MPDO Office East Compound Wall Est Rs 2 00 Lakhs SoR 2023 24

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views58 pages

MPDO Office East Compound Wall Est Rs 2 00 Lakhs SoR 2023 24

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 58

LEAD STATEMENT (2023-24)

Name of work :- Reconstruction of East Compound Wall near SHG Building at MPDO Office in Puttur Mandal Work Location :- MPDO Office
Mandal :- PUTTUR
Cement Rate as per SoR 2022-23 Municipal Allowance on Labour Charges @ 20.00% Est.Cost :- 2.00 Lakhs
Steel Rate as per May 2023 Overhead Charges & Contractors Profit @ 0.00% Grant :- MPP-GF/FFC

Lead Deduct Initial Loading and GST


S. Reference to SoR Part S.No./ Intial Lead
Name of the Material CFMS Code Unit in ConveyanceC Unloading Net Rate Source of Supply
No. and Page Item code Rate Charges
KMs harges Charges 18% 28%
No.
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)
1 Sand (unscreened) for Concrete Pg 12 of Part I MAT-00027 27(a) 1 Cum. 44.00 605.00 645.50 -37.30 0.00 0.00 0.00 1213.20 Surutpalli
2 Sand (unscreened) for filling (W R Work
Pg 12 Items)
of Part I MAT-00028 27(b) 1 Cum. 14.00 460.00 233.50 -37.30 0.00 0.00 0.00 656.20 Kusthali
(W R Work Items)

3 Sand (screened) for Mortar, Plastering Pg 12 of Part I MAT-00029 28 1 Cum. 44.00 721.00 645.50 -37.30 0.00 0.00 0.00 1329.20 Surutpalli
items (W R Work Items)
4 Aggregates 6mm nominal size (HBG) Pg 27 of Part I MAT-00215 M - 050 1 Cum. 12.00 896.00 196.50 -35.90 0.00 0.00 0.00 1056.60 Gundrajukuppam
5 Aggregates 10mm nominal size (HBG) (W R Work
Pg 27 Items)
of Part I MAT-00216 M - 051 1 Cum. 12.00 1109.00 196.50 -35.90 0.00 0.00 0.00 1269.60 Gundrajukuppam
6 Aggregates 13.20 / 12.50mm nominal size (W 27
Pg R Work Items)
of Part I MAT-00217 M - 052 1 Cum. 12.00 1306.00 196.50 -35.90 0.00 0.00 0.00 1466.60 Gundrajukuppam
7 (HBG)
Aggregates 20mm nominal size (HBG) (W 28
Pg R Work Items)
of Part I MAT-00218 M - 053 1 Cum. 12.00 1622.00 196.50 -35.90 0.00 0.00 0.00 1782.60 Gundrajukuppam
8 Aggregates 40mm nominal size (HBG) (W R Work
Pg 28 Items)
of Part I MAT-00220 M - 055 1 Cum. 12.00 1000.00 196.50 -35.90 0.00 0.00 0.00 1160.60 Gundrajukuppam
9 Rough stone (HBG) (W R Work
Pg 15 Items)
of Part II MAT-00302 12 1 Cum. 12.00 309.00 196.50 -35.90 0.00 0.00 0.00 469.60 Gundrajukuppam
11 Cement (Road
Pg & Bridge
11 of Part I Works) MAT-00005 5 1 MT --- 4219.00 0.00 0.00 0.00 0.00 1181.00 5400.00 At SIte
12 Reinforcement steel (HYSD/TMT ) Fe- (W R Work
Memo No. Items) 4 (b) 1 MT --- 64500.00 0.00 0.00 0.00 11610.00 0.00 76110.00 At SIte
500/Fe-500D Pg 11 of Part III
AEE(T1)/DEE(T)/Steel
13 Common burnt clay bricks (23x11x7cm) MAT-00721 BMT-A.01 1000 No.s 10.00 8164.00 279.00 -59.80 137.00 0.00 0.00 8520.20 Taduku
(Building Work Items)
Painting Items
Pg 64 of Part III
14 Acrylic exterior emulsion paint MAT-01107 BMT-J.34 #NAME? --- 231.00 0.00 0.00 0.00 41.58 0.00 272.58
(Building Work Items)

Certified that the leads provided are correct and nearest to the best of my knowledge
Certified that the work situated with in 12 kms. from Puttur Municipal limits

Asst. Executive Engineer


MPP, Puttur
GOVENMENT OF ANDHRA PRADESH

Panchayat Raj Engineering Department

DETAILED ESTIMATE

NAME OF THE WORK


: Reconstruction of East
Compound Wall near SHG
Building at MPDO Office in
Puttur Mandal

ESTIMATE COST Rs. : 2.00 Lakhs

GRANT : MPP-GF/FFC

NAME OF THE MANDAL : PUTTUR

NAME OF SUB.DIVISION. : PIU, Puttur

NAME OF THE DIVISION : TIRUPATI


Specification Report

Specification report to accompany the estimate for the work


Reconstruction of East Compound Wall near SHG Building at MPDO Office in Puttur Mandal

Mandal :- PUTTUR
Est.Cost :- 2.00 Lakhs
Grant :- MPP-GF/FFC

As the existing compound wall at east side of Mandal Parishad Office has
fallen , the lack of compound wall is resulting in tresspassing and leading
Neccessity of the work: to anti social elements at night hours and also snakes and other creatures
to pass in from nearby lake, there is a need to construct compound wall at
east side of MPDO Office. Hence, the work is proposed

The work is administratively sanctioned vide Res No: ____


Authority: A.S Dated ___ /___ / 2023 of the Mandal Praja Parishad, Puttur under
_________________________ Grant

Work Items proposed The estimate is prepared to accord technical sanction with the following provisions

1. Earth work excavation and depositing on bank with initial lead of 10m and initial lift

2. Filling with Sand in plinth from approved quarry

3. Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion

4. VRCC M20 Nominal mix for footings, Pedastals, columns,

5. Plastering with CM 20 mm thick two coats

6. Painting with two coats of exterior emulsion paint over base coat of cement primer

The seignorage charges added is calculated in separate sheet. The GST at relavent percentages of GST act
and QC Charges at 0.50% and Admin Charges at 3 % are provided in the estimate.

The estimate has been prepared with the current schedule of rates 2023-24 and work shall be
executed as per standard specifications.

0 Asst. Executive Engineer


0 MPP, Puttur
DETAILED CUM ABSTRACT ESTIMATE
Reconstruction of East Compound Wall near SHG Building at
Name of work :-
MPDO Office in Puttur Mandal
Est. Rs. 2.00 Lakhs
Measurements
Sl.No Description of work No.s contents Rate / Per Amount
L B D
1 2 3 4 5 6 7 8 9
1 Clearing Light Jungle including labour charges, inciental charges etc., complete for finished item of
work
East side of MPDO Office Compound 1 x 1 50.00 30.00 -- 1500.00
- Along Compound Wall - Infront of 1500.00 2.80
Total 4200.00
Sqm Sqm
2 Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of
unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual
a) Brick Masonry
Walls Old Pump Room Near OHSR - 1 x 1 12.74 0.23 3.00 8.79
Allround
Old Compound Wall - Cracked 1 x 1 5.00 0.23 2.80 3.22
Total 12.01 274.85 3301.00
Cum 1 Cum
b) Unreinforced cement concrete up to 15cm thickness
Flooring Bed inside Pump Room 1 x 1 3.14 3.14 0.10 0.99

Total 0.99 1639.68 1623.00


Cum 1 Cum
c) Reinforced cement concrete
Roof Slab of Old Pump Room with 1 1 x 1 3.90 3.90 0.13 1.90
feet projection Allround Total 1.90 2903.04 5516.00
Cum 1 Cum
d) Stone masonry in cement mortar
Basement of Old Pump Room 1 x 1 12.74 0.45 0.60 3.44
Total 3.44 656.40 2258.00
Cum 1 Cum
3 Earth work excavation and
For East side Compound Wall depositing on bank with initial lead of 10m and initial lift of 2m in Loamy
and
ColumnClayey Soils like B.C. Soils, red earth1 & Ordinary
Footings x 5 Gravel1.00(SS 20-B) including
1.00 1.35shoring, strutting,
6.75
For RR Masonry under Plinth beam of
East Side Compound Wall 1 x 1 12.00 0.60 0.45 3.24
Total 9.99 244.61 2444.00
Cum 1 Cum
4 Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides
of
EWEfoundations and basement with initial lead in layers not exceeding 15cm thick, watering and
for Footings 6.75
Deduct Sand Filling -0.50
Deduct PCC (1:5:10) -0.50
Deduct Footings
Deduct East Side Compound Wall -0.93
Columns upto plinth beam -0.26
Total 4.56 34.72 158.00
Cum 1 Cum
5 Filling with carted coarse sand in trenches, sides of foundations and basement with initial lead in
layers
For not exceeding 15cm thick,watering and ramming including cost and conveyance of water to
Foundations
Under East side Compound Wall
Column Footings 1x 5 1.00 1.00 0.10 0.50
For Basement
Under RR Masonry under Plinth
beam of East Side Compound Wall 1 x 1 12.00 0.60 0.10
0.72
Total
1.22 690.92 843.00
Cum 1 Cum
6 Plain Cement Concrete corresponding to M 5 grade as per IS 456 equivalent to (1:5:10) proportion
nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from
For Foundations
Under East side Compound Wall
Column Footings 1x 5 1.00 1.00 0.10 0.50
For Basement
Under RR Masonry under Plinth
beam of East Side Compound Wall 1 x 1 12.00 0.60 0.15
1.08
Total
1.58 4063.02 6420.00
Cum 1 Cum
7 VRCC M 20
East side grade (Cement
Compound :Fine aggregate: Coarse aggregate) corresponding to IS 456 with
Wall Column
cement
Footingscontent of 330 kgs per 1 cum of concrete
1 x with
5 20mm0.90
size graded
0.90machine
0.23crushed0.93
hard
Total
0.93 8662.19 8056.00
Cum 1 Cum
8 VRCC M 20 grade (Cement :Fine aggregate: Coarse aggregate) corresponding to IS 456 with
cement content of 330 kgs per 1 cum of concrete with 20mm size graded machine crushed hard
Ground
East SideFloor :
Compound Wall Columns
upto Plinth Beam
East Side Compound Wall Columns 1x 5 0.23 0.30 0.75 0.26
above Plinth Beam 1x 5 0.23 0.30 2.80 0.97
Total 1.23 10742.93 13214.00
Cum 1 Cum
9 Random Rubble stone masonry in CM (1:8) prop: (Cement: Sand) using hard granite stones
carted from approved
For Basement quarrybeam
under Plinth including
of cost
1 and
x conveyance
1 of all materials
12.00 0.45 like0.45
cement, screened
2.43
East Side Compound Wall Total 2.43 3546.48 8618.00
Cum 1 Cum
10 VRCC M 20 of
Plinth beam grade
East(Cement :Fine aggregate: Coarse aggregate) corresponding to IS 456 with
Side Compound
cement
Wall content of 330 kgs per 1 cum of concrete
1 x with
1 20mm size graded
12.00 0.30machine
0.23crushed0.83
hard
Total 0.83 10951.79 9090.00
item of work ( For Beams) Cum 1 Cum
11 Beam at 5 feet level of East Side
Compound Wall 1 x 1 12.00 0.23 0.23 0.63
Total 0.63 9214.57 5805.00
Cum 1 Cum
12 Brick masonry 230 mm thick for panel walls in superstructure with CM (1:6) proportion using II nd
class
Groundcountry
Floorbricks
: of size 23x11x7 cm from approved source having crushing strength not less
East side Compound Wall 1 x 1 12.00 0.23 2.80 7.73
Deduct Columns -1 x 5 0.23 0.23 2.80 -0.74
Deduct Beam at 5 feet Level -1 x 1 12.00 0.23 0.23 -0.63
Total 6.36 7222.14 45933.00
Cumof work. 1 Cum
placing in position, tying etc., and overheads & contractors profit complete for finished item
13 ( APSS No.126) Cut length
(in mtr) Kg/mtr Kgs
Footings - 10 mm Dia 5 x 12 1.00 0.617 37.02
Columns - Main Rods - 12 mm
Columns - Stirrups - 8 mm Dia @ 200Dia 5 x 4 4.00 0.888 71.04
mm c/cBeams - Main Straight Rods -
Plinth 5 x 18 0.91 0.395 32.35
12 mmBeams
Plinth Dia - Top Extra Rods at 1 x 4 11.00 0.888 39.07
columnofJunctions-
center 12 mm Dia
Column Junctions - 12 mm 1 x 5 1.00 0.888 4.44
Dia
Plinth Beams - Stirrups - 8 mm Dia @ 1 x 4 2.00 0.888 7.10
200 mm c/c
Wall - Main Straight Rods - 12 mm 4 x 13 0.91 0.395 18.69
Dia
Beams at 5 feet height of Compound 1 x 4 11.00 0.888 39.07
Wall -- Bottom
Wall Top Extra Rods
Extra - 12- mm
Rods Dia
12 mm 1 x 5 1.00 0.888 4.44
Dia - Stirrups - 8 mm Dia @ 200
Wall 1 x 4 2.00 0.888 7.10
mm c/c 4 x 13 0.91 0.395 18.69
Total 279.01 0.279 95227.50 26568.00
Kgs MTs
charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & 1 MT
14 contractors profit complete for finished item of work .(SS 901,903 & 904)
East side Compound Wall 1 x 2 11.00 -- 2.80 61.60
Total 61.60 491.04 30248.00
Sqm
operational and all labour charges etc.,and overheads & contractors profit complete for finished 1 Sqm
15 item of work in all floors.
East side Compound Wall 1 x 2 11.00 -- 2.80 61.60
Total 61.60 255.27 15725.00
Sqm 1 Sqm
Sub Total 190020.00
16 Provision for Seigniorage Charges 2072.00
17 Provision for Administrative Charges @ 3% 5763.00
18 Provision
Provsion forfor Unforeseen
QC Chargesitems
@ 0.5%
of work and Escalation in SoR 960.00
19 Prices 1185.00

GRAND TOTAL : Rs. 200000.00

Asst. Executive Engineer


MPP, Puttur
SEIGNIORAGE CHARGES
Name of work :- Reconstruction of East Compound Wall near SHG Building at MPDO Office in Puttur Mandal
Quantity of Item Cement Caluculations
Sand for Sand for Sand for 20 mm 40 mm
Sl.No Description of Item material contents Rate/Per Amount
Quantity Coefficient Filling mortor Concrete metal metal Coeficent Qty

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 Earth Work Excavation Earth 9.99 1.00 9.99 45.00 450 0 0.00
2 Sand Filling Sand 1.22 1.00 1.22 1.22 100.00 122 0 0.00
3 PCC (1:5:10) Metal 1.58 0.90 1.42 1.42 90.00 128 129.60 204.77
Sand 1.58 0.45 0.71 0.71 100.00 71
4 M20 mix for Footings Metal 0.93 0.90 0.84 0.84 90.00 76 330.00 306.90
Sand 0.93 0.45 0.42 0.42 100.00 42
5 M20 mix for Columns Metal 1.23 0.90 1.11 1.11 90.00 100 330.00 405.90
Sand 1.23 0.45 0.55 0.55 100.00 55
6 RR Masonry in CM (1:8) Metal 2.43 1.10 2.67 90.00 240 59.40 144.34
Sand 2.43 0.33 0.80 0.80 100.00 80
7 M20 mix for Plinth Beams Metal 0.83 0.90 0.75 0.75 90.00 68 330.00 273.90
Sand 0.83 0.45 0.37 0.37 100.00 37
8 M20 mix for Beams Metal 0.63 0.90 0.57 0.57 90.00 51 330.00 207.90
Sand 0.63 0.45 0.28 0.28 100.00 28
9 Brick Masonry in CM (1:6) Bricks 6.36 0.512 3.26 80.00 261 48.00 305.28
Sand 6.36 0.200 1.27 1.27 100.00 127
10 Plastering 20 mm thick in two coats Sand 61.60 0.02 1.36 1.36 100.00 136 5.76 354.82

1.22 3.43 2.33 3.27 1.42 TOTAL 2072 Total Cement 2203.81 Kgs
Required 44.08 Bags

Asst. Executive Engineer


MPP, Puttur
CIVIL DATA 2023-24 : Page-8

D A T A ( SoR 2023-24)
NameReference
of workto:-AP Reconstruction of East Compound Wall near SHG Building at MPDO Office in Puttur Mandal
Standard Data
Standard Data Page S. No.
Index Code
No S.No./
S. No. Reference to SoR Amount
Item code Description Quantity Rate (Rs.) Unit
Part and Page CFMS Code (Rs.)
No.
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1 Clearing light Jungle including labour charges, inciental charges etc., complete for finished item of work
Take Output = 1 Sqm
Pg 21 of Part II MAT-00480 110 Rate as per SoR 1 Sqm 2.80 1 Sqm 2.80
( Roads and Bridges Items) 2.80
Rate per 1 Sqm
Overhead Charges & 0.00% 2.80 0.00
Contractors Profit @
Rate per 1 Sqm 2.80

2 Pg 109 of Part III


Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials
and its with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour
a) (Buildings & 299 Brick masonry
amendment in
Electricals Items)
Take Output as 10 cum
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor(unskilled) 4.090 Nos. 560.00 1 Each 2290.40
Municipal Allowance on Labour
20.00% 2290.40 458.08
Charges @
Rate per 10
Overhead cum & Contractors
Charges 2748.48
Profit @ 0.00% 2748.48 0.00
Rate per 10 cum 2748.48
Rate per 1 cum 274.85
Pg 108 of Part III
b) (Buildings & BLD-CSTN-14-8 296 Unreinforced cement concrete up to 15cm thickness
Electricals Items)
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor(unskilled) 2.44 Nos. 560.00 1 Each 1366.40
Municipal Allowance on Labour
20.00% 1366.40 273.28
Charges @
Rate per 1Charges
Overhead cum & Contractors 1639.68
Profit @ 0.00% 1639.68 0.00
Rate per 1 cum 1639.68

(BLD-CSTN-14-
c) Unreinforced cement concrete more than 15cm thickness
8/297)
CIVIL DATA 2023-24 : Page-9

Pg 8 & 9 of Part I LAB-00120,


(W R Work Items) LAB-00121 III - 3, 4 Mazdoor(unskilled) 4.88 Nos. 560.00 1 Each 2732.80
Municipal Allowance on Labour
20.00% 2732.80 546.56
Charges @
Rate per 1Charges
Overhead cum & Contractors 3279.36
Profit @ 0.00% 3279.36 0.00
Rate per 1 cum 3279.36

(BLD-CSTN-14-
d) Reinforced cement concrete
8/298)
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor(unskilled) 4.32 Nos. 560.00 1 Each 2419.20
Municipal Allowance on Labour
20.00% 2419.20 483.84
Charges @
Rate per 1Charges
Overhead cum & Contractors 2903.04
Profit @ 0.00% 2903.04 0.00
Rate per 1 cum 2903.04

e) Kadapa slabs or shahabad stone slabs on sand bed


Pg 153 of Part III
MAT-01508 BMT-S.11 Rate as per SoR 10.00 sqm 92.00 10 sqm 92.00
(Building Work Items) Municipal Allowance on Labour
20.00% 92.00 18.40
Charges @
Rate per 10 sqm 110.40
Rate per 1Charges
Overhead sqm & Contractors 11.04
Profit @ 0.00% 0.00
Rate per 1 sqm 11.04

f) Stone masonry in cement mortar


Pg 153 of Part III
MAT-01498 BMT-S.01 Rate as per SoR 1.00 cum 547.00 1 cum 547.00
(Building Work Items) Municipal Allowance on Labour
20.00% 547.00 109.40
Charges @
Rate per 1Charges
Overhead cum & Contractors 656.40
Profit @ 0.00% 656.40 0.00
Rate per 1 cum 656.40

3 BLD-CSTN-2-1 Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall
in ordinary
Ordinary soils
Soil and depositing
- Manual Means up onto
bank
3m with
depthan initial lead of 10m and depth up to 3m including all
Unit : 1 cum
Taking output : 10.00 cum
a) Labour
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor ( Unskilled) 3.64 Nos. 560.00 1 No. 2038.40
CIVIL DATA 2023-24 : Page-10

Municipal Allowance on Labour 20.00% 2038.40


Charges @ 407.68
Basic CostCharges
Overhead for 10 Cu.m
& Contractors 2446.08
Profit @ 0.00% 2446.08 0.00
Cost for 10 cum ( a+b+c) 2446.08
Rate per cum (a+b+c) / 10 244.61
Rate per 1 cum 244.61

4 dt.14.05.2019 of Filling with carted coarse sand in trenches, sides of foundations and basement with initial lead in layers not
the Chief exceeding
Unit : 1 cum15cm thick,watering and ramming including cost and conveyance of water to work site and all
Taking output 6.00 cum
a) Labour
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor ( Unskilled ) 0.31 Nos. 560.00 1 No. 173.60
Municipal Allowance on Labour 20.00% 34.72
Charges
b)Material@:
Pg 12 of Part I
(W R Work Items) MAT-00028 27(b) Coarse sand for filling 6.00 cum 656.20 1 cum 3937.20
Basic Cost for 6 cum 4145.52
Add for water @ 1% 1.00% 4145.52 0.00
Rate per 6Charges
Overhead cum & Contractors 4145.52
Profit @ 0.00% 0.00
Rate per 1 cum 690.92

5 dt.14.05.2019 of Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of
the Chief foundations
Unit : 1 cum and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including
Taking output : 6.00 cum
a) Labour
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor ( Unskilled ) 0.31 Nos. 560.00 1 No. 173.60
Municipal Allowance on Labour 20.00% 173.60 34.72
Charges @ 208.32
Add for water @ 1% 0.01 208.32
Rate per 6Charges
Overhead cum (a+b+c)
& Contractors 208.32
Profit @ 0.00% 0.00
Rate for 6 Cu. m 208.32
Rate per 1 cum 34.72

7 BLD-CSTN-3-7 Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under
flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry using
Unit : 1 cum
CIVIL DATA 2023-24 : Page-11

A.MATERIALS :
Pg 11 of Part I 5 Cement 129.60 Kgs 5400.00 1000 Kgs 699.84
Pg 28 of Part I
(W R Work Items) Coarse aggregate 40mm 0.90 Cum 1160.60 1 Cum
(WPg
R 12
Work Items)
of Part I M - 055 1044.54
(W R Work Items) 27(a) Fine aggregate ( Sand ) 0.45 Cum 1213.20 1 Cum 545.94

Pg 35 of Part I
(W R Work Items) M - 189(b) Water(including for curing) 1.20 kl 99.00 1 kl
B.MACHINERY :
Pg 43 of Part I HIR-00018 & HIR- Concrete Mixer 10 / 7 cft (0.2 / 0.8
( WR Work
Pg 43 Items)
of Part I 00152 18 cum) capacity 1.00 hour 365.10 1 hour 365.10
( WR Work Items) LAB-00331 18 Crew charges 1.00 hour 327.60 1 hour 327.60
Municipal Allowance on Labour
20.00% 327.60 65.52
Charges @
Pg 6 of Part I C.LABOUR :
(W R Work Items) I -11 1st class mason 0.10 Nos. 670.00 1 Each 67.00
Pg 8 & 9 of Part I
(W R Work Items) III - 3, 4 Mazdoor (unskilled) 1.39 Nos. 560.00 1 Each 778.40
Municipal Allowance on Labour
20.00% 845.40 169.08
Charges @
Rate per 1Charges
Overhead cum & Contractors 4063.02
Profit @ 0.00% 0.00
Rate per 1 cum 4063.02

8 Random Rubble stone masonry in CM (1:8) prop: (Cement: Sand) using hard granite stones carted from
approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc.,
from approved quarry, to site including labour for cutting stones to required size and shape, mixing, of cement,
BLD-CSTN-6-13 mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in
foundation and basement. (APSS No. 601 & 615)

Unit = 1 cum
A.MATERIALS
Pg 11 of Part I MAT-00005 5 Cement 59.40 Kgs 5400.00 1000 Kgs 320.76
Pg 15 of Part II
(W R Work Items) Rough stone (HBG) 1.10 Cum 469.60 1 Cum
(Road
Pg&12
Bridge Works)
of Part I MAT-00302 12 516.56
(W R Work Items) MAT-00027 27(a) Fine aggregate(sand) 0.33 Cum 1213.20 1 Cum 400.36
B) LABOUR
Pg 6 of Part I 1st class mason 1.20 Nos. 670.00 1
Each
(W R Work Items) LAB-00011 I -11 804.00
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor (unskilled) 2.00 Nos. 560.00 1 Each 1120.00
Municipal Allowance on Labour 20.00% 1924.00 384.80
Charges @ 3546.48
Add water charges 1.00% 3546.48
CIVIL DATA 2023-24 : Page-12

Rate per 1Charges


Overhead cum & Contractors 3546.48
Profit @ 0.00% 0.00
Rate per 1 cum 3546.48

9 30 (A) VRCC M 20 grade (Cement :Fine aggregate: Coarse aggregate) corresponding to IS 456 with cement content
of 330 kgs per 1 cum of concrete with 20mm size graded machine crushed hard granite metal (coarse
aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering
BLD-CSTN-3-13 using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,
including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually,
laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel
and its fabrication charges for finished item of work (APSS No. 402)

FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)


A.MATERIALS :
Pg 11 of Part I MAT-00005 5 Cement 330.00 Kgs 5400.00 1000 Kgs 1782.00
(W R Work Items) 20mm HBG graded metal 0.90 Cum 1585.65 1 Cum 1427.09
Pg 12 of Part I
(W R Work Items) MAT-00027 27(a) Sand 0.45 Cum 1213.20 1 Cum 545.94
Pg 6 of Part I B.LABOUR :
(W R Work
(W RItems)
Work LAB-00011 I -11 1st class Mason 0.133 Nos 670.00 1 Each 89.11
Items) LAB-00091 II - 35 2nd class Mason 0.267 Nos 605.00 1 Each 161.54
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor (both men&women) 3.60 Nos 560.00 1 Each 2016.00
Municipal Allowance on Labour 20.00% 2266.65 453.33
Charges @
C.MACHINERY :
Pg 43 of Part I HIR-00018 & HIR- cum) capacity - Hire and Fuel
( WR Work
Pg 43 Items)
of Part I 00152 18 Charges 1.000 hours 365.10 1 hour 365.10
( WR Work Items) LAB-00331 18 Crew charges 1.000 hours 327.60 1 hour 327.60
Pg 44 of Part I HIR-00040 & HIR-
( WR Work
Pg 44 Items)
of Part I 00174 40 Needle vibrator 40mm ( petrol ) 1.000 hours 38.60 1 hour 38.60
( WR Work Items) LAB-00352 40 Crew charges 1.000 hours 235.80 1 hour 235.80
Add MA on crew charges @ 20.00% 563.40 112.68
Rate per 1 cum 7554.79

a Footings
Rate for Nominal mix M 20 1.00 Cum 7554.79 1 Cum 7554.79
Hire charges of centering and
scaffolding 1.00 Cum 301.00 1 Cum 301.00
Labour charges 1.00 Cum 672.00 1 Cum 672.00
Municipal Allowance on Labour 20.00% 672.00 134.40
Charges
Basic Cost@per Cum 8662.19
CIVIL DATA 2023-24 : Page-13

Overhead Charges & Contractors


Profit @ 0.00% 8662.19 0.00
Rate per 1 cum 8662.19

b Column pedestals
Rate for Nominal mix M 20 1.00 Cum 7554.79 1 Cum 7554.79
Hire charges of centering and
1.00 Cum 343.00 1 Cum 343.00
scaffolding
Labour charges 1.00 Cum 1069.00 1 Cum 1069.00
Municipal Allowance on Labour 20.00% 1069.00 213.80
Charges
Basic Cost
Overhead @Charges
per Cum& Contractors 9180.59
Profit @ 0.00% 0.00
Rate per 1 cum 9180.59

c Plinth Beams
Rate for Nominal mix M 20 1.00 Cum 7554.79 1 Cum 7554.79
Hire charges of centering and
scaffolding 1.00 Cum 1453.00 1 Cum 1453.00
Labour charges 1.00 Cum 1620.00 1 Cum 1620.00
Municipal Allowance on Labour 20.00% 1620.00 324.00
Charges
Basic Cost
Overhead @Charges
per Cum& Contractors 10951.79
Profit @ 0.00% 0.00
Rate per 1 cum 10951.79

10 BLD-CSTN-3-13 30 (B) VRCC M 20 grade (Cement :Fine aggregate: Coarse aggregate) corresponding to IS 456 with cement content of
330 kgs per 1LINTELS,
COLUMNS, cum of concrete
WATERwith 20mmRCC
TANKS, sizeWALL
gradedIN
machine crushed hard granite metal (coarse aggregate -
BUILDINGS:
A.MATERIALS :
Pg 11 of Part I MAT-00005 5 Cement 330.00 Kgs 5400.00 1000 Kgs 1782.00
(W R Work Items) 20mm HBG graded metal 0.90 Cum 1585.65 1 Cum 1427.09
Pg 12 of Part I
(W R Work Items) MAT-00027 27(a) Sand 0.45 Cum 1213.20 1 Cum 545.94
Pg 6 of Part I B.LABOUR :
(W R Work
(W RItems)
Work LAB-00011 I -11 1st class Mason 0.167 Nos 670.00 1 Each 111.89
Items) LAB-00091 II - 35 2nd class Mason 0.167 Nos 605.00 1 Each 101.04
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor (both men&women) 4.70 Nos 560.00 1 Each 2632.00
Municipal Allowance on Labour 20.00% 2844.93 568.99
Charges @
C.MACHINERY : / 7 cft (0.2 / 0.8
Concrete Mixer 10
Pg 43 of Part I HIR-00018 & HIR- cum) capacity - Hire and Fuel
( WR Work
Pg 43 Items)
of Part I 00152 18 Charges 1.000 hours 365.10 1 hour 365.10
( WR Work Items) LAB-00331 18 Crew charges 1.000 hours 327.60 1 hour 327.60
Pg 44 of Part I HIR-00040 & HIR-
( WR Work Items) 00174 40 Needle vibrator 40mm ( petrol ) 1.000 hours 38.60 1 hour 38.60
CIVIL DATA 2023-24 : Page-14

Pg 44 of Part I
( WR Work Items) LAB-00352 40 Crew charges 1.000 hours 235.80 1 hour 235.80
Add MA on crew charges 20.00% 563.40 112.68
Rate per 1 cum 8248.73

a) COLUMNS :
un supported height up to 3.66 m
Rate for other Floors FF SF TF
Rate as above 8248.73 8248.73 8248.73
Hire charges of centering and
scaffolding 249.00 249.00 249.00
Labour charges 1871.00 2058.00 2245.00
Add Municipal Allowance 374.20 411.60 449.00
Lift charges of materials(Manual) 0.00 284.49 568.99
Add MA on Lift Charges 0.00 56.90 113.80
Rate per 1 cum 10742.93 11308.72 11874.51
Overhead Charges & Contractors 0.00 0.00 0.00
Profit @ 1 cum
Rate per 10742.93 11308.72 11874.51

11 BLD-CSTN-3-13 30 (C) VRCC M 20 grade (Cement :Fine aggregate: Coarse aggregate) corresponding to IS 456 with cement content of
330
RCCkgs per 1,cum
SLABS of concrete
BEAMS : with 20mm size graded machine crushed hard granite metal (coarse aggregate -
A.MATERIALS :
Pg 11 of Part I MAT-00005 5 Cement 330.00 Kgs 5400.00 1000 Kgs 1782.00
(W R Work Items) 20mm HBG graded metal 0.90 Cum 1585.65 1 Cum 1427.09
Pg 12 of Part I
(W R Work Items) MAT-00027 27(a) Sand 0.45 Cum 1213.20 1 Cum 545.94
B.LABOUR :
Pg 6 of Part I
1st class Mason
Pg (W
8 ofRPart
WorkI Items) LAB-00011 I -11 0.067 Nos 670.00 1 Each 44.89
(W R Work 605.00
2nd class Mason
Items) LAB-00091 II - 35 0.133 Nos 1 Each 80.47
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor (both men&women) 2.500 Nos 560.00 1 Each 1400.00
Municipal Allowance on Labour
20.00% 1525.36 305.07
Charges @
C.MACHINERY : / 7 cft (0.2 / 0.8
Concrete Mixer 10
Pg 43 of Part I HIR-00018 & HIR- cum) capacity - Hire and Fuel
( WR Work Items) 00152 18 Charges 0.267 hours 365.10 1 hour 97.48
Pg 43 of Part I Crew charges
( WR Work Items) LAB-00331 18 0.267 hours 327.60 1 hour 87.47
Pg 44 of Part I HIR-00040 & HIR-
( WR Work
Pg 44 Items)
of Part I 00174 40 Needle vibrator 40mm ( petrol ) 0.267 hours 38.60 1 hour 10.31
( WR Work Items) LAB-00352 40 Crew charges 0.267 hours 235.80 1 hour 62.96
CIVIL DATA 2023-24 : Page-15

Add MA on crew charges 20.00% 150.43 30.09


Rate per 1 cum 5873.77

A) BEAMS :
un supported height up to 3.66 m
Rate for other Floors FF SF TF
Rate as above 5873.77 5873.77 5873.77
Hire charges of centering and
1458.00 1458.00 1458.00
scaffolding
Labour , lift charges for scaffolding 1569.00 1726.00 1883.00
Add Municipal Allowance 313.80 345.20 376.60
Lift charges of materials(Manual) 0.00 152.54 305.07
Add MA on Lift Charges 0.00 30.51 61.01
Rate for 1 Charges
Overhead cum & Contractors 9214.56 9586.01 9957.45
Profit @ 0.00 0.00 0.00
Rate per 1 cum 9214.56 9586.01 9957.45

12 Pg 31 of Standard Data BLD-CSTN-5-4 42 Brick masonry for panel walls in superstructure with CM (1:6) prop: (Cement : Sand) using common burnt
Book - Building Items clay
Unit :bricks
1cum of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from
A.MATERIALS :
Pg 11 of Part I MAT-00005 5 Cement 48.00 Kgs 5400.00 1000 Kgs 259.20
PgR11
(W of Part
Work III
Items) Common burnt clay bricks
Pg 12Work
of Part I MAT-00721 BMT-A.01 512 Nos 8520.20 1000 Nos 4362.34
(Building Items) 23x11x7cms
(W R Work Items) MAT-00027 27(a) Fine aggregate ( Sand ) 0.20 cu.m. 1213.20 1 cu.m. 242.64
Pg 6 of Part I B.LABOUR :
(W R Work Items) LAB-00011 I -11 1st class mason 0.24 Nos. 670.00 1 Each 160.80
(W R Work
Items) LAB-00091 II - 35 2nd class mason 0.56 Nos. 605.00 1 Each 338.80
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor (Unskilled)
Municipal Allowance on Labour 1.89 Nos. 560.00 1 Each 1058.40
Charges @ 20.00% 1558.00 311.60

a Up to basement
Rate as worked out above 1.00 Cum 6733.78 1 Cum 6733.78
Overhead Charges & Contractors
Profit @ 0.00% 6733.78 0.00
Rate per 1 cum 6733.78

b) Superstructure :
i) un supported height up to 3.66 m
Rate for other Floors FF SF TF 4F
Rate as worked out above 6733.78 6733.78 6733.78 6733.78
Hire charges for Access Scaffolding 46.87 46.87 46.87 46.87
CIVIL DATA 2023-24 : Page-16

Labour charges for scaffolding 367.91 526.87 685.74 844.65


Add Municipal Allowance 73.58 105.37 137.15 168.93
Lift charges ( Page 131 of Std. Data 0 155.80 311.60 467.40
)Add MA on Lift Charges 0.00 31.16 62.32 93.48
Rate per 1Charges
Overhead cum & Contractors 7222.14 7599.86 7977.46 8355.11
Profit @ 0.00 0.00 0.00 0.00
Rate per 1 cum 7222.14 7599.86 7977.46 8355.11

13 Pg 29 of Standard Data Amendment in 36 Providing Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500 D grade as per IS 1786-1979) of different
Book - Building Items SoR 2011-12 page diameters
Unit - 1 MTfor RCC works including labour charges for straightening, cutting, bending to required sizes and
Memo No.
a) AEE(T1)/DEE(T)/Steel Material
rates/2021-22 of EnC TMT bars including 5% for overlaps
PR,Pg
dated 21.06.2023
11 of Part I 0 4 (b) and wastage 1.05 MT 76110.00 1 MT 79915.50
(W R Work Items) MAT-00003 3 Binding wire 6.00 Kgs 70.00 1 Kgs 420.00
b) Labour for cutting , bending ,
shifting to site , tying and placing in
Pg 6 of Part I position
1st class Blacksmith / Barbender
(WR
Work Items) LAB-00001 I-1 3.00 Nos. 800.00 1 Each 2400.00
Pg 6 of Part I 2nd class Blacksmith / Barbender
(WR
Work Items) LAB-00002 I-2 7.00 Nos. 630.00 1 Each 4410.00
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor(Unskilled) 10.00 Nos. 560.00 1 Each 5600.00
Municipal Allowance on Labour 20.00% 12410.00 2482.00
Charges @ 95227.50

Rate for other Floors FF SF TF 4F


Rate as worked out above 95227.50 95227.50 95227.50 95227.50
Lift charges ( Page 131 of Std. Data 0.00 1241.00 2482.00 3723.00
)Add MA on Lift Charges 0.00 248.20 496.40 744.60
Rate per 1Charges
Overhead MT & Contractors 95227.50 96716.70 98205.90 99695.10
Profit @ 0.00 0.00 0.00 0.00
Rate per 1 MT 95227.50 96716.70 98205.90 99695.10
Rate per 1 Kg 95.23 96.72 98.21 99.70

14 BLD-CSTN-8-9 Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top
coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like
Unit : 10 sqm
A.MATERIALS :
Base coat in CM(1:6) , 16mm thick
CIVIL DATA 2023-24 : Page-17

Pg 11 of Part I MAT-00005 5 Cement 43.20 Kgs 5400.00 1000 Kgs 233.28


(W R Work Items) Fine aggregate (Sand) 0.18 Cum 1329.20 1
Pg 12 of Part I Cum
(W R Work Items) MAT-00029 28 239.26
Top coat in CM(1:4) , 4mm thick
Pg 11 of Part I MAT-00005 5 Cement 14.40 Kgs 5400.00 1000 Kgs 77.76
(WPg
R 12
Work Items)
of Part I Fine aggregate (Sand) 0.04 Cum 1329.20 1
Cum
(W R Work Items) MAT-00029 28 53.17
B.LABOUR :
Pg 6 of Part I 1st Class Mason 0.63 Nos. 1
Each
(W R Work Items) LAB-00011 I -11 670.00 422.10
Pg 8 of Part I
(W R Work 2nd Class Mason 1.47 Nos. 605.00 1
Each
Items) LAB-00091 CSoR I - 2 889.35
Pg 8 & 9 of Part I LAB-00120,
(W R Work Items) LAB-00121 III - 3, 4 Mazdoor (Unskilled) 3.90 Nos. 560.00 1 Each 2184.00
Add MA on Labour Charges 20.00% 3495.45 699.09
water charges @ 1% 0.01 4798.00
Rate per 10 sqm 4798.00
Rate per 1 sqm 479.80

Rate for other Floors FF SF TF 4F


Rate as worked out above 479.80 479.80 479.80 479.80
Hire charges for Access Scaffolding 1.08 1.08 1.08 1.08
Labour charges for scaffolding 8.47 12.12 15.77 19.43
0 1.69 2.42 3.15 3.89
Lift charges ( Page 131 of Std. Data 0.00 34.95 69.91 104.86
)Add MA on Lift Charges 0.00 6.99 13.98 20.97
Rate per 1Charges
Overhead sqm & Contractors 491.04 537.36 583.70 630.03
Profit @ 0.00 0.00 0.00 0.00
Rate per 1 sqm 491.04 537.36 583.70 630.03
BLD-CSTN-12-2&
15 Amendment in Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic
SoR 2011-12 exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior
Unit 10 sqm.
A. Materials:-
Cost of cement primer exterior
Pg 63 of Part III
Pg 7 of Part I Items) MAT-01074 BMT-J.02 grade II 1.00 Kg 237.18 1 Kg 237.18
(Building Work
(W R Work Items) LAB-00035 I - 35 Painter 1st class 0.21 Nos. 750.00 1 Each 157.50
(W R Work
Items) LAB-00093 II - 37 Painter 2nd class 0.49 Nos. 605.00 1 Each 296.45
Pg 64 of Part III
Pg 7 of Part I Items) MAT-01107 BMT-J.34 Acrylic emulsion paint 0.80 Ltrs 272.58 1 Ltrs 218.06
(Building Work
(W R Work Items) LAB-00035 I - 35 Painter 1st class 0.21 Nos. 750.00 1 Each 157.50
(W R Work
Items) LAB-00093 II - 37 Painter 2nd class 0.49 Nos. 605.00 1 Each 296.45
CIVIL DATA 2023-24 : Page-18

Pg 8 & 9 of Part I LAB-00120, CSoR III -


(W R Work Items) LAB-00121 3,4 Mazdoor(Unskilled) 1.50 Nos. 560.00 1 Each 840.00
Municipal Allowance on Labour 20.00% 1747.90 349.58
Charges
Sundries @
including brushes ,
ladders etc., @ 1% 1.00% 2552.72
Basic CostCharges
Overhead for 10 Sqm
& Contractors 2552.72
Profit @ 0.00% 0.00
Rate per 10 sqm 2552.72
Rate per 1 sqm 255.27

1.70 1 Alround M.S


mts . flat of size 25 x
6mm
8
0 Asst. Executive Engineer
m MPP, Puttur
t
s
D A T A ( SoR 2023-24)
Name of work :- Reconstruction of East Compound Wall near SHG Building at MPDO Office in Puttur Mandal

CEMENT MORTAR PER CUM CM (1:2) CM (1:3) CM (1:4) CM (1:5) CM (1:6) CM (1:8)

Cost of Sand for Plastering


( 1.05 cum ) 1395.66 1395.66 1395.66 1395.66 1395.66 1395.66
Cost of cement
Mazdoor ( Unskilled ) for mixing 3888.00 2592.00 1944.00 1555.20 1296.00 972.00
mortar ( 0.20 on
Municipal Allowance Nos.)
Labour 112.00 112.00 112.00 112.00 112.00 112.00
Charges @ 22.40 22.40 22.40 22.40 22.40 22.40
Rate per Cum 5418.06 4122.06 3474.06 3085.26 2826.06 2502.06

20 mm HBG graded metal


Arregates 20mm nominal size 0.60 1782.60 1069.56
Arregates 13.20 / 12.50mm nominal
size 0.15 1466.60 219.99
Arregates 10mm nominal size 0.15 1269.60 190.44
Arregates 6mm nominal size 0.10 1056.60 105.66
Rate per Cum 1585.65

12 mm HBG graded metal


Arregates 13.20 / 12.50mm nominal
size 0.60 1466.60 879.96
Arregates 10mm nominal size 0.20 1269.60 253.92
Arregates 6mm nominal size 0.20 1056.60 211.32
Rate per Cum 1345.20

1.70 1 Alround M.S


mts . flat of size 25 x
6mm
8
0
m Asst. Executive Engineer
t MPP, Puttur
s
Common SoR 2019-20 - Page : 20

Buildings SoR 2023-24


Reference to SoR Part S.No./ Item code
S.No Items CFMS code
and Page No.

Buildings SoR
Pg 11 of Part III
1 Common burnt clay bricks (23x11x7cm) MAT-00721 BMT-A.01
(Building Work Items)
Flyash cement / lime solid blocks (50 Kgs/ sq.cm) Pg 11 of Part III
2 MAT-00756 BMT-A.10
290mmx225mmx140mm (Building Work Items)
Flyash cement / lime solid blocks (50 Kgs/ sq.cm) Pg 12 of Part III
3 MAT-00759 BMT-A.13
290mmx112/100mmx140mm (Building Work Items)
Flyash cement / lime solid blocks (50 Kgs/ sq.cm) Pg 12 of Part III
4 MAT-00760 BMT-A.14
225mmx100mmx60mm (Building Work Items)
Pg 12 of Part III
5 Well burnt cinder aggregate MAT-00763 BMT-A.17
(Building Work Items)
Aerated (Cellular) Autoclaved Concrete Blocks 600mm x Pg 12 of Part III
6 MAT-00764 BMT-A.18
200mm x 100mm (Building Work Items)
Aerated (Cellular) Autoclaved Concrete Blocks 600mm x Pg 12 of Part III
7 MAT-00765 BMT-A.19
200mm x 150mm (Building Work Items)
Aerated (Cellular) Autoclaved Concrete Blocks 600mm x Pg 12 of Part III
8 MAT-00766 BMT-A.20
200mm x 200mm (Building Work Items)
Aerated (Cellular) Autoclaved Concrete Blocks 600mm x Pg 12 of Part III
9 MAT-00767 BMT-A.21
200mm x 230mm (Building Work Items)

Polished Shahabad / Tandur stone slabs 15mm to 18mm Pg 13 of Part III


10 MAT-00772 BMT-B.05
thick (Building Work Items)
Polished black Kadapa slabs minimum of 15mm thick Pg 13 of Part III
11 MAT-00773 BMT-B.06
(0.457m x 0.457m) (Building Work Items)
High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 Pg 14 of Part III
12 MAT-00776 BMT-B.09
M) other than black/premium colours (Building Work Items)
High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 Pg 14 of Part III
13 MAT-00777 BMT-B.10
M)
Highother than black
Polished and16
Granite regular
to 18 colours
mm thick up to 8'-00 (2.43 (Building
Pg 14 Work
of PartItems)
III
14 MAT-00778 BMT-B.11
M) black. (Building
Pg 13 Work
of PartItems)
III
15 16mm to 20mm thick marble slab MAT-00781 BMT-B.14
(Building Work Items)
Pg 14 of Part III
16 Granite stone tiles 8mm thick (mirror polished of all shades) MAT-00783 BMT-B.16
(Building Work Items)
Common SoR 2019-20 - Page : 21

Non-skid red or white full body Ceramic floor tiles of size


300 x 300 mm and thickness between 7-8 mm 1st quality of Pg 14 of Part III
17 any colour and finish in all shades and designs MAT-00785 BMT-C.01
(Building Work Items)

Non-skid red or white full body Ceramic floor tiles of size Pg 14 of Part III
18 MAT-00786 BMT-C.02
450 x 450redmmorand thickness between 7-8 mm 1stofquality of (Building Work Items)
Non-skid white full bodyCeramic floor tiles Size 600
mm x 600 mm and thickness between 8-10 mm and 1st Pg 14 of Part III
19 quality conforming to IS:13711,IS:13712, IS:13630 (Parts 1 MAT-00787 BMT-C.03
(Building Work Items)
to 15) ofany colour and finish in all shades anddesigns
Soluble salt porcelain vitrified tiles screen printed and
Pg 15 of Part III
20 polished of size 600mm x 600mm , 8 to 10mm thick of any MAT-00790 BMT-C.06
screen printed of insize (Building
Pg 15 Work
of PartItems)
21 colour and finish all 600mm
shades xand600mm
designsand thickness III
MAT-00791 BMT-C.07
between
porcelain8vitrified
to 10mm tilesofwith
any double
colour and
layerfinish in allofshades
pigment Size 600 (Building
Pg 15 of PartItems)
Work III
22 MAT-00793 BMT-C.09
xporcelain
600 mmvitrified
and thickness between 8-10 mm of any
tiles with double layer pigment of Size 800 colour (Building Work Items)
Pg 15 of Part III
23 MAT-00794 BMT-C.10
x 800 mm and thickness between 9-11 mm of any colour (Building
Pg 16 Work
of PartItems)
III
24 Digital / polished glazed full body porcelain vitrified tiles with MAT-00797 BMT-C.13
any typevitrified
of design (Building Work Items)
Glazed tilestexture
with mattsuch as marble
finish of size finish, wooden,and
600 x600mm Pg 16 of Part III
25 thickness between 9-10 mm BMT-C.13(a)
Glazed red or white full body ceramic wall tiles of size 200 x (Building Work Items)
Pg 16 of Part III
26 300 mmred
Glazed / 245 mm x full
or white 325body
mm ceramic
and thickness 6 mm
wall tiles of any
of size 300 x MAT-00805 BMT-C.21
(Building
Pg 16 Work
of PartItems)
III
27 colour and finish in all shades and designs
450 mm / 320 mm x 400 mm and thickness 6 mm of any MAT-00806 BMT-C.22
type ofand
design texture (Building Work Items)
28 colour finish in all such
shadesas and
marble finish, wooden,
designs Pg 17 of Part III
MAT-00808 BMT-C.24
bamboo, stone finishes etc., scratch less, stain free and (Building
Pg 17 Work
of PartItems)
III
29 Screen printed glazed full body porcelain wall tiles of size MAT-00811 BMT-C.27
300 x 600 (Building
Pg 19 of PartItems)
Work III
30 Supply andmm with any of
application type of design
epoxy covingtexture
50mmx50mmsuch as width MAT-08735 BMT-C.49
at the corners of the walls (Building Work Items)
Pg 21 of Part III
31 Plain Cement Concrete general purpose tiles of size 300 x MAT-00832 BMT-D.04
300 mm andCementthickness 20 mmheavy
of anyduty
shades. (Building Work Items)
Chequered Concrete tiles conforming to
IS: 13801 using aggregates, cement, pigments of size 300 x Pg 21 of Part III
32 300 mm and thickness 25 mm of any shades MAT-00835 BMT-D.07
(Building Work Items)

Precast concrete blocks for paving of M-30 grade and


thickness not less than 50 mm for non-traffic areas Pg 21 of Part III
33 MAT-00840 BMT-D.12
(Building Work Items)

Precast concrete blocks for paving of M-35 grade and


thickness not less than 60 mm for Light traffic areas Pg 22 of Part III
34 MAT-00841 BMT-D.13
(Building Work Items)

Precast concrete blocks for paving of M-40 grade and


thickness not less than 80 mm for Medium traffic areas Pg 22 of Part III
35 MAT-00842 BMT-D.14
(Building Work Items)
Common SoR 2019-20 - Page : 22

Precast concrete blocks for paving of M-50 grade and


thickness not less than 100 mm for Heavy traffic areas Pg 22 of Part III
36 MAT-00843 BMT-D.15
(Building Work Items)

Pg 23 of Part III
37 Medium teak wood scantilings up to 2m MAT-00846 BMT - E.01
(Building
Pg 23 Work
of PartItems)
III
38 Medium teak wood scantilings 2 to 3m MAT-00847 BMT - E.02
(Building
Pg 23 of PartItems)
Work III
39 Medium teak wood scantilings above 3m MAT-00848 BMT - E.03
(Building Work Items)
Pg 24 of Part III
40 Medium teak wood planks of any thickness MAT-00849 BMT - E.04
(Building
Pg 24 Work
of PartItems)
III
39 Best teak wood scantilings up to 2m MAT-00850 BMT - E.05
(Building Work Items)
Pg 24 of Part III
40 Best teak wood scantilings 2 to 3m MAT-00851 BMT - E.06
(Building
Pg 24 Work
of PartItems)
III
41 Best teak wood scantilings above 3m MAT-00852 BMT - E.07
(Building Work Items)
Pg 24 of Part III
42 Best teak wood planks of any thickness MAT-00853 BMT - E.08
(Building
Pg 24 Work
of PartItems)
III
43 Burma teak wood scantilings up to 2m MAT-00854 BMT - E.09
(Building Work Items)
Pg 24 of Part III
44 Burma teak wood scantilings 2 to 3m MAT-00855 BMT - E.10
(Building
Pg 24 Work
of PartItems)
III
45 Burma teak wood scantilings above 3m MAT-00856 BMT - E.11
(Building Work Items)
Pg 24 of Part III
46 Burma teak wood planks of any thickness MAT-00857 BMT - E.12
(Building
Pg 24 Work
of PartItems)
III
47 Assam Teak Wood scantlings: any length MAT-00858 BMT - E.13
(Building Work Items)
Pg 24 of Part III
48 Assam Teak Wood Plancks: any thickness MAT-00859 BMT - E.14
(Building
Pg 24 Work
of PartItems)
III
49 Sal wood scantlings any length MAT-00860 BMT - E.15
(Building Work Items)
Pg 24 of Part III
50 Sal wood planks of any thickness MAT-00861 BMT - E.16
(Building
Pg 24 Work
of PartItems)
III
51 6mm thick corrugated AC sheets MAT-00862 BMT-E.17
(Building Work Items)
Pg 24 of Part III
52 A.C sheet plain 4 mm thick MAT-00863 BMT-E.18
(Building
Pg 24 Work
of PartItems)
III
53 A.C sheet plain 6 mm thick MAT-00864 BMT-E.19
Plain or Corrugated Galvanized iron sheets as per IS (Building Work Items)
Pg 24 of Part III
54 MAT-00865 BMT-E.20
277(0.1mm to 0.8 mm thickness) (Building Work Items)
Pg 26 of Part III
55 Cost of MS Tube MAT-00871 BMT-F.04
(Building
Pg 27 Work
of PartItems)
III
56 Cost of stainless steel pipes 304 grade MAT-00872 BMT-F.06
(Building Work Items)
Pg 27 of Part III
57 Stainless steel fly proof wire mesh of not less than 20 gauge MAT-00885 BMT-F.19
(Building Work Items)
Pg 26 of Part III
58 Rabbit wire mesh (chicken mesh) MAT-00894 BMT-F.28
(Building
Pg 25 Work
of PartItems)
III
59 Rolling Shutter (80x1.25mm) MAT-00895 BMT-F.29
(Building
Pg 25 of PartItems)
Work III
60 Collapsable steel shutters MAT-00896 BMT-F.30
(Building Work Items)
Pg 27 of Part III
61 Brass tower bolt 150mm long MAT-00907 BMT-G.02
(Building Work Items)
Common SoR 2019-20 - Page : 23

Pg 27 of Part III
62 Brass tower bolt 200mm long MAT-00908 BMT-G.03
(Building
Pg 28 Work
of PartItems)
III
63 Al. tower bolt 150mm long MAT-00913 BMT-G.08
(Building Work Items)
Pg 28 of Part III
64 Al. tower bolt 200mm long MAT-00914 BMT-G.09
(Building
Pg 28 Work
of PartItems)
III
65 Al. tower bolt 300mm long MAT-00916 BMT-G.11
(Building
Pg 28 Work
of PartItems)
III
66 MS powder coated tower bolt 100mm long MAT-00919 BMT-G.14
(Building Work Items)
Pg 28 of Part III
67 MS powder coated tower bolt 150mm long MAT-00920 BMT-G.15
(Building
Pg 28 Work
of PartItems)
III
68 MS powder coated tower bolt 200mm long MAT-00921 BMT-G.16
(Building Work Items)
Pg 28 of Part III
69 Brass Butt hinges 150mm long MAT-00927 BMT-G.22
(Building
Pg 30 Work
of PartItems)
III
70 Al. Butt hinges 150mm long MAT-00931 BMT-G.26
(Building Work Items)
Pg 30 of Part III
71 MS-Powder coated butt hinges 75 mm long MAT-00932 BMT-G.27
(Building
Pg 30 Work
of PartItems)
III
72 MS-Powder coated butt hinges 100mm long MAT-00933 BMT-G.28
(Building Work Items)
Pg 30 of Part III
73 MS-Powder coated butt hinges 125 mm long MAT-00934 BMT-G.29
(Building
Pg 30 Work
of PartItems)
III
74 MS powder coated Butt hinges 150mm long MAT-00935 BMT-G.30
(Building Work Items)
Pg 30 of Part III
75 Al. handle 75mm long MAT-00936 BMT-G.31
(Building
Pg 30 Work
of PartItems)
III
76 Al. handle 100mm long MAT-00937 BMT-G.32
(Building Work Items)
Pg 30 of Part III
77 Al. handle 125mm long MAT-00938 BMT-G.33
(Building
Pg 30 Work
of PartItems)
III
78 Al. handle 150mm long MAT-00939 BMT-G.34
(Building Work Items)
Pg 30 of Part III
79 MS powder coated handle 125mm long MAT-00940 BMT-G.35
(Building
Pg 30 Work
of PartItems)
III
80 MS powder coated handle 150mm long MAT-00941 BMT-G.36
(Building Work Items)
Pg 31 of Part III
81 Brass aldrop 300mm long MAT-00942 BMT-G.37
(Building
Pg 31 Work
of PartItems)
III
82 Brass aldrop 350mm long MAT-00943 BMT-G.38
(Building Work Items)
Pg 31 of Part III
83 Brass aldrop 450mm long MAT-00944 BMT-G.39
(Building
Pg 31 Work
of PartItems)
III
84 Al. aldrop 200mm long MAT-00945 BMT-G.40
(Building Work Items)
Pg 31 of Part III
85 Al. aldrop 250mm long MAT-00946 BMT-G.41
(Building
Pg 31 Work
of PartItems)
III
86 Al. aldrop 300mm long MAT-00947 BMT-G.42
(Building Work Items)
Pg 31 of Part III
87 MS powder coated aldrop 200mm long MAT-00948 BMT-G.43
(Building
Pg 31 Work
of PartItems)
III
88 MS powder coated aldrop 250mm long MAT-00949 BMT-G.44
(Building Work Items)
Pg 31 of Part III
89 MS powder coated aldrop 300mm long MAT-00950 BMT-G.45
(Building
Pg 34 Work
of PartItems)
III
90 Brass door stopper MAT-00951 BMT-G.46
(Building Work Items)
Pg 34 of Part III
91 MS powder coated door stopper MAT-00958 BMT-G.53
(Building
Pg 34 Work
of PartItems)
III
92 Heavy duty Al.door stopper MAT-00962 BMT-G.57
(Building Work Items)
Pg 30 of Part III
93 Brass fancy handle 150mm long MAT-00963 BMT-G.58
(Building
Pg 30 Work
of PartItems)
III
94 Brass fancy handle 200mm long MAT-00964 BMT-G.59
(Building Work Items)
Common SoR 2019-20 - Page : 24

Pg 30 of Part III
95 Brass fancy handle 250mm long MAT-00965 BMT-G.60
(Building
Pg 30 Work
of PartItems)
III
96 Brass fancy handle 300mm long MAT-00966 BMT-G.61
(Building Work Items)
Pg 30 of Part III
97 Brass fancy handle 450mm long MAT-00967 BMT-G.62
Heavy duty mortise lock 6/7 levers (IS:2209) with PC or CP (Building
Pg 33 Work
of PartItems)
III
98 MAT-00971 BMT-G.66
handles complete
Heavy duty mortiseset
lock 6/7 levers (IS:2209) with brass (Building
Pg 34 Work
of PartItems)
III
99 MAT-00972 BMT-G.67
heavy handles (Building Work Items)
Pg 34 of Part III
100 Friction stay hinges for windows MAT-00976 BMT-G.71
(Building
Pg 33 Work
of PartItems)
III
101 Cost of hydraulic floor springs MAT-00982 BMT-G.77
(Building Work Items)
Pg 35 of Part III
102 Pre construction Anti termite treatment MAT-05352 BMT-H.66
(Building Work Items)
Specialised high performance acrylic polymer modified
Pg 42 of Part III
103 elastomeric cemetitios water proofing system to the wet BMT-H.71 (b)
(Building Work Items)
area / Toilet / Bath room
Specialized polysulphide sealant treatment to the expansion Pg 46 of Part III
103 MAT-05365 BMT-H.78
joints(size: 25mm x 12mm) (Building Work Items)
104 Pg 52 of Part III
Integral cement water proofing admixture MAT-05372 BMT-H.85
(Building Work Items)
105 Pg 52 of Part III
Super plasticizer and water reducing concrete admixture MAT-05375 BMT-H.88
(Building Work Items)
106 Pg 62 of Part III
5mm thick plain float glass MAT-01053 BMT-I.02
(Building
Pg 62 Work
of PartItems)
III
107 12mm thick plain float glass MAT-01057 BMT-I.06
(Building
Pg 63 Work
of PartItems)
III
108 Cost of 12mm thick tinted glass MAT-01063 BMT-I.12
(Building
Pg 62 of PartItems)
Work III
109 Pin headed glass 4mm thick MAT-01064 BMT-I.13
(Building Work Items)
Pg 62 of Part III
110 Pin headed glass 5mm thick MAT-01065 BMT-I.14
(Building
Pg 63 Work
of PartItems)
III
111 4mm thick ground glass MAT-01066 BMT-I.15
(Building Work Items)
Pg 63 of Part III
112 5mm thick ground glass MAT-01067 BMT-I.16
(Building Work Items)
Pg 63 of Part III
113 Water based Cement Primer of Interior Grade- 1 MAT-01073 BMT-J.01
(Building
Pg 63 Work
of PartItems)
III
114 Water based Cement Primer of Exterior Grade- 2 MAT-01074 BMT-J.02
(Building Work Items)
Pg 63 of Part III
115 Red oxide Primer Paint Grade-I MAT-01075 BMT-J.03
(Building
Pg 63 Work
of PartItems)
III
116 Zinc Chromate Yellow Oxide Iron Primer paint MAT-01076 BMT-J.04
(Building
Pg 63 of PartItems)
Work III
117 Wood primer MAT-01077 BMT-J.05
(Building
Pg 63 Work
of PartItems)
III
118 Supply of Metal paste (Putty) for steel works MAT-01078 BMT-J.06
(Building Work Items)
Pg 63 of Part III
119 Putty for wood work MAT-01079 BMT-J.07
(Building
Pg 63 Work
of PartItems)
III
120 White Lead MAT-01080 BMT-J.08
(Building
Pg 64 of PartItems)
Work III
121 Synthetic clear Varnish MAT-01081 BMT-J.09
(Building Work Items)
Common SoR 2019-20 - Page : 25

Pg 64 of Part III
122 Spirit MAT-01082 BMT-J.10
(Building
Pg 64 Work
of PartItems)
III
123 Linseed Oil MAT-01083 BMT-J.11
(Building Work Items)
Pg 64 of Part III
124 Thinner for Melamine polish MAT-01084 BMT-J.12
(Building
Pg 64 Work
of PartItems)
III
125 Thinner for Poly-urethene polish MAT-01085 BMT-J.13
(Building
Pg 64 Work
of PartItems)
III
126 French Polish MAT-01086 BMT-J.14
(Building Work Items)
Pg 64 of Part III
127 Ready made Wax Polish MAT-01087 BMT-J.15
(Building
Pg 65 Work
of PartItems)
III
128 Melamine Polish MAT-01088 BMT-J.16
(Building Work Items)
Pg 65 of Part III
129 Interior grade Poly -Urethene polish MAT-01089 BMT-J.17
(Building
Pg 65 Work
of PartItems)
III
130 Exterior grade Poly -Urethene polish MAT-01090 BMT-J.18
(Building Work Items)
Pg 64 of Part III
131 Acrylic based Oil bound Washable Distemper MAT-01093 BMT-J.21
(Building Work Items)
Synthetic polymer luxury plastic emulsion paint of Pg 64 of Part III
132 MAT-01094 BMT-J.22
superior grade (Building Work Items)
Pg 64 of Part III
133 Water proof Cement paint MAT-01095 BMT-J.23
(Building
Pg 64 Work
of PartItems)
III
134 Acrylic interior emulsion paint MAT-01097 BMT-J.24
(Building Work Items)
Pg 64 of Part III
135 Acrylic exterior emulsion paint MAT-01107 BMT-J.34
(Building
Pg 64 Work
of PartItems)
III
133 Water proof cement paint MAT-01098 BMT-J.25
(Building Work Items)
Pg 65 of Part III
134 Synthetic enamel paint Grade - I MAT-01102 BMT-J.29
(Building
Pg 65 Work
of PartItems)
III
135 Synthetic enamel paint Grade - II MAT-01103 BMT-J.30
(Building Work Items)
Pg 63 of Part III
136 Wall putty of White Cement or Polymer or Cement based MAT-01104 BMT-J.31
(Building Work Items)
Pg 65 of Part III
137 Exterior Texture MAT-01105 BMT-J.32
(Building
Pg 65 Work
of PartItems)
III
138 Gold line Exterior Texture MAT-01106 BMT-J.33
(Building WorkIIIItems)
Pg 66 of Part
139 Poly-urethane Paint (Building Work Items) BMT-J.42

Pg 69 of Part III
140 MDF Board: interior-Both Side Laminated -12 mm thick MAT-01166 BMT-K.58
(Building Work Items)
Pg 69 of Part III
141 MDF Board Interior - Both Side Laminated 18mm thick MAT-01167 BMT-K.59
(Building Work Items)

Pg 72 of Part III
142 Laminate sheets - Glossy finish: 1mm thick MAT-01205 BMT-L.21
(Building
Pg 72 Work
of PartItems)
III
143 Laminate sheets - Mat finish: 1mm thick MAT-01208 BMT-L.24
(Building Work Items)

Pg 73 of Part III
144 12.5mm Gypboard Tiles 595mm x 595mm MAT-01236 BMT-M.01
(Building
Pg 73 Work
of PartItems)
III
145 9mm Gypboard Tiles 595mm x 595mm MAT-01237 BMT-M.02
(Building Work Items)
Common SoR 2019-20 - Page : 26

Pg 73 of Part III
146 Gypsom board plain sheets 12.5mm thick MAT-01238 BMT-M.03
(Building
Pg 78 Work
of PartItems)
III
147 GI Ceiling Angle - 25mm x 10mm x 0.55mm MAT-01239 BMT-M.04
GI Ceiling section - 51.5mm x 26mm x 10.5mm x 0.55mm (Building Work Items)
Pg 78 of Part III
148 MAT-01240 BMT-M.05
thick (Building
Pg 78 Work
of PartItems)
III
149 Intermediate section - 45mm x 15mm x 15mm x 0.9mm MAT-01241 BMT-M.06
Perimeter channel - 20mm x 27mm x 30mm (web) of (Building
Pg 78 Work
of PartItems)
III
150 MAT-01242 BMT-M.07
0.55mm thick (Building Work Items)
Pg 78 of Part III
151 GI Angle - Precoated - 25mm x 25mm x0.7mm MAT-01243 BMT-M.08
(Building
Pg 78 Work
of PartItems)
III
152 G.I.-Precoated Fine line Grid 15 mm x 25 mm x 0.7 mm MAT-01244 BMT-M.09
(Building Work Items)
Pg 78 of Part III
153 GI pre coated - T section - 24mm x 38mm x 0.7mm thick MAT-01245 BMT-M.10
(Building
Pg 78 Work
of PartItems)
III
154 Hotdipped GI Angle - Precoated - Grid - 19mmx19mm MAT-01246 BMT-M.11
(Building Work Items)
Pg 78 of Part III
155 Polyster painted GI - T section 24x32mm MAT-01247 BMT-M.12
(Building
Pg 78 Work
of PartItems)
III
156 Polyster painted GI - T section 24x25mm (sub-cross Tee) MAT-01248 BMT-M.13
(Building Work Items)
Pg 78 of Part III
157 Polyster painted GI-T Section - 24mm x 27mm MAT-01249 BMT-M.14
(Building
Pg 78 Work
of PartItems)
III
158 Aluminium angle - 24mmx 24mm MAT-01250 BMT-M.15
(Building Work Items)
Pg 78 of Part III
159 Anodised Aluminium T section - 24mm x 24.5mm x 2.4mm MAT-01251 BMT-M.16
(Building
Pg 78 Work
of PartItems)
III
160 Connecting Clips MAT-01252 BMT-M.17
(Building Work Items)
Pg 79 of Part III
161 Rawl Plug MAT-01253 BMT-M.18
(Building
Pg 79 Work
of PartItems)
III
162 6mm Nylon Rawl Plug MAT-01254 BMT-M.19
(Building Work Items)
Pg 79 of Part III
163 Soffit Cleats MAT-01255 BMT-M.20
(Building
Pg 79 Work
of PartItems)
III
164 Drywall screws - 25mm MAT-01256 BMT-M.21
(Building Work Items)
Pg 79 of Part III
165 Jointing Compound MAT-01257 BMT-M.22
(Building
Pg 79 Work
of PartItems)
III
166 Jointing Paper tape MAT-01258 BMT-M.23
(Building Work Items)
Pg 79 of Part III
167 Drywall top coat MAT-01259 BMT-M.24
(Building
Pg 79 Work
of PartItems)
III
168 Universal Holding Clips MAT-01260 BMT-M.25
(Building Work Items)
Pg 79 of Part III
169 GI Rod - 4mm dia - Connecting Rod MAT-01261 BMT-M.26
(Building
Pg 79 Work
of PartItems)
III
170 GI rod-prestraightened 2.0mm dia. - Connecting rod MAT-01262 BMT-M.27
(Building Work Items)
Pg 73 of Part III
171 12mm Thermocole sheet MAT-01271 BMT-M.36
(Building Work Items)
Cement bonded pre-laminated particle boards aluminum Pg 90 of Part III
172 MAT-01310 BMT-M.75
glazed partitions (Building Work Items)
Mineral Fibre Ceiling Tile of 0.595m x 0.595m of 13 mm Pg 75 of Part III
173 MAT-01315 BMT-M.80
thick Square Edge Fissura Fine Model (Building Work Items)
Mineral Fibre Ceiling Tile of 0.595m x 0.595m of 13 mm Pg 75 of Part III
174 MAT-01316 BMT-M.81
thick Square Edge Speckle Model (Building Work Items)
Mineral Fibre Ceiling Tile of 0.595m x 0.595m of 13 mm Pg 75 of Part III
175 MAT-01317 BMT-M.82
thick Square Edge Textura Model (Building Work Items)
Common SoR 2019-20 - Page : 27

Mineral Fibre Ceiling Tile of 0.595m x 0.595m of 15 mm Pg 75 of Part III


176 MAT-01318 BMT-M.83
thick STandard Regular Edge (Building Work Items)
Mineral Fibre Ceiling Tile of 0.595m x 0.595m of 15 mm Pg 75 of Part III
177 MAT-01319 BMT-M.84
thick Fissura Fine Model (Building Work Items)

Supplying and fixing single side prelam solid panel PVC Pg 94 of Part III
178 MAT-01334 BMT-N-05
door frame (Choukhat) (Building Work Items)
Providing and fixing 30mm thick factory made moulded door Pg 105 of Part III
179 MAT-01336 BMT-N-07
shutter- wood free (Building Work Items)
PVC door cladding to the flush doors Pg 117 of Part III
180 MAT-01339 BMT-N-10
shutters 1.50mm thick (Building Work Items)
Pg 99 of Part III
181 30 mm thick flush shutter MAT-01345 BMT-N-16
(Building
Pg 99 Work
of PartItems)
III
182 35 mm thick flush shutter MAT-01346 BMT-N-17
(Building Work Items)
Flush door shutters, solid bond wood block board type with
Pg 99 of Part III
183 teak veneer on one face and commercial ply on another MAT-01350 BMT-N-21
(Building Work Items)
face (lipping): 30 mmthick
Pg 108 of Part III
184 Scientific Door with metal door frame (single leaf door) MAT-01374 BMT-N.45
(Building Work Items)
Pg 109 of Part III
185 Scientific Door with metal door frame (double leaf door) MAT-01375 BMT-N.46
(Building Work Items)
35mm thick Facotry made Prelaminated ABS (Acrolynitrile Pg 103 of Part III
186 MAT-01397 BMT-N.68
Butadyne Styrene) Door shutter (Building Work Items)
Stainless steel Fire Rated doors, frames & shutters made of Pg 112 of Part III
187 MAT-01388 BMT-N.59
Stainless steel of 304 grade (120 minutes) (Building Work Items)
Stainless steel Fire Rated doors, frames & shutters made of Pg 113 of Part III
188 MAT-01389 BMT-N.60
Stainless steel of 304 grade (60 minutes) (Building Work Items)
Lead Lined Stainless steel Clean room door frames and Pg 114 of Part III
189 MAT-01391 BMT-N.62
shutters (Building Work Items)
Pg 115 of Part III
190 Foamed PVC Door Frame & ABS Shutters MAT-01396 BMT-N.67
(Building
Pg 120Work Items)
of Part III
191 uPVC Two track two panels sliding door MAT-05439 BMT-N.85.A
(Building Work Items)
Pg 120 of Part III
192 uPVC Three track three panels sliding door MAT-05440 BMT-N.85.B
(Building Work Items)

193 Pre painted steel windows with guard bars


outer frame section size of 46 x 52 mm shutter frame Pg 125 of Part III
i) MAT-01412 BMT - P.04
section size frame
mm shutter of 46 xsection
46 mmsize of 46 x 46 mm Mullion (Building
Pg 125Work Items)
of Part III
ii) MAT-01415 BMT - P.07
section size of 46 x 70 mm fixed beading section size of 18 (Building Work Items)
Common SoR 2019-20 - Page : 28

0" (1828.8x1219.2mm) outer frame section size of 46 x 52


Pg 125 of Part III
mm shutter frame section size of 46 x 46 mm Mullion MAT-01416 BMT - P.08
(Building Work Items)
section size of 46 x 70 mm fixedbeading section size of 18 x
194 Pre painted steel Ventilators
MAT-01418 ,
Pg 149 of Part III
a) Top hung MAT-01419, BMT-P.10, 11 , 12
(Building Work Items)
MAT-01420
MAT-01421 ,
Pg 149 of Part III
b) Fixed louvered MAT-01422, BMT-P.13,14,15
(Building Work Items)
MAT-01423

195 Pre painted steel Windows with fly mesh


MAT-01430,
Pg 128 of Part III
i) Double shutters with central mullion MAT- BMT - P.22,23
(Building Work Items)
Pg 128 of Part III 01431
ii) Centre fixed both side openable shutters(5'x4') MAT-01432 BMT - P.24
(Building
Pg 128Work Items)
of Part III
iii) Centre fixed both side openable shutters(6'x4') MAT-01433 BMT - P.25
(Building Work Items)

Pre painted steel sliding window 2-Track with Two sliding Pg 135 of Part III
196 MAT-01434 BMT-P.26
shutters. (Building Work Items)
Pre painted steel sliding window 3-Track with Three sliding Pg 150 of Part III
197 MAT-01488 BMT-P.77
shutters. (Building Work Items)
Supply and fixing of UPVC sliding windows 2 track sliding Pg 142 of Part III
198 MAT-05447 BMT - P.80.A
(Area of window up to 1.75 sqm). (Building Work Items)
Supply and fixing of UPVC sliding windows 3 track sliding Pg 142 of Part III
199 MAT-05448 BMT - P.80.B
(Area of window upto 1.75 sqm). (Building Work Items)
Supply and fixing of UPVC sliding windows 2 track sliding Pg 142 of Part III
200 MAT-05449 BMT - P.80.C
(Area of window above 1.75 sqm). (Building Work Items)

Supply and fixing of UPVC sliding windows 2 track sliding Pg 143 of Part III
201 MAT-05450 BMT - P.81
(Area of window above 2.50 sqm to 4.00 sqm) (Building Work Items)

Pg 140 & 141 of Part III


202 Supplying and fixing of UPVC fixed windows / ventilators MAT-05446 BMT-P.79
(Building Work Items)

Pg 151 of Part III


203 Pre painted steel/ powder coate Structural Glazing MAT-01489 BMT - Q.01
(Building Work Items)
Pg 152 of Part III
204 Top Hung shutters in Structural Glazing MAT-01490 BMT - Q.02
glazing with 5 mm thick plain float glass fitted with Ethyl (Building Work Items)
205
Propylenediameine Monomer (EPDM) gaskets and the
Common SoR 2019-20 - Page : 29

18 x 25 mm Pg 152 of Part III


a) 18 x 25 mm MAT-01491 BMT - Q.03
Fixed Glazing 2'-0" x 2'-0" (609.6 x 609.6mm) grid outer (Building
Pg 153Work Items)
of Part III
b) Fixed Glazing 2'-0" x 3'-0"(609.6x914.4mm) grid outer frame MAT-01492 BMT - Q.04
18 x 25 mm (Building Work Items)
Pg 153 of Part III
c) section size of 46 x 52 mm MAT-01493 BMT - Q.05
Fixed Glazing
18 x 25 mm 3'-0" x 3'-0"(914.4x914.4mm) grid outer frame (Building
Pg 153Work Items)
of Part III
d) MAT-01494 BMT - Q.06
Fixed Glazing 3'-0" x 4'-0" (914.4x1219.2mm) grid outer (Building Work Items)

206 Dismantling
Pg 153 of Part III
a) Stone masonry in cement mortar MAT-01498 BMT-S.01
(Building
Pg 153Work Items)
of Part III
b) Terracing work in roofs or floors MAT-01499 BMT-S.02
(Building Work Items)
Pg 153 of Part III
c) Flat stone in roof or floors including lifting : MAT-01500 BMT-S.03
(Building
Pg 153Work Items)
of Part III
d) Pan tiled or Mangalore tiled roof with out roof timbers : MAT-01501 BMT-S.04
Flat and pan tiles or Mangalore tilesover flat tiles without (Building Work Items)
Pg 153 of Part III
e) MAT-01502 BMT-S.05
roof timbers (Building
Pg 153Work Items)
of Part III
f) Wrought and framed timber in roofs or floors MAT-01503 BMT-S.06
(Building Work Items)
Pg 153 of Part III
g) Old lime mortar plaster MAT-01504 BMT-S.07
(Building
Pg 153Work Items)
of Part III
h) Old cement mortar plaster MAT-01505 BMT-S.08
Dry rough stone revetment for aprons and stacking within (Building
Pg 153Work Items)
of Part III
i) MAT-01506 BMT-S.09
40 M lead (Building Work Items)
Pg 153 of Part III
j) Revetment for aprons and stacking grouted within 40 lead MAT-01507 BMT-S.10
(Building
Pg 153Work Items)
of Part III
k) Kadapa slabs or shahabad stone slabs on sand bed MAT-01508 BMT-S.11
(Building
Pg 154Work Items)
of Part III
l) Through scraping of old plastered surface MAT-01509 BMT-S.12
Washing of plastered surface with soap,soda and water (or (Building Work Items)
Pg 154 of Part III
m) MAT-01510 BMT-S.13
with soda lime and water) (Building Work Items)
Clean removal of lime plaster from walls and raking out
Pg 154 of Part III
n) joints 20mm deep or from terraced roof and raking out joints MAT-01511 BMT-S.14
100 mm deep (Building Work Items)

Clean removal of cement plaster from walls and raking out Pg 154 of Part III
o) MAT-01512 BMT-S.15
joint 200 mm deep (Building Work Items)

Pg 154 of Part III


207 High performance expansion joint filler board 20mm thick MAT-01514 BMT-U.02
(Building Work Items)
Expansion joint filler board for buildings, columns, beams Pg 154 of Part III
208 MAT-01517 BMT-U.05
and slabs 25 mm thick (Building Work Items)

Labour charges for making, fabricating cup-boards with Pg 155 of Part III
209 LAB-00418 BMM-V.07
shutters, box cup-boards, (Building Work Items)

Rounding the edges of Kadapa / Shahabad stone slab of Pg 156 of Part III
210 LAB-00503 BMM-V.09
any thickness including polishing the same (Building Work Items)
Common SoR 2019-20 - Page : 30

Half rounding the edges of Marble / Granite slabs of all Pg 156 of Part III
211 LAB-00504 BMM-V.10
thicknesses and polishing the same (Building Work Items)
Full rounding the edges of Marble / Granite slabs of all Pg 156 of Part III
212 LAB-00505 BMM-V.11
thicknesses and polishing the same (Building Work Items)

Machine cutting charges for Marble / Granite slabs up to Pg 156 of Part III
213 LAB-00506 BMM-V.12
50mm thickness by mechanical device (Building Work Items)

Pg 156 of Part III


214 Flat nosing Shahabad/Kadapa slabs of any thickness LAB-00507 BMM-V.13
(Building Work Items)

Labour charges for fabricating steel works like Window


Grills, Compound Wall Grills, Iron Doors, Windows including Pg 156 of Part III
215 LAB-00420 BMM-V.14
cost of welding rods, power charges, excluding cost of fixing (Building Work Items)
in position

Labour charges for fixing Iron Doors, Iron Windows and Pg 156 of Part III
216 LAB-00421 BMM-V.15
Window Grills in position (Building Work Items)
Trusses, Stanchions,Heavy Beams and Girders Pg 156 of Part III
217 Labour charges for fixingrods,
heavy iron grills, Trusses, LAB-00422 BMM-V.16
includingcost of welding power charges, etc excluding (Building Work Items)
Stanchions, Heavy Beams and Girders erecting in position Pg 156 of Part III
218 LAB-00423 BMM-V.17
and fixing by using chain pulley blocks, Derek pole (Building Work Items)
arrangements
Labour charges and
forcranes etc.,of
fabrication complete
stainlessinsteel
position
railing Pg 156 of Part III
219 LAB-00424 BMM-V.18
works charges for Fabrication of stainless steel sheet
Labour (Building Work Items)
cladding works using stainless steel welding rods including Pg 156 of Part III
220 LAB-00425 BMM-V.19
buffing, polishing, lacquer finishing, to present seamless (Building Work Items)
finish Pg 156 of Part III
221 Labour charges for glass designing work( Etching work) LAB-00426 BMM-V.20
(Building Work Items)
Labour charges for fixing flush door shutters to the existing Pg 157 of Part III
222 LAB-00429 BMM-V.23
door frame (Building Work Items)
Pg 157 of Part III
223 Labour charges for fixing glass LAB-00430 BMM-V.24
(Building Work Items)
Pg 160 of Part III
224 Powder coated Al. sections MAT-01575 BMS-W-01
(Building
Pg 161Work Items)
of Part III
225 Rubber beading MAT-01580 BMS-W-06
(Building Work Items)
Pg 161 of Part III
226 Chloropyriphos Lindane Emulsifiable concentrate of 20% MAT-01581 BMS-W-09
(Building Work Items)
Aluminium composite cladding 4mm thick with skin material Pg 161 of Part III
227 MAT-01585 BMS-W.13
thickness of 0.25mm (Building Work Items)
Aluminium composite cladding 4mm thick with skin material Pg 161 of Part III
228 MAT-01586 BMS-W.14
thickness of 0.50mm (Building Work Items)
Pg 162 of Part III
229 Cement Jally 50mm thick MAT-01589 BMS-W.17
(Building Work Items)
Common SoR 2019-20 - Page : 31

Pg 162 of Part III


230 24 gauge aluminium sheet MAT-01590 BMS-W.18
7.5mm thick Aluminium Grill (as approved by the (Building
Pg 162Work Items)
of Part III
231 MAT-01591 BMS-W.19
department) 3.58 Kg/Sqm (Building Work Items)
Pre-painted Galvalume Trapezoidal Profile Roofing sheets Pg 165 of Part III
232 MAT-01625 BMS-W.55
with 0.50mm thickness (Building Work Items)
Pg 166 of Part III
233 G.I scam bolts & nuts MAT-01632 BMS-W.62
(Building
Pg 166Work Items)
of Part III
234 G.I bolts & nuts MAT-01633 BMS-W.63
(Building Work Items)
Pg 166 of Part III
235 8mm dia GI 'j' bolts & nuts MAT-01634 BMS-W.64
(Building
Pg 166Work Items)
of Part III
236 GI washers MAT-01635 BMS-W.65
(Building Work Items)
Pg 166 of Part III
237 Limpet washers (for scam & ‘J’ bolts) MAT-01636 BMS-W.66
(Building
Pg 166Work Items)
of Part III
238 Bitumen washers MAT-01637 BMS-W.67
(Building Work Items)
Pg 166 of Part III
239 White cement MAT-01638 BMS-W.68
(Building
Pg 166Work Items)
of Part III
240 MS Z Hold fasts - 300 mm long of 40 x 40 x 5 mm ISA MAT-01639 BMT-W.69
(Building
Pg 166Work Items)
of Part III
241 Rubber/ Nylon door stop bushes MAT-01640 BMT-W.70
(Building Work Items)
Pg 168 of Part III
242 Power Saw cutter - Hand Operated - Hire Charges HIR-00206 BMC-X.02
(Building
Pg 168Work Items)
of Part III
243 Power Drill - Hand Operated - Hire Charges HIR-00207 BMC-X.03
(Building Work Items)

Material hire
244 Hire charges for Access Scaffolding Reference to SSR page S. No.
charges

A) Brick Masonry / Stone Maasonry


Pg 179 of Part III
a) 1st floor A 10.78
(Building
Pg 179Work Items)
of Part III
b) 2nd floor B 10.78
(Building Work Items)
Pg 179 of Part III
c) 3rd floor C 10.78
(Building
Pg 179Work Items)
of Part III
d) 4th floor D 10.78
(Building
Pg 179Work Items)
of Part III
e) 5th floor E 10.78
(Building Work Items)
Pg 179 of Part III
f) 6th floor F 10.78
(Building
Pg 179Work Items)
of Part III
g) 7th floor G 10.78
(Building
Pg 179Work Items)
of Part III
h) 8th floor H 10.78
(Building Work Items)

B) Plastering to walls
Pg 180 of Part III
a) 1st floor A 1.08
(Building
Pg 180Work Items)
of Part III
b) 2nd floor B 1.08
(Building Work Items)
Common SoR 2019-20 - Page : 32

Pg 180 of Part III


c) 3rd floor C 1.08
(Building
Pg 180Work Items)
of Part III
d) 4th floor D 1.08
(Building Work Items)
Pg 180 of Part III
e) 5th floor E 1.08
(Building
Pg 180Work Items)
of Part III
f) 6th floor F 1.08
(Building
Pg 180Work Items)
of Part III
g) 7th floor G 1.08
(Building Work Items)
Pg 180 of Part III
h) 8th floor H 1.08
(Building Work Items)

245 Hire charges for Stage Scaffolding

Ceiling Plastering
Pg 180 of Part III
a) 1st floor A 2.57
(Building
Pg 180Work Items)
of Part III
b) 2nd floor B 2.57
(Building Work Items)
Pg 180 of Part III
c) 3rd floor C 2.57
(Building
Pg 180Work Items)
of Part III
d) 4th floor D 2.57
(Building
Pg 180Work Items)
of Part III
e) 5th floor E 2.57
(Building Work Items)
Pg 180 of Part III
f) 6th floor F 2.57
(Building
Pg 180Work Items)
of Part III
g) 7th floor G 2.57
(Building Work Items)
Pg 180 of Part III
h) 8th floor H 2.57
(Building Work Items)

246 HIRE CHARGES FOR CENTERING&SCAFFOLDING-centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel c

Reference to SoR Material hire


S. No.
charges

a) Footings Pg 179 of Part III


A 301.00
(Building
Pg 179Work Items)
of Part III
b) Bed blocks, Steps B 67.00
(Building Work Items)
Pg 179 of Part III
c) Pedestals C 343.00
(Building Work Items)
Pg 179 of Part III
d) Plinth beams D 1453.00
(Building Work Items)

247 HIRE CHARGES FOR CENTERING & SCAFFOLDING -Unsupported height of 3.66M - for Steel scaffolding pipes, jack Props, Steel Centering Plate
Common SoR 2019-20 - Page : 33

Reference to SoR Material hire


S. No.
charges

a) Lintels Pg 181 of Part III


E 1233.00
(Building
Pg 181Work Items)
of Part III
b) Sunshades of any width F 243.00
(Building Work Items)
Pg 181 of Part III
c) Columns G 371.00
(Building
Pg 181Work Items)
of Part III
d) Beams H 2179.00
(Building Work Items)
Pg 181 of Part III
e) RCC roof slabs upto 150 mm depth I 247.00
(Building
Pg 181Work Items)
of Part III
f) RCC slabs upto 150-300 mm depth J 254.00
(Building Work Items)
Pg 181 of Part III
g) RCC vertical walls of plane surface like SHEAR WALLS, Q 472.00
RCC WALLS, WATER TANK WALLS (Building Work Items)

Note: - Centering & scaffolding charges for steel scaffolding with pipes, jack props, steel centring plates for unsupported heights of every 610 mm height a

may be allowed at 16.666% more than the basic material hire charges and relevant labour charges of the applicable floor and item

248 HIRE CHARGES FOR CENTERING & SCAFFOLDING -Unsupported height of 3.66M - Casurina Ballies , Bamboos , Wooden Reapers , Runners , W

Reference to SoR Material hire


S. No.
charges

a) Lintels Pg 182 of Part III


E 826.00
(Building
Pg 182Work Items)
of Part III
b) Sunshades of any width F 163.00
(Building Work Items)
Pg 182 of Part III
c) Columns G 249.00
(Building Work Items)
Pg 182 of Part III
d) Beams H 1458.00
(Building
Pg 182Work Items)
of Part III
e) RCC roof slabs upto 150 mm depth I 165.00
(Building Work Items)
Pg 182 of Part III
f) RCC slabs upto 150-300 mm depth J 170.00
(Building Work Items)

249 Pg 208 of Part III


PVC Clamps(110mm dia) (Building Work Items) MAT-01993 BMW-G.106

Common SoR
Common SoR 2019-20 - Page : 34

LABOUR CHARGES
SKILLED ( W R Work
250 Bar bender Items) LAB-00001 I-1
( W R Work
251 Blacksmith Items) LAB-00002 I-2
( W R Work
252 Blaster Items) LAB-00003 I-3
( W R Work
253 Carpenter Cl I Items) LAB-00004 I-4
( W R Work
254 Work Inspector(Non technical) Items) LAB-00010 I -10
Pg 6 of Part I
255 Mason / Brick layer Class I Pg (W
6 ofRPart
WorkI Items) LAB-00011 I -11
256 Operator concrete mixer Pg 6 of Part I Items)
(W R Work LAB-00016 I -16
257 Operator Jackhammer / Pneumatic tamper Pg (W
7 ofRPart
WorkI Items) LAB-00023 I - 23
258 Painter Cl-I Pg (W
7 ofRPart
WorkI Items) LAB-00035 I - 35
259 Plumber / Pipe fitter (W R Work Items) LAB-00035 I - 36

SEMI SKILLED Pg 7 of Part I


259 Sprayer(semi skilled) LAB-00057 II - 1
Pg 7 ofRPart
(W WorkI Items)
260 Carpenter Cl-II / Erector shuttering LAB-00060 II - 4
Pg (W
7 ofRPart
WorkI Items)
261 Fitter CL-II Pg 8 of Part I Items)
(W R Work LAB-00065 II - 9
261 Mason / Brick layer Class II Pg 8 of (W
PartRIWork Items) LAB-00091 II - 35
262 Painter Cl-II (W R Work Items) LAB-00093 II - 37

UN SKILLED Pg 8 & 9 of Part I LAB-00120,


263 Man Mazdoor / Woman Mazdoor (W R Work Items) LAB-00121 III - 3, 4

Cost of Materials : Pg 11 of Part I


264 Binding wire (WPg
R 11
Work Items) MAT-00003 3
Cement 43 Gr/53 Gr of Part I
265 Note: Rate as fixed by the Government (WPg
R 12
Work Items) MAT-00005 5
of Part I
266 Detonator electric (W R Work Items) MAT-00021 21
267 Pg 12 of Part I
Sand (un-screened for concrete items) (WPg
R 12
Work Items)
of Part I MAT-00027 27(a)
268 Sand (unscreened) for filling (W R Work Items) MAT-00028 27(b)
269 Pg 12 of Part I
Sand(screened for mortar, plastering items) (WPg
R 14
Work Items)
of Part I MAT-00029 28
270 Impervious Water proof compound (WPg
R 25
Work Items) MAT-00081 80
of Part I
271 Gravel / Quarry spall (W R Work Items) MAT-00177 M - 008
Common SoR 2019-20 - Page : 35

272 Coarse graded Granular sub-base Material 2.36 mm & Pg 26 of Part I


below (W R Work Items) MAT-00191 M - 022
273 Coarse graded Granular sub-base Material 9.5 mm to Pg 26 of Part I
4.75mm (WPg
R 27
Work Items)
of Part I MAT-00194 M - 025
274 Aggregates 6mm nominal size (HBG) (WPg
R 27
Work Items) MAT-00215 M - 050
of Part I
275 Aggregates 10mm nominal size (HBG) (WPg
R 27
Work Items) MAT-00216 M - 051
of Part I
276 Aggregates 13.20 / 12.50mm nominal size (HBG) (WPg
R 28
Work Items) MAT-00217 M - 052
of Part I
277 Aggregates 20mm nominal size (HBG) (WPg
R 28
Work Items) MAT-00218 M - 053
of Part I
278 Aggregates 40mm nominal size (HBG) (WPg
R 28
Work Items) MAT-00220 M - 055
of Part I
279 Bentonite (W R Work Items) MAT-00235 M - 071
280 Earth Cost or compensation for selected earth for Pg 30 of Part I
shoulders taken from Private Land (WPg
R 30
Work Items)
of Part I MAT-00252 M - 092
281 Gelatin 80% (WPg
R 35
Work Items) MAT-00264 M - 104
of Part I
282 Water charges(Urban) (WPg
R 35
Work Items) MAT-00332 M - 189(a)
of Part I
283 Water charges(Rural) (W R Work Items) MAT-00333 M - 189(b)
Pg 25 of Part II
284 Jute rope (Road & Bridge Works) MAT-00536 174

Common SoR
238 Reference to SoR Part CFMS Code
Machinery Charges and Page S. No/ Item Code
Pg 43 of Part I HIR-00001 &
a) Agitator car / Transit mixer 2 cum ( WR Work Items) HIR-00135& 1
Pg 43 of Part I HIR-00003
b) Air compressor 7 cmm ( diesel) ( WR Work Items) HIR-00137& 3
Pg 43 of Part I HIR-00009
c) Batching plant 0.50 cum (6 cum/hour) ( WR Work Items) HIR-00143& 9
Pg 43 of Part I HIR-00010
d) Batching plant 2x1.00 cum(15 cum/hour) ( WR Work Items) HIR-00144& 10
Pg 43 of Part I HIR-00011
e) Batching plant 2x1.50 cum(50 cum/hour) ( WR Work Items) HIR-00145& 11
Pg 43 of Part I HIR-00016
f) Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity ( WR Work Items) HIR-00150& 16
Pg 43 of Part I HIR-00018
g) Concrete mixer 600 / 400 ( diesel) / 0.28 cum ( WR Work Items) HIR-00152& 18
Pg 44 of Part I HIR-00039
h) Jack hammer ( WR Work Items)
Pg 44 of Part I HIR-00173&
HIR-00040 39
i) Needle vibrator 40mm( petrol) ( WR Work Items) HIR- 00174& 40
Pg 45 of Part I HIR-00052
j) Shovel 0.85 cum 110hp ( WR Work Items) HIR- 00186& 52
Pg 46 of Part I HIR-00066
k) Lift charges of materials(Winch 35HP- Electric) ( WR Work Items) HIR- 00200& 66
Pg 46 of Part I HIR-00071
l) Concrete placer pump (25 cum/hr)(Electric) ( WR Work Items) HIR- 00205 70
Common SoR 2019-20 - Page : 36

Roads & Bridge works Reference to SoR Part and CFMS Code S. No.
Pg 15 of Part II
Page
239 Rough Stone (OTG) (Road
Pg&15Bridge Works)
of Part II MAT-00405 1
240 Rough Stone (HBG) (Road & Bridge Works)
Pg 21 of Part II MAT-00302 12
241 Clearing heavy jungle (Road
Pg&21Bridge Works)
of Part II MAT-00479 109
242 Clearing light jungle (Road & Bridge Works)
Pg 21 of Part II MAT-00480 110
243 Clearing Scrub
including Jungle
up-rooting and removing of (Road & Bridge Works)
Pg 21 of Part II MAT-00481 111
244 Juliflora stumps. (Road & Bridge Works) MAT-00482 112
Pg 23 of Part II
245 Drilling 25mm dia. holes with pneumatic compressor (Road & Bridge Works) MAT-00512 143

Hire charges of plants & machinery


Pg 27 of Part II
246 Dozer (D50) (Road
Pg&27Bridge Works)
of Part II HIR-00072 2
247 Mortar grader (Road & Bridge Works)
Pg 27 of Part II HIR-00073 3
248 Hydraulic excavator (Road
Pg&27Bridge Works)
of Part II HIR-00052 4
249 Tipper 5.5 Cum (Road & Bridge Works)
Pg 27 of Part II HIR-00054 6
250 Vibratory roller 8T (Road
Pg&27Bridge Works)
of Part II HIR-00062 7
251 Water tanker 6 KL (Road & Bridge Works) HIR-00076 10

Pg 27 of Part II
252 Tractor for Pulling (Road
Pg&27Bridge Works)
of Part II HIR-00077 11
253 Tractor with Rotavator (Road & Bridge Works)
Pg 27 of Part II HIR-00078 12
254 Tractor with ripper attachment (Road
Pg&28Bridge Works)
of Part II HIR-00079 13
255 Light crane for lifting (3 tonnes) (Road & Bridge Works)
Pg 28 of Part II HIR-00100 35 ( c )
256 Kerb casting machine (Road & Bridge Works) HIR-00103 37

Public Health items


257 UPVC pipes for potable water 180mm dia 6 kgs/sqcm Pg 82 of Part IV
( Public Health Items) MAT-07656 Table 20

Seigniorage charges G.O.Ms.No.11 of Industries and Commerce (M.II) Dept. d


i) Coarse aggregate , stone
ii) Earth , Gravel
Common SoR 2019-20 - Page : 37

ii) Sand for mortar & filling


iv) Bricks
v) Colour Granite 16mm to 18mm thick
vi) Black Granite 16mm to 18mm thick
vii) Polished Shahabad / Tandur stone slabs 15 to 18mm thick

viii)
Polished black Kadapa slabs minimum of 15mm thick
ix) Marble 16mm to 20mm thick

Non SSR items


1
Glass strips in Granolithic concrete flooring
2
Stainless steel base Plate 25mm dia.(in SS railing)
3
Anchor bars in SS railing
4
Bondingcharges
Labour anchor including
bars in SScost
railing
of nails, making holes to wall
5 and in aluminium sheet for expansion joint
6
Cup board locks
7
Al. lock with handle
8
SS butterfly hinges
9
SS tower bolts 200mm long
10
SS flat latches 250mm long
11
SS aldrop 250mm long
Common SoR 2019-20 - Page : 38

Rate Unit

8164.00 1000 Nos.

33.00 1 No.

15.00 1 No.

8.00 1 No.

715.00 1 Cum

54.00 1 No.

75.00 1 No.

106.00 1 No.

116.00 1 No.

1900.00 10 Sqm

1750.00 10 Sqm

2800.00 1 Sqm

2500.00 1 Sqm
2100.00 1 Sqm
1070.00 1 Sqm

1100.00 1 Sqm
Common SoR 2019-20 - Page : 39

396.40 1 Sqm

390.00 1 Sqm

520.00 1 Sqm

425.00 1 Sqm
462.00 1 Sqm
625.00 1 Sqm
770.00 1 Sqm
960.00 1 Sqm

825.00 1 Sqm

330.00 1 Sqm
426.00 1 Sqm
597.00 1 Sqm
631.00 1 Sqm
515.00 1 Rm
255.00 1 Sqm

347.75 1 Sqm

350.00 1 Sqm

390.00 1 Sqm

550.00 1 Sqm
Common SoR 2019-20 - Page : 40

610.00 1 Sqm

85499.00 1 Cum
96183.50 1 Cum
106812.50 1 Cum
168193.00 1 Cum
140362.50 1 Cum
148824.00 1 Cum
161875.00 1 Cum
183377.50 1 Cum
184437.00 1 Cum
195416.00 1 Cum
209597.50 1 Cum
222533.50 1 Cum
51244.50 1 Cum
75819.00 1 Cum
53275.00 1 Cum
66549.00 1 Cum
237.50 1 Sqm
167.00 1 Sqm
177.50 1 Sqm
73.50 1 Kg

84.00 1 Kg
445.00 1 Kg

597.00 1 Sqm

22.00 1 Sqm
4314.00 1 Sqm
3746.00 1 Sqm

277.00 1 No.
Common SoR 2019-20 - Page : 41

368.00 1 No.
87.00 1 No.
114.00 1 No.
166.00 1 No.
29.00 1 No.
42.00 1 No.
60.00 1 No.
366.00 1 No.
144.00 1 No.
12.00 1 No.
22.00 1 No.
34.00 1 No.
43.00 1 No.
63.00 1 No.
72.00 1 No.
107.00 1 No.
122.00 1 No.
39.00 1 No.
52.00 1 No.
1263.00 1 No.
2413.00 1 No.
3521.00 1 No.
280.00 1 No.
331.00 1 No.
350.00 1 No.
106.00 1 No.
137.00 1 No.
165.00 1 No.
195.00 1 No.
49.00 1 No.
64.00 1 No.
340.00 1 No.
470.00 1 No.
Common SoR 2019-20 - Page : 42

843.00 1 No.
1070.00 1 No.
1673.00 1 No.
902.00 1 No.
2162.00 1 No.
107.00 1 No.
4123.00 1 No.

172.00 1 Sqm

522.00 1 Sqm

727.00 1 RM

213.00 1 Ltr
83.00 1 Ltr
634.00 1 Sqm
1375.00 1 Sqm
1800.00 1 Sqm
370.00 1 Sqm
465.00 1 Sqm
575.00 1 Sqm
750.00 1 Sqm

173.00 1 Kg
201.00 1 Kg
160.00 1 Ltr
220.00 1 Ltr
176.00 1 Ltr
133.00 1 Kg
143.00 1 Kg
121.00 1 Kg
171.00 1 Ltr
Common SoR 2019-20 - Page : 43

97.00 1 Ltr
61.00 1 Ltr
154.00 1 Ltr
259.00 1 Ltr
220.00 1 Ltr.
524.00 1 Ltr.
336.00 1 Ltr.
768.00 1 Ltr.
878.00 1 Ltr.
85.00 1 Kg

490.00 1 Ltr

54.00 1 Kg
201.00 1 Ltr
231.00 1 Ltr
1069.00 25 Kgs
281.00 1 Ltr
191.00 1 Ltr

606.00 20 Kgs

839.00 25 Kgs
1161.00 25 Kgs
523.00 1 Ltr

750.00 1 Sqm

864.00 1 Sqm

396.00 1 Sqm
415.00 1 Sqm

285.00 1 Sqm
281.00
Common SoR 2019-20 - Page : 44

233.00 1 Sqm
80.00 1 RM
110.00 1 RM
81.00 1 RM
72.00 1 RM
65.00 1 RM
59.00 1 RM
63.00 1 RM
38.00 1 RM
55.00 1 RM
50.00 1 RM
51.00 1 RM
34.00 1 RM
34.00 1 RM
11.00 1 No.
4.00 1 No.
4.00 1 No.
5.00 1 No.
4.00 1 No.
33.00 1 Kg.
6.24 1 RM
156.00 1 Ltr
4.16 1 No.
15.00 1 RM
10.00 1 RM
35.00 1 Sqm

3420.00 1 Sqm

360.00 1 Sqm

362.00 1 Sqm

399.00 1 Sqm
Common SoR 2019-20 - Page : 45

457.00 1 Sqm

525.00 1 Sqm

440.00 1 RM

2620.00 1 Sqm

415.00 1 Sqm

1410.00 1 Sqm
1530.00 1 Sqm

2348.00 1 Sqm

10530.00 1 Sqm

11000.00 1 Sqm

7010.00 1 Sqm

20900.00 1 Sqm

18700.00 1 Sqm

24200.00 1 Sqm

15250.00 1 Each
6150.00 1 Sqm
7600.00 1 Sqm

6687.00 1 Sqm
6166.00 1 Sqm
Common SoR 2019-20 - Page : 46

6166.00 1 Sqm

7477.00 1 Sqm

5115.00 1 Sqm

7907.00 1 Sqm

7191.00 1 Sqm
6486.00 1 Sqm

7377.00 1 Sqm

8253.00 1 Sqm

6698.00 1 Sqm

9000.00 1 Sqm

6960.00 1 Sqm

7266.00 1 Sqm

6456.00 1 Sqm

7507.00 1 Sqm

5998.00 1 Sqm
Common SoR 2019-20 - Page : 47

6229.00 1 Sqm
6229.00 1 Sqm
4872.00 1 Sqm
4872.00 1 Sqm

547.00 1 Cum
231.00 10 Sqm
200.00 10 Sqm
167.00 10 Sqm
200.00 10 Sqm
289.00 1 Cum
66.00 10 Sqm
82.00 10 Sqm
99.00 1 Cum
72.00 1 Cum
92.00 10 Sqm
60.00 10 Sqm
19.00 10 Sqm

60.00 10 Sqm

74.00 10 Sqm

906.00 1 Sqm

396.00 1 Sqm

732.00 1 Sqm

127.00 1 RM
Common SoR 2019-20 - Page : 48

385.00 1 RM

499.00 1 RM

21.00 1 RM

61.00 1 RM

33.00 1 Kg

6.00 1 Kg

29.00 1 Kg

25.00 1 Kg

159.00 1 Kg

2125.00 1 Sqm

1156.00 1 Sqm

463.00 1 Sqm

346.00 1 Sqm

337.00 1 Kg
2.00 1 RM

239.00 1 Ltr

2626.00 1 Sqm

2946.00 1 Sqm

388.00 1 Sqm
Common SoR 2019-20 - Page : 49

282.00 1 Sqm
1035.00 1 Sqm

407.00 1 Sqm

6.00 1 No.
6.00
11.00 1 No.
2.00 1 No.
2.00 1 No.
2.00 1 No.
31.00 1 Kg
39.00 1 No.
11.00 1 No.

132.00 1 hour
121.00 1 hour

Labour charges Unit

84.62 1 Sqm
121.18 1 Sqm
157.72 1 Sqm
194.27 1 Sqm
230.81 1 Sqm
267.35 1 Sqm
303.88 1 Sqm
340.43 1 Sqm

8.47 1 Sqm
12.12 1 Sqm
Common SoR 2019-20 - Page : 50

15.77 1 Sqm
19.43 1 Sqm
23.08 1 Sqm
26.73 1 Sqm
30.38 1 Sqm
34.05 1 Sqm

16.94 1 Sqm
24.04 1 Sqm
31.13 1 Sqm
38.23 1 Sqm
45.33 1 Sqm
52.42 1 Sqm
59.52 1 Sqm
66.62 1 Sqm

lers , Foot plates , brackets , steel centering plates etc.,

Labour charges Unit


1st 2nd 4th 5th 6th 7th 8th
3rd Floor
Floor Floor Floor Floor Floor Floor Floor
672.00 1 Cum
363.00 399.30 435.60 471.90 508.20 544.50 580.80 617.10 1 Cum
1069.00 1 Cum
1620.00 1 Cum

es, jack Props, Steel Centering Plates,etc.,


Common SoR 2019-20 - Page : 51

Labour charges Unit


1st 2nd 4th 5th 6th 7th 8th
3rd Floor
Floor Floor Floor Floor Floor Floor Floor
1720.00 1892.00 2064.00 2236.00 2408.00 2580.00 2752.00 2924.00 1 Cum
264.00 290.00 317.00 343.00 370.00 396.00 422.00 449.00 1 Sqm
2415.00 2657.00 2898.00 3140.00 3381.00 3623.00 3864.00 4106.00 1 Cum
2027.00 2230.00 2432.00 2635.00 2838.00 3041.00 3243.00 3446.00 1 Cum
241.00 265.00 289.00 313.00 337.00 362.00 386.00 410.00 1 Sqm
248.00 273.00 298.00 322.00 347.00 372.00 397.00 422.00 1 Sqm
510.00 561.00 612.00 663.00 714.00 765.00 816.00 867.00 1 Sqm

rted heights of every 610 mm height above 3.66 M,

e floor and item

oos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc.,

Labour charges Unit


1st 2nd 4th 5th 6th 7th 8th
3rd Floor
Floor Floor Floor Floor Floor Floor Floor
1332.00 1465.00 1598.00 1732.00 1865.00 1998.00 2131.00 2264.00 1 Cum
204.00 224.00 245.00 265.00 286.00 306.00 326.00 347.00 1 Sqm
1871.00 2058.00 2245.00 2432.00 2619.00 2807.00 2994.00 3181.00 1 Cum
1569.00 1726.00 1883.00 2040.00 2197.00 2354.00 2510.00 2667.00 1 Cum
186.00 205.00 223.00 242.00 260.00 279.00 298.00 316.00 1 Sqm
193.00 212.00 232.00 251.00 270.00 290.00 309.00 328.00 1 Sqm

17.00 1 Each
Common SoR 2019-20 - Page : 52

800.00 1 Each
630.00 1 Each
735.00 1 Each
750.00 1 Each
730.00 1 Each
670.00 1 Each
655.00 1 Each
655.00 1 Each
750.00 1 Each
750.00 1 Each

605.00 1 Each
605.00 1 Each
605.00 1 Each
605.00 1 Each
605.00 1 Each

560.00 1 Each

70.00 1 Kg
4220.00 1 tonne
12.00 1 No.

605.00 1 Cum
460.00 1 Cum

721.00 1 Cum
90.00 1 Kg
155.00 1 Cum
Common SoR 2019-20 - Page : 53

567.00 1 Cum

678.00 1 Cum
896.00 1 Cum
1109.00 1 Cum
1306.00 1 Cum
1622.00 1 Cum
1000.00 1 Cum
9.00 1 Kg

135.00 1 Cum
68.00 1 Kg
131.00 1 KL
99.00 1 KL
8.35 1 RM

Hire & Fuel CFMS Crew


Total
charges number charges

2266.70 1 Hour LAB-00317 418.10 2684.80


1459.30 1 Hour LAB-00319 314.50 1773.80
238.60 1 Hour LAB-00325 505.30 743.90
775.80 1 Hour LAB-00326 505.30 1281.10
1070.30 1 Hour LAB-00327 505.30 1575.60
190.60 1 Hour LAB-00329 327.60 518.20
365.10 1 Hour LAB-00331 327.60 692.70
19.10 1 Hour LAB-00351 491.40 510.50
38.60 1 Hour LAB-00352 235.80 274.40
3213.10 1 Hour LAB-00362 348.40 3561.50
348.30 1 Hour LAB-00372 393.10 741.40
1458.30 1 Hour LAB-00375 245.70 1704.00
Common SoR 2019-20 - Page : 54

Rate Unit (per)


171.45 1 Cum
309.00 1 Cum
3.20 1 Sqm
2.80 1 Sqm
2.80 1 Sqm
4.40 1 Sqm

167.00 1 RM

1907.00 1 Hour
3796.00 1 Hour
3561.50 1 Hour
1242.70 1 Hour
3499.60 1 Hour
822.00 1 Hour

531.00 1 Hour
543.00 1 Hour
543.00 1 Hour
511.00 1 Hour
611.00 1 hour

765.00 1 RM

ries and Commerce (M.II) Dept. dt.11.02.2020


90.00 1 Cum
45.00 1 Cum
Common SoR 2019-20 - Page : 55

100.00 1 Cum
80.00 1000 Nos.
45.90 1 Sqm
58.65 1 Sqm

10.00 1 Sqm

6.00 1 Sqm
5.40 1 Sqm

10.00 1 Sqm

30.00 1 No.

30.00 1 No.

15.00 1 No.
25.00 1 No.

100.00 1 No.

75.00 1 No.

150.00 1 No.

200.00 1 No.

300.00 1 No.

400.00 1 No.
Lead in Gravel &SoRCoarse
2023-24Packed
(CONVEYANCE
materials/ CHARGES)
Blocks/ charges for 1000 Nos of
KM Sand aggregate tonne Wood/cu.m 1000 litres Bricks
1 2 3 4 5 6 7
1 37.30 35.90 22.40 52.80 22.60 59.80
2 52.20 50.20 31.40 73.90 31.70 83.70
3 69.60 67.00 41.90 98.50 42.30 111.60
4 84.50 81.30 50.80 119.60 51.30 135.60
5 99.40 95.70 59.80 140.70 60.40 159.50
6 114.30 110.10 68.80 161.80 69.50 183.40
7 129.20 124.50 77.80 182.90 78.60 207.30
8 144.10 138.90 86.80 204.00 87.70 231.20
9 159.00 153.30 95.80 225.10 96.80 255.10
10 173.90 167.70 104.80 246.20 105.90 279.00
11 188.80 182.10 113.80 267.30 115.00 302.90
12 203.70 196.50 122.80 288.40 124.10 326.80
13 218.60 210.90 131.80 309.50 133.20 350.70
14 233.50 225.30 140.80 330.60 142.30 374.60
15 248.40 239.70 149.80 351.70 151.40 398.50
16 263.30 254.10 158.80 372.80 160.50 422.40
17 278.20 268.50 167.80 393.90 169.60 446.30
18 293.10 282.90 176.80 415.00 178.70 470.20
19 308.00 297.30 185.80 436.10 187.80 494.10
20 322.90 311.70 194.80 457.20 196.90 518.00
21 337.80 326.10 203.80 478.30 206.00 541.90
22 352.70 340.50 212.80 499.40 215.10 565.80
23 367.60 354.90 221.80 520.50 224.20 589.70
24 382.50 369.30 230.80 541.60 233.30 613.60
25 397.40 383.70 239.80 562.70 242.40 637.50
26 412.30 398.10 248.80 583.80 251.50 661.40
27 427.20 412.50 257.80 604.90 260.60 685.30
28 442.10 426.90 266.80 626.00 269.70 709.20
29 457.00 441.30 275.80 647.10 278.80 733.10
30 471.90 456.20 284.80 668.20 287.90 757.00
31 484.30 468.20 292.30 685.80 295.40 776.90
32 496.70 480.20 299.80 703.40 302.90 796.80
33 509.10 492.20 307.30 721.00 310.40 816.70
34 521.50 504.20 314.80 738.60 317.90 836.60
35 533.90 516.20 322.30 756.20 325.40 856.50
36 546.30 528.20 329.80 773.80 332.90 876.40
37 558.70 540.20 337.30 791.40 340.40 896.30
38 571.10 552.20 344.80 809.00 347.90 916.20
39 583.50 564.20 352.30 826.60 355.40 936.10
40 595.90 576.20 359.80 844.20 362.90 956.00
41 608.30 588.20 367.30 861.80 370.40 975.90
42 620.70 600.20 374.80 879.40 377.90 995.80
43 633.10 612.20 382.30 897.00 385.40 1015.70
44 645.50 624.20 389.80 914.60 392.90 1035.60
45 657.90 636.20 397.30 932.20 400.40 1055.50
46 670.30 648.20 404.80 949.80 407.90 1075.40
47 682.70 660.20 412.30 967.40 415.40 1095.30
48 695.10 672.20 419.80 985.00 422.90 1115.20
49 707.50 684.20 427.30 1002.60 430.40 1135.10
50 719.90 696.20 434.80 1020.20 437.90 1155.00
51 732.30 708.20 442.30 1037.80 445.40 1174.90
52 744.70 720.20 449.80 1055.40 452.90 1194.80
53 757.10 732.20 457.30 1073.00 460.40 1214.70
54 769.50 744.20 464.80 1090.60 467.90 1234.60
55 781.90 756.20 472.30 1108.20 475.40 1254.50
56 794.30 768.20 479.80 1125.80 482.90 1274.40
57 806.70 780.20 487.30 1143.40 490.40 1294.30
58 819.10 792.20 494.80 1161.00 497.90 1314.20
59 831.50 804.20 502.30 1178.60 505.40 1334.10
60 843.90 816.20 509.80 1196.20 512.90 1354.00
61 856.30 828.20 517.30 1213.80 520.40 1373.90
62 868.70 840.20 524.80 1231.40 527.90 1393.80
63 881.10 852.20 532.30 1249.00 535.40 1413.70
64 893.50 864.20 539.80 1266.60 542.90 1433.60
65 905.90 876.20 547.30 1284.20 550.40 1453.50
66 918.30 888.20 554.80 1301.80 557.90 1473.40
67 930.70 900.20 562.30 1319.40 565.40 1493.30
68 943.10 912.20 569.80 1337.00 572.90 1513.20
69 955.50 924.20 577.30 1354.60 580.40 1533.10
70 967.90 936.20 584.80 1372.20 587.90 1553.00
71 980.30 948.20 592.30 1389.80 595.40 1572.90
72 992.70 960.20 599.80 1407.40 602.90 1592.80
73 1005.10 972.20 607.30 1425.00 610.40 1612.70
74 1017.50 984.20 614.80 1442.60 617.90 1632.60
75 1029.90 996.20 622.30 1460.20 625.40 1652.50
76 1042.30 1008.20 629.80 1477.80 632.90 1672.40
77 1054.70 1020.20 637.30 1495.40 640.40 1692.30
78 1067.10 1032.20 644.80 1513.00 647.90 1712.20
79 1079.50 1044.20 652.30 1530.60 655.40 1732.10
80 1091.90 1056.20 659.80 1548.20 662.90 1752.00
81 1104.30 1068.20 667.30 1565.80 670.40 1771.90
82 1116.70 1080.20 674.80 1583.40 677.90 1791.80
83 1129.10 1092.20 682.30 1601.00 685.40 1811.70
84 1141.50 1104.20 689.80 1618.60 692.90 1831.60
85 1153.90 1116.20 697.30 1636.20 700.40 1851.50
86 1166.30 1128.20 704.80 1653.80 707.90 1871.40
87 1178.70 1140.20 712.30 1671.40 715.40 1891.30
88 1191.10 1152.20 719.80 1689.00 722.90 1911.20
89 1203.50 1164.20 727.30 1706.60 730.40 1931.10
90 1215.90 1176.20 734.80 1724.20 737.90 1951.00
91 1228.30 1188.20 742.30 1741.80 745.40 1970.90
92 1240.70 1200.20 749.80 1759.40 752.90 1990.80
93 1253.10 1212.20 757.30 1777.00 760.40 2010.70
94 1265.50 1224.20 764.80 1794.60 767.90 2030.60
95 1277.90 1236.20 772.30 1812.20 775.40 2050.50
96 1290.30 1248.20 779.80 1829.80 782.90 2070.40
97 1302.70 1260.20 787.30 1847.40 790.40 2090.30
98 1315.10 1272.20 794.80 1865.00 797.90 2110.20
99 1327.50 1284.20 802.30 1882.60 805.40 2130.10
100 1339.90 1296.20 809.80 1900.20 812.90 2150.00