Time N Work ?
Time N Work ?
(RIZE SAK- BPapeeeeennegs USE CODE VKMATHS FOR MAXIMUM DISCOUNT
24. A, Band C can do a piece of work in 10, 12
and 15 days respectively. They start the work
together but after 4 days B left the work and 3
days before C left the work. In how y
days will the total work be completed?
A, Bak c mA: 10, 12 ak 15 at A Tw
La Ww a OF YS
COhK32 12)
Sz 228) ea ates Rea wed CF OM Big fe
So XS) aa an frat ta ger?
SSC CHSL 2021
last m bs A,C se pucha h to bs Un (a) 27/5 0826/5
ki efficiency se divide krenge (©) 21/5 (D) 23/5
+d) (xisfesbook
Supercoaching
s t
%, oH sled
wi 2 18d-l (Bo
(Eos .
Yoa orf $ 1/6 aT oT 3 feat H shee eT
1
2, LAD: lode 7
) a7 SE UBL Sat aya hs fet A ae wor #13
St fet ae 8 fae onl wet 8 ed ae x
Beye 12 VCE negative wn wag
tet | (Geass
Se aie e Lice)
V (a) 6 days (8) 8.1 days
JP 5-1 days (D) 7 days
+4a> (RE FRSA A) aat wed 81 Pair faar orf oT aT ad BI
ft} ag 9 orf wis ta @ wae 10 Ra ae Port
ar 8 wero dan oni 4 at ora eRe ae
2 fea ord oe @ fax vis Uo @, ey orl Rar fear
re & | ford feat wre yer er ? Gcama
wiser «pfu ys A)
() 20 days
D) 24 days
Ueisasre a=Papeeeeennngs USE CODE VKMATHS/FOR MAXIMUM DISCOUNT
27. A can do a work in 12 days and B can do
the same work in 30 » They work
alternately, alt ng days; A st the work.
In how many days will the work be completed?
Ave ore oF 12 foal Hox Waar @ sik
B Ot ord at 30 feat F aR Tea 8) a
at-ant @ vo-ue fea visax orf axe
& a ord yw oe 8) ont foo feat
qwem?
SSC CGL PRE 2021
4 1
(a) 165 (B) 175
a 2
(C) 165 (p) 175testbook
Paepevemremms USE CODE VKMATHS|FOR MAXIMUM DISCOUNT |
27. A can do a work in 12 days and B can do
the same work in 30 days. They work
Ari2d = alternately, alternating days; A starts the work.
Co- 563, In how many days will the work be completed?
AWS orf a 12 eal Fax Toa B aie
Boat ord ot 30 feat Fax WHAT 1
TNR 8 ya—ve fea vigex orf xt
A ord ye oer 81 orl fear feat F
SSC CGL PRE 2021
iT ReRE
- 7
60k Kereeb pahuch (B) 175
to 7x56 Work 16 3
(D) 17;
AWlork Akrega 4/5tetbook
Supercoaching
err
<2dyB: te-rbale
CST Tawi e i ecreL ie
Le
Ss = FTA KB Stee arm?
\y153
27. A can do a work in 12 days and B can do
the same work in 30 days. They work
alternately, alternating days; A starts the work.
In how many days will the work be completed?
Ave ore oF 12 fel Fox Waar z ik
Bet ord at 30 feat F aR Tea ze) F
an—ant 8 vo—we fea wiser ori axe
A ord ye ae 8) ore foot feat F
SSC CGL PRE 2021
1
(B) 175
2
(D) 175
(c) 165Papmeeennrmgs USE CODE VKMATHS FOR MAXIMUM DISCOUNT
28. A can do a piece of work in 24 days and B
can do it in 80 days. B works alone for two
Ax224 a Rey and A works alone for the third day. This
Baaod 2 process continues until the work is completed.
any days will the work be completed?
A feet ort wt 24 Ra Foe wean 8 ci
SC CGL MAINS
(a) 42 45
(C) 48 (D) 44
RI ZES ARSwee ae
DIRECT MAINS QUES ATDP29. A and B work on alternate days to do a
\certain work, B starts the work on the first day]
A alone can do the work in {ddays. If the w
SST Tawi
hen in how my
Q= ees is completed in {}
a - days can B alone cdmplete 7/9 of the work.
ed 3 ‘@ After oni ot o fag a ik B
Ter Zhi bndeho..ckkadiahok) TTR Ord we 8 wed fer wart yw
total m sekitna krtah...dusreka | afel a GU wre By fer a aa