0% found this document useful (0 votes)
184 views7 pages

Overhead Tank Plan For Quotation

Sample Plan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
184 views7 pages

Overhead Tank Plan For Quotation

Sample Plan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

TABLE OF CONTENTS REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

GENERAL OFFICE OF THE BUILDING OFFICIALS


G-1 PERSPECTIVES

VICINITY MAP

LOCATION MAP
DISTRICT/CITY/MUNICIPALITY

ARCHITECTURAL
LAND USE & ZONING:
A-1 GROUND FLOOR PLAN

FRONT ELEVATION

LEFT SIDE ELEVATION

REAR ELEVATION

RIGHT SIDE ELEVATION

CROSS SECTION LINE AND GRADE:


A-2 LONGITUDINAL SECTION

ROOF PLAN

CEILING PLAN

DOOR SCHEDULE

ISOMETRIC VIEW
TYP. CEILING ARCHITECTURAL:
VENTILATION DETAIL
STRUCTURAL
S-1 GENERAL CONSTRUCTION NOTES

S-2 FOUNDATION PLAN

COLUMN-FOOTING DETAILS

BLOW UP DETAIL
ELEVATED WATER TANK ROOF FRAMING PLAN
STRUCTURAL:

WALL FOOTING DETAILS

ROOF BEAM DETAILS

1 PERSPECTIVE RAFTER DETAILS


G1 G1 SCALE: NTS WATER TANK PLAN
S-3
ETERNAL GARDENS MEMORIAL PARK WATER TANK FOUNDATION PLAN
SANITARY:
C1-F1 DETAILS

PROJECT SITE TIE BEAM DETAILS

S-4 WATER TANK ELEVATION

ALP: ZAC SPOT DETAIL "A"


MOTOR &
CAR
TO BRGY. BONBON WASH SPOT DETAIL "B"
ETERNAL
AND POBLACION GARDENS
SPOT DETAIL "C"
MEMORIAL ELECTRICAL:
PARK
PATAG
ELEMENTARY SPOT DETAIL "D"
ALP: ZAC
MOTOR & SCHOOL
CAR SPOT DETAIL "E"
WASH PATAG
BARANGAY MANHOLE DETAIL
HALL

PATAG LADDER RUNG DETAIL


ELEMENTARY
SCHOOL
CATWALK DETAIL
PATAG IGLESIA MECHANICAL:
BARANGAY FILIPPINA
SERVICE LADDER DETAIL
HALL INDEPENDIENTE
PARISH CATWALK PLAN

ELECTRICAL
IGLESIA E-1 LIGHTING FIXTURE LAYOUT
FILIPPINA
INDEPENDIENTE
CONVENIENCE OUTLET LAYOUT
TO NGCP OPOL PARISH
SUBSTATION RISER DIAGRAM
SURVEY:
SCHEDULE OF LOADS

LEGEND:
2 VICINITY MAP PLUMBING

G1 G1 SCALE: NTS 3 LOCATION MAP - PROVINCIAL ROAD P-1 EXCAVATION FOR DISTRIBUTION LINE
- BOUNDARY DRILLING & INSTALLATION OF PUMP &
G1 G1 SCALE: NTS
- BRGY. ROADS MOTOR

CIVIL ENGINEER: PROJECT TITLE: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SET NO. SHEET NO.
CADD BY: AP MACAWILE
ETERNAL GARDENS MEMORIAL PARK PERSPECTIVE
ETERNAL GARDENS ENGINEERING PROPOSED ELEVATED WATER G 1
CORPORATION DATE: OCTOBER 2023 VICINITY MAP
AND PROJECT DEVELOPMENT TANK - EG OPOL LOCATION MAP 1 1 15
TIN: REG NO.: CHECKED BY:
MR. NUMERIANO B. RODRIN
PTR NO.: DATE: LOCATION: ZONE 5, MAMIS, BRGY. PATAG, OPOL MISAMIS ORIENTAL PRESIDENT & COO APPROVED BY: REVISION:
6.80

2.00

FTB -1

4 - 20mm Ø VERT. BARS


FTB -1

FTB -1
6.80

6.80

2.00
4 - 20mm Ø VERT. BARS

NGL
2 - SETS OF 12mm Ø
LATERAL TIES @
0.20m 0.C.
4 - 20mm Ø VERTICAL 4 - 20mm Ø VERTICAL
FTB -1 BARS BARS

2 - SETS OF 12mm Ø
LATERAL TIES @ 0.20m., O.C. 13 - 20mm Ø TOP
BARS EACHWAY
6.80

WATER TANK WATER TANK 0.15m COMPACT GRAVEL

1 FOUNDATION PLAN 2 PEDESTAL AND FOOTING PLAN 13 - 20mm Ø BOTTOM


BARS EACHWAY

S3 S8 SCALE: 1:100 S3 S8 SCALE: 1:40


*CONSIDERING 100KPA SOIL BEARING CAPACITY

WATER TANK
3 PEDESTAL AND FOOTING DETAIL
S3 S8 SCALE: 1:40

13 - 20mm Ø TOP
BARS EACHWAY

NGL NOTE :
4 - 20mm Ø VERT. BARS 6 - 20mm Ø BOTTOM AND CUT BARS,
THE FOUNDATION DESIGN VARIES ACCORDING
6 - 20mm Ø TOP AND MIDDLE BARS W/
2 SETS OF 12mm Ø TIES, 2 @ 0.01m., 5 TO ACTUAL SOIL BEARING CAPACITY OF
@ 0.20m. REST @ 0.40m O.C.
PROPOSED SITE.
4 - 20mm Ø VERT. BARS

2 - SETS OF 12mm Ø
LATERAL TIES @
0.20m 0.C.

0.15m COMPACT GRAVEL

13 - 20mm Ø BOTTOM
BARS EACHWAY
0.15m COMPACT GRAVEL

WATER TANK WATER TANK


4 COLUMN FOOTING DETAIL 5 FOOTING TIE BEAM DETAIL
S3 S8 SCALE: 1:40 S3 S8 SCALE: 1:40

CIVIL ENGINEER: PROJECT TITLE: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SET NO. SHEET NO.
CADD BY: AP MACAWILE
ETERNAL GARDENS MEMORIAL PARK WATER TANK FOUNDATION PLAN
ETERNAL GARDENS ENGINEERING PROPOSED ELEVATED WATER PEDESTAL AND FOOTING PLAN
S 7
CORPORATION DATE: OCTOBER 2023
AND PROJECT DEVELOPMENT TANK - EG OPOL PEDESTAL AND FOOTING DETAIL 3 8 15
TIN: REG NO.: CHECKED BY: COLUMN FOOTING DETAIL
MR. NUMERIANO B. RODRIN
PTR NO.: DATE: LOCATION: ZONE 5, MAMIS, BRGY. PATAG, OPOL MISAMIS ORIENTAL FOOTING TIE BEAM DETAIL
PRESIDENT & COO APPROVED BY: REVISION:
W 8 x 8 x 71.43

W 8 x 8 x 71.43 welded around


NGL edges with 10mm fillet weld
d = 312mm
0.35m x 0.70m TIE BEAM w/ 6 - 20mm bf = 166mm
Ø BOTTOM AND CUT BARS, 6 - 20mm tw = 6.60mm
4 - 20mm Ø Ø TOP AND MIDDLE BARS W/ 2 SETS
VERTICAL BARS OF 12mm Ø TIES, 2 @ 0.01m., 5 @ tf = 11.20mm
0.20m. REST @ 0.40m O.C.
500mm x500mm column
4 - 20mm Ø w/ 4 - 25mm Ø BARS
VERTICAL BARS

400mm x400mm x 4.5cm thk


13 - 20mm Ø TOP base plate
BARS EACHWAY

8 - 25mmØ x 500mm Stainless


Steel Anchor Bolt
0.15m COMPACT GRAVEL

13 - 20mm Ø BOTTOM
BARS EACHWAY 0.15m COMPACT GRAVEL
BASE PLATE DETAILS
COLUMN CONNECTION DETAILS
WATER TANK
1 BLOW UP PLAN AND CONNECTION DETAILS
S4 S8 SCALE: 1:40

0.35

4-20mmØ DB 4-20mmØ DB
2-25mmØ DB

0.70
2-20mmØ DB 2-20mmØ DB

W 8 x 8 x 71.43 6-20mmØ DB 4-20mmØ DB W 8 x 8 x 71.43

@ SUPPORT @ MIDSPAN

NGL NGL
500mm x500mm column
L/5 L/5
2 - SETS OF 12mm Ø LATERAL
TIES SPACED @ 0.20m., O.C.

13 - 20mm Ø TOP. BARS

13 - 20mm Ø BOT. BARS

L/4 L/4
FTB: 350mm x 700mm w/ 6 - 20mm Ø BOTTOM AND CUT 150MM THK. GRAVEL FILL
BARS, 6 - 20mm Ø TOP AND MIDDLE BARS W/ 2 SETS OF
12mm Ø TIES, 2 @ 0.01m., 5 @ 0.20m. REST @ 0.40m O.C.

WATER TANK
2 TIE BEAM DETAILS

CIVIL ENGINEER: PROJECT TITLE: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SET NO. SHEET NO.
CADD BY: AP MACAWILE
ETERNAL GARDENS MEMORIAL PARK BLOW UP PLAN CONNECTION
ETERNAL GARDENS ENGINEERING PROPOSED ELEVATED WATER DETAILS
S 8
CORPORATION DATE: OCTOBER 2023
AND PROJECT DEVELOPMENT TANK - EG OPOL TIE BEAM DETAILS 4 8 15
TIN: REG NO.: CHECKED BY:
MR. NUMERIANO B. RODRIN
PTR NO.: DATE: LOCATION: ZONE 5, MAMIS, BRGY. PATAG, OPOL MISAMIS ORIENTAL PRESIDENT & COO APPROVED BY: REVISION:
1.00m. SHELL O.D. = 4.85m. 1.00m.

STRUT LENGTH ( VARIABLE ) = L

( ELLIPSOID )
Xi = 0.90m.
HWL
L/6 L/3 L/3 L/6 75mm. Ø 45° FAB. BEND

HORIZONTAL STRUTS PROVIDE SPACERS

CYLINDRICAL SHELL
1.00m. SHELL O.D. = 4.85m. 1.00m.
OVER FLOW PIPE

H = 3.05m.
L/3
SECONDARY

STRUT LENGTH ( VARIABLE ) = L


BRACING 3
LOWER LADDER CAGE

( ELLIPSOID )
Xi = 0.90m.
UPPER LADDER CAGE

L/3 SPACER PLATE

30°
( TYPICAL ) GRAB RAIL

45°

.
0m
ACCESS HATCHWAY

2 .0
PLATFORM

3 TANK SECTION
L/3

HORIZONTAL BRACING PLATFORM RAILING


W / STD. TURNBUCKLE
AIR VENT
75mm. Ø INLET PIPE S5 S8 SCALE: 1:50

DIAGONAL TENSION ROD

GUSSET PLATE
GRAB RAIL

TH
2 TANK PLAN

m.
OVER FLOW PIPE INVERT

WID
0.15
S5 S8 SCALE: 1:50
OVER FLOW PIPE
W 8 x 8 x 71.43 kg/m.
UPPER LADDER
DIAGONAL BRACING
PLATFORM RAILING
LEN CENTER OF D
GTH
IAGONAL BRACING
TOP OF TOWER
0.33m.

0.30m.
STIFFINER
"E"
1.80m.

VERTICAL LINE
TOP GUSSET PLATE
OVERFLOW HEIGHT = 23.55m.

4.00m.

"D"
1.80m.

BRACING TO COLUMN CENTER LINE OF COLUMN


CONNECTION
TOWER HEIGHT = 20.00m.

2.00m.

HORIZONTAL STRUTS SECTION


4.00m.

2.00m.

PRIMARY BRACING

"B" INTERMEDIATE GUSSET PLATE GUSSET PLATE


"C"
SCHEDULE OF DIMENSIONS ( BOTTOM GUSSET )
2.00m.

GUSSET THICKNESS 6.35 mm.


DIAGONAL BRACING STIFFINER W 8 x 8 x 71.43 kg/m. GUSSET LENGTH 450 mm.
BRACING TO STRUT CONNECTION
4.00m.

GUSSET WIDTH 300 mm.


STIFFENER WIDTH / THICKNESS 100 mm. / 6.35 mm.
LOWER LADDER
2.00m.

W/ SAFETY CAGE WELD PLATE LENGTH / THICK 200 mm. / 6.35 mm.
WELD DETAILS
BOTTOM GUSSET PLATE
GUSSET TO WEB 6.35 mm. thk. FILLET
"A" PLAN GUSSET TO FLANGE 6.35 mm. thk. FILLET
TOP OF BASEPLATE DIAGONAL BRACE TO GUSSET 10 mm. thk. FILLET
0.10m.

STIFFENER TO WEB & GUSSET 6.35 mm. thk. FILLET


d-2

1 WATER TANK ELEVATION


S5 S8 SCALE: 1:120
4 BOTTOM GUSSET PLATE ( "A" )
S5 S8 SCALE: NTS

CIVIL ENGINEER: PROJECT TITLE: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SET NO. SHEET NO.
CADD BY: AP MACAWILE
ETERNAL GARDENS MEMORIAL PARK WATER TANK ELEVATION
ETERNAL GARDENS ENGINEERING PROPOSED ELEVATED WATER TANK PLAN
S 9
CORPORATION DATE: OCTOBER 2023
AND PROJECT DEVELOPMENT TANK - EG OPOL TANK SECTION 5 8 15
TIN: REG NO.: CHECKED BY: BOTTOM GUSSET PLATE
MR. NUMERIANO B. RODRIN
PTR NO.: DATE: LOCATION: ZONE 5, MAMIS, BRGY. PATAG, OPOL MISAMIS ORIENTAL PRESIDENT & COO APPROVED BY: REVISION:
SCHEDULE OF DIMENSIONS ( INTERMEDIATE GUSSET )
GUSSET PLATE
W 8 x 8 x 71.43 kg/m.
GUSSET THICKNESS 6.35 mm.
DIAGONAL BRACING GUSSET LENGTH 450 mm.
GUSSET HEIGHT 60 mm.
STIFFENER WIDTH / THICKNESS 100 mm.
℄ OF DIAGONAL BRACING WELD PLATE LENGTH / THICK 200 mm. / 6.35 mm.

EQUAL EQUAL
WELD DETAILS

HEIGHT
HORIZONTAL LINE
GUSSET TO WEB 6.35 mm. thk. FILLET
GUSSET TO FLANGE 6.35 mm. thk. FILLET
HORIZONTAL BRACING STIFFINER
DIAGONAL BRACE TO GUSSET 6.35 mm. thk. FILLET
℄ OF DIAGONAL BRACING
STRUT TO GUSSET 10 mm. thk. FILLET
HORIZONTAL STRUTS HORIZONTAL STRUT
DIAGONAL BRACING
STIFFENER TO WEB & GUSSET 6.35 mm. thk. FILLET

0.1
5m
.
DIAGONAL BRACING
W 8 x 8 x 71.43 kg/m.
GUSSET PLATE GUSSET PLATE
STIFFINER
VERTICAL LINE

PLAN SECTION

1 BOTTOM GUSSET PLATE ( "B" )


S6 S8 SCALE: NTS

SCHEDULE OF DIMENSIONS
GUSSET - 1 THICKNESS 6.35 mm.
GUSSET - 1 LENGTH / WIDTH 300 mm. / 150 mm.
GUSSET - 2 THICKNESS 6.35 mm.
GUSSET - 2 LENGTH / WIDTH 250 mm. / 200 mm.
GUSSET T - 2
ADDITIONAL PLATE WIDTH / THICK 150 mm. / 6.35 mm.

LE
℄ OF PRIMARY BRACING

NG
WELD DETAILS
HEIGHT

PRIMARY BRACING

TH
GUSSET - 1 TO WEB 6.35 mm.

20
GUSSET PLATE HORIZONTAL LINE GUSSET - 1 TO FLANGE 6.35 mm.

0m
PRIMARY BRACING TO GUSSET - 1 6.35 mm.

m.
GUSSET - 2 TO HORIZONTAL STRUT 6.35 mm.
GUSSET - 1
PRIMARY BRACING TO GUSSET - 2 6.35 mm.
W 8 x 8 x 71.43 kg/m. PRIMARY BRACING
HORIZONTAL STRUTS PRIMARY BRACING TO HORIZONTAL STRUT 6.35 mm.
PRIMARY BRACING
DTH ADDITIONAL PLATE TO SECONDARY BRACING
WI & HORIZONTAL STRUTS
6.35 mm.

VERTICAL LINE
PLAN
SECTION
SECTION

2 BRACING TO COLUMN CONNECTION ( "C" ) 3 BRACING TO COLUMN CONNECTION ( "D" )


S6 S8 SCALE: NTS S6 S8 SCALE: NTS

GUSSET PLATE

TH SCHEDULE OF DIMENSIONS ( TOP GUSSET )


NG
LE GUSSET THICKNESS 6.35 mm.
HORIZONTAL LINE

G TH GUSSET LENGTH 450 mm.


N
LE STIFFINER
GUSSET WIDTH 350 mm.
STIFFENER WIDTH / THICKNESS 100 mm.
DIAGONAL BRACING W 8 x 8 x 71.43 kg/m. WELD PLATE LENGTH / THICK 200 mm. / 6.35 mm.
DIAGONAL BRACING
WELD DETAILS
GUSSET TO WEB 6.35 mm. thk. FILLET
WI

GUSSET PLATE GUSSET TO FLANGE 6.35 mm. thk. FILLET


DT

W 8 x 8 x 71.43 kg/m.
H

STIFFINER DIAGONAL BRACE TO GUSSET 10 mm. thk. FILLET


GUSSET PLATE STIFFENER TO WEB & GUSSET 6.35 mm. thk. FILLET
0.1

VERTICAL LINE d-1 VERIFY ON FIELD


5m
.

PLAN SECTION

4 TOP GUSSET PLATE ( "E" )


S6 S8 SCALE: NTS

CIVIL ENGINEER: PROJECT TITLE: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SET NO. SHEET NO.
CADD BY: AP MACAWILE
ETERNAL GARDENS MEMORIAL PARK BRACING TO COLUMN
ETERNAL GARDENS ENGINEERING PROPOSED ELEVATED WATER CONNECTION
S 10
CORPORATION DATE: OCTOBER 2023
AND PROJECT DEVELOPMENT TANK - EG OPOL TOP GUSSET PLATE DETAILS 6 8 15
TIN: REG NO.: CHECKED BY: SCHEDULE OF DIMENSION
MR. NUMERIANO B. RODRIN
PTR NO.: DATE: LOCATION: ZONE 5, MAMIS, BRGY. PATAG, OPOL MISAMIS ORIENTAL PRESIDENT & COO APPROVED BY: REVISION:
0.15m. 0.45m. MANHOLE OPENING
0.10m
COLUMN

0.60m.
0.075m TOP SHELL VERIFY
38mm. Ø GIP STRINGERS 0.40m. FLOOR PLAN 0.25m.
6.35mm. HOOPS @ 1.00m. O.C. PROVIDE LATERAL BRACING
6.35mm. x 50mm. FLAT BARS @ 2.50m.
WELDED TO HOOP

0.30m.
38mm. Ø GRAB RAIL
20mm. LADDER RUNGS PLUG 20mm. Ø G.I. PIPE LADDER
WELDED TO STRINGER
RUNGS @ 0.30m.
10 x 50mm. STRINGERS
10 x 75mm. STRINGER 6.35mm. SURFACE OF BOTTOM SHELL
SUPPORT @ 1.00m.

10 x 75mm. STRINGER

0.20m.

0.70m. 0.70m. 0.70m. 0.70m. 0.70m.


100 x 100 x 6.35mm. 100 x 100 x 6.35mm.
ANCHOR PLATE ANCHOR PLATE
1 LOWER LADDER WITH CAGE 2 INSIDE LADDER
S7 S8 SCALE: 1:30 S7 S8 SCALE: 1:20 7 - 12mm. Ø PLAIN
VERTICAL BARS

CAGE LADDER

SEE TANK PLAN FOR DIMENSION


20mm. Ø LADDER RUNG
@ 0.30m. O.C.
∠ 50 x 50 x 6.00mm.
HANDRAIL 10 x 75mm. STRINGER
SUPPORT
75 x 6.35mm. thk.
STL HOOP 0.70m.

0.30m.
0.15m.

2.00m.
0.40m. ( TYP. )
1.00m.

0.30m.
1.20m. 10 x 75mm. STRINGER

CYLINDRICAL SHELL
16mm. Ø PLAIN BARS F LAT F ORM F LOOR LI NE
PERIMETER CHANNEL
0.15m. 0.45m.
20 - 12mm. Ø PLAIN BAR

∠ 50 x 50 x 6.00mm.

50 x 50 x 6.00mm.
SUPPORT @ 1.00m.
6.35mm. ( TYPICAL ) O.C. ( MAX. ) 4 UPPER LADDER AND GRAB RAIL DETAIL
S7 S8 SCALE: 1:50
10mm. thk. STIFFENER

3 POINTER PLATFORM
S7 S8 SCALE: 1:10

CIVIL ENGINEER: PROJECT TITLE: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SET NO. SHEET NO.
CADD BY: AP MACAWILE
ETERNAL GARDENS MEMORIAL PARK LOWER LADDER WITH CAGE
ETERNAL GARDENS ENGINEERING PROPOSED ELEVATED WATER UPPER LADDER
S 11
CORPORATION DATE: OCTOBER 2023
AND PROJECT DEVELOPMENT TANK - EG OPOL UPPER LADDER & GRAB RAIL 7 8 15
TIN: REG NO.: CHECKED BY: DETAIL
MR. NUMERIANO B. RODRIN
PTR NO.: DATE: LOCATION: ZONE 5, MAMIS, BRGY. PATAG, OPOL MISAMIS ORIENTAL POINTER PLATFORM
PRESIDENT & COO APPROVED BY: REVISION:
0.66m. 13mm. Ø STRAIGHT
CONNECTOR
0.076m. 0.51m. 0.076m. 13mm. Ø RIGID STEEL SS PROBE HOLDER PRESSURE
CONDUIT TIGHT TO ACCOMODATE
MINIMUM OF 3 ELECTRODES
0.076m. TO JUNCTION BOX

0.076m.
0.076 0.66m
m. . 4.76mm. 50mm. SCHED. 40 HALF CPLG.
12.7mm. Ø BOLTS W/ WELDED TO ROOF PLATE TO

.
0.13m
STD. WASHERS FIT TO PROBE HOLDER THRED
16mm. Ø BOLT W/ NUT GA 18 thk. MANHOLE COVER
0.076
m. ROOF SHELL
0.10m.

19mm. Ø SPACER PIPE 3.17mm. thk. RUBBER GASKET INSULATED SUSPENSION OVERFLOW LEVEL
WIRES 41 STR.
NO18 SW COPPERS
12.7mm. Ø BOLTS W/ ( LENGTH AS REQUIRED )
STD. WASHERS LOWEST WATER LEVEL
12.7mm. thk. HINGE SHAFT
SECTION
6.35mm. thk. HINGE PLATE

0.256m.
12.0mm. Ø ROUND BARS
LIFT MANHOLE
PLAN
2 WATER LEVEL LAYOUT
S8 S8 SCALE: NTS

1 ACCESS HATCHWAY
S8 S8 SCALE: 1:10

0.30m. COPPER WIRE MESH


45° FAB. BENDS
HIGHEST WATER LEVEL

4.76mm.

BOTTOM OF ROOF SHELL


4mm. Ø COPPER TUBING

0.25m.
WELD JOINT
ROOFSHELL
TO POINTER 0.60m. CYLINDRICAL SHELL
TYPICAL PIPE SUPPORT ( 2.00m. MAX.
SPACING SEE DETAIL )
GA 16 FLOAT GUIDE WIRES
200mm. Ø G.I.P.
0.20m.

0.25m.
FLOAT FROM3.16mm. thk. STEEL BOTTOM OF CYLINDRICAL SHELL
PLATED FILLED W/ STYROFOME WELD JOINT
OVERFLOW PIPE
0.20m.
16mm. Ø BOLTS W/ NUTS BOTTOM SHELL
0.225m. ( TYPICAL OF TWO )
COLUMN

3 WATER LEVEL FLOAT 4 AIR VENT


S8 S8 SCALE: 1:20 S8 S8 SCALE: 1:20 5 OVERFLOW PIPE
S8 S8 SCALE: 1:30

CIVIL ENGINEER: PROJECT TITLE: PROJECT OWNER: DESIGNED BY: SHEET CONTENTS: SET NO. SHEET NO.
CADD BY: AP MACAWILE
ETERNAL GARDENS MEMORIAL PARK ACCESS HATCHWAY
ETERNAL GARDENS ENGINEERING PROPOSED ELEVATED WATER WATERLEVEL FLOAT
S 12
CORPORATION DATE: OCTOBER 2023
AND PROJECT DEVELOPMENT TANK - EG OPOL AIR VENT 8 8 15
TIN: REG NO.: CHECKED BY: OVERFLOW PIPE
MR. NUMERIANO B. RODRIN
PTR NO.: DATE: LOCATION: ZONE 5, MAMIS, BRGY. PATAG, OPOL MISAMIS ORIENTAL WATER LEVEL LAY OUT
PRESIDENT & COO APPROVED BY: REVISION: