Chronology:
- Goods already received at Jun 8 2024 , and after recheck have shortage for some item Below :
1. J18A1131000 (GD18F16T-070) - Brake Shoe QTY PO 49 Pcs, actual received qty 0 pcs (have shortage 49 Pcs)
2.J20710001 (GD12F11-21203)- Circlip Qty PO 60 Pcs, Actual Received Qty 55 Pcs ( Have Shortage 5 Pcs)
3. J20810008 (GD12F11-21003) - Thrust Qty PO 74 Pcs, Actual Received Qty 73Pcs ( Have Shortage 1 Pcs)
4. J10400002 (GB3452.1-40×2.5) - O-Seal 40X2.5 Qty PO 128, Actual Received 125 Pcs ( Have Shortage 3 Pcs)
5. J20810006 (GD12F11-21201J) - Big-Dust Wrapper Qty PO 140 Pcs, Actual received Qty 137 pcs ( Have Shortage qty 3 Pcs)
6. J11007101 (GB91-10×71) - Split Joint Qty PO 1000 Pcs, Actual received Qty 996 pcs ( Have Shortage qty 4 Pcs)
7. J11201201 (GB79-M12×12) -Inner Hex B M12X12 Qty PO 99 Pcs, Actual received Qty 1 pcs ( Have Shortage qty 1 Pcs)
Claims filed:
1. Zhejiang must revise Packing list and invoice based on actual goods we are received
2. after that mitsura will release the balance payment based on revise invoice from Zhejiang
Andika putra
ZHEJIANG ISUAO ENVIROTECH CO LTD PT Mitra Sukses Raharja