100% found this document useful (1 vote)
62 views

Hydraulic Design of Jackwell Well Cum Pump House For Bensola PM Mitra Park

DESIGN CALCULATION FOR INTAKE WELL HYDRAULIC-2

Uploaded by

saif.ce.16
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
62 views

Hydraulic Design of Jackwell Well Cum Pump House For Bensola PM Mitra Park

DESIGN CALCULATION FOR INTAKE WELL HYDRAULIC-2

Uploaded by

saif.ce.16
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

HYDRAULIC DESIGN JACK WELL CLIENT:- MPIDC

HYDRAULIC DESIGN OF JACKWELL WELL CUM PUMP HOUSE FOR BENSOLA PM MITRA PARK
A. DESIGN OF JACKWELL WELL CUM PUMP HOUSE

Sl. No. Particulars Value/Qty Unit

1 Daily Demand for design = 30.00 MLD As per ANIT

2 Operation time per day = 20.00 hrs


3
3 Design Discharge for Intake Well = 1500.00 m /hr
3
= 0.417 m /sec

4 Height of Intake well from HFL = 1.50 m

5 Detention time assumed = 12.0 min


3
6 Volume of Intake Well = 300.00 m

7 Average Water depth for Suction = 6.5 m


2
8 Area required = 46.15 m

Considering circular Intake Well - Dia


9 = 7.67 m
of Intake
say 8.00 m
Provide
Provided Size of the Intake Well = 8.00 m dia x 6.5 m LD
INTAKE DEPTH CALCULATION
Source Bed Level = 429.00 m
Depth of Slit Pocket = 1 m
Detention Time = 12.0 min
Capacity Required for Detention = 300.00 m3
Depth required for Detention = 6.5 m
Velocity Through Pump Inlet Bell = 1.5 m/s
No. of Pumps = 4.0
Dia of Pump Inlet Bell = 0.6 m
Froud No. = 0.621
Minimum Submergence = 1.4 m
Floor Clearance Depth = 0.2 m
Total Depth = 9.1 m
Lowest Level of Bowl or Entry Level of
429.0
Water = m
Required Well bottom for operation of
429.0
pump = m
Bottom of Intake Well = 428.0 m
Adopt Excavation Level of Intake = 427.5 m
Checking for Scouring, if any
Excavation Depth of Intake = 1.5 m
changes as per soil report

Pump House
Diameter of Pump House = 8.00 m
Height of Pump House = 7.00 m
Top of Bund Level = 456.40 m
Higest Flood Level = 453.00 m
Pump Floor Level = 454.50 m
Roof Level of Pump House = 461.50 m

Height of Jackwell from Bottom of


27.00 m
Jackwell to Floor Level =

Inlet Pipe are Provided at Three Level


1st Inlet Pipe level = 429.50 m
2nd Inlet Pipe Level = 432.50 m
3rd Inlet Pipe Level = 448.50 m

PM MITRA SCHEME 1 REAN WATERTECH PVT LTD