Sample - Problem Solving Methods
Sample - Problem Solving Methods
Date:
PRACTICAL PROBLEM SOLVING REPORT
Champion: Phone No. Date:
Report # Repeat Issue?
Problem found by: (circle one): Problem in shift: 1st 2nd 3rd
Environmental
Customer Internal Production Audit / Inspection Other: Sketch:
Issue
Problem Category (circle one):
Safety/Environment Quality Cost Responsiveness Other:
Process/Part Check * ANY "NO" RESPONSE REQUIRES CORRECTIVE ACTIONS Diagnostic and/or Support Tools Used (Y if used, N if not applicable or not used)
(similar to "7 Diamond Process" Steps 1-5): Y N* Quality Alert Issued for Containment:
Is the SOS / BOS being followed? Fishbone (Direct Cause Analysis)
If No, what System was not followed? 5 Why (Root Cause Analysis) Used
Is correct tool being used? Drill Deep Worksheet Used
Eng. Change Req'd? (*) (if yes, include Ref # for
Is correct part being used?
CAR closure)
Has the operator been trained? (*) EC Referce Number
Do the parts support quality? NO DIAGNOSTIC TOOLS USED
INITIAL RESPONSE PLANNING - DUE WITHIN 24 HOURS (Shade status complete with updates)
Breakpoint
Material Containment & Identification Method Qty Discrepant Qty Reviewed DATE WHO STATUS (**)
(if applicable)
@ Customer:
In-Transit:
In-Plant:
@ Supplier:
Breakpoint
Process Failure Containments DATE WHO STATUS (**)
(if applicable)
FINAL RESPONSE PLANNING - DUE WITHIN 15CALENDAR DAYS (Shade status complete with updates)
Following the Root Cause analysis, what System failured? (APQP, Process Control, Management Review, Training, etc.)
How did the nonconformance escape the facility? Cause Defined (Deep & Wide "Protect"):
Permanent Corrective Action / Long-Term Countermeasures WHO DATE Team Member Initials STATUS (**)
(**) Key for Status: 1. Identified (one fill) 2. Implemented (two fills) 3. Feedback (three fills) 4. Closed (all filled)
Quality Planning Documents Updated (indicate date) DFMEA: PFMEA: Control Plan:
Direct Cause Analysis: (Fishbone) FINAL ROOT CAUSE DUE WITHIN 10 CALENDAR DAYS
1) Indicate possible direct causes on
2) Circle most likely direct 2) Circle most likely direct causes.
1 1 1
PROBLEM
2 2 2
3 3 3
4 4 4
5 5 5
1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
( ) ( ? ) ( CROSS OUT )
st Each
Direct Cause of the Problem Possible Direct Cause Not a cause of the problem
TEST POSSIBLE DIRECT CAUSES FROM FISHBONE
Target Actual
Intermediate Action Plans (not containment) Who
Complete Complete
Status
Why?
Why?
Why?
Issue title:
P3
Predict P4
Planning process -
inform at ional cont ent P5
in FMEAs and CPs
P-RC
M3
Prevent M4
Manufact uring process -
st andardized work and
M5
error proofing
M-RC
Q3
Protect Q4
Quality process -
detection & Q5
responsiveness
Q-RC
K3
K4
K5
LESSONS LEARNED: Could the communication of this problem and its fixes possibly prevent other
departments from incurring the same problem? If Yes, Which Area?
Date/ Signature: Author (required for closure) Group Leader/Shift Leader (info only) Area Manager (info only)
A - Shift
B - Shift