0% found this document useful (0 votes)
29 views2 pages

PreShipment Inspection

Uploaded by

eyryne.matandac
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views2 pages

PreShipment Inspection

Uploaded by

eyryne.matandac
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Pre‐Shipment Inspection Report

Report Date: Report No.: 01‐05092023


INSPECTION DETAILS
Client Name: Cipriano ‐ Bahrain
Ship to: Bahrain
Inspection Location : Fine Edge, Dubai Invesment Park 2, Dubai, UAE
Inspection Date: May 8,2023
Supplier : Fine Edge/Al Araka Décor
Ref. Sample No.
Inspection Result Process if failed
No. Item no. Item Code Description Order Qty
Qty Pass Fail Remarks Redo Hold Reject
Model: DEDAR‐ Sansone
1 15365846 S1 1
Color: 11 Cenere
Leather color cognac with
C1 seams in color Rope and nails 100
2 Chrome finished
Armchair in leather col. Cognac
and fabris col. Grey w/ Chrome
C2 finished legs, decortive 10
cushion with Logo Cipriani
3 included

9
Pre-Shipment Inspection Report
Report Date: Report No.: 01-05092023
INSPECTION DETAILS
Client Name: Cipriano - Bahrain
Ship to: Bahrain
Inspection Location : Fine Edge, Dubai Invesment Park 2, Dubai, UAE
Inspection Date: May 8,2023
Supplier : Fine Edge/Al Araka Décor
P.O. No.
Result
Item no. 15365846
Information
1 Export Box Pass Fail Remarks
1.1 Shipping Mark 
1.2 Drop Test 
1.3 Carton Quality 
2 Inner Box
2.1 Barcode/Label/ Marking 
2.2 QC Label 
2.3 Carton Quality 
3 Item
3.1 Items Label 
3.2 Visual Inspection 
3.3 QC Label 
4 Accessories & documents
4.1 User manual 
4.2 Accessories & documents 
4.3 Packaging 
5 Technical Check
5.1 Dimension/weight 
5.2 Specifications compliance 

Inspected by:

Approved by :

You might also like