4-Process Flow Diagram
4-Process Flow Diagram
Road
Road
MOSQUE
W E
EXISTING LAB.
BOARD
ON TANK-1
EXISTING AERATI
PROJECT SIGN
ON TANK-2
EXISTING AERATI
S
EXISTING LAB.
EXISTING INLET
STRUCTURE
ON TANK-3
EXISTING AERATI
NCE
MAIN ENTRA
ON TANK-4
EXISTING AERATI
VALVE
AIR RELEASE
Road ON TANK-5
EXISTING AERATI
Road
Ø350
ON TANK-6
EXISTING AERATI
BUILDING
DN 1800
AGYAL TO SEA
12
POLYMER
DN 1800
AGYAL TO SEA
Ø40 POLYMER
14
TANK
TANK
SLUDGE STORAGE
Road EXISTING
DRYING SLUDGE
TREATED WATER
Road
15
BUILDING
TREATMENT
11
DEWATRING
Ø250 MH 30
MH 29
TANK
TREATED WATER
FROM TERTIARY
Ø200mm G.R.P
G
EXISTIN
STRUCTURE
EXISTING
TO SEA OUTFALL
INLET STRUCTURE
BUILDING
CHLORINATION
STRUCTURE
EXISTING
PIPE LINE
TO EXISTING
EXISTING
2 Ø 900mm
MH 2
SITE
Ø200
G.R.P
0
Ø30
0
Ø200
Ø30
0
Ø200
Ø20
A1
0 Ø110 B
CHAMBER
CHAMBER
Ø20 2Ø900 2Ø900
Ø300
SCREW PUMP
0
Ø30
0 Ø1200 F.R.P
Ø30
NEW SECONDARY
TO SEA OUTFALL
Ø350 F.R.P
Ø350
Ø200
Ø500
#2
Ø350
0
VALVE CHAMBER
Ø30
Ø500
LIFT
PIPE LINE
0
Ø30 STATION
TO SEEFALL
TWOØ900 GOING
EXISTING
WASHOUT
SUBSTATION
Ø250
2 Ø 900mm
Ø150 570.15M
0
TO SEA OUTFALL
TWOØ900 GOING
Ø20
Ø350
0
FUEL TANK
Ø90
MH 27
REA
GREEN A
OUTSIDE Ø700
TYP.D COMING FROM
ROAD EXISTING CHAMBER
ASPHALTED
TO SEA OUTFALL
PIPE LINE
2 Ø 900mm Ø900
FROM RAKKAH
#4 IN COMING
CHAMBER
CHAMBER
EXISTING SEAOUTFALL PLANT BYPASS VALVE SYSTEM
TREATMENT
TO SECONARY ODOR CONTROL
#1 MH EF
CHAMBERVALVE
WASHOUT
SECONDARY
FROM NEW A1
CHAMBER
Ø900 TO C.W.C
NaOCL
PRODUCTION PLANT
GRIT
CONTRACTOR: BLOWERS BLOWER STATION
(255) PIPE FROM EXISTING
RETURN SLUDGE SEA OUTFALL AJYAL
PUMPING STATION
TO LANDFILL (442) STP
SCREENING SAND
TRUCK DELIVERY
MAIN CONTRACTOR:
ARTELIA
Tel. No: +971 04 886 5690
Fax No: +971 04 886 5691
P.O. Box No: 18271 Dubai, U.A.E.
BIO GAS
BIOGAS DESULPHURISATION GAS FLARE GAS HOLDER BOILER ROOM CO-GENERATION BUILDING
GAS UTILIZATION/ (503) (550) (510) (530) (540) PROJECT TITLE:
DRAWING TITLE: