0% found this document useful (0 votes)
46 views2 pages

Summary 2

Uploaded by

JASON TIBON
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views2 pages

Summary 2

Uploaded by

JASON TIBON
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

JMT CONSTRUCTION & ENGINEERING SERVICES

MOHON TAGOLOAN MISAMIS AORIENAL


Email: [email protected]/[email protected]
Tel: 088-8552100/09952383556/09201866182

BILL OF MATERIALS AND COST ESTIMATES SUMMARY

DATE : July 8, 2024


PROJECT : Prposed 2 Storey Residencial Building
LOCATION : BLK 31 LOT 8 West wood Canitoa CDO

OWNER : Mrs Kate Nelasco

ITEM NO. DESCRIPTION TOTAL


1 MOBILIZATION AND DEMOBILIZATION 66,285.30
3 GENERAL REQUIREMENTS 117,000.00
4 EARTHWORK 108,155.00
5 CONCRETE 661,396.00
6 MASONRY 388,806.00
7 REINFORSMENT & METALS WORKS 805,960.60
8 FORMWORKS 337,961.50
9 STAIRS 15,386.00
(Note: KITCHEN CABINET WORKS CLOSET
10 CARPENTRY 71,610.00
AND DRAWERS including accessories)

11 THERMAL AND MOISTURE PROTECTION( water proffing) 75,618.00


12 OPENINGS 453,140.00
13 FINISHES 543,673.00
PAINTING 187,149.00
CEILING CARPENTRY 134,048.00
(Note: Septic Vault Works are
14 PLUMBING 208,726.00
already included)
15 ELECTRICAL 160,270.00
16 FIRE PROTECTION 30,000.00
TOTAL BUILDING MATERIAL COST: 4,365,184.40
LABOR (installation of trusses are included on materials) 40% 1,746,073.76
CONTINGENCIES/CONTRACTORS PROFIT 8% 349,214.75
TOTAL PROJECT COST 6,460,472.92

NOTE:
1. The above breakdown costing includes labor/equipment and mark-ups (overheads and contingencies).
2. The above unit prices shall be applied for any change orders that may be authorized by the owner.

PREPARED BY: ENGINEER EUGENE LIBOT (SE2, CE)


PRC NO: PTR NO:

DATE ISSUED: PLACE ISSUED

APPROVED BY:

OWNER ARCHITECT

SHOULD YOU HAVE ANY QUESTIONS REGARDING THIS QUOTE OR IF YOU NEED ANY ADDITIONAL INFORMATION,
PLEASE FEEL FREE TO REACH ABOVE MENTIONED CONTACTS.
Thank You For Your Business!

COST ESTIMATES SUMMARY Page 1


COST ESTIMATES SUMMARY Page 1