Ablution Block
Ablution Block
ROOFING
ROOFING
Page 1
Item No. Description Unit Quantity Rate Amount
CARPENTRY
JOINERY
Exterior quality Rosewood doors
44mm door size 925mm wide x 1960mm high solid core panel
6 single swing No 6 150.00 900.00
IRONMONGERY
Ironmongery to be as per Ironmongery schedule and is to be
fitted in strict accordance with the
8 3 Lever Mortise lock as union or equal No 6 75.00 450.00
9 2 Lever Mortise lock as union or equal No 16 75.00 1,200.00
Sundries
10 Rubber door stops No 22 20.00 440.00
Carried Forward to Summary ZMW 13,400.40
Page 2
Item No. Description Unit Quantity Rate Amount
PLUMBING INSTALLATIONS ( ALL PROVISIONAL)
Wash Hand Basins- Wash hand basin with integrated overflow from
white vitreous china "Bantum" by VAAL or equal
and approved) Vaal Potteries vitreous china 455 x 290mm (code )
"Magnolia" range with single taphole and
pedestal complete with 2No. 13mm basin pillar tap as 'Cobra'
including matching pop waste and mounting kit,
plug, chain and stay . 32 x 32mm Bottle trap; all c.p , with 75mm
9 deep seal, inlet screwed, female,outlet male as
Cobra (code 345/40)' , two flexible connectors and a pair of 13mm
angle regulating valves.32mm Bottle trap
adaptor,Chrome plated as Cobra (code C-345/1) for40mm uPVC
10 pipe. No 12 300.00 3,600.00
PLUMBING INSTALLATION
Page 3
Item No. Description Unit Quantity Rate Amount
Cold Water Installations
Service and overflow pipework in Chlorinated Polyvinyl Chloride
Pipework including fixing and jointing as described.
12 25mm ditto m 42 10.50 441.00
13 19mm diameter pipe m 18 9.60 172.80
14 13mm diameter ditto m 42 7.50 315.00
Extra over pipework for:-
15 19mm diameter bend No 4 7.50 30.00
16 19mm x 13mm x 19mm diameter tee No 29 8.10 234.90
17 25mm x 19mm reducing bush No 1 8.40 8.40
18 19mm x 13mm reducing bush No 29 4.50 130.50
Testing
27 Include for testing for water tightness. Item 1 500.00 500.00
28 Include for sterilisation of the water supply installation. Item 1 255.00 255.00
Carried to Collection ZMW 4,651.10
PLUMBING INSTALLATION
Page 4
Item No. Description Unit Quantity Rate Amount
PLUMBING INSTALLATION
COLLECTION Page
No
Total Brought Forward from Page No.
3 13,140.50
4 4,651.10
Carried Forward to Summary ZMW 17,791.60
PLUMBING INSTALLATION
Page 5
Item No. Description Unit Quantity Rate Amount
FLOOR, WALL AND CEILING FINISHINGS
Floor Finishings
Installation of 600 X 600mm nonslip porcellaine Floor tiles
1 To floor m2 100 60.00 6,000.00
2 To 100 mm high skirting m 105 10.00 1,050.00
Page 6
Item No. Description Unit Quantity Rate Amount
GLAZING
Glazing to steel windows with putty as described
GLAZING
Page 7
Item No. Description Unit Quantity Rate Amount
PAINTING AND DECORATING
INTERNALLY
Under coat, three coats washable acrylic polvin paint to
Architect's approved colour as described
1 To internally plastered walls item 1 4,500.00 4,500.00
2 To reveals width not exceeding 100mm item 1 500.00 500.00
EXTERNALLY
Sealing coat, three coats washable acrylic polvin paint
Architect's approved colour as described
3 To externally plastered walls item 1 2,350.00 2,350.00
4 To reveals width not exceeding 100mm item 1 500.00 500.00
Apply one priming coat and three coats super universal enamel
to Architect's approved colour as described
7 To door leaves m2 58 18.00 1,044.00
Page 8
Item No. Description Page Amount
1 ROOFING 1 14,139.00
2 CARPENTRY, JOINERY AND IRONMONGERY 2 13,400.40
3 PLUMBING INSTALLATIONS 5 17,791.60
4 FLOOR AND WALL FINISHINGS 6 9,536.25
5 GLAZING 7 720.00
6 PAINTING AND DECORATING 8 10,289.00
Carried to Final Summary ZMW 65,876.25
Page 9
Item Description Unit Qty Rate Amount
EXTERNAL WORKS
SOIL DRAINAGE WORKS
Pipework in trenches
Excavate in pickable material for pipe trenches not exceeding 1.5m
deep for pipes not exceeding 200mm
diameter average 600mm deep including bakfilling and wheeling,
spreading and levelling and surplus excavated
1 material on site m 18 35.00 630.00
Gulley Traps
Allow for building gulley traps in accordance with drawings,
3 including all earthworks, concrete and block work No 2 195.00 390.00
SOIL DRAINAGE
EXTERNAL WORKS
Page 10
MAIN SUMMARY
Page 11