100% found this document useful (1 vote)
26 views2 pages

Exp GBS2 0132

Uploaded by

allymack346
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
26 views2 pages

Exp GBS2 0132

Uploaded by

allymack346
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

ARCTIC LNG 2 LLC

EXCEPTION REQUEST RFC ✘ AOC


Client Name : ARCTIC LNG 2 LLC Project Name : ARCTIC LNG 2

Contractor : CASCADE ENGINEERING Project No.: 079332

EXCEPTION No: EXP-GBS2-0132 Description:


Module No.: 2-TMR-001
System No.: 2-BLM-008 IER-208
Sub-System No.: 2-BLM-008-IN-95B BLM-008-CCC BOOSTER COMPRESSOR
Type of Exception (Select applicable)
Tags ✘ QCF form Punch List NCR Document
If Other provide Details:
Disciplines included under this Exception (Select)
Civil and
Structure
Mechanical Piping Electrical ✘ Instrumentation Telecoms
HVAC Safety Equip Painting Building Other
Equipment / Tagged Items to be covered under the Exception Request. Ensuring to address all aspects
Details of Exception Include including Pre-Commissioning / Commissioning and Start-up impacts that this exception may have.

Tag Tag Description Exp. Type No: Reason for Exception


from 2TMP2-J-SC-063 (2-TMP-002) to
2TMP2-C-SC-063 QCF 3401820 Completion date 28.12.2023
LCS-208-205 (2-TMR-001/IER-208)
from 2TMP2-J-SC-063 (2-TMP-002) to
2TMP2-C-SC-063 QCF 3401821 Completion date 28.12.2023
LCS-208-205 (2-TMR-001/IER-208)
from 2TMP2-J-SC-064 (2-TMP-002) to
2TMP2-C-SC-064 QCF 3401822 Completion date 28.12.2023
LCS-208-205 (2-TMR-001/IER-208)
from 2TMP2-J-SC-064 (2-TMP-002) to
2TMP2-C-SC-064 QCF 3401823 Completion date 28.12.2023
LCS-208-205 (2-TMR-001/IER-208)
from 2TMP2-J-SC-064 (2-TMP-002) to
PTC-T2S1-0002 QCF 3539813 Completion date 28.12.2023
LCS-208-205 (2-TMR-001/IER-208)
from 2TMP2-J-SC-063 (2-TMP-002) to
PTC-T2S1-0003 QCF 3539814 Completion date 28.12.2023
LCS-208-205 (2-TMR-001/IER-208)
from 2TMP2-J-SC-064 (2-TMP-002) to
PTC-T2S1-0002 QCF 3541071 Completion date 28.12.2023
LCS-208-205 (2-TMR-001/IER-208)
from 2TMP2-J-SC-063 (2-TMP-002) to
PTC-T2S1-0003 QCF 3541072 Completion date 28.12.2023
LCS-208-205 (2-TMR-001/IER-208)

Detail Mitigation Measures (Provide Details of Mitigation measures that Contractor will implement)

Exception Originator Detail

1
EXP-GBS2-0131
ARCTIC LNG 2 LLC

EXCEPTION REQUEST RFC ✘ AOC


Client Name : ARCTIC LNG 2 LLC Project Name : ARCTIC LNG 2

Contractor : CASCADE ENGINEERING Project No.: 079332

Name: Alister Mackinnon Signature:

Position: Completion Manager Date: 12.13.2023


CTR Approval Signatories
Construction Manager Commissioning Manager
Name: Michel Swaidan / Paul De Charmoy

Signature:

Date: 12.13.2023
Company Approval Signatories
Company Representative
Name:

Signature:

Date:

Approval Required Required for every Exception