0% found this document useful (0 votes)
23 views

Front, Toc, 1-7

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

Front, Toc, 1-7

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 127

Republic of the Philippines

TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES


1000 Ayala Boulevard cor. San Marcelino St., Ermita, Manila

COLLEGE OF ENGINEERING
Department of Civil Engineering

PCS 3
PROFESSIONALIZED COURSE SPECIALIZED 3

CONSOLIDATED
REPORT

ALONZO, ABARAHAM PAUL N.


AROMIN, RUHAMA-LYN
BECKHAM. EDEN JOYCE
MOYA, JOSHMEL
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE

BSCE – 4F

JUNE 14, 2024

ENGR. JUAN PAULO L. BERSAMINA


INSTRUCTOR
TABLE OF CONTENT
1. ARCHITECTURAL PLANS
PERSPECTIVE
VICINITY MAP
SITE DEVELOPMENT
LOCATION PLAN
FLOOR PLAN
ROOF PLAN
CEILING PLAN
ELEVATION
SECTION THRU A-A, B-B
STAIR DETAILS (PLAN VIEW, ELEVATION VIEW, STAIR STEP’S BLOW UP)
DOORS AND WINDOWS SCHEDULE

2. STRUCTURAL PLANS
GENERAL NOTES
FOUNDATION PLAN
FLOOR FRAMING PLAN
ROOF FRAMING PLAN
REINFORCEMENT FOR ISOLATED FOOTING
SCHEDULE OF FOOTING
SCHEDULE OF FOOTING TIE BEAMS
TYPICAL FOOTING DETAILS
ELEVATION OF FOOTING
SCHEDULE OF BEAMS
BEAM DETAILS
BEAM SECTION
SCHEDULE OF COLUMNS
COLUMN ELEVATION
SLAB DETAILS
SCHEDULE OF SLABS
TYPICAL SLAB ELEVATION
STAIR REINFORCEMENT DETAILS
SPOT DETAILS
TRUSS DETAILS
SPOT DETAILS
3. DESIGN CRITERIA AND SEISMIC UBC
REFERENCE CODE
MATERIAL PROPERTY
DEAD LOAD
LIVE LOAD
ROOF LIVE LOAD
SOIL BEARING CAPACITY
SEISMIC – UBC 1997
DESIGN RESPONSE SPECTRUM

4. SEISMIC IBC
SEISMIC IBC
SPECTRAL RESPONSE ACCELERATION PARAMETERS
BASE SHEAR DETERMINATION
SEISMIC BASE SHEAR
DESIGN RESPONSE SPECTRUM
SEISMIC UBC VS IBC

5. MODELING OF PROJECT
GEOMETRY
PROPERTIES
MATERIAL
SPECIFICATIONS
SUPPORTS
LOADING: REFERENCE LOAD COMBINATION
LOADING: SEISMIC DEFINITION (UBC 97)
LOADING: LOAD CASES DETAILS
LOAD COMBINATION
ANALYSIS

6. RESULT ANALYSIS
ANALYSIS RESULTS FOR FLOOR DIAPHRAGM (DRIFT CHECK)
ANALYSIS RESULTS FOR SEISMIC/EARTHQUAKE (BASE SHEAR)
ANALYSIS RESULTS FOR STORY DRIFT
ANALYSIS RESULTS FOR CENTER OF RIGIDITY
ANALYSIS RESULTS FOR STORY STIFFNESS
ANALYSIS RESULTS FOR BEAMS
ANALYSIS RESULTS FOR COLUMNS
ANALYSIS RESULTS REACTIONS AT FOOTING (ALLOWABLE)
ANALYSIS RESULTS REACTIONS AT FOOTING (FACTORED)

7. DYNAMIC ANALYSIS
STATIC BASE SHEAR
MODAL PERIOD, MODE SHAPES, AND MASS PARTICIPATION (MANUAL)
MODAL PERIOD, MODE SHAPES, AND MASS PARTICIPATION (STAAD)
SCALING FACTOR FOR X DIRECTION
SCALING FACTOR FOR Y DIRECTION

8. TIME HISTORY ANALYSIS


TIME HISTORY ANALYSIS (MANUAL)
PEAK PERIOD AND DISPLACEMENTS (MANUAL)
TIME HISTORY ANALYSIS (STAAD)

9. ELCENTRO GROUND MOTION


ELCENTRO GROUND MOTION (MANUAL)
ELCENTRO GROUND MOTION (STAAD)

10. MOMENT CURVATURE DIAGRAM OF BEAMS AND COLUMNS FOR NONLINEAR


ANALYSIS
RESPONSE 2000 BEAM
RESPONSE 2000 COLUMN
STRAIN COMPATIBILITY ANALYSIS
INTERACTION DIAGRAM

11. LOAD DEFORMATION CAPACITY OF BUILDING NONLINEAR ANALYSIS


SAP 2000 MODEL
SAP 2000 MODES
SAP 2000 HINGE BEHAVIOR
SAP 2000 MOMENT CAPACITY OF COLUMN
SAP 2000 MOMENT CAPACITY OF BEAM
SAP 2000: SHEAR CAPACITY
MANUAL COMPUTATION: WORK ENERGY THEOREM
12. MEMBER DESIGN
SLAB DESIGN
MANUAL COMPUTATION
RCDC
BEAM DESIGN
MANUAL COMPUTATION
RCDC
COLUMN DESIGN
MANUAL COMPUTATION
RCDC
FOOTING DESIGN
MANUAL COMPUTATION
STAAD FOUNDATION
TABLE OF CONTENTS
ARCHITECTURAL PLANS
1 A-1 PERSPECTIVE
2 A-2 LOCATION PLAN
3 A-3 VICINITY MAP
4 A-4 SITE DEVELOPMENT PLAN
5 A-5 GROUND FLOOR PLAN
6 A-6 SECOND TO FIFTH FLOOR PLAN
7 A-7 ROOF PLAN
8 A-8 GROUND FLOOR CEILING PLAN
9 A-9 SECOND TO FIFTH FLOOR CEILING PLAN
10-14 A-10 - A-14 DOORS AND WINDOWS SCHEDULE
15-22 A-15 - A-22 STAIR DETAILS

STRUCTURAL PLANS
23 S-1 GENERAL NOTES
24 S-2 FOUNDATION PLAN
25 S-3 FOOTING DETAILS
26 S-4 FOOTING PLAN
27 S-5 FOOTING SCHEDULE
28 S-6 SECOND TO FIFTH FLOOR FRAMING PLAN
29 S-7 ROOF BEAM FRAMING PLAN
30-33 S-8 - S-11 BEAM SECTION
34-36 S-12 - S-14 BEAM DETAILS

PERSPECTIVE VIEW 37-41 S-15 - S-19 BEAM SCHEDULE


SCALE NTS 42 S-20 COLUMN DETAILS
43-57 S-21 - S-35 COLUMN SCHEDULE
58 S-36 SLAB SCHEDULE
59 S-37 SLAB SECTION
60 S-38 TRUSS DETAIL
61 S-39 SPOT DETAIL
PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-1 1
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
PERSPECTIVE VIEW
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 1 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
N

W E

LOCATION PLAN
SCALE NTS

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-2 2
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
LOCATION PLAN
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 2 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
N

W E

VICINITY MAP
SCALE NTS

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
3
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-3
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
VICINITY MAP
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 3 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
A B C D E F G H I

98700
30050 7000 1500 60000 1500 7000 5650

24350

1
54250

2
26400

PN
3500

EXIT ENTRANCE

97°

CORAL WAY TN

SITE DEVELOPMENT PLAN


SCALE 450

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-4 4
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
SITE DEVELOPMENT PLAN
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 4 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
A B C D E F G H I
B
60000

7000 8000 9000 6000 6000 9000 8000 7000


3925 2075

1 2 3 4 5

W W W
1 1 1

1
D
1
11
10 12

5000 9

8
13
14
ENTRANCE LAUNDRY SHOP STORAGE
ELECTRICAL 7 15

SECURITY ROOM PRINTING SHOP


5
4 D
3 3
2

2 D
2 D
D
2 W
D
2 UP
D
2 FITNESS
2 7 GYM
2925

D
2

W ADMINISTRATION
1 OFFICE W
6
7000

W W
T&B MALE 9
1
4075

* D
4
W
2940

1 SNACK BAR D
4

W
24000

D D
3 6 4

3 D
4
RECREATIONAL
AREA
D
W
HEALTH CLINIC
D
KIT./PREP. W
2
RESTAURANT
3500

3
D
2 AREA 2
1165

4
STORAGE
W D
W
2 CONVENIENCE STORE 4 2
7000

D T&B FEMALE
3

A W
D
2
W W
3500

2 8 2
2925

STORAGE
W W
D D
2 3 W 2 2
D
UP 2
8

4 1
2

3
4
5
BOUTIQUE
6 16
5000

W 7 15
8 14
3 9 13 W
FRONT DESK 10 12 3
11

D
1

5 W W ENTRANCE W W W
4 5 6 5 4

5
4

3
2

GROUND FLOOR PLAN


SCALE 1:250

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
5
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-5
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
GROUND FLOOR PLAN
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 5 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
A B C D E F G H I
B
60000

7000 8000 9000 6000 6000 9000 8000 7000

2175 1800 2150 2150 2150 2150 1650 1810 1810 1650 2150 2150 2150 2150 1800 2150

W W W W W W W W W W W W
1 1 1 1 1 1 1 1 1 1 1 1

2850
W ROOM 301 ROOM 302 ROOM 303 ROOM 305 ROOM 306 ROOM 307 W
55
1 1
56 WASTE

5000
54
53

52
57
58
DISPOSAL
D D D 51 59 ROOM D D D
3 3 3 50 3 3 3

2150
49
W 48 W
2 D D D
47
D D D
2
46
4 4 4 4 4 4
45

2 D D D
UP
D D D D
2000

2 2 2 2 2 2 2

W W
ROOM 310 D D D D D
ROOM 316
1 2 2 2 2 2 1
D D D D
2150

4 4 4 4
7000

W W
1 1
D D D D
D 3 3 3 3 D
2 2
D D
4 4

ROOM 311 ROOM 312 ROOM 313 ROOM 314 ROOM 315
2023
1850

W W
2 2
24000

3
1850
2023

W W
2 2
ROOM 318 ROOM 319 ROOM 320 ROOM 321 ROOM 322
D D
4 4
D D
2 D D D D 2
7000

3 3 3 3
2150

W W
1 1

A
D D D D
4 4 4 4

W ROOM 317
D D D D D
ROOM 323 W
2 2 2 2 2
2000

1 1

D D D D
UP D D D

4
2 2 2 2 2 2 2

45
D D D D D D
2150

46 4
4 4 4 4 4
W 47 W
48
2 49
2
D D D 50 60 D D D
5000

3 3 3 3 3 3
ELECTRICAL 51

52
59

58
ROOM 53 57
2850

54 56

W 55 W
ROOM 324 ROOM 325 ROOM 326 ROOM 328 ROOM 329 ROOM 330
1 1

5 W W W W W W W W W W W W
1 1 1 1 1 1 1 1 1 1 1 1

SECOND TO FIFTH FLOOR PLAN


SCALE 1:250

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
6
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-6
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
SECOND TO FIFTH FLOOR PLAN
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 6 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
A B C D E F G H I
60000

1000 7000 8000 9000 6000 6000 9000 8000 7000

200
1000
1
0.60MM THK. (BASE METAL
THICKNESS), LONG SPAN

5000
PRE-PAINTED G.I. ROOFING
SHEETS WITH TOTAL COATED
THICKNESS 0.50MM THK.

0.60 MM THICK.
7000

(BASE METAL THICKNESS)


PRE-PAINTED ORDINARY
RIDGE ROLL
24000

3
7000

0.60 MM THICK.
(BASE METAL THICKNESS)
PREFORMED.
4 PRE-PAINTED GUTTER
WITH 12X300MM
FIBER CEMENT FASCIA
5000

BOARD

ROOF PLAN
SCALE 1:250

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
7
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-7
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
ROOF PLAN
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 7 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
A B C D E F G H I
60000

7000 8000 9000 6000 6000 9000 8000 7000


3925 2075

1
5000

2
2925
7000

4075

2940
24000

3
3500

1165
7000

3500

2925

4
5000

GROUND FLOOR CEILING PLAN


SCALE 1:250

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
8
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-8
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
GROUND FLOOR CEILING PLAN
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 8 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
A B C D E F G H I
60000

7000 8000 9000 6000 6000 9000 8000 7000

2175 1800 2150 2150 2150 2150 1650 1810 1810 1650 2150 2150 2150 2150 1800 2150

1
2850
5000

2150

2
2000
2150
7000

2023
1850
24000

3
1850
2023
7000

2150
2000

4
2150
5000

2850

SECOND TO FIFTH FLOOR CEILING PLAN


SCALE 1:250

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
9
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-9
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
SECOND TO FIFTH FLOOR CEILING PLAN
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 9 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
1883 900 900

2114

2114

2114
DOORS AND WINDOW SCHEDULE
SCALE 1:50

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-10 10
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
DOORS AND WINDOW SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 10 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
900 600 600

2114

2114

2114
DOORS AND WINDOW SCHEDULE
SCALE 1:50

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-11 11
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
DOORS AND WINDOW SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 11 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
1000 500

1500
2114

2114

400
DOORS AND WINDOW SCHEDULE
SCALE 1:50

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-12 12
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
DOORS AND WINDOW SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 12 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
4600 5600
4300

140 980 980 980 980 140 290 980 980 980 980 290 290 980 980 980 980 980 290

3300
3300

DOORS AND WINDOW SCHEDULE 3300


SCALE 1:100

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
13
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-13
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
DOORS AND WINDOW SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 13 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
5600 5300

290 980 980 980 980 980 980 290 290 980 980 980 980 980 980

3300
3300

DOORS AND WINDOW SCHEDULE


SCALE 1:100

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-14 14
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
DOORS AND WINDOW SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 14 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
4000 4000 4000

2000 2000 2000 2000 2000 2000

1800
1800

1800
11 33 55
10 12 32 34 54 56
4650

4800
4800
9 13 31 35 53 57
@300=3000

@300=3000

@300=3000
8 14 30 36 52 58
10-treads

10-treads

10-treads
7 15 29 37 51 59

3000
3000

3000
6 28 50

5 27 49

4 26 48
3 25 19 47 41

2 24 20 46 42

1 23 21 45 43

22 44

UP DN UP DN UP DN

TYPICAL DETAILS OF STAIR (GRID D-E)


SCALE 1:100

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
15
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-15
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
TYPICAL DETAILS OF STAIR
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 15 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
4000 4000
2000 2000 2000 2000

1800

1800
77 77
76 78 78
76
4800

4800
75 79 79
75

@300=3000

@300=3000
74 80

10-treads
74 80

10-treads
73 81 73 81
3000

3000
72 82
71
83
70 84
69 63 85
68 64 86
67 65
87
66
88

UP DN DN

TYPICAL DETAILS OF STAIR (GRID D-E)


SCALE 1:100

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
16
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-16
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
TYPICAL DETAILS OF STAIR
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 16 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
UP DN UP DN UP DN
22 44

1 23 21 45 43

2 24 20 46 42

@300=3000

@300=3000
@300=3000
3 25 19 47 41

10-treads

10-treads
10-treads
4 26 48

3000
3000
3000

5 27 49
6 28 50
7 15 29 37 51 59

4800
4800
4800

8 14 30 36 52 58

9 13 31 35 53 57
10 12 32 34 54 56

11 33 55

1800
1800
1800

2000 2000 2000 2000 2000 2000

4000 4000 4000

TYPICAL DETAILS OF STAIR (GRID E-F)


SCALE 1:100

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-17 17
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
TYPICAL DETAILS OF STAIR
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 17 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
UP DN DN
66 88

67 65 87
68 64 86

@300=3000
@300=3000
69 63 85

10-treads
10-treads
70 84

3000

3000
71 83

72 82

73 81 73 81

4800

4800
74 80 74 80

75 79 75 79

76 78 76 78

77 77
1800

1800
2000 2000 2000 2000

4000 4000

TYPICAL DETAILS OF STAIR (GRID E-F)


SCALE 1:100

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
18
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-18
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
TYPICAL DETAILS OF STAIR
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 18 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
4800 4800

3000 3000

3300
3300

3300
3300

3300
3300

3300
3300

3300
3300
3300

1650

600
600

TYPICAL SECTION OF STAIR (GRID D-E) TYPICAL SECTION OF STAIR (GRID E-F)
SCALE 1:150 SCALE 1:150

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-19 19
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
TYPICAL SECTION OF STAIR
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 19 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
3300

1650

STAIR ELEVATION VIEW


SCALE 1:50

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
20
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-20
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
STAIR ELEVATION VIEW
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 20 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
4800

4900

2000

12

13

14
15

16

17

18
19

20

21
4000

11

10
9

8
7

4
3

1
2000

UP
STAIR TOP VIEW
SCALE 1:50

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-21 21
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
STAIR TOP VIEW
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 21 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
300

150

SPOT DETAILS
SCALE 1:25

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: A-22 22
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
STAIR SPOT DETAILS
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 22 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
23
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-1
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
GENERAL NOTES
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 1 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
A B C D E F G H I
60000

7000 8000 9000 6000 6000 9000 8000 7000

3450 3600 3600 3600 3500 3550 3550 3450 3200

1
3450

3600

3600

3600

3500

3550

3550

3450

3200
C1 C2 C3 C4 C5 C6 C7 C8 C9

FC1 FC5 FC8 FC9


5000

FC2 4200 FC3 FC4 FC6 4200 FC7


3500 3750 3700 3550 3650 3700 3450

2
3500

3750

4200

3700

3550

3650

4200

3700

3450
C10 C11 C12 C13 C14 C15 C16 C17 C18

FC10 FC11 FC13 FC14 FC15 FC17 FC18


FC12 FC16
7000

2
4400 4400
3950 4100 4100 3950
3600 3750 3600
24000

1 1

3
3600

3950

4400

4100

3750

4100

4400

3950

3600
C19 C20 C21 C22 C23 C24 C25 C26 C27

FC19 FC23 FC27


FC20 FC22 FC24 FC26
FC21 FC25
7000

2
4200 4200
3500 3750 3700 3550 3700 3700 3450

4
3500

3750

4200

3700

3550

3700

4200

3700

3450
C28 C29 C30 C31 C32 C33 C34 C35 C36

FC28 FC36
5000

FC29 FC31 FC32 FC33 FC35


3600 3600 FC30 3600 3500 3600 3550 FC34
3450 3450 3200

5
3450

3600

3600

3600

3500

3600

3550

3450

3200
C37 C38 C39 C40 C41 C42 C43 C44 C45

FC37 FC41 FC44 FC45


FC38 FC39 FC40 FC42 FC43

FOUNDATION PLAN
SCALE 1:250

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-2 24
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
FOUNDATION PLAN
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 2 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
COLUMN LINKS
LD
#16@110 C/C (B)
675

EL. 1.5m
BOF

COLUMN LINKS
150 THK PCC
#16@110 C/C (B)

LD
150 4400

SECTION 1-1
DETAIL OF FOOTING FC25
(SCALE 1:150)
#16@110 C/C (B)

675
EL. 1.5m
BOF

150 THK PCC


#16@110 C/C (B)
150 4400

SECTION 2-2
DETAIL OF FOOTING FC25
(SCALE 1:150)

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
25
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-3
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
FOOTING DETAILS
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 3 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
#16@110 C/C (B)

#16@110 C/C (B)

1
1

4400

4400
150 THK PCC

FOOTING FC25- PLAN


(SCALE 1:150)

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
26
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-4
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
FOOTING PLAN
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 4 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF ISOLATED FOOTING
FOOTING DIMENSION FOOTING REINFORCEMENT STIRRUPS
FOOTING COLUMN FOOTING SFR REMARKS
BOTTOM TOP
NUMBERS NUMBERS TYPE STEP L B D1 D2 ALONG B ALONG L
ALONG B ALONG L ALONG B ALONG L
FC1 C1,C18,C36,C37 Pad - 3450 3450 500 - #16@115 C/C #16@115 C/C -- -- - - - -

FC2 C2,C3,C4,C38,C39,C40,C42 Pad - 3600 3600 550 - #16@110 C/C #16@130 C/C -- -- - - - -

FC5 C5,C10,C28,C41 Pad - 3500 3500 525 - #16@115 C/C #16@120 C/C -- -- - - - -

FC6 C6 Pad - 3550 3550 550 - #16@115 C/C #16@140 C/C -- -- - - - -

FC7 C7,C14,C32,C43 Pad - 3550 3550 525 - #16@110 C/C #16@130 C/C -- -- - - - -

FC8 C8,C44 Pad - 3450 3450 525 - #16@120 C/C #16@135 C/C -- -- - - - -

FC9 C9,C45 Pad - 3200 3200 475 - #16@130 C/C #16@135 C/C -- -- - - - -

FC11 C11,C29 Pad - 3750 3750 550 - #16@105 C/C #16@120 C/C -- -- - - - -

FC12 C12,C16,C30,C34 Pad - 4200 4200 650 - #16@105 C/C #16@115 C/C -- -- - - - -

FC13 C13,C17,C31,C33,C35 Pad - 3700 3700 550 - #16@105 C/C #16@115 C/C -- -- - - - -

FC15 C15 Pad - 3650 3650 550 - #16@110 C/C #16@115 C/C -- -- - - - -

FC19 C19,C27 Pad - 3600 3600 525 - #16@115 C/C #16@110 C/C -- -- - - - -

FC20 C20,C26 Pad - 3950 3950 600 - #16@115 C/C #16@115 C/C -- -- - - - -

FC21 C21,C25 Pad - 4400 4400 675 - #16@105 C/C #16@110 C/C -- -- - - - -

FC22 C22,C24 Pad - 4100 4100 625 - #16@110 C/C #16@110 C/C -- -- - - - -

FC23 C23 Pad - 3750 3750 575 - #16@120 C/C #16@120 C/C -- -- - - - -

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-5 27
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
FOOTING SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 5 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
A B C D E F G H I
60000

7000 8000 9000 6000 6000 9000 8000 7000

B1 B2 B3 B4 B5 B6 B7 B8

1 C1 C2 C3 C4 C5 C6 C7 C8 C9
5000

B44

B48

B52

B56

B60

B64

B68

B72

B76
B9 B10 B11 B12 B13 B14 B15 B16

2 C10 C11 C12 C13 C14 C15 C16 C17 C18


7000

B43

B47

B51

B55

B59

B63

B67

B71

B75
24000

B17 B18 B19 B20 B21 B22 B23 B24

3 C19 C20 C21 C22 C23 C24 C25 C26 C27


7000

B42

B46

B50

B54

B58

B62

B66

B70

B74
B25 B26 B27 B28 B29 B30 B31 B32

4 C28 C29 C30 C31 C32 C33 C34 C35 C36


5000

B41

B45

B49

B53

B57

B61

B65

B69

B73
B33 B34 B35 B36 B37 B38 B39 B40

5 C37 C38 C39 C40 C41 C42 C43 C44 C45

ROOF BEAM FRAMING PLAN


SCALE 1:250

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
28
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-6
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
ROOF BEAM FRAMING PLAN
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 6 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
A B C D E F G H I
60000

7000 8000 9000 6000 6000 9000 8000 7000

B1 B2 B3 B4 B5 B6 B7 B8

1 C1 C2 C3 C4 C5 C6 C7 C8 C9

S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16


5000

B100

B104

B108
B44

B48

B52

B56

B60

B64

B68

B72

B76

B80

B84

B88

B92

B96
B9 B10 B11 B12 B13 B14 B15 B16

2 C10 C11 C12 C13 C14 C15 C16 C17 C18

S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32
7000

B103

B107
B43

B47

B51

B55

B59

B63

B67

B71

B75

B79

B83

B87

B91

B95

B99
24000

B17 B18 B19 B20 B21 B22 B23 B24

3 C19 C20 C21 C22 C23 C24 C25 C26 C27

S33 S34 S35 S36 S37 S38 S39 S40 S41 S42 S43 S44 S45 S46 S47 S48
7000

B102

B106
B42

B46

B50

B54

B58

B62

B66

B70

B74

B78

B82

B86

B90

B94

B98
B25 B26 B27 B28 B29 B30 B31 B32

4 C28 C29 C30 C31 C32 C33 C34 C35 C36

S49 S50 S51 S52 S53 S54 S55 S56 S57 S58 S59 S60 S61 S62 S63 S64
5000

B101

B105
B41

B45

B49

B53

B57

B61

B65

B69

B73

B77

B81

B85

B89

B93

B97
B33 B34 B35 B36 B37 B38 B39 B40

5 C37 C38 C39 C40 C41 C42 C43 C44 C45

2ND TO 5TH FLOOR TYPICAL FRAMING PLAN


SCALE 1:250

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
29
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-7
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF 2ND TO 5TH FLOOR TYPICAL RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 7 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay FRAMING PLAN
TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
500 500 500
5-#20
5-#20
5-#20
5-#20 5-#20
5-#20
4-#20
2-#20
750

750

750
STP 4L-#10 STP 4L-#10 STP 4L-#10

2-#20 2-#20 4-#20


5-#20 5-#20 5-#20
B26 (LOC: 0 TO 1805) B26 (LOC: 1805 TO 5395) B26 (LOC: 5395 To 7200)
(SCALE 1:25) (SCALE 1:25) (SCALE 1:25)

500 500 500


5-#20 5-#20
5-#20 5-#20 5-#20
2-#20 4-#20
750

750

750
STP 4L-#10 STP 4L-#10 STP 4L-#10

2-#20 2-#20
5-#20
5-#20 5-#20
B25 (LOC: 0 TO 1555) B25 (LOC: 1555 TO 4645) B25 (LOC: 4645 To 6200)
(SCALE 1:25) (SCALE 1:25) (SCALE 1:25)

SECTION OF BEAMS
SCALE 1:100

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
30
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-8
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM SECTION
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 8 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
500 500 500
5-#20 5-#20
5-#20 5-#20 5-#20
2-#20 2-#20
750

750

750
STP 4L-#10 STP 4L-#10 STP 4L-#10

2-#20 2-#20
5-#20
5-#20 5-#20
B28 (LOC: 0 TO 1305) B28 (LOC: 1305 TO 3895) B28 (LOC: 3895 To 5200)
(SCALE 1:25) (SCALE 1:25) (SCALE 1:25)

500 500 500


5-#20
5-#20
5-#20
5-#20 5-#20
5-#20
2-#20
2-#20
750

750

750
STP 4L-#10 STP 4L-#10 STP 4L-#10

4-#20 2-#20 2-#20


5-#20 5-#20 5-#20
B27 (LOC: 0 TO 2055) B27 (LOC: 2055 TO 6145) B27 (LOC: 6145 To 8200)
(SCALE 1:25) (SCALE 1:25) (SCALE 1:25)

SECTION OF BEAMS
SCALE 1:150

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
31
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-9
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM SECTION
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 9 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
500 500 500
5-#20
5-#20
5-#20
5-#20 5-#20
5-#20
2-#20
2-#20
750

750

750
STP 4L-#10 STP 4L-#10 STP 4L-#10

2-#20 2-#20 4-#20


5-#20 5-#20 5-#20
B30 (LOC: 0 TO 2055) B30 (LOC: 2055 TO 6146) B30 (LOC: 6146 To 8200)
(SCALE 1:25) (SCALE 1:25) (SCALE 1:25)

500 500 500


5-#20 5-#20
5-#20 5-#20 5-#20
2-#20 2-#20
750

750

750
STP 4L-#10 STP 4L-#10 STP 4L-#10

2-#20 2-#20
5-#20
5-#20 5-#20
B29 (LOC: 0 TO 1305) B29 (LOC: 1305 TO 3895) B29 (LOC: 3895 To 5200)
(SCALE 1:25) (SCALE 1:25) (SCALE 1:25)

SECTION OF BEAMS
SCALE 1:150

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
32
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-10
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM SECTION
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 10 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
500 500 500
5-#20 5-#20
5-#20 5-#20 5-#20
4-#20 2-#20
750

750

750
STP 4L-#10 STP 4L-#10 STP 4L-#10

2-#20 2-#20
5-#20
5-#20 5-#20
B32 (LOC: 0 TO 1555) B32 (LOC: 1555 TO 4645) B32 (LOC: 4645 To 6200)
(SCALE 1:25) (SCALE 1:25) (SCALE 1:25)

500 500 500


5-#20
5-#20
5-#20
5-#20 5-#20
5-#20
4-#20
2-#20
750

750

750
STP 4L-#10 STP 4L-#10 STP 4L-#10

4-#20 2-#20 2-#20


5-#20 5-#20 5-#20
B31 (LOC: 0 TO 1805) B31 (LOC: 1805 TO 5395) B31 (LOC: 5395 To 7200)
(SCALE 1:25) (SCALE 1:25) (SCALE 1:25)

SECTION OF BEAMS
SCALE 1:150

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
33
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-11
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM SECTION
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 11 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
A B C
800 800 800
6200 7200 8200
1555 1555 1805 1805 2055

5-#20
5-#20 5-#20 5-#20
2-#20 4-#20 5-#20
2-#20

2-#20 2-#20 4-#20 2-#20


5-#20
1555 1555 1805 2055
14-4L-#10 23-4L-#10 14-4L-#10 14-4L-#10 55-4L-#10 14-4L-#10 37-4L-#10
@120 C/C @135 C/C @120 C/C @120 C/C @105 C/C @120 C/C @140 C/C
1500 1500 5700 1500
C28 C29 C30
B25:500x750 B26:500x750 B27:500x750
(SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50)

BEAM DETAILS
SCALE 1:150

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
34
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-12
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM DETAILS
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 12 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
D E F
800 800 800
8200 5200 5200 8200
2055 1305 1305 1305 1305 2055

5-#20 5-#20 5-#20


2-#20 2-#20 2-#20

2-#20 2-#20

1305 1305 1305 1305


37-4L-#10 14-4L-#10 14-4L-#10 16-4L-#10 14-4L-#10 14-4L-#10 16-4L-#10 14-4L-#10 14-4L-#10 38-4L-#10
@140 C/C @120 C/C @120 C/C @135 C/C @120 C/C @120 C/C @130 C/C @120 C/C @120 C/C @135 C/C
1500 1500 1500 1500 1500 1500
C31 C32 C33
B27:500x750 B28:500x750 B29:500x750 B30:500x750
(SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50)

BEAM DETAILS
SCALE 1:150

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
35
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-13
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM DETAILS
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 13 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
G H I
800 800 800
8200 7200 6200
2055 1805 1805 1555 1555

5-#20 5-#20 5-#20


5-#20 4-#20 2-#20
2-#20

4-#20 2-#20 2-#20

2055 1805 1555 1555


38-4L-#10 14-4L-#10 16-4L-#10 32-4L-#10 14-4L-#10 14-4L-#10 22-4L-#10 14-4L-#10
@135 C/C @120 C/C @105 C/C @130 C/C @120 C/C @120 C/C @145 C/C @120 C/C
1500 1500 1500 1500 1500
C34 C35 C36
B30:500x750 B31:500x750 B32:500x750
(SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50)

BEAM DETAILS
SCALE 1:150

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
36
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-14
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM DETAILS
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 14 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF BEAMS
BEAM SCHEDULE (C27.6 : Fy420) (LEVEL: 5.4 m,8.7 m,12 m,15.3 m)

BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS


SFR DIAGONAL REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
B1 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 16-2L-#10@105 C/C 30-2L-#10@105 C/C 15-2L-#10@110 C/C - - -
+ +
4-#20 4-#20

B2 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 15-2L-#10@115 C/C 36-2L-#10@115 C/C 14-2L-#10@120 C/C - - -
+ +
4-#20 5-#20

B3 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 15-2L-#10@110 C/C 47-2L-#10@110 C/C 15-2L-#10@115 C/C - - -
+ +
5-#20 5-#20

B4 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 20-2L-#10@80 C/C 27-2L-#10@80 C/C 16-2L-#10@105 C/C - - -
+ + + +
2-#20 2-#20 5-#20 4-#20

B5 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 19-2L-#10@85 C/C 27-2L-#10@80 C/C 16-2L-#10@105 C/C - - -
+ + + +
2-#20 2-#20 4-#20 5-#20

B6 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 15-2L-#10@115 C/C 36-2L-#10@115 C/C 14-2L-#10@120 C/C - - -
+ +
5-#20 4-#20

B7 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 16-2L-#10@105 C/C 30-2L-#10@105 C/C 15-2L-#10@115 C/C - - -
+ +
4-#20 4-#20

B8 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 23-4L-#10@135 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 5-#20 5-#20
+ +
2-#20 4-#20

B9 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 39-4L-#10@105 C/C 16-4L-#10@105 C/C - - -
+ + + + +
2-#20 2-#20 4-#20 5-#20 5-#20
+ +
4-#20 5-#20
+
2-#20

B10 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 37-4L-#10@140 C/C 14-4L-#10@120 C/C - - -
+ + + + +
4-#20 2-#20 2-#20 5-#20 5-#20
+ +
5-#20 2-#20
+
2-#20

B11 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 17-4L-#10@125 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 5-#20 5-#20
+ +
2-#20 2-#20

B12 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 16-4L-#10@135 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 5-#20 5-#20
+ +
2-#20 2-#20

B13 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 38-4L-#10@135 C/C 14-4L-#10@120 C/C - - -
+ + + + +
2-#20 2-#20 4-#20 5-#20 5-#20
+ +
2-#20 5-#20
+
2-#20

B14 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 16-4L-#10@105 C/C 33-4L-#10@125 C/C 14-4L-#10@120 C/C - - -
+ + + + +
4-#20 2-#20 2-#20 5-#20 5-#20
+ +
5-#20 4-#20
+
2-#20

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
37
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-15
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 15 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF BEAMS
BEAM SCHEDULE (C27.6 : Fy420) (LEVEL: 5.4 m,8.7 m,12 m,15.3 m)

BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS


SFR DIAGONAL REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
B15 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 22-4L-#10@145 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 5-#20 5-#20
+ +
4-#20 2-#20

B16 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 23-4L-#10@135 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 5-#20 5-#20
+ +
2-#20 3-#20

B17 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 34-4L-#10@120 C/C 14-4L-#10@120 C/C - - -
+ + + + +
2-#20 2-#20 3-#20 5-#20 5-#20
+ +
3-#20 5-#20

B18 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 43-4L-#10@120 C/C 14-4L-#10@120 C/C - - -
+ + + + +
3-#20 4-#20 2-#20 5-#20 5-#20
+ +
5-#20 4-#20

B19 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 17-4L-#10@125 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 5-#20 5-#20
+ +
4-#20 2-#20

B20 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 18-4L-#10@120 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 5-#20 5-#20
+ +
2-#20 4-#20

B21 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 41-4L-#10@125 C/C 14-4L-#10@120 C/C - - -
+ + + + +
2-#20 4-#20 3-#20 5-#20 5-#20
+ +
4-#20 5-#20

B22 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 33-4L-#10@125 C/C 14-4L-#10@120 C/C - - -
+ + + + +
3-#20 2-#20 2-#20 5-#20 5-#20
+ +
5-#20 3-#20

B23 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 22-4L-#10@140 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 5-#20 5-#20
+ +
3-#20 2-#20

B24 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 16-4L-#10@130 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 5-#20 5-#20
+ +
2-#20 2-#20

B25 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 16-2L-#10@100 C/C 31-2L-#10@100 C/C 15-2L-#10@110 C/C - - -
+ +
5-#20 5-#20

B26 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 15-2L-#10@110 C/C 36-2L-#10@115 C/C 14-2L-#10@120 C/C - - -
+ +
5-#20 5-#20

B27 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 15-2L-#10@110 C/C 47-2L-#10@110 C/C 15-2L-#10@110 C/C - - -
+ +
5-#20 5-#20

B28 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 20-2L-#10@80 C/C 25-2L-#10@85 C/C 16-2L-#10@105 C/C - - -
+ + + +
2-#20 2-#20 5-#20 4-#20

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-16 38
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 16 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF BEAMS
BEAM SCHEDULE (C27.6 : Fy420) (LEVEL: 5.4 m,8.7 m,12 m,15.3 m)

BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS


SFR DIAGONAL REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
B29 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 20-2L-#10@80 C/C 27-2L-#10@80 C/C 16-2L-#10@100 C/C - - -
+ + + +
2-#20 2-#20 4-#20 5-#20

B30 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 15-2L-#10@115 C/C 38-2L-#10@110 C/C 14-2L-#10@120 C/C - - -
+ +
5-#20 5-#20

B31 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 8-4L-#10@135 C/C 14-4L-#10@120 C/C - - -
+ + + +
4-#20 3-#20 5-#20 5-#20

B32 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 16-2L-#10@105 C/C 31-2L-#10@100 C/C 17-2L-#10@95 C/C - - -
+ + +
2-#20 5-#20 4-#20

B33 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 17-2L-#10@95 C/C 31-2L-#10@100 C/C 16-2L-#10@105 C/C - - -
+ + +
2-#20 4-#20 5-#20

B34 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 8-4L-#10@135 C/C 14-4L-#10@120 C/C - - -
+ + + +
3-#20 4-#20 5-#20 5-#20

B35 400 600 3-#20 3-#20 3-#20 3-#20 3-#20 3-#20 7-2L-#10@265 C/C 5-2L-#10@265 C/C 7-2L-#10@265 C/C - - -

B36 400 600 4-#20 4-#20 4-#20 3-#20 3-#20 3-#20 12-2L-#10@215 C/C 10-2L-#10@215 C/C 12-2L-#10@215 C/C - - -
+
2-#20

B37 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 8-4L-#10@140 C/C 14-4L-#10@120 C/C - - -
+ + + +
3-#20 3-#20 5-#20 4-#20

B38 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 19-2L-#10@85 C/C 31-2L-#10@100 C/C 18-2L-#10@90 C/C - - -
+ + + +
2-#20 2-#20 4-#20 4-#20

B39 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 18-2L-#10@90 C/C 31-2L-#10@100 C/C 18-2L-#10@90 C/C - - -
+ + + +
2-#20 2-#20 4-#20 4-#20

B40 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 8-4L-#10@140 C/C 14-4L-#10@120 C/C - - -
+ + + +
3-#20 3-#20 4-#20 5-#20

B41 400 600 3-#20 3-#20 3-#20 3-#20 3-#20 3-#20 8-2L-#10@215 C/C 6-2L-#10@215 C/C 8-2L-#10@215 C/C - - -

B42 400 600 4-#20 4-#20 4-#20 3-#20 3-#20 3-#20 12-2L-#10@215 C/C 10-2L-#10@215 C/C 12-2L-#10@215 C/C - - -
+
4-#20

B43 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 8-4L-#10@140 C/C 14-4L-#10@120 C/C - - -
+ + + +
3-#20 3-#20 4-#20 4-#20

B45 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 18-2L-#10@90 C/C 31-2L-#10@100 C/C 18-2L-#10@90 C/C - - -
+ +
4-#20 4-#20

B46 400 600 4-#20 4-#20 4-#20 3-#20 3-#20 3-#20 12-2L-#10@215 C/C 10-2L-#10@215 C/C 12-2L-#10@215 C/C - - -
+ + +
2-#20 4-#20 2-#20
+
2-#20

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
39
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-17
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 17 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF BEAMS
BEAM SCHEDULE (C27.6 : Fy420) (LEVEL: 5.4 m,8.7 m,12 m,15.3 m)

BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS


SFR DIAGONAL REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
B47 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 8-4L-#10@145 C/C 14-4L-#10@120 C/C - - -
+ + + +
3-#20 2-#20 4-#20 3-#20

B48 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 18-2L-#10@90 C/C 29-2L-#10@110 C/C 17-2L-#10@95 C/C - - -
+ +
3-#20 3-#20

B49 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 17-2L-#10@95 C/C 29-2L-#10@110 C/C 18-2L-#10@90 C/C - - -
+ +
3-#20 3-#20

B50 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 8-4L-#10@145 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 3-#20 3-#20 4-#20

B51 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 7-4L-#10@155 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 4-#20 3-#20

B52 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 18-2L-#10@90 C/C 27-2L-#10@115 C/C 17-2L-#10@95 C/C - - -
+ +
3-#20 3-#20

B53 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 17-2L-#10@95 C/C 27-2L-#10@115 C/C 18-2L-#10@90 C/C - - -
+ +
3-#20 3-#20

B54 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 7-4L-#10@155 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 3-#20 4-#20

B55 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 7-4L-#10@155 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 3-#20 3-#20

B56 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 14-4L-#10@120 C/C 7-4L-#10@150 C/C 14-4L-#10@120 C/C - - -
+ + + +
2-#20 2-#20 3-#20 3-#20

B57 500 750 4-#20 4-#20 4-#20 5-#20 5-#20 5-#20 17-2L-#10@95 C/C 29-2L-#10@110 C/C 16-2L-#10@100 C/C - - -
+ +
3-#20 3-#20

B58 500 750 4-#20 4-#20 4-#20 5-#20 5-#20 5-#20 16-2L-#10@100 C/C 29-2L-#10@110 C/C 17-2L-#10@95 C/C - - -
+ +
3-#20 3-#20

B59 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 21-2L-#10@75 C/C 14-2L-#10@80 C/C 21-2L-#10@75 C/C - - -
+ + + +
2-#20 2-#20 3-#20 2-#20

B60 500 750 4-#20 4-#20 4-#20 5-#20 5-#20 5-#20 15-2L-#10@110 C/C 24-2L-#10@130 C/C 15-2L-#10@115 C/C - - -
+ +
2-#20 2-#20

B62 500 750 4-#20 4-#20 4-#20 5-#20 5-#20 5-#20 15-2L-#10@115 C/C 24-2L-#10@130 C/C 15-2L-#10@110 C/C - - -
+ +
2-#20 2-#20

B63 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 21-2L-#10@75 C/C 14-2L-#10@80 C/C 21-2L-#10@75 C/C - - -
+ + + +
2-#20 2-#20 2-#20 3-#20

B64 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 20-2L-#10@80 C/C 14-2L-#10@85 C/C 20-2L-#10@80 C/C - - -
+ + + +
2-#20 2-#20 3-#20 2-#20

B65 500 750 4-#20 4-#20 4-#20 5-#20 5-#20 5-#20 14-2L-#10@120 C/C 22-2L-#10@145 C/C 14-2L-#10@120 C/C - - -
+ +
2-#20 2-#20

B66 500 750 5-#20 5-#20 5-#20 5-#20 5-#20 5-#20 20-2L-#10@80 C/C 14-2L-#10@85 C/C 20-2L-#10@80 C/C - - -
+ + + +
2-#20 2-#20 2-#20 3-#20

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
40
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-18
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 18 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF BEAMS
ROOF BEAMS
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS
SFR DIAGONAL REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
RB1 500 750 4-#20 4-#20 4-#20 4-#20 4-#20 4-#20 14-2L-#10@120 C/C 15-2L-#10@210 C/C 14-2L-#10@120 C/C - - -

RB2 500 750 4-#20 4-#20 4-#20 4-#20 4-#20 4-#20 14-2L-#10@120 C/C 17-2L-#10@235 C/C 14-2L-#10@120 C/C - - -

RB3 500 750 4-#20 4-#20 4-#20 4-#20 4-#20 4-#20 14-2L-#10@120 C/C 20-2L-#10@255 C/C 14-2L-#10@120 C/C - - -

RB4 500 750 4-#20 4-#20 4-#20 4-#20 4-#20 4-#20 14-2L-#10@120 C/C 11-2L-#10@185 C/C 14-2L-#10@120 C/C - - -

RB5 500 750 4-#20 4-#20 4-#20 4-#20 4-#20 4-#20 14-2L-#10@120 C/C 8-2L-#10@145 C/C 14-2L-#10@120 C/C - - -

RB6 500 750 4-#20 4-#20 4-#20 4-#20 4-#20 4-#20 14-2L-#10@120 C/C 8-2L-#10@135 C/C 14-2L-#10@120 C/C - - -

RB7 500 750 4-#20 4-#20 4-#20 4-#20 4-#20 4-#20 14-2L-#10@120 C/C 15-2L-#10@205 C/C 14-2L-#10@120 C/C - - -

RB8 500 750 4-#20 4-#20 4-#20 4-#20 4-#20 4-#20 14-2L-#10@120 C/C 9-2L-#10@130 C/C 14-2L-#10@120 C/C - - -

RB9 500 750 4-#20 4-#20 4-#20 4-#20 4-#20 4-#20 14-2L-#10@120 C/C 15-2L-#10@200 C/C 14-2L-#10@120 C/C - - -

RB10 500 750 4-#20 4-#20 4-#20 4-#20 4-#20 4-#20 14-2L-#10@120 C/C 9-2L-#10@125 C/C 14-2L-#10@120 C/C - - -

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-19 41
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
BEAM SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 19 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
EL. 18.600
TOC

EL. 8.700 (1) 24-#20


TOC

(2),(3),(4) #10
@100 C/C
4 3 1 1

(1) 24-#20

(2),(3),(4) #10
@100 C/C
1 1
EL. 15.300
TOC

EL. 5.400 (1) 24-#20


TOC

(2),(3),(4) #10
@100 C/C
1 1

(2),(3),(4) #10
@100 C/C

1725
(1) 24-#20

1 1
800

(1) 24-#20
EL. 12.000
TOC
(2),(3),(4) #10
@250 C/C
1200
800

(1) 24-#20
(2),(3),(4) #10 (2),(3),(4) #10
@100 C/C

SECTION 1-1 (C25)

(2),(3),(4) #10
975

@100 C/C
(SCALE 1:25) 1 1
EL. 1.500
TOC
300@100 C/C

E1
(2),(3),(4) #10

(1) 24-#20
@175 C/C

EL. 0 EL. 8.700


230

1 1 BOF TOC

E1 DETAIL OF COLUMN C25


- (SCALE 1:50)
(1) 24-#20

1 1

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-20 42
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN DETAILS
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 20 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 300

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C1

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
43
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-21
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 21 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 275 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 225 #10 @ 100 #10 @ 100 #10 @ 300

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C2

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-22 44
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 22 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 225 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 200 #10 @ 100 #10 @ 100 #10 @ 300

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C3

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
45
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-23
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 23 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 275 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 225 #10 @ 100 #10 @ 100 #10 @ 300

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C4

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-24 46
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 24 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 225 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 175 #10 @ 100 #10 @ 100 #10 @ 300

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C5

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-25 47
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 25 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 175 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 150 #10 @ 100 #10 @ 100 #10 @ 275

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C6

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
48
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-26
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 26 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 150 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 150 #10 @ 100 #10 @ 100 #10 @ 225

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C7

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-27 49
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 27 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 200 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 175 #10 @ 100 #10 @ 100 #10 @ 250

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C8

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
50
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-28
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 28 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 250 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 200 #10 @ 100 #10 @ 100 #10 @ 300

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C9

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-29 51
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 29 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 175 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 150 #10 @ 100 #10 @ 100 #10 @ 225

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C10

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
52
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-30
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 30 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 250 #10 @ 100 #10 @ 100 #10 @ 125 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 125 #10 @ 100 #10 @ 100 #10 @ 175

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C11

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
53
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-31
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 31 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 175 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 150 #10 @ 100 #10 @ 100 #10 @ 275

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C12

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
54
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-32
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 32 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 275 #10 @ 100 #10 @ 100 #10 @ 300

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C13

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
55
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-33
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 33 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 150 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 150 #10 @ 100 #10 @ 100 #10 @ 200

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20

COLUMN MARKED C14

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-34 56
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 34 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF COLUMNS
C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

1.5 M 8.7 M 15.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 #10 @ 300 #10 @ 100 #10 @ 100 #10 @ 250 #10 @ 100 #10 @ 100 #10 @ 300

5.4 M 12 M 18.6 M

800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20 24-#20


C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm C25 : Fy420 , COVER = 40mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = 800 MM CONFINING ZONE = 800 MM

0M 5.4 M 12 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO TO TO
#10 @ 100 #10 @ 100 --- #10 @ 100 #10 @ 100 #10 @ 225 #10 @ 100 #10 @ 100 #10 @ 300

1.5 M 8.7 M 15.3 M


800

800

800
#20 #20 #20
800 800 800

24-#20 24-#20

COLUMN MARKED C15

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
57
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-35
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
COLUMN SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 35 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SCHEDULE OF SLAB
BOTTOM REINFORCEMENT TOP REINFORCEMENT

SLAB SLAB ALONG SHORT SPAN ALONG LONG SPAN OVER LONG SUPPORT OVER SHORT SUPPORT REMARKS
MARKED THICKNESS DISTRIBUTION
FULL LENGTH CURTAILED FULL LENGTH CURTAILED CONTINUOUS END CONTINUOUS END
SUPPORT SUPPORT SUPPORT SUPPORT
S1 150 #10 @ 290 C/C --- #10 @ 290 C/C --- #10 @ 290 C/C #10 @ 290 C/C #10 @ 290 C/C #10 @ 290 C/C #10 @ 290 C/C ---

S2 150 #10 @ 290 C/C --- #10 @ 290 C/C --- #10 @ 290 C/C --- #10 @ 290 C/C #10 @ 290 C/C #10 @ 290 C/C ---

S3 150 #10 @ 290 C/C --- #10 @ 290 C/C --- #10 @ 290 C/C --- #10 @ 275 C/C #10 @ 290 C/C #10 @ 290 C/C ---

S4 150 #10 @ 290 C/C --- #10 @ 290 C/C --- #10 @ 270 C/C --- #10 @ 240 C/C #10 @ 290 C/C #10 @ 290 C/C ---

S5 150 #10 @ 290 C/C --- #10 @ 290 C/C --- #10 @ 250 C/C --- #10 @ 265 C/C --- #10 @ 290 C/C ---

S6 150 #10 @ 290 C/C --- #10 @ 290 C/C --- #10 @ 215 C/C --- #10 @ 220 C/C --- #10 @ 290 C/C ---

S7 150 #10 @ 290 C/C --- #10 @ 290 C/C --- #10 @ 185 C/C --- #10 @ 190 C/C --- #10 @ 290 C/C ---

S8 150 #10 @ 290 C/C --- #10 @ 290 C/C --- #10 @ 250 C/C --- --- #10 @ 290 C/C #10 @ 290 C/C ---

S9 150 #10 @ 290 C/C --- #10 @ 290 C/C --- #10 @ 235 C/C #10 @ 290 C/C #10 @ 265 C/C #10 @ 290 C/C #10 @ 290 C/C ---

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
58
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-36
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
SLAB SCHEDULE
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 36 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
500 500 500
2500 2500
625 625 625 625
#10@290 C/C #10@290 C/C #10@290 C/C #10@290 C/C

#10@290 C/C Ø0@0 C/C Ø0@0 C/C

#10@290 C/C #10@290 C/C

#10@290 C/C #10@290 C/C

SLAB S23 SLAB S24


BEAM BEAM BEAM
(ONE WAY) (150 THK) (ONE WAY) (150 THK)

SECTION OF ONE-WAY SLAB

500 500 500


2500 2500
625 625 625 625
#10@290 C/C #10@290 C/C #10@290 C/C #10@290 C/C

#10@290 C/C Ø0@0 C/C #10@290 C/C

#10@290 C/C #10@290 C/C

#10@290 C/C #10@290 C/C

SLAB S25 SLAB S26


BEAM BEAM BEAM
(ONE WAY) (150 THK) (ONE WAY) (150 THK)

SECTION OF ONE-WAY SLAB

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
59
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-37
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
SLAB SECTION
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 37 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
1 2 3 4 5

24000

5000 7000 7000 5000

A
2500

500 @ 1.00 m O.C. = 24m 500

TRUSS DETAILS
SCALE 1:100

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
60
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-38
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
TRUSS DETAIL
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 38 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
SECTION A DETAILS
SCALE 1:500

PROJECT: SCHOOL: GROUP MEMBERS: SUBMITTED BY: SUBMITTED BY: DESIGNED BY: SHEET NO. DRAWING NO.
CHECKED BY:
TECHNOLOGICAL UNIVERSITY OF THE ALONZO, ABRAHAM PAUL N.
PROPOSED FIVE-STOREY CONDOMINIUM BUILDING CAD BY:
61
PHILIPPINES AROMIN, RUHAMA-LYN
BECKHAM, EDEN JOYCE
GROUP 2 ENGR. JUAN PAULO BERSAMINA CAD BY: S-39
LOCATION: SHEET CONTENT: MOYA, JOSHMEL CAD BY:
ASSOCIATION OF
SPOT DETAIL
RODRIGUEZ, CLARENCE JOHN
SALVADOR, EURAIAH STEPHANIE P.
REG.NO.: PTR NO.: REG.NO.: PTR NO.: DATE RELEASED: 39 61
BUILDERS AND ENGINEERS CBP Diosdado Macapagal, Sunrise Drive, Pasay TIN NO.: DATE: TIN NO.: DATE:
PLACE: PLACE:
REFERENCE CODE

NATIONAL STRUCTURAL CODE OF THE PHILIPPINES 2015, 7 th EDITION (ISSN 2094-5477)

MATERIAL PROPERTY

CONCRETE
𝑓𝑐 ′ = 27.60 𝑀𝑃𝑎
𝛾 = 24.56 𝑘𝑁/𝑚3
STEEL
𝐹𝑦 = 420 𝑀𝑃𝑎 FOR BEAM AND COLUMN DESIGN
𝐹𝑦 = 420 𝑀𝑃𝑎 FOR SLAB AND FOOTING DESIGN

DEAD LOAD

SLAB
CONCRETE (0.15 m x 24.56 kN/m3) 3.684 kPa
HARDWOOD FLOORING (22mm) 0.190 kPa
CERAMIC OR QUARRY TILE (20 mm) on 25 mm MORTAR BED 1.100 kPa
GYPSUM BOARD (per mm thickness 1/2 inch) (12.7mm x 0.008) 0.102 kPa
SUSPENDED METAL LATH AND GYPSUM PLASTER 0.480 kPa
ELECTROMECHANICAL 0.500 kPa
PARTITION LOAD 1.000 kPa
WATERPROOFING MEMBRANE 0.050 kPa

BEAMS
CONCRETE (400x600 mm – 24.56 kN/m3 Density of Unit) 5.894 kN/m
CONCRETE (500x750 mm – 24.56 kN/m3 Density of Unit) 9.210 kN/m

COLUMNS
CONCRETE (800x800 mm – 24.56 kN/m3 Density of Unit) 15.718 kN/m

ROOF DEAD LOAD


WEIGHT OF TRUSS (35.93 + 11.78(25) = 330.43 Pa) 0.330 kPa
ASPHALT SHINGLES 0.10 kPa
DECK, METAL 18 GAGE 0.14 kPa
RIGID INSULATION, 13 mm 0.04 kPa
SUSPENDED METAL LATH AND GYPSUM PLASTER 0.48 kPa
LATH AND GYPSUM PLASTER 0.48 kPa 0.10 kPa

STAIRS
𝑤𝑠𝑡𝑎𝑖𝑟 (11 𝑆𝑇𝐸𝑃𝑆) FOR 4TH TO 5TH FLOOR 31.307 kN/m
𝑤𝑠𝑡𝑎𝑖𝑟 (22 𝑆𝑇𝐸𝑃𝑆) FOR 2ND TO 4TH FLOOR 37.385 kN/m
𝑤𝑠𝑡𝑎𝑖𝑟 (𝐿𝐴𝑁𝐷𝐼𝑁𝐺) 14.183 kN/m

COMPUTATION
𝑤𝑠𝑡𝑎𝑖𝑟 (11 𝑆𝑇𝐸𝑃𝑆) = [(0.5)(0.15)(0.3)(11) + (6.848)(0.15)]24.56
𝑤𝑠𝑡𝑎𝑖𝑟 (11 𝑆𝑇𝐸𝑃𝑆) = 31.307 𝑘𝑁/𝑚
𝑤𝑠𝑡𝑎𝑖𝑟 (22 𝑆𝑇𝐸𝑃𝑆) = [(0.5)(0.15)(0.3)(22) + (6.848)(0.15)]24.56
𝑤𝑠𝑡𝑎𝑖𝑟 (22 𝑆𝑇𝐸𝑃𝑆) = 37.385 𝑘𝑁/𝑚
𝑤𝑙𝑎𝑛𝑑𝑖𝑛𝑔 = [(3.850)(0.15)]24.56
𝑤𝑙𝑎𝑛𝑑𝑖𝑛𝑔 = 14.183 𝑘𝑁/𝑚

WALL
Exterior Wall, Full (150 mm – 19.6 kN/m3 Density of Unit) 3.300 kPa
Interior Wall, Full (100 mm – 19.6 kN/m3 Density of Unit) 3.170 kPa
LIVE LOAD

BASIC FLOOR AREA 1.900 kPa


EXIT FACILITIES 4.800 kPa
STORAGE 6.000 kPa

STAIRS
𝑤𝑠𝑡𝑎𝑖𝑟 = 4.80(5.0) 24.000 kN/m

ROOF LIVE LOAD

ROOF LIVE LOAD 0.600 kPa

SOIL BEARING CAPACITY

THE SOIL BEARING CAPACITY OF THE PLAN WILL BE ASSUMED TO BE 200 kPa.

SEISMIC – UBC 1997

SEISMIC LOAD PARAMETER


PROJECT LOCATION CBP Diosdado Macapagal, Sunrise Drive, Pasay, Metro
Manila, 1300, Philippines
TYPE OF OCCUPANCY IV
SEISMIC IMPORTANCE 1.0
FACTOR (I)
SOIL PROFILE TYPE SD
SEISMIC ZONE 4
SEISMIC ZONE FACTOR, Z 0.4
NEAREST FAULT LINE WEST VALLEY FAULT SYSTEM (M ≈ 7.2)
SEISMIC SOURCE TYPE A (7.0 ≤ M ≤ 8.4)
DISTANCE FROM THE 7.300 km
NEAREST FAULT
SOURCE faultfinder.phivolcs.dost.gov.ph
INTERPOLATION FOR NEAR SOURCE FACTOR, Na
10 − 5 10 − 7.3
=
1 − 1.2 1 − 𝑁𝑎

𝑁𝑎 = 1.108

INTERPOLATION FOR NEAR SOURCE FACTOR, Nv


10 − 5 10 − 7.3
=
1.2 − 1.6 1.2 − 𝑁𝑣

𝑁𝑣 = 1.416

NEAR SOURCE FACTOR, Na 1.108


NEAR SOURCE FACTOR, Nv 1.416

VALUE FOR SEISMIC FORCE COEFFICIENT, Ca


𝐶𝑎 = 0.44𝑁𝑎
𝐶𝑎 = 0.44(1.108)
𝐶𝑎 = 0.48752

VALUE FOR SEISMIC FORCE COEFFICIENT, Cv


𝐶𝑣 = 0.64𝑁𝑣
𝐶𝑣 = 0.64(1.416)
𝐶𝑣 = 0.730624

SEISMIC FORCE COEFFICIENT, Ca 0.48752


SEISMIC FORCE COEFFICIENT, Cv 0.730624

BASIC SEISMIC-FORCE MOMENT-RESISTING FRAME


SYSTEM
RESISTING SYSTEM SPECIAL REINFORCED CONCRETE
MOMENT FRAMES
R 8.5
ΩO 2.8

STRUCTURE PERIOD, T
3
𝑇 = 𝐶𝑡 (ℎ𝑛 )4
3
𝑇 = 0.0731(18.6)4
𝑇 = 0.655

STRUCTURE PERIOD, T 0.655 seconds


BUILDING WEIGHT

LEVEL 1: SECOND FLOOR


ELEMENT COMPUTATION WEIGHT, kN
COLUMN (24.56kN/m3)(0.8m)(0.8m)(3.3m)(45pcs) 2334.182
GIRDER 1 (24.56kN/m3)(0.75m)(0.5m)(5m)(18pcs) 828.900
GIRDER 2 (24.56kN/m3)(0.75m)(0.5m)(6m)(10pcs) 552.600
GIRDER 3 (24.56kN/m3)(0.75m)(0.5m)(7m)(10pcs) 644.700
GIRDER 4 (24.56kN/m3)(0.75m)(0.5m)(8m)(10pcs) 736.800
GIRDER 5 (24.56kN/m3)(0.75m)(0.5m)(9m)(10pcs) 828.900
BEAM 1 (24.56kN/m3)(0.6m)(0.4m)(5m)(16pcs) 471.552
BEAM 2 (24.56kN/m3)(0.6m)(0.4m)(7m)(16pcs) 660.173
SLAB (125 MM) (3.648kPa)(1360m2) 4961.280
STAIRS (51.568kN/m)(4m) 206.272
EXTERIOR WALL (10.89kN/m)(84m) 914.760
INTERIOR WALL (10.461kN/m)(348m) 3640.428
CEILING (0.582kPa)(1360m2) 791.520
FLOOR FINISH (HARDWOOD
FLOORING) (0.19kPa)(230m2) 43.700
FLOOR FINISH (CERAMIC
QUARRY TILE) (1.1kPa)(1130m2) 1243.000
ELECTROMECH (0.5kPa)(1360m2) 680.000
INT. PARTITION (1kPa)(1360m2) 1360.000
WATERPROOFING (0.05kPa)(622m2) 31.100
TOTAL 20929.867

LEVEL 2: THIRD FLOOR


ELEMENT COMPUTATION WEIGHT, kN
COLUMN (24.56kN/m3)(0.8m)(0.8m)(3.3m)(45pcs) 2334.182
GIRDER 1 (24.56kN/m3)(0.75m)(0.5m)(5m)(18pcs) 828.900
GIRDER 2 (24.56kN/m3)(0.75m)(0.5m)(6m)(10pcs) 552.600
GIRDER 3 (24.56kN/m3)(0.75m)(0.5m)(7m)(10pcs) 644.700
GIRDER 4 (24.56kN/m3)(0.75m)(0.5m)(8m)(10pcs) 736.800
GIRDER 5 (24.56kN/m3)(0.75m)(0.5m)(9m)(10pcs) 828.900
BEAM 1 (24.56kN/m3)(0.6m)(0.4m)(5m)(16pcs) 471.552
BEAM 2 (24.56kN/m3)(0.6m)(0.4m)(7m)(16pcs) 660.173
SLAB (125 MM) (3.648kPa)(1360m2) 4961.280
STAIRS (51.568kN/m)(4m) 206.272
EXTERIOR WALL (10.89kN/m)(84m) 914.760
INTERIOR WALL (10.461kN/m)(348m) 3640.428
CEILING (0.582kPa)(1360m2) 791.520
FLOOR FINISH (HARDWOOD
FLOORING) (0.19kPa)(230m2) 43.700
FLOOR FINISH (CERAMIC
QUARRY TILE) (1.1kPa)(1130m2) 1243.000
ELECTROMECH (0.5kPa)(1360m2) 680.000
INT. PARTITION (1kPa)(1360m2) 1360.000
WATERPROOFING (0.05kPa)(622m2) 31.100
TOTAL 20929.867
LEVEL 3: FOURTH FLOOR
ELEMENT COMPUTATION WEIGHT, kN
COLUMN (24.56kN/m3)(0.8m)(0.8m)(3.3m)(45pcs) 2334.182
GIRDER 1 (24.56kN/m3)(0.75m)(0.5m)(5m)(18pcs) 828.900
GIRDER 2 (24.56kN/m3)(0.75m)(0.5m)(6m)(10pcs) 552.600
GIRDER 3 (24.56kN/m3)(0.75m)(0.5m)(7m)(10pcs) 644.700
GIRDER 4 (24.56kN/m3)(0.75m)(0.5m)(8m)(10pcs) 736.800
GIRDER 5 (24.56kN/m3)(0.75m)(0.5m)(9m)(10pcs) 828.900
BEAM 1 (24.56kN/m3)(0.6m)(0.4m)(5m)(16pcs) 471.552
BEAM 2 (24.56kN/m3)(0.6m)(0.4m)(7m)(16pcs) 660.173
SLAB (125 MM) (3.648kPa)(1360m2) 4961.280
STAIRS (51.568kN/m)(4m) 206.272
EXTERIOR WALL (10.89kN/m)(84m) 914.760
INTERIOR WALL (10.461kN/m)(348m) 3640.428
CEILING (0.582kPa)(1360m2) 791.520
FLOOR FINISH (HARDWOOD
FLOORING) (0.19kPa)(230m2) 43.700
FLOOR FINISH (CERAMIC
QUARRY TILE) (1.1kPa)(1130m2) 1243.000
ELECTROMECH (0.5kPa)(1360m2) 680.000
INT. PARTITION (1kPa)(1360m2) 1360.000
WATERPROOFING (0.05kPa)(622m2) 31.100
TOTAL 20929.867

LEVEL 4: FIFTH FLOOR

ELEMENT COMPUTATION WEIGHT, kN


COLUMN (24.56kN/m3)(0.8m)(0.8m)(3.3m)(45pcs) 2334.182
GIRDER 1 (24.56kN/m3)(0.75m)(0.5m)(5m)(18pcs) 828.900
GIRDER 2 (24.56kN/m3)(0.75m)(0.5m)(6m)(10pcs) 552.600
GIRDER 3 (24.56kN/m3)(0.75m)(0.5m)(7m)(10pcs) 644.700
GIRDER 4 (24.56kN/m3)(0.75m)(0.5m)(8m)(10pcs) 736.800
GIRDER 5 (24.56kN/m3)(0.75m)(0.5m)(9m)(10pcs) 828.900
BEAM 1 (24.56kN/m3)(0.6m)(0.4m)(5m)(16pcs) 471.552
BEAM 2 (24.56kN/m3)(0.6m)(0.4m)(7m)(16pcs) 660.173
SLAB (125 MM) (3.648kPa)(1360m2) 4961.280
STAIRS (38.3985kN/m)(2m) 76.797
EXTERIOR WALL (10.89kN/m)(84m) 914.760
INTERIOR WALL (10.461kN/m)(348m) 3640.428
CEILING (0.582kPa)(1360m2) 791.520
FLOOR FINISH (HARDWOOD
FLOORING) (0.19kPa)(230m2) 43.700
FLOOR FINISH (CERAMIC
QUARRY TILE) (1.1kPa)(1130m2) 1243.000
ELECTROMECH (0.5kPa)(1360m2) 680.000
INT. PARTITION (1kPa)(1360m2) 1360.000
WATERPROOFING (0.05kPa)(622m2) 31.100
TOTAL 20800.382
LEVEL 5: ROOF BEAM
ELEMENT COMPUTATION WEIGHT, kN
GIRDER 1 (24.56kN/m3)(0.75m)(0.5m)(5m)(18pcs) 828.900
3
GIRDER 2 (24.56kN/m )(0.75m)(0.5m)(6m)(10pcs) 552.600
3
GIRDER 3 (24.56kN/m )(0.75m)(0.5m)(7m)(10pcs) 644.700
GIRDER 4 (24.56kN/m3)(0.75m)(0.5m)(8m)(10pcs) 736.800
3
GIRDER 5 (24.56kN/m )(0.75m)(0.5m)(9m)(10pcs) 828.900
ROOF REACTIONS, R1 (83.567kN)(9) 752.103
ROOF REACTIONS, R2 (83.567kN)(9) 752.103
TOTAL 5096.106

BASE SHEAR DETERMINATION

FLOOR LEVEL WEIGHT (kN)


LEVEL 1 2ND FLOOR 20929.867
LEVEL 2 3RD FLOOR 20929.867
LEVEL 3 4TH FLOOR 20929.867
LEVEL 4 5TH FLOOR 20800.392
LEVEL 5 RB FLOOR 5096.106
TOTAL (W) 88686.0998

ACTUAL BASE SHEAR

𝐶𝑣 𝐼
𝑉𝑎𝑐𝑡𝑢𝑎𝑙 = 𝑊
𝑅𝑇

0.70912(1)
𝑉𝑎𝑐𝑡𝑢𝑎𝑙 = (88686.0998)
8.5(0.655)

𝑽𝒂𝒄𝒕𝒖𝒂𝒍 = 𝟏𝟏𝟐𝟕𝟗. 𝟖𝟐𝟏 𝒌𝑵

MAXIMUM BASE SHEAR

2.5𝐶𝑎 𝐼
𝑉𝑚𝑎𝑥 = 𝑊
𝑅

2.5(0.48752)(1)
𝑉𝑚𝑎𝑥 = (88686.0998)
8.5

𝑽𝒎𝒂𝒙 = 𝟏𝟐𝟕𝟏𝟔. 𝟓𝟒𝟑 𝒌𝑵

MINIMUM BASE SHEAR


𝑉𝑚𝑖𝑛 = 0.11𝐶𝑎 𝐼𝑊

𝑉𝑚𝑖𝑛 = 0.11(0.48752)(1)(88686.0998)

𝑽𝒎𝒊𝒏 = 𝟒𝟕𝟓𝟓. 𝟗𝟖𝟕 𝒌𝑵


ZONE 4 BASE SHEAR MINIMUM

0.8𝑍𝑁𝑣 𝐼
𝑉𝑧𝑜𝑛𝑒 4 = 𝑊
𝑅

0.8(0.4)(1.416)(1)
𝑉𝑧𝑜𝑛𝑒 4 = (88686.0998)
8.5

𝑽𝒛𝒐𝒏𝒆 𝟒 = 𝟒𝟕𝟐𝟕. 𝟔𝟗𝟗 𝒌𝑵

SINCE

𝑉𝑚𝑖𝑛 < 𝑉𝑎𝑐𝑡𝑢𝑎𝑙 < 𝑉𝑚𝑎𝑥 ; 𝑉𝑎𝑐𝑡𝑢𝑎𝑙 > 𝑉𝑧𝑜𝑛𝑒 4

𝑼𝒔𝒆 𝑽 = 𝑽𝒂𝒄𝒕𝒖𝒂𝒍 = 𝟏𝟏𝟐𝟕𝟗. 𝟖𝟐𝟏 𝒌𝑵

VERTICAL LOAD DISTRIBUTION OF BASE SHEAR

𝑼𝒔𝒆 𝑽 = 𝑽𝒂𝒄𝒕𝒖𝒂𝒍 = 𝟏𝟏𝟐𝟕𝟗. 𝟖𝟐𝟏 𝒌𝑵

LEVEL Wi (kN) hi (m) Wih i Wi h i / 𝜮 Wi h i Fi (kN)


ROOF BEAM 5096.106 18.6 94787.572 0.0988 1114.545
5TH FLOOR 20800.392 15.3 318246.001 0.3317 3742.047
4TH FLOOR 20929.867 12 251158.406 0.2618 2953.208
3RD FLOOR 20929.867 8.7 182089.845 0.1898 2141.076
2ND FLOOR 20929.867 5.4 113021.283 0.1178 1328.944
𝜮 Wi h i 959303.106
UBC 97: DESIGN RESPONSE SPECTRA

Design Response Spectra:


TS = Cv/2.5Ca = 0.744 sec
T0 = 0.2TS = 0.149 sec

T (sec) Sa (g)
0.00 0.488
0.15 1.219
0.74 1.219
1.24 0.729
1.74 0.520
2.24 0.404
2.74 0.330
3.24 0.279
3.74 0.242
4.24 0.214
4.74 0.191
5.24 0.173
SEISMIC – IBC

SEISMIC LOAD PARAMETER


TYPE OF OCCUPANCY IV
SEISMIC IMPORTANCE 1.0
FACTOR (I)
RESPONSE COEFFICIENT 8
COEFFICIENT, R
SOIL PROFILE TYPE SD
STRUCTURE TYPE MOMENT RESISTING FRAME SYSTEM
Ct 0.0731
X 0.75

STRUCTURE PERIOD, T
3
𝑇 = 𝐶𝑡 (ℎ𝑛 )4
3
𝑇 = 0.0731(18.6)4
𝑇 = 0.655

STRUCTURE PERIOD, T 0.655 seconds

SHORT PERIOD (0.2 S) SPECTRAL RESPONSE ACCELERATION PARAMETER


SPECTRAL RESPONSE ACCELERATION PARAMETER AT A PERIOD OF 1 S

SEISMIC COEFFICIENT (Ss) 1.5

SEISMIC COEFFICIENT (Ss) 0.6


TL 3.0

SEISMIC COEFFICIENT (Fa) 1.00


SEISMIC COEFFICIENT (Fv) 1.50
SPECTRAL ACCELERATION PARAMETERS

MAXIMUM CONSIDERED EARTHQUAKE


𝑆𝑀𝑆 = 𝐹𝑎 𝑆𝑆
𝑆𝑀𝑆 = 1(1.5)
𝑆𝑀𝑆 = 1.6

𝑆𝑀1 = 𝐹𝑣 𝑆1
𝑆𝑀1 = 1.5(0.6)
𝑆𝑀1 = 0.9
DESIGN BASIC EARTHQUAKE
2
𝑆𝐷𝑆 = 𝑆𝑀𝑆
3
2
𝑆𝐷𝑆 = (1.5)
3
𝑆𝐷𝑆 = 1
2
𝑆𝐷1 = 𝑆𝑀1
3
2
𝑆𝐷1 = (0.9)
3
𝑆𝐷1 = 0.6

BASE SHEAR DETERMINATION

SEISMIC RERSPONSE COEFFICIENT


𝑆𝐷𝑆 𝐼𝑒
𝐶𝑆 =
𝑅
1 (1)
𝐶𝑆 =
8
𝐶𝑆 = 0.125
𝐶𝑆−𝑚𝑖𝑛1 = 0.044𝑆𝐷𝑆 𝐼𝑒
𝐶𝑆−𝑚𝑖𝑛1 = 0.044(1)(1)
𝐶𝑆−𝑚𝑖𝑛1 = 0.044
𝐶𝑆−𝑚𝑖𝑛2 = 0.010

IF 𝑆1 ≥ 0.60
0.50 𝑆𝐷1 𝐼𝑒
𝐶𝑆−𝑚𝑖𝑛3 =
𝑅
0.50 (0.6)(1.00)
𝐶𝑆−𝑚𝑖𝑛3 =
8
𝐶𝑆−𝑚𝑖𝑛3 = 0.038

IF T ≤ 𝑇𝐿
𝑆𝐷1 𝐼𝑒
𝐶𝑆−𝑚𝑎𝑥 =
𝑅𝑇
(0.6)(1.00)
𝐶𝑆−𝑚𝑎𝑥 =
8(0.655)
𝐶𝑆−𝑚𝑎𝑥 = 0.115
SINCE
𝐶𝑠 > 𝐶𝑆−𝑚𝑖𝑛1 ; 𝐶𝑠 > 𝐶𝑆−𝑚𝑖𝑛2 ; 𝐶𝑠 > 𝐶𝑆−𝑚𝑖𝑛3 ; 𝐶𝑠 > 𝐶𝑆−𝑚𝑎𝑥
Use 𝑪𝑺−𝒎𝒂𝒙 = 𝟎. 𝟏𝟏𝟓

SEISMIC RESPONSE COEFFICIENT (Cs) 0.115


BUILDING WEIGHT (W) 88686.0998 kN
SEISMIC BASE SHEAR

SEISMIC BASE SHEAR


𝑉 = 𝐶𝑠 𝑊

𝑉 = (0.115)(88686.0998)
𝑉 = 10198.901 kN

DESIGN RESPONSE SPECTRUM

T (sec) Sa (g)
1.200
0.00 0.400
0.12 1.000 1.000
0.60 1.000
1.10 0.545 0.800
1.60 0.375
2.10 0.286 0.600
2.60 0.231
3.10 0.187 0.400
3.60 0.139
4.10 0.107 0.200

4.60 0.085
5.10 0.069 0.000
0.00 1.00 2.00 3.00 4.00 5.00 6.00
5.60 0.057

SEISMIC – UBC VS IBC

BASE SHEAR COMPARISON


𝑉𝑈𝐵𝐶 = 12716. 543 𝑘𝑁
𝑉𝐼𝐵𝐶 = 10198.901 𝑘𝑁
𝑉𝑈𝐵𝐶 > 𝑉𝐼𝐵𝐶
GEOMETRY

PROPERTIES
MATERIAL

SPECIFICATION
SUPPORTS

LOADING: REFERENCE LOAD COMBINATION

DL-1 SELFWEIGHT
• SELFWEIGHT – FACTOR: -1.00
THE SELFWEIGTH LOAD IS USEDTO GENERATE THE WEIGHT OF COLUMNS.
BEAMS AND PLATES(SLABS)
DL-2 SUPERIMPOSED DEAD LOAD

SLAB
• 2.272 kPa

HARDWOOD FLOORING (22mm) 0.190 kPa


GYPSUM BOARD (per mm thickness 1/2 inch) (12.7mm x 0.008) 0.102 kPa
SUSPENDED METAL LATH AND GYPSUM PLASTER 0.480 kPa
ELECTROMECHANICAL 0.500 kPa
PARTITION LOAD 1.000 kPa
TOTAL 2.272 kPa

• 3.182 kPa

CERAMIC OR QUARRY TILE (20 mm) on 25 mm Mortar Bed 1.100 kPa


GYPSUM BOARD (per mm thickness 1/2 inch) (12.7mm x 0.008) 0.102 kPa
SUSPENDED METAL LATH AND GYPSUM PLASTER 0.480 kPa
ELECTROMECHANICAL 0.500 kPa
PARTITION LOAD 1.000 kPa
TOTAL 3.182 kPa

• 3.232 kPa

CERAMIC OR QUARRY TILE (20 mm) on 25 mm Mortar Bed 1.100 kPa


WATERPROOFING MEMBRANE 0.050 kPa
GYPSUM BOARD (per mm thickness 1/2 inch) (12.7mm x 0.008) 0.102 kPa
SUSPENDED METAL LATH AND GYPSUM PLASTER 0.480 kPa
ELECTROMECHANICAL 0.500 kPa
PARTITION LOAD 1.000 kPa
TOTAL 3.232 kPa

ROOF DEAD LOAD


WEIGHT OF TRUSS (35.93 + 11.78(25) = 330.43 Pa) 0.330 kPa
ASPHALT SHINGLES 0.10 kPa
DECK, METAL 18 GAGE 0.14 kPa
RIGID INSULATION, 13 mm 0.04 kPa
SUSPENDED METAL LATH AND GYPSUM PLASTER 0.48 kPa
LATH AND GYPSUM PLASTER 0.48 kPa 0.10 kPa

TRUSS ANALYSIS
Tributary Width: 5.5 m
Joint Spacing: 1.023 m, 1.0 m, 0.500 m, 1.0 m

APPLIED LOADS
𝑃1𝐴 = (0.10 𝑘𝑃𝑎 + 0.14 𝑘𝑃𝑎 + 0.04 𝑘𝑃𝑎)(1.023 𝑚)(5.5 𝑚) = 1.575 𝑘𝑁
𝑃1𝐵 = (0.389 𝑘𝑃𝑎)(1.023 𝑚)(5.5 𝑚) = 1.857 𝑘𝑁
𝑃1 = 𝑃1𝐴 + 𝑃1𝐵 = 1.575 𝑘𝑁 + 1.857 𝑘𝑁 = 5. 641 𝑘𝑁

𝑃2 𝐴 = (0.10 𝑘𝑃𝑎 + 0.14 𝑘𝑃𝑎 + 0.04 𝑘𝑃𝑎)(1.0 𝑚)(5.5 𝑚) = 1.540 𝑘𝑁


𝑃2 𝐵 = (0.330 𝑘𝑃𝑎)(1.0 𝑚)(5.5 𝑚) = 1.815 𝑘𝑁
𝑃2 = 𝑃2 𝐴 + 𝑃2 𝐵 = 1.540 𝑘𝑁 + 1.815 𝑘𝑁 = 3.355 𝑘𝑁

𝑃3 = (0.48 𝑘𝑃𝑎 + 0.10 𝑘𝑃𝑎)(0.500 𝑚)(5.5 𝑚)


𝑃3 = 1.595 𝑘𝑁

𝑃3 = (0.48 𝑘𝑃𝑎 + 0.10 𝑘𝑃𝑎)(1.0 𝑚)(5.5 𝑚)


𝑃3 = 3.190 𝑘𝑁

REACTIONS
𝑅1 = 83.567 𝑘𝑁
𝑅2 = 83.567 𝑘𝑁

STAIRS
𝑤𝑠𝑡𝑎𝑖𝑟 (11 𝑆𝑇𝐸𝑃𝑆) FOR 4TH TO 5TH FLOOR 31.307 kN/m
𝑤𝑠𝑡𝑎𝑖𝑟 (22 𝑆𝑇𝐸𝑃𝑆) FOR 2ND TO 4TH FLOOR 37.385 kN/m
𝑤𝑠𝑡𝑎𝑖𝑟 (𝐿𝐴𝑁𝐷𝐼𝑁𝐺) 14.183 kN/m

WALLS

Exterior Wall, Full (150 mm – 19.6 kN/m3 Density of Unit) 3.300 kPa
Interior Wall, Full (100 mm – 19.6 kN/m3 Density of Unit) 3.170 kPa
LOADING: SEISMIC DEFINITION – UBC 1997

TYPE OF OCCUPANCY IV
SEISMIC IMPORTANCE FACTOR (I) 1.0
SOIL PROFILE TYPESD
SEISMIC ZONE4
SEISMIC ZONE FACTOR, Z 0.4
NEAREST FAULT LINEWEST VALLEY FAULT SYSTEM (M ≈ 7.2)
SEISMIC SOURCE TYPE A (7.0 ≤ M ≤ 8.4)
DISTANCE FROM THE NEAREST FAULT 7.300 km
NEAR SOURCE FACTOR, Na 1.108
NEAR SOURCE FACTOR, Nv 1.416
SEISMIC FORCE COEFFICIENT, Ca 0.48752
SEISMIC FORCE COEFFICIENT, Cv 0.70912
BASIC SEISMIC-FORCEMOMENT-RESISTING FRAME SYSTEM
RESISTING SYSTEM SPECIAL REINFORCED CONCRETE MOMENT
FRAMES
R 8.5
STRUCTURE PERIOD, T 0.655
LOADING: LOAD CASES DETAILS

SESIMIC X

SEISMIC Z
LOAD COMBINATION (CHANGE EX TO SEISMIC X AND EZ TO SEISMIC Z)

LOAD COMBINATION – REINFORCCED CONCRETE (BEAMS, COLUMN, SHEAR WALL)


101 1.4DL
102 1.2DL + 1.6LL + 0.5LLR
103 1.2DL + 1.6LL + F1LL
104 1.5DL+F1LL+1.0EX+0.3EZ
105 1.5DL+F1LL+1.0EX-0.3EZ
106 1.5DL+F1LL-1.0EX+0.3EZ
107 1.5DL+F1LL-1.0EX-0.3EZ
108 1.5DL+F1LL+1.0EZ+0.3EX
109 1.5DL+F1LL+1.0EZ-0.3EX
110 1.5DL+F1LL-1.0EZ+0.3EX
111 1.5DL+F1LL-1.0EZ-0.3EX
112 1.2DL+1.0EX+0.30EZ
113 1.2DL+1.0EX-0.30EZ
114 1.2DL-1.0EX+0.30EZ
115 1.2DL-1.0EX-0.30EZ
116 1.2DL+1.0EZ+0.30EX
117 1.2DL+1.0EZ-0.30EX
118 1.2DL-1.0EZ+0.30EX
119 1.2DL-1.0EZ-0.30EX
120 0.6DL+1.0EX+0.30EZ
121 0.6DL+1.0EX-0.30EZ
122 0.6DL-1.0EX+0.30EZ
123 0.6DL-1.0EX-0.30EZ
124 0.6DL+1.0EZ+0.30EX
125 0.6DL+1.0EZ-0.30EX
126 0.6DL-1.0EZ+0.30EX
127 0.6DL-1.0EZ-0.30EX

FOR LOAD COMBINATIONS 104 TO 111


1.2𝐷𝐿 + 1.0𝐸 + 𝑓1𝐿
𝐸 = 𝐸𝑥 + 𝐸𝑧; 𝐸𝑧 = 0.5𝐶𝑎𝐷𝐿; 𝐶𝑎 = 0.598
1.2𝐷𝐿 + 1.0[𝐸𝑥 + 0.5(0.598)(𝐷𝐿)] + 𝑓1𝐿
1. 5𝐷𝐿 + 1. 0𝐸𝑥 + 𝑓1𝐿
FOR LOAD COMBINATIONS 112-119
0.9𝐷𝐿 + 1.0𝐸 + 𝑓1𝐿
𝐸 = 𝐸𝑥 + 𝐸𝑧; 𝐸𝑧 = 0.5𝐶𝑎𝐷𝐿; 𝐶𝑎 = 0.598
0.9𝐷𝐿 + 1.0[𝐸𝑥 + 0.5(0.598)(𝐷𝐿)] + 𝑓1𝐿
1. 2𝐷𝐿 + 1. 0𝐸𝑥 + 𝑓1𝐿
FOR LOAD COMBINATIONS 119-127
0.9𝐷𝐿 − 1.0𝐸 + 𝑓1𝐿
𝐸 = 𝐸𝑥 + 𝐸𝑧; 𝐸𝑧 = 0.5𝐶𝑎𝐷𝐿; 𝐶𝑎 = 0.598
0.9𝐷𝐿 − 1.0[𝐸𝑥 + 0.5(0.598)(𝐷𝐿)] + 𝑓1𝐿
0. 6𝐷𝐿 − 1. 0𝐸𝑥 + 𝑓1𝐿
DRIFT CHECK LOAD COMBINATION
201 1.2DL+F1LL+1.0EX+0.3EZ
202 1.2DL+F1LL+1.0EX-0.3EZ
203 1.2DL+F1LL-1.0EX+0.3EZ
204 1.2DL+F1LL-1.0EX-0.3EZ
205 1.2DL+F1LL+1.0EZ+0.3EX
206 1.2DL+F1LL+1.0EZ-0.3EX
207 1.2DL+F1LL-1.0EZ+0.3EX
208 1.2DL+F1LL-1.0EZ-0.3EX
209 0.9DL+1.0EX+0.3EZ
210 0.9DL+1.0EX-0.3EZ
211 0.9DL-1.0EX+0.3EZ
212 0.9DL-1.0EX-0.3EZ
213 0.9DL+1.0EZ+0.3EX
214 0.9DL+1.0EZ-0.3EX
215 0.9DL-1.0EZ+0.3EX
216 0.9DL-1.0EZ-0.3EX

SERVICE LOAD COMBINATION – FOR FOOOTING DESIGN


301 1.0DL+1.0LL
302 1.0DL+0.75LL+0.535EX
303 1.0DL+0.75LL-0.535EX
304 1.0DL+0.75LL+0.535EZ
305 1.0DL+0.75LL-0.535EZ
306 0.6DL+0.714EX
307 0.6DL-0.714EX
308 0.6DL+0.714EZ
309 0.6DL-0.714EZ
310 1.0DL+1.0LL+0.714EX
311 1.0DL+1.0LL-0.714EX
312 1.0DL+1.0LL+0.714EZ
313 1.0DL+1.0LL-0.714EZ

ULTIMATE LOAD COMBINATION – FOR FOOOTING DESIGN


401 1.4DL
402 1.2DL+1.6LL+0.5LLR
403 1.2DL+1.6LLR+F1LL
404 1.2DL+F1LL+1.0EX
405 1.2DL+F1LL-1.0EX
406 1.2DL+F1LL+1.0EZ
407 1.2DL+F1LL-1.0EZ
408 0.9DL+1.0EX
409 0.9DL-1.0EX
410 0.9DL+1.0EZ
411 0.9DL-1.0EZ
ANALYSIS
ANALYSIS RESULTS FOR FLOOR DIAPHRAGM (DRIFT CHECK)

ANALYSIS RESULTS FOR SEISMIC/EARTHQUAKE (BASE SHEAR)


ANALYSIS RESULTS FOR STORY DRIFT
ANALYSIS RESULTS FOR CENTER OF RIGIDITY

ANALYSIS RESULTS FOR STORY STIFFNESS


ANALYSIS RESULTS FOR BEAMS

ANALYSIS RESULTS FOR COLUMNS


ANALYSIS RESULTS REACTIONS AT FOOTING (ALLOWABLE)

ANALYSIS RESULTS REACTIONS AT FOOTING (FACTORED)


DYNAMIC ANALYSIS: COMPARISON OF STATIC AND DYNAMIC BASE SHEAR

SCALING FOR THE X-DIRECTION IN DYNAMIC ANALYSIS SHALL BE SET TO 1

SCALING FOR THE Z-DIRECTION IN DYNAMIC ANALYSIS SHALL BE SET TO 1


STATIC BASE SHEAR

DYNAMIC BASE SHEAR X- DIRECTION


DYNAMIC BASE SHEAR Z- DIRECTION

DYNAMIC BASE SHEAR AND SCALING FACTOR FOR X DIRECTION

𝑆𝑇𝐴𝑇𝐼𝐶 𝐵𝐴𝑆𝐸 𝑆𝐻𝐸𝐴𝑅


𝑆𝐶𝐴𝐿𝐼𝑁𝐺 𝐹𝐴𝐶𝑇𝑂𝑅 (𝑆𝐹𝑥) =
𝐷𝑌𝑁𝐴𝑀𝐼𝐶 𝐵𝐴𝑆𝐸 𝑆𝐻𝐸𝐴𝑅

11792.43 𝑘𝑁
𝑆𝐶𝐴𝐿𝐼𝑁𝐺 𝐹𝐴𝐶𝑇𝑂𝑅 (𝑆𝐹𝑥) =
8273.54 𝑘𝑁

𝑆𝐶𝐴𝐿𝐼𝑁𝐺 𝐹𝐴𝐶𝑇𝑂𝑅 (𝑆𝐹𝑥) = 1.42532


DYNAMIC BASE SHEAR AND SCALING FACTOR FOR Z DIRECTION

𝑆𝑇𝐴𝑇𝐼𝐶 𝐵𝐴𝑆𝐸 𝑆𝐻𝐸𝐴𝑅


𝑆𝐶𝐴𝐿𝐼𝑁𝐺 𝐹𝐴𝐶𝑇𝑂𝑅 (𝑆𝐹𝑧) =
𝐷𝑌𝑁𝐴𝑀𝐼𝐶 𝐵𝐴𝑆𝐸 𝑆𝐻𝐸𝐴𝑅

11792.43 𝑘𝑁
𝑆𝐶𝐴𝐿𝐼𝑁𝐺 𝐹𝐴𝐶𝑇𝑂𝑅 (𝑆𝐹𝑥) =
8270.34 𝑘𝑁

𝑆𝐶𝐴𝐿𝐼𝑁𝐺 𝐹𝐴𝐶𝑇𝑂𝑅 (𝑆𝐹𝑥) = 1.42587

DYNAMIC ANALYSIS: BASE SHEAR (ANALYSIS WITH SCALING FACTOR)

DYNAMIC BASE SHEAR X- DIRECTION


DYNAMIC BASE SHEAR Z- DIRECTION

DYNAMIC ANALYSIS: MODAL PERIOD (MANUAL)

MASS PER FLOOR (m)


STIFFNESS PER FLOOR (k)

FUNCTION FOR CALCULATING THE COEFFICIENTS OF THE CHARACTERISTIC POLYNOMIAL,


EIGENVALUES, AND EIGENVECTORS
Adapted from: "Introduction to the use of SMath Studio" G. Urroz, May 2010
DYNAMIC ANALYSIS: MODE SHAPES (MANUAL)
DYNAMIC ANALYSIS: MASS PARTICIPATION (MANUAL)
DYNAMIC ANALYSIS: MODAL PERIOD (STAAD)
DYNAMIC ANALYSIS: MODE SHAPES (STAAD)

5 MODES WITH HIGHEST MASS PARTICIPATION

Frequency Period Participation X Participation Y Participation Z


Mode Type
Hz seconds % % %
1 1.646 0.607 81.04 0 0 Elastic
4 5.435 0.184 8.23 0 0 Elastic
47 39.269 0.025 2.998 0 0 Elastic
7 10.302 0.097 2.254 0 0 Elastic
63 42.821 0.023 2.157 0 0 Elastic

MODE 1
MODE 4
MODE 7
MODE 47
MODE 63
DYNAMIC ANALYSIS: MASS PARTICIPATION (STAAD)

You might also like