1 PAVER 2059.7 2062.8 3.1 0 #DIV/0! DBM LAYRING AT CH- 9+510 TO CH- 9+730 (RHS)
4 EXCAVATOR EXCAVATOR-03 4999.1 5004.5 5.4 0 #DIV/0! CH- 17+000 ROOT REMOVING WORK AND RAIN CUTT FILLING
6 LOADER NO-1 6167.6 6173.0 5.4 123.0 6172.8 6161.0 11.8 10.423728814 BARSONI PLANT
7 HYDRA WB74AZ-9107 3316.5 3320.9 4.4 28.0 3316.5 3301.0 15.5 1.8064516129 CAMP WORK HM PLANT WORK AND EMALSON DRUME UNLOADING
CH 15+000 TO 13+170 DIVERSON REAPIR WORK RSH TO CAMP TO CH- 1+700 RAIN
CUTT REPAIRING TO AMOUR AMOUR ELECTRIC WORK TO CH- 9+600 CUTTING TO
8 BACKHOE LOADER WB73E-5583 11479.8 11489.9 10.1 101.00 11479.80 11458.20 21.599999999999 4.6759259259 AMOUR TO ELECTRICAL WORK TO CAMP WORK EMALSON DRUM UNLOADING
AND CAMP
11 BIG TENDEM ROLLER 29.0 31.0 2.0 0 #DIV/0! DBM ROLLING CH- 9+510 TO CH- 9+730 RHS
12 TENDEM ROLLER NO-4 2778.2 2784.4 6.2 0 #DIV/0! DBM ROLLING CH- 9+510 TO CH- 9+730 RHS
ROLLING ON GSB TOP BED CH- 1+060 TO CH- 1+40 (LHS) TO CH- 1+140 TO CH-
14 SOIL COMPECTOR N0-3 8241.8 8246.0 4.2 178.00 8241.00 8218.00 23 7.7391304348 1+450 (LHS) TO CH- 3+180 TO CH- 3+370 (RHS)
GSB TO COMPLETED GRADING CH- 3+240 TO CH- 3+360 (RHS) TO CH- 1+200 TO CH-
18 GRADER GRADER-02 9242.6 9254.2 11.6 219.0 9250.2 9231.8 18.400000000001 11.902173913 1+460 (LHS)
CAMP TO CH- 1+400 1 TRIP GSB SHIFTING TO CH- 3+700 TO CH- 1+200 1TRIP
21 HYVA NL01AD-4108 5918.0 6098.0 180.0 0 #DIV/0! DISMANTAL UNUNLOADING TO 1 TRIP DUST SHIFING TO CAMP TO JANTA PLANT
TO CAMP 5 TRIP DUST AND 1 TRIP 10 MM SHIFTING
22 HYVA NL01AD-2451 115591.0 115775.0 184.0 0 #DIV/0! AMOUR CAMP TO UTRYE CAMP TO BAHADURGANJ CAMP DUST SHIFT
24 HYVA NL01AD-2450 138598.0 138658.0 60.0 0 #DIV/0! DBM LOADING BARSOYI PLANT TO CH- 9+600 UNLOADING (1 TRIP)
28 HYVA WB73E-7738 139366.0 139423.0 57.0 0 #DIV/0! BARSOI PLANT TO CH- 9+000 TO BARSOI PLANT 1 TRIP DBM
CH- 8+500 TO CH- 8+320 SOIL LOADING UNLOADING 20 TRIP TO CAMP TO CH-
29 HYVA WB73D-6518 MNW MNW 148.0 100.00 0 0 3+000 TO CH- 8+000 1 TRIP FOR GSB TO CH- 8+000 TO JANTA PLANT TO CAMP 1
TRIP TO CAMP TO JANTA PLANT TO CAMP 5 TRIP BLACK DUST SHIFTING.
30 HYVA NL01AD-1675 140226.0 140226.0 0.0 249.00 140266.00 139782.00 484 1.9437751004 IDLE
31 HYVA NL01AD-1677 29365.0 29510.0 145.0 0 #DIV/0! BARSONI PLANT TO AMOUR PLANT TO BARSONI 1 TRIP DBM WORK
35 HYVA NL01AD-1679 135929.0 136118.0 189.0 0 #DIV/0! AMOUR CAMP TO UTRYE CAMP TO BAHADURGANJ CAMP DUST SHIFT
36 HYVA NL01AD-4110 111765.0 111823.0 58.0 0 #DIV/0! DBM PLANT TO CH- 9+800 DBM 1 TRIP
37 HYVA NL01AD-4109 121821.0 121971.0 150.0 0 #DIV/0! BARSONI PLANT TO CH- 9+000 1 TRIP DBM
CAMP TO CH- 17+000 FOR EXCAVATOR SHIFTING TO CH- 17+000 TO CH- 25+000 TO
46 TRAILERS WB73G 6909 19897.0 19958.0 61.0 0 #DIV/0! CH- 8+000 FOR EXCAVATOR SHIFTING TO CAMP TO CH- 25+000 TO CAMP FOR
STEEL SHIFTING
47 TRACTOR NO-5 1474.6 1479.6 5.0 0 #DIV/0! CAMP T.CH9F FOR CAMPRESAR WORE D.B.M. SAIT
TACK COAT CH- 9+510 TO CH- 9+750 (RHS) TO PRIME COAT CH- 9+330 TO CH-
55 BITUMEN BROWSER WB73-7426 10.00 9+650 (LHS)
CAMP TO 7+400 TO CAMP GARD SIFT CAMP TO 25+100 TO CAMP GARD SIFT DAY
57 CAMPER WB73F-1862 173483.0 173681.0 198.0 20.0 173483.0 173364.0 119 5.95 CAMP TO PURNIA TO CASBA TO BORSOM PLANT TO CAMP CAMP TO 25+100TO
CAMP NIGHT GARD SIFT CAMP TO 2+500 TO CAMP LABAR SIFTING
BAISI TO AMOUR TO CH- 2+000 TO ROTA TO CH- 27+000 TO AMOUR TO CH- 8+000
58 LMV WB74AH-9539 412428.0 412547.0 119.0 0 #DIV/0! TO BAISI TO AMOUR TO CH- 18+000 TO AMOUR TO BAISI
60 LMV WB74BQ5134 33554.0 33703.0 149.0 0 #DIV/0! BAISI TO AMOUR TO PURNIA TO AMOUR TO BAISI
61 PICKUP WB73A-9321 MNW MNW 26.0 15.0 0 0 CAMP TO CH- 2+000 TO CAMP FOR LUNCH
CAMP TO CH- 25+000 TO CAMP FOR GARD TO CAMP TO CH- 25+000 TO CAMP FOR
LUNCH TO CAMP TO CH- 17+000 TO CAMP FOR MECHANICAL WORK TO CAMP TO
62 PICKUP WB59A-3554 1781.0 1853.0 72.0 0 #DIV/0! CH- 8+000 TO CAMP FOR MECHANICAL TO CAMP TO CH- 6+000 TO CAMP FOR
MECHANICAL WORK
64 GENSET DG-11 MNW MNW 24.0 212.0 0 0 OFFICE AND CAMP LIGHT WORK
65 DIESEL TANKER BR37GA-4206 147654.0 147751.0 97.0 0 #DIV/0! CAMP TO CH- 01+000 TO CAMP TO BARSONI TO CAMP
68 TRACTOR HIRE BR11GB- 3736 7632.2 7634.6 2.4 0.0 #DIV/0! CAMP TO CH- 5+000 TO CAMP FOR LABAR
69 TRACTOR HIRE BR11GH-1083 1228.2 1230.3 2.1 0.0 #DIV/0! CAMB TO CH- 9+000 FOR BROMER WORK
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 02-07-2024 HSD Starting
Starting Reading Close reading Total Running Close reading
Machinery No. HSD reading TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/Hrs) (KM/hrs) (KM/Hrs) (KM/hrs)
(KM/hrs)
DBM LAYING AT CH- 9+730 TO 9+755 R/S DBM LAYRING AT CH- 9+330 TO 9+370
1 PAVER 2059.7 2064.5 4.8 0 #DIV/0! L/S
CH- 8+400 25 HYVA SOIL CUTTING AND LOADING AT SHOULDER MAKING AND
2 EXCAVATOR EXCAVATOR-01 11383.1 11388.7 5.6 200 11386.7 11371.1 15.6 12.820512821 RAIN AT REPAIRING
CAMP WORK HELPING CH- 25+266 RW RAING WATER REMOVING AND MUDDY
4 EXCAVATOR EXCAVATOR-03 5004.5 5008.2 3.7 252.0 5006.1 4992.2 13.900000000001 18.129496403 SOIL REMOVING CH- 24+900 SOLDER SOIL CUTTING DRAING WORK TREE ROOT
REMOVING
7 HYDRA WB74AZ-9107 3320.9 3323.2 2.3 0 #DIV/0! HN PLANT AND WORKSHOP WORK IN CAMP
CAMP TO CH- 8+400 TO CH- 10+400 TO CH- 8+300 1 TRIP GSB LOADING AND
RAINCUT REPAIREING TO CH- 10+600 TO CAMP WORK TO RAINCUT CH- 9+500
8 BACKHOE LOADER WB73E-5583 11489.9 11498.1 8.2 43.00 11489.90 11479.80 10.1 4.2574257426 CORCUTTING JEAPLINE TO CH- 8+700 RAIN WORK TO COR CUTTING CH- 8+240 CH-
8+340 SOIL DOGING AND FELLING
RAIN CUTT REPAIRING CH- 1+100 TO CH- 1+200 LHS TO CH- 3+900 TO 4+500 BS
MARCHING SIDE SHOULDER CUTTING CH- 1+200 TO 1+400 LSH LOADING HYVER
9 BACKHOE LOADER WB73F-6479 8511.0 8530.0 19.0 81.00 8511.00 8496.00 15 5.4 DISMENTLE AND FILLING EXISTING POT HOLES AT CH- 3+850 AND 2+600 CAMP TO
CH- 22+500 TO CH- 23+150 DRAIN AND SOIL BOCKET FILLING TO CH- 23+150 TO
CH- 26+600 TO CH- 27+10 BOTHSIDE RAIN CHUTE REPAIRE WORK TO CAMP
11 BIG TENDEM ROLLER 31.0 32.1 1.1 0 #DIV/0! DBM ROLLING CH- 9+730 TO CH- 9+755 CH- 9+330 TO 9+370
DBM ROLLING CH- 9+730 TO CH- 9+755 (RHS) TO CH- 9+330 TO CH- 9+9370 (LHS)
12 TENDEM ROLLER NO-4 2784.4 2785.3 0.9 0 #DIV/0! ROLLING
RECTIFICATION WMM TOP ROLLING CH- 10+000 TO 11+500 BHS WMM 1ST LAYER
14 SOIL COMPECTOR N0-3 8246.0 8254.4 8.4 0 #DIV/0! COMPLETED ROLLING CH- 7+760 TO CH- 7+950 LHS SUBGRADE TOP GRADING CH-
8+080 TO CH- 8+240 LHS MARCHING CH- 2+000 TO CH- 10+000 TO CAMP
21 HYVA NL01AD-4108 6098.0 6132.0 34.0 0 #DIV/0! DISMANTLE LODING 3+700 UNLODING 1+200 2TRIPS
CAMP TO CH- 8+300 TO CH- 8+000 CH- 25 TRIP SOIL UNLOADING CH- 10+400
29 HYVA WB73D-6518 MNW MNW 32.0 50.00 0 0 LOADING AND CH- 10+800 UNLOADING TRIP GSB
35 HYVA NL01AD-1679 136118.0 136158.0 40.0 0 #DIV/0! BAHADURGANJ CAMP TO AMOUR CAMP
CAMP TO CH- 17+000 TO CAMP FOR EXA SIFT CAMP TO CH- 25+000 TO CAMP FOR
46 TRAILERS WB73G 6909 19958.0 19985.0 27.0 0 #DIV/0! EXA SHIFT
47 TRACTOR NO-5 1479.6 1481.0 1.4 10.00 1479.60 1471.60 8 1.25 CAMP TO CH- 9+000 TO CAMP FOR COMPRESOR WORK IN DBM SIDE
55 BITUMEN BROWSER WB73-7426 25.00 TAEK COAT AT CH- 9+730 TO CH- 9+760 (RHS) TO CH- 9+330 TO CH- 9+380 (LHS)
CAMP TO CH- 22+000 TO CAMP FOR MACNICL WORK CAMP TO CH- 9+000 TO
57 CAMPER WB73F-1862 173681.0 173734.0 53.0 10.0 173681.0 173483.0 198 19.8 CAMP FOR STAFF CAMP TO CH- 25+000 TO CAMP FOR GRADE CAMP TP AMOUR
58 TATA MAZIK 321 MNW MNW 18.0 10.0 0 0 CAMP TO CH- 13+130 TO CH- 9+340 TO CAMP TO CH- 13+130 TO CAMP
CAMP TO CHOOT TO CAMP FOR STAFF CAMP TO CH-8+000 TO CAMP FOR SARVEY
60 LMV WB73G-5439 6579.0 6745.0 166.0 0 #DIV/0! CAMP TO CHOOT TO CAMP FOR PARSAL CAMP TO ROTA TO CAMP FOR STORE
WORK
CAMP TO CH- 2+000 TO CAMP FOR STAF CAMP TO CH- 000 TO CAMP FOR LUNCH
61 LMV WB60S-1041 6562.0 6650.0 88.0 20.0 6625.0 6420.0 205 10.25 CAMP TO AMOUR TO CAMP CAMP TO CH- 9+000 TO CAMP FOR MACNICAL WORK
62 LMV WB74BQ5134 33703.0 33831.0 128.0 0 #DIV/0! BAISI TO AMOUR TO PURNIA TO AMOUR TO BAISI
64 WB 73F-0321 MNW MNW 18.0 10.0 0 0 CAMP TO CH- 13+130 TO CH- 9+340 TO CAMP TO CH-13+130 TO CAMP
CAMP TO CH- 17+000 TO CAMP FOR STAFF CAMP TO CH- 25+000 TO CAMP FOR
65 PICKUP WB59A-3554 1853.0 1910.0 57.0 20.0 1853.0 1712.0 141 7.05 GARD CAMP TO CH- 8+000 TO CAMP FOR LABOR CAMP TO CH- 25+000 TO CAMP
FOR STAFF
67 GENSET DG-11 MNW MNW 24.0 102.0 0 0 OFFICE AND CAMP LIGHT WORK
68 DIESEL TANKER BR37GA-4206 147751.0 147765.0 14.0 0 #DIV/0! CAMP TOCH- 8+000 TO CAMP
70 TRACTOR HIRE BR11A-9561 260.2 261.0 0.8 0 #DIV/0! CAMP TO CH- 9+000 TO CAMP FOR TOWER LIGHT SHIFTING IN DBM SAID
71 TRACTOR HIRE BR11GB- 3736 7632.6 7632.6 0.0 0.0 #DIV/0! IDLE
72 TRACTOR HIRE BR11GH-1083 1230.3 1232.4 2.1 10.0 1230.3 1223.1 7.2 1.3888888889 CAMP TO CH- 9+000 TO CAMP FOR BROMER WORK
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 03-07-2024 HSD Starting
Starting Reading Close reading Total Running Close reading
Machinery No. HSD reading TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/Hrs) (KM/hrs) (KM/Hrs) (KM/hrs)
(KM/hrs)
CH- 8+200 RAIN CUTT REPAIR CH- 7+445 TO CH-7+170 SIDE SHOLDER MAKING AND
2 EXCAVATOR EXCAVATOR-01 11388.7 11397.7 9.0 0 #DIV/0! CH- 7+000 7 HYVA SOIL LOADING
CH- 25+241 (RHS) RETING WALL ARIA WATER REMOVING AND SOIL LOADING NINE
4 EXCAVATOR EXCAVATOR-03 5008.2 5014.0 5.8 0 #DIV/0! HYVA SOIL DOZING SOIL SHIFTING
5 EXCAVATOR EXCAVATOR-05 13046.5 13054.8 8.3 220.0 13047.6 13047.6 0.0168613385 CAMP WORK BLACK DUST HEPING AND GSB LOADING
7 HYDRA WB74AZ-9107 3323.2 3327.8 4.6 0 #DIV/0! CAMP WORK PREECAST DRAIN SHIFT AND H.N PLANT WORK
CUTTING CHUT DRAIN FROM CH- 09+500 TO CH- 11+400 (RHS) 24 NO'S MARCHING
SIDE SHOULDER CH- 9+650 TO 09+700 (RS) CH- 9+730 TO 09+760 (RS) PLANT
8 BACKHOE LOADER WB73E-5583 11498.1 11509.6 11.5 0 #DIV/0! LOADING FOR MARCHING CONCRETE AT AMOUR CAMP TO CAMP FOR DISMENTAL
LOADING
DRAIN CH- 10+600 2 NOS TO JANTA PLANT BLACK STONE LOADING TO SHOULDER
DAMPING SOIL FILLING RHS CH- 7+480 TO CH- 7+52 TO DISMANTAL LODING CH-
9 BACKHOE LOADER WB73F-6479 8530.0 8547.0 17.0 158.00 8541.00 8511.00 30 5.2666666667 3+780 AND SPRADING TO CAMP TO AMOUR THANA WORK TO CAMP TO CH-
13+500 DRAIN SOIL BACK FILLING CH- 13+550 TO CH- 25+200 R/W SOIL FILLING
11 BIG TENDEM ROLLER 32.1 32.1 0.0 50.00 32.00 32 1.5625 IDLE
14 SOIL COMPECTOR N0-3 8254.4 8262.7 8.3 0 #DIV/0! RECTIFICTION WMM ROLLING CH- 14+800 TO CH- 17+800 (RHS)
18 GRADER GRADER-02 9265.8 9273.2 7.4 181.0 9265.8 9250.2 15.599999999999 11.602564103 RECTIFICTION WMM 1ST LAYER CH- 14+800 TO CH- 17+800 (RHS)
32 HYVA NL01AD-1678 129820.0 129845.0 25.0 60.00 129820.70 129820.7 2163.6783333 WMM DUMPING CH- 10+440 TO 10+580 RHS 2 TRIP
35 HYVA NL01AD-1679 136158.0 136179.0 21.0 0 #DIV/0! CAMP TO JANTA TO CAMP FOR 20MM SIFT
BARSONI PLANT TO AMOUR CAMP TO CH- 2+200 CH- 1+900 WMM LOADING
37 HYVA NL01AD-4109 121971.0 122089.0 118.0 0 #DIV/0! UNLOADING 3 TRIP BT DISMANTAL LOADING CH- 3+730 TO CAMP 1 TRIP
45 TRANSIT MIXER JH16B-3875 CAMP TO CH- 25+266 TO 25+278 RW 1ST LITE WALL CASTING C.7.5 M3 M30
46 TRAILERS WB73G 6909 19985.0 20027.0 42.0 100.00 19985.00 19735.00 250 2.5 CAMP TO BAHADURGANJ
CAMP TO CH- 25+000 TO CH- 13+000 TO CAMP FOR MARCHIN CAMP TO CH-
61 LMV WB60S-1041 6650.0 6720.0 70.0 0 #DIV/0! 25+000 TO CAMP FOR MACHNICAL CAMP TO JANTA PLANT TO CAMP FOR
MACHNICAL CAMP TO AMOUR TO CAMP 2 TRIP
62 LMV WB74BQ5134 33831.0 33960.0 129.0 0 #DIV/0! BAISI TO AMOUR TO PURNIA TO AMOUR TO BAISI
64 PICKUP WB 73F-0321 MNW MNW 35.0 0 #DIV/0! CAMP TO CH- 13+130 TO CAMP TO BAISI TO CAMP
CAMP TO CH- 25+000 TO CAMP FOR GARD CAMP TO CH- 25+000 TO CAMP FOR
65 PICKUP WB59A-3554 1910.0 1966.0 56.0 0 #DIV/0! LANCH CAMP TO CH- 7+000 TP CAMP FOR GARD
67 GENSET DG-11 MNW MNW 7.0 76.0 0 0 OFFICE AND CAMP LIGHT WORK
70 TRACTOR HIRE BR11A-9561 261.0 264.5 3.5 15.0 261.0 251.9 9.1 1.6483516484 CAMP TO CH- 9+000 TO CAMP 5 TRIP FOR SEFTY WORK
71 TRACTOR HIRE BR11GB- 3736 7634.6 7634.6 0.0 0.0 #DIV/0! IDLE
72 TRACTOR HIRE BR11GH-1083 1232.4 1235.1 2.7 0.0 #DIV/0! CAMP TO JANTA PLANT TO CAMP FOR BITMIN DRAM SHIFT
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 04-07-2024 HSD Starting
Starting Reading Close reading Total Running Close reading
Machinery No. HSD reading TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/Hrs) (KM/hrs) (KM/Hrs) (KM/hrs)
(KM/hrs)
2 EXCAVATOR EXCAVATOR-01 11397.7 11406.0 8.3 200 11401.5 11401.5 0 #DIV/0! CH- 6+9+128 TO 7+170 SIDE SHOULDER MARCHING LHS
5 EXCAVATOR EXCAVATOR-05 13054.8 13057.1 2.3 0 #DIV/0! CAMP WORK HN PLANT WORK AND GSB LOADING
CAMP TO CH- 25+180 RETAINING WALL AREA SOIL DOZING, SOIL SHIFING
DIVERSON AREA REPAIRING AND DISMANTAL FILLING TO CH- 13+178 DISMANTAL
9 BACKHOE LOADER WB73F-6479 8547.0 8564.0 17.0 0 #DIV/0! TO CH- 13+178 MB DIVERSON AREA DISMANTAL FILLING AND LAVELING TO CAMP
TO CH- 3+500 BT DISMANTAL LOADING 9 TRIP TO CAMP
11 BIG TENDEM ROLLER 32.1 32.1 0.0 50.00 32.00 32 1.5625 IDLE
12 TENDEM ROLLER NO-4 2785.3 2785.3 0.0 105.00 2785.30 2770.80 14.5 7.2413793103 IDLE
WMM TOP COMPLET ROLLING CH- 10+440 TO CH- 10+580 (LHS) TO CH- 10+440 TO
14 SOIL COMPECTOR N0-3 8262.7 8270.2 7.5 157.00 8262.70 8241.80 20.900000000001 7.5119617225 CH- 10+520 (RHS) TO MRCHING AMOUR CAMP TO CH- 10+500 TO CH- 5+300 TO
CH- 9+500
WMM TOP COMPLET GRADING CH- 10+440 TO CH- 10+580 (LHS) TO CH- 10+440 TO
CH- 10+540 (RHS) TO CH- 9+000 TO CH- 5+000 TO CH- 4+200 ROAD REPAIRING AND
18 GRADER GRADER-02 9273.2 9283.2 10.0 0 #DIV/0! BT DISMANTAL GRADING WORK TO CH- 4+200 TO CH- 2+600 TO CH- 2+700 ROAD
REPAIR AND BT DISMANTAL GRADING WORK TO CH- 9+000
20 HYVA NL01AD-4106 111722.0 111761.0 39.0 0 #DIV/0! CAMP TO CH- 3+500 BT DISMANTAL 4 TRIP TO CAMP
21 HYVA NL01AD-4108 6154.0 6173.0 19.0 0 #DIV/0! CAMP TO CH- 6+800 TO CAMP
22 HYVA NL01AD-2451 115905.0 115916.0 11.0 155.0 115905.0 115543.0 362 2.335483871 WMM DUMPING CH- 10+430 (RHS) 1 TRIP
29 HYVA WB73D-6518 MNW MNW 10.0 100.00 0 0 WMM DUMPING CH- 10+500 RHS 1 TRIP
35 HYVA NL01AD-1679 136179.0 136190.0 11.0 0 #DIV/0! WMM DUMPING CH- 10+480 RSH 1 REIP
CAMP TO CH- 25+092 R/W 1ST LIFT M30 1CUM TO PRE CAST DEIN WMM PLANT
40 TRANSIT MIXER BR37GA-1342 M-20 3 CUM , 4.5 CUM 2 TRIP
45 TRANSIT MIXER JH16B-3875 CAMP TO CH- 25+092 TO CH- 25+117 R/W 1ST LIFT EALL CASTING 1 TRIP
47 TRACTOR NO-5 1481.0 1483.3 2.3 0 #DIV/0! CAMP TO CH- 9+500 FOR COMPRESOR WORK DBM SIDE
CAMP TO CH- 9+000 TO CAMP FOR SERVEY WORK CAMP TO CH- 8+000 TO CAMP
60 LMV WB73G-5439 6939.0 6993.0 54.0 35.0 6939.0 6939 198.25714286 FOR STAFF CAMP TO AMOUR TO CAMP FOR STAFF CAMP TO CH- 28+000 TO CAMP
FOR FARD
CAMP TO CH- 25+000 TO CAMP FOR GARD TO CAMP TO CH- 5+000 TO CAMP FOR
61 LMV WB60S-1041 6720.0 6809.0 89.0 0 #DIV/0! STAFF SHIFTING TO CAMP TO CH- 7+000 TO CAMP FOR LUNCH TO CAMP TO CH-
9+000 TO CAMP FOR STAFF TO CAMP TO ROTA TO CAMP
62 LMV WB74BQ5134 33960.0 33995.0 35.0 43.0 33977.0 33454.0 523 12.162790698 BISIE TO AMOUR BISIE
65 PICKUP WB59A-3554 1966.0 2005.0 39.0 10.0 1966.0 1853.0 113 11.3 CAMP TO CH- 25+274 TO CAMP CAMP TO CH- 25+274 TO CAMP
67 GENSET DG-11 MNW MNW 8.0 47.0 0 0 OFFICE AND CAMP LIGHT WORK
69 DIESEL TANKER BR37GA-4206 147765.0 147783.0 18.0 0 #DIV/0! CAMP TO CH- 7+000 TO CAMP
71 TRACTOR HIRE BR11A-9561 264.5 266.5 2.0 10.0 264.5 261.0 3.5 2.8571428571 CAMP TO CH- 7+000 TO CAMP FOR LABOR
72 TRACTOR HIRE BR11GB- 3736 7634.6 7636.6 2.0 10.0 7634.6 7624.8 9.8 1.0204081633 CAMP TO CH- 7+000 TO CAMP FOR DRINE WORK
CH- 6+800 TO CH- 6+950 SHOLDER MAKING 20 HYVA SOIL LOADING AND CUTTING
2 EXCAVATOR EXCAVATOR-01 11406.0 11418.3 12.3 200 11414.3 11401.5 12.799999999999 15.625 TO SHOLDER MAKING CH- 6+600 TO CH- 6+710 SOIL CUTTING AND SHOLDER
MAKING
5 EXCAVATOR EXCAVATOR-05 13057.1 13062.2 5.1 166.0 13058.1 13047.6 10.5 15.80952381 CH- 7+100 TO CH- 7+200 SHOLDER MAKING 2 HYVA SOIL LOADING
7 HYDRA WB74AZ-9107 3329.5 3332.0 2.5 0 #DIV/0! CAMP WORK HM PLANT WORK
CAMP TO CH- 9+000 TO CH- 6+800 SUT DRIN CUTTING AN CH- 7+900 TO SHOLDER
8 BACKHOE LOADER WB73E-5583 11518.6 11524.8 6.2 0 #DIV/0! MAKING CH- 6+800 SHODLER MAKING TO CAMP
MAKING SIDE SHOLDER CH- 13+170 TO CH- 3+300 (LHS) TO CAMP TO CH- 9+500 TO
9 BACKHOE LOADER WB73F-6479 8564.0 8573.0 9.0 114.00 8564.00 8541.00 23 4.9565217391 CAMP MARCHING LOADING RMC PLANT HOPER TO CAMP
WMM 1ST LAYER COMPLET ROLLING CH- 7+800 TO CH- 7+950 (RHS) TO CH- 5+600
14 SOIL COMPECTOR N0-3 8270.2 8277.8 7.6 0 #DIV/0! TO CH- 5+750 (BHS) TO CH- 3+180 TO CH- 3+360 (LHS) TO CH- 1+870 TO CH- 2+220
(LHS) TO MARCHING CH- 9+500 TO CH- 1+800 TO CH- 9+500
WMM 1ST LAYER COMPLETED GRADING CH- 7+800 TO CH- 7+950 (RHS) TO CH-
18 GRADER GRADER-02 9283.2 9290.7 7.5 235.0 9286.0 9265.8 20.200000000001 11.633663366 5+600 TO CH- 7+750 (BHS) TO CH- 3+180 TO CH- 8+360 (LHS) TO CH- 1+870 TO CH-
2+220 (LHS) TO SG TO GRADING CH- 8+100 TO CH- 8+240
CAMP TO CH- 6+800 SOIL LOADING CH- 8+200 5 TRIP TO CH- 10+100 TO CH-
21 HYVA NL01AD-4108 6173.0 6223.0 50.0 0 #DIV/0! 7+9000 2 TRIP SOIL UNLOADING
CAMP TO CH- 6+800 LOADING SOIL CH- 7+900 2 TRIP TO CH- 8+200 6 TRIP TO CH-
22 HYVA NL01AD-2451 115916.0 115964.0 48.0 0 #DIV/0! 6+900 3+ TRIP TO CH- 6+100 4 TRIP SOIL UNLOADING TO CAMP
CAMP TO CH- 6+800 TO CH- 8+200 5 TRIP SOIL UNLOADING TO CH - 6+000 TO CH-
29 HYVA WB73D-6518 MNW MNW 44.0 0 #DIV/0! 3+000 TO CH- 6+000 TO CAMP
37 HYVA NL01AD-4109 122089.0 122108.0 19.0 0 #DIV/0! CAMP TO CH- 6+600 TO CH- 6+800 TO CAMP 1 TRIP
39 TRUCK MAZDA WB76-4134 MNW MNW 20.0 0 #DIV/0! CAMP CH- 25+000 TO CAMP FOR LUNCH
45 TRANSIT MIXER JH16B-3875 195.00 CAMP TO CH- 25+266 TO CH- 25+278 R/W 2ND LIFT CONCRET M- 30 7.4 CUM
46 TRAILERS WB73G 6909 20089.0 20107.0 18.0 0 #DIV/0! CAMP TO CH- 7+000 TO CAMP FOR EXCAVATOR SHIFTING
59 LMV WB74AH-9539 413188.0 413294.0 106.0 53.0 413244.0 412678.0 566 10.679245283 BAISI TO DALKHOLA TO BAISI TO AMOUR TO ROTA TO LOCAL AMOUR TO BAISI
62 LMV WB74BQ5134 33995.0 34056.0 61.0 0 #DIV/0! BAISI TO AMOUR TO ROTA TO AMOUR TO BAISI
64 PICKUP WB 73F-0321 MNW MNW 21.0 0 #DIV/0! CAMP TO CH- 23+128 TO CAMP TO CH- 13+130 TO CAMP
CAMP TO CH- 0+000 TO CAMP FOR LUNCH TO CAMP TO CH- 25+000 TO CAMP FOR
65 PICKUP WB59A-3554 2005.0 2086.0 81.0 0 #DIV/0! MECHANICAL WORK TO CAMP TO CH- 25+000 TO CAMP FOR GARD SHIFTING
67 GENSET DG-11 MNW MNW 9.0 98.0 0 0 OFFICE AND CAMP LIGHT WORK
69 DIESEL TANKER BR37GA-4206 147783.0 147826.0 43.0 0 #DIV/0! CAMP TO CH- 3+000 TO CAMP TO CH- 7+000 TO CAMP
72 TRACTOR HIRE BR11GB- 3736 7636.6 7639.0 2.4 0.0 #DIV/0! CAMP TO CH- 6+000 TO CAMP FOR SHUT DRAIN WORK
73 TRACTOR HIRE BR11GH-1083 1235.1 1238.2 3.1 10.0 1235.1 1230.3 4.8 2.0833333333 CAMP TO CH- 7+000 TO CAMP FOR SHUT DRAIN WORK
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 06-07-2024 HSD Starting Close reading
Starting Reading Close reading Total Running
Machinery No. (KM/Hrs) (KM/hrs) (KM/Hrs) HSD reading (KM/hrs) TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/hrs)
SHOLDER FILLING CH- 6+700 TO CH- 6+840 (LHS) TO SHOULDER FILLINGTO SOIL
2 EXCAVATOR EXCAVATOR-01 11418.3 11426.0 7.7 200 11426.0 11414.3 11.700000000001 17.094017094 CUTTING CH- 10+400 TO CH- 10+720 (LHS) TO SHOLDER SOIL CUTTING CH- 10+400
CH- 13+100 BT DISMANTAL LOADING TO CH- 25+266 TO CH- 25+278 R/W SOIL
4 EXCAVATOR EXCAVATOR-03 5014.0 5027.0 13.0 260.0 5024.2 5006.1 18.099999999999 14.364640884 FILLING TO SOIL LOADING TO R/W CH- 25+092 TO CH- 25+117 R/W WATER WASH
TO CH- 25+260 TO CH- 25+278 R/W WATER WASH AND DIVERSON
5 EXCAVATOR EXCAVATOR-05 13062.2 13069.3 7.1 0 #DIV/0! CH- 6+600 TO CH- 6+850 SAID SHOLDER MAKING 6 HYVA SOIL LOADING
7 HYDRA WB74AZ-9107 3332.0 3334.6 2.6 0 #DIV/0! CAMP WORK HM PLANT WORK AND EMALSON DRM UNLOADING
CAMP WORK RMC PLANT HOPER LOADING TO GSB LOADING AND AMOR RIVER
8 BACKHOE LOADER WB73E-5583 11524.8 11529.5 4.7 64.00 11524.80 11509.60 15.199999999999 4.2105263158 KACHRA SHIFTING
CAMP TO CH- 11+400 MARCHING SHUT DRAIN PEEPAIR AT CH- 11+400 TO CH-
9 BACKHOE LOADER WB73F-6479 8573.0 8583.0 10.0 48.00 8573.00 8564.00 9 5.3333333333 10+900 SAID SOLDER MAKING CH- 10+520 TO CH- 10+700 (LHS) TO RAIN CUTT
REPAIRING CH- 1+100 TO CH- 1+400 (LHS)
MARCHING CH- 9+500 TO CH- 5+700 TO CH- 6+600 TO WMM 1ST LAYER
14 SOIL COMPECTOR N0-3 8277.8 8282.5 4.7 0 #DIV/0! COMPLETED ROLLING CH- 5+400 TO CH- 5+750 (RHS) TO EXISTING ROAD CUTTING
ROLLING CH- 5+300 TO CH- 5+400 (RHS)
WMM 1ST LAYER GRADING CH- 5+400 TO CH- 5+500 (RHS) TO EXISTING ROAD
17 GRADER GRADER-01 4873.5 4876.1 2.6 183.00 4873.50 4857.00 16.5 11.090909091 CUTTING GRADING CH- 5+300 TO CH- 5+400 (RHS)
WMM 1ST LAYER COMPLETED GRADING CH- 5+500 TO CH- 5+750 (RHS) TO
18 GRADER GRADER-02 9290.7 9293.6 2.9 0 #DIV/0! MARCHING CH- 9+500 TO CH- 5+700 TO CH- 15+500
20 HYVA NL01AD-4106 111761.0 111785.0 24.0 0 #DIV/0! CAMP TO CH- 25+180 SOIL LOADING TO UNLOADING CH- 25+278 4 TRIP TO CAMP
CAMP TO CH- 6+800 TO CAMP CH- 8+500 1 TRIP SOIL UNLOADING TO CH- 10+600
21 HYVA NL01AD-4108 6223.0 6291.0 68.0 0 #DIV/0! TO CH- 10+600 8 TRIPSOIL UNLOADING TO CAMP TO CH- 13+200 TO CH- 8+200 TO
CAMP 5 TRIP DISMANTAL SHIFTING
CAMP TO CH- 6+600 LOADING CH- 6+400 UNLOADING 1 TRIP CH- 10+600 TO CH-
22 HYVA NL01AD-2451 115964.0 116008.0 44.0 0 #DIV/0! 3+500 1 TRIP DISMANTAL LOADING CH- 2+100 UNLOADING
29 HYVA WB73D-6518 MNW MNW 20.0 0 #DIV/0! WMM DUMPING CH- 5+460 (RHS) 1 TRIP
CAMP TO CH- 13+000 DISMANTAL LODING TO CH- 11+500 TO CH- 8+500 TO CAMP
30 HYVA NL01AD-1675 140621.0 140662.0 41.0 0 #DIV/0! 5 TRIP
31 HYVA NL01AD-1677 29573.0 29573.0 0.0 0 #DIV/0! BARSONI PLANT
32 HYVA NL01AD-1678 129845.0 129861.0 16.0 0 #DIV/0! WMM DUMPING CH- 5+500 (RHS) 1 TRIP
WMM DUMPING CH- 5+500 (RHS) 1 TRIP TO WMM DUMPING CH- 5+450 (RHS) 1
35 HYVA NL01AD-1679 136190.0 136232.0 42.0 0 #DIV/0! TRIP
37 HYVA NL01AD-4109 122108.0 122151.0 43.0 0 #DIV/0! CAMP TO CH- 13+000 DISMANTAL LOADING TO CH- 8+500 TO CAMP
CAMP TO CH- 0+000 TO CAMP FOR TREE PLNT SHIFTING TO CAMP TO CH- 25+000
39 TRUCK MAZDA WB76-4134 MNW MNW 50.0 0 #DIV/0! TO CAMP FOR LUNCH
40 TRANSIT MIXER BR37GA-1342 WMM PLANT PRE CAST DREINE M20 24CUM
CAMP TO CH- 7+000 TO CH- 10+000 FOR EXCAVATOR SHIFTING TO CAMP TO CH-
46 TRAILERS WB73G 6909 20107.0 20154.0 47.0 0 #DIV/0! 25+ 000 TO CH- 13+200 FOR EXCAVATOR SHIFTING
47 TRACTOR NO-5 1483.3 1484.7 1.4 0 #DIV/0! CAMP TO CH- 9+000 TO CAMP FOR TOWER LIGHT SHIFTING
48 TRACTOR NO-2 863.0 867.0 4.0 10.00 0 #DIV/0! BAHADURGANJ CAMP TO AMOUR CAMP TRANFER
59 TATA MAZIK WB 73F-0321 MNW MNW 25.0 10.0 0 0 CAMP TO CH- 25+190 TO CAMP TO CAMP TO CH- 13+130 TO CAMP
CAMP TO CH- 25+000 TO CAMP FOR GARD TO CAMP TO PURNIA TO CAMP FOR
61 LMV WB73G-5439 7116.0 7300.0 184.0 0 #DIV/0! STORE WORK TO CAMP TO CH- 5+000 TO CAMP FOR DPM SIR TO CAMP TO CH-
25+000 TO CAMP FOR GARD SHIFTING
63 LMV WB74BQ5134 34056.0 34207.0 151.0 0 #DIV/0! BISI TO AMOUR TO BAISI TO AMOUR TO BAHADURGANJ TO AMOUR TO BAISI
68 GENSET DG-11 MNW MNW 8.0 102.0 0 0 OFFICE AND CAMP LIGHT WORK
70 DIESEL TANKER BR37GA-4206 147826.0 147835.0 9.0 40.0 147826.0 147539.0 287 7.175 CAMP TO CH- 8+000 TO CAMP
73 TRACTOR HIRE BR11GB- 3736 7639.0 7639.0 0.0 20.0 7639.0 7639.0 0.0026181437 DHIRE
74 TRACTOR HIRE BR11GH-1083 1238.2 1240.7 2.5 10.0 1238.2 1235.1 3.1 3.2258064516 CAMP TO CH- 8+000 TO CAMP FOR SHUT DRAIN WORK
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 07-07-2024 HSD Starting Close reading
Starting Reading Close reading Total Running
Machinery No. (KM/Hrs) (KM/hrs) (KM/Hrs) HSD reading (KM/hrs) TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/hrs)
2 EXCAVATOR EXCAVATOR-01 11426.0 11434.1 8.1 0 #DIV/0! RAIN CUTT FILLING CH- 8+500 TO CH- 10+400 B/S TO CAMP WORK GSB LOADING
5 EXCAVATOR EXCAVATOR-05 13069.3 13076.6 7.3 196.0 13072.3 13058.1 14.199999999999 13.802816901 CH- 6+400 TO CH- 6+650 SIDE SOLDER MAKING
6 LOADER NO-1 6177.2 6181.6 4.4 107.0 6181.6 6172.8 8.8000000000002 12.159090909 BARSONI PLANT
7 HYDRA WB74AZ-9107 3334.6 3340.7 6.1 30.0 3334.6 3316.5 18.1 1.6574585635 HM PLANT WORK IN AMOUR CAMP
CAMP WORK GSB LOADIING AND RMC PLANT HOPER LOADING TO CAMP TO CH-
8 BACKHOE LOADER WB73E-5583 11529.5 11541.7 12.2 0 #DIV/0! 25+000 TO CAMP FOR CONCRET WORK TO CAMP TO CH- 8+000 TO CAMP FOR
HYVA TOCHAN
SHUTE DRAIN WORK CH- 11+400 TO CH- 10+600 TO DRAIN WORK COMERATE
9 BACKHOE LOADER WB73F-6479 8583.0 8592.0 9.0 55.00 8583.00 8573.00 10 5.5 AMOUR CAMP TO CH- 7+500 TO RAIN CUTT FILLING CH- 9+000 TO CH- CH- 10+000
GSB TOP COMPLETED ROLLING CH- 5+300 TO CH- 5+400 (BHS ) TO WMM CH- 1ST
LAYER ROLLING CH- 5+310 TO CH- 5+500 (LHS) TO CRUST CUTTING ROLLING TO CH-
13 SOIL COMPECTOR N0-3 8282.5 8290.2 7.7 155.00 8283.40 8262.70 20.699999999999 7.4879227053 7+960 TO CH- 8+100 (RHS) TO EXISTING CRUST ROLLING CH- 7+960 TO CH- 8+080
(LHS) TO GSB TO CH- 7+960 TO CH- 8+080 (RHS)
DOZING GRADING AND LEVLING GSB TOP BED CH- 5+300 TO CH- 5+400 (BHS) TO
GRADING AND LEVELING WMM 1ST BED CH- 5+300 TO CH- 5+600 (LHS) TO
16 GRADER GRADER-01 4876.1 4885.8 9.7 0 #DIV/0! GRADING EXISTING BED CH- 7+960 TO CH- 8+060 (LHS) CH- 6+000 TO 8+120 CH-
8+120 TO 8+260 GSB BED GRADING TO 9+000
CAMP TO CH- 13+000 LOADING AND UNLOADING CH- 9+589 DISMANTAL 6 TRIP
19 HYVA NL01AD-4106 111785.0 111858.0 73.0 0 #DIV/0! AND GSB CH- 8+120 1 TRIP
20 HYVA NL01AD-4108 6291.0 6356.0 65.0 0 #DIV/0! WMM 1ST LAYER DUMPING CH- 5+300 TO CH- 5+50 (BHS) 3 TRIP
CAMP TO CH- 5+000 1 TRIP GSB UNLOADING TO CAMP TO CH- 8+000 1 TRIP GSB
UNLOADING AND SITE TO SITE DISMANTAL CAMP TO 13+000 DISMANTAL
21 HYVA NL01AD-2451 116008.0 116098.0 90.0 0 #DIV/0! LOADING AND UNLOADING CH- 9+589 TO CAMP TOEP-GSB-1 DISMANTAL -6
DISMANTAL LOADING CH- 13+400 TO CH- 9+000 UNLOADING 4 TRIP CAMP TO CH-
5+000 1 TRIP GSB
GSB DUMPLING CH- 5+300 TO CH- 5+500 (LHS) 3 TRIP TO DISMANTAL LOADING
22 HYVA NL01AD-2453 125212.0 125291.0 79.0 0 #DIV/0! CH- 13+000 UNLOADING CH- 10+000
GSB DUMPING CH- 5+300 TO CH- 5+500 BHS 5 TRIP TO CAMP TO CH- 8+200 GSB
28 HYVA WB73D-6518 MNW MNW 160.0 0 #DIV/0! LOADING UNLOADING 9 TRIP TO CAMP TO CH- 13+130 BTIGDISMANTAL 2 TIP
UNLOADING CH- 9+000
29 HYVA NL01AD-1675 140662.0 140731.0 69.0 0 #DIV/0! GSB DUMPING CH- 5+300 TO CH- 5+500 (LHS) 3 TRIP
30 HYVA NL01AD-1677 29573.0 29573.0 0.0 0 #DIV/0! BARSONI PLANT
31 HYVA NL01AD-1678 129861.0 129888.0 27.0 0 #DIV/0! CAMP TO CH- 5+000 TO CAMP 1 TRIP GSB LOADING
34 HYVA NL01AD-1679 136232.0 136317.0 85.0 0 #DIV/0! GSB DUMPING CH- 5+300 TO CH- 5+400 (RHS) 4 TRIP
36 HYVA NL01AD-4109 122151.0 122194.0 43.0 0 #DIV/0! CAMP TO CH- 8+200 GSB LOADING UNLOADING 2 TRIP
CAMP TO CH- 25+000 TO CAMP FOR GARD TO CAMP TO CH- 25+000 TO CAMP FOR
38 TRUCK MAZDA WB76-4134 MNW MNW 60.0 30.00 0 #DIV/0! LUNCH TO CAMP TO CH- 25+000 TO CAMP FOR GARD
CAMP TO CH- 25+117 R/W 1 ST LIFT M30 6.5 CUM TO PRE CAST DRAIN WMM
40 TRANSIT MIXER BR37GA-1342 PLANT M20 3.6 CUM
CAMP TO CH- 25+278 R/W 3RD LIFT M30 7.2 CUM TO CAMP TO CH- 25+117 R/W
45 TRANSIT MIXER JH16B-3875 1ST LIFT M30 1CUM
CAMP TO CH- 13+200 TO CH- 8+000 FOR EXCAVATOR SHIFTING TO CAMP TO CH-
46 TRAILERS WB73G 6909 20154.0 20200.0 46.0 0 #DIV/0! 10+000 TO CAMP FOR EXCAVATOR SHIFTING TO CAMP TO CH- 8+000 TO CH-
13+000 FOR EXCAVATOR SHIFTING
47 TRACTOR NO-5 1484.7 1488.7 4.0 0 #DIV/0! CAMP TO CH- 7+000 TO CAMP FOR TREE PLANT SHIFTING
CAMP TO BAISI TO CAMP FOR PARSAL TO CAMP TO CH- 6+000 TO CAMP FOR
58 CAMPER WB73F-1862 174122.0 174172.0 50.0 0 #DIV/0! GARD
59 TATA MAZIK WB 73F-0321 MNW MNW 30.0 0 #DIV/0! CAMP TO BAISI TO CH- 0+000 TO CAMP
63 LMV WB74BQ5134 34207.0 34320.0 113.0 30.0 34303.0 33977.0 326 10.866666667 BAISI TO AMOUR TO BAISI TO AMOUR TO MADHAV DIGGY TO AMOUR TO BAISI
68 GENSET DG-11 MNW MNW 8.6 90.0 0 0 OFFICE AND CAMP LIGHT WORK
70 DIESEL TANKER BR37GA-4206 147835.0 147930.0 95.0 0 #DIV/0! CAMP TO CH- 5 TO CAMP CAMP TO BARSONI TO CAMP
CAMP TO CH- 9+000 TO CAMP FOR SHUTE DAINE WORK TO CAMP TO CH- 10+000
72 TRACTOR HIRE BR11GH-1083 1240.7 1244.3 3.6 0 #DIV/0! TO CAMP SHUT DRAIN WORK
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 08-07-2024 HSD Starting Close reading
Starting Reading Close reading Total Running
Machinery No. (KM/Hrs) (KM/hrs) (KM/Hrs) HSD reading (KM/hrs) TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/hrs)
1 PAVER 2064.5 2070.6 6.1 0 #DIV/0! DBM LAYING CH- 9+370 TO CH- 9+700 (LHS)
2 EXCAVATOR EXCAVATOR-01 11434.1 11440.3 6.2 0 #DIV/0! CAMP TO WORK GSB LOADING AND CH- 20MM HEOING
5 EXCAVATOR EXCAVATOR-05 13076.6 13081.9 5.3 0 #DIV/0! RAIN CUTT REPAIRING AND MAKING SIDE SHOLDER CH- 5+750 TO CH- 5+830 (BHS)
6 LOADER NO-1 6181.6 6189.7 8.1 73.0 6187.9 6181.6 6.2999999999993 11.587301587 DBM PLANT HOPER LOADING DUST
7 HYDRA WB74AZ-9107 3340.7 3342.6 1.9 0 #DIV/0! HM PLANT WORK IN AMOUR CAMP
CAMP TO CH- 13+520 TO CH- 13+550 (LHS) AND CH- 13+450 TO CH- 13+470 (LHS)
TO DRAIN EXCAVATION WORK AND 1 HYVA SOIL LOADING TO CAMP WORK HM
8 BACKHOE LOADER WB73E-5583 11541.7 11550.5 8.8 90.00 11541.70 11524.80 16.900000000001 5.325443787 PLANT WORK, RMC PLANT HOPER LOADING TO CAMP TO CH- 13+200 DIVERSON
REPAIRING WORK
REOAIRING RAIN CUTT AND MAKING SIDE SHOLDER FROM CH- 3+170 TO CH-
3+170 TO CH- 3+370 MAKING SIDE SOLDER CH- 8+320 TO CH- 8+450 (LHS) TO
9 BACKHOE LOADER WB73F-6479 8592.0 8612.0 20.0 102.00 8603.00 8583.00 20 5.1 REPAIRING RAIN CUT CH- 14+780 TO CUTTING DRAIN CH- 8+320 TO CH - 9+000 TO
CUTTING DBM EDGE CH- 9+360 TO CAMP TO CH- 16+790 AND CH- 17+450
DISMANTAL CUTTING AND LOADING TO CAMP
10 BIG TENDEM ROLLER 32.1 36.0 3.9 0 #DIV/0! DBM RROLLING CH- 9+370 TO CH- 9+700 (RHS)
11 TENDEM ROLLER NO-4 2785.3 2789.6 4.3 0 #DIV/0! DBM RROLLING CH- 9+370 TO CH- 9+700 (RHS)
WMM 1ST LAYER ROLLING CH- 3+180 TO CH- 3+360 (RHS) TO GSB TOP COMPLETED
ROLLING CH- 3+940 TO CH- 4+070 (LHS) TO GSB 1ST LAYER EXISTING ROAD
13 SOIL COMPECTOR N0-3 8290.2 8297.4 7.2 0 #DIV/0! ROLLING CH- 4+140 TO CH- 4+200 TO RECTIFICATION WMM TOP ROLLING CH-
10+180 TO CH- 10+380 (BHS) TO CH- 10+440 TO CH- 10+700 (BHS)
WMM 1ST LAYER GRADING CH- 3+180 TO CH- 3+360 (RHS) TO GSB COMPLETED
GRADING CH- 3+940 TO CH- 4+070 (LHS) TO GSB TOP LAYER GRADING CH- 4+140
TO CH- 4+200 EXIXTING ROAD FECTIFICATION TO CH- 10+600 TO CH- 10+590 (BHS)
16 GRADER GRADER-01 4885.8 4897.8 12.0 242.00 4893.60 4873.50 20.1 12.039800995 TO CH- 9+300 TO CH- 13+100 DIVERSON BT DISMANTAL GRADING WORK CH-
13+100 TO CH- 26+000 TO CH- 26+600 GRADING TO CH- 16+750 TO CH- 17+800 BT
DISMANTAL BED UNLOADING TO CAMP
19 HYVA NL01AD-4106 111858.0 111858.0 0.0 234.0 111858.0 111422.0 436 1.8632478632 BARSONI PLANT
20 HYVA NL01AD-4108 6356.0 6449.0 93.0 113.0 6356.0 6132.0 224 1.982300885 BARSONI PLANT
CAMP TO CH- 16+790 AND CH- 17+450 DISMANTAL LOADING AND UNLOADING TO
21 HYVA NL01AD-2451 116098.0 116171.0 73.0 0 #DIV/0! CAMP 3 TRIP TO CAMP TO CH- 4+000 TO CAMP 2 TRIP GSB LOADING
CAMP TO CH- 5+300 2 TRIP GSB UNLOADING TO 1 TRIP SOIL SHIFTING DRIN
22 HYVA NL01AD-2453 125291.0 125340.0 49.0 0 #DIV/0! EXCAVATION TO CAMP TO CAMP 2 TRIP MATERIAL SHIFTING
23 HYVA NL01AD-2450 138538.0 138538.0 0.0 100.00 138800.00 138570.23 229.76999999999 2.2977 BARSONI PLANT
24 HYVA WB73E-7711 148373.0 148552.0 179.0 0 #DIV/0! BARSONI PLANT TO CH- 9+000 DBM 2 TRIP TO AMOUR CAMP
BARSONI PLANT TO CH- 9+000 DBM 3 TRIP TO BRSONI PLANT TO PLANT MATERIAL
27 HYVA WB73E-7738 139263.0 139548.0 285.0 185.00 139514.00 139231.00 283 1.5297297297 SHIFTING
CAMP TO CH- 4+050 1 TRIP GSB UNLOADING TO CAMP TO CH- 5+300 1 TRIP GSB
28 HYVA WB73D-6518 MNW MNW 44.0 100.00 0 0 UNLOADING
CAMP TO CH- 4+050 2 TRIP GSB SHIFTING TO CAMP TO CH- 5+300 1 TRIP GSB
29 HYVA NL01AD-1675 140731.0 140824.0 93.0 0 #DIV/0! SHIFTING TO CAMP TO CH- 16+790 TO CH- 17+450 DISMANTAL LOADING AND
CAMP 3 TRIP
30 HYVA NL01AD-1677 29573.0 29573.0 0.0 237.00 29687.00 29195.00 492 2.0759493671 BARSONI PLANT
DBM PLANT TO CH- 9+610 DBM 1 TRIP TO CAMP TO CH- 5+300 1 TRIP GSB
34 HYVA NL01AD-1679 136317.0 136409.0 92.0 193.00 136317.00 135883.00 434 2.2487046632 UNLOADING
36 HYVA NL01AD-4109 122194.0 122194.0 0.0 147.00 122194.00 121855.00 339 2.306122449 BARSONI PLANT
37 HYVA WB73E7725 158446.0 158446.0 0.0 150.00 158568.00 158277.00 291 1.94 BARSONI PLANT
CAMP TO CH- 9+000 TO CAMP TO CH- 25+00 TO CAMP FOR LUNCH TO CAMP TO
38 TRUCK MAZDA WB76-4134 MNW MNW 57.0 0 #DIV/0! CH- 9+000 TO CAMP LABOR
CAMP TO CH- 13+550 DRAIN PCC 2 TRIP TO CAMP TO CH- 25+117 R/W 2ND LIFT 1
40 TRANSIT MIXER BR37GA-1342 TRIP
45 TRANSIT MIXER JH16B-3875 CAMP TO CH- 25+117 (RHS) A1 R/ WALL 2ND LIFT M-30 7.5 CUM
47 TRACTOR NO-5 1488.7 1493.5 4.8 10.00 1488.70 1479.60 9.1000000000001 1.0989010989 CAMP TO CH- 9+500 FOR COMPRESOR WORK DBM SAID
48 TRACTOR NO-2 867.0 870.0 3.0 15.00 867.00 867 0.0173010381 CAMP TO CH- 7+000 TO CAMP FOR SHUT DRAIN LABOAR WORK 2 TRIP
TACK COAT CH- 9+370 TO CH- 9+710 (LHS) TO PRIME COAT CH- 9+720 TO CH-
56 BITUMEN BROWSER WB73-7426 33.00 10360 (LHS)
59 TATA MAZIK WB 73F-0321 MNW MNW 13.0 0 #DIV/0! CAMP TO CH- 9+000 TO CAMP
66 PICKUP WB59A-3554 2086.0 2105.0 19.0 10.0 2086.0 1966.0 120 12 CAMP TO CH- 5+00 TO CAMP FOR MECHANICAL WORK
68 GENSET DG-11 MNW MNW 12.0 96.0 0 0 OFFICE AND CAMP LIGHT WORK
70 DIESEL TANKER BR37GA-4206 147930.0 148005.0 75.0 0 #DIV/0! CAMP TO PURNIA TO CAMP
72 TRACTOR HIRE BR11GH-1083 1244.3 1247.4 3.1 20.0 1244.3 1238.2 6.0999999999999 3.2786885246 CAMP TO CH- 9+500 FOR BROMING WORK
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 09-07-2024 HSD Starting Close reading
Starting Reading Close reading Total Running
Machinery No. (KM/Hrs) (KM/hrs) (KM/Hrs) HSD reading (KM/hrs) TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/hrs)
GSB CUTTING AND LOADING CH- 13+342 AND LEVLING TO CH- 25+117 RETAINING
2 EXCAVATOR EXCAVATOR-01 11440.3 11449.8 9.5 300 11440.3 11440.3 0.0262230886 WALL EXCAVATON MUD SOIL REMOVING AND 1ST LIFT BACK FILLING
6 LOADER NO-1 6189.7 6195.9 6.2 0 #DIV/0! HYVA LOADING 10MM DUST
7 HYDRA WB74AZ-9107 3342.6 3344.3 1.7 0 #DIV/0! CAMP WORK HM PLANT AND STORE WORK
8 BACKHOE LOADER WB73E-5583 11550.5 11555.6 5.1 40.00 11550.50 11550.5 0.0034630535 CAMP WORK RMC PLANT HOPER LOADING AND GSB LODING
SHUT DRAIN AND SAID SHOLDER CUTTING AND SHIFTING CH- 8+500 TO CH- 9+500
(BHS) TO SOIL CUTTING CH- 8+100 TO DAMPING CH- 8+500 LHS SPREDING TO
9 BACKHOE LOADER WB73F-6479 8612.0 8627.0 15.0 97.00 8622.00 8622 0.01125029 HYWA TO CHAN AND GSB UNLOADING CH- 2+250 (LHS) TO MARCHING CAMP TO
CH- 2+200 TO CAMP TO CH- 13+178 GSB DOZING AND CH- 13+300 DOZING TO
CAMP
ROLLING WMM 1ST CH- 05+300 TO CH- 05+450 (RHS) ROLLING EXITING GRADING
BED CH- 03+930 TO 04+070 (RHS) ROLLING SUBGRADING TOP BED CH- 02+220 TO
13 SOIL COMPECTOR N0-3 8297.4 8307.1 9.7 0 #DIV/0! 02+320 (LHS) TO ROLLING GSB 1ST BED CH- 02+220 TO CH- 2+320 (LHS) TO
MARCHING CH- 9+600 TO CH- 2+220 TO CH- 9+750
GSB DUMPING CH- 2+250 2 TRIP TO CAMP TO CH- 13+365 GSB LOADING
21 HYVA NL01AD-2451 116171.0 116234.0 63.0 168.0 116226.0 116226 691.82142857 UNLOADING CH- 13+130 6 TRIP
CAMP TO CH- 25+117 RETAING WALL AREA SOIL DUMPING IN ONE HUNDREAD
22 HYVA NL01AD-2453 125340.0 125360.0 20.0 0 #DIV/0! METAR DISTANCE 2 TRIP
27 HYVA WB73E-7738 139548.0 139550.0 2.0 0 #DIV/0! PLANT TON PLANT LOCAL TRIP 10MM 8 TRIP BARSONI PLANT
28 HYVA WB73D-6518 MNW MNW 28.0 0 #DIV/0! CAMP TO CH- 2+200 1 TRIP GSB SHIFTING
CAMP TO CH- 25+570 GSB 2 TRIP TO CAMP TO CH- 6+000 YO CAMP NO WORK DUE
29 HYVA NL01AD-1675 140824.0 140873.0 49.0 0 #DIV/0! TO EXCAVATOR BREAK DOWN
30 HYVA NL01AD-1677 29573.0 29573.0 0.0 0 #DIV/0! BARSONI PLANT
34 HYVA NL01AD-1679 136409.0 136465.0 56.0 0 #DIV/0! GSB DUMPING CH- 2+230 TO CH- 2+320 (LHS) 2 TRIP
CAMP TP CH- 25+000 TO CAMP FOR GRADE CAMP TO CH- 25+000 TO CAMP FOR
38 TRUCK MAZDA WB76-4134 MNW MNW 44.0 30.00 0 #DIV/0! LUNCH CAMP TO CH- 13+500 TO CAMP FOR STEEL SHIFT
CAMP TO CH- 13+450 TO CH- 13+465 (LHS) DRAIN PCC M-15 1.5 CUM TO CAMP TO
40 TRANSIT MIXER BR37GA-1342 CH- 25+117 E/W 2ND LIFT M-30 2.5 CUM
CAMP TO CH- 25+000 TO CAMP FOR EXCAVATOR SHIFTING TO CAMP TO CH- 6+000
46 TRAILERS WB73G 6909 20200.0 20268.0 68.0 0 #DIV/0! TO CAMP FOR EXCAVATOR SHIFTING TO CAMP TO CH- 25+000 TO CH- 13+500 FOR
EXCAVATOR SHIFTING TO CAMP
48 TRACTOR NO-2 870.0 875.0 5.0 10.00 0 #DIV/0! CAMP TO CH- 8+000 TO CAMP TO CH- 8+000 FOR SHUT DRAIN WORK
PRIME COAT CH- 9+750 TO CH- 10+000 TO TACK COAT CH- 9+710 TO CH- 10+350
56 BITUMEN BROWSER WB73-7426 25.00 (RHS)
CAMP TO CH- 9+000 TO CAMP FOR LABOR TO CAMP TO PURNIA TO CAMP TO CH-
58 CAMPER WB73F-1862 174355.0 174482.0 127.0 48.0 174335.0 174335 3631.9791667 9+000 TO CAMP FOR GARD
59 TATA MAZIK WB 73F-0321 MNW MNW 35.0 10.0 0 0 CAMP TO CH- 8+000 TO CAMP CAMPT O CH- 25+000 TO CAMP FOR SEFTY WORK
CAMP TO CH- 2+000 TO CAMP FOR STAF TO CAMP TO CH- 5+000 TO CAMP 2 TRIP
61 LMV WB73G-5439 7600.0 7702.0 102.0 0 #DIV/0! FOR STAF TO CAMP TO CH- 25+000 TO CMP FOR GARD
63 LMV WB74BQ5134 35210.0 35271.0 61.0 54.0 35227.0 35227 652.35185185 BAISI TO AMOUR TO ROUTA TO AMOUR TO BAISI
68 GENSET DG-11 MNW MNW 16.0 0 #DIV/0! OFFICE AND CAMP LIGHT WORK
72 TRACTOR HIRE BR11GH-1083 1247.4 1249.2 1.8 0 #DIV/0! CAMP TO CH- 13+500 FOR STEEL SHIFTING TO CAMP TO CH- 13+000 FOR LABOR
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 10-07-2024 HSD Starting Close reading
Starting Reading Close reading Total Running
Machinery No. (KM/Hrs) (KM/hrs) (KM/Hrs) HSD reading (KM/hrs) TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/hrs)
1 PAVER 2070.6 2078.6 8.0 0 #DIV/0! DBM LAYRING TO CH- 9+710 TO 10+350 (LHS)
2 EXCAVATOR EXCAVATOR-01 11449.8 11457.8 8.0 0 #DIV/0! RAIN CUT REPARING CH- 17+600 TO CH- 19+000 RHS
6 LOADER NO-1 6195.9 6204.0 8.1 140.0 6201.0 6187.9 13.1 10.687022901 DBM PLANT HOPER LOADING WORK
CAMP WORK RMC PLANT LOADING 10MM GSB LODING CAMP TO CH- 10+000 FOR
8 BACKHOE LOADER WB73E-5583 11555.6 11559.6 4.0 0 #DIV/0! DBM STAF WORK
CAMP TO CH- 6+800 TO MARCHING RAIN CUT REPAIRE TO CH- 6+600 TO CH- 6+800
9 BACKHOE LOADER WB73F-6479 8627.0 8634.0 7.0 34.00 8627.00 8622.00 5 6.8 (RHS) CH- 3+600 DISMANTAL SPRADING AND HYVA ASB SPRADING
10 BIG TENDEM ROLLER 36.0 43.4 7.4 50.00 37.00 32.00 5 10 DBM BED ROLLER FROM CH- 9+780 TO 10+340 LHS
DBM BED ROLLING WORK FROM CH- 9+750 TO CH- 10+300 LHS STARTING
11 TENDEM ROLLER NO-4 2789.6 2796.8 7.2 0 #DIV/0! PROBLEM IDLE HAI
GSB TOP LAYER GRADING CH- 1+200 TO 1+450 RHS EXITING ROAD GRADING CH-
16 GRADER GRADER-01 4897.8 4919.5 21.7 221.00 4913.70 4893.60 20.099999999999 10.995024876 7+600 TO 7+700 RHS CH- 13+340 TO 13+450 RHS
20 HYVA NL01AD-4108 6949.0 6541.0 -408.0 0 #DIV/0! 3 TRIP DBM FROM BARSONI PLANT TO CH- 9+700 RHS
21 HYVA NL01AD-2451 116234.0 116375.0 141.0 0 #DIV/0! CAMP TO PURNIA TO KASBA PLANT TO AMOUR CAMP FOR GSB
AMOUR CAMP TO BARSONI PLANT 10MM SHIFT BARSONI PLAMT TO CH- 10+050
24 HYVA WB73E-7711 148552.0 148698.0 146.0 190.00 148586.00 148246.00 340 1.7894736842 DBM 2 TRIP
BARSONI PLANT TO AMOUR SIDE 10MM STERE 1 TRIP AMOUR SIDE TO BARSONI
27 HYVA WB73E-7738 139550.0 139884.0 334.0 0 #DIV/0! PLANT BARSONI PLANT TO BAISI SIDE DBM WORK 3 TRIP
DBM BARSONI CAMP TO CH- 9+800 2 TRIP RHS AMOUR CAMP TO BARSONI PLANT
28 HYVA WB73D-6518 MNW MNW 165.0 100.00 0 0 DOUBLING DBM
29 HYVA NL01AD-1675 140873.0 141030.0 157.0 198.00 140873.00 140579.00 294 1.4848484848 BARSONI CAMP TO CH- 10+000 DBM 2 TRIP AMOUR CAMP TO BARSONI PLANT
BARSONI PLANT TO AMOUR CAMP TO BARSONI PLANT FOR 10MM SHIFT 3 TRIP
30 HYVA NL01AD-1677 29687.0 29931.0 244.0 0 #DIV/0! FROM BARSONI PLANT CH- 9+800 LHS
34 HYVA NL01AD-1679 136465.0 136489.0 24.0 0 #DIV/0! CAMP TO CH- 3+000 1 TRIP GSB
38 TRUCK MAZDA WB76-4134 MNW MNW 19.0 0 #DIV/0! CAMP TO CH- 6+000 TO CAMP FOR SHUT DRAIN WORK
40 TRANSIT MIXER BR37GA-1342 213.00 CAMP TO CH- 25+092 RW WALL 2ND LIFT M30 5.8M3
45 TRANSIT MIXER JH16B-3875 CAMP TO CH- 13+450 TO CH- 13+462 DRAIN RAFT CUSTING C-3.8 M-20
46 TRAILERS WB73G 6909 20268.0 20278.0 10.0 0 #DIV/0! CAMP TO CH- 18+000 TO CAMP FOR EXAVATOR SHIFT
47 TRACTOR NO-5 1493.5 1499.2 5.7 0 #DIV/0! CAMP TO CH- 10+000 TO CAMP FOR CAMP RESAR WORK DBM STAF
48 TRACTOR NO-2 875.0 877.0 2.0 0 #DIV/0! CAMP TO CH- 10+000 FOR TAWER LIGHT DBM SAIFT
CAMP TO CH- 25+000 TO CAMP FOR GRADE CAMP TO CH- 9+000 TO CAMP FOR
MARCHING CAMP TO PURNIA TO CAMP FOR PART PURCHASH CAMP TO CH-
58 CAMPER WB73F-1862 174482.0 174696.0 214.0 0 #DIV/0! 10+000 TO CAMP FOR DBM STAF CAMP TO BARSONI TO CAMP FOR MARCHING
CAMP TO CH- 20+000 TO CAMP
59 TATA MAZIK WB 73F-0321 MNW MNW 44.0 0 #DIV/0! CAMP TO CH- 4+728 TO CAMP CAMP TO CH- 10+100 TO CAMP 2 TRIP
68 GENSET DG-11 MNW MNW 9.0 86.0 0 0 OFFICE AND CAMP LIGHT WORK
70 DIESEL TANKER BR37GA-4206 148005.0 148074.0 69.0 0 #DIV/0! CAMP TO BARSONI TO CAMP
72 TRACTOR HIRE BR11GH-1083 1249.2 1251.8 2.6 0 #DIV/0! CAMP TO CH- 10+000 FOR BARSONI WORK DBN SIFT
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 11-07-2024 HSD Starting Close reading
Starting Reading Close reading Total Running
Machinery No. (KM/Hrs) (KM/hrs) (KM/Hrs) HSD reading (KM/hrs) TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/hrs)
CH- 18+990 TO CH- 19+070 CH- 18+100 TO CH- 16+940 RAIN CUTT SHOLDER AND
2 EXCAVATOR EXCAVATOR-01 11457.8 11470.0 12.2 250 11460.1 11440.0 20.1 12.437810945 ROAD REMOVING TO CAMP WORK GSB HIPING
6 LOADER NO-1 6204.0 6204.0 0.0 121.0 6212.0 6201.0 11 11 DBM PLANT HOPER LOADING WORK
7 HYDRA WB74AZ-9107 3344.3 3345.1 0.8 0 #DIV/0! CAMP WORK HM PLANT WORK
CAMP WORK GSB RMC PLANT LOADING CAMP TO CH- 13+500 FOR DRAIN
8 BACKHOE LOADER WB73E-5583 11559.6 11566.8 7.2 0 #DIV/0! CUTTING CAMP TO CH- 13+200 DISMANTAL LOADING AND FELLING
SOIL CLEANING SUBGRAD TOP CH- 1+140 TO CH- 1+200 (RHS) TO SHUTE DRAIN
9 BACKHOE LOADER WB73F-6479 8634.0 8643.0 9.0 41.00 8635.00 8627.00 8 5.125 CUTTING SHOLDER MAKING CH- 7+000 TO CH- 7+500 (BHS)
EXISTING ROAD ROLLING CH- 13+330 TO CH- 13+450 TO GSB TOP LAYER COMPLET
ROLLING AND SG TOP CH- 1+130 TO CH- 1+450 (RHS) TO RECTIFICATION ROLLING
13 SOIL COMPECTOR N0-3 8308.6 8316.5 7.9 179.00 8308.60 8283.40 25.200000000001 7.1031746032 CH- 10+600 TO CH- 10+930 (BHS) TO MARCHING TO CAMP TO CH- 1+100 TO CH-
10+400
SG TOP GRADING AND GSB TOP GRADING CH- 1+130 TO CH- 1+200 (RHS) TO
16 GRADER GRADER-01 4919.5 4929.1 9.6 0 #DIV/0! RECTIFICATION CH- 10+600 TO CH- 10+930 (RHS) TO CH- 10+100 TO CH- 13+100 BT
DISMANTAL GRADING CH- 13+130 TO CH- 13+180
20 HYVA NL01AD-4108 6541.0 6541.0 0.0 80.0 6541.0 6356.0 185 2.3125 IDLE
21 HYVA NL01AD-2451 116375.0 116405.0 30.0 0 #DIV/0! CAMP TO CH- 1+200 1 TRIP GSB SHIFTING
22 HYVA NL01AD-2453 125360.0 125373.0 13.0 0 #DIV/0! CAMP TO CH- 13+000 BT DISMANTAL WORK TO CAMP
23 HYVA NL01AD-2450 139048.0 139048.0 0.0 100.00 139048.00 138800.00 248 2.48 IDLE
24 HYVA WB73E-7711 148698.0 148699.0 1.0 0 #DIV/0! CAMP TO WORK MATERIAL SHIFT
27 HYVA WB73E-7738 139548.0 139884.8 336.8 0 #DIV/0! PLANT TO PLANT MATERIAR SEEPTING 10MM DUST 3 TRIP
31 HYVA NL01AD-1678 129888.0 129906.0 18.0 0 #DIV/0! CAMP TO CH- 4+000 TO CAMP FOR GSB 1 TRIP
34 HYVA NL01AD-1679 136489.0 136519.0 30.0 0 #DIV/0! GSB DUMPING CH- 1+150 (RHS) 1 TRIP
CAMP TO CH- 25+000 TO CH 13+000 TO CH- 14+000 CH- 13+000 TO CAMP FOR
38 TRUCK MAZDA WB76-4134 MNW MNW 43.0 0 #DIV/0! PLATE SHIFTING TO CAMP TO CH- 7+000 TO CAMP FOR LUNCH
45 TRANSIT MIXER JH16B-3875 CAMP TO CH- 13+550 (LHS) DRAIN RAFT M-20 4.8 CUM
46 TRAILERS WB73G 6909 20278.0 20286.0 8.0 0 #DIV/0! CAMP TO CH- 19+000 TO CAMP FOR EXCAVATOR SHIFTING
CAMP TO CH- 10+000 TO CAMP 2 TRIP FOR MECHANICAL WORK TO CAMP TO BAISI
58 CAMPER WB73F-1862 174696.0 174865.0 169.0 0 #DIV/0! TO CAMP FOR PARSAL TO CAMP TO PURNIA TO CAMP TO AMOUR
59 TATA MAZIK WB 73F-0321 MNW MNW 26.0 0 #DIV/0! CAMP TO CH- 10+400 TO CAMP TO CH- 8+115 TO CAMP
CAMP TO CH- 25+000 TO CAMP FOR LUNCH TO CAMP TO CH- 8+000 TO CAMP FOR
66 PICKUP WB59A-3554 2187.0 2221.0 34.0 0 #DIV/0! MECHANICAL WORK
68 GENSET DG-11 MNW MNW 7.0 81.0 0 0 OFFICE AND CAMP LIGHT WORK
70 DIESEL TANKER BR37GA-4206 148074.0 148147.0 73.0 38.0 148103.0 147826.0 277 7.2894736842 CAMP TO BARSONI TO CAMP
AMOUR CAMP TO CH- 7+000 TO CH- 6+000 TO CH- 1+500 TO CH- 7+000 TO SITE TO
73 BIKE BR39AC-9496 44593.0 44631.0 38.0 5.0 44593.0 44593 0.0001121252 SITE TO CAMP TO CH- 14+000 UP AND DOWN
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 12-07-2024 HSD Starting Close reading
Starting Reading Close reading Total Running
Machinery No. (KM/Hrs) (KM/hrs) (KM/Hrs) HSD reading (KM/hrs) TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/hrs)
1 PAVER 2078.6 2085.0 6.4 0 #DIV/0! DBM LAYING TO CH- 9+770 TO 10+200 (RHS)
2 EXCAVATOR EXCAVATOR-01 11470.0 11475.6 5.6 0 #DIV/0! CAMP WORK 10MM GSB LOADING 20MM GSB LOADING
6 LOADER NO-1 6204.0 6204.0 0.0 43.0 6215.7 6212.0 3.6999999999998 11.621621622
8 BACKHOE LOADER WB73E-5583 11566.8 11568.8 2.0 79.00 11566.80 11550.50 16.299999999999 4.8466257669 CAMP WORK RMC PLANT GSB LOADING AND OTHER WORK
SHOULDING MAKING CHUT DRAIN CUTTING CH- 64+500 TO 7+000 BS CH- 10+400
9 BACKHOE LOADER WB73F-6479 8643.0 8652.0 9.0 76.00 8649.00 8635.00 14 5.4285714286 TO 10+900 BS DBM EDGE CUTTING CH- 9+770 RHS REMP MAKING CH- 0+190 LHS
PECH WORK CH- 4+375
10 BIG TENDEM ROLLER 43.4 49.5 6.1 100.00 45.03 37.00 8.03 12.453300125 DBM BED ROLLING CH- 9+750 TO 10+300
11 TENDEM ROLLER NO-4 2796.8 2800.8 4.0 63.00 2796.80 2785.30 11.5 5.4782608696 DBM BED CH- 9+750 TO CH- 10+300
RECTIFICATION CH- 10+440TO 11+100 RHS GSB TOP ROLLING CH- 3+945 TO 4+070
13 SOIL COMPECTOR N0-3 8316.5 8322.1 5.6 0 #DIV/0! RHS
RECTIFICATION CH- 10+440 TO 11+000 BHS GSB TOP GRADING CH- 3+945 TO 4+070
16 GRADER GRADER-01 4929.1 4934.6 5.5 186.00 4929.10 4913.70 15.400000000001 12.077922078 RHS
AMOUR TO BARSONI PLANT 01 TRIP 10MM DBM WORK 01 TRIP BARSONI PLANT
19 HYVA NL01AD-4106 111987.0 112080.0 93.0 0 #DIV/0! TO BAISI SIDE
21 HYVA NL01AD-2451 116405.0 116461.0 56.0 0 #DIV/0! GSB DUMPING FOR RAMP CH- 0+190 LHS CAMP TO CH- 4+000 1 TRIP GSB
24 HYVA WB73E-7711 148699.0 148810.0 111.0 0 #DIV/0! BARSONI PLANT TO CH- 9+800 DBM 2 TRIP
27 HYVA WB73E-7738 139884.8 139902.0 17.2 190.00 139841.00 139514.00 327 1.7210526316 BARSONI PLANT TO CH- 9+900 DBM 2 TRIP CH- 9+900 TO CAMP
2 TRIP DBM FROM BARSONI PLANT TO CH- 10+000 RHS CH- 10+000 AMOUR CAMP
28 HYVA WB73D-6518 MNW MNW 130.0 100.00 0 0 TO BARSONI PLANT
29 HYVA NL01AD-1675 141030.0 141148.0 118.0 0 #DIV/0! DBM 2 TRIP FROM BARSONI PLANT TO CH- 9+900 RHS
30 HYVA NL01AD-1677 29931.0 29984.0 53.0 0 #DIV/0! 1 TRIP DBM FROM BARSONI PLANT TO CH- 9+900 RHS
35 HYVA NL01AD-4110 112016.0 112074.0 58.0 0 #DIV/0! DBM 1 TRIP FORM BARSONI PLANT TO CH- 9+950 RHS
AMOUR SIDE TO BARSONI PLANT 10MM 1 TRIP DBM WORK HS MEHTA PLANT
36 HYVA NL01AD-4109 122508.0 122602.0 94.0 0 #DIV/0! BARSONI TO BAISI SIDE 1 TRIP
37 HYVA WB73E7725 158867.0 158990.0 123.0 150.00 158867.00 158568.00 299 1.9933333333 BARSONI PLANT TO CH- 9+900 DBM 2 TRIP CH- 9+900 TO CAMP
CAMP TO CH- 6+000 TO CAMP FOR SHUT DRAIN LABAR CAMP TO CH- 4+000 TO
38 TRUCK MAZDA WB76-4134 MNW MNW 48.0 0 #DIV/0! CAMP FOR LUNCH CAMP TO CH- 17+000 TO CAMP FOR LABOUR CAMP TO CH-
15+500 TO CAMP TO SIFT
45 TRANSIT MIXER JH16B-3875 CAMP TO CH- 13+525 DRWN RAFT M20 5-100 M3
46 TRAILERS WB73G 6909 20286.0 20302.0 16.0 0 #DIV/0! CAMP TO ROUTA TO CAMP FOR BOMBO SIFT
47 TRACTOR NO-5 1499.2 1505.5 6.3 10.00 1499.20 1493.50 5.7 1.7543859649 CAMP TO CH- 9+700 TO CH- 10+200 FOR COMPRESER WORK DBM SIFT
CAMP TO CH- 25+710 TO CAMP FOR STEEL SHIFT CAMP TO CH- 10+000 TO CAMP
48 TRACTOR NO-2 877.0 881.0 4.0 10.00 877.00 870.00 7 1.4285714286 FOR TAWER LIGHT WORK DBM SAID
PRINE COAT CH- 9+710 TO 10+350 RHS PRINE COAT CH- 10+440 TO 10+960 RHS
56 BITUMEN BROWSER WB73-7426 ROCK COAL TO CH- 9+710 TO 9+710 TO 9+200 RHS TOTAL RANING 5 HOURS
CAMP TO CH- 25+100 TO CAMP GRADE SIFT CAMP TO AMOUR TO CAMP CAMP TO
58 CAMPER WB73F-1862 174865.0 175069.0 204.0 39.0 174865.0 174335.0 530 13.58974359 PURNIA TO LABUR CART TO CASBA SUMO PUMP TO BAISI TO CH- 10+200 PARSAL
TO CH- 3+400 TO CAMP STAF STIFTING CAMP TO CH- 25+100 GARD SIFT TO CAMP
59 TATA MAZIK WB 73F-0321 MNW MNW 20.0 10.0 0 0 CAMP TO CH- 90+200 TO CAMP CAMP TO CH- 10+100 TO CAMP
63 LMV WB74BQ5134 35352.0 35473.0 121.0 0 #DIV/0! BAISI TO PURNIA TO AMOUR TO BAISI
CAMP TO CH- 20+000 TO CAMP FOR CAMP CAMP TO AMOUR TO CAMP CAMP TO
66 PICKUP WB59A-3554 2221.0 2267.0 46.0 0 #DIV/0! CH- 10+000 TO CAMP 2 TRIP FOR MARCHING 2 HOURS SELF STARTING PROBLEM
68 GENSET DG-11 MNW MNW 8.0 0 #DIV/0! OFFICE AND CAMP LIGHT WORK
70 DIESEL TANKER BR37GA-4206 148147.0 148215.0 68.0 0 #DIV/0! CAMP TO BARSONI TO CAMP
72 TRACTOR HIRE BR11GH-1083 1251.8 1253.9 2.1 15.0 1251.8 1247.7 4.0999999999999 3.6585365854 CAMP TO CH- 9+000 TO CH- 10+200 FOR BROMING WORK DBM SITE
73 BIKE BR39AC-9496 44631.0 44663.0 32.0 0 #DIV/0! CAMP TO CH- 6+000 TO 7+000 AND SITE TO SITE TO CAMP
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 13-07-2024 HSD Starting Close reading
Starting Reading Close reading Total Running
Machinery No. (KM/Hrs) (KM/hrs) (KM/Hrs) HSD reading (KM/hrs) TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/hrs)
1 PAVER 2085.0 2089.0 4.0 0 #DIV/0! DBM LOADING TO CH- 10+200 TO 10+370 RHS TO 10+440 TO 10+470 RHS
4 EXCAVATOR EXCAVATOR-03 5052.2 5054.0 1.8 0 #DIV/0! BAHADURGANJ CAMP TO CH- 25+000 SHIFT FOR DIVISION WORK
7 HYDRA WB74AZ-9107 3345.4 3350.7 5.3 0 #DIV/0! CAMP TO CH- 25+000 TO CAMP FOR DG LOADING AND UNLOADING
8 BACKHOE LOADER WB73E-5583 11568.8 11571.9 3.1 0 #DIV/0! CAMP WORK GSB LOADING DBM PLANT WORK
10 BIG TENDEM ROLLER 49.5 53.0 3.5 0 #DIV/0! DBM ROLLING WORK DRAIN TO CH- 10+200 TO 10+380 TO 10+440 TO 10+490 RHS
WMM 1ST LAYER ROLLING CH- 1+130 TO 1+470 RHS CH- 1+350 TO 1+470 LHS
13 SOIL COMPECTOR N0-3 8322.1 8328.2 6.1 0 #DIV/0! MARCHING CH- 4+000 TO 1+100 TO CAMP
16 GRADER GRADER-01 4934.6 4940.1 5.5 0 #DIV/0! WMM 1ST LAYER GRADING CH- 1+130 TO 1+480 RHS CH- 1+350 TO 1+480 LHS
17 GRADER GRADER-02 9294.5 9300.0 5.5 0 #DIV/0! WMM TO SIDE SHOULDER CLEANING RS SAID GRADING CH- 18+300 TO 19+300 BS
19 HYVA NL01AD-4106 112080.0 112177.0 97.0 0 #DIV/0! BARSONI PLANT TO PURNIA SIDE MIX MATERLS 02 TRIP
20 HYVA NL01AD-4108 6541.0 6600.0 59.0 0 #DIV/0! CAMP TO CH- 1+300 2 TRIP GSB UNLOADING
22 HYVA NL01AD-2453 125373.0 125430.0 57.0 262.00 125402.00 124919.00 483 1.8435114504 AMOUR CAMP TO CH- 1+480 GSB UNLOADING 2 TRIP
23 HYVA NL01AD-2450 139107.0 139250.0 143.0 0 #DIV/0! DBM WORK 01 TTRIP BARSONI PLANT TO PURNIYA SIDE (02 TRIP) LOCAL (02 TRIP )
BARSONI PLANT TO AMOUR SIDE AMOUR TO BARASONI PLANT 10MM 1 TRIP DBM
24 HYVA WB73E-7711 148810.0 148932.0 122.0 0 #DIV/0! 1 TRIP FORM BARSONI PLANT TO 10+350
BARSONI PLANT TO CH- 10+400 DBM 1 TRIP AMOUR SIDE TO BARSONI PLANT
27 HYVA WB73E-7738 139902.0 139965.0 63.0 0 #DIV/0! 10MM STONE 01 TRIP
AMOUR SIDE TO BARSONI PLANT 01 TRIP 10MM SIDE 1 TRIP DBM FROM BARSONI
28 HYVA WB73D-6518 MNW MNW 64.0 0 #DIV/0! PLANT TO CH- 10+460 RHS
DBM 1 TTRIP FROM BARSONI PLANT TO CH- 10+300 RHS CH- 10+000 TO AMOUR
29 HYVA NL01AD-1675 141148.0 141206.0 58.0 0 #DIV/0! CAMP CAMP TO CH- 26+000 FOR GSB ROAD REPARING WORK
BARSONI PLANT TO AMOUR SIDE AMOUR SIDE TO BARSONI PLANT 10MM 2/2 (01
30 HYVA NL01AD-1677 29984.0 30130.0 146.0 0 #DIV/0! TRIP) 1 TRIP DBM FROM BARSONI PLANT CH- 10+200 RHS
31 HYVA NL01AD-1678 129906.0 129966.7 60.7 60.00 129937.00 129820.70 116.3 1.9383333333 CAMP TO CH- 1+200 2 TRIP GSB SHIFTING
34 HYVA NL01AD-1679 136519.0 136579.0 60.0 0 #DIV/0! GSB DUMPING CH- 1+130 RHS 1 TRIP TO CH- 1+140 LHS 1 TRIP
DBM 1 TRIP BARSONI PLANT CH- 10+300 RHS BARSONI PLANT TO PURNIA SIDE 2
35 HYVA NL01AD-4110 112074.0 112210.0 136.0 240.00 112142.00 111615.00 527 2.1958333333 TRIP BARSONI TO AMOUR SIDE TO BARSONI PLANT 1 TRIP TO AMOUR
36 HYVA NL01AD-4109 122602.0 122637.0 35.0 0 #DIV/0! DBM WORK BARSONI CAMP TO CH- 10+300 DBM 1 TRIP
CAMP TO CH- 13+200 TO CAMP FOR BORAL SHIFT CAMP TO CH- 25+000 TO CAMP
38 TRUCK MAZDA WB76-4134 MNW MNW 25.0 0 #DIV/0! FOR LUNCH
47 TRACTOR NO-5 1505.5 1508.0 2.5 15.00 1505.50 1499.20 6.3 2.380952381 CAMP TOCH- 10+000 FOR COMPRESER WORK DBM SAIDE
48 TRACTOR NO-2 881.0 883.0 2.0 0 #DIV/0! CAMP TO CH- 10+00 TO CAMP FOR TAWER LIGHT SHIFT
56 BITUMEN BROWSER WB73-7426 80.00 TACK COAT TO CH- 10+200 TO 10+350 RHS TO CH- 10440TO 10+470
CAMP TO PURNIA TO CAMP FOR BELING CAMP TO BASHAI TO CAMP FOR DBM
61 LMV WB73G-5439 8070.0 8205.0 135.0 0 #DIV/0! SHIFT
63 LMV WB74BQ5134 35473.0 35580.0 107.0 0 #DIV/0! BAISI TO PURNIA TO AMOUR TO BAISI
CAMP TO CH- 10+000 TO CAMP FOR MARCHING CAMP TO CH- 1+000 TO CAMP
66 PICKUP WB59A-3554 2267.0 2371.0 104.0 10.0 2306.0 2140.0 166 16.6 FOR LUNCH CAMP TO BARSONI TO CAMP FOR TRYE FETING
68 GENSET DG-11 MNW MNW 9.0 87.0 0 0 OFFICE AND CAMP LIGHT WORK
72 TRACTOR HIRE BR11GH-1083 1253.9 1255.7 1.8 0 #DIV/0! CAMP TO CH- 10+000 FOR BREANING WORK DBM SAID
73 BIKE BR39AC-9496 44663.0 44668.4 5.4 0 #DIV/0! AMOUR CAMP TO CH- 8+500 TO SIDE TO SIDE TO CAMP
KAMAC ENGINEER'S PVT LTD
Construction of SH-99 BAYSI DIGHALBANK PROJECT (JV)-(ADB)
Date- 14-07-2024 HSD Starting Close reading
Starting Reading Close reading Total Running
Machinery No. (KM/Hrs) (KM/hrs) (KM/Hrs) HSD reading (KM/hrs) TOTAL (KM/hrs) AVG. Work Description
Sr. No CAMPER (KM/hrs)
2 EXCAVATOR EXCAVATOR-01 11475.6 11477.4 1.8 250 11476.4 11460.1 16.299999999999 15.337423313 CAMP WORK GSB LOADING AND LOADING
CH- 25+241 REFING WALL EXCAVATION HYVA LOADING FIFTION TRIP AND WATER
4 EXCAVATOR EXCAVATOR-03 5054.0 5062.8 8.8 237.0 5054.6 5043.0 11.6 20.431034483 REMOVING WORK CAMP WORK PREE CAST DRAIN LOADING
6 LOADER NO-1 6204.0 6204.0 0.0 170.0 6231.0 6215.7 15.3 11.111111111
CAMP WORK DG SHIFT CAMP TO CH- 16+000 TO CAMP FOR TYRE CAMP TO CH-
7 HYDRA WB74AZ-9107 3350.7 3359.6 8.9 32.0 3350.7 3334.6 16.1 1.9875776398 1+200 FOR PREE CAST UNLOADING CH- 1+200 TO CAMP
CAMP EORK RMC PLANT LOADING HM PLANT WORK AND CAMP TO CH- 16+400
8 BACKHOE LOADER WB73E-5583 11571.9 11579.0 7.1 0 #DIV/0! ROOT REMOVING WORK CAMP TO AMOUR RIVER KACHRA SHIFT
TREE REMOVAL AT CH- 1+150 RHS FILLING GSB TREE ROOT REMOVAL HOLE TO CH-
9 BACKHOE LOADER WB73F-6479 8663.0 8672.0 9.0 70.00 8663.00 8649.00 14 5 1+150 RHS SO LOADING 4 TRIP TO CH- 4+450 RAIN CUT REPAIRING FROM CH-
19+450 TO 19+600 LHS
ROLLING ON 10MM 1ST BED CH-01+140 TO 1+370 LHS CH- 1+140 TO 1+370 RHS
12 SOIL COMPECTOR N0-1 6059.9 6062.2 2.3 0 #DIV/0! ROLLING ON SOIL EMB BED CH- 4+070 TO CH- 4+170 RHS
13 SOIL COMPECTOR N0-3 8328.2 8328.9 0.7 0 #DIV/0! CAMP TO CH- 17+100 TO CAMP
GRADING MAKING WMM 1ST LAYER CH- 1+050 TO 1+370 L/S SOIL SPREADING TOP
16 GRADER GRADER-01 4940.1 4945.6 5.5 189.00 4944.10 4929.10 15 12.6 CH- 4+070 TO 4+180 L/S
SH TOP GRADING CH- 18+360 TO 18+560 L/S SG GRADING CH- 18+580 TO 18+700
17 GRADER GRADER-02 9300.0 9309.3 9.3 163.0 9300.0 9286.0 14 11.642857143 L/S PAT HOLE GSB GRADING CH- 20+000 TO 26+300
19 HYVA NL01AD-4106 112177.0 112179.0 2.0 154.0 112179.0 111858.0 321 2.0844155844 BARSONI PLANT TO BARSONI LOCAL TRIP 04 TMP DUST 03 TRIP 3/4 01 TRIP
CAMP TO CH- 1+150 1 TRIP GSB DUMPING SOM SHIFTING FROM CH- 4+450 TO
20 HYVA NL01AD-4108 6600.0 6654.0 54.0 0 #DIV/0! 4+100 4 TRIP
CAMP TO CH- 25+241 REFING WALL EXCAVATION SOIL SHIFTING IN 200 METER
21 HYVA NL01AD-2451 116461.0 116483.0 50.0 0 #DIV/0! DISTENC TOTAL (06 TRIP)
CAMP TO CH- 25+241 REFING WALL EXCAVATION SOIL SHIFTING IN 200 METER
22 HYVA NL01AD-2453 125430.0 125453.0 23.0 0 #DIV/0! TOTAL (09 TRIP)
23 HYVA NL01AD-2450 139250.0 139250.0 0.0 100.00 139250.00 139048.00 202 2.02 IDLE
24 HYVA WB73E-7711 148932.0 148933.0 1.0 0 #DIV/0! BARSONI PLANT LOCAL TRIP DUST 2 TRIP 3/4 1 RIP TOTAL 03 TRIP
27 HYVA WB73E-7738 139548.0 139966.0 418.0 0 #DIV/0! PLANT TO PLANT BARSONI LOCAL TRIP 04 TRIP
28 HYVA WB73D-6518 MNW MNW 2.0 100.00 0 0 BARSONI PLANT LOCAL TRIP DUST STORE 3/4 STORE 03 TRIP
34 HYVA NL01AD-1679 136579.0 136597.0 18.0 0 #DIV/0! GSB PATHOLWORK CH- 20+000 TO 24+000
35 HYVA NL01AD-4110 112210.0 112211.0 1.0 0 #DIV/0! BARSONI PLANT LOCAL TRIP DUST 04 TRIP
37 HYVA WB73E7725 158990.0 159090.0 100.0 150.00 159090.00 158867.00 223 1.4866666667 IDLE
CAMP TO CH- 13+500 DRAIN WALL M20 5.1 M3 CAMP TO CH- 13+462 DRAIN RAFT
40 TRANSIT MIXER BR37GA-1342 M20 3.6 M3
CAMP TO CH- 25+241 TO 13+470 DRAIN RAFT 405 M3 CAMP TO CH- 13+550
45 TRANSIT MIXER JH16B-3875 DRAIN WALL 1M3
CAMP TO CH- 25+000 TO CAMP FOR EXA SHIFT CAMP TO BAISI TO CAMP 2 TRIP
46 TRAILERS WB73G 6909 20302.0 20386.0 84.0 100.00 20302.00 19985.00 317 3.17 PREE CAST DRAIN SHIFT
60 LMV WB74AH-9539 414878.0 414907.0 29.0 0 #DIV/0! ROUTA TO AMOUR CAMP TO CH- 8+000 TO AMOUR TO BARSONI
61 LMV WB73G-5439 8205.0 8273.0 68.0 0 #DIV/0! CAMP TO BAISI TO CAMP 2 TRIP DBM SHIFT
63 LMV WB74BQ5134 35580.0 35663.0 83.0 0 #DIV/0! BAISI TO AMOUR TO ROUTA TO AMOUR TO ROUTA TO AMOUR TO BAISI
66 PICKUP WB59A-3554 2371.0 2386.0 15.0 0 #DIV/0! CAMP TO ROUTA TO CAMP FOR HM PLANT WORK
67 GENSET DG-33 1730.4 1732.3 1.9 143.00 1732.20 1699.35 32.85 0.2297202797 RMC PLANT WORK
68 GENSET DG-11 MNW MNW 9.0 52.0 0 0 OFFICE AND CAMP LIGHT WORK
CAMP TO CH- 25+000 TO CAMP CAMP TO CH- 3+000 TO CAMP CAMP TO BARSONI
70 DIESEL TANKER BR37GA-4206 148215.0 148326.0 111.0 0 #DIV/0! TO CAMP
72 TRACTOR HIRE BR11GH-1083 1255.7 1257.6 1.9 0 #DIV/0! CAMP TO CH- 13+500 FOR SIED SHIFT CAMP TO CH- 13+200 FOR LABAR
1 PAVER 2089.0 2095.2 6.2 200 2089 2064.5 24.5 8.1632653061 DBM LAYERING FROM CH- 10+480 TO 11+150 RHS
CH- 25+092 TO 25+117 REFAING WALL LOCAL SIDE SOIL BRECFILAY WORK AND
4 EXCAVATOR EXCAVATOR-03 5062.8 5073.7 10.9 0 #DIV/0! HYVA LOADING 11 TRIP SOIL DOZING AND TEVELING HEEL SIDE CAMP WORK
PREEART DRAIN LOADING
6 LOADER NO-1 6204.0 6204.0 0.0 60.0 6236.7 6231.0 5.6999999999998 10.526315789
CAMP TO CH- 25+000 TO CAMP FOR ELECTROINC POLE SHIFT CAMP TO CH- 1+000
7 HYDRA WB74AZ-9107 3359.6 3371.2 11.6 27.0 3359.6 3350.7 8.9000000000001 3.0337078652 TO CAMP FOR 17 HOR PREECAST DRAIN UNLOADING
CAMP TO CH- 10+000 FOR JOINT CUTING CH- 10+000 TO 7+000 TO FOR SOIL WORK
9 BACKHOE LOADER WB73F-6479 8672.0 8675.5 3.5 54.00 8673.00 8663.00 10 5.4 GSB EMC PLANT LOADING
10 BIG TENDEM ROLLER 53.0 58.8 5.8 100.00 53.10 45.30 7.8 12.820512821 DBM ROLLING WORK DORE FROM CH- 10+480 TO 11+018 RHS
11 TENDEM ROLLER NO-4 2800.8 2805.4 4.6 0 #DIV/0! DBM ROLLING WORK DORE FROM CH- 10+480 TO 11+018 RHS
ROLLING WMM BED CH- 03+300 TO 03+520 RS ROLLING WMM TOP RECTIFICATION
12 SOIL COMPECTOR N0-1 6062.2 6068.2 6.0 0 #DIV/0! BED CH- 11+200 TO 11+480 (B/S) MARCHING CH- 03+500 TO CAMP
CAMP TO CH- 18+400 TO 05+500 MARCHING ROLLING ON WMM TOP BED CH-
13 SOIL COMPECTOR N0-3 8328.9 8334.8 5.9 172.00 8331.50 8308.60 22.9 7.5109170306 5+440 TO 5+750 RS
WMM GRADING CH- 03+300 TO 03+500 (R/S) GRADING MAKING WMM TOP CH-
16 GRADER GRADER-01 4945.6 4956.0 10.4 0 #DIV/0! 05+440 TO 05+700 (R/S) WMM TOPP BED REFICATION CH- 11+200 TO 4+480 (B/S)
17 GRADER GRADER-02 9309.3 9313.7 4.4 0 #DIV/0! PAT HOLE REPIRING CH- 20+000 TO 27+000 TO CAMP
19 HYVA NL01AD-4106 112179.0 112273.0 94.0 0 #DIV/0! 2 TRIP DBM FROM BARSONI PLANT TO CH- 10+700 RHS
20 HYVA NL01AD-4108 6654.0 6783.0 129.0 0 #DIV/0! 2 TRIP DBM FROM BARSONI PLANT TO CH- 10+990 RHS
CAMP TO CH- 05+500 2 TRIP GSB SHIFTING CAMP TO CH- 25+000 FOR 1 TRIP GSB
21 HYVA NL01AD-2451 116483.0 116545.0 62.0 0 #DIV/0! ROAD REFEALING WORK
CAMP TO CH- 25+117 REFAING WALL AREA SOIL SHIFTING IN TOW HUNDRED
22 HYVA NL01AD-2453 125453.0 125478.0 112.0 0 #DIV/0! METER DISTENCE TOTAL 11 TRIP
23 HYVA NL01AD-2450 139250.0 139356.0 106.0 0 #DIV/0! BARSONI CAMP TO 10+600 DBM 2 TRIP
24 HYVA WB73E-7711 148933.0 148967.0 34.0 0 #DIV/0! BARSONI PLANT TO CH- 10+500 1 TRIP DBM LOCAL CH- 10+000 TO CAMP
27 HYVA WB73E-7738 139966.0 140084.0 118.0 0 #DIV/0! BARSONI PLANT TO CH- 9+000 2 TRIP
28 HYVA WB73D-6518 MNW MNW 128.0 0 #DIV/0! BARSONI PLANT TO CH- 10+700 TO BASI SIDE DBM WORK 02 TRIP
29 HYVA NL01AD-1675 141206.0 141271.0 65.0 0 #DIV/0! CAMP TO CH- 5+500 2 TRIP GSB CAMP TO CH- 26+000 TO CAMP 1 TRIP GSB
30 HYVA NL01AD-1677 30130.0 30245.0 115.0 237.00 30161.00 29687.00 474 2 DBM WORK 02 TRIP BARSONI PLANT TO BAISI SIDE
31 HYVA NL01AD-1678 129966.0 129976.0 10.0 0 #DIV/0! CAMP TO CH- 11+200 1 TRIP GSB
34 HYVA NL01AD-1679 136597.0 136639.0 42.0 0 #DIV/0! GSB UNLOADING CH- 5+400 2 TRIP
35 HYVA NL01AD-4110 112211.0 112305.0 94.0 0 #DIV/0! BARSONI PLANT TO CH- 10+500 DBM 2 TRIP CH- 10+500 TO AMOUR CAMP
BARSONI CAMP TO CH- 10+850 DBM 2 TRIP AMOUR CAMP TO BARSONI PLANT
36 HYVA NL01AD-4109 122637.0 122765.0 128.0 177.00 122637.00 122194.00 443 2.5028248588 10MM SHIFT
37 HYVA WB73E7725 159090.0 159247.0 157.0 0 #DIV/0! BARSONI PLANT TO CH- 10+500 DBM 3 TRIP CH- 10+000 TO CAMP
CAMP TO CH- 3+000 TO CAMP FOR LABOUR CAMP TO CH- 13+500 FOR LABOUR
38 TRUCK MAZDA WB76-4134 MNW MNW 72.0 30.00 0 #DIV/0! CAMP TO CH- 3+000 TO CAMP FOR LUNCH CAMP TO CH- 25+000 TO CAMP FOR
GARL
40 TRANSIT MIXER BR37GA-1342 CAMP TO CH- 10+465 LHS DRAIN WORK M20; 6.5 M3
CAMP TO CH- 13+465 1.7M3 M20 FOR DRAIN WORK CAMP TO CH- 13+530 DRAIN
45 TRANSIT MIXER JH16B-3875 WORK M20 6.2 M3
46 TRAILERS WB73G 6909 20386.0 20448.0 62.0 0 #DIV/0! CAMP TO CH- 1+000 TO CAMP 2 TRIP PREECAST DRAIN SHIFT
47 TRACTOR NO-5 1508.0 1513.8 5.8 10.00 1508.00 1505.50 2.5 4 CAMP TO CH- 10+000 FOR COMPRESAR WORK DBM SAID
48 TRACTOR NO-2 883.0 885.0 2.0 0 #DIV/0! CAMP TO CH- 10+000 FOR TAWER LIGHT WORK DBM SAID
PRIME COAT TO CH- 11+000 TO 11+480 (RHS) TACK COAT TO CH- 10+470 TO
56 BITUMEN BROWSER WB73-7426 11+000 (RHS)
CAMP TO CH- 25+000 TO CAMP FOR GARED CAMP TO CH- 10+000 TO CAMP CAMP
58 CAMPER WB73F-1862 175425.0 175614.0 189.0 0 #DIV/0! TO CH- 25+000 TO CMAP FOR MAERCHING CAMP TO PURNIA TO CAMP CAMP TO
BAISHI TO CAMP FOR STAFF CAMP TO CH- 25+000 TO CAMP FOR GRADE
59 TATA MAZIK WB 73F-0321 MNW MNW 32.0 0 10.072727273 CAMP TO CH- 10+100 TO 20+190 TO CAMP
61 LMV WB73G-5439 8273.0 8381.0 108.0 0 #DIV/0! CAMP TO CH- 10+000 TO PURNIA TO CAMP FOR BILING
63 LMV WB74BQ5134 35663.0 35719.0 56.0 0 #DIV/0! BAISI TO AMOUR TO ROTA TO AMOUR TO BAISI
66 PICKUP WB59A-3554 2386.0 2405.0 19.0 0 #DIV/0! CAMP TO CH- 25+000 FOR LUNCH
68 GENSET DG-11 MNW MNW 0.0 81.0 0 0 OFFICE AND CAMP LIGHT WORK
70 DIESEL TANKER BR37GA-4206 148326.0 148408.0 82.0 34.0 148341.0 148103.0 238 7 CAMP TO CH- 8+000 TO CAMP CAMP TO BARSONI TO CAMP
72 TRACTOR HIRE BR11GH-1083 1257.6 1259.7 2.1 15.0 1257.6 1251.8 5.8 2.5862068966 CAMP TO CH- 10+500 FOR BROMAR WORK DBM SIDE
1 PAVER 2095.2 2097.5 2.3 0 #DIV/0! DBM LAYERING FROM CH- 11+015 TO 11+145 RHS
CAMP WORK 10MM LOADING 20MM LOADING AND CH- 24+000 FOR RAIN CUT
4 EXCAVATOR EXCAVATOR-03 5073.7 5082.2 8.5 264.0 5076.0 5054.6 21.4 12.336448598 FELING
7 HYDRA WB74AZ-9107 3371.2 3371.2 0.0 30.0 3371.2 3359.6 11.6 2.5862068966 IDLE
CANP TO CH- 13+490 TO 13+520 (LHS) DRAIN EXCAVATION AND SOIL DRESSING
9 BACKHOE LOADER WB73F-6479 8675.5 8685.2 9.7 0 #DIV/0! WORK AND DRAIN BACK FILLING CAMP WORK RMC PLANT LOADING CAMP TO
CH- 11+000 FOR DBM JOINT CUTING
10 BIG TENDEM ROLLER 58.8 60.5 1.7 0 #DIV/0! CH- 11+000 DBM ROLLING WORK
11 TENDEM ROLLER NO-4 2805.4 2807.0 1.6 0 #DIV/0! CH- 11+000 DBM ROLLING WORK
ROLLING WMM SPREADING BED CH- 2+940 TO 3+240 (RHS) ROLLING WMM TOP
13 SOIL COMPECTOR N0-3 8334.8 8340.6 5.8 0 #DIV/0! BED CH- 5+300 TO 05+700 (R/S)
16 GRADER GRADER-01 4956.0 4956.0 0.0 160.00 4956.00 4944.10 11.9 13.445378151
17 GRADER GRADER-02 9313.7 9319.7 6.0 159.0 9313.7 9300.0 13.700000000001 11.605839416 SG DRADING CH- 18+300 TO 18+950 RHS CH- 18+530 TO 189+650 L/S
AMOUR TO BARSONI PLANT 20MM STONE 01 TRIP BARSONI PLANT TO CH- 10+500
19 HYVA NL01AD-4106 112273.0 112367.0 94.0 0 #DIV/0! 1 TRIP DBM
20 HYVA NL01AD-4108 6783.0 6817.0 34.0 0 #DIV/0! AMOUR SIDE TO BARSONI PLANT 10MM 1/2 SRVE 01 TRIP
23 HYVA NL01AD-2450 139356.0 139356.0 0.0 0 #DIV/0! BARSONI PLANT LOCAL CARAG DUST + 30MM 03 TRIP
AMOUR SIDE TO BARSONI PLANT 10MM 2/2 (01 TRIP) BARSONI CAMP TO 11+000
24 HYVA WB73E-7711 148967.0 149058.0 91.0 225.00 148967.00 148586.00 381 1.6933333333 DBM 1 TRIP
BARSONI PLANT TO CH- 10400 1 TRIP DBM 3 TRIP TO PLANT TO PLANT METERIAL
27 HYVA WB73E-7738 140084.0 140142.0 58.0 0 #DIV/0! SHIFTING
28 HYVA WB73D-6518 MNW MNW 2.0 100.00 0 0 BARSONI PLANT LOCAL METEIAL CARGE (4 TRIP) DUST 40MM
HYVA WB73D-6519 190845.0 190954.0 109.0 RANIGAN CAMP TO BARSONI PLANT TO AMOUR CAMP
HYVA NL01AD-1676 8709.0 8788.0 79.0 RANIGAN SIDE TO KUSBA TO AMOUR CAMP
35 HYVA NL01AD-4110 112305.0 112403.0 98.0 0 #DIV/0! AMOUR SIDE TO BARSONI PLANT 10MM 01 TRIP DBM WORK 01 TRIP
36 HYVA NL01AD-4109 122765.0 122802.0 37.0 0 #DIV/0! AMOUR SIDE TO BARSONI PLANT 10MM 1/2 STONE 01 TRIP
37 HYVA WB73E7725 159247.0 159277.0 30.0 0 #DIV/0! AMOUR SIDE TO BARSONI PLANT 10MM 1/2 01 TRIP
38 TRUCK MAZDA WB76-4134 MNW MNW 27.0 0 #DIV/0! CAMP TO AMOUR TO CAMP 2 TRIP CAMP TO CH- 5+000 TO CAMP FOR GRED
CAMP TO CH- 13+470 (LHS) DRAIN WALL M20,5M3 CAMP TO CH- 13+540 (LHS)
40 TRANSIT MIXER BR37GA-1342 DRAIN WALL M20 6M3
CAMP TO CH- 25+104 R/W WALL 3RD LIFT M30, 6.9M3 CAMP TO CH- 13+470
45 TRANSIT MIXER JH16B-3875 DRAIN WALL M20, 2.2 M3 CAMP TO CH- 13+490 TO 52+000 DRAIN PCC M15 2.5M3
47 TRACTOR NO-5 1513.8 1518.5 4.7 10.00 1513.80 1508.00 5.8 1.724137931 CAMP TO CH- 11+000 FOR COMPRESAR WORK DBM SAID
48 TRACTOR NO-2 885.0 887.0 2.0 15.00 885.00 877.00 8 1.875 CAMP TO CH- 11+000 FOR TAWER LIGHT DBM SIDE
PRIME COAT TO CH- 10+440 TO 11+000 (LHS) TACK COAT TO CH- 11+015 TO
56 BITUMEN BROWSER WB73-7426 50.00 11+145 (RHS)
CAMP TO CH- 25+100 GRADE SIDE TO CAMP CAMP TO AMOUR TO CAMP CAMP TO
58 CAMPER WB73F-1862 175614.0 175766.0 152.0 0 #DIV/0! PURNIYA TO CAMP CAMP TO CH- 25+100 TO CAMP TO AMOUR TO CAMP
CAMP TO CH- 5+000 TO CAMP FOR STAFF CAMP TO PURNIYA TO CAMP FOR
61 LMV WB73G-5439 8381.0 8512.0 131.0 31.0 8381.0 7956.0 425 13.709677419 BELING
63 LMV WB74BQ5134 35719.0 35791.0 72.0 44.0 35758.0 35227.0 531 12.068181818 BAISI TO AMOUR TO ROTA TO AMOUR TO BAISI
68 GENSET DG-11 MNW MNW 0.0 46.0 0 0 OFFICE AND CAMP LIGHT WORK
71 DIESEL TANKER BR37GA-4206 148408.0 148476.0 68.0 0 #DIV/0! CAMP TO BARSONI PLANT TO CAMP
73 TRACTOR HIRE BR11GH-1083 1259.7 1262.3 2.6 0 #DIV/0! CAMP TO CH- 11+000 FOR BRANING WORK DBM SIDE
DRAIN EXCAVATION CH- 1+100 TO 1+150 RHS CH- 1+175 TO 1+220 RHS SHOULDER
4 EXCAVATOR EXCAVATOR-03 5082.2 5088.7 6.5 0 #DIV/0! MAKING CH- 5+550 TO 5+720 LHS
7 HYDRA WB74AZ-9107 3371.2 3379.0 7.8 0 #DIV/0! CAMP TO CH- 14+000 TO CH- 19+000 FOR ELECTRIC PALE WORK 40 PALE WORK
CAMP TO CH- 14+000 TO CH- 19+000 FOR ELECTRIC PALE WORK 40 POLE WORK
9 BACKHOE LOADER WB73F-6479 8685.2 8694.0 8.8 63.00 8685.00 8673.00 12 5.25 CAMP WORK RMC PLANT LOADING
ROLLING ON WMM TOP BED CH- 05+400 TO 05+750 (L/S) CH- 05+320 TO 05+750
13 SOIL COMPECTOR N0-3 8340.6 8345.2 4.6 0 #DIV/0! (R/S)
DOZING GRADING AND MARING WMM TOP BED CH- 5+400 TO 5+750 (LHS)
17 GRADER GRADER-02 9319.7 9328.2 8.5 0 #DIV/0! MARCHING CAMP TO CH- 05+400 TO CAMP
19 HYVA NL01AD-4106 112273.0 112367.0 94.0 0 #DIV/0! BARSONI PLANT LOCAL TRIP 4 TRIP
21 HYVA NL01AD-2451 116545.0 116575.0 30.0 0 #DIV/0! SOIL REMOVING FOR DRAIN EXCAVATION CH- 1+100 TO 1+220 R/S
22 HYVA NL01AD-2453 125478.0 125509.0 31.0 0 #DIV/0! SOIL REMOVING FOR DRAIN EXCAVATION CH- 1+100 TO 1+218 R/S 4 TRIP
28 HYVA WB73D-6518 MNW MNW 2.0 0 #DIV/0! BARSONI PLANT LOCAL 3 TRIP DUST SHIFT
32 HYVA NL01AD-2452 100985.0 101025.0 40.0 0 #DIV/0! BAHADURGANJ CAMP TO AMOUR TO CAMP
33 HYVA NL01AD-2449 120780.0 120828.0 48.0 0 #DIV/0! BAHADURGANJ CAMP TO AMOUR CAMP
34 HYVA NL01AD-1679 136639.0 136659.0 20.0 0 #DIV/0! CAMP TO CH- 5+000 TO CAMP FOR KONTA CHEKING
CAMP TO CH- 13+500 TO CAMP FOR STEEL SHIFT CAMP TO CH- 25+000 TO CAMP
38 TRUCK MAZDA WB76-4134 MNW MNW 24.0 0 #DIV/0! FOR LUNCH
40 TRANSIT MIXER BR37GA-1342 CAMP TO CH- 13+486 DRAIN RAFT M20 3.6M3
45 TRANSIT MIXER JH16B-3875 CAMP TO CH- 13+510 520 DRAIN RAFT M20, 3M3
WATER TANKER (TRUCK CAMP TO AMOUR TO CAMP CAMP TO CH- 17+000 TO CAMP CAMP TO CH- 5+000
49 MOUNTED) WB73B-9095 WMM WMM 47.0 30.00 0 0 TO CAMP 2 TRIP WATER QURING
58 CAMPER WB73F-1862 175766.0 175918.0 152.0 0 #DIV/0! CAMP TO PURNIYA TO KASBA TO PURNIYA TO CAMP FOR PARSAL
59 TATA MAZIK WB 73F-0321 MNW MNW 44.0 10.0 0 11.459459459 CAMP TO CH- 8+000 TO CAMP CAMP TO CH- 01+000 TO CAMP FOR SEFTY WORK
CAMP TO CH- 25+000 TO CAMP FOR GRADE CAMP TO AMOUR TO CAMP CAMP TO
61 LMV WB73G-5439 8512.0 8601.0 89.0 0 #DIV/0! CH- 1+200 TO CAMP FOR NASIM CAMP TO BAISHI TO CAMP
68 GENSET DG-11 MNW MNW 0.0 110+63 0 #VALUE! OFFICE AND CAMP LIGHT WORK
73 TRACTOR HIRE BR11GH-1083 1262.3 1263.5 1.2 0 #DIV/0! CAMP TO CH- 13+500 2 TRIP WORK QURING
DBM LAYING FROM CH- 11+735 TO 11+400 RHS DBM LAYING FROM 10+440 TO
1 PAVER 2095.2 2103.5 8.3 0 #DIV/0! 10+730 LHS
2 EXCAVATOR EXCAVATOR-01 11477.4 11480.5 3.1 0 #DIV/0! CAMP WORK 10MM LOADING
6 LOADER NO-1 6204.0 6204.0 0.0 120.0 6257.1 6246.7 10.400000000001 11.538461538
7 HYDRA WB74AZ-9107 3379.0 3380.7 1.7 0 #DIV/0! CAMP WORK HM PLANT WORK
CAMP TO 1+100 DRAIN EXCAVATION AREA WATER REMOVING AND SOIL LEVELING
9 BACKHOE LOADER WB73F-6479 8694.0 8703.0 9.0 43.00 8694.00 8685.00 9 4.7777777778 WORK RMC PLANT LOADING WORK CAMP TO 25+092 REFAING WALL AREA SOIL
FILLING WORK AND LEVEING
10 BIG TENDEM ROLLER 60.5 67.0 6.5 0 #DIV/0! CH- 10+700 TO CH- 11+000 DBM ROLLING WORK
11 TENDEM ROLLER NO-4 2807.0 2812.1 5.1 0 #DIV/0! DBM ROLLING WORK CH- 10+400 TO 11+000
ROLLING ON WMM TOP CH- 5+300 TO 05+750 R/S CH- 5+400 TO 05+700 (L/S)
13 SOIL COMPECTOR N0-3 8345.1 8349.4 4.3 0 #DIV/0! ROLLING ON DBM CH- 06+570 TO 06+580 (B/S) ROLLING ON SUBGRADE TOP CH-
8+060 TO 08+180 (L/S)
GRADING AND SPREADING WMM TOP METERIAL CH- 2+080 TO 2+300 (R/S) CH-
17 GRADER GRADER-02 9328.2 9335.9 7.7 176.0 9328.2 9313.7 14.5 12.137931034 2+740 TO 2+940 R/S GRADING AND MAKING SHUBGRADE TOP CH- 8+060 TO
8+180 L/S
20 HYVA NL01AD-4108 6817.0 6974.0 157.0 168.0 6880.0 6541.0 339 2.0178571429 3 TRIP DBM FROM BARSONI PLANT TO CH- 10+600 LHS
DBM WORK HS METHA PLANT BARSONI TO BAISI SIDE (DBM) 02 TRIP) AMOUR
23 HYVA NL01AD-2450 139356.0 139485.0 129.0 100.00 139451.00 139250.00 201 2.01 SIDE TO BARSONI PLANT 10MM 1/2 (1 TRIP )
DBM WORK (02 TRIP) BARSONI PLANT TO AMOUR SIDE AMOUR SIDE TO BARSONI
24 HYVA WB73E-7711 149058.0 149239.0 181.0 0 #DIV/0! PLANT (01 TRIP)
27 HYVA WB73E-7738 139548.0 139548.0 0.0 229.00 140205.00 139841.00 364 1.5895196507 BARSONI
BARSONI PLANT TO CH- 11+000 2 TRIP DBM LUBER BARSONI PLANT TO AMOUR
28 HYVA WB73D-6518 MNW MNW 162.0 0 #DIV/0! CAMP
29 HYVA NL01AD-1675 141271.0 141341.0 70.0 250.00 141271.00 140873.00 398 1.592 AMOUR CAMP TO BARSONI PLANT TO AMOUR CAMP 10MM SHIFTING
30 HYVA NL01AD-1677 29573.0 29573.0 0.0 0 #DIV/0! BARSONI PLANT
HYVA WB73D-6519 190954.0 191022.0 68.0 100.00 190954.00 AMOUR CAMP TO BARSONI PLANT 10MM SHIFT
HYVA NL01AD-1676 8788.0 8852.4 64.4 150.00 8788.20 AMOUR CAMP TO BARSONI PLANT TO AMOUR CAMP 10 MM SHIFT
DBM WORK BARSONI CAMP TO 11+200 DBM 2 TRIP AMOUR SIDE TO BARSONI
35 HYVA NL01AD-4110 112403.0 112536.0 133.0 0 #DIV/0! PLANT 10MM 1/0 (01 TRIP)
36 HYVA NL01AD-4109 122802.0 122921.0 119.0 0 #DIV/0! BARSONI PLANT TO CH- 10+400 2 TRIP DBM LOADING
DBM WORK BARSONI TO BAISI SIDE 02 TRIP AMOUR SIDE TO BARSONI PLANT
37 HYVA WB73E7725 159277.0 159418.0 141.0 150.00 159384.00 159090.00 294 1.96 10MM 1/2 01 TRIP
CAMP TO CH- 1+000 TO CAMP FOR BORD SHIFT CAMP TO AMOUR TO CAMP FOR
38 TRUCK MAZDA WB76-4134 MNW MNW 79.0 0.00 #DIV/0! STEEL SHIFT CAMP TO CH- 1+000 TO CAMP FOR LUNCH CAMP TO CH- 25+000 TO
CSMP FOR GARD
40 TRANSIT MIXER BR37GA-1342 CAMP TO CH- 1+000 DRAIN PCC M15 4.5M3
CAMP TO CH- 13+490 (LHS) DRAIN WALL M20 7.1M3 CAMP TO CH- 16+000 TO
45 TRANSIT MIXER JH16B-3875 CAMP FOR WATER QURING
47 TRACTOR NO-5 1518.5 1524.7 6.2 15.00 1518.50 1513.80 4.7 3.1914893617 CAMP TO CH- 10+400 TO 11+000 FOR COMPARSAR WORK DBM SIDE
CAMP TO CH- 13+200 FOR BAMBU DHIFT CAMP TO CH- 10+000 TO CAMP FOR
48 TRACTOR NO-2 887.0 890.0 3.0 0 #DIV/0! TAWER LIGHT WORK DBM SIDE
PRIME COAT TO CH- 11+000 TO 1+480 LHS TEA COAT TO CH- 11+145 TO 1+470 RHS
56 BITUMEN BROWSER WB73-7426 10+440 TO 10+730LHS TEAK COAT TO CH- 6+600 HPC
58 CAMPER WB73F-1862 175918.0 175933.0 15.0 0 #DIV/0! CAMP TO CH- 10+000 TO CAMP FOR DBM SIDE
CAMP TO CH- 10+000 TO CAMP FOR STAFF CAMP TO PURNIYA TO CAMP FOR
61 LMV WB73G-5439 8601.0 8758.0 157.0 0 #DIV/0! BILING WORK
63 LMV WB74BQ5134 35831.0 35980.0 149.0 0 #DIV/0! BAISI TO AMOUR TO PURNIYA TO AMOUR TO BAISI
CAMP TO CH- 25+000 TO CAMP FOR GARD CAMP TO CH- 1+000 TO CAMP FOR
66 PICKUP WB59A-3554 2405.0 2450.0 45.0 10.0 2405.0 2306.0 99 9.9 MACNANIC
68 GENSET DG-11 MNW MNW 0.0 86.0 0 0 OFFICE AND CAMP LIGHT WORK
71 DIESEL TANKER BR37GA-4206 148476.0 148549.0 73.0 0 #DIV/0! CAMP TO BARSONI TO CAMP
73 TRACTOR HIRE BR11GH-1083 1263.5 1267.5 4.0 15.0 1263.5 1257.6 5.9000000000001 2.5423728814 CAMP TO CH- 10+000 TO CAMP FOR BORRING WORK DBM SIDE
1 PAVER 2103.5 2110.2 6.7 0 #DIV/0! DBM LAYING FROM 10+730 TO 11+230 LHS DONE
14+710 (RHS) DRAIN EXCAVATION WORK FOURTY METER ABD HYVA LOADING 5
2 EXCAVATOR EXCAVATOR-01 11480.5 11493.6 13.1 150 11487.8 11476.4 11.4 13.157894737 TRIP CH- 24+800 TO 25+060 SOIL RAIN CH- 1+000 REPAIRE ROOT REMOVE WORK
(BOTH SIDE)
6 LOADER NO-1 6204.0 6204.0 0.0 110.0 6267.3 6257.1 10.2 10.784313725
7 HYDRA WB74AZ-9107 3380.7 3381.4 0.7 0 #DIV/0! CAMP WORK HM PLANT WORK
CAMP TO CH- 8+000 TO CAMP FOR HYVA TOCHEN CAMP WORK HM PLANT WORK
8 BACKHOE LOADER WB73E-5583 11586.4 11592.4 6.0 0 #DIV/0! RMC PLANT LOADING MENTENCE WORK ENGINE START
CAMP TO CH- 13+178 BRIDGE DIVESION AREA BAMBOO FITING WORK AND
9 BACKHOE LOADER WB73F-6479 8703.0 8711.0 8.0 55.00 8703.00 8694.00 9 6.1111111111 13+550 (LHS) DRAIN SOIL BACK FILLING 13+452 TO 13+477 (RHS) DRAIN
EXCAVATION AND LEVLING DRESSING WORK
10 BIG TENDEM ROLLER 67.0 72.6 5.6 50.00 68.00 53.10 14.9 3.355704698 DBM ROLLING WORK CH- 11+000
11 TENDEM ROLLER NO-4 2812.1 2816.3 4.2 0 #DIV/0! DBM ROLLING WORK CH- 11+000
ROLLING ON WMM TOP BED CH- 05+320 TO 05+750 (B/S) ROLLING ON WMM TOP
13 SOIL COMPECTOR N0-3 8349.4 8355.2 5.8 171.00 8354.30 8331.50 22.799999999999 7.5 BED CH- 3+440 TO 3+520 (R/S) MARCHING CH- 05+700 TO 03+400 TO 05+700
15 TYRE ROLLER (Pneumatic) 1453.6 1454.0 0.4 0 #DIV/0! CH- 11+000 DBM ROLLING WORK
GRADING AND MAKING WMM TOP BED CH- 05+300 TO 05+400 (L/S) CH- 03+440
17 GRADER GRADER-02 9335.9 9342.5 6.6 0 #DIV/0! TO 03+520 (R/S) CLEANING SIDE SHOLDER SOIL CH- 11+000 TO 11+400 (L/S)
MARCHING 05+700 TO CAMP TO 05+700
AMOUR SIDE TO BARSONI PLANT 10MM 1/2 STONE (01 TRIP) 2 TRIP DBM FROM
20 HYVA NL01AD-4108 6974.0 7104.0 130.0 0 #DIV/0! BARSONI PLANT TO 11+100 LHS
23 HYVA NL01AD-2450 139485.0 139608.0 120.0 0 #DIV/0! NARSONI PLANT TO CH- 11+000 2 TRIP DBM LOADING
24 HYVA WB73E-7711 149239.0 149354.0 115.0 182.00 149296.00 148967.00 329 1.8076923077 BARSONI CAMP TO 11+000 DBM 2 TRIP UNLOADING
DBM WORK 02 TRIP BARSONI PLANT TO BAISI SIDE BARSONI PLANT LOCAL TRIP
27 HYVA WB73E-7738 140277.0 140396.0 119.0 0 #DIV/0! DUST 40MM 04 TRIP
AMOUR CAMP TO BARSONI PLANT 10MM SHIFT BARSONI PLANT TO CH- 11+000 1
28 HYVA WB73D-6518 MNW MNW 68.0 0 #DIV/0! TRIP DBM LOADING CH- 11+000 TO AMOUR CAMP
HYVA WB73D-6519 191022.0 191057.0 35.0 50.00 CAMP TO CH- 25+000 TO CH- 8+000 1 TRIP SOIL SHIFT
HYVA NL01AD-1676 8852.4 8871.2 18.8 14+680 TO 13+178 SOIL SHIFTING 5 TRIP
35 HYVA NL01AD-4110 112536.0 112687.0 151.0 0 #DIV/0! DBM WORK 02 TRIP BARSONI PLANT TO BAISI SIDE
36 HYVA NL01AD-4109 122921.0 123015.0 94.0 0 #DIV/0! BARSONI TO 10+800 2 TRIP DBM
37 HYVA WB73E7725 159418.0 159535.0 117.0 0 #DIV/0! DBM 2 TRIP FROM BARSONI TO CAMP CH- 11+000 LHS
38 TRUCK MAZDA WB76-4134 MNW MNW 4.0 31.00 0.00 #DIV/0! CAMP TO CH- 13+200 TO CAMP FOR SEND BAG SHIFT
40 TRANSIT MIXER BR37GA-1342 CAMP TO CH- 14+622 TO 720 DRAIN PCC M15, 3.6M3
CAMP TO CH- 14+000 TO CAMP FOR EXA SHIFT CAMP TO CH- 17+000 TO CH-
46 TRAILERS WB73G 6909 20448.0 20479.0 31.0 0 #DIV/0! 14+000 FOR BORAL SHIFT CH- 14+000 TO CH- 25+000 TO CAMP FOR EXA SHIFT
CAMP TO CH- 11+000 FOR COMPRESAR WORK DBM SIDE CH- 11+000 TO CH- 5+000
47 TRACTOR NO-5 1524.7 1528.6 3.9 15.00 1524.70 1518.50 6.2 2.4193548387 COMPRESAR WORK
CAMP TO CH- 11+000 FOR WATER QURING CAMP TO CH- 11+000 TO CAMP FOR
48 TRACTOR NO-2 890.0 894.0 4.0 10.00 890.00 885.00 5 2 TAWER LIGHT WORK DBM SIDE
PRIME COAT TO CH- 5+300 TO 5+560 (RHS) TACK COAT AT CH- 10+730 TO 11+230
56 BITUMEN BROWSER WB73-7426 40.00 (LHS)
61 LMV WB73G-5439 8758.0 8791.0 33.0 0 #DIV/0! CAMP TO CH- 25+000 TO CAMP FOR GARDE CAMP TO AMOUR TO CAMP 2 TRIP
63 LMV WB74BQ5134 35980.0 36022.0 42.0 0 #DIV/0! BISAI TO AMOUR TO ROTA TO AMOUR TO BISIE
66 PICKUP WB59A-3554 2450.0 2460.0 10.0 0 #DIV/0! CAMP TO AMOUR TO CAMP 2 TRIP CAMP TO CH- 17+000 TO CAMP
69 GENSET DG-11 MNW MNW 0.0 89.0 6782.3 6782.3 76.205617978 OFFICE AND CAMP LIGHT WORK
72 DIESEL TANKER BR37GA-4206 148549.0 148617.0 68.0 0 #DIV/0! CAMP TO BARSONI TO CAMP
74 TRACTOR HIRE BR11GH-1083 1267.5 1270.3 2.8 0 #DIV/0! CAMP TO CH- 11+000 TO CH- 5+000 FOR BRANING WORK DBM SIDE
1 PAVER 2110.2 2117.5 7.3 110 2110.2 2089 21.2 5.1886792453 DBM LAYING TO CH- 11+230 TO 11+480 (LHS) AND 5+510 TO 5+760 (RHS)
CH- 25+117 R/W EXCAVATION AND SOIL LOADING AND WATER REMOVING AND
2 EXCAVATOR EXCAVATOR-01 11493.6 11500.8 7.2 0 #DIV/0! MUD REMOVING WORK
6 LOADER NO-1 6204.0 6204.0 0.0 125.0 6267.3 6278.6 -11.3 -11.061946903
7 HYDRA WB74AZ-9107 3381.4 3381.4 0.0 21.0 3381.4 3371.2 10.2 2.0588235294 IDLE
RAM PRPAIN TO CH- 11+400 AND 5+300 DBM JOINT CUTTING TO CH- 5+760 (RHS)
8 BACKHOE LOADER WB73E-5583 11592.4 11598.0 5.6 0 #DIV/0! CAMP WORK RMC PLANT GSB LOADING CAMP TO CH- 13+200 DIVISION WORK
CAMP TO CH- 25+180 REDEING WALL AREA DUMPING SOIL DOZING AND
9 BACKHOE LOADER WB73F-6479 8711.0 8720.0 9.0 39.00 8711.00 8703.00 8 4.875 DVESSING CAMP WORK RMC PLANT LOADING AND GSB LOADING 2 HYVA CAMP
WORK RMC PLANT GSB LOADING
DBM ROLLING WORK FROM CH- 11+230 TO 11+462 LHS AND MARCHING TO CH-
10 BIG TENDEM ROLLER 72.6 78.5 5.9 0 #DIV/0! 5+700 DBM ROLLING WORK FROM CH- 5+750 TO 5+525 RHS
11 TENDEM ROLLER NO-4 2816.3 2821.1 4.8 140.00 2816.30 2796.80 19.5 7.1794871795 DBM ROLLING TO CH- 11+230 TO 11+460 (LHS) 5+310 TO 5+760 (RHS)
ROLLING ON SUBGRADING TOP BED CH- 08+040 TO 08+260 (L/S) ROLLING ON GSB
13 SOIL COMPECTOR N0-3 8355.2 8358.8 3.6 0 #DIV/0! 1ST LAYER CH 08+100 TO 08+260 (L/S)
59 TOP GRADING CH- 8+180 TO 8+240 L/S GSB 1ST GRADING CH- 8+060 TO 8+260
17 GRADER GRADER-02 9346.6 9352.8 6.2 183.0 9343.2 9328.2 15 12.2 L/S CAMP TO CH- 8+100 TO 8+150 GSB GERADING LHS TO CH- 2+320 TO 2+230 LHS
TO CH- 2+090 TO 1+900 TO CAMP
CAMP TO 25+117 R/W EXCAVATION SOIL SHIFTING 200 METER DISTENCE TOTAL
20 HYVA NL01AD-4108 7104.0 7131.0 27.0 0 #DIV/0! (09 TRIP)
BARSONI PLANT TO CH- 11+000 1 TRIP DBM BARSONI PLANT TO CH- 5+000 TO
23 HYVA NL01AD-2450 139608.0 139717.0 109.0 100.00 139675.00 139675 1396.75 AMOUR CAMP 1 TRIP DBM
DBM WORK 02 TRIP BARSONI PLANT TO BAISI SIDE BARSONI PLANT TO AMOUR
24 HYVA WB73E-7711 149354.0 149493.0 139.0 0 #DIV/0! SIDE 40MM STONE 01 TRIP
27 HYVA WB73E-7738 140396.0 140488.0 92.0 0 #DIV/0! DBM WORK BARSONI PLANT TO BAISI SIDE 2 TRIP CH- 5+000 TO AMOUR CAMP
CAMP TO CH- 25+180 TO 8+000 SOIL SHIFTING (2 TRIP ) CAMP TO CH- 8+000 TO 1
29 HYVA NL01AD-1675 141341.0 141408.0 67.0 0 #DIV/0! TRIP
30 HYVA NL01AD-1677 30730.0 30901.0 171.0 0 #DIV/0! BARSONI PLANT
34 HYVA NL01AD-1679 136659.0 136675.0 16.0 0 #DIV/0! 1 GSB SHIFTING CH- 8+000 1 TRIP
CH- 25+000 TO 08+100 2 TRIP SOIL SHIFTING SIDE TO SIDE 1 TRIP SOIL SHIFTING
HYVA NL01AD-1676 8871.2 8959.1 87.9 CAMP TO 08+200 1 TRIP GSB SHIFTING
BARSONI CAMP TO 11+400 DBM 1 TRIP BARSONI CAMP TO 5+600 DBM 1 TRIP
36 HYVA NL01AD-4109 123015.0 123146.0 131.0 162.00 123015.00 122637.00 378 2.3333333333 AMOUR CAMP TO BARSONI CAMP 10MM 1 TRIP
1 TRIP DBM BARSONI PLANT CH- 11+300 LHS BARSONI CAMP TO 5+400 DBM 2
37 HYVA WB73E7725 159535.0 159674.0 139.0 0 #DIV/0! TRIP
38 TRUCK MAZDA WB76-4134 MNW MNW 4.0 0.00 #DIV/0! CAMP TO CH- 13+500 FOR STEEL SHIFT
40 TRANSIT MIXER BR37GA-1342 CAMP TO 13+452 DRAIN RAFT M20 7.2M3 TWO TRIP
CAMP TO CH- 13+510 DRAIN WALL M20 6M3 CAMP TO CH- 25+117 REFING WALL
45 TRANSIT MIXER JH16B-3875 PCC M15, 7.5M3
CAMP TO CH- 5+000 TO CAMP FOR EXA SHIFT CAMP TO CH- 11+000 TO CH- 5+000
46 TRAILERS WB73G 6909 20479.0 20541.0 62.0 0 #DIV/0! TO CH- 11+000 TO CH- 5+000 TO CAMP FOR PARSAL TANDAM PTR SHIFT
47 TRACTOR NO-5 1528.6 1533.2 4.6 10.00 1528.60 1524.70 3.8999999999999 2.5641025641 CAMP TO CH- 11+000 TO CH- 5+000 FOR COMPREASAR WORK DBM SIDE
CAMP TO CH- 13+500 FOR STEEL SHIFT CAMP TO CH- 25+000 FOR STEEL SHIFT CH-
48 TRACTOR NO-2 894.0 900.0 6.0 15.00 898.00 890.00 8 1.875 25+000 TO BARBATA TO AMOUR FOR BORAD SHIFT CAMP TO CH- 5+000 TO CAMP
FOR TAWER LIGHT DBM SIDE
WATER TANKER (TRUCK CAMP TO BAISI TO CAMP CAMP TO CH- 3+000 TO CAMP CAMP TO BAISI TO CAMP
49 MOUNTED) WB73B-9095 WMM WMM 85.0 0 #DIV/0! FOR WATER QURING
PRIME COAT TO CH- 5+320 TO 5+760 LHS TACK COAT TO CH- 11+240 TO 1+420
56 BITUMEN BROWSER WB73-7426 30+30 5+510 TO 5+760 RHS
CAMP TO CH- 10+000 TO CAMP FOR LABUR CAMP TO PURNIYA TO CAMP FOR
58 CAMPER WB73F-1862 176095.0 176261.0 166.0 0 #DIV/0! PARSAL CAMP TO AMOUR TO CAMP FOR GRUP CUTTING MACHIN SHIFT
CAMP TO CH- 13+130 TO CAMP CAMP TO 13+130 TO CAMP CH- 13+130 TO 5+600
59 TATA MAZIK WB 73F-0321 MNW MNW 36.0 0 11.341463415 TO CAMP CAMP TO CH- 19+000 TO CAMP
60 LMV WB74AH-9539 415811.0 415811.0 0.0 41.0 415811.0 415346.0 465 11.341463415
CAMP TO CH- 25+000 TO CAMP 3 TRIP GARD AND SARVEY WORK CAMP TO CH-
61 LMV WB73G-5439 8791.0 8869.0 78.0 0 #DIV/0! 10+000 TO CAMP FOR GARD
63 LMV WB74BQ5134 36022.0 36022.0 0.0 23.0 36038.0 35758.0 280 12.173913043
CAMP TO CH- 25+000 TO CAMP 2 TRIP FOR GARD SHIFT CAMP TO AMOUR TO
66 PICKUP WB59A-3554 2460.0 2507.0 47.0 0 #DIV/0! CAMP
69 GENSET DG-11 MNW MNW #VALUE! 0 #DIV/0! OFFICE AND CAMP LIGHT WORK
72 DIESEL TANKER BR37GA-4206 148617.0 148794.0 177.0 40.0 148632.0 148341.0 291 7.275 CAMP TO CH- 5+000 TO CAMP CAMP TO BAHADURGANJ TO PURNIYA TO CAMP
74 TRACTOR HIRE BR11GH-1083 1270.3 1273.3 3.0 15.0 1270.3 1263.5 6.8 2.2058823529 CAMP TO CH- 11+000 TO CH- 5+000 FOR BROONING WORK DBM SIDE
4 EXCAVATOR EXCAVATOR-03 5088.7 5093.7 5.0 240.0 5092.7 5076.0 16.7 14.371257485 CAMP WORK GSB LOADING
7 HYDRA WB74AZ-9107 3381.4 3386.6 5.2 0 #DIV/0! CAMP TO CH- 1+000 FOR DRAIN SHIFTING AND ELECTRIC PIPE SHIFTING TO CAMP
9 BACKHOE LOADER WB73F-6479 8720.0 8726.0 6.0 42.00 8720.00 8711.00 9 4.6666666667 CAMP WORK GSB SEND 40MM RMC PLANT LOADING
17 GRADER GRADER-02 9352.8 9359.9 7.1 121.0 9352.8 9343.2 9.5999999999985 12.604166667 GRADING MARCHING WMM TOP BED CH- 03+000 TO 03+450 R/S
CAMP TO 25+067 R/W AREA RISHT SIDE SOIL DUMPING (10 TRIP) DISTENCE
20 HYVA NL01AD-4108 7131.0 7153.0 22.0 0 #DIV/0! HUNDRED METER
27 HYVA WB73E-7738 140488.0 140488.0 0.0 185.00 140488.00 140205.00 283 1.5297297297
28 HYVA WB73D-6518 164409.0 164435.0 26.0 166.00 164409.00 164409 990.41566265 CAMP TO CH- 03+100 1 TRIP GSB UNLOADING
29 HYVA NL01AD-1675 141408.0 141434.0 26.0 0 #DIV/0! CAMP TO CH- 03+100 1 TRIP GSB UNLOADING
30 HYVA NL01AD-1677 29573.0 29573.0 0.0 0 #DIV/0! BARSONI PLANT
HYVA NL01AD-1676 8959.1 8982.4 23.3 GSB SHIFTING CH- 3+000 1 TRIP
37 HYVA WB73E7725 159674.0 159674.0 0.0 100.00 159674.00 159384.00 290 2.9
CAMP TO CH- 13+476 TO 14+720 DRAIN RAFT M20, 2.5M3 CAMP TO 13+452 DRAIN
40 TRANSIT MIXER BR37GA-1342 WALL M20 6.1 M3 (2 TRIP)
CAMP TO 25+092 TO 079 R/W K 3RD LIFT M30 H 6.5 M3 CAMP TO CH- 14+710
45 TRANSIT MIXER JH16B-3875 198.00 DRAIN RAFT AND WALL M20, 7M3 CAMP TO 13+498 DRAIN RAFT M20 4M3
48 TRACTOR NO-2 900.0 902.0 2.0 0 #DIV/0! CAMP TO CH- 25+000 TO CH- 14+000 TO CAMP FOR BORAD SHIFT
WATER TANKER (TRUCK CAMP TO BAISHI TO CAMP CAMP TO CH- 4+000 TO CAMP CAMP TO AMOUR TO
49 MOUNTED) WB73B-9095 WMM WMM 80.0 50.00 748.00 748 14.96 CAMP CAMP TO CH- 3+000 TO CAMP FOR WATER QURING
59 TATA MAZIK WB 73F-0321 MNW MNW 24.0 10.0 0 #DIV/0! CAMP TO 5+600 TO CAMP CAMP TO 13+130 TO CAMP
63 LMV WB74BQ5134 36022.0 36022.0 0.0 36.0 36474.0 36038.0 436 12.111111111
CAMP TO CH- 25+000 TO CAMP FOR GARD CAMP TO CH- 25+000 TO CAMP FOR
66 PICKUP WB59A-3554 2507.0 2548.0 41.0 10.0 2507.0 2405.0 102 10.2 LUNCH CAMP TO AMOUR TO CAMP
69 GENSET DG-11 MNW MNW #VALUE! 85.0 6795.1 6795.1 79.942352941 OFFICE AND CAMP LIGHT WORK
72 DIESEL TANKER BR37GA-4206 148794.0 148900.0 106.0 0 #DIV/0! CAMP TO BAHADURGANJ TO CAMP CAMP TO JANTA CHOWK TO CAMP
CAMP TO CH- 16+000 TO CAMP 2 TRIP WATER QURING CAMP TO CH- 13+200 FOR
74 TRACTOR HIRE BR11GH-1083 1273.3 1276.1 2.8 0 #DIV/0! SEND BG SHIFT