0% found this document useful (0 votes)
26 views18 pages

Metode Pelaksanaan Load Test Bangkanai Gepp

Uploaded by

julisman0221
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views18 pages

Metode Pelaksanaan Load Test Bangkanai Gepp

Uploaded by

julisman0221
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

METHOD STATEMENT

PILE STATICLOAD TEST

Project:

BANGKANAI GEPP (PEAKER)


STAGE 2 (140 MW)
Bangkanai - Kalimantan Tengah

KSO
PT.PP (Persero) Tbk - Wartsila Indonesia

Oleh:

PT. METRO MENGGALA

METHOD STATEMENT - PILE STATIC LOAD TEST


I. INTRODUCTION
Pilestatic load test is usually carried out to ensure the structural and Geotechnical
soundness of pile and also to predict settlement of other piles. The common
procedure is to increase the load in stages until the proposed working load is reached
and then to unload and reduce the load in stage and to leave the load off until the rise
or rebound substantially leases.

A variety of test procedures and method have been developed for carrying pile load,
amongst the most common procedure for pile load test is by using Kentledge method
where a static load is apply direction to the pile with the required surplus.

II. DATA PROJECT :

1. Data Project:
- Nama Proyek : BANGKANAI GEPP (PEAKER) STAGE 2 (140 MW)
- Owner : PT. PLN (Persero) Tbk.
- Contrator : KONSORSIUM
PT. PP (Persero) Tbk -
WARTSILA INDONESIA
- Location : BANGKANAI – KALIMANTAN TENGAH

2. Data Pile:
- Type Pile : Prestressed Concrete Spun Pile
- Dimension : Ø 400 mm and Ø 600 mm
- System Joint : Welded at Steel Joint Plate

METHOD STATEMENT - PILE STATIC LOAD TEST


III. COMPRESSION LOADING TEST.

A. METHOD STATEMENT
1. StandartMethod with ASTM D. 1143 - 81 (Reapproved 1994).

2. Hydraulic Jack is equipped with a plate to keep it upright. Plat as its


foundation laid over the pile in the test.

3. Piles that will be tested in advance of GROUTING to strengthen and


flatten with Grouting Sika.

4. Installation REFERENCE BEAM (pedestal reference beam) on both


sides of Pile, positioned so that does not change position during
burdened pile.

5. Installation diagonally 4 (four) DIAL MILIMETER (watch


measurement) with accuracy level 0.01-50mm, which serves to measure
the movement of the pole, located above the Dial Gauge REFERENCE
BEAM (pedestal reference beam).

6. All reactions should Stable and Balanced loading, during loading test
lasts a backlash movement of the load is read when the instrument gauge
should be monitored or considered to obtain thorough results.

7. During implementation, around the test site is not allowed there


activities that cause vibration because it will affect the accuracy of the
reading test.

8. Required Hydraulic Jack which has a load capacity of at least 120% for
experiment load. At the time of the experiment should be shielded from
the sun.

METHOD STATEMENT - PILE STATIC LOAD TEST


Schematic Drawing Compression Test

METHOD STATEMENT - PILE STATIC LOAD TEST


B. AXIAL COMPRESSION LOAD TEST PROCHEDURE (example)

METHOD STATEMENT - PILE STATIC LOAD TEST


C. EQUIPMENT AXIAL COMPRESSION LOAD TEST.

1. HYDRAULIC JACK
Type : CLR – 5006
Capacity : 500 Ton
Production : Enepack – USA

2. HYDRAULIC PUMP
Type : ZE – 3420 MI
Capacity : 10,000 Psi
Production : Enepack – USA

3. MANOMETER
Type : GP – 10S
Capacity : 10,000 Psi
Production : Enepack – USA

4. DIAL GAUGE
Accuracy : 0.01 mm
Capacity : 50 mm
Production : Mitutoyo – Japan

5. REFERENCE BEAM
H BEAM – 200

6 RIG MACHINES with COUNTER WEIGHT.

METHOD STATEMENT - PILE STATIC LOAD TEST


V. TENSION LOAD TEST.

A. METHOD STATEMENT

1. StandartASTM D 3689 - 90 (Reapproved 1995).

2. Piles that will be tested is shown pc wire about 50 cm long.

3. The PC Wire of pile locked with button and Plate.

4. Installation BOX FRAME (for tensile of pile) include with plate for lock
PC Wire pile.

5. Installation H-Beam to put Hydraulic jack and placed on cross sides of


Pile wich rest on counter weight, positioned so that does not change
position during test.

6. Hydraulic Jack is equipped placed above H-Beam and placed in such a


way that it can lift the box frame.

7. Installation REFERENCE BEAM (pedestal reference beam) on both sides


of Pile, positioned so that does not change position during burdened pole.

8. Installation diagonally 4 (four) DIAL MILIMETER (watch measurement)


with accuracy level 0.01-50mm, which serves to measure the movement
of the pile, located above the Dial Gauge REFERENCE BEAM (pedestal
reference beam).

9. All reactions should Stable and Balanced tensioning, during tension test
lasts a rebound movement of the tension is read when the instrument
gauge should be monitored or considered to obtain thorough results.

10. During implementation, around the test site is not allowed there activities
that cause vibration because it will affect the accuracy of the reading test.

METHOD STATEMENT - PILE STATIC LOAD TEST


Schematic Drawing Tension Test

METHOD STATEMENT - PILE STATIC LOAD TEST


B. TENSION LOAD TEST PROCHEDURE (example)

METHOD STATEMENT - PILE STATIC LOAD TEST


C. EQUIPMENT TENSION LOAD TEST

1. HYDRAULIC JACK
Type : CLR – 5006
Capacity : 500 Ton
Production : Enepack – USA

2. HYDRAULIC PUMP
Type : ZE – 3420 MI
Capacity : 10,000 Psi
Production : Enepack – USA

3. MANOMETER
Type : GP – 10S
Capacity : 10,000 Psi
Production : Enepack – USA
Number : 4 units

4. DIAL GAUGE
Accuracy : 0.01 mm
Capacity : 50 mm
Production : Mitutoyo – Japan

5. REFERENCE BEAM
WF BEAM – 150

6. H- BEAM
H-BEAM – 400

7.BOX FRAME
WF BEAM – 150

8.COUNTER WEIGHT
Counter Wejght Rig Machine

METHOD STATEMENT - PILE STATIC LOAD TEST


V. LATERAL LOAD TEST.

A. METHOD STATEMENT

1. StandartASTM D 3966- 90 (Reapproved 1995).

2. Piles that will be lateral tested have elevation equal with design of Top Of Pile
Cap

3. Installation Counter Weight with load 220% ton from work load test.

4. Installation Hydraulic Jack and placed horizontally with the counter weight
behind Hydraulic Jack.

5. Installation REFERENCE BEAM (with counter weight), positioned so that does


not change position during burdened pole.

6. Installation 2 (two) DIAL MILIMETER (watch measurement) with accuracy


level 0.01-50mm, which serves to measure the movement of the pile, located
above REFERENCE BEAM.

7. All reactions should Stable and Balanced of horizontally, during lateral test
lasts a rebound movement of the lateral is read when the instrument gauge
should be monitored or considered to obtain thorough results.

8. During implementation, around the test site is not allowed there activities that
cause vibration because it will affect the accuracy of the reading test.

METHOD STATEMENT - PILE STATIC LOAD TEST


Schematic Drawing Lateral Test

METHOD STATEMENT - PILE STATIC LOAD TEST


B. TESTLATERAL PROCEDURE (example)

METHOD STATEMENT - PILE STATIC LOAD TEST


C. EQUIPMENT LATERAL LOAD TEST

1. HYDRAULIC JACK
Type : CLRG – 506
Capacity : 50 Ton
Production : Enepack – USA

2. HYDRAULIC PUMP
Type : ZE – 3420 MI
Capacity : 10,000 Psi
Production : Enepack – USA

3. MANOMETER
Type : GP – 10S
Capacity : 10,000 Psi
Production : Enepack – USA

4. DIAL GAUGE
Accuracy : 0.01 mm
Capacity : 50 mm
Production : Mitutoyo–Japan
Number : 2 Units

5.REFERENCE BEAM
Counter Weigt Rig Machine

6. COUNTER WEIGHT
Total Weight 220%Ton of Load Test.

METHOD STATEMENT - PILE STATIC LOAD TEST


VI. FAILURE CRITERION
A. FAILURE CRITERION OF AXIAL AND TENSILE LOAD TEST.

1. Displacement or settlement Pile is 15% of a diameter spun pile or a diagonal


dimension Square Pile.

2. There was a crack in the pile

B. FAILURE CRITERION OF LATERAL LOAD TEST.

1. There was a crack in the pile

VII. TEST RESULT REPORT


After completing the test, an evaluation of the results is in the form of:

1. Data Record.

2. Evaluation of Data Record :


- Load vs Settlement Chart.
- Load vs Time Chart.
- Time vs Settlement/Displacement Chart.

3. Analysis of test results by: Prof. Dr. Ir. Herman Wahyudi, DEA.
Metode Analyse with :
- Metode Davisson (1973)
Sumber : Canadian Geotechnical Society 1992
- Metode Chin (1978)
Sumber : Tomlinson (2001)

METHOD STATEMENT - PILE STATIC LOAD TEST


VIII. DOCUMENTATION METRO PILE

METHOD STATEMENT - PILE STATIC LOAD TEST


METHOD STATEMENT - PILE STATIC LOAD TEST
METHOD STATEMENT - PILE STATIC LOAD TEST