0% found this document useful (0 votes)
39 views

Time N Work ?

CGL mains recently most expected questions for Rank 1 AIR

Uploaded by

TRENDING SNM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
39 views

Time N Work ?

CGL mains recently most expected questions for Rank 1 AIR

Uploaded by

TRENDING SNM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 101
The g WOK ey 9H) oy * Tine = Tole waete| STH were) 7] [ar a aR Ga aT Pr = fe dene ‘ Time f Tene) pI Derg ned ty . Were 4 Time? SL” pareeerentr ge USE CODE VKIMATHS FOR MAXIMUM DISCOUNT 1. Acan doa work in 12 days while B can do the same work in 18 days. If they work together then in how many days can (A &, together do the same wor! Arle nee AW OM or 12 fei 4 a safe Boe ort ot 18 fei AY wear | af& 3 wwe wer wr wea /d frat feat F(a & B) We aT Bl oY Had F ? 2 (a) 7% By 7 (8 textbook | Supereoaching at) ao wie CLL cere Ie 2. A can do L/Sth of a work in 4 days, B can Be H 20d do 1/6th of the same work in 5 days. If they ao gi Te work together then in how many days can they complete this work? ats = Bo 4 8 t= B T La fest ord or 1/5 ot art 4 feat Fo \2“) seen 8, Bue ard oT 1/6 af ATT 5 \ fet we wom 8) ae a ewan | faa orf ox & ct ga oe af foo feat Fa ae wad g ? SSC CGLPRE efi2 (B) 30 (C20 (D) 15 +42) (RAPES ARA) = tetbook Supercoaching Aad ss 3 $15/60= 1/4..BACHA HUA 3/4, implee aka Naw cee 34Can do the same work alone in 30 days. B can do the same work alone in 60 days. If they work together for 5 days, what portion of the work will be left 0 fer H oe HEMT BU ot a aden co fer i a ‘aoa 31 af a5 ea ae wwe ae ort oe @ at of fern fer iw wre ? SSC CGL MAINS 2020 (A) 2/3 (B) 1/2 (3/4 (D) 5/6 RIZE ASA) Parent ye USE CODE VKIMATHS FOR MAXIMUM DISCOUNT 34Can do the same work alone in 30 days. B can do the same work alone in 60 days. If they work together for 5 days, what portion Aazod ye #: ) (Cy ) of the work will be left? Brcodt 7 0 Ra A oe Boer BENS PMS 8] poet ard at oar oo fer aw won 3) af a5 a ae wwe ae ort oe @ dt of fern fer ge wTeT ? SSC CGLMA (A) 2/3 (B) 1/2 (D) 5/6 textbook Paeeemnnnys USE CODE VKMATHS FOR MAXIMUM DISCOUNY 4. If A can do a work in 20 days while (A & rood SS B) together can do the same work in 15 fiz2od “Twete then in how many days can B alone do the ame work? pga led a fart or @1 20 feat A we ToT “\ 8 wale (A & B) UH We 15 feat A wet OH ot ox wad € ct Barbet ferry fei i oat or al ax Waar 3? SSC CGL PRE 2017 VG (B) 80 (c) 50 (D) 32 textbook Supereoaching USE CODE VKMATHS FOR MAXIMUM DISCOUN{ | 5. Acan do % of a work in 9 days. B ean do 23rd of the same work in 28 days. Working A, tat ser SX Wwtogether, in how many days can A and B ‘omplete the entire work? BZ Cab he Cs we or & y% AMT ao feat FH a 3 q OS Sear 81 Bot ar S 2/3 aT BH 28 fea i ae wert 81 ere F forme are | Pe BA TH BR ors a fear fet a a ae wad g? SSC CGLPRF (A) 261/15 days (B) 198/17 days 7282/13 days (D) 262/11 days| p+ > (RAPES ARA) textbook Gupereoaching TS aise eu ee Oe ). A and B can complete a work in 25 da n complete 332% of the same work alone A+ B22 Seay Es in 15 days. In how many days will A E compieed of this work? B45 E ot A B feet ord a 25 feat F opr ae wad 1 Beh ars OT 332% AT aT 15 fei 4 aT ae Uae 81 a ge ors A kitne din m krega total work ka am 4/15 art fart feat AF aT eT ? 4/15 =225/4 x4/15, SSC CGL PRE 2020 15 (B) 10 (c) 18 (D) 12 ebook Supereoaching SS ao wince ue cece Ii 7. A, Band C can do a work in 12, 15 and 20 days respectively. In how many days will A129 they together complete the same work’ g-5 = AB ae c Peet orl wr HE 12, 15 c-20 wer 20 feat Howe Wed Bl TH AT at? C CGLPRE (A) 10 days 5 days (©) 6 days (D) 7 days RAZ ee AR A) 2| & a ebook Supereoaching USE|CODE VKMATHS FOR MAXIMUM DISCOUN’ || 8. A, Band C can do a work in 4, 20 and 60 days respectively. Working together, in how Da bay ~twar - ny day will they complete one-third of I Br 20d LS A, Bam ¢ fer orl et AR: 4, 20 TET Ca God Se oo fet H# ox wad 21 we wT ot Se ey aeth ge a eRe orl fiery Rat a | WaT Be ? SSC CGLPRE 2 4520/19 (B) 20/9 (c) 12/19 (p) 17/19 tesbook Paemeennnnys USE CODE VKMATHS FOR MAXIMUM DISCOUN‘ | 9. Working together, A, B and C can a5) complete a work in 3 days. A can complete Ar@re= 3 mye same work in 24 days and B in 6 days. In A: +9 how many days can C alone complete the (Re koa Game work? Bs “US URI SH RW BL A, Ba CW ont a 3 fea 4 ar ax wad z) eh ort oF a, 24 fea 4 cen B, 6 fer RT aR Goa 31 at ors at abe c ferry fet i aE GX Taras ? SSC CPO 2019 (a) 6 (B) 12 (D) 18 Supereoaching 10. A can complete one-third of a work in 5 days and B can complete 2/5 of the same A, tod 2l5d work in 10 days. They work together for 6 ‘Ss. U5 da ays, SEA C complete the mc, eS 2s remaining work’ 1@ dup 48d €2 2 AW OF OT Wt 5 fei a a Laepsares ax Gow @ atx Boe or 2/5 4M | cami talon by $F) B 10 feat A a we were 81 a 6 A ooo WS We TH ee, ay ord ¢ a ara at frat Ra A aT we 2 7 SSC CPO 2020 v0 (B) 30 (c)25 (D) 45 7) a = a s Supereoaching Er, Laetoli Ui 11. A can complete one-third of a work in 15 A, $ di: Ged days. B can do 75% of the same work in 18 days Ls. S54: os 'S and C can do the same work in 36 days. B and C work together for 8 days, In how many days will fie: 224 “ef he alone complete the remaining work? a feet ort or vetted wr 15 fet We FX Wom B] BEM STs ST 75% ATT 18 Ra ae feat 4 cen cadt ord 36 feat Foe WHat Sa 1 Bott C8 ft ae we ort od F) “SS area Se ord Reet Ret aT wea ? SSC CPO 2020 (A) 24days- (B)-18-days: (C) 20 days (D) 16 days (RIES ARS aesoncht (eae antec e Ounce i 11. A can complete one-third of a work in 15 At : days. B can do 75% of the same work in 18 days Atole4 dsdys i and C can do the same work in 36 days. B and C LW: work together for 8 days. In how many days will BC Bp alone complete the remaining work? 6 a foil ori or vette art 15 feat A pee RWI aX Boa 81 BEM Gel ST 75% ATT 18 Bree QSrB— 20° eat a cer cael ors 96 At A eR ToT = a) eo ce Rat aw we on we al Gay ae ard Peas feat a yer ate ? | 7 ssT CPO 2020 (A) 24 days (B) 18 days 1920 days L+ ®AZeeARA) Be. 224 ! Be c (D) 16 days fesbook Supercoaching Sas) ad wa yeu ee) Oe > 16d atk 8 Preaar Ya Or 1 18 feat F ORT aT & wae @, Baik c Peay oat wrt a 24 fea F ea Wray wae tot Ate c Porm mA 36 Rl Agr ay wed 81a wate cari Mae a arbres 2 worH Bt fore Peat a gr ae Wade? SSC CHSL bre ach ct S\e Bad (19 (920 eto 7 gE Pammessnnnys USE CODE VKMATHS FOR MAXIMUM DISCOUNT: 13, A work is completed by P and Q, Q and R nd R and P in 12, 18 and 20 days = ladeys ; spectively. How many days will P alone oe 21s Sita seeappate to complete the work? RAB = 20S RAB = 20S ve orf pale QQ ait R ae R oI P ENT wa: 12, 15 a 20 fet ¥ aT ) AlPr Oth) Ae four unet 8) p aba va or By ET Rees) wea fe ea? —. ISL 2019 (A) 35 days (B) 25 days (C)40days —__ (D4 30 days (RAZESARA) Teabook =a Supercoaching USE CODE VKMATHS FOR MAXIMUM DISCOUNT. jogether can do a piece of work in 16 days, C and A can do the work in 32 A+B= Icey 2, ays and C and B can do the work in 24 days. == They worked together for 12 days. How many, a days will C takete-eemplete-the remaining wor , ( Aa Bye ae ort aa gy feet orf | Q[A+Brc)= 1S 16 fort 4 ox wad & coi a ge or a : 32 feet Fax wad ok caik BRT prere SB & St 24 feat Ha wd T1 TA 12 (A) 40 days () 45 days Riga textbook Pymmevennnnas USE CODE VKMATHS FOR MAXIMUM DISCOUNT 15. X can complete half of a work in 20 days uw b>-2ed = Hod 8x8 > and Y can complete one-fifth of the 2 360 work in 10 days. X started the work and left y, ¢ lod = Bode” —Lo after 8 days. Y Ce =. remaining work. y for both of them to complete this work? x feet ort S at art at 20 fer A RT ee woo aie vue or S vied ATT GT 10 Gade sup fea 4 ge oe woot 8) x a or gw TY ° ar 8 fa d ae wiser von TB FR y ( Qe aM ST GM Pea Sa al aT aE, Br oer F got feet fet ort ? SSC CGL MA \wS0 days (B) 40 days (0160.4: 'D) 50 di +4e>) Azuma SO dayse i textbook Supercoaching A—hke segs B— Go day! He days nikalte h...usko >) BLE a SS aie euch ite 16. A can complete a work in 48 days and B can complete it in 60 days. They work together for 12 days and then A leaves. In how much time (in days and hours) will B complete 25% of the remaining work? awe orf oF 4s feat A ward ax wate ait Boe 60 feat A ara a WHat 81 F 12 feat oe eH Ay axe & afk fox ATaT Gre 8 1G ae rl BT 25% wr 4 (Ret otk oct |) GT ae? & (A) 6days4 hours. (B) 8 daysip noi (0) 6days 6hours (DY8 days 6 hours —" fesbook Superceaching CSS aU eu Lecee UL ie = 17. A and B ean complete a work in 15 days and 10 “15 a rely. They start working together, but after 4 days B-lo eo new worker C days. If C works alo : sinplete 40% of the same work? le Sangre tara ag 10 Ret gr a wed #13 ww we ont wer OS we eg S| aA 4 fer are Bord vty Ber 21 fe A ay aT cd wre ard eet gy ae ord os fea A a ORT ta casa ot wee & at ae veh aH! S 40% sar ay fapa et A eT ae wear B ? UG, tetoook Supercoaching ter certain time B left the work ing work then the n 18 days. After together x and A completed the rem total work will be completed 73 how many days did B leave the work? Sa fret ord ay 24 Ret A opr oe woeT 8, BU Cepia ah a Rel ga we coo #1 aR ew arr om aed & ate Aaa wad ae BA ‘or tg Rear ate a ae rd RT Rear ch eet B ka nhi pta kb bhaga.pr A to tha ~ pure ne TW sevske Wennue, TRL 18 Rat A yer eh career Poa Rat a are kro Bkaeajyga Bi wr ois fear? divide krdo B k work ko ek din kw ork se days aajayge kitne din Kam kia >) ssc CGL PRE (4) 6 days ‘ays 2 (©) 10 days (D) 12 days (RI 2EeASA) Supercoach ODE VKMATHS FOR MAXIMUM|DISCOUNY 19. A can complete a work in 10 days, B complete the same work in 15 Kou work together and after cert: 3 [O doy work and B completed the ren 2 then the total work will be completed in 9 days. B25 ai = After how many days did A leave the work? a feet orf at 10 Pal ToT we wa 2, B aah orf a 15 feat A ge ae wae 8 ae a We arr or od & ate Mar waa S are a 2 om ws fer oie a ae or ae fea at ga org feat Hae ef orem feat Rats ag at orm vrs fear? SSC CGL MAINS 2022 (A) 6 days (B) 8 days testook Gupercoaching A—lodeys & oe = ace = fs completed in days B and C left the work? A. Bait CwAR 10, 12 oie 15 fet i ye oT ! wR Wed 81 3 WH UM OM SET YS ET =z 8 aftr Akar wea $ ae oot co ws far ak at ae orf qu fea a ga om 7 feat A ye et ore fox ver wr fe feet Rett @ we pate c2t ar wee Beat 7 (A) 4 days (o) says IG? days (D) 7 days (RIZE SARA) Papeeeennngs USE CODE VKMATHS)/FOR MAXIMUM DISCOUNT 21. A and B working alone can complete a of work in 8 days and 12 days respectively. They started the work together, but_A left the work 2 days before its completio was the work completed? AG Bade HH od By feet or aA sore fate 2 fea Ht ae wd Ey ff Atom mat 2 fe rs Fem at far FT 3a Sco re (B)5 (C8 (D) 10 tesbook Supercoaching USE CODE VKMATHS FOR MAXIMUM DISCOUNT 22. A, B and C can do a piece of work in 10, 12 and 15 days respectively. They start the Bilod work together but B left the work 3 days Ge before its completion. In how many days will i B> lad the total work be completed? C3 lsd = A,B ak c HAR: 10, 12 aie 15 feat F ——

(RIZE SAK- B Papeeeeennegs USE CODE VKMATHS FOR MAXIMUM DISCOUNT 24. A, Band C can do a piece of work in 10, 12 and 15 days respectively. They start the work together but after 4 days B left the work and 3 days before C left the work. In how y days will the total work be completed? A, Bak c mA: 10, 12 ak 15 at A Tw La Ww a OF YS COhK32 12) Sz 228) ea ates Rea wed CF OM Big fe So XS) aa an frat ta ger? SSC CHSL 2021 last m bs A,C se pucha h to bs Un (a) 27/5 0826/5 ki efficiency se divide krenge (©) 21/5 (D) 23/5 +d) (xis fesbook Supercoaching s t %, oH sled wi 2 18d-l (Bo (Eos . Yoa orf $ 1/6 aT oT 3 feat H shee eT 1 2, LAD: lode 7 ) a7 SE UBL Sat aya hs fet A ae wor #13 St fet ae 8 fae onl wet 8 ed ae x Beye 12 VCE negative wn wag tet | (Geass Se aie e Lice) V (a) 6 days (8) 8.1 days JP 5-1 days (D) 7 days +4a> (RE FRSA A) a at wed 81 Pair faar orf oT aT ad BI ft} ag 9 orf wis ta @ wae 10 Ra ae Port ar 8 wero dan oni 4 at ora eRe ae 2 fea ord oe @ fax vis Uo @, ey orl Rar fear re & | ford feat wre yer er ? Gcama wiser «pfu ys A) () 20 days D) 24 days Ueisasre a= Papeeeeennngs USE CODE VKMATHS/FOR MAXIMUM DISCOUNT 27. A can do a work in 12 days and B can do the same work in 30 » They work alternately, alt ng days; A st the work. In how many days will the work be completed? Ave ore oF 12 foal Hox Waar @ sik B Ot ord at 30 feat F aR Tea 8) a at-ant @ vo-ue fea visax orf axe & a ord yw oe 8) ont foo feat qwem? SSC CGL PRE 2021 4 1 (a) 165 (B) 175 a 2 (C) 165 (p) 175 testbook Paepevemremms USE CODE VKMATHS|FOR MAXIMUM DISCOUNT | 27. A can do a work in 12 days and B can do the same work in 30 days. They work Ari2d = alternately, alternating days; A starts the work. Co- 563, In how many days will the work be completed? AWS orf a 12 eal Fax Toa B aie Boat ord ot 30 feat Fax WHAT 1 TNR 8 ya—ve fea vigex orf xt A ord ye oer 81 orl fear feat F SSC CGL PRE 2021 iT ReRE - 7 60k Kereeb pahuch (B) 175 to 7x56 Work 16 3 (D) 17; AWlork Akrega 4/5 tetbook Supercoaching err <2dyB: te-rbale CST Tawi e i ecreL ie Le Ss = FTA KB Stee arm? \y153 27. A can do a work in 12 days and B can do the same work in 30 days. They work alternately, alternating days; A starts the work. In how many days will the work be completed? Ave ore oF 12 fel Fox Waar z ik Bet ord at 30 feat F aR Tea ze) F an—ant 8 vo—we fea wiser ori axe A ord ye ae 8) ore foot feat F SSC CGL PRE 2021 1 (B) 175 2 (D) 175 (c) 165 Papmeeennrmgs USE CODE VKMATHS FOR MAXIMUM DISCOUNT 28. A can do a piece of work in 24 days and B can do it in 80 days. B works alone for two Ax224 a Rey and A works alone for the third day. This Baaod 2 process continues until the work is completed. any days will the work be completed? A feet ort wt 24 Ra Foe wean 8 ci SC CGL MAINS (a) 42 45 (C) 48 (D) 44 RI ZES ARS wee ae DIRECT MAINS QUES ATDP29. A and B work on alternate days to do a \certain work, B starts the work on the first day] A alone can do the work in {ddays. If the w SST Tawi hen in how my Q= ees is completed in {} a - days can B alone cdmplete 7/9 of the work. ed 3 ‘@ After oni ot o fag a ik B Ter Zhi bndeho..ckkadiahok) TTR Ord we 8 wed fer wart yw total m sekitna krtah...dusreka | afel a GU wre By fer a aa Fee Brid Awd Baba ABS q4 ‘ pasd ¢t Pbternafe, 1-2 A a Ll bye A ao e LS 2ouig: 37 A-lod @_ Tt? BB? a [2dex, 8 a - | ras ee: soy ace| 8 ef \2y = SAC? IBA G C 220% | ay + 2aK6: Ledoyy Gb losarc ery Aare @s ay Pe313 WG. Q +4ed paeesemnnngs, USE CODE VKMATHS FOR MAXIMUM DISCOUNT | W610 29. A and B work on alternate Asay aay A ga (ee certain work, B starts the work on the Ld ~V\ Aalone can do the work ind days. If the wy BArIS w% is completed in 1/3 days, the days can B alone complete 7/9 of the work. we fftar orf oe & fay a sik Baws fea we orf ort @ ved fa Bort YE. i opr ae % afe ord iad fer A ye eter &, th aber ord or 7/951 fra fea HRT ae Beat 81 SSC CPO} (aystaays (2) 4 days (oetaays Sabo days aD _ @izaeae teatbook onowe Pea nu Su es eae 30. A, B and C can complete a work in 10, 20 and 30 days. If the work is started by A and A God B and C work on the second and third day 8° 2ods 60-55 =, respectively and this process continues in the cy zed 2 then in how many days can @w—s so eat Bid? CO, [a2 xed —— 8s foo eat A ard yr eer oT wa 8? Briss — SSC CPO 2019 (D) None of these “Gu wos 14 Rees tetook - = Paeeeconremes | USE CODE VKMATHS FOR MAXIMUM DISCOUN? 1 persons P,Q, R, S were en} work, the P: Q; Ry S Kramah (Monday, wy) 3 (Wednesday, and was completed on Mor efficiency of P, Q, R, S in doing this work was in the rati $38} then in how many days will R, working alone continuously, be able to complete the work? aR afr PQ Ros we Hr A Ty MY ae eft f PQ; Caran); (RAR) a Rat A oe corr ge far aa int wm) a a oH TA ALORS A agama 4 eh, oh bat arene orm at gen FG PE Be OM BB we TST? (al (B) 13 Fan) on teetbooke =F a Supercoaching ere) SOU Ugo uA U tere. Ice Epes |Combbte chooter \ 32. Person A can complete 1/5 of the work in Ky 3 days, while the efficiency of B is half that of wait wig, A. In how many days can A and B, working together, do half of the work? besed oat aor or 1/s art 3 feat Fae aX Wear &, wale Bat aaa aS ore 2) aah Bue ae fray OT oR BT Sa OF or omer art feat Peat Fae Wad 8? SSC CGL PRE 2022 (ays (B)7 (4 (D) 6 ‘m bhi dete Rudajtne 7 i b imesemeresaching Trae ue Su OO cam 32. Person A can complete 1/5 of the work in 3 days, while the efficiency of B ishalf that of A. In how many days can A and together, do half of the work? aft a or oT am 3 WR Wee 8, B task owe wa F wa OM or are art feet feat A wR a SSC CGL PRE 2022 (B)7 PBs Lp ELD 5 7 >) (CEE (eas on Lownie wenn es nna 32, Person A can complete 1/5 of the work in 3 days, while the efficiency of B is half that of Avs a A. In how many d2 together, do half of the wor tetook Supercoaching esa WR Wea 8, yee Zack Bw aT = heise Sa OM or aren art fear Pal Ha Wad 8? 5 (B)7 (4 teetbooke Paeeecomeemgs |) USE CODE \VKMATHS FOR MAXIMUM DISCOUN‘ | | (0733. A does half the work as B in 1/6 time. If A, Sry together they take 16 days to complete a g C work, then how yy days will B take alone » 1 to complete the w Ae a Shey pI A1/6 WI Yes omer wr we eI afe aye arr fae we or el ET As & ) tines 21 we AGORA aa & tea ade ve | a eet ut L PRE 2018 aia e 8 (A) 38 days (B) 7 days ras: ap ery (©)44days —_{pF64 days Bupercoaching Sa aaa wero LU Ie ° 34. A is 3 times faster than B and hence is 3 B effecicy dih phie hito LOM nikalpéie to complete a work in 32 days less than ® 6 kijarurat nhi efficiency x days KWo at 2 2 sametotal Work dege. uske dato If A and B work together. Then in how kiefficency se divide krdo many days will they be able to complete this work? ABU 3 TT das atk gafery fax om a1 BY 32 fa oa wT A RT oe a war 2) aft a oie B we ure \ fraae oH ort €1 dt a ge OM aT frat fea Far ax aaa? SSC CGL MAINS 2018 (A) 10 days $8) 12 days (C) 16 days (D) 14 days aaswe testbooke Supeevtching MEESTER and 35. The ratio of time taken by Ana As Bani to complete a work is 1 : 3 respectively. Hence, Anamika can complete the work in 40 Tne iF days less than Bani, If they work together, then in how many days will the work be completed? spatter oft art ERT Ye SM BT RT SET ¥ foe ay ara oT aga wT 1:38) om: aratier sa ort a ari 8 40 fet Be Be oa waa 4 ae oe un & ale a ww wer : rH ard @, ot fear fea ¥ ora ae erm? SSC CGL MAINS 2018 (A) 20 (B) 10 40) 15 de>) testbooke Supercoaching USE CODE VKMATHS FOR MAXIMUM DISCOUN( ~ 36. The ratio of efficiency of X and Y in doing a certain work is 5 : 7. X and Y together can complete the same work in 70 days. X alone started the work and left the work after 42 days. In how many days lax Jo = Sto sgnayrilly alone complete the remaining work? 210 ke tar orf a wei & fae x ake vA Quan or agua 5:7 81 x ate y freee SSE ae nd 10 fe Hr we wR Ea . ord ge fear sik 42 fet ae orf vrs fear] ity abe Vat ard a ar Rea Hag we? SSC CGL MAINS 2020 V9 90 days (B) 96 days (©) 80 days (D) 72 days GAZ letook 5 7 Pameesennemes _USE|CODE VKMATHS FOR MAXIMUM DISCOUNT 36. The ratio of efficiency of X and Y in doing a certain work is 5: 7. X and Y together can complete the same work in 70 days. X alone started the work and left the work aft ys. In how many days lax7Jo = Be alone complete the remaining work? 210 ort a ae & fag x aie y oT zee 781 x atte y Frere | SF ae ord 70 Ra Hae ae Wed 81 ba x4 3% ord ge fear ai 42 fet are ord vrs fear] "ae abe vate od oer Rea H ag OT? SSC CGL MAINS 2020 YH 90 days (B) 96 days (C) 80 days (D) 72 days 4 >) (RAe testbooke (105137. A cam do a work in 15 days. B is @BYmore Q"Vefficient than A. Both worked together for 4 days. The remaining work was completed by C in 8 days. In how many days can A, B and C together complete the same work? Awe ort Ft 15 fer 3 aX Wea BI B, Pe Say WH we wer ore as or ecw a 8 feet ¥ au far (a, Baie c iaales! orl a frat fea F ORT He Tod BP SSC CGL PRE 2018 a hss days (B) 4% days RO Sauna ee cea (©) 6% days (D) 4 days LIARS) testbooke USE CODF“"«MATHS FOR MAXIMUM DISCOUNY Is. A and B together can complete a work in 4 = 12 days. If A works half his normal work Mitel = B +38) ne capacity and B works thrice his normal work capacity, then the work is finished in 9 Latu® = gh+ 8 ys. If A works alone then how much time upereoaching x will he take to complete the work? Bh. ign Brie ad pve unr fit of ot 12 Ret a * as ware aR Wad #1 ae a eet aT arF amor & anit ver Boer aT orf aa ArQars & fag orf wt at orf 9 feat A ware eT wren 81 a a ode ard we ch wa oa or at ere we oot ere ae? SSC CGLPRE 2018, (3) 22495 $ OY gi 224 dye 2 a DVT 9 days 5 +4 2)) (Riga. testbooke Supercoaching a, Eee ag Aacod oF Fort - re 5 Ba Hod +S > bea Je ¥ Gp EDM 25% 15. ¥ Sten49, (Roe. TE aa ee ete) Oita 39. A can complete 25% of a work in 15 days. He worked for 15 days and then the remaining work was completed by B alone in 30 days. In how many days will A and B together complete 50% of the work? aX Goat 31 we 15 feat ae we far atk Fax a OTH BY abet BA 30 FAH qe fear a otk Bye ure Poer a RA BY SH ST GT 50% TT feeert Rat 4 a oe? wv (B) a ° (D) 25 CGL PRE 2018 (a) 24 ale Ae) Re RBs) testbook Supereoaching USE CODE VKMATHS FOR MAXIMUM DISCOUNT’ 40. P can do one fourth of a work in 18 days. R eek leds Boe He completed 37.5% of the work and left 4 \_- Q completed the remaining work in 40 da: Peche wale question m A.B dono Working together, in how many days will Li eee re eet, they complete 17/48th of the same work? ne 5/8 REMEMBER p feet orf ar ye cheng art 18 ff Mp p Shits © Ao coh t1 sat gaan wt for ge oa oe 8 Bis Rett Psqad ye re words De Bere ae orm ae_ey aot orf a(Z Say wrens ee SSC CGL PRE 2020 wt 10 days (B) 8 days pasa (D) 6days Boy mS tesbooke (Supercoaching USE CODE VKMATHS FOR MAXIMUM DISCOUN® ce fork toge work be completed? a aber We Ori By 2/5 aT 12 Rat A RT aR wed Fad ger 4 w, 25 vite aftr arégua &1 carbar vet ord ai(e 8 12 Ra) aa origara 81 aft 8 an yw are Meroe orl oy, dt ard foot feat Foye ey ore Sse TPO testbooke Supercoaching Se wz iéd yore a mriaae Fi a Ze Bho Sots Koc G se 21> i 2 te) RI gesAes) Ua oO be ate 42. X and Y can complete a certain work in 16 days and 24 days respectively. “They_work completes the In how many plete 7/8th of the same work? xaik y fired Pitac ord ot wre 16 fx sik { 24 fia 9 a ox wod 8) a uw ure 4 fe ae ord wed Feada ae ort a 10% fea} wi oe é vai z we we wt orl & carr at fart fea ¥ ae wad a? SSC CPO 2020 (a) 10 days (8) 12 days (QB aays Pr9 days letook S upercoaching ye led =~ aaa eC ursae O° Faq 58 Tar une a 42. X and Y can complete a certain work in 16 days and 24 days respectively. They work for 4 days. @ alone completes they ig ark ATOR ny H0% day) In how many days can ‘Vand Z together complete 7/8th of the same work? xcate » Ret Pte ard ot ree: 16 fem ate agg 2s fon a ae wot B18 ew aM Re ei ae orf oe Stade ve ort a 10y fea ¥ Ww oem é vst z we we wht orl & £. Pm sar at fart fea # ae wad a? SSC CPO 2020 eR Ke 1 24 (A) 10 days (B) 12 days C ae ky (8 days P79 days #>) x RN Gos AR) textbook Supereoaching DSEICODE KUNIS) VT eel Ul it G4goX dnd Y can complete a certain work in 16 Cae 7 Wand 24 days respectively. “They work > al ¢ “38 ame work? Ty Prt aa anf aw ® DO THIS aq ¥ aq ae aod 818 ort axe Stade we ort aren 8 voit z wo ue wy Z Ki efficiency Ane k bad just Z#V ki efficiency=14/3 x 48(t W) = kitne din m krenge dono pao dvs ©) B days ae Pammesennemes USE CODE VKMATHS FOR MAXIMUM DISCOUNT TYPE : NO. OF MEN 43. 1f 35 men can complete a work in 6 di then in how man la half of the same work? S Bebo, HP) ate 35 are TH OT BT 6 , zt She nap SSC CGL MA (B) 30 vestook Supercoaching yng s QeQna Oey CU Wis a Aue i exes Ute a Sve sac 45. Fourteen people can complete a work in 18 days. After working for 5 days, 6 workers leave the job. And the last day of work is added back. In how many days will the work be completed? thas af fat orf ar te fet 4 RT ax und @1 5 fer orl oe S ae 6 wg of vs ed 81 ok oF F aber fe amet Ys ord & ors fart feat & waver er? SSC CGL PRE 2021 (a) 24 (B) 12 (21 7 letook Gupercoaching QoKBoe on RK Id = 20 a 2 ter 25d * Wake awn Uc SSC CGL MAINS 2019 G55 (328 (D) 30 46. 20 men can finish a work in 30 days. They started the work, but 4 men left the work after 10 days. In how many days will the work be complete: 20 set yr or Bi Go) eat H ware wR Ua = i Oe YS aK fear, afarks X10 feat S are | Bis 8a F1 ord for fat F OT am TT (c)25 Kuch kam krke LEFT TO ADD KRNA mt bhulna RS goers tesbooke Supereoaching USE CODE VKMATHS FOR MAXIMUM DISCOUN?” 47. 40 men can complete a work in 18 days. 9 d working together, 5 days after they s qe~ oN Z more men join them. How many days will Y > they now take to complete the remaining work2—> = 8 een 4 WT a wed 8) Sd UH TT oe SIRT OST So fet ae, 5 dk gos wad UT afta ef ond 81 ay ort ot met % oa 3 fot feat or waa oh? SSC CGL MAINS 2022 (A) 9 days \ 45) 8 days (©) 6 days (D) 7 days A.0d m a0 hue to Kuch ADD ni krte...Just day km hojayge ‘uch kam krke LEFT krte to ADD krte ho Kam phle hua left hone se @izEeee2) esto Supercoaching wer he: 4 ae eo an D DiS USE CODE VKMATHS FOR MAXIMUM DISCOUN? 48. A hotel has 51 days' ration available for 148 persons. If 37 persons leave the hotel, for how many days will the rema last? we Bea 4 as afwal & fey 51 fa wr WR eet 3) aft 37 afl + Beat ws fear, at as wer ferry feat ae wer? ¢ ration SSC CGL MAINS 2021 (A) 69 (B) 67 (6s (D) 68 testbook v ua aaa $upereoaching USE CODE VKMATHS FOR MAXIMUM DISCOUN? 49. There provision for 350 boys in the mess of a college hostel for 25 days. After 10 “ aso we side thea & Aa F 350 agai & fey 25 fei ot wit 81 10 Ral S are, oa GT agat ay gat wrarere 4 wrsiaftr we 25 se 18 din ka khana bacha h 350 wr, aE Tra Tar A 21 RA oT He bacho ka = 21 din = kitne bache foot sei a aR TET F kha lenge ax Rar wa? 350 the 250 reh gye SSC CG| (a) 98 (B) 92 (aso +4100 +4 zd) (RO Gos ARA) testbooke Superceaching USE CODE VKMATHS FOR MAXIMUM DISCOUN? 49. There provision for 350 boys in the mess of a college hos 5 days. After 10 fen Inversely kitne Din khana > . ys were shifted to . that there were D»ws at 21 more day@ any boys were Bl shifted to anof® Ge } faye eetce testbook | Supercoaching USE CODE VKMATHS FOR MAXIMUM DISCOUN: ” 50. There is enough food for 1600 people for 120 days and each person eats 900 grams of food per day. But after 80 days 400 people [GooHoxduegm= \aoox taper trom there, Now every person ex o) 1000 grams of food per day. How many days D=48 willthe leftover food last the leftover man? wet S aa oMt F) ora Wee are 1000 aT wats Grr wre 81 war By arn wa By area & Ferg fort fe wetm? SSC CGL PRE 2020 (ay24 (B)36 48 (D) 72 ae (Rs testbook 7 sam Gupercoaching USE CODE VKMATHS FOR MAXIMUM DISCOUN® 51. 64 men plan to complete a work in 9 days by : only 40% of the work. He wants to SuRHRH in 4 days. How many the remaining work in the stipulated time? 64 ore oft 8 de om oe fit of ao fa i ware oe at tad #15 a ae Se oT aor & fis SEY 40% or Ot far 81 ae or Br aha fis 4 ae oe aed dy) ae on @ Pati ser geo ey rer aT TT oem erm? (ayaa (B) 12 (c) 13 V5 ! (RO 7Os ARH lestbooke = $upercoaching USE CODE VKMATHS FOR MAXIMUM DISCOUNT nvzed, Quran oe cose ere another person joins to do i til chat work be completed Bre te mt vie wtes ats ears we a ww ad BY 20 Ra JAtas 'd — ust gl a wom € ww ay ara ord ge fear ore | Mate Id BU ame fae ow he ats ork we rg eo et AA = Hut he sete ord fer ee ok ay ort wet oe Pricey = Hutt catheter 81 ate fer Set or A oe aay PtBanrGsid : SU] ‘mer UI wad 8) aw wre freed Pat AF RT er? BreanrGold « Srl 2 3 (0) @iZEeARS lesbooke 5 ‘ upercoaching CAST Tao LU RL xece ULe r 53. 150 workers were employed to complete Epwencers X-8, a [Spidey ieee a work in a certain number of days. 4 GM AMT: [O(R-B) workers leave the work on the second day, 4 more workers leave the work on the third IHC. 142, [zB eee Shei and so on hence it takes 8 Le . ‘ nore days to complete the work, then in how =a > many days will the work be completed Ces) feet orf at ye Pikad fal i ori o fee Sp: phowtn-vd] 150 aif wd 7a) 4 afte GR Ra orl Bis @0 @ 4 ote afte dr fer orf vis 50-9) elas yeh] 20 € ok ae WON aG we Fo em dT fapor -1)K-A] fre ard at ot et A 9 frst sure 5[20°~36) uafecom in SI Sar PM RH IE QSK20Y kt check krlia yay SSC CHSL 2020 esook Supercoaching THox2s | KyEs | 3 rece whe a wo hota h... 1/4 hogya mtlb 1 hogya 3 baki (A) 90 (B) 82 an _ (€) 80 (D) 85, 4 ed) RI ZOwAS oar USE CODE VKMATHS FOR MAXIMUM DISCOUNT” | 54. A contractor takes a contract to complete a road in 60 days and employs 70 laborers for the work. After 25 days one-fourth of the work is completed. How many more workers will he require to complete the remaining work in the given time? we ddan 60 feat 4 ww use a I aT or dar amt @ aie 70 wag a ge oF amen 8) 25 Rai S ae woes arr ET Boom @) ae om w fy Ty wT ET oe 3 fay wa fort stk woh a orem TS? SSC CPO 2021 Gupereoaching MISSENSE I | eo 54. A contractor tak am 3 a road in 60 days employs 70 laborers is ; for the work. After 25 days one-fourth of the \ a work is completed. How many more workers Sfex2e \nr es will he require to complete the remaining 1 work in the given time? \6# ue ddan 60 fat A ww usm BW WT aT SSP SM AAS a dor ar & ate 70 ag at ae are a contract to complete rey =e aren &) 25 Rat B are voters wT WT Qo a AAS Bom 8) a om w fey wy eR WT ——{ ws we Rw ok wai A area Teh? baki ka kam lie 150 chhiye honge ssc CPO 2021 70 phle se hi extra chiye 80 \ Bes a i +4 ad) (RA GosAee ne Re Iestbook Sin a Gupereoaching USE CODE VKMATHS FOR MAXIMUM DISCOUNT 55. A contractor took a contract to complete a project in 90 days and employed 60 people to complete it After 60 days, he found that three-fourths of the work had been completed. How many men can he relieve ‘work so that the project can be completed on ‘i we ddan A 90 fell A ee oto a IT ae aT wigae fern otk 3a HT BY wr raw fart 60 fet are, Se GTA Bye C1 we fot get at aft sche: rer Ue aT Bt TS? (aso Aif0 (c)30 (p) 15 3/4 Kam kia mtlb 3 kia 1 reh gya ES testbook $uperceaching 100 New Workers RIG 6 AR) (Br 2 USE CODE VKMATHS FOR MAXIMUM DISCOUNT 56. A person undertakes to complete a work in 150 days. He employs 200 men and finds that only one-fourth of the work has been completed in 50 days. How many additional men should he employ so that the entire work can be completed on time? ye afte fret ort ot 150 feat A aT ae ar urate aa 81 ae 200 set Faw axa @ Va vat worn & fH 50 fei Hoa ord wr dae ve-deng a ye a war 8) WA fet afetad sret oo aise SR fe ae qe or wa S ae a Te? SSC MAINS 2022 (a) 75 (B) 85 (C100 (D) 120 festbook Supercoaching WS Ketel Ae MUU Ui toto) ea 57. If 4 men and 6 boys can do a work in 8 ys and 6 men and 4 boys can do the same (Um+eg}xa = (Cr+ha rq workin 7 days, then in how many days will 5 men and 4 boys do the same work? BIM+yES: m+ 2B ae 4 areal ak 6 ase feet wer aT 8 fai i ax wad & atk 6 one aie 4 asd Ue or at 7 feat Fw wad z, rov-nabs ee") dts arat ak 4 asd ot oF oF (Baye FR Bhyee fart Rea a wth? SSC CGL PRE 2017 hxo= Wine (ye 8 (Os Mo (RE ZEwsS-) — +| a [Bs wy teak Supercoaching ye far 19chs Comerteh Ise eee i Fav GR n Dar: (Cae USE CODE VKMATHS FOR MAXIMUM DISCOUNT 58, Two men and 7 women can complete a piece of work in 28 days while 6 men and 16 women can complete the same work in Lig@ days. In how many days can 7 men compli the same work? dt ges atk 7 afgeny, fart art at, fea & a oy wad & wale 6 Gor 16 AfeMg SA orf et 11 fea A a Uod 81 7 Foy, wet ori a fa fea A ae oe wad #? SSC CGL PRE 2019 (ay 12 (B) 11 (C24 (D) 22 lesbook 5 Supereoaching USE CODE VKMATHS FOR MAXIMUM DISCOUNT 59. Five men and 2 women can do a work in 9 days, while 11 men n can do the same work in 4 days, how many women will be required to complete the same work in 6 days: via gos sik 2 afar we GH aT 9 nd 5 wom (a) 16 (C20 (D) 18 IgE eaRS tetbook Supercoaching [bmast 2 . ameef)xie- IXmtisF= |Om+': f Sm ae Qs mae Bz dri de uments in Sn oe als x¢ pe) JE9) (RO Zeb ASA) ary Tawi wt L Ui cece) Uy 61. 4 men and 5 women can complete a work in 15 days, while 9 men and 6 women can complete it in 10 days. To complete the same work in 7 days, how many women should help 4 men? 4 Jou ott 5 aftorg ye ord or 15 Pei 4 WW a wad 8 vale o ges sik | nftarg 8 10 feat ¥ aT ax wed B1 | RH orf aw 7 at F gr ae S fee, fort afgersit ot 4 gest at wera oeh afey? (ay 14 (11 SSC CGL MAINS 2021 (B)15 13 tesook Supercoaching (m+ ¥fnge = Gmt6P)x 11 ; See nas Bem ter Iprns 3 q m NSep est) (Be an =r et) va0 BRD \\ mee D Sealgy _lpeeeen) ake en wn Un 62. 2 men and 7 women can complete a work in 28 days, while 6 men and 16 women can complete the work in I1 days. In how many days will 5 men and 4 women together complete the work? 2 yeu ok 7 afeery 28 feat A uw ore Bl I oe Hod z, Tal 6 You sik 16 afer 11 at F orf a ye we wad #15 ges otk 4 afterg we are fort fet Ford a yer He? SSC CGL MAINS 2021 (a) 18 (B) 14 (C22 (D) 20 tetbook mare Pammesenneneg USE CODE VKMATHS FOR MAXIMUM DISCOUNT 63. 6 men or 2 women or 4 boys can complete WBT Aan a work in 77 days. How many days will it ul take for 1 man, | woman and 1 boy together > eo He we © Senate 6 yer a 2 aay a4 aed fet s om a 77 fea 4 a oe wed z1 1 Rae Feu, 1 Afgan sik 1 ager reer weit (tei B)xDs Sen ore Br ye Ger F foray fa aa? SSC CGL MAINS 2020 Mads ORE (A) 86 (B) 80 as a 84 (0) 82 + m uy @iweeeeo) CEO cue UI Teco ae more to complete a work than A how many days will A alone take adie pO GT Aaa w om oe 4 27 de afte ohh cen a oie B Ol Gert 4 Bal We oF ET oe Fs He afte HT Ta sda Ga Sr ST pr wer 4 ferry fa on? SSC CGL 2021 (B) 18 (12 (D) 20 Re Res nee eae RU een ee ca 68, A takes 5 days more than B and 9 days Az te dart more than C to do a piece of work. A and B d mB can finish the work in the same time as C Xe er den alone takes. In how ¢ will A alone A+B Key cnh uch do the work? A+@: (aro afadt om at oe 4 Ba 5 fa ora +B: Cade aa 8 ak c¥ 9 fet wre aa BA “ee ak B Ue OF Bua a waa 4 aH ax Wed & frat wa 4 cue or ST arbar ae oot 81 a aba Sa oO ar fat By we? &, — SSC CGL,2020 (ayaa efi same as before Just lang different Iestbook Supercoaching 42-6 patet2) 78) * [Cages 7" pee: Re Arey more than C to do together then the time taken by them to do the work is equal to the time taken by C.to” tow many days will B take alone to do the same work? gg A Fete Rao cde fea cat aot 8) aA cB we ae oe we dt are aw on oe 4 fer a wa, cam od a ot ¥ Ty whys Wa a Te Bada ot orf a oe 4 fort fami ssc CPO 2018 (B14 (D6 tetook Supercoaching TYPE : PAISA DISTRIBUTE s_feae te and 10 days respectively. He contracted to A-15 Zh. complete the work for Rs 30,000. A's share in ge 7b the contracted money will be- Ak B wr: 15 feet ste 10 feat ¥ Ww OH QI et Wed f1 TEM G 30,000 wa Farr qT wei or ade | 00K rar) atgattrt at Far fee eer ‘SSC CGL MAINS 2020 me h / efficiency alg h (A)® 16,500 _ (BY 12,500 icy k base p batenge \! (c) B 18,000 (D)® 12,000 Ig h/ efficiency same h base p batenge Iestbook | USE CODE VKMATHS FOR MAXIMUM DISCOUNT Supercoaching 71. Acan complete a work in 15 days, Bin 20 days and C in 25 days. All three of them Aalrd oD Bo 20d tao C225d Agere art Qo sIss2 pt 4700 | — [00 200 COMMON kaam zee © + cy k base p batenge +4 2)>) RS 7H A RS Iestbook USE CODE VAMATHS FOR MAXIMUM DISCOUN? $upereoaching 72. Acan do a work in 12 days while B can do the same work in 15 days. With the help of C Avied they all together can complete his work in B~ sd Sp days. If they get Rs 6,000 for some work, fj *@ C's share in it. Aretes Fd AQ or B12 Rat A ae won f oral ) . wih arf a 15 fit ¥ ae awa 21 c Agerc¢ werner & a ww aT 5 feet F wad Sef st lh er ae wd aE .4 % 6,000 frert @ at wert car (A) 1,200 (c) 1,800 POEAR- Papeeenring USE CODE VKMATHS FOR MAXIMUM DISCOUN® | 73. A, B and C together earn Rs 150 per day, while A and C together earn Rs 94 per day Keer = tse Ps 94 =(SERRM 8 and C together earn Rs hen how much does C earn per day? Bee 2 14H A, Boe c Prarae wfafer 150 wre 7 Bre s FOO orate a site c Pree wf of 2 seB (cs 20% —— L PRE (A) 8 56 G 20 (CB 34 (D) & 75 ufff Plus minus @ at wa ae ae =) é tetbook Supercoaching Bees 18 " 23—_ ms | as 4 — Cot y— TST Tao waa iO reel ice (RS Zoe 74. A, B and C are hired to do a work for Rs 575. If A and C together complete 19/23 work, then how much amount was given to B? A,B Ta c feet ort SG 575 Foe fay oH We war OMe za aie PAH 19/23 GH WI GB Aa z a Bay frat afr wars a ag? SSC CGL MAINS 2018 BF 100 (D) & 475 (a) ® 210 (C)® 200 a testbook Supercoaching CRS oa ee nuh ic (RS zoeAS 75.2 men and 1 woman can complete a piece of work in 14 days while 4 women and 2 men can complete the same work in 8 days. If a man earns Rs 90 per day, then what should be the daily wage of a woman? we ort 2 ges ak 1 after 14 feat A aT ae wad 8 walt 4 afterd afk 2 you wt ort 1 8 fest a a wad F1 ale we Yer & 90 wfafea on &, at ve after oT wfafea a Horgtt frat ert mise? > CGL PRE 2016 (Ay 48 (B) & 60 (QB 72 IF 135 Supercoaching CRS oa ee coeur UL cee 76. 5 men and 3 boys can complete a work in 7 days while 9 men and 5 boys can do the same work in 4 days. If 6 men and 4 boys are paid Rs 6,000 for 6 days' work, then what is the one day's wage of one boy? 5 art atk 3 aed ve ori at 7 Ral a % WR ax Wad & orale o aah sie 5 ash Ba OM G1 4 fer Fae wad Fae 6 arett ax 4 agal a 6 fea d orf or tar & 6000 wad fear wa da YH ash oT TH fea ar tar ae 8? ssc ¢ LIS 100 (8) % 300 (C)® 200 (D) & 400 1.2020 tetbook Supercoaching PEST Tao wie Le cece ice iece of work in 60 days, B does it in 40 days son works in turn for a fay that A does the work on the first day, B A works and C works on work is completed. He is If they are given money A get? Ag ad 3t 60 fea 9 oer, B40 fear 4 oer & ae c 12 fea ¥ weer & ueto aafty at—art B ww fea S fare We Wor ord ae @ fr a ued fea orf wer tw GET t Sat ga orf & fag w 270 RA om 1 ond o aqER are srat wed Ry ony at A wt frrt waa Fa? SSC CGL MAINS 2022 ye 14 (8) % 96 pOR24___ (8 27 gOeae testbook Supercoaching Sy Tao wae ale Ou cece ici ay that A does the work on the first C works on AW Bri @ 60 fea 4 wear, ‘p40 ea A aoe & eC 12 fea A weer & uete afte at—art B ww fer & fare WH Wer ori at @ fh a ved fea orf weer tw GET ft ort oer # atk c det fea orf oem @ otk Ht Wor wa ae ord ware at Bt Gre a wT aed ed BI wret ga ont & fey w 20 fea ord 1 orl S aE aft waar wre fey oe at Aw faery wre freA? ‘SSC CGL MAINS 2022 (ye 14 (8) 96 lOB.24 (8 27 GOERS tetbook Supercoaching Peake No WO uu cea 78. The daily wages of A and B are Rs 3.50 and Rs 2.50 respectively. When A completes the work he gets total salary of Rs 63, When B does the same work his total salary is Rs 75. What is the cost of the work if they both do it together? Adit nam ogg mT: w 3.50 se w 2.50 STASI ae aI MA GATING 63 Prom 31 wa BWA ort oe 8 ch we ga ter & 75 Port) ae a oH eer Get Ect ore Tarra wT 8? SSC CGL MAINS 2021 (a) & 67.50 (B) B 27.50 (VB 60.50 (p)B 70.50 RO gow AS Supercoaching Teka Noun ey en ul eae cee 78. The daily wages of A and B are Rs 3.50 and Rs 2.50 respectively. When A completes the work he gets total salary of Rs 63, When B does the same work his total salary is Rs 75. What the cost of the work if they both do it together? Adit nap og mT: w 3503 w 2.50 ST Aor WW oa 2 a A GT AIMS 63 from 31 wa BWA ort oer 3 ch we a ae w 75 Prom #1 ae a cht ww wer Get Ect or Tarra wa 8? ae 6750 (=) 2750 (C) 8 60.50 (D)® 70.50 RO goeAS tetbook Supercoaching USE/CODE VKMATHS FOR MAXIMUM DISCOUN* 80. A and B worked together and received a total of Rs 18,000 for 15 days. The efficiency of A in the work was 5 times that of B. What was A's daily wage (in rupees)? A@k BY ww ue om fea ak 15 feat & fry Get 18,000 way ure faq| or FAG Qa BM Grr FH 5 WAT ft) a or ae avorg’ (oad 4) fercrit oft? SSC CGL MAINS 2017 (A) 800 (B) 600 (c) 1200 (D) 1000 RSgosAe testbook Supercoaching CRS Tao ue aL U eol Ueas 81. Sameer and Puneet can complete a work in 10 days and 15 days respectively. A sum of Rs 4500 was allocated for this work. After Sameer and Puneet worked together for 3 days, Ashok was included in the task. The work was completed in total 5 days. Find the amount (in rupees) paid to Ashok. varie atte pa go ord ah sore 10 fer atk 15 fr H gy ae wad 81 ga ort & fey 4500 wa Fh erat orate @ ag oft) wie ote git ¥ 3 Ra ae we oer foo orf ol od arg, orate ot ort a wit ox fer ot gas ft ¥ ET BM ark Bt grat a ag wT (WRI A) TT BI SSC CGL MAINS 2018 (a) 750 (B) 1500 (1071 (®) 800 RS goeAS testbook | Gupercoaching USE/CODE VKMATHS FOR MAXIMUM DISCOUN* 82. A can do a piece of work in 8 days while B alone can do it in 12 days. They work together for 4 days and the remaining work is completed by C alone in 2 days. He is paid Rs 7,200 for completing the entire work. The earnings of A, B and C respectively are: awe ori @ 8 Rai i oe wom @ wale B ber SO 12 feat A ae wr B24 Re Pe ee ay oni aed & atk ae orf ada c are 2 feat FT fara ort 8) SS Ye wT TY GT wet S fre 7.200 wa a yar fea wer 81 wT a, BIR cH war &: (A) Rs 2400, Rs 2400 Rs 2400 (B) Rs 4000, Rs 2400 Rs 800 SSC CGL MAINS 2017 (C) Rs 3600, Rs 2400 Rs 1200 Jp hn 2800-B--2009 Rs 1200 PS a ea Re 120

You might also like