0% found this document useful (0 votes)
6 views

Index For GCC: General Conditions of Contract

Uploaded by

dcprojects2024
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

Index For GCC: General Conditions of Contract

Uploaded by

dcprojects2024
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

General Conditions of Contract Page 2 of 45

INDEX for GCC

1.0 Definition, interpretations, etc 7.0 Site


1.3 Definitions 7.1 Possession of the site
1.4 Communications 7.2 Awareness of Site
1.5 Queries about the Contract Data 7.3 Access to Site and Works
1.6 Notices 7.4 Land for Contractor
2.0 Extent and scope of Contract 7.5 Clearing the Site
2.2 Contractor's obligations 7.6 Discoveries
2.3 Coverage of costs 7.7 Unauthorised use
2.4 Employer's obligations 8.0 Temporary Works and utilities
2.5 Contract Agreement 8.5 Approval by the Engineer
2.6 Language of the Contract and applicable law 8.6 Water
2.7 Documents forming part of the Contract 8.7 Electricity
2.8 Documents mutually explanatory 8.8 Lighting
2.9 Interpretation of Contract documents 8.9 Rectification of utilities
2.10 Sufficiency of Tender 8.10 Construction yards and premises
2.11 Sufficiency of Contract 8.11 Site Office, stores and work places
2.12 Securities 9.0 Cooperation and coordination
2.13 Change in Employer / Engineer 9.2 Interference
2.14 Subcontracting 9.3 Facilities for others
2.15 Assignment and transfer of Contract 9.4 Coordinating work
2.16 Employer’s and Contractor’s Risks 9.5 Engineer’s decision
3.0 Engineer 10.0 Safety and Security
3.1 Identity 10.3 Explosives
3.2 Delegation 11.0 Protection of Environment
3.3 Works to the satisfaction of Engineer 12.0 Care of Works
3.4 Duties and powers of Engineer 12.5 Damages to persons and property
3.5 Instructions 12.6 Insurance
3.6 Form of instructions 13.0 Plant, Materials & Labour
3.7 Site Order Book 13.3 Adequacy
3.8 Compliance by Contractor 13.4 Liability against loss or injury to plant
4.0 Drawings 13.5 Irremovability
4.1 Supply of Drawings 13.6 Plant, Equipment, Tools and Tackles
4.2 Return of Drawings 13.7 Plant and machinery by Employer
4.3 As-built drawings 13.8 Engineers discretion
4.4 Drawings to be available at Site 13.9 Obligations of the Contractor
4.5 Ownership of drawings and documents 13.10 Charges
4.6 Confidentiality of drawings & documents 13.11 Materials
4.7 Tender Drawings 13.12 Substitution

AEH, Salem Design Collaborative Private Limited, Pondicherry


General Conditions of Contract Page 3 of 45

Materials obtained from dismantling, etc.


5.0 Measurements 13.13

6.0 Alterations, additions and omissions 13.14 Patent Rights & Royalties
6.1 Variations 13.15 Materials by Employer
6.2 Orders for variations to be in writing 13.16 Requisition
6.3 Valuation of variations and Power of Engineer 13.17 Emergency procurement
6.4 Day work 13.18 Intertransfer
13.19 Bonafide use
13.20 Accounting

14.0 Manpower 18.8 Documents alongwith Bills


14.4 Compliance with Labour Regulations 18.9 Periodicity of Bills
14.5 Indemnity 18.10 Minimum amount for certification
14.6 Returns of Labour 18.11 Period of certification
14.7 Authorised Agent 18.12 Amending previous certifications
14.8 Competent personnel 18.13 Payments
14.9 Removal of Workmen 18.14 Mode of payment
14.10 Accident or injury to Workmen 18.15 Interest on late payment
14.11 Salient features of some major labour laws 18.16 Tax

AEH, Salem Design Collaborative Private Limited, Pondicherry

You might also like