TITLE : A C GENERATOR TESTS PROCEDURE

WINDING RESISTANCE MEASUREMENT

NEUTRAL W V U
2 2 2

DC
DC EXCITOR
AC GENERATOR
MOTOR STATOR
MOTOR

DE NDE
U V W
MAIN 1 1 1

KELVIN
BRIDGE
REF. STANDARD : IS 7132 / IEC 34-4
TOLERANCE : +/- 5% FOR MAIN STATOR & +/- 10% FOR OTHER WINDINGS

PROCEDURE :

1 CLEAN THE TERMINALS FOR GOOD CONTACT. FROM OUTLINE DRAWING IDENTIFY THE MAIN
& NEUTRAL SIDE AND MAKE STAR CONNECTION BY SHORTING THE NEUTRAL SIDE TERMINALS.
(ie U2 , V2 & W2.)
2 NOTE DOWN THE AMBIENT TEMPERATURE & HUMIDITY. CONNECT THE KELVIN BRIDGE
CURRENT & POTENTIAL LEAD TO U1 & V1 TERMINALS FIRMLY .
3 SWITCH ON THE BRIDGE . ADJUST THE KNOB TILL THE GALVANOMETER READS ZERO & RECORD
THE VALUES. IF REQUIRED CHANGE THE MULTIPLIER BY CHANGING THE POSITION OF THE
MULTIPLIER & RECORD THE VALUE IN THE BRIDGE & MULTIPLY THE READINGS BY MULTIPLIER.
4 NOW CHANGE THE BRIDGE TERMINALS TO V1 & W1 AND REPEAT THE ABOVE PROCEDURE
5 FOLLOW THE ABOVE PROCEDURE FOR MAIN FIELD, EXCITER ARMATURE & EXCITER FIELD.

Format No. T7001004 R0

DSP JR/PKSBG NSR DATE : 11.03.2009


DOC.NO TLM07000 R0
PRE CHE APP PAGE : 1 OF 1

TD POWER SYSTEMS PVT LTD


TITLE : A C GENERATOR TESTS PROCEDURE
INSULATION RESISTANCE MEASUREMENT FOR MAIN ARMATURE

NEUTRAL W V U
2 2 2

DC EXCITOR
MAIN
MAIN GENERATOR
GENERATOR STATOR
MOTOR
E
DE NDE
U V W
MAIN 1 1 1

Positive Negative

MOTORISED
MEGGER
REF. STANDARD : IS 4722-2001 / IEEE43

PROCEDURE :

1 CLEAN THE TERMINALS FOR GOOD CONTACT.


2 NOTE DOWN THE AMBIENT TEMPERATURE & HUMIDITY.
3 CONNECT THE +VE CABLE ( NORMALLY RED ) TO THE U 1 TERMINAL AND -VE CABLE
( EITHER BLACK OR BLUE ) TO THE GENERATOR BODY OR GROUND.
4 SELECT THE SUITABLE VOLTAGE RANGE FOR MEASUREMENT.
5 PRESS THE START BUTTON & WAIT TILL ONE MINUTE. NOTEDOWN THE READINGS.
6 CARE SHOULD BE TAKEN THAT THE LIVE (+VE) CABLE SHOULD NOT TOUCHING THE GROUND.
7 AFTER COMLETEION OF ONE MINUTE , DISCHARGE THE TERMINAL AND THEN REMOVE THE
POSITIVE CABLE CLIP
8 THE SAME PROCEDURE SHOULD BE REPEATED FOR IR MEASUREMENT OF MAIN FIELD,
EXCITOR FIELD, EXCITOR ARMATURE & SPACE HEATERS.

Format No. T7001004 R0

DSP JR/PKSBG NSR DATE : 11.03.2009


DOC.NO TLM07001R0
PRE CHE APP PAGE : 1 OF 1

TD POWER SYSTEMS PVT LTD


TITLE : A C GENERATOR TESTS PROCEDURE
OPEN CIRCUIT CHARACTERISTICS TEST ( OCC )

NEUTRAL W V U
2 2 2

DC EXCITOR
MAIN GENERATOR
STATOR
MOTOR

DE NDE
U V W
MAIN 1 1 1

Primary Side
Potential
Trasnsformer
Secondary Side

R Y B N
Armature
Digital Power RECTI
voltage V A
S
FIER
Analyser ( V AC )
Ex V Ex A
230V AC SUPPLY FOR DIMMER

REF. STANDARD : IS 7306 /IS 7132 / IEC 34-4

PROCEDURE :
1 MAKE THE CONNECTIONS AS PER THE ABOVE DRAWING
2 RUN THE DC MOTOR / GENERATOR TO ITS RATED SPEED & MEASURE THE DC MOTOR POWER .
3 NOTE DOWN THE GENERATOR RESIDUAL VOLTAGE FROM THE POWER ANALYSER
4 SWITCH ON THE DIMMERSTAT AND RISE THE VOLTAGE IN THE STEPS OF 1 AMPS AND
NOTE DOWN THE EXCITATION VOLTAGE (Vf Exc), CURRENT ( If Exc) , ARMATURE VOLTAGE ( Va)
AND DC MOTOR POWER
5 RISE THE ARMATURE VOLTAGE TO 130% OF THE RATED VOLTAGE OF THE GENERATOR.
6 REPEAT THE ABOVE PROCEDURE FOR STEPPING DOWN OF THE EXCITATION CURRENT ALSO.
( NO NEED OF MEASURING DC MOTOR POWER)
7 DRAW THE GRAPH FOR If Exc Vs Va

OCC
Format No. T7001004 R0

16000
14000
12000
10000
Va

8000
6000
4000
2000
0
0 2 4 6 8
If Exc

DSP JR/PKSBG NSR DATE : 11.03.2009


DOC.NO TLM07002R0
PRE CHE APP PAGE : 1 OF 1

TD POWER SYSTEMS PVT LTD


TITLE : A C GENERATOR TESTS PROCEDURE
SHORT CIRCUIT CHARACTERISTICS TEST ( SCC )

NEUTRAL W V U
2 2 2

CT DETAIL

DC EXCITOR
MAIN GENERATOR
STATOR
MOTOR

DE NDE
U V W S1 S2
MAIN 1 1 1

CURRENT
TRANSFORMERS

RYB N
Armature
RECTI
Digital Power Current
current V A
FIER

S
Analyser ( I AC )
Ex V Ex A

230V AC SUPPLY FOR DIMMER

REF. STANDARD : IS 7306 / IS 7132 / IEC 34-4

PROCEDURE :
1 MAKE THE CONNECTIONS AS PER THE ABOVE DRAWING
2 RUN THE DC MOTOR / GENERATOR TO ITS RATED SPEED & MEASURE THE DC MOTOR POWER .
3 NOTE DOWN THE GENERATOR RESIDUAL CURRENT FROM THE POWER ANALYSER
4 SWITCH ON THE DIMMER AND RISE THE DIMMER VOLTAGE TO MEASURE THE GENERATOR
CURRENT IN STEPS OF 25% , 50% , 75% , 100% & 110% OF THE RATED GENERATOR CURRENT
AND NOTE DOWN THE VOLTAGE (Vf Exc), CURRENT ( If Exc) , ARMATURE CURRENT ( Ia) AND
DC MOTOR POWER

MOMENTARY OVERLOAD TEST / EXCESS CURRENT TEST

REF. STANDARD : IS 7131 / IS 4722 / IEC 34-3

5 RISE THE ARMATURE CURRENT TO THE 150% OF THE RATED CURRENT FOR 30 SECS
6 DRAW THE GRAPH FOR If Exc Vs Ia
Format No. T7001004 R0

SCC
1500

1000
Ia

500

0
0 2 4 6 8 10
If Exc

DSP JR/PKSBG NSR DATE : 11.03.2009


DOC.NO TLM07003R0
PRE CHE APP PAGE : 1 OF 1

TD POWER SYSTEMS PVT LTD


TITLE : A C GENERATOR TESTS PROCEDURE
PHASE SEQUENCE TEST

W V U
2 2 2

DC EXCITOR
MAIN GENERATOR
STATOR
MOTOR

U V W
DE
MAIN 1 1 1
U V W
1 1 1

R Y B Primary Side
Potential
Trasnsformer
PSM
Secondary Side

Phase Sequence
Meter Armature
Digital Power RECTI
voltage V A
S
FIER
Analyser ( V AC )
Ex V Ex A
230V AC SUPPLY FOR DIMMER

REF. STANDARD : IS 7132 / IEC 34-8

PROCEDURE :
1 MAKE THE CONNECTIONS AS PER ABOVE DRAWING
2 RUN THE GENERATOR TO IT'S RATED SPEED AND NOTEDOWN THE " RESIDUAL VOLTAGE "
3 IF THE RESIDUAL VOLTAGE IS " MORE THAN 110 VOLTS ", CHECK THE PHASE SEQUENCE BY
CONNECTING THE 'R' , 'Y', 'B' TERMINALS OF THE PHASE SEQUENCE METER TO THE 'U', 'V', 'W'
TERMINALS RESPECTIVELY AND THE ROTATION OF THE METER SHOULD BE IN
CLOCKWISE DIRECTION.
4 NEXT INTERCHANGE THE ANY TWO TERMINALS OF THE METER AND CHECK THE ROTATION IT
WILL BE ANTICLOCKWISE.

CAUTION :
1 BEFORE CHECKING THE PHASE SEQUENCE PLEASE CONFIRM THAT THE TERMINAL VOLTAGE
IS " LESS THAN 450 VOLTS ".
2 PHASE SEQUENCE TO BE CHECKED IN " LESS THAN 500 VOLTS "
3 DO NOT KEEP THE PHASE SEQUENCE METER IN " CIRCUIT " FOR "CONTINUOUSLY "
Format No. T7001004 R0

DSP JR/PKSBG NSR DATE : 11.03.2009


DOC.NO TLM07004R0
PRE CHE APP PAGE : 1 OF 1

TD POWER SYSTEMS PVT LTD


TITLE : A C GENERATOR TESTS PROCEDURE
SHAFT VOLTAGE MEASUREMENT
ANALOG
Between DE to NDE MULTIMETE
W V U
2 2 2

DC EXCITOR
MAIN GENERATOR
STATOR
MOTOR
Between NDE to Ground

U V W
Between DE 1 1 1 ANALOG
to Ground MULTIMETE
ANALOG
MULTIMETE
Potential
Trasnsformer

Armature
RECTI
voltage S
FIER V A
( V AC )

230V AC SUPPLY FOR DIMMER

REF. STANDARD : TDPS STANDARD

PROCEDURE :
1 MAKE THE CONNECTIONS AS PER THE ABOVE DRAWING
2 RUN THE GENERATOR TO ITS RATED SPEED ,VOLTAGE & FREQUENCY.
3 " DE " SIDE SHAFT IS GROUNDED BY EARTH BRUSH.
4 AN "AC" VOLTMETER OF FULL SCALE RANGE ABOUT 1V TO 5V SHALL BE CONNECTED ACROSS
THE ENDS OF THE GENERATOR BY MEANS OF SOLID COPPER STRIP HELD FIRMLY IN THE
SHAFT CENTRE.
5 MEASURE THE VOLTAGE BETWEEN " DE & NDE "AS IN ABOVE DRAWING ( DOTTED LINE )
6 REPEAT THE SAME PROCEDURE FOR VOLTAGE BETWEEN " DE & GND " AND " NDE & GND ".

CAUTION :
1 ALWAYS MEASURE SHAFT VOLTAGE AT " NEUTRAL SIDE OF THE GENERATOR " FOR SAFETY . Format No. T7001004 R0

DSP JR/PKSBG NSR DATE : 11.03.2009


DOC.NO TLM07005R0
PRE CHE APP PAGE : 1 OF 1

TD POWER SYSTEMS PVT LTD


TITLE : A C GENERATOR TESTS PROCEDURE
VOLTAGE BALANCE TEST
W V U
2 2 2

DC EXCITOR
MAIN GENERATOR
STATOR
MOTOR

U V W
1 1 1

Potential
Trasnsformer

Armature
RECTI
voltage V A

S
FIER
( V AC )

230V AC SUPPLY FOR DIMMER

REF. STANDARD : IS 7132 / IS 4722-2001 / IEC 34-1

PROCEDURE :
1 MAKE THE CONNECTIONS AS PER ABOVE DRAWING.
2 RUN THE GENERATOR TO ITS RATED RPM & FREQUENCY.
3 CHECK THE RESIDUAL VOLTAGE WITH MULTIMETER BETWEEN ALL THREE PHASES AND IT
SHOULD BE SAME EACH OTHER. ( THAT IS UV = VW = UW )
4 INCREASE THE VOLTAGE TO THE RATED VOLTAGE.
5 IN POWER ANALYSER CHECK THE THREE PHASE VOLTAGE & THIS SHOULD BE BALANCED .

Format No. T7001004 R0

DSP JR/PKSBG NSR DATE : 11.03.2009


DOC.NO TLM07006R0
PRE CHE APP PAGE : 1 OF 1

TD POWER SYSTEMS PVT LTD


TITLE : A C GENERATOR TESTS PROCEDURE
HARMONICS MEASUREMENT
W V U
2 2 2

DC EXCITOR
MAIN GENERATOR
STATOR
MOTOR

U V W
1 1 1

Potential
Trasnsformer

Armature
RECTI
voltage V A

S
FIER
( V AC )

230V AC SUPPLY FOR DIMMER

REF. STANDARD : IS 7132-1973 / IS 4722-2001 / IEC 34-1

PROCEDURE :
1 MAKE THE CONNECTIONS AS PER ABOVE DRAWING
2 RUN THE GENERATOR TO ITS RATED SPEED , VOLTAGE AND & FREQUENCY.
3 MEASURE THE HARMONICS FROM THE " DIGITAL POWER ANALYSER ".
4 NOTE DOWN THE THD ALSO.

Format No. T7001004 R0

DSP JR/PKSBG NSR DATE : 11.03.2009


DOC.NO TLM07007R0
PRE CHE APP PAGE : 1 OF 1

TD POWER SYSTEMS PVT LTD


TITLE : A C GENERATOR TESTS PROCEDURE
VIBRATION MEASUREMENT
V
W V U
2 2 2

A A

DC EXCITOR
MAIN GENERATOR
STATOR
MOTOR

U V W
H 1 1 1 H

Potential
Trasnsformer

Armature
RECTI
voltage V A

S
FIER
( V AC )

230V AC SUPPLY FOR DIMMER


REF. STANDARD : IS 12075-1987 / IEC 34-14

PROCEDURE :
1 MAKE THE CONNECTIONS AS PER THE ABOVE DRAWING
2 RUN THE MACHINE TO ITS RATED SPEED ,VOLTAGE , FREQUENCY AND IN THE MAGNETIC
CENTRE POSITION
3 MEASURE THE VIBRATION IN 3 POSITIONS OF BEARING HOUSING ON BOTH DE & NDE SIDE.
( ie VERTICAL , HORIZONTAL & AXIAL )
4 MEASURE THE SHAFT VIBRATION ALSO IF THERE IS PROVISION.

OVER SPEED TEST


5 THIS IS CONDUCTED ON THE GENERATOR AT AROUND 20% MORE THAN THE RATED SPEED FOR
2 MIN & BROUGHT DOWN TO RATED SPEED & CHECK IF THERE IS ANY ABNORMALITY.
( THIS TEST IS CARRIED OUT UNDER " UN-EXCITED " CONDITION.

Format No. T7001004 R0

DSP JR/PKSBG NSR DATE : 11.03.2009


DOC.NO TLM07008R0
PRE CHE APP PAGE : 1 OF 1

TD POWER SYSTEMS PVT LTD


TITLE : A C GENERATOR TESTS PROCEDURE
HIGH VOLTAGE TEST

W V U
2 2 2

DC EXCITOR
AC GENERATOR
STATOR
MOTOR

U V W
1 1 1
ABLE
HV C

E
BL
CA
D
HIGH VOLTAGE OUN
TRANSFORMER GR

REF. STANDARD : IS 7132 / IS 4722:2001 / IEC 34-1

PROCEDURE :

1 REMOVE THE SHORTING LINK FROM THE NEUTRAL SIDE.


2 MAKE CONNECTIONS AS SHOWN ABOVE.
3 WHEN DOING ONE PHASE HV , THE OTHER TWO PHASES TO BE SHORTED & GROUNDED.
( Ex : If you going to do U phase HV , then V & W phases to be grounded.)
4 SLOWLY INCREASE THE VOLTAGE UP TO THE TEST VOLTAGE.
(Test voltage = 2U + 1 kV . Where U = Rated voltage of the machine.
Ex: if U = 11kV, then Test Voltage = 11*2+1 kv = 23 kV)
5 AFTER REACHING TEST VOLTAGE START THE TIMER OR STOP WATCH.
( TIMER TO BE SET FOR 60SECS)
6 NOTEDOWN THE LEAKAGE CURRENT.
7 AFTER COMPLETION OF TIME DURATION , DECREASE THE TEST VOLTAGE TO ZERO
& SWITCH OFF.
8 REPEAT THE SAME PROCEDURE FOR OTHER TWO PHASES ALSO
9 HV TEST IS CARRIED OUT ON THE OTHER WINDINGS LIKE MAIN FIELD WITH EXCITER
ARMATURE , EXCITOR STATOR & SPACE HEATER.
Format No. T7001004 R0

CAUTION: IT’S HIGHLY DANGEROUS TEST. DO NOT ALLOW ANY PERSON NEAR THE
TESTING AREA DURING HV TEST. AFTER HV TEST DISCHARGE THE TERMINALS. USE HV
GLOVES DURING DISCHARGING AND CHANGING LEADS.

DSP JR/PKSBG NSR DATE : 11.03.2009