Processing Summary
Observation From To Solution H. Prec. V. Prec. Geodetic Ellipsoid ΔHeight
Type (Meter) (Meter) Az. Dist. (Meter)
(Meter)
ctgr --- CP 0 (B3) ctgr CP 0 Fixed 0,017 0,097 122°57'42" 11363,114 16,200
ctgr --- BM O (B4) ctgr BM O Fixed 0,025 0,096 123°17'43" 11347,119 16,440
Acceptance Summary
Processed Passed Flag Fail
2 2 0 0
RMS: 0,026 m
1
Vector Components (Mark to Mark)
From: ctgr
To: CP 0
Vector
Standard Errors
Vector errors:
X 0,0002220898
Y -0,0006428294 0,0022131016
2
Occupations
From To
3
Tracking Summary
4
5
6
Residuals
7
8
9
10
Processing style
Elevation mask: 10°00'00,0"
Continuous vectors: No
Force float: No
11
Acceptance Criteria
RMS: 0,032 m
To: BM O
Vector
12
Standard Errors
Vector errors:
X 0,0002663514
Y -0,0006802702 0,0021032696
Occupations
From To
13
Tracking Summary
14
15
16
Residuals
17
18
19
Processing style
Elevation mask: 10°00'00,0"
Continuous vectors: No
Force float: No
Acceptance Criteria
20