NC800 - DRAWING OFFICE PROCEDURES AND TECHNIQUES L4 P1 QP SUPP 2019 Signed Off
NC800 - DRAWING OFFICE PROCEDURES AND TECHNIQUES L4 P1 QP SUPP 2019 Signed Off
(12050724)
TIME: 3 HOURS
MARKS: 100
3. Number the answers according to the numbering system used in this question
paper.
4. ALL drawing work must comply with the relevant SANS (SABS)
recommended codes.
5. ALL abbreviations and symbols must comply with the latest National Building
Regulations and ALL relevant SANS (SABS) codes.
1.2 State FIVE points to be included when reviewing the workflow plan. (5 × 2) (10)
1.5 Explain the date on which schedule activities in a project occur. (4)
[34]
2.3 State whether each of the following are examples of fixed or variable costs:
2.3.1 Maintenance
2.3.2 Entertainment
2.3.4 Stationery
2.4 Indicate whether the following statements are TRUE or FALSE. Choose the
answer and write only 'true' or 'false' next to the question number
(2.4.1–2.4.9) in the ANSWER BOOK.
2.4.2 Cost escalations are not changes in the cost or price of specific
goods or services in a given economy over a period.
2.4.4 One of the steps to take when comparing budgets is not to check if
the budget is correct.
3.2 Give FOUR points included in management documents, which are reasons
for providing support to a project team. (4)
3.5 Describe what clear communication refers to in the management of a project. (2)
TOTAL: 100