0% found this document useful (0 votes)
25 views

Obmerga BOM

Uploaded by

Arki Paolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

Obmerga BOM

Uploaded by

Arki Paolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project: A PROPOSED TWO STOREY RESIDENTIAL BUILDING

Location: BLOCK 8, LOT 18-B (PSD-04-179742), BRGY. AYUTI, LUCBAN, QUEZON


Owner: ELLIEZER EZRA A. OBMERGA

BILL OF MATERIALS
I. EARTH WORKS:
1 51.70 cu.m. Excavation 380.00 /cu.m. 19,646.00
2 31.02 cu.m. Backfilling 350.00 /cu.m. 10,857.00
3 1.00 lot Compactor 15,000.00 /lot 15,000.00
II. CONCRETE, MASONRY & SCAFFOLDING WORKS:
1 503.00 bags Portland Cement 255.00 /bag 128,265.00
2 26.00 cu.m. Gravel, 3/4 1,350.00 /cu.m. 35,100.00
3 37.00 cu.m. Sand (S-1) 1,350.00 /cu.m. 49,950.00
4 258.00 pcs RSB 12 mm x 6m 205.00 /pc 52,890.00
5 417.00 pcs RSB 10 mm x 6m 150.00 /pc 62,550.00
6 5.00 rolls G.I. Wire #16 2,300.00 /roll 11,500.00
7 2,100.00 pcs CHB #5 17.00 /pc 35,700.00
8 567.00 pcs CHB #4 16.00 /pc 9,072.00
9 80.00 sheets Phenolic Board, 1/2 x 4x8 750.00 /sht 60,000.00
10 20.00 sheets Marine Plywood, 1/4 x 4x8 480.00 /sht 9,600.00
11 15.00 pc Metal Cutting Disc 14" 380.00 /pc 5,700.00
12 400.00 pcs Coco Lumber 2"x3"x12' 108.00 /pc 43,200.00
13 500.00 pcs Coco Lumber 2"x2"x12' 84.00 /pc 42,000.00
14 1.00 box Assorted CWN 1,050.00 /box 1,050.00
15 5.00 kg Concrete Nail 4" 90.00 /kg 450.00
16 1.00 m Welded Wire 83.00 /m 83.00
III. CEILING & WOOD WORKS:
1 18.00 sheets Hardiflex Boards 3.5mmx4'x8' 480.00 /sht 8,640.00
2 66.00 pcs C Furrings 105.00 /pc 6,930.00
3 24.00 pcs C Channels 135.00 /pc 3,240.00
4 11.00 pcs Wall Angles 55.00 /pc 605.00
5 100.00 pcs W-Clip 8.00 /pc 800.00
6 700.00 pcs Gypsum Board Screw 1.50 /pc 1,050.00
IV. DOORS & WINDOWS:
1 1.00 set Swing-type Panel Door w/Jambs (0.90) 9,500.00 /set 9,500.00
2 1.00 set Swing-type Panel Door w/Jambs (0.70) 4,500.00 /set 4,500.00
3 2.00 set Sliding Door w/Jambs (0.80) 7,500.00 /set 15,000.00
4 1.00 set PVC Flush Door w/ Jambs (0.60x2.10) 2,300.00 /set 2,300.00
5 1.00 lot Aluminum-framed Sliding Windows 55,000.00 l.s. 55,000.00
V. PLUMBING FIXTURES & INSTALLATIONS:
1 1.00 set Water Closet w/Lavatory, Tissue-paper 23,500.00 /set 23,500.00
2 1.00 set Shower heads and Valves 3,000.00 /set 3,000.00
3 5.00 pcs Faucets 1,500.00 /pc 7,500.00
4 1.00 set Stainless Kitchen Sink 6,200.00 /set 6,200.00
5 1.00 lot Sewer and Storm Drain Lines 30,000.00 /lot 30,000.00
6 1.00 lot Cold Water Lines 12,000.00 /lot 12,000.00
VI. ELECTRICAL INSTALLATIONS:
1 1.00 lot Wires and Cables 10,000.00 /lot 10,000.00
2 1.00 lot Panel Board and Circuit Breakers 12,000.00 /lot 12,000.00
3 1.00 lot Switches and Outlets 6,000.00 /lot 6,000.00
4 1.00 lot Electrical Conduits 6,000.00 /lot 6,000.00
5 1.00 lot Lighting Fixtures 6,000.00 /lot 6,000.00
6 1.00 lot Conduit Fittings and Boxes 5,600.00 /lot 5,600.00
7 1.00 lot Entrance Line and Grounding 23,500.00 /lot 23,500.00
VII. PAINTING& FINISHING WORKS
1 1.00 lot Painting Works 60,000.00 /lot 60,000.00

MATERIAL COST 911,478.00


LABOR COST 410,165.10
CONTINGENCIES 63,803.46
TOTAL BUILDING COST 1,385,446.56