0% found this document useful (0 votes)
26 views5 pages

Ref615 CBF

Uploaded by

Amr Elkady
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views5 pages

Ref615 CBF

Uploaded by

Amr Elkady
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Commissioning Service Department

Commissioning Standard Test Formats

Description: (50+62BF) CBF RELAY REF615 Record No. :


Equip. No. Drawing ref.: Page 1 of 5
Contractor : Contract no.: Substation No :

1. GENERAL DATA AND INFORMATION:


Panel No. Designation
Serial No. Rated Voltage 125 VDC
Make Aux. Voltage 48 – 250 VAC/DC
DWG. & SH. No. Frequency 50 – 60 Hz
CT Ratio 1200/1A

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM DESCRIPTION CHECKED
1 Inspect for physical damage / defects.
2 Verify Connections as per approved drawings.
3 Check tightness of all connections.
5 Check apparatus lists.
6 Check ferrules
7 Test Switch checked for correct function.
8 Check case earthing.

3. ELECTRICAL TESTS: With relay energized condition

ITEM DESCRIPTION CHECKED


1 Measured auxiliary supply.
2 Clock set at local time.
3 Time maintained when auxiliary supply removed.
5 Relay healthy (green) LED working.
6 Trip (red) LED working.

3.1 OPERATING DC SUPPLY CURRENT:


DC Current DC Current
DC Volt (V) Calculated WATT (W)
Without Fault (mA) During Fault (mA)

125 VDC

(Relays /energized): < 12.0 W (nominal)/< 18.0 W (max) Technical Data page: 809

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats

Description: (50+62BF) CBF RELAY REF615 Record No. :


Equip. No. Drawing ref.: Page 2 of 5
Contractor : Contract no.: Substation No :

4. INPUTS AND OUTPUTS TESTS:

INPUT OPTO-ISOLATORS CHECKS (With Relay Energized):

Test Procedure:
Go to CONFIGURATION - MONITORING,
I/O STATUS,
then go to BINARY INPUTS VALUES ( X120 (AIM) – X110 (BIO) )
to check the values after giving pulse on each BI.

TEST METHOD RESULT


OPTO
(Energize only one at a time with Display FALSE REMARKS
INPUT NO.
125V DC Station Battery voltage) to TURE

X120

BI 1 ENERGIZE TB NO. X120 : 1 – 2C SPARE

BI 2 ENERGIZE TB NO. X120 : 3 – 2C SPARE

BI 3 ENERGIZE TB NO. X120 : 4 – 2C SPARE

BI 4 ENERGIZE TB NO. X120 : 5 – 6 SPARE

X110

BI 1 ENERGIZE TB NO. X110 : 1 – 2 CBF INITIATION

BI 2 ENERGIZE TB NO. X110 : 3 – 4 SPARE

BI 3 ENERGIZE TB NO. X110 : 5 – 6C SPARE

BI 4 ENERGIZE TB NO. X110 : 7 – 6C SPARE

BI 5 ENERGIZE TB NO. X110 : 8 – 9C SPARE

BI 6 ENERGIZE TB NO. X110 : 10 – 9C SPARE

BI 7 ENERGIZE TB NO. X110 : 11 – 12C SPARE

BI 8 ENERGIZE TB NO. X110 : 13 – 12C SPARE

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats

Description: (50+62BF) CBF RELAY REF615 Record No. :


Equip. No. Drawing ref.: Page 3 of 5
Contractor : Contract no.: Substation No :

OUTPUT RELAYS CHECKS (With Relay Energized):

Test Procedure:
Go to IED CONFIGURATION,
TESTS, IED TEST, TEST MODE : ON,
then go to BINARY OUTPUTS-CHANGE THE POSITION OF EACH BO FROM FULSE TO TURE FROM HMI,
then check contact resistance.

TEST METHOD RESULT


OUTPUT
(Energize only one relay at a time by Contact Checked REMARKS
RELAY No.
Test ON in ‘IED TEST’) ≤ 0.2Ω

X100

PO1 CONTACT OPERATED X100 : 6 – 7 (N/O) CBF OPTD(86CBF)

PO2 CONTACT OPERATED X100 : 8 – 9 (N/O) CBF OPTD(86CBF)

SO1 CONTACT OPERATED X100 : 10 – 11 /10 - 12 (C/O) SPARE

SO2 CONTACT OPERATED X100 : 13 – 14 (N/O) CBF OPTD(FR)

PO3 CONTACT OPERATED X100 : 16 – 17 (N/O) SPARE

PO4 CONTACT OPERATED X100 : 21 – 22 (N/O) SPARE

IRF CONTACT OPERATED X100 : 3 – 4 (N/O) WATCHDOG

X110

SO1 CONTACT OPERATED X110 : 14 – 16 /14 - 15 (C/O) SPARE

SO2 CONTACT OPERATED X110 : 17 – 19 /17 - 18 (C/O) SPARE

SO3 CONTACT OPERATED X110 : 20 – 22 /20 - 21 (C/O) SPARE

SO4 CONTACT OPERATED X110 : 23 – 24 (N/O) SPARE

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats

Description: (50+62BF) CBF RELAY REF615 Record No. :


Equip. No. Drawing ref.: Page 4 of 5
Contractor : Contract no.: Substation No :

INDICATION LED TEST


LED Checks:

Go to MONITORING,
PROGRAMMABLE LEDS to view the physical position of the LED.

OPTO Input Number Result Display On or Off Function

LED 1 CBF INITIATION

LED 2 CBF OPTD

LED 3 DIST. TRIGGERED

LED 4 SPARE

LED 5 SPARE

LED 6 SPARE

LED 7 SPARE

LED 8 SPARE

5. MEASUREMENTS ACCURACY CHECKS:

Displayed value ( A )
Applied Value Expected Value ( A )
R Y B
0.1 In 120
0.5 In 600
1 In 1200
1.5 In 1800

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats

Description: (50+62BF) CBF RELAY REF615 Record No. :


Equip. No. Drawing ref.: Page 5 of 5
Contractor : Contract no.: Substation No :
6. BREAKER FAILURE PROTECTION (50+62BF) PICK UP & DROP OFF
Current ( A ) Stage 1 Stage 2
Phase
Set Pickup Drop-off Set OPTD (ms) Set OPTD (ms)
R
Y 5% In 50 ms 100 ms
B
R
Y 15% In 100 ms 200 ms
B
R
Y 20% In 200ms 400 ms
B

Operation accuracy:
±1.5% of the set value or ±0.002 x In Technical Data page : 499

Operate time accuracy:


±1.0% of the set value or ±20 ms Technical Data page : 499
refer to manual page : 26/132

1 Communication with PC
2 Event Record Check
3 Disturbance Record Check

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date: