0% found this document useful (0 votes)
19 views76 pages

ISO As Built

Uploaded by

Younes Gda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views76 pages

ISO As Built

Uploaded by

Younes Gda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 76

0

340
0 140
TO
0 N. )
200 N
CO t.2/2
5 (sh

0 0 530 5 00
680 200 ND
530 1/3
0 F.J
280 3 287
0

0 5

530
3 200 1/2 F.J F.J
02-BK 1/4
0-0 5
530

300 420
-20 0
TO SW 0 200 F.J
N. . 500-

1250
680
530
N
CO E No
LI N F.J 0
574 4

2 800 3

530

127
5
0 F.J
200
F.J
1/1 1/5

300 420
F.J CO
530
5
560

1250
Lin NN. T
eN O
0 o.5
780 574 4 00-
F.J SW
-20
4 0-0
3 07-B
4 127 K3
530

F.J
750

1/6 C
Lin ONN.
300 420

F.J e N TO - -
1250

2 o.5
00- - -
S W-
E R ED Elbow 4 200
IT ed -00 N
3 M Flang 6-B
90° 1xND
K3 Key-Plan Project:
Bassin de filtration SAFI
127

R=
Location
Morocco
CO
Lin NN. T Contractor
eN O OCP GROUPE
o.5
00- DN 500

S W- End User
200 OCP
- 005
-B K3 Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-003-BK3 1 of 2 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-003-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
w
T E REDd Elbo
0 I e
200 3 M Flang
800 °
90 1xND
6
R=
0
280
2

750
5 F.J

1250
0
200 5 00 750

200
ND 1/3
F.J
5
0 530
200
1/4
0
680 0

300
F.J
530 F.J 552
3
2 800 4

530
0

127
5 F.J F.J
200 1/2 1/5 CO
Lin NN. TO

300 420
0
340 530 5 F.J
eN

1250
0 o.5
200 0
00-
530 574 4 SW
- 200
F.J
3 -01
0 0-B
140 K3

127
F.J
530

500
5 ND F.J
1/6 CO
Lin NN. T
300 420

1/1
F.J
eN O
1250

F.J
0 o.5
TO 00-
N N. ) 287 S W-
CO t.1/2 4 200
( sh -00
9-B - -
K 3
127

- -

N
CO
Lin NN. TO Key-Plan Project:
Bassin de filtration SAFI
eN
o.5
00- Location
SW Morocco
- 200
-00
8-B Contractor
K3 OCP GROUPE
DN 500

End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-003-BK3 2 of 2 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-003-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
0
340
0 140

0 . TO
NN /2)
200 O
C t.2
5 (sh

0 0 530 500
680 200 ND
530 1/3
0 F.J
280 3 287
0

0 5

530
200 1/2 F.J F.J
-B K3
0- 002 5
1/4
530

300 420
20 0
200
- F.J
TO -SW 0

1250
N. . 500 680
530
N
CO E No
LIN F.J 0
574 4

2 800 3

530

127
5
0 F.J
200
F.J
1/1 1/5

300 420
F.J CO
530
5
560

1250
Lin NN. T
eN O
0 o.5
780 574 4 00-
F.J S W-
4 20 0-0
3 14-
4 127 BK3
530

F.J
750

1/6 C
Lin ONN.
300 420

F.J e N TO - -
1250

2 o.5
00- - -
SW
E R ED Elbow 4 -20
0-0 N
IT ed 15-
3 M Flang
90° 1xND
BK3
Key-Plan Project:
Bassin de filtration SAFI
127

R=
Location
Morocco
CO
Lin NN. T Contractor
eN O OCP GROUPE
o.5
00- DN 500

S W- End User
200 OCP
-01
6-B
K3 Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-004-BK3 1 of 2 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-004-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
w
TE REDd Elbo
0 I e
200 3 M Flang
680
0 90°1xND
R=
0
280
2

750
5 F.J

1250
0
200 500 750
ND

200
1/3
5 F.J
0 530
200
1/4
0
680 0

300
F.J
530 F.J 552
3
0
280 4

530
0

127
5 F.J F.J
200 1/2 1/5

300 420
0
340 530
5 F.J

1250
0
200 0
530 574 4 CO
F.J Lin NN. T
0
3 eN O
o.5
140 00-

127
F.J S W-
530

500 CO 200
-01
5 ND F.J
Lin NN. T 1-B
1/6 eN O K3
o.5
300 420

1/1
F.J 00-
S
1250

W-
F.J
0 200
. TO 287 -01
NN
CO t.1/2) 4 2-B - -
( sh
K3
- -
127

Key-Plan Project:
Bassin de filtration SAFI
Location
CO
N Morocco
Lin N. TO
eN
o.5 Contractor
00- OCP GROUPE
SW
-20 DN 500

0-0 End User


13- OCP
BK3
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-004-BK3 2 of 2 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-004-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
CO
NN D
(sh . TO
t.2/ O LDE OW
2) M ELB D
N
90=°1.5x
932 R
2

750
977

530
F.J
F.J
4
1/4 750

1890
F.J

345
9 600

1140
3
0
F.J
530 188
500
ND 530 1/2
1/3
932
4

** 1 F.J
311
2 F.J
D
O LDEBOW 1 CO
M EL D 439 Lin NN. T
90°1.5xN eN O
o.5
R= 00-
750

SW
750 -20
F.J 0-0
03-
BK3
1890

1140

1/1 - -
N
Key-Plan - -

F.J Project:
Bassin de filtration SAFI

CO Location
Lin NN. T Morocco
eN O
o.5
00- Contractor
SW OCP GROUPE
-20
0 -00 End User
4-B
K3 OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-002-BK3 1 of 2 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
5- Installation(AG) PIPE CLASS FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-002-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
MO
90° LDED
R= ELBO
1.5 W
xND
750

321
6

750
F.J 171
F.J
2
6

1250
ND
500

500

ND 500
1/2 750 MO
90° LDED
1/1 2 R= ELBO
F.J 1.5 W
xND
F.J

Con 3 F.J
ND ,Redu

750
500 cer
X4
00 F.J

250
CO
(sh NN.TO 1/3
t.1/
2)

3300
ND 400

2300
- -
CO
Lin NN. T
eN O
N
Key-Plan - -
o.5
00-
SW
-20 Project:
0-0
01-
BK3 Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-002-BK3 2 of 2 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-002-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
ND 500
-B K3
0- 002
Dri 20
. TO -SW-

425
llin N
gP N
N10 CO o.500
EN
Co LIN
ND n,Red
ND 300
500 ucer
500 X4 Detail (A)
00

250
300
F.J
200 1

780
875
345 F.J

530
2 F.J

ND 500
6 530
1/1
See
Det
225 200
ail 1/3 F.J 5
Dri (A) F.J **
CO llin 345
Lin NN. TO
gP
N1 425 ND
500 Dri
eN 0 400 500 lli ng
o.3 200 PN1
00- 400 ** 0
SW 4 F.J
300
-2 0
0-0 530 6
01- 1/2
BK3

225 200
1/3 F.J
F.J
2

425
See
Det
ail 4
(A)
- -
Dri
llin
gP
N
Key-Plan - -

CO N1
0
Lin NN. T Project:
eN O
o.3 Bassin de filtration SAFI
00-
S W-
20 0-0
Location
02- Morocco
BK3
Contractor
OCP GROUPE
End User
OCP
1
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-001-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
5- Installation (AG) PIPE CLASS FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-001-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
1- BK3
0-00
-20
. TO 0-SW
NN 0

d
CO No.5
e
Lin

240 78
Detail (A)

450
225 225
l e
Dri
llin
gP
2 N10
F.J
Dri

114
2 llin
gP
N10

5038

e 225
Dri
2 llin
gP
N10

c
F.J

4474
4024(+100)*

n
ND 300

1/1

a
- -
N
Key-Plan - -
225

F.J Dri Project:


llin

c
2
gP Bassin de filtration SAFI
N10
Location
See
Det Morocco
ail
(A ) Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-001-BK3 1 of 1 0
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-RW-02-020-BK4 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
1- BK3
0 -00
20
. TO -SW-
NN 00
CO No.5
e
Lin

d
240 78
Detail (A)

450
225 225
l e
Dri
llin
g PN1
2
F.J
0
Dri

114
2 lling
P N10

5038

e 225
Dri
2 llin
gP
N10

c
F.J

4474
4024(+100)*

n
ND 300

1/1

a
- -
N
Key-Plan - -
225

F.J Dri Project:

c
2 llin
g PN1 Bassin de filtration SAFI
0
Location
See
Det Morocco
a il (A
) Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-002-BK3 1 of 1 0
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- Installation (AG) T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-RW-02-020-BK4 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

3
0 3-BK
0 -0
20
TO - SW-
.
NN 500
CO No.
E
3 LIN
0

127
1 3 -50
PS 8

575
4 400 r
245 uce 00
1/3 e d 4
,R
2 5 Con 500 X 6)
845 N
** D 50 ND 1- TY( Y(6)
0 FI G 1 - T
109 11- FIG
0 9
F.J
S 8 1 1 -
P
530 F.J ND PS8
400
250 1/1
F.J
6
420 6
150 1/2
0 7
300
8
8 623
125
102 - -

748 - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-005-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-005-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

-B K3
-003
- 200
. TO 0-SW
NN 50
CO No.
E
3
LIN

127
500
13-
PS8

575
400
245
1/3
4
d ucer 0
,Re 40
845
2 N 5 Con 500 X Y(6
)
)
** D 50 ND G 1 - T
TY(6
0 I -
109
11-
F G1
0 9
F.J
S 8 1 1 -FI
P
530 F.J ND PS8
400
250 1/1
6
F.J
420 6
150 1/2
0 7
300
8
8 623
125
102 - -

748 - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-006-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE
5- Installation (AG) PIPE CLASS
- DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-006-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

-B K3
0- 003
O W-20
.T - S
O NN o. 500
C N
E
3 LIN
0

127
1 3 -50
PS8

575
4 400 r
245 uce 00
1/3 e d 4
,R
845
2 N 5 Con 500 X Y(6
)
)
** D 50 ND G 1 - T
TY(6
109 0 F I G1 -
0 F.J
S 8 11- 1 -FI
9 P 1
530 F.J ND PS8
400
250 1/1
6
F.J
420 6
150 1/2
0 7
300
8
8 623
125
102 - -
- -
748
Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-007-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE
5- Installation (AG) PIPE CLASS
- DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. .500-SW-200-007-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

3- BK3
-00
200
W-
N. TO 00-S
N 5
CO No.
E
LIN
3
500
13-
PS8

575
4 400 r
245 uce 00
1/3 e d 4
,R
845
2 N 5 Con 500 X Y(6
)
)
** D 50 ND G 1 - T
TY(6
109 0 F I G1 -
0 F.J
S 8 11- 1 -FI
9 P 1
530 F.J
PS8
ND
250 400
1/1
6
F.J
420 6
150 1/2
0 7
300
8
8 623
125
102 - -
- -
748
Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-008-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE H.Adel R.Mileh
5- Installation (AG) PIPE CLASS
- DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata
FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-008-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

-B K3
0- 003
O W -20
.T -S
O NN o. 500
C N
E
3 LIN
0
1 3 -50
PS8

575
4 400 r
245 uce 00
1/3 e d 4
,R
845
2 N 5 Con 500 X Y(6
)
)
** D 50 ND G 1 - T
TY(6
109 0 F I G1 -
0 F.J
S 8 11- 1 -FI
9 P 1
530 F.J ND PS8
400
250 1/1
6
F.J
420 6
150 1/2
0 7
300
8
8 623
125
102 - -
- -
748
Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-009-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
5- Installation (AG) PIPE CLASS
- DESIGN 4 - 1
FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-009-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

3- BK3
0 -00
20
T O - S W-
.
NN 500
CO No.
E
LIN
3
500
13-
PS8

575
4 400 r
245 uce 00
1/3 e d 4
,R
845
2 N 5 Con 500 X Y(6
)
)
** D 50 ND G 1 - T
TY(6
109 0 F I G1 -
0 F.J
S 8 11- 1 -FI
9 P 1
530 F.J
PS8
ND
250 400
1/1
6
F.J
420 6
150 1/2
0 7
300
8
8 623
125
102 - -
- -
748
Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-010-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE H.Adel R.Mileh
5- Installation (AG) PIPE CLASS
- DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata
FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-010-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

3
0 4-BK
0-0
-20
TO SW
N N. 500-
CO No.
E
LIN
3
0
1 3 -50
P S8

575
4 400 r
245 uce 00
1/3 e d 4
,R
845
2 N 5 Con 500 X Y(6
)
)
** D 50 ND G 1 -T
T Y(6
109 0 F I G1 -
0 F.J
S 8 11- 1 -FI
9 P 1
530 F.J
PS8
ND
250 4 00
1/1
6
F.J
420 6
150 1/2
0 7
300
8
8 623
125
102 - -
- -
748
Project:
Bassin de filtration SAFI

Location
Morocco

Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-011-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE
5- Installation (AG) - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-011-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

- BK3
0 -004
-20
TO W
N N. 00-S
CO No. 5
E
3 LIN 0
1 3-50
PS8

575
4 400 r
245 uce 00
1/3 ed 4
,R
845
2 N 5 Con 500 X Y(6
)
)
** D 50 ND G 1 - T
TY(6
109 0 FI G1 -
0 F.J
S 8 11- 1 -FI
9 P 1
530 F.J
PS8
ND
250 400
1/1
6
F.J
420 6
150 1/2
0 7
300
8
8 623
125
102 - -
- -
748
Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-012-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE
5- Installation (AG) PIPE CLASS
- DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-012-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

4- BK3
-00
- 200
N . TO 0-SW
N 0
CO No. 5
E
3 LIN
0
1 3 -50
PS8

575
4 400 r
245 uce 00
1/3 e d 4
,R
845
2 N 5 Con 500 X Y(6
)
)
** D 50 ND G 1 - T
TY(6
109 0 F I G1 -
0 F.J
S 8 11- 1 -FI
9 P 1
530 F.J
PS8
ND
250 400
1/1
6
F.J
420 6
150 1/2
0 7
300
8
8 623
125
102 - -
- -
748
Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-013-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- (**) There will be clash between the support and FJ.
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
5- Installation (AG) PIPE CLASS FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-013-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

4- BK3
00-00
-2
. TO 0-SW
NN 0
CO No. 5
E
LIN
3
0
1 3-50
PS8

575
4 400
245 r
1/3 educe 00
,R 4
845
2 N 5 Con 500 X Y(6
)
)
** D 50 ND G 1 - T
TY(6
109 0 FI G1 -
0 F.J
S 8 11- 1 -FI
9 P 1
530 F.J
PS8
ND
250 400
1/1
6
F.J
420 6
150 1/2
0 7
300
8
8 623
125
102 - -
- -
748
Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-014-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE
5- Installation (AG) PIPE CLASS
- DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. No.500-SW-200-014-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

4- BK3
0 -00
O W -20
. T -S
O NN . 500
C No
E
3 LIN
500

127
3 -
P S81

575
4 400 r
245 uce 00
1/3 e d 4
,R
845
2 N 5 Con 500 X Y(6
)
)
** D 50 ND G 1 - T
TY(6
109 0 F I G1 -
0 F.J
S 8 11- 1 -FI
9 P 1
530 F.J
PS8
ND
250 400
1/1
6
F.J
420 6
150 1/2
0 7
300
8
8 623
125
102 - -
- -
748
Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-015-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- (**) There will be clash between the support and FJ.
B.F -BLIND FLANGE ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
5- Installation (AG) PIPE CLASS
- DESIGN 4 - 1
FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-015-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

4- BK3
0 -00
-20
TO SW
N N. 500-
CO No.
E
3 LIN

127
0
1 3 -50
PS8

575
4 400 r
245 uce 00
1/3 e d 4
,R
845
2 N 5 Con 500 X Y(6
)
)
** D 50 ND G 1 - T
TY(6
109 0 F I G1 -
0 F.J
S 8 11- 1 -FI
9 P 1
530 F.J ND PS8
400
250 1/1
6
F.J
420 6
150 1/2
0 7
300
8
8 623
125
102 - -
- -
748
Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-016-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE
5- Installation (AG) PIPE CLASS
- DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-016-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N Key-Plan

TO
N N. )(UG)
CO .2/2 0
(sh
t N10 N1
P gP
ng llin
Drilli Dri
6
F.J
2
2
0
120 5 P N10
ng
rilli
700
F.J 6 D
260 3 ND
**
600 ND
120 0
600 590 0 120 5 N1 0
F.J n gP
109 1/3 lli
0 00 Dri
169
0
3 N D7
109 F.J
0
125 0 0
320 6 0 120 5 PN1
F.J ng
rilli
109
0 ** 3 D 700 D
250 N
0 109 F.J
0 1/2
0
320 1/1 120 5
F.J
109 700
250 0 3 ND
0 109
0 F.J P N10
6
l ling
320 ** ND Dri
120 - -
590 0
109 F.J - -
250 0 2
0 4

109 Blin Project:


0 Dri d Flan Bassin de filtration SAFI
llin ge
600 gP
N10 Location
169 Morocco
0
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.1200-SW-200-001-BK3 1 of 2 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- (**) There will be clash between the support and FJ. T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
5- Installation (AG) PIPE CLASS FUTURE PIPE INDUSTRIES LLC.
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
Glassfiber Reinforced Pipe Systems
LINE NO. 1200-SW-200-001-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
1 - BK3
00
2 00-
O - S W-
. T 00
O NN o. 12

d
Dri C EN
lli ng LIN
PN1
0
165

e
300

l
4
Dri 122
llin
g PN1
Dri 0
llin
gP
700 F.J 2
N10 4
122 ND

e
450
1/2

*
F.J 1 00)

c
8(+
0 154 8
105
2
244
Dri
lli ng 00 450
PN1 D7 F.J 2

n
0 N
0
105 450 229
1/1
- -
00)
* N
Key-Plan

a
1 - -
F.J
0( +
120 00
2 21 Project:
Bassin de filtration SAFI

c
450 Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.700-SW-200-001-BK3 1 of 1 0
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-RW-02-020-BK4 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
1- BK3
00 -00
W -2
-S
N . TO 1200
N
CO E No.

d
Dri
llin
g LIN
PN1
0
165

e
300

l
4
Dri 122
llin
gP
Dri N10
llin
g
700
PN1 F.J 2
4 ND
122

e
0
450
1/2

*
F.J 1 00)

c
8(+
0 154 8
105
2
244
Dri
l li ng 450
PN1 700 F.J 2
ND

n
0
0
105 450 229
1/1
- -
00)
* N
Key-Plan

a
1 - -
F.J
0 ( +
120 0
2 210 Project:
Bassin de filtration SAFI

c
450 Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.700-SW-200-002-BK3 1 of 1 0
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-RW-02-020-BK4 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
1- BK3
00 -00
W -2
-S
N . TO 1200
N
CO E No.

d
Dri
llin
gP LIN
N10

165

e
300

l
4
Dri 122
lli ng
Dri P N10
llin
g PN1 00 F.J 2
122
4 D7

e
0 N
450
1/2

*
F.J 1 00)

c
8(+
0 154 8
105
2
244
Dri
llin
gP 00 450
N10 D7 F.J 2

n
N
0
105 450 229
1/1
- -
00)
* N
Key-Plan

a
1 - -
F.J
0( +
120 00
2 21 Project:
Bassin de filtration SAFI

c
450 Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.700-SW-200-003-BK3 1 of 1 0
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1
5- Client to advise the correct Flange Drilling. PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-RW-02-020-BK4 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
1- BK3
00 -00
W -2
-S
. TO 1200

d
N N
Dri CO E No.
llin
g LIN
PN1
0
165

e
300

l
4
Dri 122
llin
gP
Dri N10
llin

e
g PN1 00 F.J 2
4 7
0 122 ND
450
1/2

c
*
F.J 1 00)
8(+
0 154 8
105
2
244
Dri
450

n
l li ng
PN1 700 F.J 2
0 ND
0
105 450 229
1/1

a
- -

F.J ( + 100)
* N
Key-Plan - -
0
120 0
2 210 Project:

c
Bassin de filtration SAFI
450 Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.700-SW-200-004-BK3 1 of 1 0
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-RW-02-020-BK4 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
100
2900
3

3100

ND 200
2800
1/1

360
200
F.J

60
2

200
2
- -
N
Key-Plan
1900

F.J - -

Project:
1700

Bassin de filtration SAFI


ND 200

1/2
Location
Morocco

n end Contractor

Op e OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.200-SW-200-001-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 200-SW-200-001-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
0
791 PN1
ng
540 D rilli

2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-001-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- Installation (AG) T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-001-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
790 N10
gP
Dr illin 0
539 g PN1
llin
ND Dri
2
300 78
D ow
478 I T ERE d Elb
1 3 M Flange
3 90°1xND
R=
3
5

300 4

450
2_
IG
811_F
PS nd
ne
Op e

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-003-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-003-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 500
1/2 MO
L
90° DED
3 R= ELBO
1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-017-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-017-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
791 P N10
il li ng
540 Dr
2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-002-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-002-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
790 N10
gP
illin
539 Dr P N10
i ll ing
ND Dr
2
300 78
D ow
478 IT ERE d Elb
1 3 M Flange
3 90°1xND
R=
3
5

300 4

450
2 _
IG
1 1_F
PS8 n end
Ope

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-004-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-004-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 500
1/2 MO
L
90° DED
3 R= ELBO
1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-018-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- Installation (AG) T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-018-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
791 N10
gP
Dr illin
540
2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-003-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-003-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
790 P N10
l ling
539 Dri N10
gP
ND D ir llin
2
300 78 w
478 T E RED Elbo
I d
1 3 M Flange
3 90°1xND
R=
3
5

00 4
2_3

450
IG
11 _F
PS8 n end
Ope

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-005-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-005-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 5 00
1/2 MO
L
90° DED
3 R= ELBO
1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-019-BK3 1 of 1 0
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
- DESIGN 4 - 1
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-019-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
791 P N10
ng
540 D rilli

2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-004-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- Installation (AG) T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-004-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
790 P N10
ng
D rilli N10
539 gP
ND D ir llin
2
300 78 w
478 T E RED Elbo
I d
1 3 M Flange
3 90°1xND
R=
3
5

00 4
2_3

450
IG
_F
PS 811 nd
ne
Ope

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-006-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-006-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 5 00
1/2 MO
L
90° DED
3 R= ELBO
1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-020-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-020-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
791 P N10
i l l i ng
540 Dr
2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-005-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-005-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
790 P N10
ng
D rilli N10
539 gP
ND D ir llin
2
300 78 w
478 T E RED Elbo
I d
1 3 M Flange
3 90°1xND
R=
3
5

00 4
2_3

450
IG
_F
PS 811 nd
ne
Ope

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-007-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- Installation (AG) T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-007-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 500
1/2 MO
L
90° DED
3 R= ELBO
1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-021-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
- DESIGN 4 - 1
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-021-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
791 N10
gP
D ir llin
540
2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-006-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-006-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
790 P N10
l ling
539 Dri N10
gP
ND D ir llin
2
300 78 w
478 T E RED Elbo
I d
1 3 M Flange
3 90°1xND
R=
3
5

00 4
2_3

450
IG
11 _F
PS8 n end
Ope

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-008-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-008-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 500
1/2 MO
L
90° DED
3 R= ELBO
1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-022-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-022-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
100
2170
3

2370

ND 200
2070
1/1

360
200
F.J

60
2

200 2
- -
N
Key-Plan
1667

F.J - -

Project:
1467

Bassin de filtration SAFI


ND 200

1/2
Location
Morocco

n end Contractor

Ope
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.200-SW-200-002-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 200-SW-200-002-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
0
791 PN1
ng
540 D rilli

2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-012-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-012-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
790 P N10
l ling
539 Dri P N10
lling
ND Dri
2
300 78
D ow
478 I T ERE d Elb
1 3 M Flange
3 90°1xND
R=
3
5

00 4
2_3

450
IG
_F
PS 811 nd
ne
Ope

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-014-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-014-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 5 00
1/2 MO
L
90° DED
3 R= ELBO
1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-028-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-028-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
791 P N10
lling
540 Dri
2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-011-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-011-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
790 P N10
l ling
539 Dri P N10
lling
ND Dri
2
300 78
D ow
478 IT ERE d Elb
1 3 M Flange
3 90°1x ND
R=
3
5

00 4
2_3

450
IG
11 _F
PS8 n end
Ope

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-013-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-013-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 5 00
1/2 MO
L
90° DED
3 R= ELBO
1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-027-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- Installation (AG) T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-027-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
791 P N10
l ling
540 Dri
2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-010-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-010-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
790 P N10
lling
539 Dri P N10
lling
ND Dri
2
3 00 78
D ow
478 IT ERE d Elb
1 3 M Flange
3 90°1xND
R=
3
5

_3 00 4

450
IG2
1 1_F
PS8 ne
nd
O p e

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-012-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-012-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 500
1/2 MO
L
90° DED
R= ELBO
3 1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-026-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-026-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
791 N10
gP
Dr illin
540
2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-009-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-009-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
790 P N10
l ling
539 Dri N10
gP
ND D ir llin
2
300 78 w
478 T E RED Elbo
I d
1 3 M Flange
3 90°1xND
R=
3
5

00 4
2_3

450
IG
11 _F
PS8 n end
Ope

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-011-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- Installation (AG) T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-011-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 5 00
1/2 MO
L
90° DED
3 R= ELBO
1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-025-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-025-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
791 P N10
ng
540 D rilli

2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-008-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-008-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
0
790 g PN1
l lin
539 Dri P N10
l ling
ND Dri
2
300 78
D ow
478 I T ERE d Elb
1 3 M Flange
3 90°1xND
R=
3
5

_3 00 4

450
_F IG2
11
PS8 n end
Ope

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-010-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-010-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 5 00
1/2 MO
L
90° DED
3 R= ELBO
1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-024-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- Installation (AG) T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-024-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
791 P N10
l ling
540 Dri
2 ND
800
Blin
Dri d Fla
llin nge
1 gP
N10

3 4

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.800-SW-200-007-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
4- Installation (AG) T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 800-SW-200-007-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
251
790 P N10
l ling
539 Dri P N10
lling
ND Dri
2
300 78
D ow
478 IT ERE d Elb
1 3 M Flange
3 90°1xND
R=
3
5

00 4
2_3

450
IG
11 _F
PS8 n end
Ope

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.300-SW-200-009-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE H.Adel R.Mileh
- DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-009-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
200 125
0
105
0
ND
2 5 00
1/2 MO
L
90° DED
3 R= ELBO
1.5 W
xN
D

750
F.J

1200

ND 500

3052
2302
4
U-B
OLT
1/1

- -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.500-SW-200-023-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Osama H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 500-SW-200-023-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
PS8
1 3_6
00
PS8
13_
600 3
PS8
13_ 0
600 400 600
1/1 ND
PS8
1 3_6 0 125
00 400 4

0 75
400 4
116
F.J
1/3
0
3
200 4
F.J
1/2
00
F.J
4 360
0 182
2
164
0
190
850
101 900
4 - -
N
Key-Plan - -
D
I T EREW
3 M ELBOD Project:
90°1.5xN Bassin de filtration SAFI
R=
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.600-SW-200-001-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 600-SW-200-001-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
3_ 600
P S81
3_ 600
3 P S81
3_ 600
P S81
125
1/1 3 _ 600
4 1
PS8
116 3M
118 7 5 90°ITERE
00 4
F.J R= ELB D
ND 1.5 OW 3
600 xND
4

1/2 2
183 565 4 F.J
50 0
164
900 850

4
101 - -
N
Key-Plan - -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT FPI-ISO Line No.600-SW-200-002-BK3 1 of 1 0
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 600-SW-200-002-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
3M
90°ITERE
R= ELB D
1.5 OW
xND
198
0 584
0

1980
0
386

363
4
F.J 0
ND

600
F.J
1 200
1/2 373

2698
0 7

0
F.J

105
V

48
PS
81 1/1

°
3_ 9
PS 1 20 2 42 CO
Dri
lli
8 13
_1
0
(sh NN. T
ng 20 5 t.1/ O
PN1 0 2)(
0 F.J AG
Dri Dri
llin 6 00 2 00 2M )
2
llin
g gP
00 D1 5 0
48°ITERE
PN1 N10 30 7 N 1/3 10
0 F.J R= ELB D
0 1.5 OW
7 1 80 xND
254 6 F.J
1/4
1

120CONN 0 3 00 0
0-S . TO 126 F.J 56 9 01
3 1
W-2 3 5 60
00-
002 1/5
560
- BK
3 2 120
0
8 600
F.J
N D 0 1M
12°ITERE
8
254
710 7 8
116
109 R= ELB D
0
PS
8 PS
81 1.5 OW
11
_ FIG 1 _F xND
0
1
289 090
F.J 1-T
Y8
IG
1-T
Y8
N
Key-Plan - -
- -
HT
122

50.503

HT
121

49.995

Project:

X = 137568.20
Bassin de filtration SAFI
Y = 187187.18

X = 137545.85
Y = 187187.18

Location
Morocco
Cond. DN 600
FE 49.92 Contractor
OCP GROUPE

COUDE PLANI. : 100.00g


COUDE ALTI. : 146.21g

COUDE ALTI. : 187.71g


End User
Protection par Dallette OCP
1
Drawing Title:
From N 1 to N 13 ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT LINE NO. 1200-SW-200-001-BK3 2 of 2 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 1200-SW-200-001-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
0
125
TO
N N. )
0 CO t.2/2
575 (sh
Dri
llin
g ASA 0
Dri 150 125
Dri llin F.J
llin gA 00 Con
gP SA 100 D7 5
Dri N10 150 5 N ND ,Redu
llin 120 cer
g 0 0X
PN1 450 1/2 700
0 600 F.J
600
600 1 200 F.J
254 3 ND Con
3
5 ND ,Redu
F.J
1/1
120 cer
0 0X
126 4 7
700

4 7 PS8
11-
0 7 F
F.J
2 120 PS8
IG1
-TY
ND 7 1 (8)
PS8 1
11- -FIG1
FIG -TY
PS8 1-T (8)
4
11-
FIG
1-T
Y(8
)
N
Key-Plan - -
271 6
600 Y(8
0 ) - -

Project:
0
120 254 Traversée de Route

_ Bassin de filtration SAFI


13 0
PS8 PN1
Cond. DN 600
FE 49.69

Cond. DN 300 Cond. DN 1200

COUDE PLANI. : 100.00g


FE 46.76 FE 46.76

COUDE ALTI. : 177.31g


44.70

Location
ll i n
Dri
Protection par Dallette

Cotes T.F Voirie


Cotes T.F Voirie
Cotes TN
Cotes Projet
Cotes Projet - TN
Distances Partielles
Distances Cumulées
Déclivité Projet

Alignements et Courbes
Morocco
Cotes TN
Nature de la conduite

Cotes Projet
Cotes Projet - TN
Distances Partielles
Contractor
Distances Cumulées
Déclivité Projet
OCP GROUPE
Alignements et Courbes
Conduite FRP DN1200
Nature de la conduite End User
OCP
1
Drawing Title:
From N 1 to N 15 ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT LINE NO. 1200-SW-200-002-BK3 1 of 2 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (UG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 1200-SW-200-002-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
3M
IT
90° ERED
R= ELBO
1.5 W
xND 223
0
210
0
8 0 4
19 130
1/5

F.J
0
48
3
18 0
0 120
0
118 ND

1/3

6623
V
0 F.J
04 9
1/4 3
25
17

21
°
0
61 F.J

1/2 F.J
2
1M
21°ITERE
F.J 610 ELB D
0 179
0 OW N
Key-Plan - -
120
1/1 ND - -

0
253
Project:
0
493
Traversée de Route

Bassin de filtration SAFI


F.J
Cond. DN 600
FE 49.69

TO
Cond. DN 300 Cond. DN 1200

COUDE PLANI. : 100.00g


FE 46.76 FE 46.76

N. )

COUDE ALTI. : 177.31g


44.70

Location
N
CO .1/2
Protection par Dallette

Cotes T.F Voirie


Cotes TN
Cotes Projet
Morocco
t
Cotes Projet - TN
Distances Partielles

Cotes T.F Voirie Distances Cumulées

(sh
Déclivité Projet

Alignements et Courbes

Cotes TN
Nature de la conduite

Cotes Projet
Cotes Projet - TN
Distances Partielles
Contractor
Distances Cumulées
Déclivité Projet
OCP GROUPE
Alignements et Courbes
Conduite FRP DN1200
Nature de la conduite End User
OCP
1
Drawing Title:
From N 1 to N 15 ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT LINE NO. 1200-SW-200-002-BK3 2 of 2 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (UG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 1200-SW-200-002-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N Key-Plan

UG
AG

200 245 P N10


0 l i ng
222 Dr i l
P N10
5 l ling
4 Dri
78
225
1/3
1
2
F.J 225 130
0
2 625
5
ND 450
5 F.J 300
1/1
F.J
D
LDE W
3
MO ELBOD
CO 90°1.5xN
LIN NN. T 300 F.J R=
- -
EN O 1/2 ND 1 450 - -
o. 3
00-
SW
-20
0- 590 0 Project:
017
- 104 Bassin de filtration SAFI
BK3 F.J
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT LINE NO. 300-SW-200-016-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (UG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-016-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

200 P N10
342 ng
150 5 D rilli PN1
0
0 g
4 llin
Dri
ND 150
3 00 0 78
4
225
1/1
2
320 F.J 225 115
0 6
611 320 6- BK3
6 -01
ND 200
300 320 W-
6
. TO 00-S
F.J
2 560 N N 3
CO No.
1/2 E
F.J LIN
ND 240 T ERED
I W
300 2 M ELBOD
5 °
39 1.5x N
320
F.J
R=
3

240
51
°
1/3 F.J

52
85
- -

2750
H - -
F.J

13590
39°
10
56 Project:
1

10600
1/4
Bassin de filtration SAFI
Location
Morocco
Co
ll
R 2 1.1 Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT LINE NO. 300-SW-200-017-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (UG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-017-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
Dri
lling
PN1
0
PS8
11-
FIG
1-T
Y(4
)
N10 78 K 3
gP 5) 5-B
D r i llin 1 - TY( - 0 1
200
5
G
11 -FI TO 0-SW
-
N10
1/1
300 PS8 P
.
NN 0
llin
g 5) 07 225 CO No. 3
Dri - TY( 10 E
ND G 1 LIN
4 00 1 -FI
2 PS8
1 402 F.J

300
F.J
120
0 380 ND 3 8
2
150 7 F.J 1/2
0 300 D
7
6
O LDEBOW
4 M EL ND
530 F.J 90=°1.5x
102 R
530
600

600
166 N
0 Ope
n end
Key-Plan - -
- -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT LINE NO. 400-SW-200-002-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (UG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 400-SW-200-002-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
3

CO 1/1
300
NN
LIN . TO ND
EN
o. 4 3 125
00- F.J
SW
-20
0-0 2
300 0
02-
BK F.J 280
3 5
292

0
315
225
78

N
Key-Plan - -
- -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT LINE NO. 300-SW-200-015-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (UG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 A.Zalata H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 300-SW-200-015-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

650 0
g PN1
150 450
Dri
llin PN10
g
llin
30 Dri
ND 0 200
4 200 1
60
1/1
200 143
F.J 0 D
2 110 ITERE W
0 1 M ELBOD
26° .5xN
2
5
130 R=1
5 F.J ND
200
3
1/2
F.J

13
0
1

15
13

F.J

30
00
H

27
40
26

1/3
96

°
26

13
- -

F.J

0
- -

1/4
RED F.J Project:
I T E W
3
Bassin de filtration SAFI
1 M ELBOD
130
26°1.5xN 1 Location
R= Morocco
500
630 Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT LINE NO. 200-SW-200-003-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (UG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 200-SW-200-003-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
300 0
170
0 g PN1
110 1400 Dri
llin P N10
g
0 llin
4 Dri
ND 300 102
400
1/1
F.J
300 111
9
2 219
5
600
5 F.J ND
400 D
2
O LDE OW
1/2
M ELB D
F.J 90°1.5xN
R=

600
3

n end
Ope

N
Key-Plan - -
- -

Project:
Bassin de filtration SAFI
Location
Morocco
Contractor
OCP GROUPE
End User
OCP
Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 09-11-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT LINE NO. 400-SW-200-001-BK3 1 of 1 1
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2
4- Installation (UG) B.F -BLIND FLANGE 04-03-2024 H.Adel R.Mileh
- DESIGN 4 - 1 ISSUED FOR AS-BUILT KH.Mohamed
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 400-SW-200-001-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.
N
Key-Plan

TN 256
52.55

98
4

1664
cer 0

1566
4 d u 0
c c ,Re0 X 7
E 90 1/8
ND
500 202 98

1/6
5 3
D
I T EREW
F.J 3 M ELBOD
1/5 700 90°1.5xN
ND 900

ND R=
500

1
187
5690
3000

1/7
6
2500

F.J
1/4
13090
1490
1490 400

F.J - -
11600
nge
le Fla
- -
8200 d
r Bud
2 900 2350 150 ng ul a
ND 900 A 74 Project:
F.J
7 °
F.J Bassin de filtration SAFI
1/3 F.J
16°

D
ERE W
1/2 Location
1/1
I T Morocco
3 M ELBOD See
90°1.5xN Det
ail
150 Contractor
R= (A 0
12

1160 OCP GROUPE


08

)
58

36
3

End User
OCP
2 Detail (A) Drawing Title:
ISOMETRIC DRAWING
DESIGNED A.Ibrahim CHECKED H.Adel APPROVED M.Fouad
NOTES : PROCESS DATA REVISION STATUS DRAWN BY A.Ibrahim DATE 12-12-2023 SCALE NTS

- CONDITIONS PRESS. ( Bar g ) TEMP. (° C) 5 ISO DRAWING NO. SHT. NO. REV. NO.
1- All dimensions are in mm. LEGEND- : MEDIUM
2- Drilling standard to be reconfirmed by the client prior to production. - MINIMUM - - 4
FJ -FIELD JOINT LINE NO. 900-SW-200-001-BK3 1 of 1 2
WORKING

STIFFNESS 5,000 NORMAL - - 3


3- (*) We considered that all non standard items are special items. SJ -SHOP JOINT
T.N -TRUE NORTH SYSTEM PCT MAXIMUM - - 2 ISSUED FOR AS-BUILT 04-03-2024 KH.Mohamed H.Adel R.Mileh
4- Installation (AG) B.F -BLIND FLANGE - DESIGN 4 - 1 ISSUED FOR REVIEW & COMMENTS 12-12-2023 A.Ibrahim H.Adel M.Fouad
PIPE CLASS
- FEILD TEST - - 0 ISSUED FOR REVIEW & COMMENTS 09-11-2023 A.Ibrahim H.Adel M.Fouad
FUTURE PIPE INDUSTRIES LLC.
Glassfiber Reinforced Pipe Systems
LINE NO. 900-SW-200-001-BK3 REV DESCRIPTION DATE PREPARED CHECKED APPROVED

CB/CS - CEMENT BELL & SPIGOT TB/TS - TAPERED BELL & SPIGOT FB/FS - FIXED BELL & SPIGOT CB/CB - DOUBLE BELL COUPLER PL/PL - PLAIN END FL/FL - FLANGE CONNECTION THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF FUTURE PIPE INDUSTRIES LLC. NO REPRODUCTION
OR DISCLOSURE OF ANY PART HEREOF TO THIRD PARTIES OR USE HEREOF IS ALLOWED AT ANY TIME WITHOUT AUTHORIZATION
ADHESIVE BONDED JOINT ADHESIVE BONDED JOINT RUBBER SEAL LOCK JOINT ADHESIVE BONDED JOINT BUTT & WRAP LAMINATION JOINT FLANGE / FLANGE CONN. JOINT IN WRITING. ALL RIGHTS ARE VESTED IN FUTURE PIPE INDUSTRIES.

You might also like