100% found this document useful (1 vote)
467 views

All Turtle Diagram

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
467 views

All Turtle Diagram

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 11

Doc. No.: PIPL-QM-01 APPX.

V
Turtle Diagram Rev. No.: 00
PIPL Effective Date: 20/10/2017
Process:

Production Process Control

SUPPORT FUNCTION PERFORMANCE INDICATORS & ITS


1: PPC ANALYSIS :
2: QA
3: Store As per Departmental Objectives -
4: Maintenance Deptt. FMT-14
5: Purchase
6: HR
7:Development

INPUT
1: Production Planning
2: Raw Material and BOP Production OUTPUT
3: Skilled Manpower Process owner: HOD 1: OK Products as per plan
4: M/C in running condition Prod. 2: Rejction
5: Process Parameter & WI 3:Process validation
6: Product spec. * Process Control 4: Maintaining of 5 - S
7: Packing Accessories * Production 5: Improvement / Kaizen
Secheduling
* Process Validation

Training ,Skill & Competency


1: Knowledge Of Production Process
2: Kaizen
3: Safety
REF. DOCUMENTS 4: 5'S'
5: Product Safety Awareness.
Monthly production plan F/PRD/02 6: Knowledge Of Soldering
Daily Production Report F/PRD/01 7: Knowledge Of Wiring , Drilling etc.
Daily Check Sheet of machine F/MNT/13 Operation
Line Inspection Report F/QC/04 8: Knowledge Of Product Inspection
Lab Scope Matrix F/QC/LAB/01
Company Performance Indicator For Month
………….. F/SYS/05
Dispatch schedule cum monitor F/PRD/03
Process Validation Report F/QC/21 Risk
1: Delayed Production
2.: Occurance of Non Conformity
3: Manpower Shortage
4: Process non Validated
5: Less Optimization / utilize of
Resources

PREPARED BY ( Deptt. HOD) APPROVED BY ISSUED BY ( MR) COPY STATUS

( Director )
PREPARED BY ( Deptt. HOD) APPROVED BY ISSUED BY ( MR) COPY STATUS

( Director )
Doc. No.: PIPL-QM-01 APPX. V
Turtle Diagram Rev. No.: 00
Effective Date: 20/10/2017
Process:

Human Resource Process


PIPL

SUPPORT FUNCTION PERFORMANCE


1: Manpower Placement INDICATORS & ITS
2: News Paper ANALYSIS :
3: All Department
4: Govt. Department As per Departmental
Objectives - FMT-14

INPUT OUTPUT
1: Recruited Man Power
1: Manpower Requirement 2: Training Plan
2: Training Needs & Resources Human Resources 3: Training Evalueation
3: Legal / Factory Act Requirment Process owner: HR 4: Satisfaction of
* Recruitment Employee
& Training to Employee 5: Full fill of Legal
*Employee Satisfaction Activities/ requirement
Servey 6: Improvement through
* Exit Interview Exit Interview ( In case
employee resigning )

REF. DOCUMENTS
Manpower requirement
Employee Competency Criteria F/16-02 Training ,Skill &
Induction training Schedule cum feed back Competency
form F/HRD/13 1: Knowledge of HR
On Job Training F/HRD/20 activities
Training Need Identification F/HRD/01 2: Kaizen
Annual Training Plan F/HRD/02 3: Safety
Attendence Sheet F/HRD/03 4: 5-S
Training Feed back and effectiveness 5: Knowlwdge of Legal
F/HRD/04 Activity / Factory Act.
Training Record F/HRD/05

Risk
1. Recruitment of Incompetent
person
2.: Insufficient Awareness of
Process importance
3: Manpower Shortage
4: Less Motivation
5: Heigher Manpower Cost

PREPARED BY ( Deptt. HOD) APPROVED BY ISSUED BY ( MR) COPY STATUS

( Director )
Doc. No.: PIPL-QM-01 ANNX. V
Turtle Diagram Rev. No.: 00
PIPL Effective Date: 20/10/2017
Process:

Corrective & Preventive Action AND


Quality Assurance
SUPPORT FUNCTION
1: HR PERFORMANCE INDICATORS & ITS
2: Production ANALYSIS :
3: Purchase
4: Maintenance As per Departmental Objectives -
5: Store/despatch FMT-14
6 :customer

INPUT

1:Manufactured/receiving mat.
2: Customer Complaint & return
Quality Assurance OUTPUT
material
Process owner: HOD QA 1: Calibration Plan
3: Customer Requierement &
*Equipment Calibration 2: Calibrated Instrumentt
spec.
* Inspection 3: Mat. Inspection Report
4: Customer's Drg.
(Incoming/Inprocess/Final) 4: Customer Rejection
5: Manpower
* Handaling of customer 5: Handling customer complaint
6. Gauges 7. Instruments
complaint 6: Process/Product Check Sheet
* Control of Non
Conformance
* Customer Complaint
Handling
REF. DOCUMENTS

INSPECTION STANDARDS
MATERIAL RECEIVING INSPECTION REPORT Training ,Skill & Competency
F/QC/29 1: Knowledge of QMS requirment
DAILY INSPECTION REPORT F/QC/04 2: Kaizen
PRE-DISPATCH INSPECTION REPORT F/QC/06 3: Safety
INCOMING INSPECTION REPORT F/QC/54 4: 5-S
SAMPLING INSPECTION PLAN F/QC/57 5: Quality tools like 7 QC Tools
MATERIAL TEST REPORT 6: Knowledge of calibration
CUSTOMER COMPLAINT REGISTER F/MKT/04 process
CUSTOMER RETURN REGISTER F/QC/31 7. Knowlwdge of Quality Control
CAPA F/QC/05 Plan

. Risk
1: Gauges remains non Calibrated
2.: Occurance of Non Conformity
3: Shipment of Non Conformity
4: Customer Complaints not
closed
5: Heigher Degree of non
Conformance

PREPARED BY ( Deptt. HOD) APPROVED BY ISSUED BY ( MR) COPY STATUS


( Director )
Doc. No.: PIPL-QM-01 APPX. V
Turtle Diagram Rev. No.: 00
PIPL Effective Date: 20/10/2017
Process:

Purchasing

SUPPORT FUNCTION PERFORMANCE INDICATORS & ITS


1: All Deptt. ANALYSIS :
2: Top Management
3 : Suppliers
As per Departmental Objectives -
FMT-14

INPUT OUTPUT
Purchasing
1: Purchase mat. as reqd.
1: Material Specification Process owner: HOD
2: Approved Supplier list
2: Indent / Rurchase Request Purchase
3: Supplier Rating
3: Prod. Plan / Stock Status * Mat. Purchasing
4: Purchase Order
Sheet * New Supplier Devlopment
5: Stock Statement
4: Man Power * Supplier Rating
6.Supplier Quality Audit &
* Supplier Quality Audit &
Improvement
Improvement
* Outsourse Process
Control

REF. DOCUMENTS
LIST OF OUT SOURCE ACTIVITY Training ,Skill & Competency
TRIMMING REGISTER OUTSOURCE 1: Knowledge of Purchase process
2: Kaizen
LIST OF APPROVED SUPPLIERS F/PUR/03 3: Safety
SUPPLIER EVALUATION REQUEST CUM 4: 5-S
REGISTRATION FMT-38 5: Negotiation Skills
PURCHASE ORDER F/PUR/05
SUPPLIER SCHDULE F/PUR/08
SUPPLIER RATING SHEET F/PUR/10
INDENT SLIP
VERBAL ORDER REGISTER FOR SUPPLIERS

Work Instruction For Supplier Rating Risk


1: Incompetent Supplier Developed
2.: Supply of Non Conformity
3: Delayed Receipt of Material
4: Inappropriate Supplier's
Performance
5: Heigher Degree of non Conformance

PREPARED BY ( Deptt. HOD) APPROVED BY ISSUED BY ( MR) COPY STATUS

( Director )
Doc. No.: PIPL-QM-01 APPX. V
Turtle Diagram Rev. No.: 00
PIPL Effective Date: 20/10/2017
Process:

Management Process & QMS Control

SUPPORT FUNCTION PERFORMANCE INDICATORS & ITS


1: All Deptt. ANALYSIS :
2: Top Management
3: External Agencies As per Departmental Objectives -
FMT-14

INPUT
Management Review
1: Dept. Objective Target vs Process owner: MR
achivement * Internal Audit
2: External / Customer Std * Document Control OUTPUT
3: Products * Record Control 1: Management Review Report
4: Manpower * External Doc. Control 2: Internal Audit Plan and
* Manageent Review Conduction
* Corrective and 3: Controlled Manual, Procedure
Preventive Actions etc.
* Continual Doc. No. 4: Corrective & Preventive Action
* Communication for QMS 5: Internal Audit Results
6: Kaizan Activity
REF. DOCUMENTS
Master List of document cum
Distribution F/SYS/01
Master List Of External Docs F/SYS/03
Document change request F/SYS/07
Engineering Change Notification
F/NPD/11
Engineering Change Note Register
F/NPD/03
Internal Audit Schedule F/SYS/09 Training ,Skill & Competency
Non Conformance Report F/MR/03 1: Knowledge of QMS ISO 9001 &
Audit report summary F/SYS/12 TS 16949 requirments
Internal Quality Audit Checklist 2: Kaizen
F/SYS/13 3: Safety
List Of Trained Internal Auditor F/SYS/23 4: 5-S
Internal EHS Audit Checklist F 5 : Knowledge of Manufacturing
Minutes of Meeting (Meenutes of Process
Management Review Meeting) F/MR/01 6 : Qualified Internal Auditor for
Departmental Objectives F/SYS/05 ISO/ TS 16949 : 2009
CORRECTIVE & PREVENTIVE ACTION
REQUEST (CAPA) F/QC/05
Risk
1: In appropriate Doc. Control
2.: Inappropriate Record Control
. 4: Irregular QMS Audits Conduc
5: Irregualar Management Review
Conduction
6. In appropriate Communication for
QMS

PREPARED BY ( Deptt. HOD) APPROVED BY ISSUED BY ( MR) COPY STATUS

( Director )
Doc. No.: PIPL-QM-01 APPX. V
Turtle Diagram Rev. No.: 00

PIPL Effective Date: 20/10/2017


Process:

Sales & Marketing

PERFORMANCE INDICATORS & ITS


SUPPORT FUNCTION ANALYSIS :
1: HR.
2: Acounts As per Departmental Objectives -
3: Development /QA FMT-14
4: PPC/ Prod.
5: Store/ Purchase
6: Customer

INPUT Marketing & Tendering


1: Man power Process
2: Customer Enquairy/ Process owner: Concern
information HOD Marketing
3: Customer Drg./Spec. OUTPUT
4: Cus. Purchase *Business Plan 1: Customer Feed Back
Ordre/Contract * Contract Review 2: List of Customer
5: Customer Feedback * Customer Satsfaction ( Existing &
Servey and Improvement Potential)
REF. DOCUMENTS * Tender Submission and 3: Customer Audit Plan:
Participation Management 4: Customer Audit Feed
MASTER LIST OF REGULAR *Service and Installation Back Report
CUSTOMERS CUM SATISFACTION Management
SURVEY PLAN
CUSTOMERS SATISFACTION SURVEY
F/MKT/02
CUSTOMER ENQUIRY CHECK SHEET
FEASIBILITY STUDY SHEET
F/NPD/04
Training ,Skill & Competency
1: Knowledge of process
2: Kaizen
3: Safety
4: 5-S
5. Knowledge of Service and
Installation

Risk
1: In appropriate Customer
Satisfaction
2.: Inappropriate Order Confirm
3: Inadequate Business Plan
Prepared

PREPARED BY ( Deptt. HOD) APPROVED BY ISSUED BY ( MR) COPY STATUS

( Director )
PREPARED BY ( Deptt. HOD) APPROVED BY ISSUED BY ( MR) COPY STATUS

( Director )
Doc. No.: PIPL-QM-01 APPX. V

PIPL
Turtle Diagram Rev. No.: 00
Effective Date: 20/10/2017
Process:

Maintenance

SUPPORT FUNCTION PERFORMANCE INDICATORS & ITS


1:Production ANALYSIS :
2:Quality
3:Purchase As per Departmental Objectives -
4:P.P.C FMT-14
5:HR
6:Account

Maintenance Process
Process woner:
HOD Maintenance
INPUT *M/C Maintenance OUTPUT
( 1: Established or ok m/c
1: Man power Preventive/Predictive / 2: Preventive Maint Plan
2: Purchased M/c & Manual Break Down) 3: List of Criticacal Spare Parts
3: B/D information *New M/c Establishment 4: B/D Hrs Analysis
4: Spare parts * Critical Spare Parts 5: Daily M/c Check Sheet
5: Oil & Management 6: Power Consumption
* Utility Control

REF. DOCUMENTS
MASTER LIST OF MANUFACTURING
EQUIPMENTS F/MNT/07 Training ,Skill & Competency
DAILY MACHINE CHECKLIST F/MNT13 1: Knowledge of Machine inhouse
ANNUAL SCHEDULES OF PREVENTIVE 2: Kaizen
MAINT. F/MNT/04 3: Safety
LIST OF CRITICAL PARTS CUM MIN. 4: 5-S
STOCK STATUS
PREVENTIVE MAINT CHECK LIST
F/MNT/03
MACHINE HISTORY CARD F/MNT/02
WHY WHY ANALYSIS REPORT F/MN/09
BREAKDOWN HOURS ANALYSIS Risk
F/MNT/16 1: In appropriate Prevetive
Maintenance
2.: Inappropriate Predective
Maintenance
3: Heavy Breackdown hours may
occure
4. More Critical Spare Consumed

PREPARED BY ( Deptt. HOD) APPROVED BY ISSUED BY ( MR) COPY STATUS

( Director )
Doc. No.: PIPL-QM-01 ANNX. V
Turtle Diagram Rev. No.: 00
PIPL
Effective Date: 20/10/2017
Process:

Stores

PERFORMANCE INDICATORS &


ITS ANALYSIS :
SUPPORT FUNCTION
1: All Deptt. As per Departmental Objectives -
2: Suppliers F/SYS/05
3 : Customer

INPUT OUTPUT
1: Purchase Order F/PUR/05 1: Receving of OK (incoming)/ FG /
2: Mat. Issue Slip Store & Dispatch NG material.
3: Incomming / FG / NG Process owners: HOD Store and 2: Identification / Preservation &
Products. Dispatch Incharge desposion of mat.
4: Manpower * Material Storage & Handling 3: Inventry Control
5: Incoming Inspection Report/ * Matterial Issue 4: Mat. despatch to customer
F/QC/29 * Inventory Control 5: FIFO maintening
6: GRN * Daily Dispatch 6: Mat. Issue to production deptt.
7: Supp./ Customer Documents * FIFO Maintenance 7: Document submition record
8: Packed Material updation

REF. DOCUMENTS

Inward Record Register FMT-70 Training ,Skill & Competency


Goods Receipt Note ( GRN ) FMT-71 1: Process Knowledge stores
Raw Material Requistion / Issue Slip and Dispatch
FMT-72 2: Kaizen
Stock Register FMT-74 3: Safety
List of Hazards Material FMT-75 4: 5-S
List of Self Life Control items FMT-76
Daily Dispatch Report FMT-77

Risk :
1: In appropriate Preservation of
Products
2.: Inappropriate Material Handling

3: Material Shortage
4. Irregular Self Life Control &
Hazard Material Control

PREPARED BY ( Deptt. HOD) APPROVED BY ISSUED BY ( MR) COPY STATUS


( Director )
Doc. No.: PIPL-QM-01 ANNX. V
Turtle Diagram Rev. No.: 00

PIPL Effective Date: 20/10/2017


Process:
New Product Development

SUPPORT FUNCTION
1: Mkt PERFORMANCE INDICATORS & ITS
2: QA ANALYSIS :
3: Store
4: Maintenance As per Departmental Objectives -
5: Purchase F/SYS/05
6: HR
7: Production
8: Tool Manufacturer

INPUT New Product


1: Customer Enquiry Development
2: Customer specific Owner :HOD Design &
requirement Development OUTPUT
3: Raw Material * Product Design & 1: PFMEA Process Flow
4: Skilled Manpower Proto samples Diagram/Chart
5: M/C must be in running * Validation of Product 2. Quality Control Plan
condition Design 3: Tool dev. And validation As
6: Forging M/C/Tool for trial * Tool/Fixture/Dev. per customer req.
Activity 4: SIR of part
* Tool Control 5: Maintaining of 5 - S
* APQP
* PPAP 6: Improvement / Kaizen
* KAIZEN 7. Tool Trial and Inspection
Report

REF. DOCUMENTS Training ,Skill & Competency


1: Kaizen
TOOL DEVELOPMENT TIMING PLAN 2: Safety
F/NPD/01 3: 5-S
Process Flow Chart F/NPD/05 4. Process Flow Diagram/Chart
Control Plan F/NPD/07 5. Quality Control Plan ,
PACKING STD F/PRD/12 6. PPAP
LIST OF CHECKING AIDS F/QC/10 7. Machining Process
NEW TOOL TRIAL REPORT F/NPD/13

Risk :
1 . More time Consumed for
Development
2. Development / Product
Approval in Multiple hits
3. Cost of Development
Increased

PREPARED BY ( Deptt. HOD) APPROVED BY ISSUED BY ( MR) COPY STATUS

( Director )

You might also like