = 0.92 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.9 / 0.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.70 / 0.69 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-60

4C24 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 87.1 0.3 1.4 77.7 2.0 -0.5
2 95.4 0.7 1.7 86.0 1.6 -1.1
3 94.9 0.4 1.4 85.4 2.3 -0.6
4 67.4 0.2 1.0 58.0 1.4 -0.2
5 75.7 0.0 1.2 66.2 2.6 -1.0
6 89.0 0.3 1.4 79.6 2.2 -0.4
7 89.3 0.3 1.5 79.8 2.2 -0.9
8 66.9 0.2 1.1 57.4 1.1 -0.5
9 74.2 0.0 1.2 64.8 2.7 -0.7
10 94.1 0.7 1.6 84.6 1.7 -0.9
11 94.9 0.4 1.4 85.4 2.3 -0.6
12 70.5 -2.6 1.0 62.4 -0.4 -0.4
13 78.8 3.2 1.4 70.7 3.9 -0.6
14 71.2 0.1 -1.5 63.1 1.7 -2.4
15 78.1 0.4 3.9 70.0 1.8 1.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 87.1 - 87.1
M1 (kN.m) 2.0 1.3 3.4 300
M2 (kN.m) 1.4 1.3 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.039 Le1/b1 = 7.0 < 15.0 300
Beta = 0.95 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 0.3 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.67 / 0.67 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = H8-225

5C24 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 27.2 4.6 2.0 17.7 -0.9 -0.9
2 28.1 4.5 1.8 18.6 -0.9 -0.9
3 32.0 5.0 2.1 22.5 -1.1 -1.1
4 20.9 3.2 1.6 11.5 -0.6 -0.6
5 26.4 4.6 1.0 17.0 -0.9 -0.9
6 28.6 4.8 2.1 19.1 -1.0 -1.0
7 28.0 4.8 1.7 18.6 -0.9 -0.9
8 18.5 3.1 1.5 9.0 -0.5 -0.5
9 25.9 4.6 1.2 16.5 -0.8 -0.8
10 29.1 4.4 1.9 19.7 -1.0 -1.0
11 32.0 5.0 2.1 22.5 -1.1 -1.1
12 22.6 1.6 1.6 14.5 -0.7 -0.7
13 24.9 6.2 1.7 16.8 -0.9 -0.8
14 22.7 3.7 -0.4 14.6 -0.7 -0.7
15 24.7 4.1 3.7 16.6 -0.8 -0.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 27.2 - 27.2
M1 (kN.m) 4.6 0.4 6.6 300
M2 (kN.m) 2.0 0.4 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.012 Le1/b1 = 6.7 < 15.0 300
Beta = 0.99 Le2/b2 = 6.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.4 / 1.5 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.68 / 0.68 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.03 / 0.02 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-61

1C25 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 826.7 0.0 0.0 817.2 13.3 -3.3
2 666.0 0.0 0.0 656.6 10.4 -2.6
3 833.9 0.0 0.0 824.4 13.4 -3.3
4 760.2 0.0 0.0 750.7 11.1 -3.0
5 765.7 0.0 0.0 756.2 13.8 -3.0
6 826.5 0.0 0.0 817.0 13.6 -3.3
7 829.6 0.0 0.0 820.1 13.7 -3.3
8 758.9 0.0 0.0 749.5 10.8 -3.0
9 761.5 0.0 0.0 752.0 14.0 -3.0
10 667.5 0.0 0.0 658.1 10.4 -2.7
11 833.9 0.0 0.0 824.4 13.4 -3.3
12 717.8 0.0 0.0 709.7 -32.2 -2.8
13 682.2 0.0 0.0 674.1 54.5 -2.9
14 665.8 0.0 0.0 657.7 11.1 -14.5
15 734.1 0.0 0.0 726.0 11.3 8.9
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 682.2 - 682.2
M1 (kN.m) 54.5 10.2 61.1 300
M2 (kN.m) -2.9 -10.2 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.303 Le1/b1 = 7.5 < 15.0 300
Beta = 0.65 Le2/b2 = 7.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 18.2 / 4.8 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.04 / 1.03 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.24 / 0.06 N/mm2
Links = H8-225

2C25 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 635.2 -25.5 5.8 625.8 24.4 -4.8
2 511.9 -20.0 4.6 502.5 19.1 -3.8
3 642.7 -25.6 5.7 633.3 24.6 -4.7
4 583.6 -21.3 5.3 574.2 20.6 -4.4
5 589.8 -26.4 5.3 580.3 25.3 -4.4
6 635.0 -26.0 5.8 625.6 25.0 -4.8
7 637.7 -26.3 5.8 628.3 25.2 -4.8
8 582.7 -20.8 5.3 573.2 20.1 -4.4
9 586.4 -26.7 5.3 576.9 25.6 -4.4
10 513.1 -19.9 4.6 503.6 19.0 -3.8
11 642.7 -25.6 5.7 633.3 24.6 -4.7
12 547.8 7.6 5.3 539.7 -13.3 -4.6
13 528.6 -50.5 4.4 520.5 54.4 -3.5
14 519.4 -20.4 -7.6 511.3 19.6 -6.5
15 557.0 -22.5 17.3 548.9 21.5 -1.6
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 528.6 - 528.6
M1 (kN.m) 54.4 7.9 60.2 300
M2 (kN.m) 4.4 7.9 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.235 Le1/b1 = 6.4 < 15.0 300
Beta = 0.73 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 35.0 / 0.4 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.23 / 0.70 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.45 / 0.00 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-62

3C25 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 446.9 -24.4 4.2 437.4 24.5 -4.0
2 360.3 -19.1 3.3 350.8 19.2 -3.0
3 454.9 -24.4 4.2 445.5 24.5 -4.2
4 410.1 -20.6 3.8 400.6 20.7 -3.7
5 416.6 -25.2 3.8 407.2 25.4 -3.5
6 446.7 -24.9 4.2 437.3 25.1 -4.0
7 449.0 -25.2 4.1 439.5 25.3 -3.9
8 409.5 -20.0 3.8 400.0 20.2 -3.6
9 414.1 -25.5 3.8 404.6 25.6 -3.6
10 361.0 -19.0 3.3 351.6 19.1 -3.0
11 454.9 -24.4 4.2 445.5 24.5 -4.2
12 383.5 -5.9 3.2 375.4 2.0 -3.6
13 374.6 -35.2 3.8 366.5 39.3 -3.1
14 370.1 -19.9 0.6 362.0 20.0 -5.8
15 388.0 -21.1 6.4 379.9 21.3 -0.9
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 374.6 - 374.6
M1 (kN.m) 39.3 5.6 43.9 300
M2 (kN.m) 3.8 5.6 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.166 Le1/b1 = 6.4 < 15.0 300
Beta = 0.81 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 24.8 / 2.1 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 1.06 / 0.89 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.32 / 0.03 N/mm2
Links = H8-225

4C25 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 259.9 -26.8 4.9 250.4 28.5 -4.5
2 209.6 -20.5 4.1 200.2 21.8 -4.0
3 268.4 -26.7 4.7 258.9 28.5 -4.1
4 237.8 -23.0 4.4 228.3 24.5 -4.0
5 244.8 -27.7 4.6 235.4 29.4 -4.9
6 259.8 -27.4 4.9 250.3 29.1 -4.3
7 261.6 -27.6 5.0 252.1 29.3 -5.0
8 237.5 -22.5 4.5 228.1 23.9 -4.3
9 243.1 -27.9 4.5 233.6 29.7 -4.6
10 210.0 -20.4 4.1 200.5 21.7 -3.9
11 268.4 -26.7 4.7 258.9 28.5 -4.1
12 222.8 -13.5 4.0 214.7 12.5 -3.9
13 219.4 -31.6 4.3 211.3 35.5 -3.7
14 217.6 -22.2 1.4 209.5 23.5 -5.7
15 224.5 -22.9 6.9 216.4 24.5 -1.9
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 219.4 - 219.4
M1 (kN.m) 35.5 3.3 39.2 300
M2 (kN.m) 4.3 3.3 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.097 Le1/b1 = 6.4 < 15.0 300
Beta = 0.88 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 22.4 / 2.4 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.89 / 0.81 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.29 / 0.03 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-63

5C25 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 68.5 -16.3 4.6 59.0 15.0 -3.0
2 54.3 -12.6 3.3 44.9 14.1 -2.2
3 79.5 -15.4 4.9 70.1 14.1 -3.5
4 61.4 -14.2 4.4 52.0 11.2 -2.6
5 68.4 -16.7 3.4 59.0 15.5 -2.9
6 68.5 -16.5 4.8 59.0 15.3 -3.0
7 69.5 -16.7 4.2 60.1 15.6 -3.0
8 61.4 -14.0 4.0 52.0 11.0 -2.6
9 67.7 -16.7 3.7 58.3 15.5 -2.9
10 54.4 -12.6 3.5 44.9 14.0 -2.2
11 79.5 -15.4 4.9 70.1 14.1 -3.5
12 59.8 -9.7 3.9 51.7 6.8 -2.6
13 59.1 -17.7 3.9 51.0 18.5 -2.6
14 59.1 -13.6 1.8 51.0 12.5 -2.6
15 59.9 -13.8 5.9 51.8 12.9 -2.6
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 59.1 - 59.1
M1 (kN.m) 18.5 0.9 22.3 300
M2 (kN.m) 3.9 0.9 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.026 Le1/b1 = 6.3 < 15.0 300
Beta = 0.97 Le2/b2 = 6.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 12.1 / 2.8 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.72 / 0.71 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.16 / 0.04 N/mm2
Links = H8-225

1C26 Storey: 1 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 377.9 0.0 0.0 368.5 1.1 -1.1
2 297.6 0.0 0.0 288.1 0.8 -0.9
3 402.9 0.0 0.0 393.5 1.3 -1.3
4 382.9 0.0 0.0 373.5 1.1 -1.1
5 330.2 0.0 0.0 320.7 0.9 -0.9
6 377.5 0.0 0.0 368.1 1.1 -1.1
7 380.4 0.0 0.0 370.9 1.1 -1.1
8 398.6 0.0 0.0 389.2 1.3 -1.2
9 327.0 0.0 0.0 317.6 0.9 -0.9
10 282.3 0.0 0.0 272.8 0.7 -0.8
11 402.9 0.0 0.0 393.5 1.3 -1.3
12 331.1 0.0 0.0 323.0 -13.7 -0.6
13 310.9 0.0 0.0 302.8 15.6 -1.3
14 295.1 0.0 0.0 287.0 1.0 -12.5
15 346.9 0.0 0.0 338.8 0.9 10.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 377.9 - 377.9
M1 (kN.m) 1.1 5.7 0.0 300
M2 (kN.m) -1.1 -5.7 -10.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.168 Le1/b1 = 7.9 < 15.0 300
Beta = 0.81 Le2/b2 = 7.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.2 / 4.2 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.83 / 0.82 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.07 / 0.05 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-64

2C26 Storey: 2 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 301.3 -2.3 2.3 291.8 2.0 -1.9
2 236.8 -1.8 1.7 227.3 1.5 -1.4
3 317.8 -2.5 2.5 308.3 2.2 -2.0
4 305.3 -2.3 2.3 295.8 2.0 -2.0
5 265.3 -1.9 1.9 255.8 1.6 -1.5
6 301.0 -2.3 2.3 291.5 2.0 -1.9
7 303.4 -2.3 2.3 293.9 2.0 -1.9
8 315.5 -2.4 2.5 306.0 2.2 -2.1
9 262.7 -1.9 1.9 253.3 1.6 -1.5
10 226.9 -1.6 1.5 217.4 1.3 -1.3
11 317.8 -2.5 2.5 308.3 2.2 -2.0
12 261.7 -16.8 2.5 253.6 -1.0 -2.4
13 250.2 12.9 1.4 242.1 4.4 -0.7
14 240.9 -1.3 -10.2 232.8 1.3 -4.3
15 271.0 -2.5 14.0 262.9 2.1 1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 301.3 - 301.3
M1 (kN.m) -2.3 -4.5 0.0 300
M2 (kN.m) 2.3 4.5 8.3
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.134 Le1/b1 = 7.3 < 15.0 300
Beta = 0.84 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.9 / 2.0 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.75 / 0.74 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.04 / 0.03 N/mm2
Links = H8-225

3C26 Storey: 3 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 219.0 -1.7 1.8 209.5 0.9 -1.1
2 171.8 -1.3 1.4 162.4 0.6 -0.7
3 229.4 -1.7 1.9 219.9 1.0 -1.3
4 221.9 -1.7 1.7 212.5 1.1 -1.1
5 194.6 -1.4 1.5 185.2 0.6 -1.0
6 218.8 -1.7 1.8 209.3 0.8 -1.0
7 220.6 -1.7 1.8 211.1 0.9 -1.2
8 228.1 -1.7 1.8 218.7 1.2 -1.2
9 192.8 -1.4 1.5 183.4 0.5 -0.8
10 165.8 -1.2 1.3 156.3 0.6 -0.7
11 229.4 -1.7 1.9 219.9 1.0 -1.3
12 189.2 -4.2 0.8 181.1 -2.0 -1.3
13 183.0 1.4 2.2 174.9 3.5 -0.6
14 178.8 -1.4 -1.6 170.7 0.5 -3.3
15 193.4 -1.4 4.6 185.3 0.9 1.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 219.0 - 219.0
M1 (kN.m) -1.7 -3.3 0.0 300
M2 (kN.m) 1.8 3.3 6.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.097 Le1/b1 = 7.3 < 15.0 300
Beta = 0.88 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.7 / 0.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.72 / 0.71 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
QLEL (*1A7-8DE4-RZ2R-5HH7)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-65

4C26 Storey: 4 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 135.4 -2.9 2.6 126.0 5.2 -2.9
2 106.0 -2.2 2.1 96.5 4.5 -2.0
3 140.0 -3.0 2.7 130.6 5.7 -3.1
4 137.3 -2.7 2.6 127.9 4.2 -3.3
5 122.7 -2.6 2.1 113.3 5.0 -2.6
6 135.4 -2.9 2.7 126.0 5.4 -3.1
7 136.5 -2.9 2.5 127.0 5.3 -2.6
8 139.8 -2.8 2.8 130.3 4.2 -3.5
9 121.7 -2.6 2.3 112.2 5.1 -3.0
10 103.6 -2.1 1.9 94.1 4.4 -1.6
11 140.0 -3.0 2.7 130.6 5.7 -3.1
12 116.7 -5.3 1.9 108.6 2.2 -2.8
13 113.7 0.4 2.5 105.6 6.6 -2.1
14 112.4 -2.4 -0.4 104.3 4.2 -5.2
15 118.1 -2.5 4.8 110.0 4.6 0.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 135.4 - 135.4
M1 (kN.m) 5.2 2.0 7.9 300
M2 (kN.m) -2.9 -2.0 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.060 Le1/b1 = 7.3 < 15.0 300
Beta = 0.93 Le2/b2 = 7.0 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.1 / 1.6 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.72 / 0.71 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.03 / 0.02 N/mm2
Links = H8-225

5C26 Storey: 5 (Con.:C20/25 / Steel:Grade 500 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 52.6 1.5 0.8 43.2 2.1 -2.2
2 40.5 1.7 0.8 31.1 1.5 -1.6
3 50.5 1.7 0.9 41.0 2.0 -2.0
4 53.4 0.5 0.4 44.0 2.2 -2.2
5 51.5 1.9 0.5 42.1 2.1 -2.1
6 52.6 1.7 0.5 43.2 2.1 -2.2
7 53.1 1.6 1.1 43.7 2.2 -2.2
8 51.4 0.3 0.4 42.0 2.1 -2.1
9 51.2 2.0 0.0 41.7 2.1 -2.1
10 42.5 1.8 1.0 33.1 1.6 -1.7
11 50.5 1.7 0.9 41.0 2.0 -2.0
12 45.5 -1.0 0.3 37.4 1.8 -1.9
13 44.5 3.6 1.0 36.4 1.8 -1.8
14 44.4 1.2 -2.2 36.3 1.8 -1.8
15 45.6 1.4 3.5 37.5 1.9 -1.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 52.6 - 52.6
M1 (kN.m) 2.1 0.8 0.0 300
M2 (kN.m) -2.2 -0.8 -4.2
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.023 Le1/b1 = 6.9 < 15.0 300
Beta = 0.97 Le2/b2 = 6.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.1 kN As (Required): %1.00 (min) 900.00 mm2 4H20
vc'(1/2)= 0.66 / 0.66 N/mm2 As (Provided): %1.40 1256.64 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = H8-225

Project: QL_21_01_JUJA_FLATS_GT_NDEGWA_REVISED
STAIRCASE
Job Number Sheet
QL-21-01 ST-01
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Continuous Beam: STAIRCASE (Code of Practice : BS8110 - 1997)
5/31/2021 11:44:12 AM C01

Input Tables
fcu (MPa) 20
fy (MPa) 500
fyv (MPa) 500
% Redistribution 0
Downward/Optimized redistr. D
Cover to centre top steel(mm) 25
Cover to centre bot.steel(mm) 25
Dead Load Factor 1.4
Live Load Factor 1.6
Density of concrete (kN/m3) 24
% Live load permanent 25
Ø (Creep coefficient) 2
Ecs (Free shrinkage strain) 300E-6

Sec Bw D Bf-top Hf-top Bf-bot Hf-bot Y-offset Web Flange


No. (mm) (mm) (mm) (mm) (mm) (mm) (mm) offset offset

1 1150 175

Span Section Sec No Sec No


No Length(m) Left Right

1 3.65 1

Sup Code Column Below Code Column above Code


No. C,F F,P F,P
D(mm) B(mm) H(m) D(mm) B(mm) H(m)

Case Span Wleft Wright a b P a M a Load


D,L (kN/m) (kN/m) (m) (m) (kN) (m) (kNm) (m) Description

D 1 3.5
L 1 2

Span M left M right


(kNm) (kNm)
Job Number Sheet
QL-21-01 ST-02
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Sections

1150

175
SECTION 1
Beam Elevation

SPAN 1
1 2

Live
2.00

Dead+
8.33
Own W

3.650
Job Number Sheet
QL-21-01 ST-03
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Deflection, Shear, Moment and Steel diagrams. Span 1

Elastic Deflections (Alternate spans loaded) Def max = 1.937mm @ 1.82m


.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60
.500

1.00

1.50

Long-term Deflections (All spans loaded - using entered reinforcement) Def max = 13.94mm @ 1.82m
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60
2.00
4.00
6.00
8.00
10.0
12.0
14.0

SHEAR: X-X V max = 27.12kN @ 0.00m

20.0

10.0
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60
-10.0

-20.0

MOMENTS: X-X M max = 24.75kNm @ 1.82m


.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

5.00

10.0

15.0

20.0

25.0

Shear Steel: X-X Asv max = 1.058mm²/mm @ 0.00m


1.00

.800

.600

.400

.200
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

Bending Steel: X-X As max = 402.5mm2 @ 1.82m


.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

100

200

300

400
Job Number Sheet
QL-21-01 ST-04
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

=====================================================================
C O N T I N U O U S B E A M Ver W3.0.24 - 03 Oct 2017

Title : STAIRCASE
Data File : E:\QUEST LINKS ENGINEERING\2021\QL-21-01- JUJA APARTMENTS_GT\STRUCTURAL\CALCULATIO
Date/Time : 5/31/2021
Code of Practice : BS8110 - 1997
=====================================================================

BENDING MOMENTS & REINFORCEMENT

SPAN 1

Position(m) Min.Moment(kNm) Max.Moment(kNm) As-top(mm2) As-bot(mm2)

0.000 0.00 0.00 0.00 0.00


0.100 1.48 2.64 0.00 42.58
0.200 2.87 5.13 0.00 82.76
0.300 4.19 7.47 0.00 120.54
0.400 5.41 9.66 0.00 155.92
0.500 6.56 11.70 0.00 188.90
0.600 7.62 13.60 0.00 219.49
0.700 8.60 15.35 0.00 247.67
0.800 9.50 16.94 0.00 273.46
0.900 10.31 18.39 0.00 296.85
1.000 11.04 19.69 0.00 317.84
1.100 11.68 20.84 0.00 336.43
1.200 12.25 21.85 0.00 352.62
1.300 12.72 22.70 0.00 367.21
1.400 13.12 23.41 0.00 379.32
1.500 13.43 23.96 0.00 388.91
1.600 13.66 24.37 0.00 395.96
1.700 13.81 24.63 0.00 400.45
1.800 13.87 24.75 0.00 402.38
1.825 13.87 24.75 0.00 402.46
1.925 13.83 24.68 0.00 401.18
2.025 13.71 24.45 0.00 397.32
2.125 13.50 24.08 0.00 390.91
2.225 13.21 23.56 0.00 381.95
2.325 12.83 22.89 0.00 370.47
2.425 12.37 22.07 0.00 356.50
2.525 11.83 21.11 0.00 340.70
2.625 11.21 19.99 0.00 322.71
2.725 10.50 18.73 0.00 302.32
2.825 9.71 17.32 0.00 279.53
2.925 8.83 15.76 0.00 254.35
3.025 7.87 14.05 0.00 226.76
3.125 6.83 12.19 0.00 196.77
3.225 5.71 10.19 0.00 164.39
3.325 4.50 8.03 0.00 129.61
3.425 3.21 5.73 0.00 92.43
3.525 1.84 3.27 0.00 52.85
3.625 0.38 0.67 0.00 10.87
3.650 0.00 0.00 0.00 0.00

---------------------------------------------------------------------

SHEAR FORCES & REINFORCEMENT

SPAN 1
Job Number Sheet
QL-21-01 ST-05
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Position(m) Minimum Maximum Shear Asv/Sv Asv/Sv(nom)
Shear(kN) Shear(kN) Capacity(kN) (mm2/mm) (mm2/mm)

0.000 15.20 27.12 617.15 0.00 1.06


0.100 14.37 25.64 222.07 0.00 1.06
0.200 13.54 24.15 117.79 0.00 1.06
0.300 12.70 22.66 86.55 0.00 1.06
0.400 11.87 21.18 90.40 0.00 1.06
0.500 11.04 19.69 90.40 0.00 1.06
0.600 10.20 18.21 90.40 0.00 1.06
0.700 9.37 16.72 90.40 0.00 1.06
0.800 8.54 15.23 90.40 0.00 1.06
0.900 7.71 13.75 90.40 0.00 1.06
1.000 6.87 12.26 90.40 0.00 1.06
1.100 6.04 10.77 90.40 0.00 1.06
1.200 5.21 9.29 90.40 0.00 1.06
1.300 4.37 7.80 90.40 0.00 1.06
1.400 3.54 6.32 90.40 0.00 1.06
1.500 2.71 4.83 90.40 0.00 1.06
1.600 1.87 3.34 90.40 0.00 1.06
1.700 1.04 1.86 90.40 0.00 1.06
1.800 0.21 0.37 90.40 0.00 1.06
1.825 0.00 0.00 90.40 0.00 1.06
1.925 -1.49 -0.83 90.40 0.00 1.06
2.025 -2.97 -1.67 90.40 0.00 1.06
2.125 -4.46 -2.50 90.40 0.00 1.06
2.225 -5.94 -3.33 90.40 0.00 1.06
2.325 -7.43 -4.17 90.40 0.00 1.06
2.425 -8.92 -5.00 90.40 0.00 1.06
2.525 -10.40 -5.83 90.40 0.00 1.06
2.625 -11.89 -6.66 90.40 0.00 1.06
2.725 -13.38 -7.50 90.40 0.00 1.06
2.825 -14.86 -8.33 90.40 0.00 1.06
2.925 -16.35 -9.16 90.40 0.00 1.06
3.025 -17.83 -10.00 90.40 0.00 1.06
3.125 -19.32 -10.83 90.40 0.00 1.06
3.225 -20.81 -11.66 90.40 0.00 1.06
3.325 -22.29 -12.50 88.34 0.00 1.06
3.425 -23.78 -13.33 107.58 0.00 1.06
3.525 -25.27 -14.16 177.65 0.00 1.06
3.625 -26.75 -14.99 617.15 0.00 1.06
3.650 -27.12 -15.20 617.15 0.00 1.06

---------------------------------------------------------------------

COLUMN REACTIONS

Support Dead Load(kN) Live Load(kN) Dead + Live(kN) Ultimate(kN)

1 15.20 3.65 18.85 27.12


2 15.20 3.65 18.85 27.12

---------------------------------------------------------------------

COLUMN MOMENTS (Ultimate limit state)

Columns below

Support Bending Moment(kNm) Shear Force (kN)


No. Min. Max. Min. Max.

1 0.00 0.00 0.00 0.00


Job Number Sheet
QL-21-01 ST-06
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
2 0.00 0.00 0.00 0.00

Columns above

Support Bending Moment(kNm) Shear Force (kN)


No. Min. Max. Min. Max.

1 0.00 0.00 0.00 0.00


2 0.00 0.00 0.00 0.00

---------------------------------------------------------------------

ELASTIC DEFLECTIONS (Alternate spans loaded - positive downward)

Modulus of elasticity: Ec = 20 + fcu/5 = 24.0 Gpa

SPAN 1

Position(m) Min.Deflection(mm) Max.Deflection(mm)

0.000 0.00 0.00


0.100 0.14 0.17
0.200 0.27 0.33
0.300 0.40 0.50
0.400 0.53 0.65
0.500 0.65 0.80
0.600 0.77 0.95
0.700 0.88 1.09
0.800 0.98 1.22
0.900 1.08 1.34
1.000 1.17 1.45
1.100 1.26 1.56
1.200 1.33 1.65
1.300 1.40 1.73
1.400 1.45 1.80
1.500 1.50 1.86
1.600 1.53 1.90
1.700 1.55 1.92
1.800 1.56 1.94
1.825 1.56 1.94
1.825 1.56 1.94
1.925 1.56 1.93
2.025 1.54 1.91
2.125 1.51 1.87
2.225 1.46 1.81
2.325 1.41 1.75
2.425 1.35 1.67
2.525 1.28 1.58
2.625 1.19 1.48
2.725 1.10 1.37
2.825 1.01 1.25
2.925 0.90 1.12
3.025 0.79 0.98
3.125 0.68 0.84
3.225 0.56 0.69
3.325 0.43 0.54
3.425 0.30 0.37
3.525 0.17 0.21
3.625 0.03 0.04
3.650 0.00 0.00

---------------------------------------------------------------------
Job Number Sheet
QL-21-01 ST-07
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

LONGTERM DEFLECTIONS (All spans loaded - positive downward)

Symbols: DS : Shrinkage deflection.


DL : Long-term deflection under permanent load.
DI : Instantaneous deflection under short-term load.
DT : Total long-term deflection.

SPAN 1

Position(m) DS(mm) DL(mm) DI(mm) DT(mm)

0.000 0.00 0.00 0.00 0.00


0.100 0.17 0.84 0.14 1.15
0.200 0.33 1.67 0.28 2.29
0.300 0.50 2.50 0.42 3.42
0.400 0.66 3.32 0.56 4.54
0.500 0.81 4.12 0.70 5.64
0.600 0.96 4.90 0.84 6.71
0.700 1.11 5.65 0.97 7.73
0.800 1.24 6.37 1.10 8.71
0.900 1.36 7.03 1.22 9.62
1.000 1.48 7.65 1.33 10.46
1.100 1.58 8.21 1.44 11.23
1.200 1.67 8.71 1.53 11.90
1.300 1.74 9.14 1.61 12.49
1.400 1.80 9.51 1.67 12.98
1.500 1.85 9.80 1.73 13.38
1.600 1.89 10.01 1.77 13.67
1.700 1.92 10.15 1.79 13.86
1.800 1.93 10.21 1.80 13.94
1.825 1.93 10.21 1.80 13.94
1.825 1.93 10.21 1.80 13.94
1.925 1.92 10.17 1.79 13.89
2.025 1.90 10.05 1.77 13.73
2.125 1.87 9.86 1.74 13.46
2.225 1.82 9.59 1.69 13.09
2.325 1.76 9.24 1.62 12.62
2.425 1.69 8.83 1.55 12.06
2.525 1.60 8.34 1.46 11.40
2.625 1.50 7.80 1.36 10.66
2.725 1.39 7.19 1.25 9.84
2.825 1.27 6.54 1.13 8.94
2.925 1.14 5.84 1.00 7.98
3.025 1.00 5.10 0.87 6.97
3.125 0.85 4.32 0.73 5.91
3.225 0.70 3.52 0.60 4.82
3.325 0.54 2.71 0.46 3.70
3.425 0.37 1.88 0.32 2.57
3.525 0.21 1.05 0.18 1.43
3.625 0.04 0.21 0.04 0.29
3.650 -0.00 0.00 -0.00 0.00

---------------------------------------------------------------------
QUANTITIES

Section Area(m²)
1 0.201

Total weight of beam = 17.63 kN


=====================================================================
Job Number Sheet
QL-21-01 ST-08
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

COLUMN REACTIONS

Support Dead Load(kN) Live Load(kN) Dead + Live(kN) Ultimate(kN)

1 15.20 3.65 18.85 27.12


2 15.20 3.65 18.85 27.12

---------------------------------------------------------------------

COLUMN MOMENTS (Ultimate limit state)

Columns below

Support Bending Moment(kNm) Shear Force (kN)


No. Min. Max. Min. Max.

1 0.00 0.00 0.00 0.00


2 0.00 0.00 0.00 0.00

Columns above

Support Bending Moment(kNm) Shear Force (kN)


No. Min. Max. Min. Max.

1 0.00 0.00 0.00 0.00


2 0.00 0.00 0.00 0.00

---------------------------------------------------------------------
Job Number Sheet
QL-21-01 ST-09
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcing Tables
Beam type (1-5) 2
Maximum bar length (m) 12
TOP: Minimum bar diameter (mm) 12
Maximum bar diameter (mm) 16
BOTTOM: Minimum bar diameter (mm) 12
Maximum bar diameter (mm) 16
STIRRUP: Minimum diameter (mm) 8
Maximum diameter (mm) 16
Stirrup shape code 72
First bar mark - top A
First bar mark - mid.[optional]
First bar mark - bot.[optional]
Cover to stirrups - top (mm) 30
Cover to stirrups - bot (mm) 30
Cover to stirrups - sides (mm) 25
Minimum stirrups as % of nominal 100
Loose method of detailing (Y/N) N
Exploded elevation (Y/N) Y
Bending schedule scale 1: Auto
Number bars from left to right (Y/N) Y
Middle bar diameter (mm) Auto
Target Padds

Bars Mark SC Span Offset Length Hook Layer


6Y10 A 35 1 0.025 3.600 R B

Stirrup Section Bar Type + Shape Top Top Bottom


Number Number Diameter Mark Code Offset Flange Flange

Stirrup Length
Number Spacing Span Offset (m)

Section positions
Label Span Offset(m)
A 1 2.0

File name STAIRCASE.PAD


First span 1
Last span 1
Draw grid lines?(Y/N) Y
Draw columns?(Y/N) Y
Number/Letter of first grid A
Number (U)p or (D)own U
Drawing size?(A4 or A5) A5
Height (normal text) mm 2
Height (title text) mm 2.5
Height (sec. bar mark) mm 1.8
Job Number Sheet
QL-21-01 ST-10
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Main and Shear Reinforcing diagrams. Span 1

SPAN 1 - 3.650

6Y10-A

MAIN REINFORCEMENT As max = 471.2mm2 @ .400m


.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60
100

200

300

400

SPAN 1 - 3.650

SHEAR REINFORCEMENT Asv max = 1.058mm²/mm @ 0.00m


1.00

.800

.600

.400

.200
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60
TYPICAL FLOOR
BEAMS
TYPICAL FLOOR SLAB
Job Number Sheet
QL-21-01 S1-01
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Rectangular Slab Panel Design : TYPICAL FLOOR SLAB (5.2X3.2) -GRIDS (C-B)/ (1-2)
C04
Input Data

Lx (m) 5.2
Ly (m) 3.2
Slab depth (mm) 150
deff X-dir (mm) 124
deff Y-dir (mm) 114
Poisson's ratio 0.2
fcu (MPa) 20
fy (MPa) 500
Density (kN/m3) 24
Self weight LF 1.4
e - time factor 2
(ACI318 :9.5.2.5)

Load Cases

Unfactored Loads Unfactored Point Loads Unfactored Line Loads


LC Load UDL P x y L x1 y1 x2 y2
No. fact kN/m² kN m m kN/m m m m m

1 1.4 1.5
1.6 2

Sketch of slab
BS8110 - 1997
Y

Lx=5.20
Ly=3.20

Total UDL =

10.340 kN/m² Load Case 1 (factored)

(Incl self Wt)


Job Number Sheet
QL-21-01 S1-02
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Output

Wood-Armer Moments and reinforcement for each load case:


Wood-Armer moments were calculated using the 'Wood & Armer' theory.

LOAD CASE 1
Position Wood-Armer Moments (kNm/m) Reinforcement (mm²/m)
Top Bottom Top Bottom
X (m) Y(m) X Y X Y X Y X Y

0.00 0.00 0.5 0.6 0.4 0.3 10 13 8 7


0.43 0.00 1.0 3.5 0.0 0.0 20 75 0 0
0.87 0.00 1.5 6.4 0.0 0.0 29 135 0 0
1.30 0.00 1.6 7.3 0.0 0.0 31 154 0 0
1.73 0.00 1.7 8.2 0.0 0.0 33 174 0 0
2.17 0.00 1.7 8.2 0.0 0.0 33 175 0 0
2.60 0.00 1.7 8.4 0.0 0.0 34 178 0 0
3.03 0.00 1.6 7.9 0.0 0.0 32 168 0 0
3.47 0.00 1.6 7.4 0.0 0.0 31 158 0 0
3.90 0.00 1.3 5.8 0.0 0.0 26 123 0 0
4.33 0.00 1.0 4.0 0.0 0.0 20 85 0 0
4.77 0.00 0.6 2.0 0.0 0.0 11 42 0 0
5.20 0.00 0.1 0.0 0.3 0.4 2 1 5 8
0.00 0.27 1.2 1.4 1.3 1.1 23 29 25 24
0.87 0.27 1.1 3.8 0.0 0.0 21 81 0 0
1.73 0.27 1.0 4.7 0.0 0.0 19 99 0 0
2.60 0.27 0.9 4.7 0.0 0.0 18 101 0 0
3.47 0.27 1.1 4.3 0.0 0.0 21 92 0 0
4.33 0.27 1.0 2.7 0.2 0.0 20 58 4 0
5.20 0.27 1.1 0.3 0.0 0.1 21 7 0 3
0.00 0.53 1.8 2.0 2.2 2.0 36 43 43 43
0.43 0.53 1.2 1.7 2.0 1.5 24 37 39 33
0.87 0.53 0.7 1.4 1.7 1.0 14 30 33 21
1.30 0.53 0.5 1.3 1.0 0.2 9 27 19 4
1.73 0.53 0.3 1.2 0.2 0.0 6 26 4 0
2.17 0.53 0.1 1.0 0.0 0.0 2 22 0 0
2.60 0.53 0.1 1.1 0.0 0.0 3 23 0 0
3.03 0.53 0.3 1.2 0.3 0.0 6 25 5 0
3.47 0.53 0.5 1.3 0.9 0.1 11 28 17 2
3.90 0.53 0.8 1.4 1.2 0.6 16 30 24 13
4.33 0.53 1.1 1.5 1.8 1.4 21 33 36 29
4.77 0.53 1.6 1.1 0.4 0.9 31 24 8 18
5.20 0.53 2.1 0.7 0.0 0.0 42 15 0 0
0.00 0.80 1.5 1.6 2.0 1.8 28 34 39 39
0.87 0.80 0.0 0.0 2.2 2.1 0 1 43 44
1.73 0.80 0.0 0.0 1.0 1.4 0 0 20 31
2.60 0.80 0.0 0.0 0.7 1.2 0 0 13 26
3.47 0.80 0.0 0.0 1.4 1.7 0 0 27 35
4.33 0.80 0.6 0.7 2.0 1.9 11 14 39 41
5.20 0.80 3.4 1.0 0.0 0.0 67 22 0 0
0.00 1.07 1.1 1.3 1.7 1.5 21 27 34 33
0.43 1.07 0.0 0.0 2.3 2.4 0 0 45 51
0.87 1.07 0.0 0.0 2.7 3.2 0 0 52 68
1.30 1.07 0.0 0.0 2.0 3.3 0 0 40 69
1.73 1.07 0.0 0.0 1.6 3.4 0 0 31 72
2.17 1.07 0.0 0.0 1.3 3.2 0 0 25 68
2.60 1.07 0.0 0.0 1.2 3.3 0 0 24 69
3.03 1.07 0.0 0.0 1.5 3.3 0 0 30 69
3.47 1.07 0.0 0.0 1.9 3.3 0 0 38 70
3.90 1.07 0.0 0.0 1.9 2.9 0 0 36 61
4.33 1.07 0.0 0.0 2.2 2.5 0 0 43 53
4.77 1.07 2.1 0.5 0.0 0.6 42 11 0 13
5.20 1.07 4.6 1.2 0.0 0.0 90 26 0 0
0.00 1.33 0.3 0.6 1.1 0.9 7 12 21 18
0.87 1.33 0.0 0.0 2.4 3.1 0 0 47 66
1.73 1.33 0.0 0.0 1.7 3.8 0 0 32 81
2.60 1.33 0.0 0.0 1.4 3.8 0 0 27 82
3.47 1.33 0.0 0.0 1.9 3.5 0 0 36 75
Job Number Sheet
QL-21-01 S1-03
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
4.33 1.33 0.0 0.0 1.8 2.2 0 0 35 46
5.20 1.33 4.9 1.2 0.0 0.0 97 26 0 0
0.00 1.60 0.0 0.0 0.4 0.2 0 0 8 3
0.43 1.60 0.0 0.0 1.4 1.6 0 0 27 34
0.87 1.60 0.0 0.0 2.2 3.0 0 0 42 65
1.30 1.60 0.0 0.0 1.9 3.7 0 0 37 78
1.73 1.60 0.0 0.0 1.7 4.3 0 0 34 91
2.17 1.60 0.0 0.0 1.6 4.4 0 0 31 92
2.60 1.60 0.0 0.0 1.5 4.4 0 0 30 94
3.03 1.60 0.0 0.0 1.6 4.1 0 0 32 87
3.47 1.60 0.0 0.0 1.8 3.8 0 0 34 80
3.90 1.60 0.0 0.0 1.4 2.8 0 0 27 60
4.33 1.60 0.0 0.0 1.3 1.8 0 0 26 38
4.77 1.60 1.8 0.0 0.0 0.3 35 0 0 6
5.20 1.60 5.3 1.2 0.0 0.0 103 25 0 0
0.00 1.87 0.3 0.6 1.1 0.9 7 12 21 18
0.87 1.87 0.0 0.0 2.4 3.1 0 0 47 66
1.73 1.87 0.0 0.0 1.7 3.8 0 0 32 81
2.60 1.87 0.0 0.0 1.4 3.8 0 0 27 82
3.47 1.87 0.0 0.0 1.9 3.5 0 0 36 75
4.33 1.87 0.0 0.0 1.8 2.2 0 0 35 46
5.20 1.87 4.9 1.2 0.0 0.0 97 26 0 0
0.00 2.13 1.1 1.3 1.7 1.5 21 27 34 33
0.43 2.13 0.0 0.0 2.3 2.4 0 0 45 51
0.87 2.13 0.0 0.0 2.7 3.2 0 0 52 68
1.30 2.13 0.0 0.0 2.0 3.3 0 0 40 69
1.73 2.13 0.0 0.0 1.6 3.4 0 0 31 72
2.17 2.13 0.0 0.0 1.3 3.2 0 0 25 68
2.60 2.13 0.0 0.0 1.2 3.3 0 0 24 69
3.03 2.13 0.0 0.0 1.5 3.3 0 0 30 69
3.47 2.13 0.0 0.0 1.9 3.3 0 0 38 70
3.90 2.13 0.0 0.0 1.9 2.9 0 0 36 61
4.33 2.13 0.0 0.0 2.2 2.5 0 0 43 53
4.77 2.13 2.1 0.5 0.0 0.6 42 11 0 13
5.20 2.13 4.6 1.2 0.0 0.0 90 26 0 0
0.00 2.40 1.5 1.6 2.0 1.8 28 34 39 39
0.87 2.40 0.0 0.0 2.2 2.1 0 1 43 44
1.73 2.40 0.0 0.0 1.0 1.4 0 0 20 31
2.60 2.40 0.0 0.0 0.7 1.2 0 0 13 26
3.47 2.40 0.0 0.0 1.4 1.7 0 0 27 35
4.33 2.40 0.6 0.7 2.0 1.9 11 14 39 41
5.20 2.40 3.4 1.0 0.0 0.0 67 22 0 0
0.00 2.67 1.8 2.0 2.2 2.0 36 43 43 43
0.43 2.67 1.2 1.7 2.0 1.5 24 37 39 33
0.87 2.67 0.7 1.4 1.7 1.0 14 30 33 21
1.30 2.67 0.5 1.3 1.0 0.2 9 27 19 4
1.73 2.67 0.3 1.2 0.2 0.0 6 26 4 0
2.17 2.67 0.1 1.0 0.0 0.0 2 22 0 0
2.60 2.67 0.1 1.1 0.0 0.0 3 23 0 0
3.03 2.67 0.3 1.2 0.3 0.0 6 25 5 0
3.47 2.67 0.5 1.3 0.9 0.1 11 28 17 2
3.90 2.67 0.8 1.4 1.2 0.6 16 30 24 13
4.33 2.67 1.1 1.5 1.8 1.4 21 33 36 29
4.77 2.67 1.6 1.1 0.4 0.9 31 24 8 18
5.20 2.67 2.1 0.7 0.0 0.0 42 15 0 0
0.00 2.93 1.2 1.4 1.3 1.1 23 29 25 24
0.87 2.93 1.1 3.8 0.0 0.0 21 81 0 0
1.73 2.93 1.0 4.7 0.0 0.0 19 99 0 0
2.60 2.93 0.9 4.7 0.0 0.0 18 101 0 0
3.47 2.93 1.1 4.3 0.0 0.0 21 92 0 0
4.33 2.93 1.0 2.7 0.2 0.0 20 58 4 0
5.20 2.93 1.1 0.3 0.0 0.1 21 7 0 3
0.00 3.20 0.5 0.6 0.4 0.3 10 13 8 7
0.43 3.20 1.0 3.5 0.0 0.0 20 75 0 0
0.87 3.20 1.5 6.4 0.0 0.0 29 135 0 0
1.30 3.20 1.6 7.3 0.0 0.0 31 154 0 0
1.73 3.20 1.7 8.2 0.0 0.0 33 174 0 0
2.17 3.20 1.7 8.2 0.0 0.0 33 175 0 0
2.60 3.20 1.7 8.4 0.0 0.0 34 178 0 0
Job Number Sheet
QL-21-01 S1-04
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
3.03 3.20 1.6 7.9 0.0 0.0 32 168 0 0
3.47 3.20 1.6 7.4 0.0 0.0 31 158 0 0
3.90 3.20 1.3 5.8 0.0 0.0 26 123 0 0
4.33 3.20 1.0 4.0 0.0 0.0 20 85 0 0
4.77 3.20 0.6 2.0 0.0 0.0 11 42 0 0
5.20 3.20 0.1 0.0 0.3 0.4 2 1 5 8

Deflections

Short term deflections: Load case 1 (mm)

0.04
0.04
0.06

0.02
0.06 0.08

0 .1
0.16 0.1 0
0.18 2
0.0 4

0.1 0.14
6
0.0
2

0.20 6
0.0

0.22

20 0.24

0.06
18 0. 22

0.08
0.26

0.10
0.

0.04
0.

0.22
0.06

6
0.04
0.02

0.1

0.12
0.10 0.12
0.08 0.10 0 2
0.06 0.

NOTE:Short term elastic deflections based on gross concrete sections


Job Number Sheet
QL-21-01 S1-05
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997
Top:LC 1 (kNm/m)

1.00
0.50
0
0.50 1.5
50
00

0.
1.

1.50
1.00
0.50
0.50
1.00

0.50

1.
50
1.00
1.00

1.50 1.5
0

Max value:5.3 at X:5.2 Y:1.6


Wood-Armer Moments:

BS8110 - 1997
Top:LC 1 (kNm/m)

4.00 4.00
3.00 3.00
2.00 2.00

0 0
1.

1.
00
1.00 1.00

5.00 4.0
6.00 5.0 0
7.00 0
0

6
0

7.0 .00
2. 0
3. 0
0

8.00 0
1. 0

Max value:8.4 at X:2.6 Y:3.2


Job Number Sheet
QL-21-01 S1-06
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997
Bot:LC 1 (kNm/m)

00.4.20

0.20.400
100.8.600

0..680
1.6 .4020 00
1

0
0 .00
1 .

1 0
. 0 0

1..240
1 .60
0.2

1 .80
1
0

0.8 1.60
1.0 0
1.200
2.20

1.80
2.00

1.40
1.80

0.20
0

0.40
2 .0

1.6

0 0 1.80
1.8 2.0 .20
40
1.

1.0
0.8 0
0.600

0.20.4600
0
60 . 4 0 0

0..80
0.20.40

0 .00

0
1 0
1. 1 1.2.00

1..240
1 .60
1 .80
1
1

0
0.4 .20
0

Max value:2.7 at X:0.9 Y:2.1


Wood-Armer Moments:

BS8110 - 1997
Bot:LC 1 (kNm/m)

0.50
0.50

1.00
1.00

1.50 2.00
2.00 2.50
00

2.50
3.00 3.00
2.

4.0
0.50
0

0
1.00
3.5

1.50

3.50
0

3.00
2. 0

1.50
1.00

1.000.50

Max value:4.4 at X:2.6 Y:1.6


Job Number Sheet
QL-21-01 S1-07
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997
Top:LC 1 (mm²/m)

10
10 30
10
20

30
20
10
10
20

10

30
20
20

30 30

Max value:102.8 at X:5.2 Y:1.6


Reinforcement:

BS8110 - 1997
Top:LC 1 (mm²/m)

80 80
60 60
40 40

20

20
20 20

100 80
120 1 00
140 1 20
60

160 1 40
40
20

Max value:178.1 at X:2.6 Y:3.2


Job Number Sheet
QL-21-01 S1-08
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997
Bot:LC 1 (mm²/m)

15
150

5
2

10
2 0

15
30 5

20
25
5

30
35
15
20
25 35
40

30
35

5
40

20
35
35 40
30

25

15
30 5 10

5 0
1
15
2 0 5

20
25
30
2

5 35

Max value:52.2 at X:0.9 Y:2.1


Reinforcement:

BS8110 - 1997
Bot:LC 1 (mm²/m)

10
20
10
20

30 40
40 50
50
40

60 60
70 70
50

80
10

90
20
70

30
40

70
50

70

30
20

20 10

Max value:94.5 at X:2.6 Y:1.6


Job Number Sheet
QL-21-01 S1-09
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Deflections

Envelope of Maximum Short term deflections (mm)

0.04
0.04
0.06

0.02
0.06 0.08

0.1
0.16 0.1 0
0.18 2
0.0 4

0.1 0.14
6
0.0
2

0.20 6
0.0

0.22

20 0.24

0.06
18 0. 22

0.08
0.26

0.10
0.

0.04
0.

0.22
0.06

6
0.04
0.02

0.1
0.12
0.10 0.12
0.08 0.10 0 2
0.06 0.

NOTE:Short term elastic deflections based on gross concrete sections

Wood-Armer Moments:

BS8110 - 1997
Envelope : Max. Top (kNm/m)

1.00
0.50
0
0.50 1.5
50
00

0.
1.

1.50
1.00
0.50
0.50
1.00

0.50
1.
50

1.00
1.00

1.50 1.5
0

Max value:5.3 at X:5.2 Y:1.6


Job Number Sheet
QL-21-01 S1-10
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997
Envelope : Max. Top (kNm/m)

4.00 4.00
3.00 3.00
2.00 2.00

0 0
1.

1.
00
1.00 1.00

5.00 4.0
6.00 5.0 0
7.00 0
0

6
0

7.0 .00
2. 0
3. 0
0

8.00 0
1. 0

Max value:8.4 at X:2.6 Y:3.2


Wood-Armer Moments:

BS8110 - 1997
Envelope : Max. Bot (kNm/m)

00.4.20
0.20.400

100.8.600
0..680

1.61.410.20.000
0
0 .00
1 0

0
1..240
1 .60

0.2
1 .80
1

0.8 1.60
1.0 0
1.200
2.20

1.80
2.00

1.40
1.80

0.20
0

0.40
2 .0

1.6

0 0 1.80
1.8 2.0 .20
40
1.

1.0
0.8 0
0.6 0
0.20.4600

0
60 . 4 0 0.400
0..80
0 .00

0
1 0

1. 1 1.2.00 0.20
1..240
1 .60
1 . 80
1

0
0.4 .20
0

Max value:2.7 at X:0.9 Y:2.1


Job Number Sheet
QL-21-01 S1-11
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997
Envelope : Max. Bot (kNm/m)

0.50
0.50

1.00
1.00

1.50 2.00
2.00 2.50
00

2.50
3.00 3.00
2.

4.0

0.50
0

1.00
3.5

1.50
3.50
0

3.00
2. 0

1.50

1.00
. 0 0
1 0.50

Max value:4.4 at X:2.6 Y:1.6


Reinforcement:

BS8110 - 1997
Envelope : Max. Top (mm²/m)

10
10 30
10
20

30
20
10
10
20

10
30

20
20

30 30

Max value:102.8 at X:5.2 Y:1.6


Job Number Sheet
QL-21-01 S1-12
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997
Envelope : Max. Top (mm²/m)

80 80
60 60
40 40

20

20
20 20

100 80
120 1 00
140 1 20
60

160 1 40
40
20

Max value:178.1 at X:2.6 Y:3.2


Reinforcement:

BS8110 - 1997
Envelope : Max. Bot (mm²/m)

15
150
5

30 25 20
10
15
20
25

5
30
35

15
20
25 35
40

30
35

5
40

20

35
35 40
30

25

15
30 5 10
5 0
1
15

2 0 5
20
25
30

2
35

Max value:52.2 at X:0.9 Y:2.1


Job Number Sheet
QL-21-01 S1-13
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997
Envelope : Max. Bot (mm²/m)

10
20
10
20

30 40
40 50
50
40

60 60
70 70
50

80

10
90

20
70

30
40

70
50

70
30

20
20 10

Max value:94.5 at X:2.6 Y:1.6


Deflections

Envelope of Minimum Short term deflections (mm)

0.04
0.04
0.06
0.02

0.06 0.08

0.1
0.16 0.1 0
0.18 2
0.0 4

0
6

0.1 .14
0.0
2

0.20 6
0.0

0.22

20 0.24
0.06

18 0. 22
0.08

0.26
0.10

0.
0.04

0.

0.22
0.06

6
0.04
0.02

0.1

0.12
0.10 0.12
0.08 0.10 0 2
0.06 0.

NOTE:Short term elastic deflections based on gross concrete sections


Job Number Sheet
QL-21-01 S1-14
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997
Envelope : Min. Top (kNm/m)

1.00
0.50
0
0.50 1.5
50
00

0.
1.

1.50
1.00
0.50
0.50
1.00

0.50

1.
50
1.00
1.00

1.50 1.5
0

Max value:5.3 at X:5.2 Y:1.6


Wood-Armer Moments:

BS8110 - 1997
Envelope : Min. Top (kNm/m)

4.00 4.00
3.00 3.00
2.00 2.00

0 0
1.

1.
00
1.00 1.00

5.00 4.0
6.00 5.0 0
7.00 0
0

6
0

7.0 .00
2. 0
3. 0
0

8.00 0
1. 0

Max value:8.4 at X:2.6 Y:3.2


Job Number Sheet
QL-21-01 S1-15
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997
Envelope : Min. Bot (kNm/m)

00.4.20

0.20.400
100.8.600

0..680
1.6 .4020 00
1

0
0 .00
1 .

1 0
. 0 0

1..240
1 .60
0.2

1 .80
1
0

0.8 1.60
1.0 0
1.200
2.20

1.80
2.00

1.40
1.80

0.20
0

0.40
2 .0

1.6

0 0 1.80
1.8 2.0 .20
40
1.

1.0
0.8 0
0.600

0.20.4600
0
60 . 4 0 0

0..80
0.20.40

0 .00

0
1 0
1. 1 1.2.00

1..240
1 .60
1 .80
1
1

0
0.4 .20
0

Max value:2.7 at X:0.9 Y:2.1


Wood-Armer Moments:

BS8110 - 1997
Envelope : Min. Bot (kNm/m)

0.50
0.50

1.00
1.00

1.50 2.00
2.00 2.50
00

2.50
3.00 3.00
2.

4.0
0.50
0

0
1.00
3.5

1.50

3.50
0

3.00
2. 0

1.50
1.00

1.000.50

Max value:4.4 at X:2.6 Y:1.6


Job Number Sheet
QL-21-01 S1-16
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997
Envelope : Min. Top (mm²/m)

10
10 30
10
20

30
20
10
10
20

10

30
20
20

30 30

Max value:102.8 at X:5.2 Y:1.6


Reinforcement:

BS8110 - 1997
Envelope : Min. Top (mm²/m)

80 80
60 60
40 40

20

20
20 20

100 80
120 1 00
140 1 20
60

160 1 40
40
20

Max value:178.1 at X:2.6 Y:3.2


Job Number Sheet
QL-21-01 S1-17
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997
Envelope : Min. Bot (mm²/m)

15
150

5
2

10
2 0

15
30 5

20
25
5

30
35
15
20
25 35
40

30
35

5
40

20
35
35 40
30

25

15
30 5 10

5 0
1
15
2 0 5

20
25
30
2

5 35

Max value:52.2 at X:0.9 Y:2.1


Reinforcement:

BS8110 - 1997
Envelope : Min. Bot (mm²/m)

10
20
10
20

30 40
40 50
50
40

60 60
70 70
50

80
10

90
20
70

30
40

70
50

70

30
20

20 10

Max value:94.5 at X:2.6 Y:1.6


Job Number Sheet
QL-21-01 S1-18
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Rebar Excess:

Rebar Excess Top (mm²/m)


Note:Default reinforce-
ment should be checked 14Y10-C-400 (T2) (Bar 1)
and adjusted for suit-

Offset
ability and layout.

Offset

9Y10-E-400 (B1) (Bar 1)

9Y10-B-400 (T1) (Bar 1)


Offset
Offset

14Y10-F-400 (B2) (Bar 1)

14Y10-D-400 (T2) (Bar 1)

Rebar Excess:

Rebar Excess Top (mm²/m)


Note:Default reinforce-
ment should be checked 14Y10-C-400 (T2) (Bar 1)
and adjusted for suit-
Offset

ability and layout.

Offset
-150 -150
9Y10-E-400 (B1) (Bar 1)

9Y10-B-400 (T1) (Bar 1)

-250
-200

Offset -10
0
0

-50
- 15

-50
Offset

14Y10-F-400 (B2) (Bar 1)

14Y10-D-400 (T2) (Bar 1)


Job Number Sheet
QL-21-01 S1-19
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Rebar Excess:

Rebar Excess Bot (mm²/m)


Note:Default reinforce-
ment should be checked 14Y10-C-400 (T2) (Bar 1)
and adjusted for suit-

Offset
ability and layout.

-1 9
0 Offset

-19
-
-17 180

-18
-17

0
0

9Y10-E-400 (B1) (Bar 1)


0

9Y10-B-400 (T1) (Bar 1)


0
-180
-170
- 160

-160

-180
60
-1 -160
70
-1

-180

-19
7 0

-18
-1 -190

-17

0
0
0
Offset
0
- 19
Offset

14Y10-F-400 (B2) (Bar 1)

14Y10-D-400 (T2) (Bar 1)

Rebar Excess:

Rebar Excess Bot (mm²/m)


Note:Default reinforce-
ment should be checked 14Y10-C-400 (T2) (Bar 1)
and adjusted for suit-
Offset

ability and layout.

Offset
-180
-180

9Y10-E-400 (B1) (Bar 1)

9Y10-B-400 (T1) (Bar 1)

-160
-140 -140
06
-1

-180
0

-160
- 12

-120
60
-1

-160

-180

Offset
Offset

14Y10-F-400 (B2) (Bar 1)

14Y10-D-400 (T2) (Bar 1)


Job Number Sheet
QL-21-01 S2-01
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Rectangular Slab Panel Design : TYPICAL FLOOR SLAB (8.2X3.2)-GRIDS (6-9 )(B-C )
C04
Input Data

Lx (m) 8.2
Ly (m) 3.2
Slab depth (mm) 150
deff X-dir (mm) 124
deff Y-dir (mm) 114
Poisson's ratio 0.2
fcu (MPa) 20
fy (MPa) 500
Density (kN/m3) 24
Self weight LF 1.4
e - time factor 2
(ACI318 :9.5.2.5)

Load Cases

Unfactored Loads Unfactored Point Loads Unfactored Line Loads


LC Load UDL P x y L x1 y1 x2 y2
No. fact kN/m² kN m m kN/m m m m m

1 1.4 1.5
1.6 2

Sketch of slab
BS8110 - 1997
Y

Lx=8.20
Ly=3.20

Total UDL =

10.340 kN/m² Load Case 1 (factored)

(Incl self Wt)


Job Number Sheet
QL-21-01 S2-02
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Output

Wood-Armer Moments and reinforcement for each load case:


Wood-Armer moments were calculated using the 'Wood & Armer' theory.

LOAD CASE 1
Position Wood-Armer Moments (kNm/m) Reinforcement (mm²/m)
Top Bottom Top Bottom
X (m) Y(m) X Y X Y X Y X Y

0.00 0.00 0.5 0.7 0.3 0.1 10 15 7 3


0.68 0.00 1.2 4.5 0.0 0.0 23 95 0 0
1.37 0.00 1.7 8.1 0.0 0.0 34 171 0 0
2.05 0.00 1.7 8.3 0.0 0.0 33 177 0 0
2.73 0.00 1.7 8.7 0.0 0.0 34 184 0 0
3.42 0.00 1.7 8.6 0.0 0.0 34 183 0 0
4.10 0.00 1.7 8.7 0.0 0.0 34 184 0 0
4.78 0.00 1.7 8.6 0.0 0.0 34 183 0 0
5.47 0.00 1.7 8.7 0.0 0.0 34 184 0 0
6.15 0.00 1.7 8.3 0.0 0.0 33 177 0 0
6.83 0.00 1.7 8.1 0.0 0.0 34 171 0 0
7.52 0.00 1.2 4.5 0.0 0.0 23 95 0 0
8.20 0.00 0.5 0.7 0.3 0.1 10 15 7 3
0.00 0.27 1.1 1.4 1.2 0.9 22 30 24 19
1.37 0.27 1.1 4.6 0.0 0.0 21 97 0 0
2.73 0.27 1.0 5.0 0.0 0.0 19 106 0 0
4.10 0.27 1.0 4.9 0.0 0.0 19 105 0 0
5.47 0.27 1.0 5.0 0.0 0.0 19 106 0 0
6.83 0.27 1.1 4.6 0.0 0.0 21 97 0 0
8.20 0.27 1.1 1.4 1.2 0.9 22 30 24 19
0.00 0.53 1.7 2.0 2.2 1.9 33 42 42 39
0.68 0.53 1.1 1.7 1.7 1.1 21 36 32 22
1.37 0.53 0.4 1.3 1.0 0.2 9 27 19 3
2.05 0.53 0.3 1.2 0.1 0.0 6 26 2 0
2.73 0.53 0.2 1.2 0.0 0.0 5 26 0 0
3.42 0.53 0.3 1.2 0.0 0.0 5 26 0 0
4.10 0.53 0.2 1.2 0.0 0.0 5 26 0 0
4.78 0.53 0.3 1.2 0.0 0.0 5 26 0 0
5.47 0.53 0.2 1.2 0.0 0.0 5 26 0 0
6.15 0.53 0.3 1.2 0.1 0.0 6 26 2 0
6.83 0.53 0.4 1.3 1.0 0.2 9 27 19 3
7.52 0.53 1.1 1.7 1.7 1.1 21 36 32 22
8.20 0.53 1.7 2.0 2.2 1.9 33 42 42 39
0.00 0.80 1.3 1.5 2.0 1.8 26 32 40 39
1.37 0.80 0.0 0.0 1.6 1.8 0 0 31 38
2.73 0.80 0.0 0.0 0.3 1.1 0 0 6 23
4.10 0.80 0.0 0.0 0.2 1.0 0 0 4 21
5.47 0.80 0.0 0.0 0.3 1.1 0 0 6 23
6.83 0.80 0.0 0.0 1.6 1.8 0 0 31 38
8.20 0.80 1.3 1.5 2.0 1.8 26 32 40 39
0.00 1.07 1.0 1.2 1.8 1.6 19 25 36 35
0.68 1.07 0.0 0.0 2.2 2.6 0 0 42 56
1.37 1.07 0.0 0.0 2.2 3.5 0 0 43 75
2.05 1.07 0.0 0.0 1.3 3.3 0 0 26 71
2.73 1.07 0.0 0.0 0.8 3.3 0 0 16 70
3.42 1.07 0.0 0.0 0.7 3.2 0 0 14 69
4.10 1.07 0.0 0.0 0.6 3.2 0 0 12 68
4.78 1.07 0.0 0.0 0.7 3.2 0 0 14 69
5.47 1.07 0.0 0.0 0.8 3.3 0 0 16 70
6.15 1.07 0.0 0.0 1.3 3.3 0 0 26 71
6.83 1.07 0.0 0.0 2.2 3.5 0 0 43 75
7.52 1.07 0.0 0.0 2.2 2.6 0 0 42 56
8.20 1.07 1.0 1.2 1.8 1.6 19 25 36 35
0.00 1.33 0.2 0.4 1.2 1.0 4 9 24 22
1.37 1.33 0.0 0.0 2.1 3.8 0 0 42 80
2.73 1.33 0.0 0.0 0.9 4.0 0 0 18 85
4.10 1.33 0.0 0.0 0.8 4.0 0 0 15 84
5.47 1.33 0.0 0.0 0.9 4.0 0 0 18 85
Job Number Sheet
QL-21-01 S2-03
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
6.83 1.33 0.0 0.0 2.1 3.8 0 0 42 80
8.20 1.33 0.2 0.4 1.2 1.0 4 9 24 22
0.00 1.60 0.0 0.0 0.6 0.3 0 0 11 7
0.68 1.60 0.0 0.0 1.5 2.2 0 0 29 47
1.37 1.60 0.0 0.0 2.1 4.0 0 0 40 86
2.05 1.60 0.0 0.0 1.4 4.4 0 0 28 93
2.73 1.60 0.0 0.0 1.1 4.7 0 0 21 100
3.42 1.60 0.0 0.0 1.0 4.7 0 0 20 99
4.10 1.60 0.0 0.0 0.9 4.7 0 0 18 100
4.78 1.60 0.0 0.0 1.0 4.7 0 0 20 99
5.47 1.60 0.0 0.0 1.1 4.7 0 0 21 100
6.15 1.60 0.0 0.0 1.4 4.4 0 0 28 93
6.83 1.60 0.0 0.0 2.1 4.0 0 0 40 86
7.52 1.60 0.0 0.0 1.5 2.2 0 0 29 47
8.20 1.60 0.0 0.0 0.6 0.3 0 0 11 7
0.00 1.87 0.2 0.4 1.2 1.0 4 9 24 22
1.37 1.87 0.0 0.0 2.1 3.8 0 0 42 80
2.73 1.87 0.0 0.0 0.9 4.0 0 0 18 85
4.10 1.87 0.0 0.0 0.8 4.0 0 0 15 84
5.47 1.87 0.0 0.0 0.9 4.0 0 0 18 85
6.83 1.87 0.0 0.0 2.1 3.8 0 0 42 80
8.20 1.87 0.2 0.4 1.2 1.0 4 9 24 22
0.00 2.13 1.0 1.2 1.8 1.6 19 25 36 35
0.68 2.13 0.0 0.0 2.2 2.6 0 0 42 56
1.37 2.13 0.0 0.0 2.2 3.5 0 0 43 75
2.05 2.13 0.0 0.0 1.3 3.3 0 0 26 71
2.73 2.13 0.0 0.0 0.8 3.3 0 0 16 70
3.42 2.13 0.0 0.0 0.7 3.2 0 0 14 69
4.10 2.13 0.0 0.0 0.6 3.2 0 0 12 68
4.78 2.13 0.0 0.0 0.7 3.2 0 0 14 69
5.47 2.13 0.0 0.0 0.8 3.3 0 0 16 70
6.15 2.13 0.0 0.0 1.3 3.3 0 0 26 71
6.83 2.13 0.0 0.0 2.2 3.5 0 0 43 75
7.52 2.13 0.0 0.0 2.2 2.6 0 0 42 56
8.20 2.13 1.0 1.2 1.8 1.6 19 25 36 35
0.00 2.40 1.3 1.5 2.0 1.8 26 32 40 39
1.37 2.40 0.0 0.0 1.6 1.8 0 0 31 38
2.73 2.40 0.0 0.0 0.3 1.1 0 0 6 23
4.10 2.40 0.0 0.0 0.2 1.0 0 0 4 21
5.47 2.40 0.0 0.0 0.3 1.1 0 0 6 23
6.83 2.40 0.0 0.0 1.6 1.8 0 0 31 38
8.20 2.40 1.3 1.5 2.0 1.8 26 32 40 39
0.00 2.67 1.7 2.0 2.2 1.9 33 42 42 39
0.68 2.67 1.1 1.7 1.7 1.1 21 36 32 22
1.37 2.67 0.4 1.3 1.0 0.2 9 27 19 3
2.05 2.67 0.3 1.2 0.1 0.0 6 26 2 0
2.73 2.67 0.2 1.2 0.0 0.0 5 26 0 0
3.42 2.67 0.3 1.2 0.0 0.0 5 26 0 0
4.10 2.67 0.2 1.2 0.0 0.0 5 26 0 0
4.78 2.67 0.3 1.2 0.0 0.0 5 26 0 0
5.47 2.67 0.2 1.2 0.0 0.0 5 26 0 0
6.15 2.67 0.3 1.2 0.1 0.0 6 26 2 0
6.83 2.67 0.4 1.3 1.0 0.2 9 27 19 3
7.52 2.67 1.1 1.7 1.7 1.1 21 36 32 22
8.20 2.67 1.7 2.0 2.2 1.9 33 42 42 39
0.00 2.93 1.1 1.4 1.2 0.9 22 30 24 19
1.37 2.93 1.1 4.6 0.0 0.0 21 97 0 0
2.73 2.93 1.0 5.0 0.0 0.0 19 106 0 0
4.10 2.93 1.0 4.9 0.0 0.0 19 105 0 0
5.47 2.93 1.0 5.0 0.0 0.0 19 106 0 0
6.83 2.93 1.1 4.6 0.0 0.0 21 97 0 0
8.20 2.93 1.1 1.4 1.2 0.9 22 30 24 19
0.00 3.20 0.5 0.7 0.3 0.1 10 15 7 3
0.68 3.20 1.2 4.5 0.0 0.0 23 95 0 0
1.37 3.20 1.7 8.1 0.0 0.0 34 171 0 0
2.05 3.20 1.7 8.3 0.0 0.0 33 177 0 0
2.73 3.20 1.7 8.7 0.0 0.0 34 184 0 0
3.42 3.20 1.7 8.6 0.0 0.0 34 183 0 0
4.10 3.20 1.7 8.7 0.0 0.0 34 184 0 0
Job Number Sheet
QL-21-01 S2-04
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
4.78 3.20 1.7 8.6 0.0 0.0 34 183 0 0
5.47 3.20 1.7 8.7 0.0 0.0 34 184 0 0
6.15 3.20 1.7 8.3 0.0 0.0 33 177 0 0
6.83 3.20 1.7 8.1 0.0 0.0 34 171 0 0
7.52 3.20 1.2 4.5 0.0 0.0 23 95 0 0
8.20 3.20 0.5 0.7 0.3 0.1 10 15 7 3

Deflections

Short term deflections: Load case 1 (mm)

0.0
0.06 0 2
0.06 0.08 0.0 .04
0.08 6

0.16 0.16
4 06 8 0.18 0.18
02 .0 0. .010 0.20
0. 0 00. 0.22 0.22 0.20
0
0.26 0 .1
4
0.20.26 0.28 0. 0.20. 10.1 .142
22 0 8 6

0.24
0.10
0.08
0.06

0.22
0.04
0.02

0.1
0.12 4 0.14
0.12 6
0.08 0.10 0.10 0.0

NOTE:Short term elastic deflections based on gross concrete sections


Job Number Sheet
QL-21-01 S2-05
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997

Top:LC 1 (kNm/m)

0.80 0.80
0.60

1.00
0.60

0.80
0.40

0.60
0.40

0 0
80 .6 .4 20
0. 0 0 0.

0.20 0
0.40 0.20 0.06.8.000
1
1.00 1.00
1.20 1.20
1.40 1.40
1.00
0.80

1.60 1.60
0.60

Max value:1.7 at X:5.5 Y:3.2


Wood-Armer Moments:

BS8110 - 1997

Top:LC 1 (kNm/m)

4.00 4.00 3.00


3.00 3.00 2.00
2.00 2.00

00
1.

1.00 1.00 1.00

5.00
6.00 5.00
7.00 6.00
7.00
4. .00

8.00
00

8.00
00
00

3
2.
1.

Max value:8.7 at X:5.5 Y:3.2


Job Number Sheet
QL-21-01 S2-06
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997

Bot:LC 1 (kNm/m)

0
0.600.40.20
00
0.20

1.8
0.40

10.0
0.60

0 00
0.80

.2
1.4 1.6

0 0.40
2.0 0.60 0 .00 0
0.8 1 1.2
1.40

0
0 1.8 .60
1.60
1.80

2 .0
2.00

1.00 1

0.80

1. 2 0
2.00

1. 0 0
0. 8 0
1
0 1 .8
0.08.6.04020 1. 1.2 1.4 .60 0
00. 00 0 0
0.20

Max value:2.2 at X:6.8 Y:2.1


Wood-Armer Moments:

BS8110 - 1997

Bot:LC 1 (kNm/m)

0.510.00

1.50 1.50
2.00
0 2.00 2.50
2.0 .50 2.50
3.00 3.00
2
4.00
4.00
2.50
3.00

4.50
3.50
4.00
0

3.50 3.50
0
2 .5
2 .0

1.00 1.5
0.50 0.5 1.00 0
0

Max value:4.7 at X:5.5 Y:1.6


Job Number Sheet
QL-21-01 S2-07
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997

Top:LC 1 (mm²/m)

15 15
10

20
10

15
5

10
0
15 1 5

5 1015
20
20 20
25 25
30 30
20
15
10

Max value:34.1 at X:5.5 Y:3.2


Reinforcement:

BS8110 - 1997

Top:LC 1 (mm²/m)

100
80 100 60
80
4060 4060 40

20

20 20
20

120
140 120
160 140
180160
800

180
40
6
20

Max value:184.1 at X:5.5 Y:3.2


Job Number Sheet
QL-21-01 S2-08
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997

Bot:LC 1 (mm²/m)

105
21025530
10
5
15

5
10
40 15 20 25

35 0
30

40
35

3
40

25
40 15

20
3
1510 3 5
5 20 25 0
5

Max value:42.8 at X:6.8 Y:2.1


Reinforcement:

BS8110 - 1997

Bot:LC 1 (mm²/m)

10 20

30 4030
40 0 40
50 50
5 70 60 60
70

90
60

90
50
70
80

80 80
50

70
40

20 30
10 10 20

Max value:100.1 at X:5.5 Y:1.6


Job Number Sheet
QL-21-01 S2-09
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Deflections

Envelope of Maximum Short term deflections (mm)

0.0
0.06 0 2
0.06 0.08 0.0 .04
0.08 6

0.16 0.16
4 06 8 0.18 0.18
02 .0 0. .010 0.20
0. 0 00. 0.22 0.22 0.20
0
0.26 0 .1
4
0.20.26 0.28 0. 0.20.10.1 . 142
22 0 8 6

0.24
0.10
0.08
0.06

0.22
0.04
0.02

0.1
0.12 4 0.14
0.12 6
0.08 0.10 0.10 0.0

NOTE:Short term elastic deflections based on gross concrete sections

Wood-Armer Moments:

BS8110 - 1997

Envelope : Max. Top (kNm/m)

0.80 0.80
0.60
1.00

0.60
0.80

0.40
0.60

0.40

0 0
80 .6 .4 20
0. 0 0 0.

0.20 0
0.40 0.20 0.06.8.000
1
1.00 1.00
1.20 1.20
1.40 1.40
1.00
0.80

1.60 1.60
0.60

Max value:1.7 at X:5.5 Y:3.2


Job Number Sheet
QL-21-01 S2-10
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997

Envelope : Max. Top (kNm/m)

4.00 4.00 3.00


3.00 3.00 2.00
2.00 2.00

00
1.

1.00 1.00 1.00

5.00
6.00 5.00
7.00 6.00
7.00
4. .00

8.00
00

8.00
00
00

3
2.
1.

Max value:8.7 at X:5.5 Y:3.2


Wood-Armer Moments:

BS8110 - 1997

Envelope : Max. Bot (kNm/m)

0.600.40.200
00
0.20

1.8
0.40

10.0
0.60

0 00
0.80

.2
1.4 1.6

0 0.40
2.0 0.60 0 .00 0
0.8 1 1.2
1.40

0
0 1.8 .60
1.60
1.80

2 .0
2.00

1.00 1

0.80
1. 2 0

2.00
1. 0 0
0. 8 0

1
0 1 .8
0.08.6.04020 1. 1.2 1.4 .60 0
00. 00 0 0
0.20

Max value:2.2 at X:6.8 Y:2.1


Job Number Sheet
QL-21-01 S2-11
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997

Envelope : Max. Bot (kNm/m)

0.510.00

1.50 1.50
2.00
0 2.00 2.50
2.0 .50 2.50
3.00 3.00
2
4.00
4.00

2.50
3.00
4.50

3.50
4.00
0

3.50 3.50
0
2 .5
2 .0

1.00 1.5
0.50 0.5 1.00 0
0

Max value:4.7 at X:5.5 Y:1.6


Reinforcement:

BS8110 - 1997

Envelope : Max. Top (mm²/m)

15 15
10
20

10
15

5
10

0
15 1 5

5 1015
20
20 20
25 25
30 30
20
15
10

Max value:34.1 at X:5.5 Y:3.2


Job Number Sheet
QL-21-01 S2-12
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997

Envelope : Max. Top (mm²/m)

100
80 100 60
80
4060 4060 40

20

20 20
20

120
140 120
160 140
180160
800

180
40
6
20

Max value:184.1 at X:5.5 Y:3.2


Reinforcement:

BS8110 - 1997

Envelope : Max. Bot (mm²/m)

105
21025530
10
5
15

5
10
40 15 20 25

35 0
30

40
35

3
40

25

40 15
20

3
1510 3 5
5 20 25 0
5

Max value:42.8 at X:6.8 Y:2.1


Job Number Sheet
QL-21-01 S2-13
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997

Envelope : Max. Bot (mm²/m)

10 20

30 4030
40 0 40
50 50
5 70 60 60
70

90

60
90

50
70
80
80 80
50

70
40

20 30
10 10 20

Max value:100.1 at X:5.5 Y:1.6


Deflections

Envelope of Minimum Short term deflections (mm)

0.0
0.06 0 2
0.06 0.08 0.0 .04
0.08 6

0.16 0.16
4 06 8 0.18 0.18
02 .0 0. .010 0.20
0. 0 00. 0.22 0.22 0.20
0
0.26 0 .1
4
0.20.26 0.28 0. 0.20.10.1 . 142
22 0 8 6

0.24
0.10
0.08
0.06

0.22
0.04
0.02

0.1
0.12 4 0.14
0.12 6
0.08 0.10 0.10 0.0

NOTE:Short term elastic deflections based on gross concrete sections


Job Number Sheet
QL-21-01 S2-14
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997

Envelope : Min. Top (kNm/m)

0.80 0.80
0.60

1.00
0.60

0.80
0.40

0.60
0.40

0 0
80 .6 .4 20
0. 0 0 0.

0.20 0
0.40 0.20 0.06.8.000
1
1.00 1.00
1.20 1.20
1.40 1.40
1.00
0.80

1.60 1.60
0.60

Max value:1.7 at X:5.5 Y:3.2


Wood-Armer Moments:

BS8110 - 1997

Envelope : Min. Top (kNm/m)

4.00 4.00 3.00


3.00 3.00 2.00
2.00 2.00

00
1.

1.00 1.00 1.00

5.00
6.00 5.00
7.00 6.00
7.00
4. .00

8.00
00

8.00
00
00

3
2.
1.

Max value:8.7 at X:5.5 Y:3.2


Job Number Sheet
QL-21-01 S2-15
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Wood-Armer Moments:

BS8110 - 1997

Envelope : Min. Bot (kNm/m)

0
0.600.40.20
00
0.20

1.8
0.40

10.0
0.60

0 00
0.80

.2
1.4 1.6

0 0.40
2.0 0.60 0 .00 0
0.8 1 1.2
1.40

0
0 1.8 .60
1.60
1.80

2 .0
2.00

1.00 1

0.80

1. 2 0
2.00

1. 0 0
0. 8 0
1
0 1 .8
0.08.6.04020 1. 1.2 1.4 .60 0
00. 00 0 0
0.20

Max value:2.2 at X:6.8 Y:2.1


Wood-Armer Moments:

BS8110 - 1997

Envelope : Min. Bot (kNm/m)

0.510.00

1.50 1.50
2.00
0 2.00 2.50
2.0 .50 2.50
3.00 3.00
2
4.00
4.00
2.50
3.00

4.50
3.50
4.00
0

3.50 3.50
0
2 .5
2 .0

1.00 1.5
0.50 0.5 1.00 0
0

Max value:4.7 at X:5.5 Y:1.6


Job Number Sheet
QL-21-01 S2-16
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997

Envelope : Min. Top (mm²/m)

15 15
10

20
10

15
5

10
0
15 1 5

5 1015
20
20 20
25 25
30 30
20
15
10

Max value:34.1 at X:5.5 Y:3.2


Reinforcement:

BS8110 - 1997

Envelope : Min. Top (mm²/m)

100
80 100 60
80
4060 4060 40

20

20 20
20

120
140 120
160 140
180160
800

180
40
6
20

Max value:184.1 at X:5.5 Y:3.2


Job Number Sheet
QL-21-01 S2-17
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Reinforcement:

BS8110 - 1997

Envelope : Min. Bot (mm²/m)

105
21025530
10
5
15

5
10
40 15 20 25

35 0
30

40
35

3
40

25
40 15

20
3
1510 3 5
5 20 25 0
5

Max value:42.8 at X:6.8 Y:2.1


Reinforcement:

BS8110 - 1997

Envelope : Min. Bot (mm²/m)

10 20

30 4030
40 0 40
50 50
5 70 60 60
70

90
60

90
50
70
80

80 80
50

70
40

20 30
10 10 20

Max value:100.1 at X:5.5 Y:1.6


Job Number Sheet
QL-21-01 S2-18
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Rebar Excess:

Rebar Excess Top (mm²/m)


Note:Default reinforce-
ment should be checked 21Y10-B-400 (T2) (Bar 1)
and adjusted for suit-
Offset
ability and layout.

15 15
10
Offset

20
10

15
5

10
0
15 1 5

5 1015
20
Offset 25
20
25
20
30 30
20
15

Offset
10

21Y10-E-400 (B2) (Bar 1)

21Y10-C-400 (T2) (Bar 1)

Rebar Excess:

Rebar Excess Top (mm²/m)


Note:Default reinforce-
ment should be checked 21Y10-B-400 (T2) (Bar 1)
and adjusted for suit-
Offset

ability and layout.


-100
-150
-100
-150 -150
Offset

-20
0

Offset
-50 -50
05

Offset
-1

21Y10-E-400 (B2) (Bar 1)

21Y10-C-400 (T2) (Bar 1)


Job Number Sheet
QL-21-01 S2-19
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Rebar Excess:

Rebar Excess Bot (mm²/m)


Note:Default reinforce-
ment should be checked 21Y10-B-400 (T2) (Bar 1)
and adjusted for suit-
Offset
ability and layout.

10 Offset
20 30
10
10
40
30 20

40 30
40

40

20
30
10 20
Offset
Offset

21Y10-E-400 (B2) (Bar 1)

21Y10-C-400 (T2) (Bar 1)

Rebar Excess:

Rebar Excess Bot (mm²/m)


Note:Default reinforce-
ment should be checked 21Y10-B-400 (T2) (Bar 1)
and adjusted for suit-
Offset

ability and layout.


Offset
-180

-160 -160
0 -140 -140
-16
-140

-100
-120

-120 -120
0
-16

-16
-180 0
-18
0
Offset
Offset

21Y10-E-400 (B2) (Bar 1)

21Y10-C-400 (T2) (Bar 1)


ROOF LEVEL BEAMS
ROOF LEVEL SLABS
TIMBER PITCHED ROOF
Job Number Sheet
QL-21-01 T-01
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Frame Analysis Ver W3.0.33 - 15 Nov 2017


Input file:E:\QUEST LINKS ENGINEERING\2021\QL-21-01- JUJA APARTMENTS_GT\STRUCTURAL\CALCULATIONS\AMEN
Created : 5/31/2021 4:58:48 PM A03
Job Number Sheet
QL-21-01 T-02
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

========== S p a c e - F r a m e A n a l y s i s - P R O K O N =========================
Ver W3.0.33 - 15 Nov 2017

TITLE :

Data file : E:\QUEST LINKS ENGINEERING\2021\QL-21-01- JUJA APARTMENTS_GT\STRUCTURAL\CALCULATIONS\AMENDED CALCS\TRUSS T


Created on: 5/31/2021

========================== NODAL POINT COORDINATES ==========================================

Node No X-coord Y-coord Z-coord Node No X-coord Y-coord Z-coord


m m m m m m

1 0.000 0.000 0.000 2 0.986 0.000 0.000


3 1.969 0.000 0.000 4 2.700 0.000 0.000
5 3.937 0.000 0.000 6 5.175 0.000 0.000
7 5.906 0.000 0.000 8 6.889 0.000 0.000
9 7.875 0.000 0.000 10 0.986 0.408 0.000
11 1.969 0.815 0.000 12 2.954 1.223 0.000
13 3.937 1.631 0.000 14 4.921 1.223 0.000
15 5.906 0.815 0.000 16 6.889 0.408 0.000

=============================== ELEMENT DATA ================================================

Beam Secn. type Fixity Length ß Group no. Stage


m (°)

1-2 RAF 00 0.986 0.00 0 0


2-3 RAF 00 0.983 0.00 0 0
3-4 RAF 00 0.731 0.00 0 0
4-5 RAF 00 1.237 0.00 0 0
5-6 RAF 00 1.238 0.00 0 0
6-7 RAF 00 0.731 0.00 0 0
7-8 RAF 00 0.983 0.00 0 0
8-9 RAF 00 0.986 0.00 0 0
1-10 RAF 00 1.067 0.00 0 0
10-11 RAF 00 1.064 0.00 0 0
11-12 RAF 00 1.066 0.00 0 0
12-13 RAF 00 1.064 0.00 0 0
13-14 RAF 00 1.065 0.00 0 0
14-15 RAF 00 1.066 0.00 0 0
15-16 RAF 00 1.064 0.00 0 0
9-16 RAF 00 1.067 0.00 0 0
2-10 INT 00 0.408 0.00 0 0
3-10 INT 00 1.064 0.00 0 0
3-11 INT 00 0.815 0.00 0 0
4-11 INT 00 1.095 0.00 0 0
4-12 INT 00 1.249 0.00 0 0
5-12 INT 00 1.569 0.00 0 0
5-13 INT 00 1.631 0.00 0 0
5-14 INT 00 1.570 0.00 0 0
6-14 INT 00 1.249 0.00 0 0
6-15 INT 00 1.095 0.00 0 0
7-15 INT 00 0.815 0.00 0 0
7-16 INT 00 1.064 0.00 0 0
8-16 INT 00 0.408 0.00 0 0

============================ SECTION PROPERTIES =============================================

Section : RAF Section designation: 50x150 RT


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

7.500E-3 0.000 0.000 14.1E-6 1.56E-6 4.94E-6 Timber:SA Pine Gr4

Section : INT Section designation: 50x100 RT


----------------
A Ay Ax Ixx Iyy J Material
m^2 m^2 m^2 m^4 m^4 m^4

5.000E-3 0.000 0.000 4.17E-6 1.04E-6 2.86E-6 Timber:SA Pine Gr4

================================== MATERIALS ================================================


Job Number Sheet
QL-21-01 T-03
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Designation E poisson Density Exp. coeff.
kPa kN/m^3
Timber:SA Pine Gr4 6.000E6 0.20 5.00 5.400E-6

=============================== SUPPORT DATA ================================================

Prescribed displacements
Node Fixity X Y Z X-Rot Y-Rot Z-Rot Orien node
m m m rad. rad. rad.

1 XY 0.00 0.00 0.00 0.00 0.00 0.00 0


6 Y 0.00 0.00 0.00 0.00 0.00 0.00 0
9 Y 0.00 0.00 0.00 0.00 0.00 0.00 0

Spring constants
Node Fixity X Y Z X-Rot Y-Rot Z-Rot
kN/m kN/m kN/m kNm/rad kNm/rad kNm/rad

=================================== LOADS ===================================================

Load Case Description

D
L

Add own weight to load case : D

================================== LOAD CASE D =========================================

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz Stage
kN kN kN kNm kNm kNm

1 0.00 -0.55 0.00 0.00 0.00 0.00 1


9 0.00 -0.55 0.00 0.00 0.00 0.00 1
10 0.00 -1.10 0.00 0.00 0.00 0.00 1
11 0.00 -1.10 0.00 0.00 0.00 0.00 1
12 0.00 -1.10 0.00 0.00 0.00 0.00 1
13 0.00 -1.10 0.00 0.00 0.00 0.00 1
14 0.00 -1.10 0.00 0.00 0.00 0.00 1
15 0.00 -1.10 0.00 0.00 0.00 0.00 1
16 0.00 -1.10 0.00 0.00 0.00 0.00 1

================================== LOAD CASE L =========================================

*** POINT LOADS ***

Node Fx Fy Fz Mx My Mz Stage
kN kN kN kNm kNm kNm

1 0.00 -0.70 0.00 0.00 0.00 0.00 1


9 0.00 -0.70 0.00 0.00 0.00 0.00 1
10 0.00 -1.40 0.00 0.00 0.00 0.00 1
11 0.00 -1.40 0.00 0.00 0.00 0.00 1
12 0.00 -1.40 0.00 0.00 0.00 0.00 1
13 0.00 -1.40 0.00 0.00 0.00 0.00 1
14 0.00 -1.40 0.00 0.00 0.00 0.00 1
15 0.00 -1.40 0.00 0.00 0.00 0.00 1
16 0.00 -1.40 0.00 0.00 0.00 0.00 1

============================= LOAD COMBINATIONS =============================================

Load Comb Description

D+L

Comb. Load factor for each load case: Ultimate Limit State

D L
Job Number Sheet
QL-21-01 T-04
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
D+L 1.40 1.60

Comb. Load factor for each load case: Serviceability Limit State

D L

D+L 1.00 1.00

========================== OWN WEIGHT ACCELERATIONS =========================================

Direction Acceleration (g)


X 0.00
Y -1.00
Z 0.00

=============================== OUTPUT: LINEAR ANALYSIS =================================


=========================== NODAL POINT DISPLACEMENTS at SLS ============================

Node Lcase X-disp. Y-disp Z-rot.


mm mm rad.

1 D+L 0.00 0.00 -0.0027


2 D+L 0.21 -2.19 -0.0012
3 D+L 0.43 -2.48 0.0001
4 D+L 0.56 -2.24 0.0004
5 D+L 0.69 -1.33 0.0010
6 D+L 0.62 0.00 0.0003
7 D+L 0.58 -0.11 -0.0003
8 D+L 0.59 -0.24 0.0001
9 D+L 0.60 0.00 0.0003
10 D+L 0.63 -2.19 -0.0010
11 D+L 0.52 -2.45 0.0002
12 D+L 0.21 -2.05 0.0005
13 D+L -0.10 -1.40 0.0008
14 D+L 0.22 -0.52 0.0007
15 D+L 0.52 -0.09 0.0001
16 D+L 0.52 -0.24 0.0000

=================================== REACTIONS AT ULS ====================================


(In rotated axes where applicable)
Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 D+L 0.00 8.84 0.00


6 D+L 0.00 20.30 0.00
9 D+L 0.00 2.46 0.00

EQUILIBRIUM CHECK AT ULS:

LC APPLIED LOADS & MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Px Py Mz

D+L 0.00 -31.59 -124.39

LC REACTIONS & REACTION MOMENTS about (0.0,0.0,0.0) in global axes

Sum of: Rx Ry MRz

D+L 0.00 31.59 124.39

======================= REACTIONS AT SLS (Combinations only) ============================

(In rotated axes


Node Lcase X-force Y-forcet Z-moment
kN kN kNm

1 D+L 0.00 5.86 0.00


6 D+L 0.00 13.47 0.00
9 D+L 0.00 1.63 0.00

================= BEAM ELEMENT END FORCES IN LOCAL ELEMENT AXES at ULS ==================

Elem Lcase Axial Y-Shea M-xx Axial Y-Shea M-xx


kN kN kNm kN kN kNm

1-2 D+L -14.74 0.44 0.01 14.74 -0.39 0.40


2-3 D+L -14.94 -0.33 -0.34 14.94 0.38 0.00
Job Number Sheet
QL-21-01 T-05
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
3-4 D+L -11.73 -0.10 -0.09 11.73 0.14 0.00
4-5 D+L -7.09 0.00 -0.07 7.09 0.07 0.03
5-6 D+L 3.81 -0.39 -0.19 -3.81 0.46 -0.34
6-7 D+L 3.45 0.52 0.29 -3.45 -0.48 0.08
7-8 D+L -0.72 0.11 0.00 0.72 -0.06 0.09
8-9 D+L -0.97 -0.01 -0.04 0.97 0.06 0.01
1-10 D+L 16.10 0.38 -0.01 -16.08 -0.32 0.39
10-11 D+L 12.80 -0.27 -0.30 -12.78 0.32 -0.01
11-12 D+L 8.64 -0.09 -0.10 -8.62 0.14 -0.03
12-13 D+L 2.51 0.01 -0.04 -2.49 0.04 0.02
13-14 D+L 2.49 -0.12 -0.07 -2.51 0.18 -0.09
14-15 D+L -7.55 -0.08 0.02 7.53 0.14 -0.14
15-16 D+L -3.72 0.28 0.14 3.70 -0.23 0.13
9-16 D+L 1.09 0.10 0.01 -1.07 -0.05 0.07
2-10 D+L 0.72 -0.20 -0.06 -0.70 0.20 -0.02
3-10 D+L 3.28 0.06 -0.01 -3.27 -0.03 0.06
3-11 D+L -1.59 0.20 0.08 1.62 -0.20 0.08
4-11 D+L 5.51 -0.05 -0.04 -5.48 0.08 -0.03
4-12 D+L -4.31 0.06 0.03 4.35 -0.05 0.03
5-12 D+L 7.58 -0.03 -0.04 -7.53 0.06 -0.03
5-13 D+L 1.86 0.07 0.06 -1.80 -0.07 0.05
5-14 D+L -9.58 0.07 0.05 9.62 -0.04 0.03
6-14 D+L 15.56 -0.03 -0.01 -15.52 0.04 -0.03
6-15 D+L 5.42 0.08 0.05 -5.39 -0.06 0.03
7-15 D+L -1.31 -0.11 -0.06 1.34 0.11 -0.03
7-16 D+L 4.38 0.01 -0.01 -4.37 0.03 0.00
8-16 D+L 0.07 -0.25 -0.04 -0.05 0.25 -0.06

=================================== STATISTICAL DATA ====================================

Weights of beam elements: (Added to load case D)

Section Designation Total Mass


(kN) (kg)

RAF 50x150 RT 0.615 62.7


INT 50x100 RT 0.351 35.8
---------------------
0.966 98.4

Total weight of structure = 0.97 kN

No. of real numbers in Stiffness matrix = 0 (0 bytes)


Time used to analyse = 0: 0:0.032 seconds
Total number of : Nodes = 16
Beam Elements = 29
Cable Elements = 0
Shell Elements = 0
Supports = 3
Section Properties = 2
Load Cases = 2
Load Combinations = 1

==================================== END OF OUTPUT ======================================


Job Number Sheet
QL-21-01 TM-01
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021
Timber Member Design for Combined Stresses Ver W3.0.06 - 08 Aug 2017

Design parameters Maximum L/r ratios


k2-bending (1 or 0.8) 1 L Case Compr. Tension x
k2-compr. (1 or 0.6) 1 D+L 180 250 x
Calc k7,k14 (Y/N) Y
k8-sharing (1 or 1.1) 1
B (select Breadth) Auto
D (select Depth) Auto

Bending Tension Compression E-modulus Size


Grade (MPa) (MPa) (MPa) (MPa) number

SC3 5.3 3.2 2.2 8800 1

Task: Task 1
Element 1-2 Select lightest section

Lx Eff = 0.838 m
MOMENTS: X-X M max = .2000kNm @ .986m
Ly Eff = 0.986 m
.100

.200

.300

.400

.500

.600

.700

.800

.900

Le Eff = 1.893 m
.050 Critical Load Case : D+L

.100 Section 47 x 100

.150 k7=1.13(x-x), 1.17(y-y)


k14=1.17
.200
BS5268-1991 paragraph 16.3
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -2.06 2.55 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.98 OK
.00400 st,adm smx,adm sby,adm -3.74 5.98 6.20
.00300

.00200 Slenderness Ratio: L/r = 73 OK

.00100 ----------------------------------------------------------
.100

.200

.300

.400

.500

.600

.700

.800

.900

AXIAL FORCE P max = -9.700kN @ 0.00m


.100

.200

.300

.400

.500

.600

.700

.800

.900

-2.00

-4.00

-6.00

-8.00
Job Number Sheet
QL-21-01 TM-02
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 2-3 Select lightest section

Lx Eff = 0.836 m
MOMENTS: X-X M max = .2000kNm @ 0.00m Ly Eff = 0.983 m
.100

.200

.300

.400

.500

.600

.700

.800

.900
Le Eff = 1.887 m
.050 Critical Load Case : D+L

.100 Section 47 x 100

.150 k7=1.13(x-x), 1.17(y-y)


k14=1.17
.200
BS5268-1991 paragraph 16.3
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -2.11 2.55 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.99 OK
.00400 st,adm smx,adm sby,adm -3.74 5.98 6.20
.00300

.00200 Slenderness Ratio: L/r = 72 OK

.00100 ----------------------------------------------------------
.100

.200

.300

.400

.500

.600

.700

.800

.900

AXIAL FORCE P max = -9.900kN @ 0.00m


.100

.200

.300

.400

.500

.600

.700

.800

.900

-2.00

-4.00

-6.00

-8.00

-10.0

Element 3-4 Select lightest section

Lx Eff = 0.621 m
MOMENTS: X-X M max = .0025kNm @ .365m Ly Eff = 0.731 m
.100

.200

.300

.400

.500

.600

.700

Le Eff = 1.404 m
.00050 Critical Load Case : D+L
.00100
Section 38 x 75
.00150
k7=1.16(x-x), 1.17(y-y)
.00200 k14=1.17
.00250
BS5268-1991 paragraph 16.3
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -2.70 0.07 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.73 OK
.00400 st,adm smx,adm sby,adm -3.74 6.17 6.20
.00300

.00200 Slenderness Ratio: L/r = 67 OK

.00100 ----------------------------------------------------------
.100

.200

.300

.400

.500

.600

.700

AXIAL FORCE P max = -7.700kN @ 0.00m


.100

.200

.300

.400

.500

.600

.700

-2.00

-4.00

-6.00
Job Number Sheet
QL-21-01 TM-03
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 4-5 Select lightest section

Lx Eff = 1.051 m
MOMENTS: X-X M max = .0072kNm @ .619m
Ly Eff = 1.237 m
.200

.400

.600

.800

1.00

1.20
.00100 Le Eff = 2.375 m
.00200
Critical Load Case : D+L
.00300
Section 38 x 75
.00400
.00500 k7=1.16(x-x), 1.17(y-y)
.00600 k14=1.17
.00700
BS5268-1991 paragraph 16.3
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -1.65 0.20 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.47 OK
.00400 st,adm smx,adm sby,adm -3.74 6.13 6.20
.00300

.00200 Slenderness Ratio: L/r = 113 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

1.20

AXIAL FORCE P max = -4.700kN @ 0.00m


.200

.400

.600

.800

1.00

1.20

-1.00

-2.00

-3.00

-4.00

Element 5-6 Select lightest section

Lx Eff = 1.052 m
MOMENTS: X-X M max = -.2000kNm @ 1.24m
-.200
Ly Eff = 1.238 m
Le Eff = 2.377 m
-.150 Critical Load Case : D+L
-.100

-.050
Section 38 x 100
.200

.400

.600

.800

1.00

1.20

k7=1.13(x-x), 1.17(y-y)
.050 k14=1.17
.100
BS5268-1991 paragraph 15.6
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 0.66 3.16 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.94 OK
.00400 sc,adm smx,adm sby,adm 1.60 5.91 6.20
.00300

.00200 Slenderness Ratio: L/r = 113 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

1.20

AXIAL FORCE P max = 2.500kN @ 0.00m


2.50

2.00

1.50

1.00

.500
.200

.400

.600

.800

1.00

1.20
Job Number Sheet
QL-21-01 TM-04
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 6-7 Select lightest section

Lx Eff = 0.621 m
MOMENTS: X-X M max = -.1000kNm @ 0.00m
Ly Eff = 0.731 m
-.100
Le Eff = 1.404 m
-.080 Critical Load Case : D+L
-.060 Section 38 x 75
-.040
k7=1.16(x-x), 1.17(y-y)
-.020 k14=1.17
.100

.200

.300

.400

.500

.600

.700

BS5268-1991 paragraph 15.6


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 0.77 2.81 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.84 OK
.00400 sc,adm smx,adm sby,adm 2.02 6.17 6.20
.00300

.00200 Slenderness Ratio: L/r = 67 OK

.00100 ----------------------------------------------------------
.100

.200

.300

.400

.500

.600

.700

AXIAL FORCE P max = 2.200kN @ 0.00m

2.00

1.50

1.00

.500
.100

.200

.300

.400

.500

.600

.700

Element 7-8 Select lightest section

Lx Eff = 0.836 m
MOMENTS: X-X M max = .0045kNm @ .492m
Ly Eff = 0.983 m
.100

.200

.300

.400

.500

.600

.700

.800

.900

Le Eff = 1.887 m
.00100 Critical Load Case : D+L
.00200 Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400
k14=1.17

BS5268-1991 paragraph 16.3


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -0.14 0.13 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.06 OK
.00400 st,adm smx,adm sby,adm -3.74 6.17 6.20
.00300

.00200 Slenderness Ratio: L/r = 90 OK

.00100 ----------------------------------------------------------
.100

.200

.300

.400

.500

.600

.700

.800

.900

AXIAL FORCE P max = -.4000kN @ 0.00m


.100

.200

.300

.400

.500

.600

.700

.800

.900

-.100

-.200

-.300

-.400
Job Number Sheet
QL-21-01 TM-05
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 8-9 Select lightest section

Lx Eff = 0.838 m
MOMENTS: X-X M max = .0046kNm @ .493m
Ly Eff = 0.986 m
.100

.200

.300

.400

.500

.600

.700

.800

.900
Le Eff = 1.893 m
.00100 Critical Load Case : D+L
.00200 Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400
k14=1.17

BS5268-1991 paragraph 16.3


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -0.21 0.13 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.08 OK
.00400 st,adm smx,adm sby,adm -3.74 6.17 6.20
.00300

.00200 Slenderness Ratio: L/r = 90 OK

.00100 ----------------------------------------------------------
.100

.200

.300

.400

.500

.600

.700

.800

.900

AXIAL FORCE P max = -.6000kN @ 0.00m


.100

.200

.300

.400

.500

.600

.700

.800

.900

-.100

-.200

-.300

-.400

-.500

-.600

Element 1-10 Select lightest section

Lx Eff = 0.907 m
MOMENTS: X-X M max = .2000kNm @ 1.07m
Ly Eff = 1.067 m
.200

.400

.600

.800

1.00

Le Eff = 2.049 m
.050 Critical Load Case : D+L

.100 Section 47 x 150

.150 k7=1.08(x-x), 1.17(y-y)


k14=1.17
.200
BS5268-1991 paragraph 15.6
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 1.50 1.13 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.98 OK
.00400 sc,adm smx,adm sby,adm 1.93 5.68 6.20
.00300

.00200 Slenderness Ratio: L/r = 79 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = 10.60kN @ 0.00m

10.0

8.00

6.00

4.00

2.00
.200

.400

.600

.800

1.00
Job Number Sheet
QL-21-01 TM-06
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 10-11 Select lightest section

Lx Eff = 0.904 m
MOMENTS: X-X M max = .2000kNm @ 0.00m Ly Eff = 1.064 m
.200

.400

.600

.800

1.00
Le Eff = 2.043 m
.050 Critical Load Case : D+L

.100 Section 50 x 125

.150 k7=1.10(x-x), 1.17(y-y)


k14=1.17
.200
BS5268-1991 paragraph 15.6
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 1.36 1.54 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.96 OK
.00400 sc,adm smx,adm sby,adm 1.97 5.81 6.20
.00300

.00200 Slenderness Ratio: L/r = 74 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = 8.500kN @ 0.00m

8.00

6.00

4.00

2.00
.200

.400

.600

.800

1.00

Element 11-12 Select lightest section

Lx Eff = 0.906 m
MOMENTS: X-X M max = .0049kNm @ .533m Ly Eff = 1.066 m
.200

.400

.600

.800

1.00

Le Eff = 2.047 m
.00100 Critical Load Case : D+L
.00200
Section 47 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17

BS5268-1991 paragraph 15.6


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 1.62 0.11 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.86 OK
.00400 sc,adm smx,adm sby,adm 1.93 6.17 6.20
.00300

.00200 Slenderness Ratio: L/r = 79 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = 5.700kN @ 0.00m

5.00

4.00

3.00

2.00

1.00
.200

.400

.600

.800

1.00
Job Number Sheet
QL-21-01 TM-07
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 12-13 Select lightest section

Lx Eff = 0.904 m
MOMENTS: X-X M max = .0049kNm @ .532m
Ly Eff = 1.064 m
.200

.400

.600

.800

1.00
Le Eff = 2.043 m
.00100 Critical Load Case : D+L
.00200
Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17

BS5268-1991 paragraph 15.6


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 0.56 0.14 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.34 OK
.00400 sc,adm smx,adm sby,adm 1.77 6.14 6.20
.00300

.00200 Slenderness Ratio: L/r = 97 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = 1.600kN @ 0.00m


1.60
1.40
1.20
1.00
.800
.600
.400
.200
.200

.400

.600

.800

1.00

Element 13-14 Select lightest section

Lx Eff = 0.905 m
MOMENTS: X-X M max = .0049kNm @ .533m
Ly Eff = 1.065 m
.200

.400

.600

.800

1.00

Le Eff = 2.045 m
.00100 Critical Load Case : D+L
.00200
Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17

BS5268-1991 paragraph 15.6


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 0.56 0.14 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.34 OK
.00400 sc,adm smx,adm sby,adm 1.77 6.14 6.20
.00300

.00200 Slenderness Ratio: L/r = 97 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = 1.600kN @ 0.00m


1.60
1.40
1.20
1.00
.800
.600
.400
.200
.200

.400

.600

.800

1.00
Job Number Sheet
QL-21-01 TM-08
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 14-15 Select lightest section

Lx Eff = 0.906 m
MOMENTS: X-X M max = .0049kNm @ .533m
Ly Eff = 1.066 m
.200

.400

.600

.800

1.00
Le Eff = 2.047 m
.00100 Critical Load Case : D+L
.00200
Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17

BS5268-1991 paragraph 16.3


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -1.75 0.14 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.49 OK
.00400 st,adm smx,adm sby,adm -3.74 6.14 6.20
.00300

.00200 Slenderness Ratio: L/r = 97 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = -5.000kN @ 0.00m


.200

.400

.600

.800

1.00

-1.00

-2.00

-3.00

-4.00

-5.00

Element 15-16 Select lightest section

Lx Eff = 0.904 m
MOMENTS: X-X M max = -.1000kNm @ 0.00m
Ly Eff = 1.064 m
-.100
Le Eff = 2.043 m
-.080 Critical Load Case : D+L
-.060 Section 38 x 75
-.040
k7=1.16(x-x), 1.17(y-y)
-.020 k14=1.17
.200

.400

.600

.800

1.00

BS5268-1991 paragraph 16.3


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -0.84 2.81 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.68 OK
.00400 st,adm smx,adm sby,adm -3.74 6.14 6.20
.00300

.00200 Slenderness Ratio: L/r = 97 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = -2.400kN @ 0.00m


.200

.400

.600

.800

1.00

-.500

-1.00

-1.50

-2.00
Job Number Sheet
QL-21-01 TM-09
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 9-16 Select lightest section

Lx Eff = 0.907 m
MOMENTS: X-X M max = .0049kNm @ .533m
Ly Eff = 1.067 m
.200

.400

.600

.800

1.00
Le Eff = 2.049 m
.00100 Critical Load Case : D+L
.00200
Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17
.00500
BS5268-1991 paragraph 15.6
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 0.25 0.14 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.16 OK
.00400 sc,adm smx,adm sby,adm 1.76 6.14 6.20
.00300

.00200 Slenderness Ratio: L/r = 97 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = .7000kN @ 0.00m


.700
.600
.500
.400
.300
.200
.100
.200

.400

.600

.800

1.00
Job Number Sheet
QL-21-01 TM-10
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 2-10 Select lightest section

Lx Eff = 0.347 m
MOMENTS: X-X M max = 0.000kNm @ .532m Ly Eff = 0.408 m
.00500
Le Eff = 0.783 m
.00400 Critical Load Case : D+L
.00300
Section 38 x 75
.00200
k7=1.16(x-x), 1.17(y-y)
.00100 k14=1.17
.050

.100

.150

.200

.250

.300

.350

.400

BS5268-1991 paragraph 15.6


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 0.14 0.00 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.06 OK
.00400 sc,adm smx,adm sby,adm 2.19 6.17 6.20
.00300

.00200 Slenderness Ratio: L/r = 37 OK

.00100 ----------------------------------------------------------
.050

.100

.150

.200

.250

.300

.350

.400

AXIAL FORCE P max = .4000kN @ 0.00m


.400

.300

.200

.100
.050

.100

.150

.200

.250

.300

.350

.400

Element 3-10 Select lightest section

Lx Eff = 0.904 m
MOMENTS: X-X M max = .0033kNm @ .532m Ly Eff = 1.064 m
.200

.400

.600

.800

1.00

.00050
Le Eff = 2.043 m
Critical Load Case : D+L
.00100

.00150 Section 38 x 75
.00200

.00250
k7=1.16(x-x), 1.17(y-y)
k14=1.17
.00300

BS5268-1991 paragraph 15.6


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 0.74 0.09 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.43 OK
.00400 sc,adm smx,adm sby,adm 1.77 6.14 6.20
.00300

.00200 Slenderness Ratio: L/r = 97 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = 2.100kN @ 0.00m


2.00

1.50

1.00

.500
.200

.400

.600

.800

1.00
Job Number Sheet
QL-21-01 TM-11
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 3-11 Select lightest section

Lx Eff = 0.693 m
MOMENTS: X-X M max = 0.000kNm @ .532m
.00500 Ly Eff = 0.815 m
Le Eff = 1.565 m
.00400 Critical Load Case : D+L
.00300
Section 38 x 75
.00200
k7=1.16(x-x), 1.17(y-y)
.00100 k14=1.17
.100

.200

.300

.400

.500

.600

.700

.800

BS5268-1991 paragraph 16.3


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -0.35 0.00 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.09 OK
.00400 st,adm smx,adm sby,adm -3.74 6.17 6.20
.00300

.00200 Slenderness Ratio: L/r = 74 OK

.00100 ----------------------------------------------------------
.100

.200

.300

.400

.500

.600

.700

.800

AXIAL FORCE P max = -1.000kN @ 0.00m


.100

.200

.300

.400

.500

.600

.700

.800

-.200

-.400

-.600

-.800

-1.00

Element 4-11 Select lightest section

Lx Eff = 0.931 m
MOMENTS: X-X M max = .0025kNm @ .548m
Ly Eff = 1.095 m
.200

.400

.600

.800

1.00

Le Eff = 2.102 m
.00050 Critical Load Case : D+L
.00100
Section 38 x 75
.00150
k7=1.16(x-x), 1.17(y-y)
.00200
k14=1.17
.00250
BS5268-1991 paragraph 15.6
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 1.26 0.07 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.74 OK
.00400 sc,adm smx,adm sby,adm 1.74 6.14 6.20
.00300

.00200 Slenderness Ratio: L/r = 100 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = 3.600kN @ 0.00m


3.50
3.00
2.50
2.00
1.50
1.00
.500
.200

.400

.600

.800

1.00
Job Number Sheet
QL-21-01 TM-12
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 4-12 Select lightest section

Lx Eff = 1.062 m
MOMENTS: X-X M max = .0010kNm @ .625m
Ly Eff = 1.249 m
.200

.400

.600

.800

1.00

1.20
Le Eff = 2.398 m
.00020 Critical Load Case : D+L
.00040
Section 38 x 75
.00060
k7=1.16(x-x), 1.17(y-y)
.00080 k14=1.17
.00100
BS5268-1991 paragraph 16.3
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -0.98 0.03 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.27 OK
.00400 st,adm smx,adm sby,adm -3.74 6.13 6.20
.00300

.00200 Slenderness Ratio: L/r = 114 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

1.20

AXIAL FORCE P max = -2.800kN @ 0.00m


.200

.400

.600

.800

1.00

1.20

-.500

-1.00

-1.50

-2.00

-2.50

Element 5-12 Select lightest section

Lx Eff = 1.334 m
MOMENTS: X-X M max = .0048kNm @ .785m
Ly Eff = 1.569 m
.200

.400

.600

.800

1.00

1.20

1.40

Le Eff = 3.012 m
.00100 Critical Load Case : D+L
.00200
Section 47 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17

BS5268-1991 paragraph 15.6


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 1.42 0.11 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.92 OK
.00400 sc,adm smx,adm sby,adm 1.57 6.14 6.20
.00300

.00200 Slenderness Ratio: L/r = 116 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

1.20

1.40

AXIAL FORCE P max = 5.000kN @ 0.00m


5.00

4.00

3.00

2.00

1.00
.200

.400

.600

.800

1.00

1.20

1.40
Job Number Sheet
QL-21-01 TM-13
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 5-13 Select lightest section

Lx Eff = 1.386 m
MOMENTS: X-X M max = 0.000kNm @ .785m
.00500 Ly Eff = 1.631 m
Le Eff = 3.132 m
.00400 Critical Load Case : D+L
.00300
Section 38 x 75
.00200
k7=1.16(x-x), 1.17(y-y)
.00100 k14=1.17
.200

.400

.600

.800

1.00

1.20

1.40

1.60

BS5268-1991 paragraph 15.6


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 0.42 0.00 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.35 OK
.00400 sc,adm smx,adm sby,adm 1.21 6.10 6.20
.00300

.00200 Slenderness Ratio: L/r = 149 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

1.20

1.40

1.60

AXIAL FORCE P max = 1.200kN @ 0.00m


1.20

1.00

.800

.600

.400

.200
.200

.400

.600

.800

1.00

1.20

1.40

1.60

Element 5-14 Select lightest section

Lx Eff = 1.335 m
MOMENTS: X-X M max = .0048kNm @ .785m
Ly Eff = 1.570 m
.200

.400

.600

.800

1.00

1.20

1.40

Le Eff = 3.014 m
.00100 Critical Load Case : D+L
.00200
Section 38 x 75
.00300
k7=1.16(x-x), 1.17(y-y)
.00400 k14=1.17

BS5268-1991 paragraph 16.3


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -2.21 0.14 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.61 OK
.00400 st,adm smx,adm sby,adm -3.74 6.10 6.20
.00300

.00200 Slenderness Ratio: L/r = 143 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

1.20

1.40

AXIAL FORCE P max = -6.300kN @ 0.00m


.200

.400

.600

.800

1.00

1.20

1.40

-1.00

-2.00

-3.00

-4.00

-5.00

-6.00
Job Number Sheet
QL-21-01 TM-14
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 6-15 Select lightest section

Lx Eff = 0.931 m
MOMENTS: X-X M max = .0025kNm @ .548m Ly Eff = 1.095 m
.200

.400

.600

.800

1.00
Le Eff = 2.102 m
.00050 Critical Load Case : D+L
.00100
Section 38 x 75
.00150
k7=1.16(x-x), 1.17(y-y)
.00200 k14=1.17
.00250
BS5268-1991 paragraph 15.6
MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 1.26 0.07 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.74 OK
.00400 sc,adm smx,adm sby,adm 1.74 6.14 6.20
.00300

.00200 Slenderness Ratio: L/r = 100 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = 3.600kN @ 0.00m


3.50
3.00
2.50
2.00
1.50
1.00
.500
.200

.400

.600

.800

1.00

Element 7-15 Select lightest section

Lx Eff = 0.693 m
MOMENTS: X-X M max = 0.000kNm @ .548m Ly Eff = 0.815 m
.00500
Le Eff = 1.565 m
.00400 Critical Load Case : D+L
.00300
Section 38 x 75
.00200
k7=1.16(x-x), 1.17(y-y)
.00100 k14=1.17
.100

.200

.300

.400

.500

.600

.700

.800

BS5268-1991 paragraph 16.3


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 st,a smx,a smy,a -0.32 0.00 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.08 OK
.00400 st,adm smx,adm sby,adm -3.74 6.17 6.20
.00300

.00200 Slenderness Ratio: L/r = 74 OK

.00100 ----------------------------------------------------------
.100

.200

.300

.400

.500

.600

.700

.800

AXIAL FORCE P max = -.9000kN @ .815m


.100

.200

.300

.400

.500

.600

.700

.800

-.200

-.400

-.600

-.800
Job Number Sheet
QL-21-01 TM-15
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021

Element 7-16 Select lightest section

Lx Eff = 0.904 m
MOMENTS: X-X M max = .0033kNm @ .532m
Ly Eff = 1.064 m
.200

.400

.600

.800

1.00
.00050
Le Eff = 2.043 m
Critical Load Case : D+L
.00100

.00150 Section 38 x 75
.00200

.00250
k7=1.16(x-x), 1.17(y-y)
k14=1.17
.00300

BS5268-1991 paragraph 15.6


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 1.02 0.09 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.59 OK
.00400 sc,adm smx,adm sby,adm 1.77 6.14 6.20
.00300

.00200 Slenderness Ratio: L/r = 97 OK

.00100 ----------------------------------------------------------
.200

.400

.600

.800

1.00

AXIAL FORCE P max = 2.900kN @ 0.00m


3.00

2.50

2.00

1.50

1.00

.500
.200

.400

.600

.800

1.00

Element 8-16 Select lightest section

Lx Eff = 0.347 m
MOMENTS: X-X M max = 0.000kNm @ .532m
.00500 Ly Eff = 0.408 m
Le Eff = 0.783 m
.00400 Critical Load Case : D+L
.00300
Section 38 x 75
.00200
k7=1.16(x-x), 1.17(y-y)
.00100 k14=1.17
.050

.100

.150

.200

.250

.300

.350

.400

BS5268-1991 paragraph 15.6


MOMENTS: Y-Y M max = 0.000kNm @ 0.00m
.00500 sc,a smx,a smy,a 0.00 0.00 0.00
------ + ------ + ------- = ----- + ----- + ----- = 0.00 OK
.00400 sc,adm smx,adm sby,adm 2.19 6.17 6.20
.00300

.00200 Slenderness Ratio: L/r = 37 OK

.00100 ----------------------------------------------------------
.050

.100

.150

.200

.250

.300

.350

.400

AXIAL FORCE P max = 0.000kN @ .532m


.00500

.00400

.00300

.00200

.00100
.050

.100

.150

.200

.250

.300

.350

.400
Job Number Sheet
QL-21-01 TM-16
Job Title
Proposed Development on Juja/ Kalimoni Block 14/215, Juja Town, Kiambu County
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com Trenibra Investments Ltd
Calcs by Checked by Date
E-Mail : [email protected] MKK IOB 5/31/2021