0% found this document useful (0 votes)
45 views

NTPL Process Production User Manual

sdg

Uploaded by

anil.qba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views

NTPL Process Production User Manual

sdg

Uploaded by

anil.qba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

Process Production

Production & Planning (PP) –


Testing Reference Document
cum User Manual

Project Nandan Terry


Doc. Version 00
Date 20-02-2019
Reviewded By Mr. Anil Singh
Prepared By Mr. Anubhav Sharma
Approved By
1. PROCESS TITLE: STO Pending Qty. Report

OVERVIEW

The procedure will be used check qty. pending to receive.

PROCEDURAL STEPS
Via Transaction Code ME3N

STEP: 1. Enter Process Plan T-code –ME2N

Step 2. Enter Supply Plant, Document Type & Plant

Page 1 of 18
Click on execute Button or press F8.

2. PROCESS TITLE: Gate Entry

OVERVIEW

The procedure will be used for Gate Entry.

Page 2 of 18
PROCEDURAL STEPS
Via Transaction Code ZGATEENTRY

STEP: 1. Enter Gate Entry T-code –ZGATEENTRY

Select With Stock Transfer Order

Click on Create Button

Page 3 of 18
FIELD NAME Description ENTRY REMARK
Vehicle No. Vehicle No. Required
Transporter Transporter Required
LR No. LR No. Required
LR Date LR Date Required
Bill/ Challan no. Bill/ Challan no. Required Enter Invoice No.
Bill/ Challan Date Bill/ Challan Date Required Enter Invoice Date

Enter Stock Transfer Order/ Purchase Order – Press F4 for Help.

Enter Challan Qty.

Click on Save Button or CTRL+S

Result:

3. PROCESS TITLE: GOODS RECIEPT

OVERVIEW

The procedure will be used for Goods Receipts.

PROCEDURAL STEPS
Via Transaction Code MIGO

STEP: 1. Enter Gate Entry T-code –MIGO

Page 4 of 18
Click on Gate Entry Tab

FIELD NAME Description ENTRY REMARK


Gate Entry No. Vehicle No. Required F4 help available
Plant Transporter Required
Year LR No. Required

Select gate entry No.

Page 5 of 18
Mark tick on Item OK & Click on Check Button

Click on post Button

Result:

4. PROCESS TITLE: Grey Inventory Report

OVERVIEW

The procedure will be used for Grey inventory Reports.

PROCEDURAL STEPS
Via Transaction Code ZWARESPIN

STEP: 1. Enter T-code – ZWARESPIN

Page 6 of 18
Enter required fields & Click on Execute Button.

5. PROCESS TITLE: Drug Sheet Prepare

OVERVIEW

The procedure will be used for Drug Sheet Preparation.

PROCEDURAL STEPS
Via Transaction Code ZRE01

STEP: 1. Enter T-code – ZRE01

Page 7 of 18
FIELD NAME Description ENTRY REMARK
Plant Plant Required
SLoc Store Location Required F4 Help
Dyelot Batch/Dye Lot Required F4 Help
Machine No. Machine Name Required
Prog. Program Required
Lq. Ratio Liquid Ration Required
Issue Type Required Selection available

Click on Save Button or CTRL+S

Result:

Page 8 of 18
6. PROCESS TITLE: Drug Sheet Issue Slip

OVERVIEW

The procedure will be used for Drug Sheet Issue Slip.

PROCEDURAL STEPS
Via Transaction Code ZCSLIP

STEP: 1. Enter T-code – ZCSLIP

Fill Drug Sheet No./ Slip No. & Execute

Page 9 of 18
7. PROCESS TITLE: Drug Sheet Issue

OVERVIEW

The procedure will be used for Drug Sheet Issue.

PROCEDURAL STEPS
Via Transaction Code ZDISSUE

STEP: 1. Enter T-code – ZDISSUE

Step 2- Enter Reservation number

Press Enter

Result:

Page 10 of 18
8. PROCESS TITLE: Process Production Entry

OVERVIEW

The procedure will be used for Process Production Entry.

PROCEDURAL STEPS
Via Transaction Code ZPPLAN

STEP: 1. Enter T-code – ZPPLAN

Select Plan Confirmation for process & Execute.

Step: 2. Dyeing Stage Process Confirmation

Select Production stage DY1 (F4 for help)

Enter required fields & Execute

Page 11 of 18
Check the details if any change then make changes

Click on save button or CTRL+S

Result:

Step:3 Finish Process Confirmation

Select Production stage DY1 (F4 for help)

Enter required fields & Execute

Check the details if any change then make changes

Click on save button or CTRL+S

Result:

Page 12 of 18
Step: 4 Inventory report. (ZWARESPIN)

9. PROCESS TITLE: Rope wise Actual Weight measuring

OVERVIEW

The procedure will be used for Rope actual weight measuring.

PROCEDURAL STEPS
Via Transaction Code ZROPE

STEP: 1. Enter T-code – ZROPE

FIELD NAME Description ENTRY REMARK


Rope num Rope Number Required F4 help available
Way Bridge Wt. Way Bridge weight Required
Tapa Wt. Tapa Weight Required
Bag Wt. Bag Weight Required
Bag Bag No. Required

Click on Save Button or CTRL+S

Result:

Page 13 of 18
10. PROCESS TITLE: Waste Booking

OVERVIEW

The procedure will be used for waste booking.

PROCEDURAL STEPS
Via Transaction Code ZWSTAGE

STEP: 1. Enter T-code – ZWSTAGE

Click on save Button or CTRL+S

11. PROCESS TITLE: Waste Booking

OVERVIEW

The procedure will be used for waste booking report.

PROCEDURAL STEPS
Via Transaction Code ZWAS_TYPE

STEP: 1. Enter T-code – ZWAS_TYPE

Enter Required fields & Execute

Page 14 of 18
12. PROCESS TITLE: Detention Booking & Report

OVERVIEW

The procedure will be used for Detention booking & Report.

PROCEDURAL STEPS
Via Transaction Code ZDELAY

STEP: 1. Enter T-code – ZDELAY

Step: 2. Click on Entry Screen for Booking

Fill Required Details & Save.

Result:

Step:3. Enter T Code- Zdelay & Click on Report

Page 15 of 18
Enter required fields & Execute

13. PROCESS TITLE: Dye & Chemical Issue Report

OVERVIEW

The procedure will be used for Dye & Chemical Issue report.

PROCEDURAL STEPS
Via Transaction Code ZRE03

STEP: 1. Enter T-code – ZRE03

Page 16 of 18
Fill required fields & Execute.

14. PROCESS TITLE: Daily Production Report

OVERVIEW

The procedure will be used for Daily Production Report.

PROCEDURAL STEPS
Via Transaction Code ZPRDREP

STEP: 1. Enter T-code – ZPRDREP

Fill required fields & Execute

Page 17 of 18

You might also like