Shedule & Details of Dryer
Shedule & Details of Dryer
Dt 10/7/2024
Sr WORK TO DO START DAY DAY FINISH DATE REMARKS
1 DRYER BODY WORK START 13/7/2024 10 22/7/24
2 SHEET METAL WORK FEBRICATION 1/8/2024 7 8/8/2024
3 PAINTING WORK 9/8/2024 4 12/8/2024
4 ASSEMBLING OF ALL PARTS 13/8/2024 5 18/8/2024
5 PANEL AND WIRING FEETING 19/8/2024 3 21/8/2024
6 CHECK WHOLE MACHINERY 22/8/2024 1 22/08/2024
7 TESTING 23/8/2024 2 24/8/2024
Manufacturing Components
1 Main Frame Assy MS 1
Main Frame
2 Frame Bottom Support MS 2
3 Tray Connector Plate 1 MS 12
4 Leaf Spring Mounting Bracket 1 MS 8
5 Leaf Spring Mounting Bracket 2 MS 8
6 Shaft Connector Bracket Assy 1 MS 1
7 Shaft Connector Bracket Assy 2 MS 1
8 Shaft Mounting Bracket 1 MS 2
9 Material Tray Support Pipe SS 1 Tray Asse
10 Shaft Connecting Plate 1 MS + Hardening 4
11 Shaft Connecting Plate 2 MS 8
12 Shaking Shaft Assy 1 MS 2
13 Shaking Shaft Assy 2 MS 2
14 Shaft Connector Bracket Assy 3 MS 2
15 Shafting Mounting Spacer MS 2
16 Mechanism Shaft Assy MS 1
17 Movable Bearing Housing MS 4
18 Shaft Bushing 1 MS 4
19 Shaft Bushing 2 MS 2
20 Distance Piece For Pulley MS 2
21 Bearing Housing Blind Plate 1 MS 6
22 Bearing Housing Blind Plate 2 MS 4 Mechanism
23 Fix Bearing Housing MS 2
24 Distance Piece For Bush MS 4
25 Bearing housing lock plate 1 MS 6
26 Bearing housing lock plate 2 MS 2
27 Rod for Oscillating Assy MS + Hardening 2
28 Bearing housing lock plate 3 MS 4
29 puff_panel_mnt_washer SS 100 Puff Pannel
Sr. No Description Material Qty.