0% found this document useful (0 votes)
16 views

FAA 2016 0459 0005 - Attachment - 4

report

Uploaded by

buyut
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views

FAA 2016 0459 0005 - Attachment - 4

report

Uploaded by

buyut
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 49

@A340-500/600

SERVICE BULLETIN
REVISION TRANSMITTAL SHEET

AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
Tel : (33) 5 61 93 33 33
Telex : AIRBU 530526F
Fax : (33) 5 61 93 42 51

MANDATORY MANDATORY MANDATORY


ATA SYSTEM: 32

TITLE: LANDING GEAR - MAIN GEAR - INSPECTION OF SIDE STAY UPPER


CARDAN PIN AND NUT
MODIFICATION No.: None

This page transmits Revision No.01 of Service Bulletin No.A340-32-5115

ADDITIONAL WORK

**CONF ALL

No additional work is required by this revision for aircraft modified by any previous issue.

REASON

Revision No. 01 issued to:

- update the Reason paragraph

- update the Compliance.

CHANGES

SUMMARY
REASON/DESCRIPTION/OPERATIONAL REASON UPDATED R
CONSEQUENCES
MATERIAL PRICE INFORMATION MATERIAL PRICE INFORMATION TABLE R
UPDATED
MATERIAL PRICE INFORMATION TABLE R
UPDATED
EFFECTIVITY OPERATOR LIST UPDATED R
REFERENCES / REPERCUSSIONS REFERENCES/REPERCUSSIONS TABLE R
UPDATED
PLANNING INFORMATION
EFFECTIVITY EFFECTIVITY RELATED INFORMATION R
UPDATED
Configuration definition

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 1

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET

CONF 001 CONFIGURATION DEFINITION UPDATED R


CONFIGURATION DESCRIPTION UPDATED
CONF 002 CONFIGURATION DEFINITION UPDATED R
CONFIGURATION DESCRIPTION UPDATED
Material Effectivity MATERIAL EFFECTIVITY ADDED N
MATERIAL EFFECTIVITY ADDED N
MATERIAL EFFECTIVITY DELETED FOR D
APPLICABLE MSN
MATERIAL EFFECTIVITY DELETED FOR D
APPLICABLE MSN
REASON
History HISTORY UPDATED R
Objective/Action OBJECTIVE/ACTION UPDATED R
Advantages ADVANTAGES UPDATED R
Operational/Maintenance OPERATIONAL/MAINTENANCE CONSEQUENCES R
Consequences UPDATED
COMPLIANCE
Accomplishment Timescale ACCOMPLISHMENT TIMESCALE UPDATED R
REFERENCES REFERENCED DOCUMENTATION UPDATED R
REFERENCED DOCUMENTATION UPDATED R
MATERIAL INFORMATION
MATERIAL - PRICE AND AVAILABILITY MATERIAL - PRICE AND AVAILABILITY UPDATED R
Procurement Addresses PROCUREMENT ADDRESSES PARAGRAPH D
DELETED
Price and Availability PRICE AND AVAILABILITY PARAGRAPH D
DELETED
LIST OF MATERIALS - OPERATOR
SUPPLIED
Consumable Materials
Consumable CMLB01 CONSUMABLE MATERIAL SET UPDATED R
QUANTITY UPDATED
CONSUMABLE UPDATED
Equipment EQUIPMENT UPDATED R
Equipement BFEB01 PART MATERIAL SET DELETED D
Equipement BFEB02 PART MATERIAL SET DELETED D
ACCOMPLISHMENT INSTRUCTIONS
TASK 325115- 832-895-001-Inspection TASK SOLUTION UPDATED R
NOTE UPDATED
Subtask 325115-832-401-002 SUBTASK SOLUTION UPDATED R
REFERENCED DOCUMENTATION UPDATED
QUANTITY UPDATED
CONFIGURATION UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
FIGURE REFERENCE UPDATED
PART NUMBER DESCRIPTION UPDATED
REFERENCES UPDATED

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 2

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET

Subtask 325115-832-402-001 SUBTASK SOLUTION UPDATED R


REFERENCED DOCUMENTATION UPDATED
QUANTITY UPDATED
CONFIGURATION UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
FIGURE REFERENCE UPDATED
PART NUMBER DESCRIPTION UPDATED
REFERENCES UPDATED
Subtask 325115-833-401-002 SUBTASK SOLUTION UPDATED R
QUANTITY UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
KEYWORD UPDATED
CONSUMABLE UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
PART NUMBER DESCRIPTION UPDATED
FIN UPDATED
NOTE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
Subtask 325115-833-402-001 SUBTASK SOLUTION UPDATED R
QUANTITY UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
KEYWORD UPDATED
CONSUMABLE UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
PART NUMBER DESCRIPTION UPDATED
FIN UPDATED
NOTE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
Subtask 325115-410-401-002 SUBTASK SOLUTION UPDATED R
QUANTITY UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
KEYWORD UPDATED
CONSUMABLE UPDATED
REFERENCED DOCUMENTATION UPDATED
PART NUMBER DESCRIPTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 3

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET

Subtask 325115-410-402-001 SUBTASK SOLUTION UPDATED R


QUANTITY UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
KEYWORD UPDATED
CONSUMABLE UPDATED
REFERENCED DOCUMENTATION UPDATED
PART NUMBER DESCRIPTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
Subtask 325115-832-401-004 SUBTASK SOLUTION ADDED N
Subtask 325115-832-402-003 SUBTASK SOLUTION ADDED N
Subtask 325115-833-401-004 SUBTASK SOLUTION ADDED N
Subtask 325115-833-402-003 SUBTASK SOLUTION ADDED N
Subtask 325115-410-401-004 SUBTASK SOLUTION ADDED N
Subtask 325115-410-402-003 SUBTASK SOLUTION ADDED N
Subtask 325115-832-401-003 SUBTASK SOLUTION DELETED FOR D
APPLICABLE MSN
Subtask 325115-832-402-002 SUBTASK SOLUTION DELETED FOR D
APPLICABLE MSN
Subtask 325115-833-401-003 SUBTASK SOLUTION DELETED FOR D
APPLICABLE MSN
Subtask 325115-833-402-002 SUBTASK SOLUTION DELETED FOR D
APPLICABLE MSN
Subtask 325115-410-401-003 SUBTASK SOLUTION DELETED FOR D
APPLICABLE MSN
Subtask 325115-410-402-002 SUBTASK SOLUTION DELETED FOR D
APPLICABLE MSN
Subtask 325115-700-401-001 SUBTASK SOLUTION UPDATED R
LOCATION UPDATED
Subtask 325115-700-401-001 SUBTASK SOLUTION UPDATED R
LOCATION UPDATED
Fig. A-UBAAA FIGURE SOLUTION UPDATED R
CONFIGURATION UPDATED
Fig. A-UBAAA Sheet 01 SHEET UPDATED R
Fig. A-UBAAA Sheet 02 SHEET UPDATED R
Fig. A-UBAAA Sheet 03 SHEET DELETED D
Fig. A-UBAAB FIGURE SOLUTION DELETED FOR APPLICABLE D
MSN
Fig. A-UBBAA
Fig. A-UBBAA Sheet 01 SHEET UPDATED R

FILLING INSTRUCTIONS

This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 4

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET

Put this Revision Transmittal Sheet in front of the Service Bulletin.

HISTORY OF PREVIOUS REVISIONS

No previous revision

REVISION SEQUENCE

ORIGINAL: Feb 17/15

REVISION No. : 01 - Dec 11/15

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 5

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET

This Page Intentionally Left Blank

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 6

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
SUMMARY

AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
Tel : (33) 5 61 93 33 33
Telex : AIRBU 530526F
Fax : (33) 5 61 93 42 51

This summary is for information only and is not approved for modification of the aircraft.

MANDATORY MANDATORY MANDATORY


ATA SYSTEM: 32

TITLE: LANDING GEAR - MAIN GEAR - INSPECTION OF SIDE STAY UPPER


CARDAN PIN AND NUT
**CONF ALL

MODIFICATIONS

None

REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES

Inspection of an A330 aircraft fitted with Basic Main Landing Gear (MLG) has shown that the MLG Side
Stay Upper Cardan Pin (UCP) can migrate from its original position and that the UCP nut and retainer
can become detached. The reported MLG sidestay UCP migration event had been caused by corrosion,
due to lack of jointing compound and inadequate sealant application during MLG installation. Therefore,
this issue affects any MLG that has had a UCP replacement or re-installation, since Entry Into Service
(EIS), irrespective of MLG overhaul.

The loss of the side stay UCP locking function can lead to a complete migration of the UCP and
disconnection of the MLG side stay upper arm from the aircraft structure.

An inspection is considered necessary to capture any corrosion that may be present on the UCP and
associated nut threads. Corrosion may contribute to migration of the UCP. The aim of this inspection
Service Bulletin is to request operators to:

- do a Detailed Inspection (DET) of the Side Stay Upper Cardan Pin Locking Assembly

- check for corrosion, pitting and/or damage to the threads on the UCP and UCP Nut

- if corrosion, pitting and/or damage is found on the UCP or UCP Nut, the damaged parts are to be
replaced before further flight.

Accomplishment of this Inspection Service Bulletin (ISB) will help in the early detection of corrosion
and/or damage to the UCP and nut retainer assembly. This minimizes the possibility of a potential
unsafe condition arising from the disconnection of the upper side stay arm from the aircraft structure.

In addition, to prevent any improper re-installation of an Upper Cardan Pin on a MLG, Airbus amended
the applicable Aircraft Maintenance Manual (AMM) on OCT 01/14.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 1

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
SUMMARY

GENERAL EVALUATION

EVALUATION TABLE
COMPLIANCE MANDATORY (1) CANCELS INSPECTION SB NO
POTENTIAL AD YES A/C OPERATION AFFECTED NO
RELIABILITY AFFECTED NO PAX COMFORT AFFECTED NO
COST SAVING NO LROPS AFFECTED NO
STRUCTURAL LIFE EXTN NO VENDOR SB INVOLVED NO
AIRCRAFT JACKING YES

NOTE (1): Service Bulletin must be accomplished.

MATERIAL PRICE INFORMATION

**CONF 001

No Material

**CONF 002

No Material

EFFECTIVITY

**CONF ALL

This Service Bulletin is applicable to this (these) operator(s) :

06U 15T 16R 31V 32P 70U 72W 81Q AHY AIB BOE DLH ETD
HFY I2L IBE IRM QAF QTR SAA TAM THA UAE VIR

CONCURRENT REQUIREMENTS

None

REFERENCES / REPERCUSSIONS

TFU None
OEB None
AOT None
SIL None
ISI None
LINE MAINTENANCE AFFECTED No
LIFE LIMIT None
OTHER None

NATURE OF THE WORK

AIRCRAFT YES
EQUIPMENT YES
HARD NO
SOFT NO

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 2

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
SUMMARY

OBRM NO

MANPOWER

**CONF 001

Task 325115-832-895-001: Inspection


TOTAL MANHOURS 23.00
ELAPSED TIME (HOURS) 13.00

**CONF 002

Task 325115-832-895-001: Inspection


TOTAL MANHOURS 23.00
ELAPSED TIME (HOURS) 13.00

APPENDICES

**CONF ALL

Appendix 01 - Elapsed Time Assumption

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 3

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
SUMMARY

**CONF ALL

LH SHOWN
RH SIMILAR

SIDE STAY
UPPER CARDAN PIN
SIDE STAY LOCKING ASSEMBLY
5012GM
(5013GM)

NOTE: A
AREA OF INSPECTION
F_SB_325115_7_SAAA_01_01

Figure A-USAAA - Sheet 01

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 4

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
Tel : (33) 5 61 93 33 33
Telex : AIRBU 530526F
Fax : (33) 5 61 93 42 51

MANDATORY MANDATORY MANDATORY


ATA SYSTEM: 32

TITLE: LANDING GEAR - MAIN GEAR - INSPECTION OF SIDE STAY UPPER


CARDAN PIN AND NUT
MODIFICATION No.: None

This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.

1. PLANNING INFORMATION

**CONF ALL

A. EFFECTIVITY

(1) Models

340-541 340-542 340-642

(2) Effectivity by MSN

0371 0376 0383 0391 0410 0416-0417 0426 0431 0436 0440 0445 0449 0453 0457
0460 0464 0468 0471 0475 0478 0482 0485 0488 0492 0495 0499 0514 0517 0520
0523 0531 0534 0537 0540 0543 0547 0557 0560 0563 0566 0569 0572 0575 0577
0580 0583 0586 0601 0604 0606 0608 0611 0615 0617 0619 0622 0624 0626 0628
0630 0639 0672 0677 0681 0685 0689 0694 0698 0702 0706 0710 0715 0719 0723
0727 0736 0740 0744 0748 0753 0757 0761-0768 0771 0775 0779 0783 0787 0790
0794 0798 0804 0812 0829 0837 0846 0848 0870 0886 0894 0897 0902 0910 0912
0917 0924 0929 0933 0953 0960 0972 0981 0987 0993 1005 1017 1030 1040 1079
1091 1102 1122

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 1

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(3) Effectivity by Operator

The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.

OPERATOR MSN
06U 1091 1102
15T 0924
16R 0622
31V 0436
32P 0560
70U 0902
72W 0917
81Q 0563
AHY 0779 0886 0894
AIB 0478 0492 0499
BOE 0468 0488 0514 0577 0586
DLH 0482 0517 0523 0537 0540 0543 0566 0569 0580 0583 0762 0763
0767 0771 0790 0794 0812 0846 0848 0897 0972 0981 0987 1005
ETD 0748 0757 0761 0783 0829 0837 0870 0929 0933 1030 1040
HFY 0910 0912
I2L 0453 0475
IBE 0431 0440 0460 0601 0604 0606 0617 0619 0672 0702 0727 0744
0960 0993 1017 1079 1122
IRM 0371 0376 0383 0391 0416 0449 0615
QAF 0495
QTR 0715 0740 0766 0798
SAA 0410 0417 0426 0531 0534 0547 0557 0626 0630
TAM 0445 0464
THA 0624 0628 0677 0681 0689 0698 0710 0719 0775 0953
UAE 0457 0471 0485 0520 0572 0608 0611 0685 0694
VIR 0575 0639 0706 0723 0736 0753 0764 0765 0768 0787 0804

(4) Configuration by MSN

MSN CONFIGURATION
0371 0376 0391 0410 0417 0426 0431 0436 0440 0445 0453 001 002
0457 0460 0464 0468 0471 0475 0478 0485 0488 0492 0495
0499 0514 0520 0531 0534 0547 0557 0560 0563 0572 0575
0577 0586 0601 0604 0606 0608 0611 0615 0617 0619 0622
0624 0626 0628 0630 0639 0672 0677 0681 0685 0689 0694
0698 0702 0706 0710 0715 0719 0723 0727 0736 0740 0744
0748 0753 0757 0761 0762 0763 0764 0765 0766 0767 0768
0771 0775 0779 0783 0787 0790 0794 0798 0804 0812 0829
0837 0846 0848 0870 0886 0894 0897 0902 0910 0912 0917
0924 0929 0933 0953 0972 0981

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 2

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

MSN CONFIGURATION
0383 0416 0449 0482 0517 0523 0537 0540 0543 0566 0569 002
0580 0583 0960 0987 0993 1005 1017 1030 1040 1079 1091
1102 1122

(5) Configuration definition

**CONF 001
Config. 001 is valid for aircraft that have not accomplished Service Bulletin No.
A340-32-5102 and not embodied Modification No. 56849H16167.

NOTE: Aircraft that have accomplished Service Bulletin No. A340-32-5102


should be considered as Config 002.

**CONF 002
Config 002 is valid for aircraft that have accomplished Service Bulleting No.
A340/500-32-5102 or embodied Modification No. 56849H16167.

(6) Material Effectivity

**CONF 001

MATERIAL QTY PER A/C SEE NOTES


Consumable CMLB01 1

**CONF 002

MATERIAL QTY PER A/C SEE NOTES


Consumable CMLB01 1

**CONF ALL

B. CONCURRENT REQUIREMENTS

None

C. REASON

(1) History

Inspection of an A330 aircraft fitted with Basic Main Landing Gear (MLG) has shown that
the MLG Side Stay Upper Cardan Pin (UCP) can migrate from its original position and
that the UCP nut and retainer can become detached. The reported MLG sidestay UCP
migration event had been caused by corrosion, due to lack of jointing compound and
inadequate sealant application during MLG installation. Therefore, this issue affects any
MLG that has had a UCP replacement or re-installation, since Entry Into Service (EIS),
irrespective of MLG overhaul.

The loss of the side stay UCP locking function can lead to a complete migration of the
UCP and disconnection of the MLG side stay upper arm from the aircraft structure.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 3

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(2) Objective/Action

An inspection is considered necessary to capture any corrosion that may be present on


the UCP and associated nut threads. Corrosion may contribute to migration of the UCP.
The aim of this inspection Service Bulletin is to request operators to:

- do a Detailed Inspection (DET) of the Side Stay Upper Cardan Pin Locking
Assembly

- check for corrosion, pitting and/or damage to the threads on the UCP and UCP Nut

- if corrosion, pitting and/or damage is found on the UCP or UCP Nut, the damaged
parts are to be replaced before further flight.

(3) Advantages

Accomplishment of this Inspection Service Bulletin (ISB) will help in the early detection
of corrosion and/or damage to the UCP and nut retainer assembly. This minimizes the
possibility of a potential unsafe condition arising from the disconnection of the upper side
stay arm from the aircraft structure.

(4) Operational/Maintenance Consequences

In addition, to prevent any improper re-installation of an Upper Cardan Pin on a MLG,


Airbus amended the applicable Aircraft Maintenance Manual (AMM) on OCT 01/14.

D. DESCRIPTION

To accomplish this Service Bulletin it is necessary to :

**CONF 001

Task 325115-832-895-001: Inspection

(1) Inspect the Upper Cardan Pin and Nut on the LH MLG

(2) Inspect the Upper Cardan Pin and Nut on the RH MLG

(3) Replace the Upper Cardan Pin on the LH MLG

(4) Replace the Upper Cardan Pin on the RH MLG

(5) Install the Upper Cardan Pin Nut on the LH MLG

(6) Install the Upper Cardan Pin Nut on the RH MLG

**CONF 002

Task 325115-832-895-001: Inspection

(1) Inspect the Upper Cardan Pin and Nut on the LH MLG

(2) Inspect the Upper Cardan Pin and Nut on the RH MLG

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 4

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(3) Replace the Upper Cardan Pin on the LH MLG

(4) Replace the Upper Cardan Pin on the RH MLG

(5) Install the Upper Cardan Pin Nut on the LH MLG

(6) Install the Upper Cardan Pin Nut on the RH MLG

**CONF ALL

E. COMPLIANCE

(1) Classification

MANDATORY: Service Bulletin must be accomplished.

(2) Accomplishment Timescale

Table 01: Detailed Inspection (DET) of the Upper Cardan Pin (UCP) and nut retainer assembly
CONDITION ACTION COMPLIANCE TIME REPETITIVE
THRESHOLD GRACE PERIOD INTERVAL
If an Upper Cardan Inspect the Upper 8 years from Whichever occurs None
Pin on either LH or Cardan Pin and installation of the later
RH MLG has been nut MLG UCP
replaced or re- or
installed since within 12 months
Entry Into Service after the effective
(EIS) at the time of date of AD
issue of this 2015-0079
Service Bulletin
AND if this action
was accomplished
using the
applicable Airbus
AMM at a revision
dated prior to 01
October 2014.

This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Aviation Safety Agency (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.

F. APPROVAL

The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.

If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 5

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

G. MANPOWER

The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.

**CONF 001

Task 325115-832-895-001: Inspection


Get Access 1.00
On Aircraft
Inspect the Upper Cardan Pin and Nut on the LH MLG 4.00
Inspect the Upper Cardan Pin and Nut on the RH MLG 4.00
Replace the Upper Cardan Pin on the LH MLG 4.00
Replace the Upper Cardan Pin on the RH MLG 4.00
Install the Upper Cardan Pin Nut on the LH MLG 2.00
Install the Upper Cardan Pin Nut on the RH MLG 2.00
Tests 1.00
Close-Up 1.00
TOTAL MANHOURS 23.00
ELAPSED TIME (HOURS) 13.00

NOTE: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-UAAAA given in Appendix 01 - Elapsed Time Assumption .

NOTE: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.

**CONF 002

Task 325115-832-895-001: Inspection


Get Access 1.00
On Aircraft
Inspect the Upper Cardan Pin and Nut on the LH MLG 4.00
Inspect the Upper Cardan Pin and Nut on the RH MLG 4.00
Replace the Upper Cardan Pin on the LH MLG 4.00
Replace the Upper Cardan Pin on the RH MLG 4.00
Install the Upper Cardan Pin Nut on the LH MLG 2.00
Install the Upper Cardan Pin Nut on the RH MLG 2.00
Tests 1.00
Close-Up 1.00
TOTAL MANHOURS 23.00
ELAPSED TIME (HOURS) 13.00

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 6

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

NOTE: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-UAAAA given in Appendix 01 - Elapsed Time Assumption .

NOTE: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.

**CONF ALL

H. WEIGHT AND BALANCE

Not Changed

I. ELECTRICAL LOAD DATA

Not Changed

J. REFERENCES

**CONF 001

Aircraft Maintenance Manual (AMM) 06-20-00 07-11-00 12-34-24


20-21-11 32-00-00 32-11-16
32-31-00 32-33-00
Consumable Material List (CML)
Component Maintenance Manual Manufacturer 32-12-37
(CMMm)
Elec. Std. Practices Manual (ESPM) 20-55-00

**CONF 002

Aircraft Maintenance Manual (AMM) 06-20-00 07-11-00 12-34-24


20-21-11 32-00-00 32-11-16
32-31-00 32-33-00
Consumable Material List (CML)
Component Maintenance Manual Manufacturer 32-12-74
(CMMm)
Elec. Std. Practices Manual (ESPM) 20-55-00

**CONF ALL

K. PUBLICATION AFFECTED

None

L. INTERCHANGEABILITY/MIXABILITY

Not Applicable

M. SPARES

None

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 7

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

This Page Intentionally Left Blank

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 8

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

2. MATERIAL INFORMATION

**CONF ALL

A. MATERIAL - PRICE AND AVAILABILITY

No Material Set

B. INDUSTRY SUPPORT INFORMATION

AIRBUS will not provide industry support for accomplishment of this Service Bulletin.

C. LIST OF COMPONENTS

No Kit

D. LIST OF MATERIALS - OPERATOR SUPPLIED

(1) Consumable Materials

To accomplish this Service Bulletin it will be necessary to use the Consumable Materials
listed in the subsequent listed AMM Tasks:

- AMM Task 32-11-16-400-801.

Consumable CMLB01

ITEM DESCRIPTION REFERENCE TO CML QTY PER A/C SEE


MAT. No. NOTES
Polysulfide Sealant - General 06AAC5 As required
Purpose Interfay
Non Hardening Jointing Putty-High 06LDG6 As required
Temp
Non Aqueous Cleaner - General 08BAA9 As required
Textile - Lint Free Cotton 14SBA1 As required

(2) Components

To accomplish this Service Bulletin it will be necessary to use the Expendable


Components listed in the subsequent listed AMM Tasks:

- AMM Task 32-11-16-400-801.

(3) Equipment

None

E. PARTS TO BE RE-IDENTIFIED BY OPERATOR

None

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 9

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

F. TOOLING

(1) Tooling - Price and Availability

None

(2) Tools

To accomplish this Service Bulletin it will be necessary to use the Standard Tools listed
in the subsequent listed AMM Tasks:

- AMM Task 32-11-16-000-801

- AMM Task 32-11-16-400-801.

(3) Special Tools

None

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 10

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

3. ACCOMPLISHMENT INSTRUCTIONS

Task 325115-832-895-001 - Inspection

WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.

WARNING: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE
IN POSITION BEFORE YOU START A TASK ON OR NEAR:

- THE FLIGHT CONTROLS

- THE FLIGHT CONTROL SURFACES

- THE LANDING GEAR AND THE RELATED DOORS

- COMPONENTS THAT MOVE.

MOVEMENT OF COMPONENTS CAN KILL OR INJURE PERSONS.

CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP


ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE). WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:

- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS


NECESSARY ON WIRING AND COMPONENTS.

- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND


OTHER CONTAMINATION.

THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION


AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.

IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.

NOTE: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.

NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.

NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.

NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 11

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these


accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.

NOTE: The purpose of flow charts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.

NOTE: Discarded parts must be managed at the operator’s discretion.

Task Associated Data

**CONF 001

Zone
731 741
Modified FIN
5012GM 5013GM
Manpower
TOTAL MANHOURS 23.00
ELAPSED TIME (HOURS) 13.00

**CONF 002

Zone
731 741
Modified FIN
5012GM 5013GM
Manpower
TOTAL MANHOURS 23.00
ELAPSED TIME (HOURS) 13.00

**CONF ALL

A. GENERAL

**CONF 001

(1) Subtask 325115-910-401-001 - Standard Practices

Manpower Resources
Skills NON SPECIFIC

References
Aircraft Maintenance Manual (AMM) 06-20-00, Page Block 001
Task 07-11-00-581-801
Task 20-21-11-911-801
Consumable Material List (CML)

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 12

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(a) For the specification of materials (Mat. No.) given in this Service Bulletin refer to
Consumable Materials List (CML).

(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.

(c) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.

(d) Obey the maintenance jacking procedures, refer to AMM Task 07-11-00-581-801.

(e) Tag all the parts you must remove and retain to make the subsequent installation
easier.

(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.

(2) Subtask 325115-839-401-001 - Administrative

Manpower Resources
Skills NON SPECIFIC

Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.

**CONF 002

(1) Subtask 325115-910-401-001 - Standard Practices

Manpower Resources
Skills NON SPECIFIC

References
Aircraft Maintenance Manual (AMM) 06-20-00, Page Block 001
Task 07-11-00-581-801
Task 20-21-11-911-801
Consumable Material List (CML)

(a) For the specification of materials (Mat. No.) given in this Service Bulletin refer to
Consumable Materials List (CML).

(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.

(c) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.

(d) Obey the maintenance jacking procedures, refer to AMM Task 07-11-00-581-801.

(e) Tag all the parts you must remove and retain to make the subsequent installation
easier.

(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 13

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(2) Subtask 325115-839-401-001 - Administrative

Manpower Resources
Skills NON SPECIFIC

Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.

**CONF ALL

B. PREPARATION

**CONF 001

(1) Subtask 325115-941-401-001 - Job Set-up

Work Zones and Access Panels


Zone Access/Work location
731
741

Manpower Resources
Skills NON SPECIFIC

References
Aircraft Maintenance Manual (AMM) Task 07-11-00-581-801
Task 12-34-24-860-802
Task 32-00-00-481-801
Task 32-00-00-481-802

NOTE: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:

- Aircraft on the ground resting on landing gear (the ground safety


locks and the wheel chocks are in position on the landing gear)

- Engine shut down, thrust reversers closed and locked

- Aircraft in clean configuration

- Parking brake applied

- Aircraft electrical network de-energized

- Hydraulic systems depressurized

- Access to the cockpit and cabin is available

- All circuit breakers are in closed position

- All controls in NORM, AUTO or OFF position.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 14

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.

(b) Do the installation of the Safety Devices on the Landing Gears, refer to AMM Task
32-00-00-481-801.

(c) Do the installation of the Safety Devices on the Landing Gear Doors, refer to AMM
Task 32-00-00-481-802.

(d) Lift the aircraft on jacks, refer to AMM Task 07-11-00-581-801.

**CONF 002

(1) Subtask 325115-941-401-001 - Job Set-up

Work Zones and Access Panels


Zone Access/Work location
731
741

Manpower Resources
Skills NON SPECIFIC

References
Aircraft Maintenance Manual (AMM) Task 07-11-00-581-801
Task 12-34-24-860-802
Task 32-00-00-481-801
Task 32-00-00-481-802

NOTE: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:

- Aircraft on the ground resting on landing gear (the ground safety


locks and the wheel chocks are in position on the landing gear)

- Engine shut down, thrust reversers closed and locked

- Aircraft in clean configuration

- Parking brake applied

- Aircraft electrical network de-energized

- Hydraulic systems depressurized

- Access to the cockpit and cabin is available

- All circuit breakers are in closed position

- All controls in NORM, AUTO or OFF position.

(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 15

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(b) Do the installation of the Safety Devices on the Landing Gears, refer to AMM Task
32-00-00-481-801.

(c) Do the installation of the Safety Devices on the Landing Gear Doors, refer to AMM
Task 32-00-00-481-802.

(d) Lift the aircraft on jacks, refer to AMM Task 07-11-00-581-801.

**CONF ALL

C. PROCEDURE

**CONF 001

(1) Subtask 325115-832-401-002 - Inspect the Upper Cardan Pin and Nut on the LH
MLG

Work Zones and Access Panels


Zone Access/Work location
731 Work location LH Main Landing Gear

Manpower Resources
Manhours 4.00
Minimum number of person 1
Subtask elapsed time 4.00
Skills AIRFRAME

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Non Aqueous Cleaner - 08BAA9 As required
General
Textile - Lint Free Cotton 14SBA1 As required

References
Component Maintenance Manual 32-12-37
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut
Fig. A-UFAAA Sheet 01
Flow Chart
Fig. A-UBBAA Sheet 01
Inspection of the Side Stay Upper
Cardan Pin Nut

(a) At the Upper Cardan Pin (UCP), on the LH MLG Side Stay 5012GM, remove the
UCP Nut, refer to CMMm 32-12-37.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 16

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(b) Clean the thread of the UCP Nut with:

Textile - Lint Free 14SBA1 As required


Cotton

made moist with

Non Aqueous 08BAA9 As required


Cleaner - General

(c) Inspect the UCP Nut threads for damage, pitting and corrosion, refer to Fig. A-
UFAAA Sheet 01 and Fig. A-UBBAA Sheet 01.

1 If no damage, pitting or corrosion is found, retain the UCP Nut.

2 If damage, pitting or corrosion is found, discard the UCP Nut.

(d) Clean the thread of the UCP with:

Textile - Lint Free 14SBA1 As required


Cotton

made moist with

Non Aqueous 08BAA9 As required


Cleaner - General

(e) Inspect the UCP threads for damage, pitting and corrosion, refer to Fig. A-UFAAA
Sheet 01 and Fig. A-UBBAA Sheet 01.

1 If no damage, pitting or corrosion is found, retain the UCP and go to


SUBTASK 325115-410-401 002 Install the Upper Cardan Pin Nut on the LH
MLG .

2 If damage, pitting or corrosion is found go to SUBTASK 325115-833-401 002


Replace the Upper Cardan Pin on the LH MLG .

(2) Subtask 325115-832-402-001 - Inspect the Upper Cardan Pin and Nut on the RH
MLG

Work Zones and Access Panels


Zone Access/Work location
741 Work location RH Main Landing Gear

Manpower Resources
Manhours 4.00
Minimum number of person 1
Subtask elapsed time 4.00
Skills AIRFRAME

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 17

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Non Aqueous Cleaner - 08BAA9 As required
General
Textile - Lint Free Cotton 14SBA1 As required

References
Component Maintenance Manual 32-12-37
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut
Fig. A-UFAAA Sheet 01
Flow Chart
Fig. A-UBBAA Sheet 01
Inspection of the Side Stay Upper
Cardan Pin Nut

(a) At the Upper Cardan Pin (UCP) on the RH MLG Side Stay 5013GM, remove the
UCP Nut, refer to CMMm 32-12-37.

(b) Clean the thread of the UCP Nut with:

Textile - Lint Free 14SBA1 As required


Cotton

made moist with

Non Aqueous 08BAA9 As required


Cleaner - General

(c) Inspect the UCP Nut threads for damage, pitting and corrosion, refer to Fig. A-
UFAAA Sheet 01 and Fig. A-UBBAA Sheet 01.

1 If no damage, pitting or corrosion is found, retain the UCP Nut.

2 If damage, pitting or corrosion is found, discard the UCP Nut.

(d) Clean the thread of the UCP with:

Textile - Lint Free 14SBA1 As required


Cotton

made moist with

Non Aqueous 08BAA9 As required


Cleaner - General

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 18

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(e) Inspect the UCP threads for damage, pitting and corrosion, refer to Fig. A-UFAAA
Sheet 01 and Fig. A-UBBAA Sheet 01.

1 If no damage, pitting or corrosion is found, retain the UCP and go to


SUBTASK 325115-410-402 001 Install the Upper Cardan Pin Nut on the RH
MLG .

2 If damage, pitting or corrosion is found go to SUBTASK 325115-833-402 001


Replace the Upper Cardan Pin on the RH MLG .

(3) Subtask 325115-833-401-002 - Replace the Upper Cardan Pin on the LH MLG

Work Zones and Access Panels


Zone Access/Work location
731 Work location LH Main Landing Gear

Manpower Resources
Manhours 4.00
Minimum number of person 1
Subtask elapsed time 4.00
Skills AIRFRAME

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Non Hardening Jointing 06LDG6 As required
Putty-High Temp

References
Aircraft Maintenance Manual (AMM) Task 32-11-16-000-801
Task 32-11-16-400-801
Component Maintenance Manual 32-12-37
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut

(a) At the Upper Cardan Pin joint on the LH MLG Side Stay 5012GM, remove and
discard the UCP, refer to AMM Task 32-11-16-000-801 and CMMm 32-12-37.

(b) At the Upper Cardan Pin joint on the LH MLG Side Stay 5012GM, install a new
UCP, refer to AMM Task 32-11-16-400-801, CMMm 32-12-37 and Fig. A-UBAAA
Sheet 02, to the surface of the threads on the Upper Cardan Pin, apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 19

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(c) Go to SUBTASK 325115-410-401 002 Install the Upper Cardan Pin Nut on the LH
MLG .

(4) Subtask 325115-833-402-001 - Replace the Upper Cardan Pin on the RH MLG

Work Zones and Access Panels


Zone Access/Work location
741 Work location RH Main Landing Gear

Manpower Resources
Manhours 4.00
Minimum number of person 1
Subtask elapsed time 4.00
Skills AIRFRAME

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Non Hardening Jointing 06LDG6 As required
Putty-High Temp

References
Aircraft Maintenance Manual (AMM) Task 32-11-16-000-801
Task 32-11-16-400-801
Component Maintenance Manual 32-12-37
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut

(a) At the Upper Cardan Pin joint on the RH MLG Side Stay 5013GM, remove and
discard the UCP, refer to AMM Task 32-11-16-000-801 and CMMm 32-12-37.

(b) At the Upper Cardan Pin joint on the RH MLG Side Stay 5013GM, install a new
UCP, refer to AMM Task 32-11-16-400-801, CMMm 32-12-37 and Fig. A-UBAAA
Sheet 02, to the surface of the threads on the Upper Cardan Pin, apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

(c) Go to SUBTASK 325115-410-402 001 Install the Upper Cardan Pin Nut on the RH
MLG .

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 20

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(5) Subtask 325115-410-401-002 - Install the Upper Cardan Pin Nut on the LH MLG

Work Zones and Access Panels


Zone Access/Work location
731 Work location LH Main Landing Gear

Manpower Resources
Manhours 2.00
Minimum number of person 1
Subtask elapsed time 2.00
Skills AIRFRAME

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Polysulfide Sealant - 06AAC5 As required
General Purpose Interfay
Non Hardening Jointing 06LDG6 As required
Putty-High Temp

References
Aircraft Maintenance Manual (AMM) Task 32-11-16-400-801
Component Maintenance Manual 32-12-37
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut

(a) Install the UCP Nut on the LH MLG:

1 If NO damage, pitting or corrosion was found on the UCP Nut, install the
UCP Nut, refer to AMM Task 32-11-16-400-801 and CMMm 32-12-37, to the
threads of the UCP nut and the splines of the UCP, apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

2 If damage, pitting or corrosion was found on the UCP Nut, discard the UCP
Nut and install a new UCP Nut, refer to AMM Task 32-11-16-400-801 and
CMMm 32-12-37, to the threads of the UCP nut and the splines of the UCP,
apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 21

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(b) On the UCP Locking Assembly, refer to Fig. A-UBAAA Sheet 01 and Fig. A-UBAAA
Sheet 02, apply:

Polysulfide Sealant 06AAC5 As required


- General Purpose
Interfay

(6) Subtask 325115-410-402-001 - Install the Upper Cardan Pin Nut on the RH MLG

Work Zones and Access Panels


Zone Access/Work location
741 Work location RH Main Landing Gear

Manpower Resources
Manhours 2.00
Minimum number of person 1
Subtask elapsed time 2.00
Skills AIRFRAME

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Polysulfide Sealant - 06AAC5 As required
General Purpose Interfay
Non Hardening Jointing 06LDG6 As required
Putty-High Temp

References
Aircraft Maintenance Manual (AMM) Task 32-11-16-400-801
Component Maintenance Manual 32-12-37
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut

(a) Install the UCP Nut on the RH MLG:

1 If NO damage, pitting or corrosion was found on the UCP Nut, install the
UCP Nut, refer to AMM Task 32-11-16-400-801 and CMMm 32-12-37, to the
threads of the UCP nut and the splines of the UCP, apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 22

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

2 If damage, pitting or corrosion was found on the UCP Nut, discard the UCP
Nut and install a new UCP Nut, refer to AMM Task 32-11-16-400-801 and
CMMm 32-12-37, to the threads of the UCP nut and the splines of the UCP,
apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

(b) On the UCP Locking Assembly, refer to Fig. A-UBAAA Sheet 01 and Fig. A-UBAAA
Sheet 02, apply:

Polysulfide Sealant 06AAC5 As required


- General Purpose
Interfay

**CONF 002

(1) Subtask 325115-832-401-004 - Inspect the Upper Cardan Pin and Nut on the LH
MLG

Work Zones and Access Panels


Zone Access/Work location
731 Work location LH Main Landing Gear

Manpower Resources
Manhours 4.00
Minimum number of person 1
Subtask elapsed time 4.00
Skills AIRFRAME

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Non Aqueous Cleaner - 08BAA9 As required
General
Textile - Lint Free Cotton 14SBA1 As required

References
Component Maintenance Manual 32-12-74
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut
Fig. A-UBBAA Sheet 01
Inspection of the Side Stay Upper
Cardan Pin Nut

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 23

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

References
Fig. A-UFAAA Sheet 01
Flow Chart

(a) At the Upper Cardan Pin (UCP), on the LH MLG Side Stay 5012GM, remove the
UCP Nut, refer to CMMm 32-12-74.

(b) Clean the thread of the UCP Nut with:

Textile - Lint Free 14SBA1 As required


Cotton

made moist with

Non Aqueous 08BAA9 As required


Cleaner - General

(c) Inspect the UCP Nut threads for damage, pitting and corrosion, refer to Fig. A-
UFAAA Sheet 01 and Fig. A-UBBAA Sheet 01.

1 If no damage, pitting or corrosion is found, retain the UCP Nut.

2 If damage, pitting or corrosion is found, discard the UCP Nut.

(d) Clean the thread of the UCP with:

Textile - Lint Free 14SBA1 As required


Cotton

made moist with

Non Aqueous 08BAA9 As required


Cleaner - General

(e) Inspect the UCP threads for damage, pitting and corrosion, refer to Fig. A-UFAAA
Sheet 01 and Fig. A-UBBAA Sheet 01.

1 If no damage, pitting or corrosion is found, retain the UCP and go to


SUBTASK 325115-410-401 004 Install the Upper Cardan Pin Nut on the LH
MLG .

2 If damage, pitting or corrosion is found go to SUBTASK 325115-833-401 004


Replace the Upper Cardan Pin on the LH MLG .

(2) Subtask 325115-832-402-003 - Inspect the Upper Cardan Pin and Nut on the RH
MLG

Work Zones and Access Panels


Zone Access/Work location
741 Work location RH Main Landing Gear

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 24

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

Manpower Resources
Manhours 4.00
Minimum number of person 1
Subtask elapsed time 4.00
Skills AIRFRAME

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Non Aqueous Cleaner - 08BAA9 As required
General
Textile - Lint Free Cotton 14SBA1 As required

References
Component Maintenance Manual 32-12-74
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut
Fig. A-UBBAA Sheet 01
Inspection of the Side Stay Upper
Cardan Pin Nut
Fig. A-UFAAA Sheet 01
Flow Chart

(a) At the Upper Cardan Pin (UCP) on the RH MLG Side Stay 5013GM, remove the
UCP Nut, refer to CMMm 32-12-74.

(b) Clean the thread of the UCP Nut with:

Textile - Lint Free 14SBA1 As required


Cotton

made moist with

Non Aqueous 08BAA9 As required


Cleaner - General

(c) Inspect the UCP Nut threads for damage, pitting and corrosion, refer to Fig. A-
UFAAA Sheet 01 and Fig. A-UBBAA Sheet 01.

1 If no damage, pitting or corrosion is found, retain the UCP Nut.

2 If damage, pitting or corrosion is found, discard the UCP Nut.

(d) Clean the thread of the UCP with:

Textile - Lint Free 14SBA1 As required


Cotton

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 25

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

made moist with

Non Aqueous 08BAA9 As required


Cleaner - General

(e) Inspect the UCP threads for damage, pitting and corrosion, refer to Fig. A-UFAAA
Sheet 01 and Fig. A-UBBAA Sheet 01.

1 If no damage, pitting or corrosion is found, retain the UCP and go to


SUBTASK 325115-410-402 003 Install the Upper Cardan Pin Nut on the RH
MLG .

2 If damage, pitting or corrosion is found go to SUBTASK 325115-833-402 003


Replace the Upper Cardan Pin on the RH MLG .

(3) Subtask 325115-833-401-004 - Replace the Upper Cardan Pin on the LH MLG

Work Zones and Access Panels


Zone Access/Work location
731 Work location LH Main Landing Gear

Manpower Resources
Manhours 4.00
Minimum number of person 1
Subtask elapsed time 4.00
Skills AIRFRAME

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Non Hardening Jointing 06LDG6 As required
Putty-High Temp

References
Aircraft Maintenance Manual (AMM) Task 32-11-16-000-801
Task 32-11-16-400-801
Component Maintenance Manual 32-12-74
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut

(a) At the Upper Cardan Pin joint on the LH MLG Side Stay 5012GM, remove and
discard the UCP, refer to AMM Task 32-11-16-000-801 and CMMm 32-12-74.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 26

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(b) At the Upper Cardan Pin joint on the LH MLG Side Stay 5012GM, install a new
UCP, refer to AMM Task 32-11-16-400-801, CMMm 32-12-74 and Fig. A-UBAAA
Sheet 02, to the surface of the threads on the Upper Cardan Pin, apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

(c) Go to SUBTASK 325115-410-401 004 Install the Upper Cardan Pin Nut on the LH
MLG .

(4) Subtask 325115-833-402-003 - Replace the Upper Cardan Pin on the RH MLG

Work Zones and Access Panels


Zone Access/Work location
741 Work location RH Main Landing Gear

Manpower Resources
Manhours 4.00
Minimum number of person 1
Subtask elapsed time 4.00
Skills AIRFRAME

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Non Hardening Jointing 06LDG6 As required
Putty-High Temp

References
Aircraft Maintenance Manual (AMM) Task 32-11-16-000-801
Task 32-11-16-400-801
Component Maintenance Manual 32-12-74
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut

(a) At the Upper Cardan Pin joint on the RH MLG Side Stay 5013GM, remove and
discard the UCP, refer to AMM Task 32-11-16-000-801 and CMMm 32-12-74.

(b) At the Upper Cardan Pin joint on the RH MLG Side Stay 5013GM, install a new
UCP, refer to AMM Task 32-11-16-400-801, CMMm 32-12-74 and Fig. A-UBAAA
Sheet 02, to the surface of the threads on the Upper Cardan Pin, apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 27

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(c) Go to SUBTASK 325115-410-402 003 Install the Upper Cardan Pin Nut on the RH
MLG .

(5) Subtask 325115-410-401-004 - Install the Upper Cardan Pin Nut on the LH MLG

Work Zones and Access Panels


Zone Access/Work location
731 Work location LH Main Landing Gear

Manpower Resources
Manhours 2.00
Minimum number of person 1
Subtask elapsed time 2.00
Skills AIRFRAME

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Polysulfide Sealant - 06AAC5 As required
General Purpose Interfay
Non Hardening Jointing 06LDG6 As required
Putty-High Temp

References
Aircraft Maintenance Manual (AMM) Task 32-11-16-400-801
Component Maintenance Manual 32-12-74
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut

(a) Install the UCP Nut on the LH MLG:

1 If NO damage, pitting or corrosion was found on the UCP Nut, install the
UCP Nut, refer to AMM Task 32-11-16-400-801 and CMMm 32-12-74, to the
threads of the UCP nut and the splines of the UCP, apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 28

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

2 If damage, pitting or corrosion was found on the UCP Nut, discard the UCP
Nut and install a new UCP Nut, refer to AMM Task 32-11-16-400-801 and
CMMm 32-12-74, to the threads of the UCP nut and the splines of the UCP,
apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

(b) On the UCP Locking Assembly, refer to Fig. A-UBAAA Sheet 01 and Fig. A-UBAAA
Sheet 02, apply:

Polysulfide Sealant 06AAC5 As required


- General Purpose
Interfay

(6) Subtask 325115-410-402-003 - Install the Upper Cardan Pin Nut on the RH MLG

Work Zones and Access Panels


Zone Access/Work location
741 Work location RH Main Landing Gear

Manpower Resources
Manhours 2.00
Minimum number of person 1
Subtask elapsed time 2.00
Skills AIRFRAME

Material necessary to do the job

Consumable CMLB01
ITEM DESCRIPTION REFERENCE TO QTY PER A/C SEE
CML MAT. No. NOTES
Polysulfide Sealant - 06AAC5 As required
General Purpose Interfay
Non Hardening Jointing 06LDG6 As required
Putty-High Temp

References
Aircraft Maintenance Manual (AMM) Task 32-11-16-400-801
Component Maintenance Manual 32-12-74
Manufacturer (CMMm)
Fig. A-UBAAA Sheet 01
Removal and Installation of the Side Sheet 02
Stay Upper Cardan Pin and Nut

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 29

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(a) Install the UCP Nut on the RH MLG:

1 If NO damage, pitting or corrosion was found on the UCP Nut, install the
UCP Nut, refer to AMM Task 32-11-16-400-801 and CMMm 32-12-74, to the
threads of the UCP nut and the splines of the UCP, apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

2 If damage, pitting or corrosion was found on the UCP Nut, discard the UCP
Nut and install a new UCP Nut, refer to AMM Task 32-11-16-400-801 and
CMMm 32-12-74, to the threads of the UCP nut and the splines of the UCP,
apply:

Non Hardening 06LDG6 As required


Jointing Putty-High
Temp

(b) On the UCP Locking Assembly, refer to Fig. A-UBAAA Sheet 01 and Fig. A-UBAAA
Sheet 02, apply:

Polysulfide Sealant 06AAC5 As required


- General Purpose
Interfay

**CONF ALL

D. TEST

**CONF 001

(1) Subtask 325115-700-401-001 - Testing

Work Zones and Access Panels


Zone Access/Work location
731 Work location LH Main Landing Gear
741 Work location RH Main Landing Gear

Manpower Resources
Skills AIRFRAME

References
Aircraft Maintenance Manual (AMM) Task 32-31-00-710-801
Task 32-31-00-740-801
Task 32-33-00-710-801

NOTE: The worksteps that follow are only necessary if the Upper Cardan Pin
has been replaced.

(a) Do a BITE test of the Normal Extension and Retraction System, refer to AMM Task
32-31-00-740-801.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 30

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(b) Do a functional test of the Normal Extension and Retraction, refer to AMM Task
32-31-00-710-801.

(c) Do an operational test of the Free-Fall System, refer to AMM Task


32-33-00-710-801.

**CONF 002

(1) Subtask 325115-700-401-001 - Testing

Work Zones and Access Panels


Zone Access/Work location
731 Work location LH Main Landing Gear
741 Work location RH Main Landing Gear

Manpower Resources
Skills AIRFRAME

References
Aircraft Maintenance Manual (AMM) Task 32-31-00-710-801
Task 32-31-00-740-801
Task 32-33-00-710-801

NOTE: The worksteps that follow are only necessary if the Upper Cardan Pin
has been replaced.

(a) Do a BITE test of the Normal Extension and Retraction System, refer to AMM Task
32-31-00-740-801.

(b) Do a functional test of the Normal Extension and Retraction, refer to AMM Task
32-31-00-710-801.

(c) Do an operational test of the Free-Fall System, refer to AMM Task


32-33-00-710-801.

**CONF ALL

E. CLOSE-UP

**CONF 001

(1) Subtask 325115-942-401-001 - Close-up

Manpower Resources
Skills NON SPECIFIC

References
Aircraft Maintenance Manual (AMM) Task 07-11-00-586-801
Task 32-11-16-400-801

(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 31

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

(b) Do the Close-up and Close Access procedures as specified in "Installation of the
MLG Side Stay Assembly", refer to AMM Task 32-11-16-400-801.

(c) Lower the aircraft off jacks, refer to AMM Task 07-11-00-586-801.

(d) Put the aircraft back to its initial configuration.

**CONF 002

(1) Subtask 325115-942-401-001 - Close-up

Manpower Resources
Skills NON SPECIFIC

References
Aircraft Maintenance Manual (AMM) Task 07-11-00-586-801
Task 32-11-16-400-801

(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.

(b) Do the Close-up and Close Access procedures as specified in "Installation of the
MLG Side Stay Assembly", refer to AMM Task 32-11-16-400-801.

(c) Lower the aircraft off jacks, refer to AMM Task 07-11-00-586-801.

(d) Put the aircraft back to its initial configuration.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 32

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

**CONF ALL

HAS THE LH OR RH
MAIN LANDING GEAR (MLG)
BEEN REPLACED POST ENTRY NO
INTO SERVICE (EIS)?

WITHIN THE ACCOMPLISHMENT


YES TIMESCALES DEFINED IN PARA 1.E. (2),
REMOVE UPPER CARDAN NUT

CLEAN THE THREADS OF THE


UPPER CARDAN PIN AND NUT

DO A DETAILED INSPECTION
ON THE THREADS OF THE
UPPER CARDAN PIN AND NUT

IS CORROSION,
REPLACE DAMAGED PITTING, OR THREAD
PART(S) BEFORE YES DAMAGE OBSERVED ON THE THREADS
NEXT FLIGHT OF THE UPPER CARDAN NUT
AND/OR THE UPPER
CARDAN PIN?

NO

REASSEMBLE UPPER
CARDAN JOINT

NO FURTHER
ACTION

NOTE: THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION


GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN.
F_SB_325115_7_FAAA_01_03

Figure A-UFAAA - Sheet 01


Flow Chart

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 33

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

**CONF ALL

LH SHOWN
RH SIMILAR

SIDE STAY
5012GM
(5013GM)

F_SB_325115_7_BAAA_01_02

Figure A-UBAAA - Sheet 01


Removal and Installation of the Side Stay Upper Cardan Pin and Nut

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 34

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

**CONF ALL

ILLUSTRATION SHOWS THE COVERAGE OF THE SEALANT


AND IS TYPICAL FOR NUT AND LOCKING ASSEMBLIES

SEALANT 01 SEALANT 01

UPPER
CARDAN PIN

B
CARDAN NUT
ASSEMBLY
A A

NOTE:
01 APPLY MAT NO. 06AAC5 TO COMPLETELY COVER
UPPER CARDAN PIN LOCKING ASSEMBLY.
F_SB_325115_7_BAAA_02_03

Figure A-UBAAA - Sheet 02


Removal and Installation of the Side Stay Upper Cardan Pin and Nut

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 35

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN

**CONF ALL

B
SIDE STAY
LH SHOWN 5012GM
RH SIMILAR (5013GM)

UPPER
CARDAN PIN

UPPER
CARDAN PIN NUT

B
NOTE:
AREA OF INSPECTION
F_SB_325115_7_BBAA_01_02

Figure A-UBBAA - Sheet 01


Inspection of the Side Stay Upper Cardan Pin Nut

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 36

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
Appendix 01 - Elapsed Time Assumption

**CONF ALL

01
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A340−32−5115
02

STEPS MH PER ET/S

GET ACCESS 1.00 1 1.00

INSPECT THE UPPER CARDAN PIN NUT ON THE LH MLG 4.00 1 4.00

INSPECT THE UPPER CARDAN PIN NUT ON THE RH MLG 4.00 1 4.00

REPLACE THE UPPER CARDAN PIN ON THE LH MLG 4.00 1 4.00

REPLACE THE UPPER CARDAN PIN ON THE RH MLG 4.00 1 4.00

INSTALL THE UPPER CARDAN PIN NUT ON THE LH MLG 2.00 1 2.00

INSTALL THE UPPER CARDAN PIN NUT ON THE RH MLG 2.00 1 2.00

CLOSE−UP 1.00 1 1.00

TEST 1.00 1 1.00

0 2 4 6 8 10 12 14 16 18 20
SB ELAPSED TIME
(HOURS)
TOTAL MANHOURS 23.00
SB ELAPSED TIME 13.00

NOTE:
01 THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
MH : MANHOURS
PER : NUMBER OF PERSONS 02 IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ET/S: ELAPSED TIME PER STEP ARE NOT REFLECTED IN THIS GANTT CHART. F_SB_325115_7_AAAA_01_01

Figure A-UAAAA - Sheet 01


Gantt Chart

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 1

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
REPORTING SHEET

TITLE: LANDING GEAR - MAIN GEAR - INSPECTION OF SIDE STAY UPPER


CARDAN PIN AND NUT
MODIFICATION No.: None
Please complete the appropriate item (A or B):
A - SB WILL BE embodied YES/NO (if NO please comment)
If YES, aircraft concerned (as per SB effectivity by default) and planned dates (month/year) of
embodiment:

B - SB HAS BEEN embodied on aircraft:

Operator comments:

From Airline:
Name/Title:
Signature: Date:

If operational documentation is affected (see Paragraph 1.K of this SB): If information is needed prior to
next normal revision or prior to SB embodiment, please indicate required service(s):
Either: Modification Operational Impact (MOI), if available YES/NO
Or : Intermediate revision YES/NO

Important Information: This SB will only be incorporated in your maintenance and operational
documentation if this sheet is returned to Airbus and signed by a duly authorised representative. With
the next feasible revision, this will result in

- Updating of maintenance documentation to show pre and post SB data.


- Updating of maintenance and operational documentation to show post SB data after embodiment.

If this SB requires previous or simultaneous accomplishment of other SBs, Airbus shall automatically
include them in the manual revisions. Refer to SIL 00-037 for detailed information.

Please return this completed sheet to:

AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE

Attn: SDC32 Technical Data and Documentation Services


FAX: (+33) 5 61 93 28 06
e-mail: [email protected]
or via your Resident Customer Support Office.

Alternatively, SB lists via letters or fax are also accepted.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 1

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.


@A340-500/600
SERVICE BULLETIN
QUALITY PERCEPTION FORM

Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.

(Please rate on a scale of 1 to 4, with 4 being the highest score)

- Quality rating of this SB 4 3 2 1


- Quality rating of the Accomplishment Instructions 4 3 2 1
- Quality rating of the Illustrations 4 3 2 1
- Is this SB easy to understand ? Y/N

If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.

Planning Material Instructions

X Effectivity X Kit content X Preparation


X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations

Comments:

Operator: Date:

Name/Title:

Please return this form to:

AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE

Attn : SEM4 Service Bulletins Management


FAX : (33) 5 61 93 42 51

Or via your Resident Customer Support Office.

7 DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115

REVISION No.: 01 - Dec 11/15 Page: 1

Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.