0% found this document useful (0 votes)
8 views

Survey Notification Letter Updated

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Survey Notification Letter Updated

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

OFFICE OF THE PRESIDENT


NATIONAL COMMISSION ON INDIGENOUS PEOPLES
AGUSAN DEL SUR PROVINCIAL OFFICE
DOP Government Center, Patin-ay, Prosperidad, Agusan del Sur
Tel. No. (085) 839-5975/Email address: [email protected]

May 12, 2023

HON. MICHAEL D. LIM


Municipal Mayor
La Paz, Agusan del Sur

SURVEY NOTIFICATION LETTER

Pursuant to Memorandum Order No. 095-B dated April 03, 2023, issued by the National
Commission on Indigenous Peoples (NCIP) Regional Director, Ordonio P. Rocero for the
Implementation of Survey Work Order No. 121-23-03 series of 2023, the Survey Team of NCIP-
RXIII, will conduct a perimeter survey simultaneous with the establishment and observation of
control points and Ancestral Domain Boundary Monuments (ADBMs) of the Manobo ICCs in
the Barangays Poblacion, Comota and Osmeña, Municipality of La Paz; and Barangays Marbon
and Desamparados, Municipality of Talacogon; All in Agusan del Sur.

As an adjacent owner/ stakeholder/ individual or entity having interests over the area, we
would like to inform you about the impending survey and you may send representative if you
wish, to observe/monitor the conduct of the actual ground survey to ensure that the respective
rights of all the stakeholders are properly protected.

Nevertheless, while your presentation is highly solicited, rest assured that with or without your
representative, Sec. 56 of R.A. 8371, pertaining to the respect accorded to property rights
within the ancestral domain already existing and/or vested before the effectivity shall be
diligently observed.

Moreover, the Mission Planning was conducted last May 11, 2023. The team clearly discussed
the procedure and set the schedules for the Survey. As a result, these were the schedules
agreed upon by the Team and the Community.

SCHEDULING OF THE SURVEY ACTIVITY


1.) Mission Planning - May 11, 2023
2.) Notification to Stakeholders - May 15, 2023
3.) Control/Reference Stations Recovery
LOCATION STA. NAME SURVEY TEAM DATE
AGS-3079,
AGS-3459, TEAM A
Comota
AGS-3460, Engr. Niña
AGS-3461

AGS-3447,
Osmeña AGS-3448,
AGS-3449 22-May-23
TEAM B
Michael
AGS-4001, Mongaya
Poblacion AGS-4002,
AGS-3441,
AGS-3442,
AGS-3443
Republic of the Philippines
OFFICE OF THE PRESIDENT
NATIONAL COMMISSION ON INDIGENOUS PEOPLES
AGUSAN DEL SUR PROVINCIAL OFFICE
DOP Government Center, Patin-ay, Prosperidad, Agusan del Sur
Tel. No. (085) 839-5975/Email address: [email protected]

Desamparados AGS-37,
AGS-3416,
AGS-3417

Marbon AGS-3402,
AGS-3405
AGS-3420, TEAM C
Zillovia
AGS-3421 Jeffrey Bat-ao
3.) Fabrication of ADBM - May 22, 2023
4.) Installation of ADBMs - May 23
A.) Establishment and Observation of Control Monuments
SURVEY
LOCATION STA. NAME TEAM DATE

Muybalite A May 23, 2023

Marbon Yawit B May 23, 2023

Bangahon C May 23, 2023

Sabang
A May 24, 2023
Yagkawan
Kaulo sa
B May 25, 2023
Osmeña Yagkawan

Malinaw C May 24, 2023

Dayhugan
Poblacion (Suba Creek A May 25, 2023
1)
Kinilaw Creek
(Suba Creek B May 25, 2023
2)
Sabang Suba
D May 26, 2023
Creek
Adgawan
May 26, 2023
River A

You may attend to witness the installation and observation.


May Magbabaja protect and guide us all! Thank you very much and more power.

Respectfully yours,

NIÑA BUSA BURDEOS, GE


Engr. II/Chief of Survey Party (COP)

Noted:

ROSEMARIE P. MORDENO
Provincial Officer

You might also like