13 Oil Recovery Station
13 Oil Recovery Station
JOBLIST
( Hazard Identification, Risk Assessment and Control )
13.4 Maintenance
13.5 Housekeeping
KETERUKAN Reviewed
MUHAMMAD HAIKAL BIN RUSDI
1. KEMALANGAN NYARIS / PERTOLONGAN by
CEMAS
2. KECEDERAAN RINGAN (< 4 HARI)
(Mill Engineer) Date: January 2020
3. KECEDERAAN SERIUS (> 4 HARI) Approved
TEY YONG JIAN
4. MAUT / HILANG KEUPAYAAN KEKAL by
(Manager) Date: January 2020
KILANG SAWIT CHARUK PUTTING SDN BHD
Department: Oil Recovery SOP Activity: Feeding raw sludge into the
Section: Cooling pond SOP No. SOP Date
Station pond
EXISTING CONTROL RISK ASSESSMENT RECOMMENDED RISK CONTROL
No.
1-3 4-10 11-16 Implemented
JOB STEP HAZARD(S) EFFECT Probability Severity Nature of Risk
Nature of Risk Control Type
Control
Low Medium High Checked by Date
Use PPE
Use PPE
3 Lifting the Swictch over plate Fall into tha drain Body injury Cover the drain 1 4 4
KETERUKAN Reviewed
MUHAMMAD HAIKAL BIN RUSDI
1. KEMALANGAN NYARIS / PERTOLONGAN by
CEMAS
2. KECEDERAAN RINGAN (< 4 HARI)
(Mill Engineer) Date: January 2020
3. KECEDERAAN SERIUS (> 4 HARI) Approved
TEY YONG JIAN
4. MAUT / HILANG KEUPAYAAN KEKAL by
(Manager) Date: January 2020
KILANG SAWIT CHARUK PUTTING SDN BHD
1 Stating the machine Electrocution Fatality/Burnt Regular check of Switch Box condition 1 4 4
KETERUKAN Reviewed
MUHAMMAD HAIKAL BIN RUSDI
1. KEMALANGAN NYARIS / PERTOLONGAN by
CEMAS
2. KECEDERAAN RINGAN (< 4 HARI)
(Mill Engineer) Date: January 2020
3. KECEDERAAN SERIUS (> 4 HARI) Approved
TEY YONG JIAN
4. MAUT / HILANG KEUPAYAAN KEKAL by
(Manager) Date: January 2020
KILANG SAWIT CHARUK PUTTING SDN BHD
Gas cutting torch Shut the gas cutting equipment when doing
slipped and the fire Scalded/burnt. other things like removing the old metal plate 1 4 4
hit the person. after cutting, etc.
Welding chips
Eye injury. Wear welding shields. 1 4 4
enter to eyes.
Supervision by Chargeman
Supervision by Foreman 1 4 4
Prepare the chain block for heavy Fatality, Serious
4 Heavy parts
lifting Injury
Training on the handling procedure 1 4 4
KETERUKAN Reviewed
MUHAMMAD HAIKAL BIN RUSDI
1. KEMALANGAN NYARIS / PERTOLONGAN by
CEMAS
2. KECEDERAAN RINGAN (< 4 HARI)
(Mill Engineer) Date: January 2020
3. KECEDERAAN SERIUS (> 4 HARI) Approved
TEY YONG JIAN
4. MAUT / HILANG KEUPAYAAN KEKAL by
(Manager) Date: January 2020
CEMAS
2. KECEDERAAN RINGAN (< 4 HARI)
3. KECEDERAAN SERIUS (> 4 HARI)
4. MAUT / HILANG KEUPAYAAN KEKAL
KILANG SAWIT CHARUK PUTTING SDN BHD
Supervision by Chargeman
Supervision by Chargeman
Supervision by Chargeman
Supervision by Superior
Injury on the workers
7 Put the sign "Men at Working" Suddenly start
body
1 4 4
KETERUKAN Reviewed
MUHAMMAD HAIKAL BIN RUSDI
1. KEMALANGAN NYARIS / PERTOLONGAN by
CEMAS
2. KECEDERAAN RINGAN (< 4 HARI)
(Mill Engineer) Date: January 2020
3. KECEDERAAN SERIUS (> 4 HARI) Approved
TEY YONG JIAN
4. MAUT / HILANG KEUPAYAAN KEKAL by
(Manager) Date: January 2020