You are on page 1/ 24

REPUBLIC OF IRAQ

MINISTRY OF MUNICIPALITIES AND PUBLIC WORK

GENERAL DIRECTORATE FOR WATER

BAGHDAD- IRAQ

SPECIFICATION VOLUME- II

TAZA WATER TRAETMENT PLANT

KIRKUK GOVERNORATE

OTHER DOCUMENTS :-
GENERAL CONDITION OF TENDER & GENERAL CONDITION OF
CONTRACT .
GENERAL SPECIFICATIONS VOLUME –I
FOR ELECTRO –MECHNICAL AND CIVIL WORKS
DRAWINGS OF PROJECT

- KEY PLAN OF PROJECT TA / 1


- T.P SITE PLAN TA / 2
- SITE PLAN T.P TA / 3
- LAY OUT TA / 4
- LOW LIFT PUMP HOUSE BUILDINGS TA / 5
- HIGH LIFT PUMP HOUSE BUILDINGS TA / 6
- WORK SHOP TA / 7a,b
- POWER BUILDINGS TA / 8
- CHEMICAL BUILDINGS TA / 10
- ENGINEER BUILDINGS TA / 11
- OPERATOR BUILDINGS TA / 12
- GUARD ROOM
- FENCE TA/29a,b
- ROAD AND FOOTPATH DETAILS TA/36a,b,c

Page 1 of 28
Amendment to general specification

The contractor shall observe the following points in tender before


submitting his offer:-

1- scope of the contract :-


The scope of the contract is included submitting complete designs
of water treatment plant with supplying all electro- mechanical
equipment accordingly and construction all building ,erection all
equipment with testing and operation and putting the plant in good
operation .

2- drawings and design :-


After awarding the contract the contractor shall be start to
submit within 3 months the mechanical and electrical , civil design
work with their calculation and drawings ,also drawings of
architectural ,sanitary work . the drawings shall be submitted to
design department of ( general directorate of water) to get the
approval on the drawings . (3) Copies of drawings with 5 No. CD
for final approved drawings shall be submitted to the client .
Note:- Contractor shall submit designs and drawings for electro-
mechanical works prepared by a reputable foreign consultant
bureau with a related experience in waterworks designing in
coordination with the equipment supplier

3- schedule of prices :-
form of summary of tender which attached this document shall
priced and submitted the prices for exported materials shall be
DDP site including off loading and sorting in the store .

Page 2 of 28
RECOMMENDATION FOR FOUNDATIONS DESIGN

The contractor shall price the contract according to the following:-


recommendation, after awarding the contractor shall carry out a full
soil test for all structures ,If the finding are different than below
mentioned and effect the design of the foundations ,it will be
compensated for both parties according to schedule of prices .

1- TREATMENT PLANT SITE


A- Work shop , chemical building ,power house , administration
building , Ground storage tank ,Raft foundation , Bearing pressure 6.0 T/M2

B- Flash mixer , cariflocculators , Filters , Low lift pump house,


High lift pump house , sludge pit , Elevated
steel tank , Pile foundation , working load 40 tons length of pile
20m from cut off level Dia. Of pile 45cm .

- Notes
A- sulfate resisting cement type V should be used for all concrete
work in touch with soil .
B- All structure below ground level should receive three coat of flint
coat .
C- special protection is required for structures that mention below to
do that on his own expense .

The protection are :-


1- to protect the walls and foundation of G.S.T, filter building, sludge
pit ,clarifying tanks, flash mixer , high &low lift pump house
which are in contact with soil .
Foundation :- by using bitumen placed between two layers ,the
top layer of 5cm thick lean concrete the bottom layer 10 cm thick
lean concrete .these layers placed beneath the base foundation .
Walls :- by using 12cm thickness brick walls parallel to
reinforcement concrete walls at 2.5cm distance fill the blank with
bitumen .

D- compacted subbase to be used beneath the base of


shallow foundation . The compaction not less than 95% of max
dry density and to be in a layers not exceeding 20 cm each .

E- one failure test pile should done for each structure with safety
factor (2-3) .

Page 3 of 28
F- To determine actual pile capacity pile test should be done by the
contractor according to ( ASTM D1143 ) minimum one tested pile
( working pile ) per each structure or per each 100 pile , with safety
factor ( S.F=2) , pile test result should sent to directorate to check
with the pile design capacity and take approval for final Nos. of
piles.

G- Concrete compressive strength fcu not less than 45Mpa at 28 days


for pre castpile and 35 Mpa at 28 days for cast insitu pile and
also for low part of H.L and L.L building and retaining structures
(clarifiers , ground storage tanks , Filters , Flash mixer , control
chamber, distribution chamber , sludge pit) and for others not
less than 30 Mpa at 28 days .

H- One bore hole for each structure at depth 30 m for retaining


Structures[ clariflocculater ( one borehole for each clariflocculater),
G.S.T , Filter building, elevated steel tank , sludge pit ] and 20m for
H.L and L.L building and others not less than 15 m and the
contractor should take approval for location and depth and No. of
bore holes before soil investigation .

Page 4 of 28
BASIC DATA AND PLANT REQUIRMENTS
INDEX OF CLAUSES
1- Works included in the contract
2- Site of works
3- Basic data
4-Pumping installation
5- Piping works
6- Flash mixers
7- Clarifying tanks
8-Sludge pit
9-Alum dosing & mixer
10- Chlorinators
11- Filters
12- G.F.W.S.T
13- E.S.T
14- L.T switch board and instrument panels
15- Sub station
16- Stand by generators
17 - Lighting
18- Cables
19- Buildings
20- Environmental requirement
21- Water services
22- Suction mains & Intake structure
23- Water meters
24- Over head traveling cranes
25- Sewage disposal system
26- Painting
27- Water sampling and testing equipments
28- Road and footpaths
29- Spare parts ,tools and furnishing
30- Transportation facilities

Page 5 of 28
1-WORKS INCLUDED IN THE CONTRACT
The works included in the contract are the manufacture , conveyance to
the construction ,erection and testing at the TAZA water supply scheme
- in KIRKUK governorate of the following :-
- Clarifying tanks
- Sludge scraper mechanically operated
- Flocculation tanks
- Flash mixers
- Alumina dosing apparatus
- Rapid gravity filters
- Ground filtered water storage tanks
- Air blowers
- Electrically operated low and high lift pumping units
- Switchboard and instrument panels
- Electrical sub-station control and telephone system
- Power plant (stand by generators sets )
- Cable & lighting
- Water meter
- Pump and filter house buildings
- Operator houses
- Engineer house
- Work shop buildings
- Low lift buildings
- Electrical lighting
- Suction mains & Intake structure
- Administration building
- Filtered water rising mains
- Chemical disinfection equipments
- Sewage disposed system
- Overhead traveling cranes
- Painting
- Water services
- Water sampling equipments
- Fencing with guard room
- Road and footpath
- Elevated steel tank
- Plant operation and training of operators and maintenance
- Spare parts, tools, furnishings, etc..
- Transportation facilities

Page 6 of 28
The contractor shall be solely responsible for setting out the works
and putting the plant in good operation ,the prices shall be included
of customs clearances and duties , design of all the structures ,all risks
and insurance under statutory enactment enforced relating to injuries
sustained by or accident to workmen or other employees in connection
with the execution of the works shall be included in the total price of
the scheme as well as the laboratory tests for materials used in the
works, as well as cutting and filling the site to reformed ground level
and all structures shall be tested for water tightness and hydraulic
character as soon as each unit finished .

2-SITE OF WORKS :-

The site of the proposed TAZAT for water treatment - work is


demarcated in the drawings annexed to the appendix and will be
precisely indicated by the authority .the site is filled ,leveled and
dressed to bring the surface of the reformed ground to the level
mentioned in the basic data .
Within one month after the award of the contract, the contractor shall
inform the ( general director of water ) of any difficulties he may
meet in fixing the site or any changes in levels .. etc.. he may find at
the site and shall arrange for the G.D.W or its representatives to fix
the site for him and conform any changes which may have occurred .
As the contractor is assumed to have obtained all information
concerning the site before submitting his tender, he shall not be
entitled to claim for any extra payment or extension of contract
period for any change or delay which might occur in carrying out the
above mentioned work.

3-BASIC DATA:-

The following are the basic data of water treatment supply


scheme :-
1- Name of project :- TAZA
2-Out put of the water treatment plant in 22 hrs operation
per day = 44000 M3/day = 2000 M3/Hr.
3-Sourse of raw water supply : - TAZA CHANNEL

Page 7 of 28
4-LEVELS :-
Reduced level are to the datum of the great trigonometrically survey
of Iraq .
Before submitting his tender the contractor shall check the below
levels and shall indicate in his offer any variations he may find and
shall take into account all consequences of this.
A- Reduced level of highest water at the source of supply.. 240.8 M

B- Reduced level of lowest water at the source of supply 237.15 M

C-Average reduced ground level at the site of water works 239.57 M

D- Reduced level of reformed ground level at site of


water works …. 240.00 M

E- Reduced level of finished floor at Low lift pump … 240.60 M

F-1. Reduced level of finished floor at High lift pump … 240.6 M


2. Reduced level of finished floor at low part of H.L.P … 238.6 M

G- Reduced Reformed ground level of finished floor


of Filter building , chemical , work shop building … 240.6 M

H- Average reduced ground level at site of E.S.T. TAZA…249.00 M

I- Height of E.S.T TAZA from R.G.L to low water level 25 M

J -Classification of available electric power 33KV,3-PH ,50HZ

K- Maximum limited manometric suction lift ( total )………… 4M

5- PUMPING INSTALLATION :
See clause 8 of Vol.1
All pumps are centrifugal split case horizontal type
1 - AT SITE OF WATER WORK
A- 4 Nos. low lift pumps ( 3 working and 1 stand by)
each of a capacity of 700 m3/hr

B- 3 Nos. high lift pumps ( 2 working and 1 stand by)


for pumping water from T.P to existent E.S.T.
(300m3)at AL-BASHIR
capacity of each 250 M3/Hr

Page 8 of 28
C-3 No. High lift pumps (2 working and 1 stand by )
for pumping from T.P to proposed 500m3 presst steel
at AL-TAZA old sector
capacity of each …. 500 M3/Hr

D-2 No. High lift pumps (1 working and 1 stand by )


for pumping from T.P to villages (ALBUO MAFRAGE ,
TAL JOWAL, AL-MONTHARIY )
capacity each of …. 200 M3/Hr

E- 3No. High lift pumps (2 working and 1 stand by )


for pumping from T.P to villages AL-QADSIYA &
KATASH ) and existent E.S.T. at AL-QADSIYA village
capacity each of ….. 150 M3/Hr

F- 3No. wash water pumps (2 working and 1 stand by )


capacity Each of ….. 600 M3/Hr

G-3 No. sludge pumps (2 working and 1 stand by )


capacity each of ….. 400 M 3/Hr

6- piping works :-
See Clause 19 of VOL.1

All piping in side water treatment plant ductile Iron Bolted Gland
and all rising mains tyton joint ductile Iron pipes expose pipes
should be flanged ductile iron

A-1- Diameter of each of Two feedr from the channel to


suction well 700 MM
2- Length of each – ditto- 120.0 M

B- Diameter of each of Four suction main


from section well to pumps 500 MM
C- Diameter of pump main from L.L to flash mixer 800MM

D- Diameter of each feeding pipe from flash Mixer to each


Clarifloculator … 600 MM

E- Diameter of each settled water outlet from


Each clarifloculator to control chamber 600MM

Page 9 of 28
F-Diameter of two mains settled water outlet from control chamber
to filters building 600MM

G- Diameter of sludge pipe outlet from each clarifloculator 300MM

H- Diameter of common sludge pipe from clarifloculators to


Sludge pit 400MM

I- Diameter of inlet pipe for each filter 300MM

J- Diameter of filtered water outlet of each filter 300MM

K- Diameter of air inlet pipe to each filter 200MM

L-Diameter of two pipes filtered water from filters building to


Inlet chamber of G.S.T 700MM

M- Diameter of wash water pipe to each filter 600MM

N- Diameter of wash out pipe from filter … 600MM

O- Diameter of main sludge pipe from sludge pit to the


AL- KHASSA river 500MM

P-Length of – ditto - 150 M

Q- Diameter of overflow pipe for G.S.T.in T.P extended to


AL- KHASA River and by pass to sludge pit . 800 MM

- Over flow pipe from tank ( TAZA) extended out of fence to


AL-KHASSA river. 300MM
-
- Length of – ditto - 850M

R- pumping mains :-
1-Diameter of pumping main from T.P to existent
E.S.T.at AL-BASHIR at distance 2150M conactiun
to existent pipe dia. 4" To feed AL-SHAMSAY &
AL-MARIYA villages
and at distance 2850M conaction with existent
pipe dia. (4") to feed AL-JADEEDA village 400 MM

Page 10 of 28
2- Length of –ditto- …. 5550 M

3- Diameter of pumping main from T.P to proposed E.S.T.


In TAZA old sector ….. 500 MM

4- Length of –ditto- … 3200 M

5-Diameter of pumping main from T.P to Network at


Villages in TALL JAWAL , ALBU MAFARG ,
MANTHARIYA and two conation one at
distance 450M with existent pipe dia. (8") AND
ANOTHER ONE to
and the anther one at the end pipe dia. (6") to feed far
villages 200 MM

6- Length of –ditto - 7100 M

7- Diameter of pumping main from T.P to existent


E.S.T.at AL-QADSIYA village and there is conaction
with the pipe dia. (6") feeding Network of villages,
AL-QADSIYA & KATASH 250 MM

8- Length of –ditto- 3850 M

-NOTES :-
1- when the pumping main cross high way sleeve pipe shall be used.

2-The contractor should make arrangement to supply all valves,


fittings bends ,tee ,air valves , wash out valves , to complete the
work according to the specification for all pumping mains and
delivery mains .

3 - steel structure required for each main when grossing river or


drainage canal .

4- pressure reducing valves with isolating valve shall be used for


branch line from pumping main .

5-Anti hammer system shall be used for pumping mains .

Page 11 of 28
7- FLASH MIXER :-

See Clause 2 of VOL . 1

A- Number . of F.M 1 No
The net volume not less than 35M3
B- Control chamber for settled water 200 M3

8- CLARIFLOCULATORS :-

See clause 2 of Vol.1


A- Number of Tanks 3 No
B- in side Diameter of each clarifier 34m
C- Inside Diameter of flocculators 12m

9- ALUM DOSING :-

See clause 4 of VOL . 1

A- Number of mixers for each tank 2 No


B- Alum preparation Tanks Nos. of 2 No
C- The Net volume of each not less than 30M3
D- 4 No Alum dosing unit , 1000 L/Hr (2working 2 stand by)

10- CHLORINATORS

See clause 5 of VOL. 1

A- Pre-Chlorination in T.P. 3 Number each of a capacity of 10 Kg/Hr


(1 working and 2 standby )

B- Post – Chlorination in T.P. 4 Number each of a capacity of 5 Kg/Hr


( 2 working and 2 standby )

Page 12 of 28
11-FILTERS :-

See clause 6 of VOL. 1

A- No. of filter 10 No.


B- Effective area of each filter 40 M2
C- Air blowers 2 No , ( 1 working and 1 standby )
each of a capacity of 1600 M3/hr
D-Wash water tank capacity 200 M3

12-GROUND FILTERED WATER STORAGE TANK:-

See clause 7 of VOL.1

- T.P site :- Tank Consisting of 2 compartment , capacity of the tank 6000 M 3.


Water depth shall be 3.0 M and 0.5m for freeboard.
Over flow pipe 800 mm dia. Extended to the KHASSA River .

13- L.T SWITCH BOARDS AND INSTRUMENT PANELS

See clause 9 of VOL.1

A- shall be installed in T.P site .


with telephone connection

14- SUB-STATIONS :-

See clause 10 of VOL.1

T.P site . 33/11KV , 11/ 0.4 KV

15- STAND BY GENERATORS :-

See clause 11 of VOL.1

A- For T.P site sufficient for 100% of the output capacity of the plant
100% of auxiliaries and services .

Page 13 of 28
16- LIGHTING :-

See clause 13 of VOL.1


For T.P site.

17-CABLES :-

See clause 12 of VOL.1


For T.P site.

18- BUILDING :-

See clause 14 of VOL.1

1- Water treatment site :-


A- work shop building
B-High lift pump house
C- Low lift pump house
D - Filter building
E- Power building
F- Chemical building
G- Administration building
H- 2 No. operator house
I- 1No. Engineer house
J- 1No. Guard room

19- SLUDGE PIT :-

See clause 3 of vol.1

The volume of pit is : 400M3


Sludge pipes 500MM dia. Extended to the river
3Nos. of pump sets (2working and one stand by)
capacity of each 400 M3/Hr

20- SUCTION MAIN AND SUCTION WELL:-

See clause 18 VOL.1 type A


Volume of section well not less than 200 M3

Page 14 of 28
21- WATER MTERS :-

See clause 22 of VOL.1

Will be electromagnetic where the pipe size permits and ultrasonic


type for large pipes to be installed in all pumping and delivery main.

22- WATER SERVICES :-

See clause 16 of VOL.1

23- OVER HEAD TRAVELLING CRANES :-

See clause 21 of VOL.1

24--ENVIRONMENTAL REQUIREMENT:-

See clause 15 of VOL.1

A-All pumps Houses in T.P , L.L Ventilation.

B-Engineers and operators rooms in all pump houses . window type air
conditioning in each room 2 tons capacity .

C-Filters Building Ventilation .

D-Control rooms and operators rooms in filters building window type


air conditioning in each room 2 tons capacity.

E -Power Building in all sites Ventilation .

F-Engineers houses and operators Houses Window type Air


Conditioning, 2 tons capacity in each room, same for administration
Building and guard rooms .

G-Chemical building ventilation and window type


Air condition for the Rooms, 2 tons capacity for each .

H-Every air conditioned room must be heated in winter by Oil immersed


heaters of 2 KW capacity.

Page 15 of 28
25-WATER SAMPLING AND TESTING EQUIPMENTS:-

See clause 36 of VOL.1

T.P as in specification ,laboratory equipments shall be A type .

26- ELVATED STEEL TANKS ( E.S.T ) :-

See clause 17 of VOL.1

1- Pressed E.S.T 500M3 pressed steel tank at AL-TAZA old sector


instead of exist tank in the same site .

2- The contractor must tak in to consider in his offer removing the old
tank and delivering it to KIRKUK water directorate ware house .

 Over flow pipe of tank extended to AL-KASSA river 850M out of


fence .

27-FENCES WITH GUARD ROOM :-

See clause 29 of VOL.1

All fences shall be brick of 2.50M high above reformed ground level
according to DRW.F/29 .
A- T.P total length as shown in the drawing (170M × 170M ) with
gates and guard room .

28-ROADS AND FOOTPATHS:-

See clause 30 of VOL.1

A- All inside road and footpath for T.P site .

29- PAINTING :-

See clause 24 of VOL.1.

Page 16 of 28
30-SEWAGE DISPOSAL SYSTEM :-

See clause 23 of VOL.1

31-SPARE PARTS , TOOLS AND FURNISHING :-

See clause 33,34 and 35 of VOL.1.

32-OPERATION AND MAINTANANCE :-

See clause 37and 38 VOL .1

33-HYDROPHORE SYSTEM :-

2 No. complete hydrophore system one for pumping main to net work of
AL-SQADSIYA villages and other for pumping main to Network of
ALBU MAFARGE , TALL JOWAL , MONTHARIY villages.
The tank shall made from mild steel plate thickness 10mm and dish end
12mm , with 2No. Air compressor (1 working other stand by) for each
system ,with all valves and accessories to maintain the pumps working
and control their operation .

34- TRANSPORTATION FACILITES:-

The contractor is responsible to provide two pickup double cabinet ,


Fully air conditioned with accessories . Nissan Mark or similar.

Page 17 of 28
SCHEDULE NO1

Item UNIT Description Rate


I.D
Excavation in trench work of
earth , gravel, sand , clay or
Per other material excluding rock in
1
cu.m strata not exceeding 1m in
depth including refilling trench
and all contingent charges.
Excavation as last but in strata
Per between 1m and 2m in depth
2
cu.m including refilling trench and all
contingent charges
Excavation as last but in strata
Per between 2m and 3m in depth
3
cu.m including refilling trench and all
contingent charges

Page 18 of 28
SCHEDULE NO2

Flexible Joint Ductile Iron B.S. 4772 & ISO K9


‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
In accordance with the relative clause 19 of volume1

1-internal dia. and price per linear meter for supply


ductile iron pipe not include special fittings, valves and
ancillary works . .

FLEX IBLE JOINTS PIPE DIAMETER IN mm


900 800 700 600 500 400 300 200

2-internal dia. and price per linear meter for


excavation , lay, joint and test ductile iron pipe.

AVERAGE FLEX IBLE JOINTS PIPE DIAMETER IN mm


DEPTH IN
m.
1 900 800 700 600 500 400 200 100
2

2

3

Page 19 of 28
Flanged Ductile Iron pipes B.S. 4772

‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
In accordance with the relative clause 19 of volume1

internal dia. and price per linear meter -1


for supply ductile iron pipe not include
special fittings, valves and ancillary
works . .

FLANGED PIPE DIAMETER IN mm


900 800 700 600 500 400 300 250 200

2-internal dia. and price per linear meter for


excavation , lay, joint and test ductile iron pipe.

AVERAGE FLANGED PIPE DIAMETER IN mm


DEPTH IN
m.
1 900 800 700 600 400 300 200 100
2

2

3

Page 20 of 28
SCHEDULENO. 3
The unit price shall be applicable for deduction or
addition
Item UNIT Description Rate
I.D
1 Per ton net Cement as specified
2 Per cu .m 1:1.5:3 concrete in situ – with 1:1.5 m ,
above or below ground level
3 Per cu .m 1:2:4 – ditto -
4 Per cu .m 1:2.5:5-ditto-
5 Per cu .m 1:3:6-ditto-
6 Per cu .m Extra labour only over concrete in situ
within 1.5 m above ground level for
concrete per 1.5, left above 1.5 from
ground level
7 Per cu .m Extra labour only over concrete in situ
within 1.5 m below ground level for
concrete per 1.5,depth below 1.5 from
ground level
8 Per square Steel metal forms in horizontal
.m shuttering to concrete inclusive of
supporting members

Page 21 of 28
Item UNIT Description Rate
I.D
9 Per sq .m Ditto – in vertical shuttering to concrete
ditto – 35 -40 mm limber Horizontal
shuttering to concrete inclusive of
supporting members.
10 Per sq .m Ditto – in vertical shuttering to concrete
- ditto –
11 Per ton labor only in cutting , bending
And fixing round steel bar reinforcement
in concrete .
12 Per ton 1/4 inch dia deformed steel bars .
13 Per ton 3/4 inch dia - ditto -
14 Per ton 1/2 inch dia - ditto –
15 Per ton 5/8 5/8 inch dia - ditto -
16 Per ton 3/8 inch dia - ditto
17 Per ton 7/8 inch dia - ditto
18 3/4Per Kg No 16 gauge soft iron wire .
19 Per cu .m Brick work in walls to buildings formed
in factory made bricks laid in 1:3 cement
mortar
20 Per cu .m Sand .
21 Per cu .m Aggregate for concrete.
22 Per cu .m 1:3 cement plastering to walls 12.0 mm

Page 22 of 28
Item UNIT Description Rate
23 Per sq. .m 1;1 cement rendering 12mm
24 Per sq m Distemper to walls building in two coat .
25 Per sq .m Painting iron work in red paint per coat .
26 Per sq .m Ditto in special non – tasting under –
tank paint per coat
27 Per sq .m Ditto in aluminum paint per coat
28 Per sq .m Ditto in bituminous paint per coat
29 Per ton Rolled steel joints
30 Per ton Steel chequer plates 20mm thick
31 Per sq .m Floor tiles of local manufacture in situ
32 Per lin. .m Cast iron curbs to steel chequer plates
10mm thick
33 Per sq .m Terrazzo or mosaic tiles situ
34 Per lin .m piles

Note : the rate for materials shall be inclusive of


delivery to site of work .

Page 23 of 28