List of Selected Projects - FINAL
List of Selected Projects - FINAL
Upgrading the rail-road The project addresses the upgrade of the freight terminal in Graz. The
terminal Graz works consist in new railway infrastructure able to handle freight trains
(Werndorf) through of up to 740 meters in length, new transshipment infrastructure for
expansion and Güterterminal efficient rail-road handling and digitalisation of the terminal check-in
23-AT-TG-RRT-
AT digitalisation with clean Werndorf Projekt 6,054,150 and check-out area.
Graz
transhipment handling GmbH
processes to remove The main benefit of the project will be increased capacity and
infrastructure capacity efficiency of inter-modal freight transport in a road-rail terminal of the
bottlenecks TEN-T network.
Baltic-Adriatic Core
Network Corridor:
The project concerns planning activities for the existing single-track
Enhancing the Graz
railway section between Leibnitz and the Slovenian border to
(AT) – Maribor (SI)
23-AT-TG- transform it into a more efficient and expanded double-track line.
Cross-Border Railway OBB-Infrastruktur
AT Werndorf- 12,763,667
Link’s segment AG
Spielfeld The main benefit of the project will be increased rail capacity and
between Leibnitz and
efficiency for freight and passenger traffic on the cross-border railway
the border (preparing
link between Austria and Slovenia.
for double-track
expansion)
Optimisation of the
cross-border railway The project concerns the development of rail infrastructure on the
connection between Brussels–Luxembourg–Strasbourg cross-border link, located on the
23-BE-TG- Louvain-la-Neuve and North Sea–Mediterranean Corridor.
BE INFRABEL SA 20,115,591
EuroCap-Rail Luxembourg situated
on the North Sea – The main benefit of the project will be increasing rail competitiveness
Mediterranean CNC and providing a faster connection between Brussels and Luxembourg.
(EuroCap-Rail)
The project aims to prepare studies for the development of the
intermodal hub at Brussels Airport that will integrate seamlessly
Intermodal Hub BRUSSELS various transport modes including rail, public transport and cycling.
23-BE-TG-IMH
BE Terminal Zone (CEF AIRPORT 4,563,358
TZ Study Project
Study project) COMPANY The main benefit of the project will be enhanced multimodal services
provided by a future multimodal passenger hub strategically located in
an urban node of the TEN-T network.
The project addresses the deployment of ERTMS by upgrading to
Upgrade of vehicles
ERTMS Baseline 3 around 500 passenger trains for international and
AM08, M6, I11 and SOCIETE
national traffic.
23-BE-TG- T18-19 with ETCS NATIONALE DES
BE 27,830,000
MUROSI Baseline3 Level2 to CHEMINS DE
The main benefit of the project will be increased rail capacity,
promote safety and FER BELGES
interoperability and safety of the TEN-T network in Belgium and
cross border transport
across its borders.
The project aims to construct new railway tracks within the maritime
port of Burgas in Bulgaria.
23-BG-TC- From East 2 West BMF PORT
BG 9,148,346
FE2WC Connections BURGAS AD
The main benefit of the project will be a more sustainable port and
increased competitiveness of rail freight transport.
Greener, electrified The project aims to provide onshore power supply for freight and
traffic machines by passenger ferries connecting the ports of Rødby (Denmark) and
Scandlines
23-DE-TG- enabling shore side Puttgarden (Germany).
DE Deutschland 1,765,440
Green.E-TRM battery charging aiming
GmbH
at zero emission on the The main benefit of the project will be greener maritime transport for
link Puttgarden-Rodby freight and passengers.
The project covers works for the upgrade of the existing 51.35 km
UPGRADE OF THE ORGANISMOS
double-track railway section from Acharnes to Oinoi railway station.
EXISTING SKA-OINOI SIDIRODROMON
23-EL-TC-SKA-
EL DOUBLE RAILWAY ELLADOS 192,142,704
OINOI The main benefits of the project will be an enhanced rail traffic in the
LINE AND ALIARTOS ANONYMI
TEN-T network in Greece, precisely in the rail line from the urban
RS ETAIREIA
node of Athens to Oinoi.
The project addresses studies and works for the upgrade of specific
sections of the existing Pythion-Ormenio single track railway line, for a
UPGRADING OF THE total length of 47.2 km.
23-EL-TC- PYTHIO – ORMENIO
EL ERGA OSE AE 186,667,918
SPYTHORM EXISTING SINGLE The main benefits of the project will be an enhanced rail traffic in the
RAILWAY LINE TEN-T network in Greece, in particular in the rail line from Pythion
(near Turkey) to Ormenio for an enhanced cross-border connection
with Bulgaria.
Phase 1 and 2 of the The project aims to deploy an onshore power supply network that
23-ES-TG- Plan to implement AUTORITAT allows the direct connection of ships to the electricity grid.
ES NEXIGEN Shore-to-Ship Power PORTUARIA DE 15,182,390
PHASE 1-2 Supply at the Port of BARCELONA The main result will be a more sustainable port offering electricity to
Barcelona. vessels and curbing air pollution.
FUNDACION DE
LA COMUNIDAD
The project addresses studies and works related to deployment of the
VALENCIANA
onshore power supply (OPS) infrastructure in the port of Valencia.
Onshore power supply PARA LA
23-ES-TG-OPS
for containerships, INVESTIGACION,
ES VALENCIAPOR 23,868,798 The benefits of the project will be a more sustainable port with an
ferries and cruise ships PROMOCION Y
T improved infrastructure to provide OPS to vessels, increased grid
in the Port of Valencia ESTUDIOS
reliability with an intelligent energy management system and deployed
COMERCIALES
photovoltaic systems.
DE
VALENCIAPORT
The project concerns works for basic infrastructure improvements in
the TEN-T port of Almeria.
23-ES-TG- AUTORIDAD
Extension of the
ES PECHINAQUAY PORTUARIA DE 5,970,412
Pechina quay. Phase I The benefit of the project will be increased efficiency in the port,
EXTENSION ALMERIA
including the future transportation of offshore wind farms near the
port.
This project aims to implement a Secure and Safe Truck Parking Area
Safe and Secure Truck (SSTPA) for Heavy Goods Vehicles (HGVs) in the southern region of
Parking area in Pinto in Atalaya Madrid and will offer 125 parking spaces meeting the Gold level
23-ES-TG-Pinto
ES the South of Madrid on Patrimonio 2,444,572 standard.
SSTPA Phase 1
the Atlantic TEN-T Inmobiliario S.L
Core Network Corridor The benefit of the project will be a more secure and safer road
transport and better conditions for professional drivers.
The main benefit will be a more secure and safer road transport and
better conditions for professional drivers.
MEDITERRANEAN
CORRIDOR. BILBAO-
PAMPLONA-
The project consists of works for improving the Zaragoza-Teruel-
ZARAGOZA-
Sagunto rail line. Electrification will be completed, axle load capacity
SAGUNTO LINE. ADMINISTRADO
for the section will be increased to 22.5 tonnes and the UIC gauge
23-ES-TG- SECTION ZARAGOZA- R DE
tracks will be built.
ES ZARAGOZA- TERUEL-SAGUNTO. INFRAESTRUCT 77,760,000
TER-SAGUNTO ELECTRIFICATION, URAS
The main results of the project will be the enhanced capacity,
GAUGE EXPANSION FERROVIARIAS
efficiency and interoperability with better rail services in the TEN-T
AND
network in Spain.
INFRASTRUCTURE
ADAPTATION
WORKS.
MINISTERE DE The project aims to deploy Cooperative ITS services and support new
LA TRANSITION C-ITS use cases in 10 different European Pilot and Operations Sites.
Strengthening C-ITS
23-EU-TG- ECOLOGIQUE
EU Adoption and Lining-up 38,493,989
SCALE ET DE LA The main benefits of the project will be C-ITS services deployed,
across Europe
COHESION DES increasing road safety and efficiency of road management leading to
TERRITOIRES reduce congestion and emissions.
The project aims to connect the Seine and Scheldt basins and further
MINISTERE DE the Rhine and Maas ones and create a high gauge cross-border
SEINE-ESCAUT 2.3:
LA TRANSITION 1,100 km network of waterways.
23-EU-TG- Developing the largest
ECOLOGIQUE
EU SEINE-ESCAUT inland waterway 300,000,000
ET DE LA The main benefits of the project will be the timely completion of the
2.3 network in the heart of
COHESION DES cross-border inland waterway connection between France and
the EU
TERRITOIRES Belgium, increasing capacity and efficiency of inland waterway
transport.
FUNDACION DE
The project aims to develop the Maritime Single Windows in line with
LA COMUNIDAD
the EMSWe Regulation. It contains the design and development of
VALENCIANA
Smart European the EMSWe components as well as their deployment into the
PARA LA
23-EU-TG- Maritime Space respective national single window systems.
INVESTIGACION,
EU SEMAS- through the European 14,882,418
PROMOCION Y
EMSWe Maritime Single The main benefit of the project will be a smarter and more digital
ESTUDIOS
Window environment maritime sector with a digital space collecting the reporting obligations
COMERCIALES
applied to ships calling the ports of the TEN-T network in Spain,
DE
Sweden, The Netherlands, Portugal, Finland, Italy and Slovenia.
VALENCIAPORT
The project addresses works between Saint-Jean-de-Maurienne and
Susa/Bussoleno. It includes the connection to the existing line in
Saint-Jean-de-Maurienne, the Mont-Cenis cross-border base tunnel
Cross-border section of
(around 57.7 km), the Susa valley crossing, the interconnecting tunnel
the new Turin-Lyon TUNNEL
between Susa and Bussoleno (around 2 km) and the entry into the
EU 23-EU-TG-TELT railway line on the EURALPIN LYON 700,000,000
existing Bussoleno railway station.
Mediterranean TEN-T TURIN
CNC
The main results of the project will be the timely completion of the
cross-border rail connection between France and Italy (Lyon-Turin),
enhancing rail capacity for passenger and freight traffic.
The project concerns the planning of six passing loops at four sites of
the Riihimäki-Tampere railway section on the Helsinki-Tampere
Improving throughput railway line in Finland.
23-FI-TG-
FI capacity of Riihimäki– VAYLAVIRASTO 1,750,000
RITAPASS
Tampere railway line The main benefits of the project will be the preparation of the works
for the upgrade of the existing line with the aim to increase its capacity
and performance to enhance passenger and freight rail transport.
The main benefits of the project will be the timely construction of the
main tunnels and of the new access line.
The project concerns the upgrade to ETCS Level 2, Baseline 3 of 114
Upgrade to ERTMS
locomotives for international traffic that will operate in the TEN-T
Baseline 3 of 14
23-FR-TG- network.
locomotives series for
FR AKIEM-ERTMS- AKIEM 3,540,000
the improvement of rail
5 The main benefit of the project will be increased capacity, efficiency
interoperability on the
and interoperability of rail traffic through ETCS equipped trains
TEN-T Corridors
operating in the TEN-T network.
The project addresses works for implementing a Platinum Level safe
and secure parking area to accommodate 300 trucks in the vicinity of
23-FR-TG-BTS BAPAUME the French city of Bapaume.
FR BTS Real Estate 3,284,214
A1 TRUCKSTOP A1
The benefits of the project will be increased road safety and better
conditions for professional drivers.
The project addresses works for the upgrade of an existing parking for
310 heavy goods vehicles, at certified Gold level SSTPA in Marck
Truck Parking
23-FR-TG- Upgrading a SSTPA in (Calais) France.
FR Network France 1,224,297
Calais Upgrade Calais to Gold Level
S.A.S
The benefits of the project will be increased road safety and better
conditions for professional drivers.
The project concerns the retrofit with ERTMS L2 Baseline 3 of 10
locomotives owned by SNCF Reseau. They will run on the Marseille-
Upgrade to ERTMS
Ventimiglia line and will be in service with ERTMS in 2027.
23-FR-TG- Baseline 3 of 10
FR ERTMS-4-TEN- BB60000 locomotives SNCF RESEAU 1,890,000
The main benefits of the project will be increased capacity and
T for works on the TEN-T
efficiency of rail operations by the ETCS equipped locomotives and
rail infrastructure
enhanced interoperability and safety of railways in the TEN-T network
in France.
The project aims to develop a feasibility study to reorganise spaces
and signage at the metro stations interchanging with two major and
REGIE
Crossing Paris from long-distance railway stations: Gare de l’Est and Montparnasse.
23-FR-TG- AUTONOME DES
FR Gare de l’Est to Gare 1,385,000
GEMO TRANSPORTS
Montparnasse The main benefits of the project will be to prepare the construction of
PARISIENS
two passengers’ hubs with long-distance rail in the urban node of
Paris.
The project entails the construction of a new high-speed railway line in
southwest France (Bordeaux/Toulouse/Spain). The project covers the
GPSO - Grand Projet
update of the existing preliminary design studies for the creation of the
du Sud-Ouest - studies
23-FR-TG- new mixed section from Dax to Spain and the interim commissioning
FR and works to prepare SNCF RESEAU 19,508,900
GPSO-prep of the 3rd track in Villenave d'Ornon.
the new high-speed line
on the Atlantic corridor
The main benefit of the project will be the timely completion of the
cross-border rail connection between France (Bordeaux) and Spain.
The project addresses the retrofit of 50 trainsets with ERTMS L2
Prototype and serial
Baseline 3 for regional trains and high-speed connections in France,
retrofitting of 7 high-
Italy and Luxembourg.
23-FR-TG- speed trains and 43
SNCF
FR INTEROPERAB regional trainsets with 11,800,000
VOYAGEURS The main benefit of the project will be increased rail capacity,
LE ERTMS Baseline 3 for
efficiency, and interoperability o rail traffic for passengers with the
operation in France,
ETCS equipped trains operating in the TEN-T network in France, Italy
Italy and Luxembourg.
and Luxembourg.
The project concerns works for the Roissy–Picardie rail link to provide
direct access to Roissy-Charles de Gaulle airport and its TGV station
from the south of the Hauts-de-France Region and the north of the Ile-
23-FR-TG-LiFe- Works on the Roissy -
FR SNCF RESEAU 10,374,456 de-France Region.
RP Picardie Rail Link
The main benefit of the project will be better rail connection to the
airport in the urban node of Paris.
New railway Line
between Montpellier et The project addresses the detailed design of the passenger and
Perpignan (LNMP) on freight section from Montpellier to Beziers, and the climate resilient
23-FR-TG- the Mediterranean design of the section from Beziers to Perpignan.
FR LNMP-CPDD1- Corridor: climate SNCF RESEAU 22,547,134
CRD2 proofed detailed design The main benefit of the project will be the advanced preparation for
of Phase 1 and climate the construction of the new railway line between Montpellier and
resilient design of Perpignan.
Phase 2
The project addresses detailed studies for the multimodal passenger
hub at the Marseille Saint-Charles railway station, covering the design
Marseille Saint Charles
of an underground extension of the station with a connection to the
23-FR-TG- - Development of the SNCF GARES &
FR 7,612,968 metro.
Marseille - Hub multimodal passenger CONNEXIONS
hub : Detailed studies
The main benefit of the project will be the future construction of a
multimodal passenger hub in the urban node of Marseille.
The project aims to construct a safe and secure truck parking area
(SSTPA) on the A31/ E21 motorway in France complying with
standards of the Platinum security level, offering 82 parking lots for
23-FR-TG- SECURE TRUCK
FR SCI LUCIE Sàrl 3,463,673 Heavy Goods Vehicles.
Pinzler Park PARKING 54
The benefits of the project will be increased road safety and better
conditions for professional drivers.
Capacity rail The project concerns studies for the upgrade of Le Boulou rail-road
investments to increase terminal and its connection to the Figueras-Perpignan international
23-FR-TG- rail-freight at “Boulou high-speed railway line between France and Spain (through Le-
FR RRT_LB_Rail_S Rail-Road Terminal” SNCF RESEAU 4,505,000 Perthus tunnel).
tudies and remove the
bottleneck at the The main benefit of the project will be the future works for the upgrade
French-Spanish border of the freight terminal, enhancing rail capacity.
HRVATSKE
AUTOCESTE The project covers the upgrade of road safety infrastructure on the
Safety upgrade on
DOO ZA Bregana-Zagreb–Lipovac A3 motorway, in the Lipovljani–Nova
Croatian motorways
UPRAVLJENJE, Gradiška section in Croatia. It will install around 47 kms of protective
23-HR-TC-CEF- and harmonization of
HR GRADENJE I 11,390,081 road guardrails.
2023-Fences protective road fences
ODRZAVANJE
system with the EU
AUTOCESTA*CR The main benefits of the project will be enhanced road safety in a
Directive (2008/96/EC)
OATIAN section with a poor performance of the TEN-T network in Croatia.
MOTORWAYS
The project covers the studies and works for the installation of
Upgrade of the Rijeka
23-HR-TC- onshore power supply in the port of Rijeka.
Port infrastructure – LUCKA UPRAVA
HR POR2CORE - 13,144,842
On-shore Power RIJEKA
OPS The main benefits of the project will be a more sustainable port
Supply
offering electricity to vessels, and curbing air pollution.
The project covers the reconstruction and upgrade of basic port
Reconstruction and
23-HR-TC- infrastructure in the port of Pula.
upgrade of the Pula Port
HR PULA 18,310,197
breakwater in the Port Authority
BREAKWATER The main result of the project will be increased efficiency of the
of Pula
operations in the TEN-T port.
DEVELOPMENT OF The project covers the preparatory activities and works for upgrading
THE BUDAPEST the Southern Railway Ring of Budapest, specifically the Kelenfold–
SOUTHERN RAILWAY EPITESI ES Ferencvaros section.
23-HU-TC-BP
HU RING: Capacity KOZLEKEDESI 290,000,000
RAILWAY RING
Enhancement of the MINISZTERIUM The main results of the project will be increased capacity and
Ferencváros – efficiency of rail traffic for passengers and freight in the urban node of
Kelenföld Section Budapest, enabling a modal shift from road to rail.
Construction of a
The project addresses works for a new railway junction together with
railway junction for the
the necessary technical infrastructure in the port of Police, with the
Port of Police with the ZARZAD
23-PL-TC- overall objective of improving the accessibility and handling capacity
technical infrastructure MORSKIEGO
PL railway-Port- 35,903,764 of the port.
as part of the PORTU POLICE
Police
construction of the SP Z O O
The main benefit will be an enhanced rail access to the port of Police
railway line No. 437 to
in the TEN-T network.
the Police Seaport
Completing of the
missing link at the CNC The project concerns the development of design documentation for
North Sea – Baltic: CENTRALNY 155 km of the new Sieradz-Poznan high-speed railway line, as well as
23-PL-TC-
Preparation of design PORT the preparation and submission of permits for the subsequent works.
PL SIERADZ- 37,527,500
documentation for the KOMUNIKACYJN
POZNAN
Sieradz Północny – Y SP ZOO The main benefit of the project will be the future construction of a new
Pleszew – Poznań high-speed line in the TEN-T network in Poland.
section
Works on the railway The project concerns works on the Skierniewice-Pilawa rail section. It
PKP POLSKIE
line no. 12 Skierniewice entails the upgrade of the double-track railway line on the eastern
23-PL-TC- LINIE
- Łuków (C-E20), Czachowek Wschodni-Pilawa section.
PL Skierniewice- KOLEJOWE 145,000,000
Skierniewice – Pilawa
Pilawa SPOLKA
section – remaining The main benefit of the project will be enhanced capacity of rail traffic
AKCYJNA
works for freight and passenger transport in the TEN-T network in Poland.
ZARZAD The project covers the design and construction of a ship waste
Providing for reception
MORSKICH reception and storage facility for vessels calling at the port of
of waste from ships in
PORTOW Swinoujscie in Poland.
23-PL-TC- the seaport of
PL SZCZECIN I 1,555,780
WasteLess Świnoujście to meet
SWINOUJSCIE The main benefits of the project will be protecting the marine
environmental
SPOLKA environment from pollution of ships, while enabling uninterrupted
requirements
AKCYJNA maritime transport operations.
The project concerns the upgrade and modernisation of 58.6 km of
PKP POLSKIE
Works on the E 75 the Bialystok–Osowiec railway section of Rail Baltica in Poland.
23-PL-TG- LINIE
railway line (Rail
PL Bialystok - KOLEJOWE 223,120,891
Baltica), Białystok - The main benefit of the project will be enhanced capacity of rail traffic
Osowiec SPOLKA
Osowiec section for freight and passenger transport for the cross-border connection of
AKCYJNA
Rail Baltica between Poland and Lithuania.
The project concerns the construction of the first phase of a new high-
speed railway line between Lisbon and Porto, featuring 142 km of
railway works and 51 km of new single-track connections.
23-PT-TC-HSL High-Speed Line Porto- INFRAESTRUTU
PT Porto-Lisbon Lisbon: 1st phase RAS DE 813,160,397
The main benefit of the project will be a future rail connection between
1ph (PPP1 and PPP2) PORTUGAL SA
Portugal and Spain, promoting the modal shift from road and air to
rail, contributing to lower greenhouse gas emissions, and enhancing
network quality and interoperability.
The project concerns the design studies to upgrade the existing 59.7
COMPANIA
Rehabilitation of the km Valea Calugareasca-Buzau railway section.
NATIONALA DE
RO 23-RO-TC-VCB Valea Calugareasca 45,000,000
CAI FERATE CFR
Buzau railway section The main benefit of the project will be to enable future works, leading
SA
to increased rail capacity and better service to users.