0% found this document useful (0 votes)
118 views

Rate Analysis For Conservation Works

Uploaded by

ASIF ALI ASIF
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views

Rate Analysis For Conservation Works

Uploaded by

ASIF ALI ASIF
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 121

INTACH

SCHEDULE OF RATES

FOR

BUILDING CONSERVATION WORKS

ARCHITECTURAL HERITAGE DIVISION

INDIAN NATIONAL TRUST FOR ART AND CULTURAL HERITAGE

71, LODHI ESTATE

NEWDELHI- 110003
PREFACE

1. INTACH Schedule of Rates includes the items required for Restoration and Renovation of
Heritage Buildings with Rate Analysis.
2. Traditional Materials and Traditional techniques are followed for preparation of Rate Analysis
for Restoration Works
3. Modern Materials and Techniques which are compatible with Heritage Buildings are included in
the Schedule of Rates
4. Rate Analysis has been prepared based on method proposed in Rate Analysis of DSR and from
the experiences of INTACH, Contractor and ASI Engineer
5. Try to include all Types of lime works in Mortars, Concrete, Plastering, Stone works, Water
Proofing and Repair works in the items of SOR.
6. Since Traditional Construction Techniques consume more time and materials compare to
Modern Techniques, 20 to 50 % of more quantity is considered for labor and wastage
calculation depends upon the work.
7. The rates are as per prevailing market Rates and DSR 2013 rates

.
BASIC RATES
The rates of Machinery are as per DSR 2013 and prevailing market rates
0.1 HIRE CHARGES OF PLANTS
Code No Description Unit Rate Rs.
DSR 0002 Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper day 800.00
DSR 0003 Hire charges of Diesel Road Roller - 8 to 10 tonne Day 1,500.00
DSR 0006 Spray machine day 250.00
DSR 0013 Machine for rubbing of floors day 350.00
DSR 0080 Hire and running charges of drill machine up to 400 mm dia day 7,500.00
M Rate Pressure Pump day 1,000.00
M Rate Hand operated mixer/Mechanical mixer day 800.00
0.2 LABOUR
The rates of labour are as per DSR 2013 and prevailing market rates
DSR 0100 Bandhani day 328.00
DSR 0101 Bhisti day 328.00
DSR 0102 Blacksmith 1st Class day 393.00
DSR 0111 carpenter day 297.00
DSR 0113 Chowkidar day 297.00
DSR 0114 Beldar day 297.00
DSR 0115 Coolie day 297.00
DSR 0123 Mason 1st class day 393.00
DSR 0124 Mason (brick layer) 2nd class day 361.00
DSR 0125 Mason (for plain stone work) 2nd class day 361.00
DSR 0126 Mason (for ornamental stone work) 1 st class day 393.00
DSR 0126 Extra labour for ornamental finish Mason (for ornamental stone work) 1 st class day 393.00
DSR 0127 Driver (for Road Roller, Concrete Mixer Truck etc.) day 393.00
DSR 0128 Mate day 328.00
DSR 0131 Painter day 361.00
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 328.00
DSR 0155 Mason (Average) day 377.00
M Rate Conservator day 1,650.00
M Rate Designer for Arts day 1,000.00
0.3 MATERIAL
The rates of Materials and machinery are as per DSR 2013 and prevailing market rates
DSR 0286 Brick Aggregate 50mm Cum 500.00
DSR 0287 Brick Aggregate 40mm Cum 510.00
DSR 0293 Stone Aggregate 40mm Cum 1,000.00
DSR 0295 Stone Aggregate (Single size) : 20 mm nominal size Cum 1,200.00
DSR 0297 Stone Aggregate (Single size) : 20 mm nominal size Cum 1,050.00
DSR 0305 Bamboo Battens 25mm 2.5 M long Score 350.00
DSR 0308 Bhusa Quintal 400.00
DSR 0362 Brick Bats Cum 500.00
DSR 0367 Portland Cement tonne 6,600.00
DSR 0373 Cramp Gun metal 25x6x300 mm Each 80.00
DSR 0771 Kerosene Oil Lit 60.00
DSR 0773 Unslaked lime Quintal 800.00
DSR 0784 Marble dust Cum 1,000.00
Ready mixed pink or grey primer on wood work (hard and soft wood) having VOC
DSR 0806 lit 120.00
content less than 50 grams/ litre
DSR 0811 Mud (dry) Cum 60.00
DSR 0859 Oil type wood preservative lit 80.00
DSR 0874 Black colour dark shade pigment Kg 55.00
DSR 0875 Red oxide Cum 75.00
DSR 0982 coarse sand zone III Cum 1,120.00
DSR 0983 Fine Sand zone IV Cum 650.00
DSR 1002 Mild steel round bar 12 mm dia and below quintal 4,500.00
DSR 1007 Structural steel such as tees, angles channels and R.S. joists quintal 4,650.00
DSR 1010 Mild Steel Plates Quintal 4,700.00
DSR 1024 Galvanised steel bolts & nuts Exch 12.00
DSR 1189 Second class teak wood in scantling 1cum 66,000.00
DSR 1154 Through and bond stone 100 nos 1,200.00
DSR 1157 Stone for masonry work Cum 700.00
DSR 1159 Sand dust Cum 1,000.00
DSR 1160 Red sand stone block 10cudm 65.00
DSR 1161 White sand stone block 10cudm 70.00
DSR 1163 White sand stone slab 75 mm thick (un-dressed) Sqm 300.00
DSR 1164 Red sand stone slab 40 mm thick (Indressed) Sqm 190.00
DSR 1165 White sand stone slab 40 mm thick (Indressed) Sqm 215.00
DSR 1166 Red sand stone slab 30 mm thick (Indressed) Sqm 130.00
DSR 1168 Kota stone slab 20 mm to 25 mm thick (semi- polished) Sqm 357.00
DSR 1169 Kota stone slab 25mm thick (rough chiseled) Sqm 210.00
DSR 1174 Red sand stone slab 45 mm to 50 mm thick (un-dressed) Sqm 172.00
DSR 1175 White sand stone slab 45 mm to 50 mm thick (un-dressed) Sqm 225.00
DSR 1182 Surkhi Cum 700.00
DSR 1219 wire nails Kg 60.00
DSR 1220 wire mesh Sqm 45.00
DSR 1235 Diesel oil lit 48.63
DSR 1237 Cutting sand stone slab up to 50 mm thick by mechanical device m 9.00
DSR 1984 Common burnt clay F.P.S. (non modular) of bricks class designation 10 1000 nos. 4,800.00
DSR 2602 Common burnt clay F.P.S. (non modular) of bricks class designation 7.5 1000 Nos 4,800.00
DSR 2750 8 mm thick Raj Nagar white (mirror polished of all shades) Sqm 500.00
DSR 6001 White marble slab Makrana second quality plain veined 18 mm thick Sqm 2,375.00
DSR 6007 Pink marble slab plain 18 mm thick Sqm 750.00
DSR 6010 Udaypur green marble slab plain 18 mm thick Sqm 825.00
DSR 6019 Black Zebra marble slab plain 18 mm thick Sqm 650.00
DSR 7071 White marble Raj Nagar plain 18 mm thick upto 0.50 sqm area Sqm 770.00
DSR 7266 Pressed clay tiles 20mm thick 250x250 mm size 1000 Nos. 12,150.00
DSR 7296 Granite of any colour, 30 mm thick (slab area upto 0.50 sqm) Sqm 2,300.00
Raj nagar plain white marble (table rubbed and polished) 18 mm thick (slab area
DSR 7453 Sqm 1,100.00
more than 0.50 sqm)
DSR 7850 Agaria White marble slab plain 18 mm thick Sqm 1,430.00
DSR 8666 Stainless steel screws 25 mm x4 mm 100 nos 32.00
DSR 8737 Stainless steel wire guage (Grade-304) aperture 1.4 mm and 0.50 mm dia wire Sqm 830.00
DSR 9999 Sundries L.S 1.70
M Rate Laterite stone Sqm 1,050.00
M Rate Heritage Floor Tile Sqm 2,044.40
M Rate Heritage Skirting Tile Sqm 1,614.00
M Rate Brick aggregate 25mm Cum 500.00
M Rate Brick aggregate 20mm Cum 550.00
M Rate Washing soap Kg 125.00
M Rate Alum Kg 75.00
M Rate Fuel Cost for running the miller lit 60.00
M Rate 5 % crude oil by weight of lime Kg 100.00
M Rate Bonding Agent (Nitobond SBR) Lit 400.00
M Rate Polimer Lit 1,000.00
M Rate Grouting Machine day 1,000.00
M Rate Stone cutter machine day 650.00
M Rate Running cost for upkeep of mortar mill day 800.00
M Rate Tiles average size of 200mmx125mmx6mm 1000 nos 3,000.00
M Rate Bamboo Battens 25mm 3.3 M long No 462.00
M Rate Rope Kg 50.00
M Rate Bricks No 7.00
M Rate Traditional Bricks No 12.00
M Rate Micro sand Kg 5.00
M Rate Burnt Earthern Pot No 12.00
M Rate Bond stone of size 450x200x50 No 150.00
M Rate Non Ionic Soap Lit 150.00
M Rate Lime stone of size 15"x9"x7" No 34.00
0.4 CARRIAGE CODES
DSR 2201 Carriage of bricks L.S 284.39
DSR 2202 Carriage of stone aggregate Cum 106.64
DSR 2203 Carriage of coarse sand zone III Cum 106.64
DSR 2205 Carriage of steels tone 94.80
DSR 2206 Carriage of stone aggregate 40 mm nominal size and above Cum 115.92
DSR 2207 Carriage of brick tiles 1000 Nos 170.63
DSR 2208 Carriage of lime Cum 106.64
DSR 2209 Carriage of cement tonne 94.80
DSR 2215 Carriage of Soling stone & masonry stone Cum 125.47
DSR 2216 Carriage of stone blocks white & red sand stone & kota stone slab tonne 94.80
DSR 2260 Carriage of Brick Aggregates Cum 115.92
DSR 2261 Carriage of fine sand zone IV Cum 106.64
DSR 2264 Carriage of rubbish Cum 106.64
DSR 2266 Carriage of surkhi cum 106.64
DSR 2267 Carriage of sand dust Cum 106.64
DSR 2268 Carriage of marble dust and/or marble chips cum 106.64
DSR 2342 Carriage of Solvent / Diesel. Quintal 10.66
0.5 DSR ITEMS
Centering and shuttering including strutting, propping etc. and removal of form
DSR 5.9.9. Sqm 1,006.65
for Arches, domes, vaults up to 6 m span.
DSR 3.8 Cement Mortar 1:3 (1 Cement: 3 Coarse Sand) Cum 4,347.70
DSR 3.18 Mud Mortar Cum 366.20
Demolishing lime concrete manually/ by mechanical means and disposal of
DSR 15.1 Cum 281.45
material within 50 metres lead as per direction of Engineerin- charge.
Demolishing brick tile covering in terracing including stacking of serviceable
DSR 15.26 Sqm 36.95
material and disposal of unserviceable material within 50 metres lead.
Making chases up to 7.5x7.5 cm in walls including making good and finishing
DSR 18.78 m 77.65
with matching surface after housing G.I. pipe etc
INTACH SOR
S NO Description of Items Unit Rate in Rs
1. SITE CLEARANCE
Clearance of debris around the heritage building by excavation upto depth 1.50mtr to
2.00 mtr carefully without damaging the buried architectural parts of the building and
1.1
collect all the intact parts at proper place for reuse at the time of restoration work as per
direction of Engineer incharge.
All kinds of soil Cum 434.95
Scientific debris to be done manually using sieve as per the direction of the conservation
1.2 architect. All antiquities and historic remains to be classified and documentated Cum 594.12
photographically before numbering and storing them in the office

1.3 Add extra for sorting lifting & stacking charges for architectural parts up to 50m lead. Cum 372.27
2. SURFACE CLEANING AND BONDING
Removing of old sulphated lime wash/white or colour wash in multiple applications
without causing damage to the surface below. Scrubbing (not by scraping which leaves
surfaces scarred and scratched ) with bristle brushes and hot water ( Care to be taken if
the surface is weak one it will break down). Hot water should be used if the limewash has
2.1 Sqm 451.93
an oil or tallow binder. Gentle cleaning with air abrasive tools can be used if the wall
surface is not very week.The final clean will almost invariably have to be carried out by
hand scrubbing and rinsed with clean water on completion. The work should be done
under supervision of a trained conservator.

Removal of rust, existing coatings, mill scale, dirt, oil, grease, and other contaminants
2.2 Sqm
q 293.33
from steel sections using Micro sand with the help of pressure pump.pump
Removal of stains, dirt, blackening and other contaminants from Marble by using the
2.3 solution of Non Ionic soap diluted with water . The soap solution should be mild and the Sqm 133.15
recommeded PH Value is 7.
3.0 LIME MORTAR
Preparation of Lime Mortar 1:3 (1 Lime: 3 Sand)
Construct two tanks at ground level. One for slaking of lime and other for storage of slaked lime. Slake the lime in the
tank mixing it with water. Water should be sufficiently more and above the lime. Mix and stir with wooden solid pole
for three days under the supervision of conservation Architect. Sieve the sand passing through 4.75mm sieve set. Take
one part of slaked lime in a container and 3 parts of sieved sand in the same size container Place these materials in a
lime mortar miller Grind the mix for a 12 to 15 minutes Remove the mix from the miller and stack it in a storage tank
for maturity period of 4 to 5 days.

A good aggregate for a Lime Mortar should be with angular grains and free of contaminats such as salt and oranic
matter. The aggregates should be well graded sand typically has grain sizes between 4mm and 0.125mm, with the
largest proportion of grains at the mid‐point sieve fractions.

3.1 Lime Mortar 1:1 ( 1 Slaked lime :1 fine sand) Cum 9,142.95
3.2 Lime mortar 1:1:1 ( 1 Slaked lime:1 surkhi:1 fine sand) Cum 8,232.80
3.3 Lime mortar 1:1:1 ( 1 Slaked lime:1 surkhi:1 Coarse sand) Cum 6,806.02
3.4 Lime mortar 1:1.5:1.5 ( 1 Slaked lime:1.5 surkhi:1.5 Coarse sand) Cum 6,319.53
3.5 Lime Mortar 1:2 ( 1 Slaked lime: 2 Surkhi) Cum 6,565.11
3.6 Lime Mortar 1:2:1 ( 1 Slaked lime : 2 Surkhi:1 fine sand) Cum 7,571.58
3.7 Lime Mortar 1:2 ( 1 Slaked lime: 2 Coarse Sand) Cum 7,005.52
3.8 Lime Mortar 1:2 ( 1 Slaked lime: 2 Fine sand) Cum 8,256.64
3.9 Lime Mortar 1:3 ( 1 Slaked lime: 3 Coarse Sand) Cum 7,588.17
3.10 Lime Mortar 1:1:2 ( 1 Slaked lime: 1Surkhi:2 Coarse Sand) Cum 6,397.70
3.11 Lime Mortar 1:1:2 ( 1 Slaked lime: 1Surkhi:2 fine Sand) Cum 7,679.30
3.12 Lime Mortar 1:3 ( 1 Slaked lime: 3 fine Sand) Cum 8,782.53
3.13 Lime Mortar 1:2 ( 1 Slaked lime: 2 Marble dust) Cum 6,891.19
3.14 Kafgi Lime Mortar 3:4: 8( 3 Slaked lime :4 coarse sand: 8 surkhi) Cum 5,904.21
3.14.1 Khafgi mix with cement 8:1(8 Khafgi: 1cement) Cum 8,517.74
3.15 Lime Mortar 1:3:6 ( 1 Slaked lime: 3Surkhi:6 Coarse Sand) Cum 5,511.77
3.16 Mud Mortar 1:3:1 ( 1 Slake Lime : 3 Mortar:1 Coarse sand Sand) Cum 4,989.45
3.17 Mud Mortar Cum 759.20
4. LIME CONCRETE
Providing and laying lime concrete in footings and bases excluding cost of centring and
4.1
shuttering
With graded stone aggregate 40mm nominal size and mortar comprising of 1 lime putty
4.1.1 Cum 7,461.59
:1 surkhi : 1 fine sand
With graded stone aggregate 40mm nominal size and mortar comprising of 1 lime putty
4.1.2 Cum 6,569.66
:1 surkhi : 1 coarse sand
With graded brick aggregate 40mm nominal size and 40% mortar comprising of 1 lime
4.1.3 Cum 6,309.73
putty :1 surkhi : 1 fine sand
Providing and laying lime concrete with graded brick aggregate 50 mm nominal size and
4.2 50% mortar comprising of 1 lime putty : 2 surkhi rammed excluding cost of centring and Cum 11,441.03
shuttering
50mm lime concrete flooring laid on existing base afte the damage floor up to 40mm
4.3 average thickness, with brick aggregate size 25mm and 50% lime mortar 1:2 (1 lime putty: Sqm 910.43
2 Surkhi) rammed and finished with lime putty complete
Providing and laying lime concrete with graded brick bats nominal size and lime mortar
4.4 compromising of 1 lime putty 1 Surkhi and 1 coarse sand rammed and finished with gur Sqm 841.74
and belgiri treatment complete
Providing and laying lime concrete with broken brick aggregate of 40mm nominal size
4.5 and lime mortar compromising of 1 lime putty 1 Surkhi and 1 coarse sand rammed and Sqm 1,109.30
fi i h d with
finished i h gur and
dbbelgiri
l i i treatment complete
l
Lime concrete terracing on roofs with 25mm nominal size brick aggregate and 50% lime
4.6 mortar 1:2 (1lime putty: 2 surkhi) rammed and finished with gur and belgiri treatment Cum 9,341.38
complete including rounding of junctions with parpet wall complete
Lime concrete on floors with 25mm nominal size brick aggregate and 50% lime mortar
4.7 1:3:6 (1lime putty: 3 surkhi:6 Coarse Sand) rammed and finished with gur and belgiri Cum 8,729.65
treatment
Plinth Area Protection using Lime concrete and brick tiles around the building to prevent
4.8 sqm 3,352.09
entry of water by dampness and capilarry rise
5. BRICK MASONRY
Traditional Bricks
Traditional brick masonry in nanakshahi or lakhori bricks in lime mortar in proportion
5.1 Cum 38,974.17
similar to the existing traditional lime mortar 1:1:1 (lime :1 surkhi: 1 finesand)
Traditional Brick work in plain arches in lime mortar 1:1:1 (1 lime : 1 coarse sand:
5.2 Cum 44,133.67
1surkhi).
Traditional Brick work in gauged arches in lime mortar 1:1:1 (1 lime : 1 coarse sand:
5.3 Cum 45,286.82
1surkhi).
Regular Bricks
Brick work with bricks of class designation 7.5 in foundation and plinth in
5.4 Cum 8,809.80
Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand)
Brick work with bricks of class designation 7.5 in superstructure up to two level
5.5 Cum 9,613.35
Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand)
5.6 Extra for brick in Square or rectangular pillars Cum 504.50
Providing half brick masonry with bricks of class designation 7.5 in lime mortar 1:1:1 (1
5.7 Cum 1,117.99
lime putty:1 surkhi:1 fine sand)
Brick work in plain arches including centering and shuttering complete for span up to 6
5.8 metres with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in Cum 12,533.71
lime mortar 1:1:1 (1 lime : 1 surkhi: 1 fine sand).
Brick work in gauged arches including centering and shuttering complete for span up to 6
5.9 metres with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in Cum 14,418.27
lime mortar 1:1:1 (1 lime : 1 surkhi: 1 fine sand).
Brick Tile Work
Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class
5.10 Cum 14,085.47
designation 10 in superstructure in lime mortar 1:3 (1 lime putty : 3 coarse sand).
Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class
5.11 designation 10 in plain arch work in lime mortar 1:3 (1 lime : 3 coarse sand) including Cum 16,129.77
centering and shuttering complete
Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class
5.12 designation 10 in gauged arch work in lime mortar 1:3 (1 lime : 3 coarse sand) including Cum 16,211.13
centering and shuttering complete
Tile brick masonry work 5 cm thick with common burnt clay F.P.S. (non modular) tile
5.13 Sqm 692.89
bricks of class designation 10 in lime mortar 1:3 (1 lime : 3 coarse sand)
6. STONE MASONRY
6
Random Rubble Masonry
Random rubble masonry with hard stones in foundation and plinth including levelling
6.1 with lime concete (1 lime:3surkhi:6 coarse sand) with 40mm stone aggregate upto plinth Cum 6,341.59
level with lime mortar 1:1:1(1Lime: 1Surkhi:1Coarse sand)
Random rubble masonry with hard stones in superstructure including levelling with lime
6.2 concete (1 lime:3surkhi:6coarse sand) with 40mm stone aggregate upto plinth level with Cum 7,135.87
lime mortar 1:1:1(1Lime: 1Surkhi:1Coarse sand)
Coursed Rubble Masonry
Coursed rubble masonry in first sort with hard stones in foundation and plinth including
6.3 levelling with lime concete upto plinth level with lime mortar 1:1:1(1Lime: Cum 5,688.89
1Surkhi:1course sand)
Coursed rubble masonry in second sort with hard stones in foundation and plinth
6.4 including levelling with lime concete upto plinth level with lime mortar 1:1:1(1Lime:1 Cum 5,386.22
surkhi:1 fine sand)
Coursed rubble masonry with hard stone (first or second sort) in superstructure above
6.5
plinth level and upto two floor level
6.5.1 Masonry work (first sort) , in lime mortar 1:1:1 (1 lime : 1surkhi:1 coarse sand) Cum 6,385.56
6.5.2 Masonry work (second sort) , in lime mortar 1:1:1 (1 lime : 1surkhi:1 coarse sand) Cum 6,093.17
Ashlar Masonry
Stone work in plain ashlar masonry in superstructure in lime mortar 1:1:1 (1 lime:1
6.6 surkhi:1 fine sand) including pointing with lime mortar and an admixture of pigmen
matching the stoneshade.
6.6.1 One face dressed
6.6.1.1 Red sand stone Cum 30,640.50
6.6.1.2 White sand stone Cum 31,316.52
6.6.2 Both face dressed
6.6.2.1 Red sand stone Cum 38,786.24
6.6.2.2 White sand stone Cum 39,102.47
6.6.2.3 Lime Stone cum 35,456.51
Stone work plain ashlar in arches in super structure in lime mortar 1:3 (1 lime : 3 coarse
6.7 sand) including centring, shuttering and pointing with lime mortar and an admixture of
pigment matching the stone shade
6.7.1 One face dressed
6.7.1.1 Red sand stone Cum 35,799.80
6.7.1.2 White sand stone Cum 36,573.94
6.7.2 Both face dressed
6.7.2.1 Red sand stone Cum 44,043.66
6.7.2.2 White sand stone Cum 44,817.80
Stone work plain ashlar in domes in lime mortar 1:3 (1 lime : 3 coarse sand) including
6.8 centring, shuttering and pointing with lime mortar and an admixture of pigment matching
the stone shade.
6.8.1 One face dressed
6.8.1.1 Red sand stone Cum 47,919.70
6.8.1.2 White sand stone Cum 48,693.84
6 8 2 Both
6.8.2 B h fface d
dressed
d
6.8.2.1 Red sand stone Cum 72,021.29
6.8.2.2 White sand stone Cum 72,795.43
7. FLOORING
Stone Flooring
Marble stone flooring with 18 mm thick marble stone, as per sample of marble approved
7.1 by conservation architect, over 20 mm (average) thick base of lime mortar 1:1:1 (1 lime :1
surkhi:1 coarse sand) laid and jointed , including rubbing and polishing complete with
7.1.1 Makrana white second quality Sqm 3,927.19
7.1.2 Raj Nagar plain Sqm 1,783.35
7.1.3 Agaria White Sqm 2,659.58
7.1.4 Black zebra Sqm 1,623.07
7.1.5 Udaipur green marble Sqm 1,856.82
7.1.6 Pink plain marble Sqm 1,756.64
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with lime
slurry mixed with pigment to match the shade of the slab, including rubbing and polishing
7.2 Sqm 1,271.69
complete with base of lime mortar 1 : 1:1 (1 lime :1surkhi:1 coarse sand)
25mm thick
Kota stone slabs 25 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm
(average) thick lime mortar 1:1:1 (1 lime: 1surkhi:1coarse sand) and jointed with lime
7.3 Sqm 1,352.09
slurry mixed with pigment to match the shade of the slabs, including rubbing and
polishing complete.
Laterite stone flooring with 18 mm thick Laterite stone as per sample of Laterite approved
by Engineer‐in‐Charge, over 20 mm (average) thick base of lime mortar 1:4 (1 lime : 4
7.4 Sqm 2,272.37
coarse sand) laid and jointed withlime slurry including rubbing and polishing complete
with :
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar
7.5
1:3 (1 lime: 3coarse sand) with joints finished flush.
7.5.1 Red sand stone Sqm 727.16
7.5.2 White sand stone Sqm 759.10
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar
7.6 1:3 ( 1lime : 3 coarse sand), including pointing with lime mortar 1:2 (1 lime : 2 stone dust) Sqm
with an admixture of pigment to match the shade of stone.
7.6.1 Red sand stone 842.42
7.6.2 White sand stone 874.36
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar
7.7
1:1:1 (1 lime: 1 surkhi:1coarse sand) with joints finished flush.
7.7.1 Red sand stone Sqm 704.45
7.7.2 White sand stone Sqm 736.39
40 mm thick rubbed stone flooring over 20 mm (average) thick base of lime mortar 1:3 (1
lime :3 coarse sand) with joints 3 mm thick, side buttered with lime mortar 1:2 (1 lime : 2
7.8 Sqm
stone dust) admixed with pigment to match the shade of stone and pointing with same
mortar
7.8.1 Red sand stone 906.13
7.8.2 White sand stone 938.07
40mm thick red oxide flooring under layer 0f 30mm thick cement concrete
1:2:4(1cement:2 coarse sand: 4 graded stone aggregate 12.5 mm nominal size) and top
layer of 10mm thick plaster of cement red oxide mix( using 3.5 kg of red oxide of iron per
7.9 Sqm 571.63
50 kg of cement) 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat
cement red oxide mix of same proportion including cement slurry, rounding off egdes,
strips, etc but excluding the cost of nosing of steps. complete
Red oxide plastering (up to 30cm height) with cement mortar 1:3( 1 cement : 3 coarse
sand) finished with a floating coat of neat cement including rounding of junctions with
7.10 Sqm 649.74
floor.
18mm thick
Laying lime flooring‐Providing and laying lime concrete(1 lime:3 brick bats) up to 100mm
7.11 thickness tamping and compacting properly which is follwed by laying of Lime mortar 1:3 Sqm
up to a thickness of 20mm.Rework on it to get desired smooth surface
Heritage floor tiles over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse
7.12 Sqm 3,211.69
sand) with joints finished flush.
Heritage Skirting tiles over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse
7.13 Sqm 2,690.71
sand) with joints finished flush.

8. ROOFING
Providing and laying flat brick/ Terracota tiles on roofs grouted with lime mortar 1:2(1
8.1 lime: 2 fine sand) mixed with 5% crude oil by weight of lime, over 12mm layer of lime Sqm 624.91
mortar 1:2 (1 lime: 2 fine sand)
Removing brick tiles from 50 to 6cm thick lime terrace and relaying an average thickness
7.5cm laid to fall with 25mm nominal size brick aggregate and 50% lime mortar 1:2 (1
Lime putty:2 Surkhi) rammed and finished with gur and belgiri treatment complete and
8.2 Sqm 751.35
covered with brick tiles of class designation 100 to 50 mm thick red sand stone grouted
with lime mortar 1:3(1 Lime: 3 Fine sand) with 5% crude oil by weight of lime over 20mm
layer of lime mortar 1:3 (1 lime : 3 fine sand)
Providing & fixing on roof Country clay tile of 6 mm nominal thickness and of approved
8.3 Sqm 1,401.98
size and as per approved pattern on bamboo frame work complete
Providing & fixing on roof Country clay tile of 6 mm nominal thickness and of approved
8.4 Sqm 2,928.94
size and as per approved pattern on Teak wooden frame work complete

8.5 Construction of Jack arched roof using Rolled steel joists, fired clay bricks with Kafgi mix Sqm 10,444.98
Providing Lime stone slab for roofing and laying them in Lime mortar 1:3 over wooden
karries or R.C.C. battens or structural steel sections (karries or battens or structural steel
8.6 Sqm 915.62
sections to be separetely), including pointing the ceiling joints with lime mortar 1:3
complete:
Roofing with pot‐Providing and laying burnt earthen pots over and between lime
8.7 concrete/mud mortar using pots of max dia 150mm to 200 mm and pack the gaps Sqm 1,138.40
between pots with Lime Mortar (1:3)
9. FINISHING
Preparation of Lime Plaster
Mix lime mortar to the lime water which is to be applied with natutal additives like jaggery, soapnut, bhel fruit, etc
Preparation of surface
Wet the surface. Remove all the dust particles .Apply lime plaster up to required thickness . Rework on the plaster to
9 1 Lime
9.1 Li plaster
l 1
1:3
3 (1 Sl
Slaked
k d lilime : 3 C
Coarse sand)
d)
9.1.1 20mm thick in two coarses. First coat will be in 12mm and second coat will be in 8 mm. Sqm 1,019.53
9.1.2 15mm thick‐ single coat Sqm 975.47
9.1.3 12mm thick‐ single coat Sqm 949.02
9.2 Lime plaster 1:1:1 (1 lime putty : 1 surkhi: 1 finesand)
9.2.1 20mm thick in two coarses. First coat will be in 12mm and second coat will be in 8 mm. Sqm 1,032.48
9.2.2 15mm thick‐ single coat Sqm 987.06
9.2.3 12mm thick‐ single coat Sqm 954.07
9.3 Lime plaster 1:2:1 (1 lime putty : 2 Coarse sand:1 surkhi)
9.3.1 20mm thick in two coarses. First coat will be in 12mm and second coat will be in 8 mm. Sqm 988.56
9.3.2 15mm thick‐ single coat Sqm 955.86
9.3.3 12mm thick‐ single coat Sqm 929.11
9.4 Lime Plaster 1:2 (1 lime : 2 surkhi)
9.4.1 20mm thick in two coarses. First coat will be in 12mm and second coat will be in 8 mm. Sqm 992.92
9.4.2 15mm thick sqm 953.65
9.4.3 12mm thick Sqm 927.34
9.5 Lime Plaster 1:2 (1 lime : 2 Coarse Sand) 20mm thick Sqm 1,004.37
Lime punning with lime putty mixed with Gur,Bilgri,Urd and other ingredients followed by
9.6 sqm 424.67
grinding to fine paste for smooth finish
Preparing and applying of lime mortar plaster 1 Lime:2 fine sand up to a thickness of
9.7 Sqm 291.33
3mm over the lime mortar plaster laid.
Plastering of the dome in lime mortar 1:1:1(1 Lime:1 surkhi:1 coarse sand) of 100mm
9.8 Sqm 1,163.34
thickness
9.9 Mud plaster 1:3:1(1 lime slaked : 3 Mud:1 coarse sand) Sqm 951.92
Ornamental Plaster work
Making cornice band with ornamental design as per the conservation Architect's design
9.10
with lime plaster (1lime:3 finesand)
9.10.1 Size 150mm wide and 50mm average thick M 792.75
9.10.2 Size 100mm wide and 50mm average thick M 577.41
9.10.3 Size 50mm wide and 50mm average thick M 573.64
Repairing ornamental plaster works to match with the existing design using lime plaster
9.11 Sqm 3,294.11
(1lime putty:1surkhi)
Stucco work in lime, surkhi(1:2) as per traditional practices and design, the mortar should
9.12 be prepared by grinding mill only. The thickness varies from 10mm to 100mm as per Sqm 2,592.02
design.
Lime Pointing
9.13 Raised and cut lime pointing 1:2 (1 Lime:2 surkhi)
9.13.1 In stonework Sqm 309.33
9.13.2 In Brickwork Sqm 305.14
9.14 Recessed lime pointing 1:2 (1 Lime:2 surkhi)
9.14.1 In stonework Sqm 207.12
9.14.2 In Brickwork Sqm 177.44
9.15 Flush / Ruled/Struck or Weatheredd lime pointing 1:2 (1 Lime:2 surkhi)
9.15.1 In stonework 275.41
9.15.2 In Brickwork 183.45
9.16 Ruled Pointing on brickwork with lime surkhi mortar 1:2 (1 lime putty :2 Surkhi) Sqm 337.19
Struck or weathered Pointing on brickwork with lime surkhi mortar 1:2 (1 lime putty :2
9.17 Sqm 339.07
Surkhi)
Repointing of raked out joints of Random rubble masonry by using lime mortar 1:1:1
9.18 Sqm 415.90
(1Lime:1coarse sand:1Brick jeera)
Repointing
R i i off raked
k d out jjoints
i off A
Ashlar
hl masonry b by using
i lilime mortar 1
1:1:1
11
9.19 Sqm 321.34
(1Lime:1coarse sand:1 Surkhi)
10. STONE WORKS
Wall Lining works
Stone work (Machine cut edges) for wall lining (Veneer work) upto 10m height, backing
filled with a grout of average 12 mm thick lime mortar 1:2 (1 lime : 2 coarse sand)
10.1 including pointing in lime mortar 1:2 (1 lime : 2 stone dust) with an admixtureof pigment
matching the stone shade : (To be secured to the backing and the sides by means of
cramps and pins which shall be paid for separately) :
Red sand stone ‐ exposed face fine dressed with rough backing.
10.1.1 70 mm thick Sqm 2,889.90
10.1.2 60 mm thick Sqm 2,766.26
10.1.3 50 mm thick Sqm 2,584.90
10.1.4 40 mm thick Sqm 2,336.93
10.1.5 30 mm thick Sqm 2,232.92
10.2 Red sand stone ‐ Exposed face machine cut and table rubbed with rough backing
10.2.1 70 mm thick Sqm 3,883.05
10.2.2 60 mm thick Sqm 3,709.93
10.2.3 50 mm thick Sqm 3,574.32
10.2.4 40 mm thick Sqm 3,379.48
10.2.5 30 mm thick Sqm 3,255.72
10.3 White sand stone ‐ exposed face fine dressed with rough backing .
10.3.1 70 mm thick Sqm 3,125.71
10.3.2 60 mm thick Sqm 2,964.59
10.3.3 50 mm thick Sqm 2,845.36
10.3.4 40 mm thick Sqm 2,691.72
10.3.5 30 mm thick Sqm 2,560.22
10.4 White sand stone ‐ Exposed face machine cut and table rubbed with rough backing
10.4.1 70 mm thick Sqm 3,927.37
10.4.2 60 mm thick Sqm 3,782.04
10.4.3 50 mm thick Sqm 3,644.62
10.4.4 40 mm thick Sqm 3,493.37
10.4.5 30 mm thick Sqm 3,361.87
10.5 25mm thick Kota stone slabs exposed face dressed and rubbed Sqm 1,601.59

Wall lining butch work upto 10 m height with Dholpur stone 40 mm thick rough facing on
the exposed surface with stone strips of minimum length 300 mm and required width,
including embedding every tenth layer and bottom most layer in masonry or concrete
10.6 after making necessary chases of size 75x75 mm and by providing layer of 75 mm thick Sqm 1,624.11
strips i/c 20 mm thick bed of lime mortar 1:3 (1 lime : 3 coarse sand) i/c ruled pointing in
lime mortar 1:2 (1 lime : 2 stone dust) with an admixture of pigment to match the shade
of stone complete as per direction of Engineer‐incharge

Marble work gang saw cut (polished and machine cut) of thickness 18 mm for wall lining
(veneer work), backing filled with a grout of average 12 mm thick in cement mortar 1:3 (1
10.7 cement : 3 coarse sand), including pointing with white cement mortar 1:2 (1 white cement Sqm 3,426.46
: 2 marble dust) with an admixture of pigment to match the marble shade (To be secured
to the backing by means of cramps, which shall be paid for separately).

Marble work gang saw cut (polished and machine cut) of thickness 18 mm for cladding
over dome (veneer work), backing filled with a grout of average 20 mm thick in lime
10 8
10.8 mortar
t 11:3
3 (1 lilime : 3 coarse sand),
d) iincluding
l di pointing
i ti with
ith lilime mortar
t 1 1:2
2 (1 lilime : 2 SSqm 4,120.22
4 120 22
marble dust) with an admixture of pigment to match the marble shade (To be secured to
the backing by means of cramps, which shall be paid for separately).
Providing and fixing stainless steel cramps of required size and shape for anchoring stone
wall lining to the backing or securing adjacent stones in stone wall lining in lime mortar
10.9 Kg 680.16
1:2 (1lime : 2 coarse sand), including making the necessary chases in stone and holes in
walls wherever required
Providing and fixing stone dowels 10x5x2.50 cm cut to double wedge shape as per design
10.10 Each 41.34
in lime mortar 1:2 (1 lime : 2 coarse sand), including making the necessary chases.
Providing and fixing copper pins 7.5 cm long 6 mm diameter for securing adjacent stones
10.11 in stone wall lining in lime mortar 1:2 (1lime : 2coarse sand), including making the Each 34.92
necessary chases.
Sunshade, Brackets and others
Providing and fixing red sand stone brackets 55x22.5x45 cm sunk and moulded including
10.12 providing and fixing with 4 Nos gun metal cramp 25x6 mm 30 cm long and dowel bars 7.5 Each 3,433.20
cm long 6 mm dia as per design
Providing and fixing sloping chajja of stone 40 mm thick and upto 80 cm wide beyond the
wall as measured along the slope in lime mortar 1:1:1 (1 lime : 1Surkhi:1 Fine sand) with
12 mm diameter anchoring steel bar, 45 cm long, fixed in each stone and supported on
10.13 Sqm
and including with bricks cove in lime mortar 1:1:1 (1 lime : 1Surkhi:1 Fine sand),
including pointing in lime mortar 1:2 (1 lime cement : 2 stone dust) with an admixture of
pigment matching the stone shade
10.13.1 Red sand stone
With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 1,851.51
10.13.2 White sand stone
With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 1,891.44
Providing and fixing horizontal chajja of stone 40 mm thick and upto 80 cm wide
projection in lime mortar 1:3 (1 lime : 3 coarse sand) including pointing in lime mortar
10.14
1:2 (1 lime cement : 2 stone dust) with an admixture of pigment matching the stone
shade
10.14.1 Red Sand stone Sqm 1,187.20
10.14.2 White Sand stone Sqm 1,288.39
30 mm red sand stone sun‐shade (chisel‐dressed) supported on red sand stone brackets,
10.15 1,600.93
fixed in walls with lime mortar 1:3 (1 lime : 3coarse sand), including finishing complete

Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick
10.16 in lime mortar 1:6 (1 lime : 6 coarse sand), including pointing with lime mortar 1:2 (1 lime
: 2 stone dust) with an admixture of pigment matching the stone shade
10.16.1 Red Sand stone Cum 49,495.21
10.16.2 White Sand stone Cum 50,737.35
Providing and fixing stone jali 40 mm thick throughout in lime mortar 1:3 (1 lime : 3
10.17 coarse sand), including pointing in lime mortar 1:2 (1 lime : 2 stone dust) with an
admixture of pigment, matching the stone shade, jali slab without any chamfers etc
10.17.1 Red Sand stone Sqm 14,553.66
10.17.2 White Sand stone Sqm 14,668.00
Sandstone flooring as a plinth protection around the building using sand stone of 50mm
10.18
thick & 1:1:1 lime mortar (1 lime:1surkhi:1 coarse sand) for filling up the joints.
10.18.1 Red Sand stone Sqm 824.20
10.18.2 White Sand stone Sqm 891.92
11.
11 REPAIRS AND RECONSTRUCTION
Repairs to plaster of thickness 10 mm to 30 mm in patches of area 2.5 sq. meters and
under, including cutting the patch in proper shape, raking out joints and preparing and
plastering the surface of the walls complete, preparation of mortar by traditional practice
11.1 Sqm 1,354.73
(by hand grinder) in 3 course & loi, tamping, beating, till the shrinkage cracks are
disappear disposal of rubbish to the dumping ground within 50 metres lead with lime
moratr 1:2 (1 lime: 2 surkhi)
Regrading terracing of mud phaska covered with tiles or brick, in lime by dismantling tiles
or bricks, removing mud plaster, preparing the surface of mud phaska to proper slope,
relaying mud plaster gobri leaping and tiles or bricks, grouted in lime mortar 1:3 (1 lime :
11.2 Sqm 427.27
3 fine sand), including replacing unserviceable tiles or bricks with new ones and disposal
of unserviceable material to the dumping ground (the cost of the new tiles or brick
excluded) within 50 metres lead.

Removing brick tiles in 5 to 6 cm thick lime terracing from existing roof and relaying an
average thickness 7.5 cm laid to fall with 25mm nominal brick size aggregate and 50%
lime mortar 1:2 (lime putty : 2surkhi) rammed and finished with gur and belgiri treatment
11.3 Sqm 2,071.37
complete and covered with flat brick tiles of class designation 100 or 50mm thick red sand
stone grouted with lime mortar 1:3(1 lime : 3 fine sand) mixed with 5% of crude oil by
weight of lime, over 12mm layer of lime mortar 1:3(1lime:2 fine sand)

Replacing sand stone slabs in roofing, laid in lime mortar 1:3 (1 lime :34 coarse sand),
11.4 including necessary repairs and lime pointing with same mortar complete, including
disposal of rubbish to dumping ground within 50 metres of lead :
11.4.1 Red/ white sand stone slabs 30 to 50 mm thick Sqm 918.79
11.4.2 Granite /Marble stone slabs Sqm 4,076.41
Providing post dated Damp Proof Course (DPC) by raking out mortar from brickwork
atleast 75mm deep from both faces of wall at plinth height. The cavities formed must be
cleaned by flushing with clean water. The clean surface with open cavities are next
11.5 treated with limewater to attempt to consolidate the friable areas. The consolidation M 2,688.87
treatment is followed by pressure grouting with a line of close‐spaced drilling (average
150mm centres) to be made and silicone solutions in solvent and the siliconate/latex
mixture are pumped in under pressure.
Stone consolidation‐removing the loose/damaged stone and reconsolidating with new
11.6 Cum 5,642.86
stone/reusable stone with lime mortar(1:3) wherever ncessary
12. TREATMENT OF CRACKS
Repairing of .5mm to 5 mm wide open joints / cracks in all types of sand stone masonry
work including scrapping of loose jointing material from cracks. The inner side to be
filled/pointed with polymer mixed lime mortar with wooden trowel and fixing grouting
nipple from outer side as directed by Architect. Then apply polymer based lime mortar by
12.1 injection grouting through 5mm diameter nozzle through the pre fix nipple up to total M 71.53
thickness of existing stone wall and removing the PVC nipple pipe, lime moratr of mix lime
& sand 1:1 mix with polymer using katha or other additives to achieve require matching
colour and including cost of all materials, labour, machinery, equipment, curing and
cleaning the site as directed.

Providing and fixing chicken wire mesh (6mm x 6mm) of 24 gauge 200 mm wide along the
12.2 joints of brick work with hooks/nails etc. complete so as to receiving the plastering work sqm 1,162.78
over chicken mesh as per the direction of Engineer‐in‐charge.

Steel‐rod
Steel rod stitching incracked stone patties, beam,and lintels.Providing and fixing stainless
steel rods of 90cms length of which 15cm on either side and cold bending at 90degrees.
The stainless steel clamps to be fixed perpendicular to the crack by drilling in stone and
12.3 fixing with cement and aradite mixture in such a way that the entire length of the rod is in No 191.30
complete contact of the stone and the bent ends are fully inserted in the cracked stone.
Use 316 grade stainless steel charge per hole.steel rod charges are counted per kg.Holes
with 6mm, 8mm, 10mm or 12mm dia.as per requirement of position.
Stitching of cracks in brick masonry with stone lintels of 450x 200x50 mm . Chasing,
12.4 grooving the brick masonry and inserting the stone lintel. All around the stone, lime No 253.79
mortar should be properly packed .
Propping with steel to support the leaned structure ( roof and wall) using pipes,
12.5 Sqm 981.47
channels, angles, girders , wooden wages to prevent further leaning/ collapse

Providing and placing of anchors in cored holes of predefined lengths, diameters &
locations obtained as output from analysis of the simulated model of the bridge using
existing material properties and geometrical conditions Coring should be done by use of
12.6
high speed low vibratory coring machine with diamond core bits. It should impart minimal
or no vibration to the structure being strengthened. The coring motor & bit should be
capable to core at least upto 3m in straight line.
13.DISMANTLING AND DEMOLISHING
Dismantling tile work in floors and roofs laid in lime mortar including stacking material
13.1
within 50 metres lead For thickness of tiles .

13.1.1 For thickness of tiles 10 mm to 25 mm. Sqm 111.70

13.1.2 For thickness of tiles above 25 mm and up to 40 mm. Sqm 140.43


Careful removal of existing deteriorated/ damaged/ weathered lime plaster without
damaging the suurface below it. Caution: Workers have to wear helmet,safety belt and
safety gloves
13.2 Sqm 291.10
Methodology: i. Erect scaffolding enabling the safe platform to work ii. Use precise tools
like scalpe etc, to remove the plaster iii. Take precaution such that surface below the
plaster is not damaged.
Raking out the joints of country/Nankshahi brick, scooping out dead and decayed mortar
13.3 very slowly and carfully with scooping rods, then washing complete with hand spray Sqm 227.54
pump. Preparing the surface for replastering including disposal of rubbish with 250m lead
Raking out joints of brick masonry surface to the required width and depth, with due care
and precaution, by mechanical / manual means, including preparing and cleaning the
13.4 Sqm 213.66
surface for re‐pointing/ refilling of joints, including disposal of rubbish to the dumping
ground within 50 metre lead.
14. WOOD REPAIR WORKS
14.1 Reinforcing timber beams with steel plates of size 100 x300x12 mm with bolts and nuts No 423.82
Reinforcing timber beams with flitch plates that is sandwiched between to increase the
14.2 m 1,357.90
sstrenght of beams
Reinforcement of existing wooden beams with L shape Angles 70x70x6 at the bottom of
14.3 m 1,153.51
the beam
Consolidation of woodwork with sawdust and polyster resin of low viscosity, wherein the
14.4 work needs to completed in similar application and then smoothen and finished as per Sqm 1,094.48
the Engineer incharge.
15. ADDITIONAL ITEMS (WATER PROOFING, SURFACE CONSOLIDATION)
Removing the present treatment of APP mineral finish given on the terraces and reach the
15.1 Sqm 120.00
sound surface below the APP and cleaning the surface to reach the sound surface.
Repairing of the cracks and the junctions at the terraces with Cement & Latex putty, so as
15.2 to make them water tight and providing the Concave shaped Gola all along the periphery m 65.00
of the terraces.
Providing and applying Single component Coloured acrylic elastomeric coating in two
15.3 coats of SHALICRYL 215 2nd coat after touch dry of 1st coat as per the manufacturers Sqm 280.00
specification or strictly as per Engineer In‐ Charge.

Over insulation directly providing and laying specially formulated elastomeric single‐ply
45 mil (1.2 mm) EPDM non‐reinforced (Ethylene, Propylene, Diene Terpolymer)
membrane like SURE SEAL non‐reinforced black 45 mil or approved equivalent with
minimum Roll width 6 meters. Membrane shall be laid loose. Overlap joint shall be made
using SecurTape technology. Membrane shall have minimum of 75mm side and end laps
which shall be sealed with highly formulated double sided SECUR TAPE. Membrane shall
15.4 be able to resist 40mtr. head pressure, with tensile strength of > 11.3 mpa, elongation > Sqm 720.00
500% and water vapour diffusion of < 24'000 microns, Tear resistance to ASTM D624, Die
C dimensional change < ‐0.7%. 100% UV resistance, Ozone resistance according to ASTM
D1149, The membrane shall be taken to a height of 300mm of the parapet wall or
adjoining wall & fixed with HP fastener and sealed with Sealant and Water cutoff mastic.
The membrane shall be covered with the geo‐textile membrane for the protection of
EPDM membrane to avoid getting membrane punctured while working further.

Providing and Laying SHALIMAGIC (1:1) on Horizontal surface admixed with water at
15.5 Sqm 105.00
required dosage as per the manufacturers specification, as directed by Engineer Incharge.
MEMBRANE APPLICATION
Starting at low point from the roof, unroll the STP LTD. APP membrane SUPER
THERMOLAY (4mm ) once the priming coat with SHALITEX PRIMER of STP LTD is dried.
Align the roll correctly roll it half in alignment before torching. Avoid shifting of the
membrane while torching. Use gas burner to heat substrate and underside to softening
points. When the embossing disappears, roll forward and press firmly against substrate to
bond from the lower end toward and press firmly against substrate to bond from the
15.6 lower end towards the higher end. Ensure sufficient bleed on side and end over laps. Sqm 430.00
Once the half of the roll is torched properly to the substrate, unroll the balance roll and
repeat the process.
An overlap of 75‐ mm shall be maintained for all the continuing sides. Heating shall be
done on both the membranes to be overlapped and pressed firmly with the help of round
shape trowel. The care shall be taken to leave no gap at any point in the overlapped area.
If noticed, reheating shall be done to seal it.

Providing and Laying Of China Mosaic Tiles in white cement on membrane based water
15.7 Sqm 300.00
proofing as sacrificial layer
Repairing of Grooves and the cracks available on the terrace with POLYMERIC Putty
15.8 Sqm 100.00
prepared by admixing with Cement mortars / neat cement.
Providing and laying PCC in panels of 3m X 3m with the Average thickness of 30‐40 mm in
the ratio of 1:2:4 admixing the integral waterproofing compound as per IS: 2645 and
15.9 Sqm 405.00
reinforcing with RECRON 3S fibers so as to attain the proper slope and protection for the
EPDM membrane system.
15.10 Filling the PU sealant in the grooves of the panels of PCC laid over the terrace. m 185.00
Water proofing for lime terrace deck slab including preparation of the surface : The top
surface
f should
h ld bbe cleaned
l d off allll dirt,
di loose
l material
i l & kkept d
dry. IIn case off pot holes
h l /
cracks, the same shall be repaired with E‐3‐HP ( epoxy grouting system ) Shalimer 456 (
15.11 Sqm 232.2
Epoxy mortar) or SBR emulsion of Dr Fix.. After repairing the surface a layer of galvanized
chicken mesh should be laid and finished with 20 mm thick lime mortar of 1: 2 ( 1 lime : 2
coarse sand ).

Starting at low point from the roof, unroll the STP Superthermolay 3mm (with polyster)
(36 kgs)( 1 Mtr X 10 Mtr) or APP Torchshield ( with polyester ) of Dr. FIX, roll once the
priming coat is dried. Align the roll correctly and RE‐ roll it half in alignment befor
torching. Avoid shifting of the membrane while torching. Use gas burner to heats
substrate and underside to softening points. When the embossing disappears, roll
forward and press firmly against substrate to bond from the Lowe end toward and press
firmly against substrate to bond from the lower end towards the higher end. Ensure
sufficient bleed on side and end over laps. Once the half of the roll is torched properly to
the substraste, unroll the balance roll and repeat the process. An overlap of 100‐ mm shall
be maintained for all the continuing sides. Heating shall be done on both the membranes
15.12 Sqm 529.64
to be overlapped and pressed firmly with the help of round shape trowel. The care shall
be taken to leave no gap at any point in the overlapped area. If noticed, reheating shall be
done to seal it.The places where opening are encountered for rain water down take pipes,
the membranes shall be cut open by sharp knife in + sign in the center of an opening.
Circular cutting shall not be done. Torching shall be done on the reverse side of these four
triangular pieces. Bend all the four pieces inside and tightly pressed against pipe surface.
The treatment shall have to terminate at the expansion joint. The curb wall of 4 inches
thick shall be constructed on both sides of joint. The height can vary from 300 mm to 500
mm. The curb wall shall be plastered smoothly and corner rounding with polymer‐
modified mortar shall be done before membrane applications starts.
Exposing the first layer of brick wall using 14mm bit with rotary hammer spacing min.
100mm, max. 150mm at an angle of 45degree to reach the centre of the wall. The
15.13 specialised waterproofing chemical (WACKER 290) to be inserted through drip tanks into m 650.00
these holes for 2‐3 days at a regular liquid flow speed after applying of this DPC liquid one
coat of PRO‐TEKA 500 to be applied on the wall surface before plastering
Providing and applying of double coat ethyle silicate (Waker OH 100) with soft non ferous
15.14 brush on week surfaces of stone for consolidation of the surface. The second coat has to Sqm 1500.00
be aplied when the first coat is still wet
Bonding Work for plaster repairing surface : Providing and painting with Dr fix MPB a
polymer resin such as acrylic copolymers after properly cleaning the surface from
imperative (dust and grease free) to be plastered just before plastering so that the mortar
15.15 Sqm 100.00
must be applied while the bond coat is still 'sticky'. Conservator must be vigilant as in case
the bond coat cures / dries, the original surface must be uncovered and the process
started again.
1.0 SITE CLEARANCE

Clearance of debris around the heritage building by excavation upto depth 1.50mtr to 2.00 mtr
1.1 carefully without damaging the buried architectural parts of the building and collect all the intact
parts at proper place for reuse at the time of restoration work as per direction of Engineer incharge.

Code Description Unit Quantity Rate in Rs Amount in Rs


Details of cost for 10 cum
LABOUR
DSR 0114 Beldar Day 6.50 297.00 1,930.50
DSR 0115 Coolie day 4.50 297.00 1,336.50
DSR 0101 Bhisti day 0.40 328.00 131.20
DSR 0113 Chowkidar day 0.01 297.00 2.38
Tools and Tackles L.S 25.00 1.70 42.50
DSR 9999 Sundries L.S 2.73 1.70 4.64
Additional for sorting of
serviceable and stacking Material
DSR 0115 Coolie day 1.00 297.00 297.00
Total 3,744.72
Add water charges 1% 37.45
Total 3,782.16
Add CPOH @ 15% 567.32
Cost of 10 Cum 4,349.49
Cost of 1 Cum 434.95

Scientific debris to be done manually using sieve as per the direction of the conservation architect.
1.2 All antiquities and historic remains to be classified and documentated photographically before
numbering and storing them in the office

Code Description Unit Quantity Rate Amount


Details of cost for 1 cum
LABOUR
DSR 0114 Beldar Day 0.50 297.00 148.50
DSR 0115 Coolie day 1.00 297.00 297.00
DSR 9999 Sundries L.S 13.83 1.70 23.51
Tools and Tackles L.S 25.00 1.70 42.50
Total 511.51
Add water charges 1% 5.12
Total 516.63
Add CPOH @ 15% 77.49
Cost of 1 Cum 594.12

1.3 Add extra for sorting lifting & stacking charges for architectural parts up to 50m lead.

Code Description Unit Quantity Rate Amount


Details of cost for 1 cum
LABOUR
DSR 0114 Beldar Day 0.25 297.00 74.25
DSR 0115 Coolie day 0.75 297.00 222.75
DSR 9999 Sundries L.S 13.83 1.70 23.51
Total 320.51
Add water charges 1% 3.21
Total 323.72
Add CPOH @ 15% 48.56
Cost of 1 Cum 372.27
2.0 SURFACE CLEANING AND BONDING

Removing of old sulphated lime wash/white or colour wash in multiple applications without causing
damage to the surface below. Scrubbing (not by scraping which leaves surfaces scarred and
scratched ) with bristle brushes and hot water ( Care to be taken if the surface is weak one it will
2.1 break down). Hot water should be used if the limewash has an oil or tallow binder. Gentle cleaning
with air abrasive tools can be used if the wall surface is not very week.The final clean will almost
invariably have to be carried out by hand scrubbing and rinsed with clean water on completion. The
work should be done under supervision of a trained conservator.

Code Description Unit Quantity Rate Amount


Details of cost for 10 Sqm
DSR 0771 Fuel for hot water lit 15.00 60.00 900.00
M Rate Conservator day 0.05 1,650.00 82.50
DSR 0124 Mason day 0.75 361.00 270.75
DSR 0114 Beldar day 8.50 297.00 2,524.50
DSR 0128 Mate day 0.06 328.00 19.68
DSR 9999 Sundries LS 55.00 1.70 93.50
Total 3,890.93
Add water charges 1% 38.91
Total 3,929.84
Add CPOH @ 15% 589.48
Cost of 10 Sqm 4,519.32
Cost of 1 Sqm 451.93

Removal of rust, existing coatings, mill scale, dirt, oil, grease, and other contaminants from steel
2.2
sections using Micro sand with the help of pressure pump.

Code Description Unit Quantity Rate Amount


Details of cost for 1 Sqm
MATERIAL
M Rate Micro Sand Kg 10.00 5.00 50.00
M Rate Pressure Pump Day 0.05 1,000.00 50.00
LABOUR
DSR 0124 Mason day 0.05 361.00 18.05
DSR 0114 Beldar day 0.25 297.00 74.25
DSR 0128 Mate day 0.08 328.00 26.24
DSR 9999 Sundries LS 20.00 1.70 34.00
Total 252.54
Add water charges 1% 2.53
Total 255.07
Add CPOH @ 15% 38.26
Cost of 1 Sqm 293.33

Removal of stains, dirt, blackening and other contaminants from Marble by using the solution of
2.3 Non Ionic soap diluted with water . The soap solution should be mild and the recommeded PH
Value is 7.

Code Description Unit Quantity Rate Amount


Details of cost for 1 Sqm
MATERIAL
M Rate Non Ionic Soap Solution Lit 0.05 150.00 7.50
LABOUR
DSR 0124 Mason day 0.05 361.00 18.05
DSR 0114 Beldar day 0.10 297.00 29.70
DSR 0128 Mate day 0.09 328.00 29.52
DSR 9999 Sundries including consumables LS 15.00 1.70 25.50
Total 110.27
Add water charges 5% 5.51
Total 115.78
Add CPOH @ 15% 17.37
Cost of 1 Sqm 133.15
3.0 LIME MORTAR

A good aggregate for a Lime Mortar should be with angular grains and free of contaminats such
as salt and oranic matter. The aggregates should be well graded sand typically has grain sizes
between 4mm and 0.125mm, with the largest proportion of grains at the mid-point sieve
fractions.

3.1 Lime Mortar 1:1 ( 1 Slaked lime :1 Fine sand)


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 cum.
Ref DAR 1972 ( E) Mortars Item No.4 Pg
53
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)

(0.713 cum. of lime putty = 4.5 q of


unslaked lime) 0775 -DAR 2007

Carriage (1 E- DAR 1972 pg 51 ) carriage


of lime -1 Quintals occupies 0.129 cum
DSR 0773 Un Slaked Lime Quintal 4.51 800.00 3,608.00
DSR 0983 Fine Sand zone(IV) cum 1.07 650.00 695.18
DSR 2261 Carriage of fine sand cum 1.07 115.92 123.98
Carriage of lime. 4.51q=.58 cum
DSR 2208 cum 0.00 106.64 0.00
unslaked lime
LABOUR:
For measuring, carrying, depositing and
mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 0101 Bhisti day 3.00 328.00 984.00
M Rate Running cost for upkeep of mortar mill day 1.00 800.00 800.00
M Rate Fuel cost for running the miller Lit 10.00 60.00 600.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 9,142.95
Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is
considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which
results in more man days and use of machines.

3.2 Lime Mortar 1:1:1 ( 1 Slaked lime :1 surkhi:1 fine sand)


Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 3.01 800.00 2,408.00
DSR 0983 Fine Sand zone(IV) cum 0.71 650.00 463.13
DSR 1182 Surkhi cum 0.71 700.00 498.75
Carriage of lime 3.01q=.48 cum
DSR 2208 cum 0.39 106.64 41.41
unslaked lime
DSR 2261 Carriage of fine sand cum 0.48 115.92 55.06
Carriage of surkhi cum 0.48 106.64 50.65
LABOUR:
For measuring, carrying, depositing and
mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 0101 Bhisti day 3.00 328.00 984.00
M Rate Running cost for upkeep of mortar mill day 1.00 800.00 800.00
M Rate Fuel cost for running the miller Lit 10.00 60.00 600.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 8,232.80
Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is
considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which
results in more man days and use of machines.

3.3 Lime Mortar 1:1:1 ( 1 Slaked lime:1 surkhi:1 course sand)


Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
Ref DAR 1972 ( E) Mortars Item No.4 Pg
53
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 3.01 800.00 2,408.00
DSR 0983 Coarse sand zone III cum 0.48 1,120.00 532.00
DSR 1182 Surkhi cum 0.48 700.00 332.50
DSR 2208 Carriage of lime cum 0.39 106.64 41.41
DSR 2261 Carriage of coarse sand cum 0.48 106.64 50.65
Carriage of surkhi cum 0.48 106.64 50.65
LABOUR:
For measuring, carrying, depositing and
mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 2.00 297.00 594.00
DSR 0101 Bhisti day 2.00 328.00 656.00
M Rate Running cost for upkeep of mortar mill day 0.50 800.00 400.00
M Rate Fuel cost for running the miller Lit 5.00 60.00 300.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 6,806.02
3.4 Lime Mortar 1:1:2 ( 1 Slaked lime :1.5 surkhi:1.5 course sand)
Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 2.26 800.00 1,809.80
DSR 0983 Coarse sand zone III cum 0.54 1,120.00 599.20
DSR 1182 Surkhi cum 0.54 700.00 374.50
DSR 2208 Carriage of lime cum 0.29 106.64 31.12
DSR 2261 Carriage of coarse sand cum 0.54 106.64 57.05
DSR 2266 Carriage of surkhi cum 0.54 106.64 57.05
LABOUR:
For measuring, carrying, depositing and
mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 2.00 297.00 594.00
DSR 0101 Bhisti day 2.00 328.00 656.00
M Rate Running cost for upkeep of mortar mill day 0.50 800.00 400.00
M Rate Fuel cost for running the miller Lit 5.00 60.00 300.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 6,319.53

3.5 Lime Mortar 1:2 ( 1 Slaked lime:2 surkhi)


Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 3.01 800.00 2,408.00
DSR 1182 Surkhi cum 0.95 700.00 665.00
Carriage of lime 3.01q=.39 cum
DSR 2208 cum 0.00 106.64 0.00
unslaked lime
DSR 2266 Carriage of surkhi cum 0.95 106.64 101.31
LABOUR:
For measuring, carrying, depositing and
mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 2.00 297.00 594.00
DSR 0101 Bhisti day 2.00 328.00 656.00
M Rate Running cost for upkeep of mortar mill day 0.50 800.00 400.00
M Rate Fuel cost for running the miller Lit 5.00 60.00 300.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 6,565.11
3.6 Lime Mortar 1:2:1 ( 1 Slaked Lime: 2 Surkhi:1 fine sand)
Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
(0.356 cum. of lime putty = 2.3 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 2.30 800.00 1,840.00
DSR 1182 Surkhi cum 0.71 700.00 499.10
DSR 1182 Fine sand zone IV cum 0.53 650.00 347.10
Carriage of lime 3.01q=.48 cum
DSR 2208 cum 0.30 106.64 31.64
unslaked lime
DSR 2266 Carriage of surkhi cum 0.71 106.64 76.03
DSR 2261 Carriage of fine sand cum 0.53 115.92 61.90
LABOUR:
For measuring, carrying, depositing and mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 0101 Bhisti day 3.00 328.00 984.00
M Rate Running cost for upkeep of mortar mill day 1.00 800.00 800.00
M Rate Fuel cost for running the miller Lit 10.00 60.00 600.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 7,571.58
Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is
considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which
results in more man days and use of machines.

3.7 Lime Mortar 1:2 ( 1 Slaked lime :2 coarse sand)


Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 3.01 800.00 2,408.00
DSR 1182 Coarse sand zone III cum 0.95 1,120.00 1,064.00
Carriage of lime 3.01q=.48 cum
DSR 2208 cum 0.39 106.64 41.41
unslaked lime
DSR 2266 Carriage of coarse sand cum 0.95 106.64 101.31
LABOUR:
For measuring, carrying, depositing and mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 2.00 297.00 594.00
DSR 0101 Bhisti day 2.00 328.00 656.00
M Rate Running cost for upkeep of mortar mill day 0.50 800.00 400.00
M Rate Fuel cost for running the miller Lit 5.00 60.00 300.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 7,005.52

3.8 Lime Mortar 1:2 ( 1 Slaked lime:2 fine sand)


Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 3.01 800.00 2,408.00
DSR 0983 Fine sand zone IV cum 1.43 650.00 926.25
Carriage of lime 3.01q=.48 cum
DSR 2208 cum 0.39 106.64 41.41
unslaked lime
DSR 2266 Carriage of coarse sand cum 1.43 115.92 165.19
LABOUR:
For measuring, carrying, depositing and
mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including
sieving of sand
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 0101 Bhisti day 3.00 328.00 984.00
M Rate Running cost for upkeep of mortar mill day 1.00 800.00 800.00
M Rate Fuel cost for running the miller Lit 10.00 60.00 600.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 8,256.64
Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is
considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which
results in more man days and use of machines.

3.9 Lime Mortar 1:3 ( 1 Slaked lime :3 Coarse sand)


Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 3.01 800.00 2,408.00
DSR 0982 Coarse sand zone III cum 1.43 1,120.00 1,596.00
DSR 2208 Carriage of lime cum 0.39 106.64 41.41
DSR 2266 Carriage of coarse sand cum 1.43 106.64 151.96
LABOUR:
For measuring, carrying, depositing and mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 2.00 297.00 594.00
DSR 0101 Bhisti day 2.00 328.00 656.00
Running cost for upkeep of mortar mill day 0.50 800.00 400.00
M Rate Fuel cost for running the miller Lit 5.00 60.00 300.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 7,588.17

3.10 Lime Mortar 1:1:2 ( 1 Slaked Lime: 1 Surkhi:2 Coarse sand)


Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
(0.356 cum. of lime putty = 2.3 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 2.30 800.00 1,840.00
DSR 1182 Surkhi cum 0.36 700.00 249.20
DSR 1182 Coarse sand zone III cum 0.71 1,120.00 797.44
DSR 2208 Carriage of lime cum 0.30 106.64 31.64
DSR 2266 Carriage of surkhi cum 0.36 106.64 37.96
DSR 2266 Carriage of coarse sand cum 0.48 106.64 50.65
LABOUR:
For measuring, carrying, depositing and mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 2.00 297.00 594.00
DSR 0101 Bhisti day 2.00 328.00 656.00
M Rate Running cost for upkeep of mortar mill day 0.50 800.00 400.00
M Rate Fuel cost for running the miller Lit 5.00 60.00 300.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 6,397.70

3.11 Lime Mortar 1:1:2 ( 1 Slaked Lime: 1 Surkhi:2 Fine sand)


Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
(0.356 cum. of lime putty = 2.3 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 2.30 800.00 1,840.00
DSR 1182 Surkhi cum 0.36 700.00 249.20
DSR 1182 Fine sand zone IV cum 1.07 650.00 694.20
DSR 2208 Carriage of lime cum 0.30 106.64 31.64
DSR 2266 Carriage of surkhi cum 0.36 106.64 37.96
DSR 2266 Carriage of sand cum 1.07 106.64 113.89
LABOUR:
For measuring, carrying, depositing and
mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 0101 Bhisti day 3.00 328.00 984.00
M Rate Running cost for upkeep of mortar mill day 1.00 800.00 800.00
M Rate Fuel cost for running the miller Lit 10.00 60.00 600.00
DSR 9999 Sundries L.S 50.00 1.70 85.00
Cost of 1 cum say 7,679.30
Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is
considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which
results in more man days and use of machines.

3.12 Lime Mortar 1:3 ( 1 Slaked lime: 3 Fine sand)


Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 3.01 800.00 2,408.00
DSR 0983 Fine Sand zone(IV) cum 2.14 650.00 1,389.38
DSR 2208 Carriage of lime cum 0.39 106.64 41.41
DSR 2261 Carriage of fine sand cum 2.14 106.64 227.94
LABOUR:
For measuring, carrying, depositing and mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 0101 Bhisti day 3.00 328.00 984.00
M Rate Running cost for upkeep of mortar mill day 1.00 800.00 800.00
M Rate Fuel cost for running the miller Lit 10.00 60.00 600.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 8,782.53
Note: In conservation works fine sand passing through 600 microns should be used.Hence, 50% wastage is
considered.Preparation of fine mortar takes 1 to 1.5 hrs more than the preparation of other lime mortars which
results in more man days and use of machines.

3.13 Lime Mortar 1:2 ( 1 Slaked lime :2 Marble dust)


Code Description Unit Quantity Rate Amount
DSR 3.15 Details of cost for 1 cum.
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 3.01 800.00 2,408.00
DSR 0784 Marble dust cum 0.95 1,000.00 950.00
DSR 2208 Carriage of lime cum 0.39 106.64 41.09
Carriage of marble dust and/or marble
DSR 2268 cum 0.95 106.64 101.31
chips
LABOUR:
For measuring, carrying, depositing and
mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 2.00 297.00 594.00
DSR 0101 Bhisti day 2.00 328.00 656.00
M Rate Running cost for upkeep of mortar mill day 0.50 800.00 400.00
M Rate Fuel cost for running the miller Lit 5.00 60.00 300.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 6,891.19

3.14 Kafgi Lime Mortar 3:4: 8( 3Slaked lime:4 coarse sand: 8 surkhi)
Code Description Unit Quantity Rate Amount
DSR 3.15 Details of cost for 1 cum.
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime) i.e 0.28 cum of lime
putty is 60% of .475 cum
DSR 0773 Un Slaked Lime Quintal 1.81 800.00 1,444.80
DSR 0982 Coarse sand zone III cum 0.37 1,120.00 414.40
DSR 1182 Surkhi cum 0.75 700.00 525.00
DSR 2208 Carriage of lime cum 0.23 106.64 24.84
DSR 2203 Carriage of coarse sand zone III cum 0.37 106.64 39.46
DSR 2266 Carriage of surkhi cum 0.75 106.64 79.98
LABOUR:
For measuring, carrying, depositing and
mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including sieving of sand
DSR 0114 Beldar day 2.00 297.00 594.00
DSR 0101 Bhisti day 2.00 328.00 656.00
M Rate Running cost for upkeep of mortar mill day 0.50 800.00 400.00
M Rate Fuel cost for running the miller Lit 5.00 60.00 300.00
Hire and running charges of mechanical
DSR 9999 L.S 26.91 1.70 45.75
mixer
DSR 9999 Sundries L.S 16.22 1.70 27.58
Cost of 1 cum say 5,904.21

3.14.1 Khafgi mix with cement 8:1(8 Khafgi: 1cement)


3.16 Khafgi mix cum 1.20 5,904.21 7,085.05
DSR 0367 Portland cement tonne 0.21 6,600.00 1,412.40
DSR 2209 Carriage of cement tonne 0.21 94.8 20.29
Cost of 1 cum say 8,517.74
A special mix known as khafgi is applied over the jack-arch structure to give a firm cover and good sealant against
rainwater penetration and to improve the structural and heat insulation properties of the roof. Khafgi is prepared
with 3 parts hydrated lime, 4 parts of coarse sand and 8 parts of burnt clay bricks crushed into 20mm size particles.
8 parts of the khafgi are combined with 1 part of ordinary cement. The resulting mixture is then mixed thoroughly
with water to give a workable paste that is applied over the top surface of the roof. This method is practised in
Sudan recommended by UNESCO. Source: Rural housing website
3.15 Lime Mortar 1:3:6 ( 1 slaked lime:3 surkhi:6 course sand)
Code Description Unit Quantity Rate Amount
ISOR 2.2 Details of cost for 1 cum.
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 0.90 800.00 719.87
DSR 0983 Coarse sand zone III cum 0.85 1,120.00 954.24
DSR 1182 Surkhi cum 0.43 700.00 298.20
DSR 2208 Carriage of lime cum 0.12 106.64 12.38
DSR 2261 Carriage of coarse sand cum 0.85 106.64 90.86
DSR 2266 Carriage of surkhi cum 0.43 106.64 45.43
LABOUR:
For measuring, carrying, depositing and
mixing
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
DSR 0101 Bhisti day 1.50 328.00 492.00
Preparation of Lime Mortar including
sieving of sand
DSR 0114 Beldar day 2.00 297.00 594.00
DSR 0101 Bhisti day 2.00 328.00 656.00
M Rate Running cost for upkeep of mortar mill day 0.50 800.00 400.00
M Rate Fuel cost for running the miller Lit 5.00 60.00 300.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 5,511.77

3.16 Mud Mortar 1:3:1( 1 Slaked lime:3 Mud:1 course sand)


Code Description Unit Quantity Rate Amount
ISOR 2.2 Details of cost for 1 cum.
MATERIAL:
(0.475 cum. of lime putty = 3.01 q of
unslaked lime)
DSR 0773 Un Slaked Lime Quintal 1.80 800.00 1,439.73
DSR 0983 Coarse sand zone III cum 0.28 225.00 63.90
DSR 0811 Mud cum 0.85 60.00 51.12
DSR 2208 Carriage of lime cum 0.23 106.64 24.76
DSR 2261 Carriage of coarse sand cum 0.28 106.64 30.29
DSR 2266 Carriage of mud cum 0.85 106.64 90.86
LABOUR:
For measuring, carrying, depositing and
mixing
DSR 0123 Mason First class day 1.00 393.00 393.00
DSR 0114 Beldar day 0.90 297.00 267.30
DSR 0101 Bhisti day 0.45 328.00 147.60
For Slaking of lime
DSR 0114 Beldar day 1.50 297.00 445.50
Preparation of Mud Mortar including sieving of sand
DSR 0114 Beldar day 2.00 297.00 594.00
DSR 0101 Bhisti day 2.00 328.00 656.00
M Rate For Mixing and Kneading the mortar day 0.50 800.00 400.00
DSR 0114 Beldar day 1.00 297.00 297.00
DSR 9999 Sundries L.S 52.00 1.70 88.40
Cost of 1 cum say 4,989.45

3.17 Mud Mortar


Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
DSR 0811 Mud (dry) cum 1.08 60.00 64.80
LABOUR:
DSR 0123 Mason First class day 1.00 393.00 393
DSR 0114 Beldar day 0.63 297.00 187.11
DSR 0101 Bhisti day 0.32 328.00 103.32
DSR 9999 Sundries L.S 6.45 1.70 10.97
Cost of 1 cum say 759.20
4.0 LIME CONCRETE
4.1 Providing and laying lime concrete excluding cost of centring and shuttering
With graded stone aggregate 40mm nominal size and mortar comprising of 1 Slaked lime :1 surkhi :
4.1.1
1 fine sand
Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
Stone Aggregate (Single size) : 40 mm
DSR 0293 nominal size (0.63 cum-7.5% for voids cum 0.58 1,000.00 580.00
i.e. 0.04 = 0.56 cum)
Stone Aggregate (Single size) :20 mm
DSR 0295 cum 0.27 1,200.00 324.00
nominal size
Stone Aggregate (Single size) :10 mm
DSR 0297 cum 0.15 1,050.00 157.50
nominal size
Carriage of stone aggregate 40 mm
DSR 2206 cum 0.58 115.92 67.23
nominal size and above
Carriage of stone aggregate below 40
DSR 2202 cum 0.42 106.64 44.79
mm nominal size
Lime Mortar 1Lime putty:1 surkhi: 1
3.2 cum 0.46 8,232.80 3,787.09
Fine sand
LABOUR:
DSR 0114 Beldar day 1.35 297.00 400.95
DSR 0115 Coolie day 1.17 297.00 347.49
DSR 0101 Bhisti day 1.05 328.00 344.40
DSR 0123 Mason (brick layer) 1 st class day 0.09 393.00 35.37
DSR 0125 Mason (brick layer)2nd class day 0.09 361.00 32.49
DSR 0002 Hand operated mixer/Mechanical mixer day 0.11 800.00 84.00
DSR 9999 Scaffolding LS 114.40 1.70 194.48
DSR 9999 Sundries LS 14.30 1.70 24.31
Total 6,424.10
Add water charges 1% 64.24
Total 6,488.34
Add CPOH @ 15% 973.25
Cost of 1 cum 7,461.59
4.1.2 With graded stone aggregate 40mm nominal size and mortar comprising of 1 Slaked lime :1 surkhi
Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
Stone Aggregate (Single size) : 40 mm
DSR 0293 nominal size (0.63 cum-7.5% for voids cum 0.58 1,000.00 580.00
i.e. 0.04 = 0.56 cum)
Stone Aggregate (Single size) :20 mm
DSR 0295 cum 0.22 1,200.00 264.00
nominal size
Stone Aggregate (Single size) :10 mm
DSR 0297 cum 0.11 1,050.00 115.50
nominal size
Carriage of stone aggregate 40 mm
DSR 2206 cum 0.58 115.92 67.23
nominal size and above
Carriage of stone aggregate below 40
DSR 2202 cum 0.33 106.64 35.19
mm nominal size
Lime Mortar 1Lime putty:1 surkhi: 1
3.3 cum 0.46 6,806.02 3,130.77
coarse sand
LABOUR:
DSR 0114 Beldar day 1.35 297.00 400.95
DSR 0115 Coolie day 1.17 297.00 347.49
DSR 0101 Bhisti day 1.05 328.00 344.40
DSR 0123 Mason (brick layer) 1 st class day 0.09 393.00 35.37
DSR 0125 Mason (brick layer)2nd class day 0.09 361.00 32.49
DSR 0002 Hand operated mixer/Mechanical mixer day 0.11 800.00 84.00
DSR 9999 Scaffolding LS 114.40 1.70 194.48
DSR 9999 Sundries LS 14.30 1.70 24.31
Total 5,656.18
Add water charges 1% 56.56
Total 5,712.74
Add CPOH @ 15% 856.91
Cost of 1 cum 6,569.66

With graded stone aggregate 40mm nominal size and mortar comprising of 1 Slaked lime :1.5
4.1.3
surkhi : 1.5 coarse sand
Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
Stone Aggregate (Single size) : 40 mm
DSR 0293 nominal size (0.63 cum-7.5% for voids cum 0.58 1,000.00 580.00
i.e. 0.04 = 0.56 cum)
Stone Aggregate (Single size) :20 mm
DSR 0295 cum 0.22 1,200.00 264.00
nominal size
Stone Aggregate (Single size) :10 mm
DSR 0297 cum 0.11 1,050.00 115.50
nominal size
Carriage of stone aggregate 40 mm
DSR 2206 cum 0.58 115.92 67.23
nominal size and above
Carriage of stone aggregate below 40
DSR 2202 cum 0.33 106.64 35.19
mm nominal size
Lime Mortar 1 Slaked Lime :1.5 surkhi:
3.4 cum 0.46 6,319.53 2,906.98
1.5 coarse sand
LABOUR:
DSR 0114 Beldar day 1.35 297.00 400.95
DSR 0115 Coolie day 1.17 297.00 347.49
DSR 0101 Bhisti day 1.05 328.00 344.40
DSR 0123 Mason (brick layer) 1 st class day 0.09 393.00 35.37
DSR 0125 Mason (brick layer)2nd class day 0.09 361.00 32.49
DSR 0002 Hand operated mixer/Mechanical mixer day 0.11 800.00 84.00
DSR 9999 Scaffolding LS 114.40 1.70 194.48
DSR 9999 Sundries LS 14.30 1.70 24.31
Total 5,432.40
Add water charges 1% 54.32
Total 5,486.72
Add CPOH @ 15% 823.01
Cost of 1 cum 6,309.73

Providing and laying lime concrete with graded brick aggregate 50 mm nominal size and 50%
4.2 mortar comprising of 1 lime putty : 2 coarse sand rammed excluding cost of centring and
shuttering
Code Description Unit Quantity Rate Amount
Detail of cost for 1 cum
Materials
Common burnt clay F.P.S. (non
M Rate No 247.00 7.00 1,729.00
modular) of bricks class designation 10
DSR 2260 Carriage of brick aggregate Cum 1.00 115.92 115.92
3.1.5 Lime mortar 1 lime putty:2 coarse sand Cum 0.50 7,005.52 3,502.76
Labour
For Breaking bricks to make 40mm and
50mm size aggregates.
DSR 0114 Beldar day 1.25 297.00 371.25
Labour for laying lime concrete
DSR 0123 Mason (brick layer) 1 st class day 0.50 393.00 196.50
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 0101 Bhisti day 0.50 328.00 164.00
Additional labour for levelling,ramming,
beating with thapies and finishing
smooth without adding any mortar for
finishing mason
DSR 0114 Beldar day 1.00 297.00 297.00
DSR 0101 Bhisti day 0.50 328.00 164.00
DSR 0002 Hand operated mixer/Mechanical mixer day 0.50 800.00 400.00
M Rate Washing soap Kg 12.00 125.00 1,500.00
M Rate Alum Kg 4.00 75.00 300.00
DSR 9999 Scaffolding LS 114.40 1.70 194.48
DSR 9999 Sundries LS 14.30 1.70 24.31
Total 9,850.22
Add water charges 1% 98.50
Total 9,948.72
Add CPOH @ 15% 1,492.31
Cost of 1 cum 11,441.03
Brick aggregates available in the market are of inferior quality. So in conservation bricks are procurred and broken in
to required sizes.
4.3 50mm lime concrete flooring laid on existing base over the damaged floor up to 40mm average
Code Description Unit Quantity Rate Amount
Detail of cost for 10 Sqm
Demolishing lime concrete manually/
by mechanical means and disposal of
DSR 15.1 Sqm 10.50 11.26 118.21
material within 50 metres lead as per
direction of Engineer in- charge.
Materials
Common burnt clay F.P.S. (non
M Rate No 247.00 7.00 1,729.00
modular) of bricks class designation 10
DSR 2260 Carriage of brick aggregate Cum 0.50 115.92 57.96
3.5 Lime mortar 1 Slaked lime :2 surkhi Cum 0.50 6,565.11 3,282.55
Labour
For Breaking bricks to make 25mm size
aggregates.
DSR 0114 Beldar day 1.40 297.00 415.80
Labour for laying lime concrete
DSR 0123 Mason (brick layer) 1 st class day 0.50 393.00 196.50
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 0101 Bhisti day 0.50 328.00 164.00
Additional labour for levelling,ramming,
beating with thapies and finishing
smooth without adding any mortar for
finishing mason
DSR 0114 Beldar day 1.00 297.00 297.00
DSR 0101 Bhisti day 0.50 328.00 164.00
DSR 0002 Hand operated mixer/Mechanical mixer day 0.40 800.00 320.00
DSR 9999 Scaffolding LS 114.40 1.70 194.48
DSR 9999 Sundries LS 14.30 1.70 24.31
Total 7,736.60
Add water charges 1% 77.37
Total 7,813.97
Add CPOH @ 15% 1,172.10
Cost of 10 Sqm 9,104.27
Cost of 1 Sqm 910.43
Brick aggregates available in the market are of inferior quality. So in conservation bricks are procurred and broken in
to required sizes.

Providing and laying lime concrete with graded brick bats and 50% lime mortar 1:1:1 ( 1 Slaked
4.4 lime : 1 surkhi:1 coarse sand) rammed and finished with gur and belgiri treatment excluding cost
of centring and shuttering (Thickness 100mm)
Detail of cost for 10 Sqm
Materials
DSR 0362 Brick Bats Cum 0.12 500.00 60.00
DSR 2260 Carriage of brick aggregate Cum 1.00 115.92 115.92
Lime mortar 1:1:1 (1 Slaked lime :1
3.3 Cum 0.60 6,806.02 4,083.61
surkhi:1 coarse sand)
Labour
DSR 0114 Beldar day 5.50 297.00 1,633.50
DSR 0123 Mason (brick layer) 1 st class day 0.50 393.00 196.50
DSR 0101 Bhisti day 0.50 328.00 164.00
Additional labour for levelling,ramming,
beating with thapies and finishing
smooth without adding any mortar for
finishing mason
DSR 0114 Beldar day 1.00 297.00 297.00
DSR 0101 Bhisti day 0.50 328.00 164.00
DSR 0002 Hand operated mixer/Mechanical mixer day 0.40 800.00 320.00
Sundries including washing soap, Alum,
DSR 9999 LS 125.00 1.70 212.50
Gur, Belgiri
Total 7,247.03
Add water charges 1% 72.47
Total 7,319.50
Add CPOH @ 15% 1,097.92
Cost of 10 Sqm 8,417.42
Cost of 1 Sqm 841.74

Providing and laying lime concrete with broken brick aggregate and 50% lime mortar 1:1:1 ( 1
4.5 Slaked lime : 1 surkhi:1 coarse sand) rammed and finished with gur and belgiri treatment
excluding cost of centring and shuttering (Thickness 100mm)
Detail of cost for 10 Sqm
Materials
Common burnt clay F.P.S. (non
M Rate No 247.00 7.00 1,729.00
modular) of bricks class designation 10
DSR 2260 Carriage of brick aggregate Cum 1.00 115.92 115.92
Lime mortar 1:1:1 (1 Slaked lime :1
3.3 Cum 0.60 6,806.02 4,083.61
surkhi:1 coarse sand)
Sundries Washing soap,Alum,
DSR 9999 LS 125.00 1.70 212.50
Gur,Belgiri, Jute San
Labour
For Breaking bricks to make 25mm size
aggregates.
DSR 0114 Beldar day 1.40 297.00 415.80

DSR 0114 Beldar day 5.50 297.00 1,633.50


DSR 0123 Mason (brick layer) 1 st class day 0.50 393.00 196.50
DSR 0101 Bhisti day 0.50 328.00 164.00
Additional labour for levelling,ramming,
beating with thapies and finishing
smooth without adding any mortar for
finishing
DSR 0114 Beldar day 1.00 297.00 297.00
DSR 0101 Bhisti day 0.50 328.00 164.00
DSR 0002 Hand operated mixer/Mechanical mixer day 0.40 800.00 320.00
DSR 9999 Scaffolding LS 114.40 1.70 194.48
DSR 9999 Sundries LS 14.30 1.70 24.31
Total 9,550.62
Add water charges 1% 95.51
Total 9,646.13
Add CPOH @ 15% 1,446.92
Cost of 10 Sqm 11,093.04
Cost of 1 Sqm 1,109.30
Lime concrete terracing on roofs with 25mm nominal size brick aggregate and 50% lime mortar 1:2
4.6 (1 Slaked lime : 2 surkhi) rammed and finished with gur and belgiri treatment complete including
rounding of junctions with parpaet wall complete
Code Description Unit Quantity Rate Amount
Detail of cost for 1 cum
Materials

Common burnt clay F.P.S. (non


M Rate No 247.00 7.00 1,729.00
modular) of bricks class designation 10
DSR 2260 Carriage of brick aggregate Cum 1.00 115.92 115.92
3.5 Lime mortar 1 lime putty:2 surkhi Cum 0.50 6,565.11 3,282.55
Sundries Washing soap,Alum,
DSR 9999 LS 125.00 1.70 212.50
Gur,Belgiri, Jute
Labour
For Breaking bricks to make 25mm size
aggregates.
DSR 0114 Beldar day 1.25 297.00 371.25
Labour for laying lime concrete
DSR 0123 Mason (brick layer) 1 st class day 0.50 393.00 196.50
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 0101 Bhisti day 0.50 328.00 164.00
Additional labour for levelling,ramming,
beating with thapies and finishing
smooth without adding any mortar for
finishing mason
DSR 0114 Beldar day 1.00 297.00 297.00
DSR 0101 Bhisti day 0.50 328.00 164.00
DSR 0002 Hand operated mixer/Mechanical mixer day 0.50 800.00 400.00
DSR 9999 Scaffolding LS 114.40 1.70 194.48
DSR 9999 Sundries LS 14.30 1.70 24.31
Total 8,042.51
Add water charges 1% 80.43
Total 8,122.94
Add CPOH @ 15% 1,218.44
Cost of 1 Cum 9,341.38

Lime concrete on floors with 25mm nominal size brick aggregate and 50% lime mortar 1:3:6
4.7
(1lime putty: 3 surkhi:6 Coarse Sand) rammed and finished with gur and belgiri treatment

Code Description Unit Quantity Rate Amount


Detail of cost for 1 cum
Materials

Common burnt clay F.P.S. (non


M Rate No 247.00 7.00 1,729.00
modular) of bricks class designation 10
DSR 2260 Carriage of brick aggregate Cum 1.00 115.92 115.92
Lime mortar 1 Slaked lime :3 surkhi:6
3.15 Cum 0.50 5,511.77 2,755.88
Coarse Sand
Sundries Washing soap,Alum,
DSR 9999 LS 125.00 1.70 212.50
Gur,Belgiri, Jute
Labour
For Breaking bricks to make 25mm size
aggregates.
DSR 0114 Beldar day 1.25 297.00 371.25
Labour for laying lime concrete
DSR 0123 Mason (brick layer) 1 st class day 0.50 393.00 196.50
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 0101 Bhisti day 0.50 328.00 164.00
Additional labour for levelling,ramming,
beating with thapies and finishing
smooth without adding any mortar for
finishing mason
DSR 0114 Beldar day 1.00 297.00 297.00
DSR 0101 Bhisti day 0.50 328.00 164.00
DSR 0002 Hand operated mixer/Mechanical mixer day 0.50 800.00 400.00
DSR 9999 Scaffolding LS 114.40 1.70 194.48
DSR 9999 Sundries LS 14.30 1.70 24.31
Total 7,515.84
Add water charges 1% 75.16
Total 7,591.00
Add CPOH @ 15% 1,138.65
Cost of 1 Cum 8,729.65

Plinth Area Protection using Lime concrete and brick tiles around the building to prevent entry of
4.8
water by dampness and capilarry rise
Code Description Unit Quantity Rate Amount
Detail of cost for 1 Sqm
Materials
Providing and laying Lime concrete
4.7 Cum 0.18 8,729.65 1,571.34
1:3:6 up to150mm thick
DSR 7266 Brick tiles of size 250mmx250mm 1000 Nos 18.00 12,150.00 218.70

3.9 Lime mortar 1 lime putty:3 coarse sand Cum 0.03 7,588.17 204.88
DSR 9999 Sundries LS 23.00 1.70 39.10
Labour for laying brick tiles
DSR 0123 Mason (brick layer) 1 st class day 0.50 393.00 196.50
DSR 0114 Beldar day 1.00 297.00 297.00
DSR 0101 Bhisti day 0.50 328.00 164.00
DSR 9999 Scaffolding LS 114.40 1.70 194.48
Total 2,886.00
Add water charges 1% 28.86
Total 2,914.86
Add CPOH @ 15% 437.23
Cost of 1 Sqm 3,352.09
5.0 BRICK WORK

5.1 Traditional brick masonry in nanakshahi or lakhori bricks in lime mortar in proportion similar to the
Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand)
Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
M Rate Nanakshahi Lakhori Bricks of size 200x50x40 mm No 2500.00 12.00 30,000.00
3.3 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse sand) Cum 0.20 8,232.80 1,646.56
DSR 2201 Carriage of bricks 1000 nos. 2500.00 284.39 710.98
DSR 9999 Sundries L.S 48.00 1.70 81.60
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 0.54 393.00 212.22
DSR 0124 Mason (brick layer) 2nd class day 0.54 361.00 194.94
DSR 0115 Coolie day 2.06 297.00 610.34
DSR 0114 Bhisti day 0.30 328.00 98.40
Total 33,555.03
Add water charges 1% 335.55
Total 33,890.58
Add CPOH @ 15% 5,083.59
Cost of 1 Cum 38,974.17

Traditional Brick work in plain arches including centering and shuttering complete for span up to 6
5.2
metres in lime mortar 1:1:1 (1 lime : 1 surkhi: 1 coarse sand).
Code Description Unit Quantity Rate Amount
DSR 6.9 Details of cost for 1 cum.
MATERIAL:
M Rate Nanakshahi Lakhori Bricks of size 200x50x40 mm No 2500.00 12.00 30,000.00
3.3 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum 0.38 8,232.80 3,087.30
DSR 2201 Carriage of bricks 1000 nos. 2500.00 284.39 710.98
DSR 9999 Sundries L.S 2.73 1.70 4.64
Centering and Shuttering:
Taking a semi circular arch 3.6m span, 3.6m long and
0.40m thick
Area of centering = 3.142 x 1.8 x 3.6 = 20.37 Sqm
Brick work in Arch = 3.142x2.00x0.4x3.6 =9.05 Cum
Area per cum = 20.37/9.05 = 2.25 sqm
Centering and shuttering including strutting, propping
DSR 5.9.9. etc. and removal of form for Arches, domes, vaults up Sqm 2.25 1,006.65 2,264.96
to 6 m span.
DSR 9999 Scaffolding L.S 18.85 1.70 32.05
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 0.80 393.00 312.44
DSR 0124 Mason (brick layer) 2nd class day 0.80 361.00 287.00
DSR 0115 Coolie day 3.44 297.00 1,020.20
DSR 0114 Bhisti day 0.30 297.00 89.10
DSR 0115 Coolie Extra for lifting materials day 1.70 297.00 503.42
Total 38,312.06
Add Water Charges @ 1% except on formwork 360.47
Total 38,672.53
Add CPOH @ 15% except on formwork 5,461.14
Cost of 1 Cum 44,133.67
Traditional Brick work in gauged arches including centering and shuttering complete for span up to 6
5.3
metres in lime mortar 1:1:1 (1 lime : 1 surkhi: 1 coarse sand).
Code Description Unit Quantity Rate Amount
DSR 6.9 Details of cost for 1 Cum.
MATERIAL:
Common burnt clay F.P.S. (non modular) of bricks class
DSR 2602 No 2500.00 12.00 30,000.00
designation 7.5
3.2 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum 0.38 8,232.80 3,087.30
DSR 2201 Carriage of bricks 1000 nos. 2500.00 284.39 710.98
DSR 9999 Sundries L.S 2.73 1.70 4.64
Centering and Shuttering:
Taking a semi circular arch 3.6m span, 3.6m long and
0.40m thick
Area of centering = 3.142 x 1.8 x 3.6 = 20.37 Sqm
Brick work in Arch = 3.142x2.00x0.4x3.6 =9.05 Cum
Area per cum = 20.37/9.05 = 2.25 sqm
Centering and shuttering including strutting, propping
DSR 5.9.9 etc. and removal of form for Arches, domes, vaults up Sqm 2.25 1,006.65 2,264.96
to 6 m span.
DSR 9999 Scaffolding L.S 18.85 1.70 32.05
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 1.70 393.00 666.14
DSR 0124 Mason (brick layer) 2nd class day 1.36 361.00 489.52
DSR 0115 Coolie day 5.30 297.00 1,575.29
DSR 0114 Bhisti day 0.24 297.00 71.28
DSR 0115 Coolie Extra for lifting materials day 1.36 297.00 402.73
Total 39,304.87
Add Water Charges @ 1% except on formwork 370.40
Total 39,675.27
Add CPOH @ 15% except on formwork 5,611.55
Cost of 1 Cum 45,286.82

5.4 Brick work with bricks of class designation 7.5 in foundation and plinth in
Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand)
Code Description Unit Quantity Rate Amount
Details of cost for 1 cum.
MATERIAL:
Common burnt clay F.P.S. (non modular) of bricks class
M Rate No 494.00 7.00 3,458.00
designation 7.5
3.2 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum 0.38 8,232.80 3,087.30
DSR 2201 Carriage of bricks 1000 nos. 494.00 284.39 140.49
DSR 9999 Sundries L.S 3.73 1.70 6.34
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 0.43 393.00 169.78
DSR 0124 Mason (brick layer) 2nd class day 0.43 361.00 155.95
DSR 0115 Coolie day 1.64 297.00 488.27
DSR 0114 Bhisti day 0.24 328.00 78.72
Total 7,584.85
Add water charges 1% 75.85
Total 7,660.69
Add CPOH @ 15% 1,149.10
Cost of 1 Cum 8,809.80
5.5 Brick work with bricks of class designation 7.5 in superstructure up to two level
Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand)
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 6.4 Details of cost for 1 cum.
MATERIAL:
Prevailing Common burnt clay F.P.S. (non modular) of bricks class
1 494.00 7.00 3,458.00
Rate designation 7.5
3.2 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum 0.38 8,232.80 3,087.30
DSR 2201 Carriage of bricks 1000 nos. 494.00 284.39 140.49
DSR 9999 Sundries L.S 2.73 1.70 4.64
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 0.56 393.00 221.65
DSR 0124 Mason (brick layer) 2nd class day 0.56 361.00 203.60
DSR 0115 Coolie day 2.16 297.00 641.52
DSR 0114 Bhisti day 0.24 328.00 78.72
DSR 9999 Scaffolding L.S 22.36 1.70 38.01
DSR 0115 Coolie day 1.36 297.00 402.73
Total 8,276.67
Add water charges 1% 82.77
Total 8,359.44
Add CPOH @ 15% 1,253.92
Cost of 1 Cum 9,613.35

5.6 Extra for Brickwork in Square or rectangular pillars


Code Description Unit Quantity Rate Amount
DSR 7.4.1 Details of cost for 1 cum.
LABOUR
DSR 0124 Mason (brick layer) 2nd class day 0.87 361.00 314.07
DSR 0115 Coolie day 0.41 297.00 120.29
Total 434.36
Add water charges 1% 4.34
Total 438.70
Add CPOH @ 15% 65.80
Cost of 1 Cum 504.50

Providing half brick masonry with bricks of class designation 7.5 in lime mortar 1:1:1 (1 lime putty:1
5.7
surkhi:1 fine sand)
Code Description Unit Quantity Rate Amount
DSR 6.13 Details of cost for 10 sqm.
MATERIAL:
Prevailing Common burnt clay F.P.S. (non modular) of bricks class
No 565.00 7.00 3,955.00
Rate designation 7.5
3.2 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum 0.42 8,232.80 3,457.78
DSR 2201 Carriage of bricks 1000 nos. 565.00 284.39 160.68
DSR 9999 Sundries L.S 13.52 1.70 22.98
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 0.72 393.00 282.96
DSR 0124 Mason (brick layer) 2nd class day 0.72 361.00 259.92
DSR 0115 Coolie day 2.40 297.00 712.80
DSR 0114 Bhisti day 0.84 328.00 275.52
DSR 9999 Scaffolding L.S 22.36 1.70 38.01
DSR 0115 Coolie day 1.55 297.00 459.76
Total 9,625.41
Add water charges 1% 96.25
Total 9,721.66
Add CPOH @ 15% 1,458.25
Cost of 10 Sqm 11,179.91
Cost of 1 Sqm 1,117.99

Brick work in plain arches including centering and shuttering complete for span up to 6 metres with
5.8 common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in lime mortar 1:1:1 (1 lime : 1
surkhi: 1 fine sand).
Code Description Unit Quantity Rate Amount
DSR 6.9 Details of cost for 1 cum.
MATERIAL:
Prevailing Common burnt clay F.P.S. (non modular) of bricks class
No 494.00 7.00 3,458.00
Rate designation 7.5
3.1.2 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum 0.38 9,142.95 3,428.61
DSR 2201 Carriage of bricks 1000 nos. 494.00 284.39 140.49
DSR 9999 Sundries L.S 2.73 1.70 4.64
Centering and Shuttering:
Taking a semi circular arch 3.6m span, 3.6m long and
0.40m thick
Area of centering = 3.142 x 1.8 x 3.6 = 20.37 Sqm
Brick work in Arch = 3.142x2.00x0.4x3.6 =9.05 Cum
Area per cum = 20.37/9.05 = 2.25 sqm
Centering and shuttering including strutting, propping
DSR 5.9.9. etc. and removal of form for Arches, domes, vaults up Sqm 2.25 1,006.65 2,264.96
to 6 m span.
DSR 9999 Scaffolding L.S 18.85 1.70 32.05
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 0.64 393.00 249.95
DSR 0124 Mason (brick layer) 2nd class day 0.64 361.00 229.60
DSR 0115 Coolie day 2.75 297.00 816.16
DSR 0114 Bhisti day 0.24 328.00 78.72
DSR 0115 Coolie Extra for lifting materials day 1.36 297.00 402.73
Total 11,105.90
Add Water Charges @ 1% except on formwork i.e on
88.41
(7702.75-2264.96)
Total 11,194.31
Add CPOH @ 15% except on formwork i.e on (7723.88-
1,339.40
2264.96)
Cost of 1 Cum 12,533.71

Brick work in gauged arches including centering and shuttering complete for span up to 6 metres with
5.9 common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in lime mortar 1:1:1 (1 lime : 1
surkhi: 1 fine sand).
Code Description Unit Quantity Rate Amount
DSR 6.9 Details of cost for 1 Cum.
MATERIAL:
Common burnt clay F.P.S. (non modular) of bricks class
DSR 2602 1 538.00 7.00 3,766.00
designation 7.5
3.2 Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 fine sand) Cum 0.38 9,142.95 3,428.61
DSR 2201 Carriage of bricks 1000 nos. 538.00 284.39 153.00
DSR 9999 Sundries L.S 2.73 1.70 4.64
Centering and Shuttering:
Taking a semi circular arch 3.6m span, 3.6m long and
0.40m thick
Area of centering = 3.142 x 1.8 x 3.6 = 20.37 Sqm
Brick work in Arch = 3.142x2.00x0.4x3.6 =9.05 Cum
Area per cum = 20.37/9.05 = 2.25 sqm
Centering and shuttering including strutting, propping
DSR 5.9.9 etc. and removal of form for Arches, domes, vaults up Sqm 2.25 1,006.65 2,264.96
to 6 m span.
DSR 9999 Scaffolding L.S 18.85 1.70 32.05
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 1.36 393.00 532.91
DSR 0124 Mason (brick layer) 2nd class day 1.36 361.00 489.52
DSR 0115 Coolie day 5.30 297.00 1,575.29
DSR 0114 Bhisti day 0.24 328.00 78.72
DSR 0115 Coolie Extra for lifting materials day 1.36 297.00 402.73
Total 12,728.42
Add Water Charges @ 1% except on formwork i.e on
104.63
(9228.47-2264.96)
Total 12,833.06
Add CPOH @ 15% except on formwork i.e on (9298.11-
1,585.21
2264.96)
Cost of 1 Cum 14,418.27

BRICK TILE WORK


Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in
5.10
superstructure in lime mortar 1:6 (1 lime putty : 3 coarse sand).
Code Description Unit Quantity Rate Amount
DSR 6.18 Details of cost for 1 Cum.
MATERIAL:
Common burnt clay F.P.S. (non modular) of bricks class
DSR 1984 No 777.00 7.00 5,439.00
designation 10
3.9 Lime mortar 1:3 (1 Lime putty:3 Coarse sand) Cum 0.60 7,588.17 4,552.90
DSR 2207 Carriage of brick tiles 1000 nos. 777.00 170.63 132.58
DSR 9999 Sundries L.S 4.55 1.70 7.74
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 1.08 393.00 424.44
DSR 0124 Mason (brick layer) 2nd class day 1.08 361.00 389.88
DSR 0115 Coolie day 2.16 297.00 641.52
DSR 0114 Bhisti day 0.24 328.00 78.72
Extra for lifting
DSR 9999 Scaffolding L.S 33.80 1.70 57.46
DSR 0115 Coolie day 1.36 297.00 402.73
Total 12,126.97
Add water charges 1% 121.27
Total 12,248.24
Add CPOH @ 15% 1,837.24
Cost of 1 Cum 14,085.47
Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in
5.11
plain arch work in lime mortar 1:4 (1 lime : 3 coarse sand) including centering and shuttering complete

Code Description Unit Quantity Rate Amount


DSR 6.20 Details of cost for 1 Cum.
MATERIAL:
Common burnt clay F.P.S. (non modular) of bricks class
DSR 1984 1000 nos. 777.00 7.00 5,439.00
designation 10
3.9 Lime mortar 1:3 (1 Lime putty:3 Coarse sand) Cum 0.53 7,588.17 3,983.79
DSR 2207 Carriage of brick tiles 1000 nos. 777.00 170.63 132.58
DSR 9999 Sundries L.S 5.46 1.70 9.28
DSR 5.9.9 Centering and Shuttering: Sqm 2.25 1,006.65 2,264.96
DSR 9999 Scaffolding L.S 18.85 1.70 32.05
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 0.95 393.00 372.56
DSR 0124 Mason (brick layer) 2nd class day 0.95 361.00 342.23
DSR 0115 Coolie day 3.85 297.00 1,144.04
DSR 0114 Bhisti day 0.24 328.00 78.72
Extra for lifting
DSR 0115 Coolie day 1.36 297.00 402.73
Total 14,201.95
Add Water Charges @ 1% except on formwork i.e on
119.37
(10311.21-2264.96)
Total 14,321.32
Add CPOH @ 15% except on formwork i.e on (10391.67-
1,808.45
2264.96)
Cost of 1 Cum 16,129.77

Tile brick masonry with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in
5.12
plain arch work in lime mortar 1:4 (1 lime : 3 coarse sand) including centering and shuttering complete

Code Description Unit Quantity Rate Amount


DSR 6.21 Details of cost for 1 Cum.
MATERIAL:
Common burnt clay F.P.S. (non modular) of bricks class
DSR 1984 1000 nos. 777.00 7.00 5,439.00
designation 10
3.9 Lime mortar 1:3 (1 Lime putty:3 Coarse sand) Cum 0.35 7,588.17 2,655.86
DSR 2207 Carriage of brick tiles 1000 nos. 777.00 170.63 132.58
DSR 9999 Sundries L.S 5.46 1.70 9.28
DSR 5.9.9. Centering and Shuttering: Sqm 2.25 1,006.65 2,264.96
DSR 9999 Scaffolding L.S 18.85 1.70 32.05
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 1.80 393.00 707.40
DSR 0124 Mason (brick layer) 2nd class day 1.80 361.00 649.80
DSR 0115 Coolie day 6.40 297.00 1,899.61
DSR 0114 Bhisti day 0.24 328.00 78.72
Extra for lifting
DSR 0115 Coolie day 1.36 297.00 402.73
Total 14,271.99
Add Water Charges @ 1% except on formwork i.e on
120.07
(11709.19-2264.96)
Total 14,392.06
Add CPOH @ 15% except on formwork 1,819.07
Cost of 1 Cum 16,211.13
Tile brick masonry work 5 cm thick with common burnt clay F.P.S. (non modular) tile bricks of class
5.13
designation 10 in lime mortar 1:3 (1 lime : 3 coarse sand)
Code Description Unit Quantity Rate Amount
DSR 6.22 Details of cost for 10 Sqm
MATERIAL:
Common burnt clay F.P.S. (non modular) of bricks class
DSR 1984 No 377.00 7.00 2,639.00
designation 10
3.1.9 Lime mortar 1:3 (1 Lime putty:3 Coarse sand) Cum 0.15 7,588.17 1,138.23
DSR 2207 Carriage of brick tiles 1000 nos. 377.00 170.63 64.33
DSR 9999 Sundries & Scaffolding L.S 8.06 1.70 13.70
LABOUR
DSR 0123 Mason (brick layer) 1 st class day 1.13 393.00 443.30
DSR 0124 Mason (brick layer) 2nd class day 1.13 361.00 407.21
DSR 0115 Coolie day 2.26 297.00 670.03
DSR 0114 Bhisti day 0.40 328.00 129.89
Extra for lifting
DSR 0115 Coolie day 1.55 297.00 459.76
Total 5,965.44
Add water charges 1% 59.65
Total 6,025.10
Add CPOH @ 15% 903.76
Cost of 10 Sqm 6,928.86
Cost of 1 Sqm 692.89
6.0 MASONRY

RANDOM RUBBLE MASONRY


Random rubble masonry with hard stones in foundation and plinth including levelling with lime
6.1 concete (1 lime:3surkhi:6 coarse sand) with 40mm stone aggregate upto plinth level with lime
mortar 1:1:1(1Lime: 1Surkhi:1Coarse sand)

Code Description Unit Quantity Rate in Rs Amount in Rs


DSR 7.1.1 Details of cost for 1 cum.
MATERIAL:
DSR 1157 Stone for masonry work Cum 1.00 700.00 700.00
DSR 1154 Through and bond stone 100 nos. 7.00 1,200.00 84.00
Carriage of Soling stone & masonry stone
DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1.00cum. + Cum 1.16 125.47 145.55
0.16 cum. = 1.16 cum
Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse
3.3 Cum 0.33 6,806.02 2,245.99
sand)
3.15 Lime concrete (1:3:6) Cum 0.20 5,511.77 1,102.35
LABOUR
DSR 0123 Mason (for plain stone work) First class day 1.28 393.00 504.61
DSR 0114 Beldar day 1.28 297.00 381.35
DSR 0115 Coolie day 0.85 297.00 253.04
DSR 0101 Bhisti day 0.11 328.00 35.42
DSR 9999 Sundries L.S 4.42 1.70 7.51
Total 5,459.83
Add water charges 1% 54.60
Total 5,514.42
Add CPOH @ 15% 827.16
Cost of 1 Cum 6,341.59

Random rubble masonry with hard stones in superstructure including levelling with lime
6.2 concete (1 lime:3surkhi:6coarse sand) with 40mm stone aggregate upto plinth level with lime
mortar 1:1:1(1Lime: 1Surkhi:1Coarse sand)
DSR 7.1.2 Details of cost for 1 cum.
MATERIAL:
DSR 1157 Stone for masonry work Cum 1.00 700.00 700.00
DSR 1154 Through and bond stone 100 nos. 7.00 1,200.00 84.00
Carriage of Soling stone & masonry stone
DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1.00cum. + Cum 1.16 125.47 145.55
0.16 cum. = 1.16 cum
Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse
3.3 Cum 0.33 6,806.02 2,245.99
sand)
3.15 Lime concrete (1:3:6) Cum 0.20 5,511.77 1,102.35
LABOUR
DSR 0123 Mason (for plain stone work) First class day 1.61 393.00 631.94
DSR 0114 Beldar day 1.74 297.00 516.78
DSR 0115 Coolie day 0.85 297.00 253.04
DSR 0101 Bhisti day 0.11 328.00 35.42
Extra for lifting
DSR 0115 Coolie day 1.36 297.00 402.73
DSR 9999 Sundries L.S 15.21 1.70 25.86
Total 6,143.67
Add water charges 1% 61.44
Total 6,205.10
Add CPOH @ 15% 930.77
Cost of 1 Cum 7,135.87

COURSED RUBBLE MASONRY

6.3 Coursed rubble masonry in first sort with hard stones in foundation and plinth including
Code Description Unit Quantity Rate Amount
DSR 7.1.1 Details of cost for 1 cum.
MATERIAL:
DSR 1157 Stone for masonry work Cum 1.21 700.00 847.00
DSR 1154 Through and bond stone 100 nos. 7.00 1,200.00 84.00
Carriage of Soling stone & masonry stone
DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1.21cum. + Cum 1.37 125.47 171.89
0.16 cum. = 1.16 cum
Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse
3.3 Cum 0.30 6,806.02 2,041.80
sand)
LABOUR
DSR 0123 Mason (for plain stone work) First class day 2.54 393.00 999.79
DSR 0114 Beldar day 1.49 297.00 441.94
DSR 0115 Coolie day 0.85 297.00 253.04
DSR 0101 Bhisti day 0.11 328.00 35.42
DSR 9999 Sundries L.S 13.52 1.70 22.98
Total 4,897.88
Add water charges 1% 48.98
Total 4,946.86
Add CPOH @ 15% 742.03
Cost of 1 Cum 5,688.89

Coursed rubble masonry in second sort with hard stones in foundation and plinth including
6.4
levelling with lime concete upto plinth level with lime mortar 1:1:1(1Lime:1 surkhi:1 fine sand)

DSR 7.1.1 Details of cost for 1 cum.


MATERIAL:
DSR 1157 Stone for masonry work Cum 1.10 700.00 770.00
DSR 1154 Through and bond stone 100 nos. 7.00 1,200.00 84.00
Carriage of Soling stone & masonry stone
DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1.1cum. + Cum 1.26 125.47 158.09
0.16 cum. = 1.16 cum
Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse
3.3 Cum 0.30 6,806.02 2,041.80
sand)
LABOUR
DSR 0123 Mason (for plain stone work) First class day 2.11 393.00 830.02
DSR 0114 Beldar day 1.49 297.00 441.94
DSR 0115 Coolie day 0.85 297.00 253.04
DSR 0101 Bhisti day 0.11 328.00 35.42
DSR 9999 Sundries L.S 13.52 1.70 22.98
Total 4,637.30
Add water charges 1% 46.37
Total 4,683.67
Add CPOH @ 15% 702.55
Cost of 1 Cum 5,386.22
Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth
6.5
level and upto two floor level
6.5.1 Masonry work (first sort) , in lime mortar 1:1:1 (1 lime : 1surkhi:1 Coarse sand)
DSR 7.8.1 Details of cost for 1 cum.
MATERIAL:
DSR 1157 Stone for masonry work Cum 1.21 700.00 847.00
DSR 1154 Through and bond stone 100 nos. 7.00 1,200.00 84.00
Carriage of Soling stone & masonry stone
DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1.21cum. + Cum 1.37 125.47 171.89
0.16 cum. = 1.16 cum
Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse
3.3 Cum 0.30 6,806.02 2,041.80
sand)
LABOUR
DSR 0123 Mason Brick I Class day 2.86 361.00 1,031.02
DSR 0114 Beldar day 1.91 297.00 566.68
DSR 0115 Coolie day 0.85 297.00 253.04
DSR 0101 Bhisti day 0.11 328.00 35.42
Extra for lifting
DSR 0115 Coolie day 1.36 297.00 402.73
DSR 9999 Sundries, Scaffolding L.S 37.70 1.70 64.09
Total 5,497.68
Add water charges 1% 54.98
Total 5,552.66
Add CPOH @ 15% 832.90
Cost of 1 Cum 6,385.56

6.5.2 Masonry work (second sort) , in lime mortar 1:1:1 (1 lime : 1surkhi:1 coarse sand)
DSR 7.8.1 Details of cost for 1 cum.
MATERIAL:
DSR 1157 Stone for masonry work Cum 1.00 700.00 700.00
DSR 1154 Through and bond stone 100 nos. 7.00 1,200.00 84.00
Carriage of Soling stone & masonry stone
DSR 2215 7.00x24cmx24cmx39cm = 0.16 cum, 1 cum. + Cum 1.16 125.47 145.55
0.16 cum. = 1.16 cum
Lime mortar 1:1:1 (1 Lime putty:1 surkhi: 1 coarse
3.3 Cum 0.30 6,806.02 2,041.80
sand)
LABOUR
DSR 0123 Mason (for plain stone work) First class day 2.42 393.00 952.63
DSR 0114 Beldar day 1.91 297.00 566.68
DSR 0115 Coolie day 0.85 297.00 253.04
DSR 0101 Bhisti day 0.11 328.00 35.42
Extra for lifting
DSR 0115 Coolie day 1.36 297.00 402.73
DSR 9999 Sundries, Scaffolding L.S 37.70 1.70 64.09
Total 5,245.95
Add water charges 1% 52.46
Total 5,298.41
Add CPOH @ 15% 794.76
Cost of 1 Cum 6,093.17
ASHLAR MASONRY

6.6 Stone work in plain ashlar masonry in superstructure in lime mortar 1:1:1 (1 lime:1 surkhi:1 fine
6.6.1 One Face dressed
6.6.1.1 Red Sand Stone
DSR 7.12.1.1 Details of cost for 1 cum.
MATERIAL:
Red sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1160 Red sand stone block 10cudm 13.33 65.00 86.65
3.2 Lime MortAr 1:1:1 (1 Lime:1 Surkhi:1 Fine Sand) Cudm 4.67 8.23 38.41

Carriage of stone blocks white & red sand stone


DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t

Extra labour for lifting of materials 0.01x1.50 =


0.015
DSR 0115 Coolie day 0.02 297.00 4.46
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.09 393.00 34.58
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.36
DSR 0114 Beldar day 0.04 297.00 13.07
DSR 0115 Coolie day 0.02 297.00 6.53
DSR 0100 Bandhani day 0.04 328.00 14.43
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 377.00 19.91
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
Total 263.80
Add water charges 1% 2.64
Total 266.44
Add CPOH @ 15% 39.97
Cost of 0.01 Cum 306.41
Cost of 1 Cum 30,640.50

6.6.1.2 White Sand Stone


Code Description Unit Quantity Rate Amount
DSR 7.12.1.2 Details of cost for 1 cum.
MATERIAL:
White sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1161 White sand stone block 10cudm 13.33 70.00 93.31
3.2 Lime Moratr 1:1:1 (1 Lime:1 Surkhi:1 Fine Sand) Cudm 4.67 8.23 38.41

Carriage of stone blocks white & red sand stone


DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
Extra labour for lifting of materials 0.01x1.50 =
0.015
DSR 0115 Coolie day 0.02 297.00 4.46
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.09 393.00 34.58
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.36
DSR 0114 Beldar day 0.04 297.00 13.07
DSR 0115 Coolie day 0.02 297.00 6.53
DSR 0100 Bandhani day 0.04 328.00 14.43
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 361.00 19.06
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
Total 269.62
Add water charges 1% 2.70
Total 272.32
Add CPOH @ 15% 40.85
Cost of 0.01 Cum 313.17
Cost of 1 Cum 31,316.52

6.6.2 Both Face dressed


6.6.2.1 Red Sand Stone
Code Description Unit Quantity Rate Amount
DSR 7.12.1.1 Details of cost for 1 cum.
MATERIAL:
Red sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1160 Red sand stone block 10cudm 13.33 65.00 86.65
3.2 Lime Moratr 1:1:1 (1 Lime:1 Surkhi:1 Fine Sand) Cudm 4.67 8.23 38.41
Carriage of stone blocks white & red sand stone
DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
Extra labour for lifting of materials 0.01x1.50 =
0.015
DSR 0115 Coolie day 0.02 297.00 4.46
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.18 393.00 69.17
DSR 0102 Blacksmith 1st Class day 0.01 393.00 4.72
DSR 0114 Beldar day 0.09 297.00 26.14
DSR 0115 Coolie day 0.04 297.00 13.07
DSR 0100 Bandhani day 0.09 328.00 28.86
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 361.00 19.06
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
Total 333.93
Add water charges 1% 3.34
Total 337.27
Add CPOH @ 15% 50.59
Cost of 0.01 Cum 387.86
Cost of 1 Cum 38,786.24

6.6.2.2 White Sand Stone


Code Description Unit Quantity Rate Amount
DSR 7.12.1.2 Details of cost for 1 cum.
MATERIAL:
White sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1161 White sand stone block 10cudm 13.33 70.00 93.31
3.2 Lime Moratr 1:1:1 (1 Lime:1 Surkhi:1 Fine Sand) Cudm 4.67 8.23 38.41
Carriage of stone blocks white & red sand stone
DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
Extra labour for lifting of materials 0.01x1.50 =
0.015
DSR 0115 Coolie day 0.02 297.00 4.46
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.18 361.00 63.54
DSR 0102 Blacksmith 1st Class day 0.01 393.00 4.72
DSR 0114 Beldar day 0.09 297.00 26.14
DSR 0115 Coolie day 0.04 297.00 13.07
DSR 0100 Bandhani day 0.09 328.00 28.86
Fixing charges
DSR 0123 Mason (for plain stone work) First class day 0.05 393.00 20.75
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
Total 336.65
Add water charges 1% 3.37
Total 340.02
Add CPOH @ 15% 51.00
Cost of 0.01 Cum 391.02
Cost of 1 Cum 39,102.47

6.6.2.3 Lime Stone


DSR 7.12.1.1 Details of cost for 1 cum.
MATERIAL:
Red sand stone
Finished work = 0.01.+Add wastage @ 33.3% =
3.33 cudm Add wastage @ 33.3% =0.133 cudm.
Total = 13.33 cudm
M Rate Lime sand stone block No 0.90 34.00 30.60
Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying
3.2 Cudm 8.00 8.78 70.24
& pointing
Carriage of stone blocks white & red sand stone
DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.18 393.00 69.17
DSR 0102 Blacksmith 1st Class day 0.01 393.00 4.72
DSR 0114 Beldar day 0.09 297.00 26.14
DSR 0115 Coolie day 0.04 297.00 13.07
DSR 0100 Bandhani day 0.09 328.00 28.86
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 361.00 19.06
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
Total 305.26
Add water charges 1% 3.05
Total 308.32
Add CPOH @ 15% 46.25
Cost of 0.01 Cum 354.57
Cost of 1 Cum 35,456.51

Stone work plain ashlar in arches in super structure in lime mortar 1:3 (1 lime : 3 coarse sand)
6.7 including centring, shuttering and pointing with lime mortar and an admixture of pigment
matching the stone shade
6.7.1 One Face dressed
6.7.1.1 Red Sand Stone
Code Description Unit Quantity Rate Amount
MATERIAL:
Red sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1160 Red sand stone block 10cudm 13.33 65.00 86.65
Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying
3.9 Cudm 8.00 7.59 60.69
& pointing
Carriage of stone blocks white & red sand stone
DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.09 393.00 34.58
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.36
DSR 0114 Beldar day 0.04 297.00 13.07
DSR 0115 Coolie day 0.02 297.00 6.53
DSR 0100 Bandhani day 0.04 328.00 14.43
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 361.00 19.06
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
DSR 9999 Centring and shuttering L.S 13.52 1.70 22.98
Extra labour for lifting of materials 0.01x1.50 =
DSR 0115 0.015
Coolie day 0.02 297.00 4.46
Total 308.22
Add water charges 1% 3.08
Total 311.30
Add CPOH @ 15% 46.70
Cost of 0.01 Cum 358.00
Cost of 1 Cum 35,799.80

6.7.1.2 White Sand Stone


DSR 7.12.1.2 Details of cost for 1 cum.
MATERIAL:
White sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1161 White sand stone block 10cudm 13.33 70.00 93.31
Lime Mortar 1:3 (1 Lime:3 coarse Sand) for laying
3.9 Cudm 8.00 7.59 60.69
& pointing
Carriage of stone blocks white & red sand stone
DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.09 393.00 34.58
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.36
DSR 0114 Beldar day 0.04 297.00 13.07
DSR 0115 Coolie day 0.02 297.00 6.53
DSR 0100 Bandhani day 0.04 328.00 14.43
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 361.00 19.06
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
DSR 9999 Centring and shuttering L.S 13.52 1.70 22.98
Extra labour for lifting of materials 0.01x1.50 =
DSR 0115 0.015
Coolie day 0.02 297.00 4.46
Total 314.89
Add water charges 1% 3.15
Total 318.03
Add CPOH @ 15% 47.71
Cost of 0.01 Cum 365.74
Cost of 1 Cum 36,573.94

6.7.2 Both Faces dressed


6.7.2.1 Red Sand Stone
DSR 7.12.1.1 Details of cost for 1 cum.
MATERIAL:
Red sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1160 Red sand stone block 10cudm 13.33 65.00 86.65
Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying
3.9 Cudm 8.00 7.59 60.69
& pointing
Carriage of stone blocks white & red sand stone
DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.18 393.00 69.17
DSR 0102 Blacksmith 1st Class day 0.01 393.00 4.72
DSR 0114 Beldar day 0.09 297.00 26.14
DSR 0115 Coolie day 0.04 297.00 13.07
DSR 0100 Bandhani day 0.09 328.00 28.86
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 361.00 19.06
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
DSR 9999 Centring and shuttering L.S 13.52 1.70 22.98
Extra labour for lifting of materials 0.01x1.50 =
DSR 0115 0.015
Coolie day 0.02 297.00 4.46
Total 379.20
Add water charges 1% 3.79
Total 382.99
Add CPOH @ 15% 57.45
Cost of 0.01 Cum 440.44
Cost of 1 Cum 44,043.66

6.7.2.2 White Sand Stone


DSR 7.12.1.2 Details of cost for 1 cum.
MATERIAL:
White sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1161 White sand stone block 10cudm 13.33 70.00 93.31
Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying
3.9 Cudm 8.00 7.59 60.69
& pointing
Carriage of stone blocks white & red sand stone
DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.18 393.00 69.17
DSR 0102 Blacksmith 1st Class day 0.01 393.00 4.72
DSR 0114 Beldar day 0.09 297.00 26.14
DSR 0115 Coolie day 0.04 297.00 13.07
DSR 0100 Bandhani day 0.09 328.00 28.86
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 361.00 19.06
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
DSR 9999 Centring and shuttering L.S 13.52 1.70 22.98
Extra labour for lifting of materials 0.01x1.50 =
DSR 0115 0.015
Coolie day 0.02 297.00 4.46
Total 385.86
Add water charges 1% 3.86
Total 389.72
Add CPOH @ 15% 58.46
Cost of 0.01 Cum 448.18
Cost of 1 Cum 44,817.80

6.8 Stone work plain ashlar in domes in lime mortar 1:3 (1 lime : 3 coarse sand) including centring,
6.8.1 One Face dressed
6.8.1.1 Red Sand Stone
DSR 7.14.1.1 Details of cost for 1 cum.
MATERIAL:
Red sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1160 Red sand stone block 10cudm 13.33 65.00 86.65
Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying
3.9 Cudm 8.00 7.59 60.69
& pointing
Carriage of stone blocks white & red sand stone
DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.18 393.00 69.17
DSR 0102 Blacksmith 1st Class day 0.01 393.00 4.72
DSR 0114 Beldar day 0.09 297.00 26.14
DSR 0115 Coolie day 0.04 297.00 13.07
DSR 0100 Bandhani day 0.09 328.00 28.86
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 361.00 19.06
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
DSR 9999 Centring and shuttering L.S 33.15 1.70 56.36
Extra labour for lifting of materials 0.01x1.50 =
DSR 0115 0.015
Coolie day 0.02 297.00 4.46
Total 412.57
Add water charges 1% 4.13
Total 416.69
Add CPOH @ 15% 62.50
Cost of 0.01 Cum 479.20
Cost of 1 Cum 47,919.70

6.8.1.2 White Sand Stone


DSR 7.12.1.2 Details of cost for 1 cum.
MATERIAL:
White sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1161 White sand stone block 10cudm 13.33 70.00 93.31
Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying
3.9 Cudm 8.00 7.59 60.69
& pointing
Carriage of stone blocks white & red sand stone
DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.18 393.00 69.17
DSR 0102 Blacksmith 1st Class day 0.01 393.00 4.72
DSR 0114 Beldar day 0.09 297.00 26.14
DSR 0115 Coolie day 0.04 297.00 13.07
DSR 0100 Bandhani day 0.09 328.00 28.86
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 361.00 19.06
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
DSR 9999 Centring and shuttering L.S 33.15 1.70 56.36
Extra labour for lifting of materials 0.01x1.50 =
DSR 0115 0.015
Coolie day 0.02 297.00 4.46
Total 419.23
Add water charges 1% 4.19
Total 423.42
Add CPOH @ 15% 63.51
Cost of 0.01 Cum 486.94
Cost of 1 Cum 48,693.84

6.8.2 Both Faces dressed


6.8.2.1 Red Sand Stone
DSR 7.12.1.1 Details of cost for 1 cum.
MATERIAL:
Red sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1160 Red sand stone block 10cudm 13.33 65.00 86.65
Lime Mortar 1:3 (1 Lime:3 coarse Sand) for laying
3.9 Cudm 8.00 7.59 60.69
& pointing
Carriage of stone blocks white & red sand stone
DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.35 393.00 138.34
DSR 0102 Blacksmith 1st Class day 0.01 393.00 4.72
DSR 0126 Mason (for ornamental stone work) 1 st class day 0.35 393.00 138.34
DSR 0114 Beldar day 0.09 297.00 26.14
DSR 0115 Coolie day 0.04 297.00 13.07
DSR 0100 Bandhani day 0.09 328.00 28.86
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 361.00 19.06
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
DSR 9999 Centring and shuttering L.S 33.15 1.70 56.36
Extra labour for lifting of materials 0.01x1.50 =
0.015
DSR 0115 Coolie day 0.02 297.00 4.46
Total 620.07
Add water charges 1% 6.20
Total 626.27
Add CPOH @ 15% 93.94
Cost of 0.01 Cum 720.21
Cost of 1 Cum 72,021.29

6.8.2.2 White Sand Stone


DSR 7.12.1.2 Details of cost for 1 cum.
MATERIAL:
White sand stone
Finished work = 10 cudm.+Add wastage @ 33.3%
= 3.33 cudm Add wastage @ 33.3% = 3.33 cudm.
Total = 13.33 cudm
DSR 1161 White sand stone block 10cudm 13.33 70.00 93.31
Lime Moratr 1:3 (1 Lime:3 coarse Sand) for laying
3.9 Cudm 8.00 7.59 60.69
& pointing
Carriage of stone blocks white & red sand stone
DSR 2216 & kota stone slab @ 2.30kg/cudm = 13.33x2.30 = tonne 0.03 94.80 2.94
30.659 kg = 0.031 t
LABOUR
Dressing charges
DSR 0123 Mason (for plain stone work) First class day 0.35 393.00 138.34
DSR 0102 Blacksmith 1st Class day 0.01 393.00 4.72
DSR 0126 Mason (for ornamental stone work) 1 st class day 0.35 393.00 138.34
DSR 0114 Beldar day 0.09 297.00 26.14
DSR 0115 Coolie day 0.04 297.00 13.07
DSR 0100 Bandhani day 0.09 328.00 28.86
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.05 361.00 19.06
DSR 0102 Blacksmith 1st Class day 0.01 393.00 2.83
DSR 0114 Beldar day 0.03 297.00 7.84
DSR 0115 Coolie day 0.03 297.00 7.84
DSR 0100 Bandhani day 0.03 328.00 8.66
DSR 0101 Bhisti day 0.03 328.00 8.66
DSR 9999 Scaffolding L.S 2.73 1.70 4.64
DSR 9999 Centring and shuttering L.S 33.15 1.70 56.36
Extra labour for lifting of materials 0.01x1.50 =
DSR 0115 0.015
Coolie day 0.02 297.00 4.46
Total 626.74
Add water charges 1% 6.27
Total 633.00
Add CPOH @ 15% 94.95
Cost of 0.01 Cum 727.95
Cost of 1 Cum 72,795.43
7.0 FLOORING

Marble stone flooring with 18 mm thick marble stone, as per sample of marble approved by
7.1 conservation architect, over 20 mm (average) thick base of lime mortar 1:1:1 (1 lime :1 surkhi:1
coarse sand) laid and jointed , including rubbing and polishing complete with

7.1.1 Makrana white second quality


Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 11.23.1 Details of cost for 10 sqm
MATERIAL:

18mm thick marble slab = 10.00sqm. Add for


wastage 15% = 1.50sqm. Total = 11.50sqm
White marble slab Makrana second quality plain
DSR 6001 Sqm 11.50 2,375.00 27,312.50
veined 18 mm thick
Base lime mortar of 20mm thick
3.3 Cum 0.22 6,806.02 1,524.55
1:1:1(1lime:1surkhi:1 coarse sand)
Joint lime mortar of 20mm thick
3.3 Cum 0.06 6,806.02 381.14
1:1:1(1lime:1surkhi:1 coarse sand)
DSR 9999 Carriage of marble slab LS 26.91 1.70 45.75
LABOUR ( for finishing, polishing and fixing)
DSR 0123 Mason (brick layer) 1st class day 1.44 393.00 565.92
DSR 0114 Beldar day 1.20 297.00 356.40
DSR 0115 Coolie day 1.20 297.00 356.40
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 5.00 328.00 1,640.00
DSR 0013 Machine for rubbing of floors day 4.00 350.00 1,400.00
DSR 9999 Sundries including carriage of lime etc LS 134.55 1.70 228.74
Total 33,811.39
Add water charges 1% 338.11
Total 34,149.50
Add CPOH @ 15% 5,122.43
Cost of 10 Sqm 39,271.93
Cost of 1 Sqm 3,927.19

7.1.2 Raj Nagar Plain


DSR 11.23.2 Details of cost for 10 sqm
MATERIAL:

18mm thick marble slab = 10.00sqm. Add for


wastage 15% = 1.50sqm. Total = 11.50sqm
White marble Raj Nagar plain 18 mm thick upto
DSR 7071 Sqm 11.50 770.00 8,855.00
0.50 sqm area
Base lime mortar of 20mm thick
3.3 Cum 0.22 6,806.02 1,524.55
1:1:1(1lime:1surkhi:1 coarse sand)
Joint lime mortar of 20mm thick
3.3 Cum 0.06 6,806.02 381.14
1:1:1(1lime:1surkhi:1 coarse sand)
DSR 9999 Carriage of marble slab LS 26.91 1.70 45.75
LABOUR ( for finishing, polishing and fixing)
DSR 0123 Mason (brick layer) 1st class day 1.44 393.00 565.92
DSR 0114 Beldar day 1.20 297.00 356.40
DSR 0115 Coolie day 1.20 297.00 356.40
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 5.00 328.00 1,640.00
DSR 0013 Machine for rubbing of floors day 4.00 350.00 1,400.00
DSR 9999 Sundries including carriage of lime etc LS 134.55 1.70 228.74
Total 15,353.89
Add water charges 1% 153.54
Total 15,507.43
Add CPOH @ 15% 2,326.11
Cost of 10 Sqm 17,833.54
Cost of 1 Sqm 1,783.35

7.1.3 Agaria White


DSR 11.23.3 Details of cost for 10 sqm
MATERIAL:

18mm thick marble slab = 10.00sqm. Add for


wastage 15% = 1.50sqm. Total = 11.50sqm

DSR 7850 Agaria White marble slab plain 18 mm thick Sqm 11.50 1,430.00 16,445.00
Base lime mortar of 20mm thick
3.3 Cum 0.22 6,806.02 1,524.55
1:1:1(1lime:1surkhi:1 coarse sand)
Joint lime mortar of 20mm thick
3.3 Cum 0.06 6,806.02 381.14
1:1:1(1lime:1surkhi:1 coarse sand)
DSR 9999 Carriage of marble slab LS 26.91 1.70 45.75
LABOUR ( for finishing, polishing and fixing)
DSR 0123 Mason (brick layer) 1st class day 1.44 361.00 519.84
DSR 0114 Beldar day 1.20 297.00 356.40
DSR 0115 Coolie day 1.20 297.00 356.40
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 5.00 328.00 1,640.00
DSR 0013 Machine for rubbing of floors day 4.00 350.00 1,400.00
DSR 9999 Sundries including carriage of lime etc LS 134.55 1.70 228.74
Total 22,897.81
Add water charges 1% 228.98
Total 23,126.78
Add CPOH @ 15% 3,469.02
Cost of 10 Sqm 26,595.80
Cost of 1 Sqm 2,659.58

7.1.4 Black Zebra


DSR 11.23.4 Details of cost for 10 sqm
MATERIAL:

18mm thick marble slab = 10.00sqm. Add for


wastage 15% = 1.50sqm. Total = 11.50sqm
DSR 6019 Black Zebra marble slab plain 18 mm thick Sqm 11.50 650.00 7,475.00
Base lime mortar of 20mm thick
3.3 Cum 0.22 6,806.02 1,524.55
1:1:1(1lime:1surkhi:1 coarse sand)
Joint lime mortar of 20mm thick
3.3 Cum 0.06 6,806.02 381.14
1:1:1(1lime:1surkhi:1 coarse sand)
DSR 9999 Carriage of marble slab LS 26.91 1.70 45.75
LABOUR ( for finishing, polishing and fixing)
DSR 0123 Mason (brick layer) 1st class day 1.44 393.00 565.92
DSR 0114 Beldar day 1.20 297.00 356.40
DSR 0115 Coolie day 1.20 297.00 356.40
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 5.00 328.00 1,640.00
DSR 0013 Machine for rubbing of floors day 4.00 350.00 1,400.00
DSR 9999 Sundries including carriage of lime etc LS 134.55 1.70 228.74
Total 13,973.89
Add water charges 1% 139.74
Total 14,113.63
Add CPOH @ 15% 2,117.04
Cost of 10 Sqm 16,230.67
Cost of 1 Sqm 1,623.07

7.1.5 Udaipur Green Marble


DSR 11.23.5 Details of cost for 10 sqm
MATERIAL:

18mm thick marble slab = 10.00sqm. Add for


wastage 15% = 1.50sqm. Total = 11.50sqm

DSR 6010 Udaypur green marble slab plain 18 mm thick Sqm 11.50 825.00 9,487.50
Base lime mortar of 20mm thick
3.3 Cum 0.22 6,806.02 1,524.55
1:1:1(1lime:1surkhi:1 coarse sand)
Joint lime mortar of 20mm thick
3.3 Cum 0.06 6,806.02 381.14
1:1:1(1lime:1surkhi:1 coarse sand)
DSR 9999 Carriage of marble slab LS 26.91 1.70 45.75
LABOUR ( for finishing, polishing and fixing)
DSR 0123 Mason (brick layer) 1st class day 1.44 393.00 565.92
DSR 0114 Beldar day 1.20 297.00 356.40
DSR 0115 Coolie day 1.20 297.00 356.40
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 5.00 328.00 1,640.00
DSR 0013 Machine for rubbing of floors day 4.00 350.00 1,400.00
DSR 9999 Sundries including carriage of lime etc LS 134.55 1.70 228.74
Total 15,986.39
Add water charges 1% 159.86
Total 16,146.25
Add CPOH @ 15% 2,421.94
Cost of 10 Sqm 18,568.19
Cost of 1 Sqm 1,856.82

7.1.6 Pink Plain Marble


DSR 11.23.6 Details of cost for 10 sqm
MATERIAL:

18mm thick marble slab = 10.00sqm. Add for


wastage 15% = 1.50sqm. Total = 11.50sqm
DSR 6007 Pink marble slab plain 18 mm thick Sqm 11.50 750.00 8,625.00
Base lime mortar of 20mm thick
3.3 Cum 0.22 6,806.02 1,524.55
1:1:1(1lime:1surkhi:1 coarse sand)
Joint lime mortar of 20mm thick
3.3 Cum 0.06 6,806.02 381.14
1:1:1(1lime:1surkhi:1 coarse sand)
DSR 9999 Carriage of marble slab LS 26.91 1.70 45.75
LABOUR ( for finishing, polishing and fixing)
DSR 0123 Mason (brick layer) 1st class day 1.44 393.00 565.92
DSR 0114 Beldar day 1.20 297.00 356.40
DSR 0115 Coolie day 1.20 297.00 356.40
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 5.00 328.00 1,640.00
DSR 0013 Machine for rubbing of floors day 4.00 350.00 1,400.00
DSR 9999 Sundries including carriage of lime etc LS 134.55 1.70 228.74
Total 15,123.89
Add water charges 1% 151.24
Total 15,275.13
Add CPOH @ 15% 2,291.27
Cost of 10 Sqm 17,566.39
Cost of 1 Sqm 1,756.64

Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with lime slurry
7.2 mixed with pigment to match the shade of the slab, including rubbing and polishing complete with
base of lime mortar 1 : 1:1 (1 lime :1surkhi:1 coarse sand)

7.2.1 25mm thick


DSR 11.26 Details of cost for 10 sqm
MATERIAL:
Kota stone slab 20 mm to 25 mm thick (semi-
DSR 1168 Sqm 11.50 357.00 4,105.50
polished) including 15% wastage
Base lime mortar of 20mm thick
3.3 Cum 0.22 6,806.02 1,524.55
1:1:1(1lime:1surkhi:1 coarse sand)
Pointing lime mortar of 20mm thick
3.3 Cum 0.06 6,806.02 381.14
1:1:1(1lime:1surkhi:1 coarse sand)
DSR 0874 Black colour dark shade pigment Kg 4.50 55.00 247.50
Carriage of stone blocks white & red sand stone
DSR 2216 Tonne 0.67 94.80 63.52
& kota stone slab
LABOUR ( for finishing, polishing and fixing)
DSR 0124 Mason (brick layer) 2nd class day 1.44 361.00 519.84
DSR 0114 Beldar day 1.20 297.00 356.40
DSR 0115 Coolie day 1.20 297.00 356.40
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 5.00 328.00 1,640.00
DSR 0013 Machine for rubbing of floors day 4.00 350.00 1,400.00
DSR 9999 Sundries including carriage of lime etc LS 208.13 1.70 353.82
Total 10,948.66
Add water charges 1% 109.49
Total 11,058.15
Add CPOH @ 15% 1,658.72
Cost of 10 Sqm 12,716.87
Cost of 1 Sqm 1,271.69

Kota stone slabs 25 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average)
7.3 thick lime mortar 1:1:1 (1 lime: 1surkhi:1coarse sand) and jointed with lime slurry mixed with
pigment to match the shade of the slabs, including rubbing and polishing complete.

DSR 11.26 Details of cost for 10 sqm


MATERIAL:
Kota stone slab 20 mm to 25 mm thick (semi-
DSR 1168 Sqm 11.50 357.00 4,105.50
polished) including 15% wastage
Base lime mortar of 20mm thick
3.3 Cum 0.22 6,806.02 1,524.55
1:1:1(1lime:1surkhi:1 coarse sand)
Pointing lime mortar of 20mm thick
3.3 Cum 0.06 6,806.02 381.14
1:1:1(1lime:1surkhi:1 coarse sand)
DSR 0874 Black colour dark shade pigment Kg 4.50 55.00 247.50
Carriage of stone blocks white & red sand stone
DSR 2216 Tonne 0.67 94.80 63.52
& kota stone slab
LABOUR ( for finishing, polishing and fixing)
DSR 0124 Mason (brick layer) 2nd class day 3.60 361.00 1,299.60
DSR 0114 Beldar day 3.60 297.00 1,069.20
DSR 0115 Coolie day 1.20 297.00 356.40
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 7.00 328.00 2,296.00
DSR 9999 Sundries including carriage of lime etc LS 174.98 1.70 297.47
Total 11,640.87
Add water charges 1% 116.41
Total 11,757.27
Add CPOH @ 15% 1,763.59
Cost of 10 Sqm 13,520.87
Cost of 1 Sqm 1,352.09

Laterite stone flooring with 19 mm thick Laterite stone as per sample of Laterite approved by
7.4 Engineer-in-Charge, over 20 mm (average) thick base of lime mortar 1:4 (1 lime : 4 coarse sand)
laid and jointed withlime slurry including rubbing and polishing complete

DSR 11.23.1 Details of cost for 10 sqm


MATERIAL:
20mm laterite stone = 10.00sqm. Add for
wastage 15% = 1.50sqm. Total = 11.50sqm
M Rate Laterite stone Sqm 11.50 1,050.00 12,075.00
Base lime mortar of 20mm thick 1:3(1lime:3
3.9 Cum 0.22 7,588.17 1,699.75
coarse sand)
Joint lime mortar of 20mm thick 1:3(1lime:3
3.1.9 Cum 0.06 7,588.17 424.94
coarse sand)
DSR 9999 Carriage of stone LS 26.91 1.70 45.75
LABOUR ( for finishing, polishing and fixing)
DSR 0124 Mason (brick layer) 2nd class day 3.60 361.00 1,299.60
DSR 0114 Beldar day 3.60 297.00 1,069.20
DSR 0115 Coolie day 1.20 297.00 356.40
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 7.00 328.00 2,296.00
DSR 9999 Sundries LS 174.98 1.70 297.47
Total 19,564.10
Add water charges 1% 195.64
Total 19,759.74
Add CPOH @ 15% 2,963.96
Cost of 10 Sqm 22,723.70
Cost of 1 Sqm 2,272.37

40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar 1:3 (1
7.5
lime: 3coarse sand) with joints finished flush.

7.5.1 Red Sand stone


DSR 11.28.1 Details of cost for 10 sqm
MATERIAL:

Finished work = 10sqm


Add wastage 10% =1.00sqm
Total = 11.00 sqm

DSR 1164 Red sand stone slab 40 mm thick (Indressed) Sqm 11.00 190.00 2,090.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:3 (1 Lime:3 Coarse sand)
i. For bedding 0.22
ii. For Joining 0.03
3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) 0.25 7,588.17 1,897.04
LABOUR
DSR 0123 Mason Brick I Class day 3.72 393.00 1,461.96
DSR 0100 Bandhani day 1.32 328.00 432.96
DSR 0115 Coolie day 0.66 297.00 196.02
DSR 0114 Bhisti day 0.32 328.00 106.27
DSR 9999 Sundries LS 10.79 1.70 18.34
Total 6,260.50
Add water charges 1% 62.60
Total 6,323.10
Add CPOH @ 15% 948.47
Cost of 10 Sqm 7,271.57
Cost of 1 Sqm 727.16

7.5.2 White Sand stone


DSR 11.28.2 Details of cost for 10 sqm
MATERIAL:
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm

DSR 1165 White sand stone slab 40 mm thick (Indressed) Sqm 11.00 215.00 2,365.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:3 (1 Lime:3 Coarse sand)
i. For bedding 0.22
ii. For Joining 0.03
3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) 0.25 7,588.17 1,897.04
LABOUR
DSR 0123 Mason Brick I Class day 3.72 393.00 1,461.96
DSR 0100 Bandhani day 1.32 328.00 432.96
DSR 0115 Coolie day 0.66 297.00 196.02
DSR 0114 Bhisti day 0.32 328.00 106.27
DSR 9999 Sundries LS 10.79 1.70 18.34
Total 6,535.50
Add water charges 1% 65.35
Total 6,600.85
Add CPOH @ 15% 990.13
Cost of 10 Sqm 7,590.98
Cost of 1 Sqm 759.10

40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar 1:3 (1
7.6
lime: 3coarse sand) with joints finished flush.
7.6.1 Red Sand stone
DSR 11.29.1 Details of cost for 10 sqm
MATERIAL:
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm

DSR 1164 Red sand stone slab 40 mm thick (Indressed) Sqm 11.00 190.00 2,090.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:3 (1 Lime:3 Coarse sand)
i. For bedding 0.22
ii. For Joining 0.03
iii. For Pointing 0.02
3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) 0.27 7,588.17 2,071.57
LABOUR
DSR 0123 Mason Brick I Class day 4.68 393.00 1,839.24
DSR 0100 Bandhani day 1.32 328.00 432.96
DSR 0115 Coolie day 1.68 297.00 498.96
DSR 0114 Bhisti day 0.66 328.00 216.48
DSR 9999 Sundries LS 26.91 1.70 45.75
Total 7,252.86
Add water charges 1% 72.53
Total 7,325.39
Add CPOH @ 15% 1,098.81
Cost of 10 Sqm 8,424.20
Cost of 1 Sqm 842.42

7.6.2 White Sand stone


Details of cost for 10 sqm
MATERIAL:
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm

DSR 1165 white sand stone slab 40 mm thick (Indressed) Sqm 11.00 215.00 2,365.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:3 (1 Lime:3 Coarse sand)
i. For bedding 0.22
ii. For Joining 0.03
iii. For Pointing 0.02
3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) 0.27 7,588.17 2,071.57
LABOUR
DSR 0123 Mason Brick I Class day 4.68 393.00 1,839.24
DSR 0100 Bandhani day 1.32 328.00 432.96
DSR 0115 Coolie day 1.68 297.00 498.96
DSR 0114 Bhisti day 0.66 328.00 216.48
DSR 9999 Sundries LS 26.91 1.70 45.75
Total 7,527.86
Add water charges 1% 75.28
Total 7,603.14
Add CPOH @ 15% 1,140.47
Cost of 10 Sqm 8,743.61
Cost of 1 Sqm 874.36
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar 1:1:1 (1
7.7
lime: 1 surkhi:1coarse sand) with joints finished flush.

7.7.1 Red Sand stone


DSR 11.28.1 Details of cost for 10 sqm
MATERIAL:
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm

DSR 1164 Red sand stone slab 40 mm thick (Indressed) Sqm 11.00 190.00 2,090.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:1:1 (1 Lime:1surkhi:1 Coarse
sand)
i. For bedding 0.22
ii. For Joining 0.03
Lime mortar 1:1:1 (1 Lime:1surkhi:1 Coarse
3.3 0.25 6,806.02 1,701.50
sand)
LABOUR
DSR 0123 Mason Brick I Class day 3.72 393.00 1,461.96
DSR 0100 Bandhani day 1.32 328.00 432.96
DSR 0115 Coolie day 0.66 297.00 196.02
DSR 0114 Bhisti day 0.32 328.00 106.27
DSR 9999 Sundries LS 10.79 1.70 18.34
Total 6,064.96
Add water charges 1% 60.65
Total 6,125.61
Add CPOH @ 15% 918.84
Cost of 10 Sqm 7,044.45
Cost of 1 Sqm 704.45

7.7.2 White Sand stone


DSR 11.28.1 Details of cost for 10 sqm
MATERIAL:
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm

DSR 1165 White sand stone slab 40 mm thick (Indressed) Sqm 11.00 215.00 2,365.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:1:1 (1 Lime:1surkhi:1 Coarse
sand)
i. For bedding 0.22
ii. For Joining 0.03
Lime mortar 1:1:1 (1 Lime:1surkhi:1 Coarse
3.1.3 0.25 6,806.02 1,701.50
sand)
LABOUR
DSR 0123 Mason Brick I Class day 3.72 393.00 1,461.96
DSR 0100 Bandhani day 1.32 328.00 432.96
DSR 0115 Coolie day 0.66 297.00 196.02
DSR 0114 Bhisti day 0.32 328.00 106.27
DSR 9999 Sundries LS 10.79 1.70 18.34
Total 6,339.96
Add water charges 1% 63.40
Total 6,403.36
Add CPOH @ 15% 960.50
Cost of 10 Sqm 7,363.86
Cost of 1 Sqm 736.39

40 mm thick rubbed stone flooring over 20 mm (average) thick base of lime mortar 1:3 (1 lime :3
7.8 coarse sand) with joints 3 mm thick, side buttered with lime mortar 1:2 (1 lime : 2 stone dust)
admixed with pigment to match the shade of stone and pointing with same mortar

7.8.1 Red Sand stone


DSR 11.30.1 Details of cost for 10 sqm
MATERIAL:
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm

DSR 1164 Red sand stone slab 40 mm thick (Indressed) Sqm 11.00 190.00 2,090.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:3 (1 Lime:3 Coarse sand)
i. For bedding 0.22
ii. For Joining 0.03
iii. For bedding 0.02
3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) 0.27 7,588.17 2,071.57
DSR 0123 Mason Brick I Class day 4.68 393.00 1,839.24
DSR 0100 Bandhani day 1.32 328.00 432.96
DSR 0115 Coolie day 1.68 297.00 498.96
DSR 0114 Bhisti day 0.66 328.00 216.48
DSR 9999 Sundries LS 26.91 1.70 45.75
LABOUR
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 0.62 328.00 202.70
DSR 0013 Machine for rubbing of floors day 0.99 350.00 345.80
Total 7,801.36
Add water charges 1% 78.01
Total 7,879.38
Add CPOH @ 15% 1,181.91
Cost of 10 Sqm 9,061.28
Cost of 1 Sqm 906.13

7.8.2 White Sand stone


DSR 11.30.2 Details of cost for 10 sqm
MATERIAL:
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm

DSR 1165 White sand stone slab 40 mm thick (Indressed) Sqm 11.00 215.00 2,365.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:3 (1 Lime:3 Coarse sand)
i. For bedding 0.22
ii. For Joining 0.03
iii. For Pointing 0.02
3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) 0.27 7,588.17 2,071.57
DSR 0123 Mason Brick I Class day 4.68 393.00 1,839.24
DSR 0100 Bandhani day 1.32 328.00 432.96
DSR 0115 Coolie day 1.68 297.00 498.96
DSR 0114 Bhisti day 0.66 328.00 216.48
DSR 9999 Sundries LS 26.91 1.70 45.75
LABOUR
DSR 0139 Skilled Beldar (for floor rubbing etc.) day 0.62 328.00 202.70
DSR 0013 Machine for rubbing of floors day 0.99 350.00 345.80
Total 8,076.36
Add water charges 1% 80.76
Total 8,157.13
Add CPOH @ 15% 1,223.57
Cost of 10 Sqm 9,380.70
Cost of 1 Sqm 938.07

40mm thick red oxide flooring under layer 0f 30mm thick cement concrete 1:2:4(1cement:2 coarse
sand: 4 graded stone aggregate 12.5 mm nominal size) and top layer of 10mm thick plaster of
cement red oxide mix( using 3.5 kg of red oxide of iron per 50 kg of cement) 1:3 (1 cement : 3
7.9
coarse sand) finished with a floating coat of neat cement red oxide mix of same proportion
including cement slurry, rounding off egdes, strips, etc but excluding the cost of nosing of steps.
complete

DSR 11.3.1 Details of cost for 10 sqm


MATERIAL:
Stone Aggregate (Single size) : 20 mm nominal
DSR 0295 Cum 0.27 1,200.00 320.40
size
Stone Aggregate (Single size) : 20 mm nominal
DSR 0297 Cum 0.09 1,050.00 93.45
size
Carriage of stone aggregate below 40 mm
DSR 2202 Cum 0.36 106.64 37.96
nominal size
DSR 0982 Coarse sand (zone III) Cum 0.18 1,120.00 199.36
DSR 2203 Carriage of coarse sand Cum 0.18 106.64 18.98
DSR 0367 Portland Cement tonne 0.17 6,600.00 1,122.00
DSR 2209 Carriage of cement tonne 0.17 94.80 16.12
M Rate Red oxide Kg 15.00 75.00 1,125.00
LABOUR
DSR 0123 Mason 1st class day 1.40 393.00 550.20
DSR 0114 Beldar day 2.45 297.00 727.65
DSR 0101 Bhisti day 1.82 328.00 596.96
Driver (for Road Roller, Concrete Mixer Truck
DSR 0127 day 0.05 393.00 20.63
etc.)
Hire charges of Concrete Mixer 0.25 to 0.40
DSR 0002 day 0.03 800.00 24.00
cum with Hopper
DSR 9999 Sundries LS 40.43 1.70 68.73
Total 4,921.45
Add water charges 1% 49.21
Total 4,970.66
Add CPOH @ 15% 745.60
Cost of 10 Sqm 5,716.26
Cost of 1 Sqm 571.63
Red oxide plastering (up to 30cm height) with cement mortar 1:3( 1 cement : 3 coarse sand)
7.10
finished with a floating coat of neat cement including rounding of junctions with floor.
DSR 11.3.1 Details of cost for 10 sqm
MATERIAL:
Cement mortar 1:3 = 0.205 cum+Add for
DSR 3.8 Cum 0.24 366.20 86.06
rounding corners = 0.030 cum = 0.235
DSR 0367 Portland Cement tonne 0.19 6,600.00 1,226.61
DSR 2209 Carriage of cement tonne 0.19 94.80 17.62
DSR 0875 Red oxide Kg 22.00 75.00 1,650.00
LABOUR
DSR 0123 Mason 1st class day 3.29 393.00 1,292.97
DSR 0115 Coolie day 3.29 297.00 977.13
DSR 0101 Bhisti day 0.95 328.00 309.96
DSR 9999 Sundries LS 19.76 1.70 33.59
Total 5,593.94
Add water charges 1% 55.94
Total 5,649.88
Add CPOH @ 15% 847.48
Cost of 10 Sqm 6,497.36
Cost of 1 Sqm 649.74

Laying lime flooring-Providing and laying lime concrete(1 lime:3 brick bats) up to 100mm thickness
7.11 tamping and compacting properly which is follwed by laying of Lime mortar 1:3 up to a thickness
of 20mm.Rework to be done till the desired smoothness on the surface

DSR 11.3.1 Details of cost for 1 sqm


MATERIAL:
4.4 Lime Concrete Sqm 1.20 841.74 1,010.09
Lime Mortar 1:3 (1 Lime: 3 Coarse sand) Cum 0.01 7,588.17 91.06
Lime Mortar 1:3 (1 Lime: 3 Fine Sand sand) Cum 0.01 8,782.53 105.39
LABOUR
DSR 0123 Mason 1st class day 0.41 393.00 162.11
DSR 0115 Coolie day 0.15 297.00 44.55
DSR 0101 Bhisti day 0.74 328.00 243.54
DSR 9999 Sundries LS 19.76 1.70 33.59
Total 1,690.33
Add water charges 1% 16.90
Total 1,707.24
Add CPOH @ 15% 256.09
Cost of 1 Sqm 1,963.32

Heritage floor tiles over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse sand) with
7.12
joints finished flush.
DSR 11.29.1 Details of cost for 10 sqm
MATERIAL:
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm
M Rate Heritage Floor tiles Sqm 11.00 2,044.40 22,488.40
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:3 (1 Lime:3 Coarse sand)
i. For bedding 0.22
ii. For Joining 0.03
iii. For Pointing 0.02
3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) 0.27 7,588.17 2,071.57
LABOUR
DSR 0123 Mason Brick I Class day 4.68 393.00 1,839.24
DSR 0100 Bandhani day 1.32 328.00 432.96
DSR 0115 Coolie day 1.68 297.00 498.96
DSR 0114 Bhisti day 0.66 328.00 216.48
DSR 9999 Sundries LS 26.91 1.70 45.75
Total 27,651.26
Add water charges 1% 276.51
Total 27,927.77
Add CPOH @ 15% 4,189.17
Cost of 10 Sqm 32,116.94
Cost of 1 Sqm 3,211.69

Heritage Skirting tiles over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse sand)
7.13
with joints finished flush.
DSR 11.29.1 Details of cost for 10 sqm
MATERIAL:
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm
M Rate Heritage Floor tiles Sqm 11.00 1,614.00 17,754.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:3 (1 Lime:3 Coarse sand)
i. For bedding 0.22
ii. For Joining 0.03
iii. For Pointing 0.02
3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) 0.27 7,588.17 2,071.57
LABOUR
DSR 0123 Mason Brick I Class day 5.07 393.00 1,992.51
DSR 0100 Bandhani day 1.43 328.00 469.04
DSR 0115 Coolie day 1.82 297.00 540.54
DSR 0114 Bhisti day 0.72 328.00 234.52
DSR 9999 Sundries LS 26.91 1.70 45.75
Total 23,165.83
Add water charges 1% 231.66
Total 23,397.49
Add CPOH @ 15% 3,509.62
Cost of 10 Sqm 26,907.11
Cost of 1 Sqm 2,690.71
8.0 ROOFING

Providing and laying Flat brick/ Terracota tiles on roofs grouted with lime mortar 1:2(1 lime: 2 fine
8.1 sand) mixed with 5% crude oil by weight of lime, over 20mm layer of lime mortar 1:2 (1 lime: 2 fine
sand)
Amount in
Code Description Unit Quantity Rate in Rs
Rs
DSR 12.20 Detail of cost for 10 Sqm
MATERIAL:
DSR7266 Pressed clay tiles 20mm thick 250x250 mm size 1000 Nos 160 12150 1,944.00
DSR2207 Carriage of brick tiles 1000 Nos 160 170.63 27.30
3.8 Lime mortar 1:2 (1 lime: 2 Fine Sand) for bedding Cum 0.224 8,256.64 1,849.49

3.8 Lime mortar 1:2 (1 lime: 2 Fine Sand) for pointing Cum 0.037 8,256.64 305.50
M Rate 5 % crude oil by weight of lime Kg 0.2 100.00 20.00
LABOUR
DSR0123 Mason (brick layer) 1st class day 0.72 393.00 282.96
DSR 0114 Beldar day 3.12 297.00 926.64
DSR 9999 Sundries LS 14.3 1.70 24.31
Total 5,380.19
Add water charges 1% 53.80
Total 5,434.00
Add CPOH @ 15% 815.10
Cost of 10 Sqm 6,249.10
Cost of 1 Sqm 624.91

Removing brick tiles from 50 to 60cm thick lime terrace and relaying an average thickness 7.5cm laid
to fall with 25mm nominal size brick aggregate and 50% lime mortar 1:2 (1 Lime putty:2 Surkhi)
8.2 rammed and finished with gur and belgiri treatment complete and covered with brick tiles of class
designation 100 to 50 mm thick red sand stone grouted with lime mortar 1:3(1 Lime: 3 Fine sand) with
5% crude oil by weight of lime over 20mm layer of lime mortar 1:3 (1 lime : 3 fine sand)

Amount in
Code Description Unit Quantity Rate in Rs
Rs
DSR 12.20 Detail of cost for 10 Sqm

Demolishing brick tile covering in terracing including


DSR 15.26 stacking of serviceable material and disposal of Sqm 10.5 36.95 387.975
unserviceable material within 50 metres lead
MATERIAL:
Lime concrete with 25mm size brick aggregate and
4.6 Cum 0.075 9,341.38 700.60
50% lime mortar 1:2 (1lime:2 Surkhi)
DSR7266 Pressed clay tiles 20mm thick 250x250 mm size 1000 Nos 160 12,150.00 1,944.00
DSR2207 Carriage of brick tiles 1000 Nos 160 170.63 27.30
3.8 Lime mortar 1:2 (1 lime: 2 Fine Sand) Cum 0.224 8,256.64 1,849.49
3.8 Lime mortar 1:2 (1 lime: 2 Fine Sand) Cum 0.037 8,256.64 305.50
M Rate 5 % crude oil by weight of lime Kg 0.2 100.00 20.00
LABOUR
DSR0123 Mason (brick layer) 1st class day 0.72 393.00 282.96
DSR 0114 Beldar day 3.12 297.00 926.64
DSR 9999 Sundries LS 14.3 1.70 24.31
Total 6,468.77
Add water charges 1% 64.69
Total 6,533.46
Add CPOH @ 15% 980.02
Cost of 10 Sqm 7,513.48
Cost of 1 Sqm 751.35

Providing & fixing on roof Country clay tile of 6 mm nominal thickness and of approved size and as per
8.3
approved pattern on bamboo frame work complete
Amount in
Code Description Unit Quantity Rate in Rs
Rs
Details of cost for 12.76 Sqm
MATERIAL:
M Rate Tiles average size of 200mmx125mmx6mm 1000 Nos 1276 3,000.00 3,828.00
DSR 2207 Carriage of country tiles 1000 Nos 1276 170.63 217.72
DSR 0305 Bamboo Battens 25mm 2.5 M long =350
Bamboo Battens 25mm 1 M long =Rs.140
Bamboo Battens 25mm 3.3 M long =Rs.462
Bamboo Battens 25mm 3.3 M long No 12.00 462.00 5,544.00
M Rate Fibre rope Kg 1.00 50.00 50.00
DSR 1219 Iron Nails Kg 1.00 60.00 60.00
DSR 0859 Oil type wood preservative lit 2 80.00 160.00
Labour - Fixing Battens
DSR 0123 Mason 1st class day 5.00 393.00 1,965.00
DSR 0114 Beldar day 5.00 297.00 1,485.00
Labour - Laying Tiles
DSR 0123 Mason 1st class day 3.00 393.00 1,179.00
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 9999 Sundries L.S 13.00 1.70 22.10
Total 15,401.82
Add water charges 1% 154.01824
Total 15,555.84
Add CPOH @ 15% 2333.3763
Cost of 12.76 Sqm 17,889.22
Cost of 1 Sqm 1401.9764

Providing & fixing on roof Country clay tile of 6 mm nominal thickness and of approved size and as per
8.4
approved pattern on Teak wooden frame work complete
Amount in
Code Description Unit Quantity Rate in Rs
Rs
Details of cost for 10 Sqm
MATERIAL:
M Rate Tiles average size of 200mmx125mmx6mm 1000 Nos 1125 3,000.00 3,375.00
DSR 2207 Carriage of country tiles 1000 Nos 1125 170.63 191.96
DSR 1189 Second class teak wood in scantling cum 0.12 160,678.70 19,763.48
DSR 0806 Paint lit 2.00 120.00 240.00
DSR 0859 Oil type wood preservative lit 2 80.00 160.00
DSR 0806 Primer lit 2 120.00 240.00
DSR 1219 Iron Nails Kg 0.55 60.00 33.00
Labour
DSR 0111 Carpenter day 2.20 393.00 864.60
DSR 0114 Beldar day 1.10 297.00 326.70
DSR 9999 Sundries L.S 13.00 1.70 22.10
Total 25,216.84
Add water charges 1% 252.16839
Total 25,469.01
Add CPOH @ 15% 3820.3511
Cost of 10 Sqm 29,289.36
Cost of 1 Sqm 2928.9358

Construction of Jack arched roof using Rolled steel joists, fired clay bricks with Kafgi mix
8.5
recommended by by UNESCO
Amount in
Code Description Unit Quantity Rate in Rs
Rs
Details of cost for 12 Sqm (2.4mx5m)
MATERIAL:
DSR 1007 Rolled steel Joists of 160mmx60mm size Quintal 6.92 4,650.00 32,178.00
DSR 2207 Carriage of steel Tonne 0.692 94.80 65.60
Centering and shuttering including strutting, propping
etc. and removal Centering and shuttering including
DSR 5.9.9 Sqm 16.00 1,006.65 16,106.40
strutting, propping etc. and removal Arches, domes,
vaults up to 6 m span
Brick work in gauged arches for span up to 6 metres
with common burnt clay F.P.S. (non modular) bricks of
5.10 Cum 1.34 12,153.31 16,334.04
class designation 7.5 in lime mortar 1:1:1 (1 lime : 1
surkhi: 1 fine sand).
DSR 1002 Tie rod Kg 4.40 4,500.00 19,800.00
3.16.1 Kafgi cement mix Cum 1.08 8,517.74 9,158.27
DSR 9999 Sundries LS 125 1.70 212.50
DSR 0123 Mason 1st class day 5.50 393.00 2,161.50
DSR 0115 Coolie day 10.00 297.00 2,970.00
DSR 9999 Sundries L.S 58.00 1.70 98.60
Total 89,926.65
Add water charges 1% 899.26646
Total 90,825.91
Add CPOH @ 15% 13623.887
Cost of 10 Sqm 104,449.80
Cost of 1 Sqm 10444.98

Providing Lime stone slab for roofing and laying them in Lime mortar 1:3 over wooden karries or R.C.C.
8.6 battens or structural steel sections (karries or battens or structural steel sections to be separetely),
including pointing the ceiling joints with lime mortar 1:3 complete:
Lime Sand stone
Amount in
Code Description Unit Quantity Rate in Rs
Rs
DSR
Details of cost for 10 sqm
11.30.1
MATERIAL:
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm
M Rate Lime stone of size 15"x9"x7" No 130 34.00 4,420.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:3 (1 Lime:3 Coarse sand)
For Joining and Pointing 0.049
3.9 Lime mortar 1:3 (1 Lime:3 Coarse sand) 0.049 7,588.17 371.82
Labour
DSR 0123 Mason Brick I Class day 4.68 393.00 1,839.24
DSR 0100 Bandhani day 1.32 328.00 432.96
DSR 0115 Coolie day 1.68 297.00 498.96
DSR 0114 Bhisti day 0.66 328.00 216.48
DSR 9999 Sundries LS 26.91 1.70 45.75
Total 7,883.11
Add water charges 1% 78.83
Total 7,961.94
Add CPOH @ 15% 1,194.29
Cost of 10 Sqm 9,156.23
Cost of 1 Sqm 915.62

Roofing with pot-Providing and laying burnt earthern pots over and between lime concrete/mud
8.7 mortar using pots of max dia 150mm to 200 mm and pack the gaps between pots with Lime Mortar
(1:3)
Amount in
Code Description Unit Quantity Rate in Rs
Rs
DSR
Details of cost for 1 sqm
11.30.1
MATERIAL:

3.9 Lime Mortar as a filling material between the pots Cum 0.017 7,588.17 129.00
M Rate Burnt Earthern Pots No 50 12.00 600.00
Labour
DSR 0123 Mason Brick I Class day 0.3 393.00 117.90
DSR 0100 Bandhani day 0.13 328.00 42.64
DSR 0115 Coolie day 0.17 297.00 50.49
DSR 0114 Bhisti day 0.06 328.00 19.68
DSR 9999 Sundries LS 12 1.70 20.40
Total 980.11
Add water charges 1% 9.80
Total 989.91
Add CPOH @ 15% 148.49
Cost of 1 Sqm 1,138.40
9.0 FINISHES

9.1 Lime plaster 1:3 (1 slaked lime : 3 coarse sand)


9.1.1 20mm Thickness
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 13.1.1 Details of cost for 1 Sqm.
MATERIAL:
Lime mortar1: 3(1 Lime:3 coarse
3.9 Cum 0.0224 7,588.17 169.97
sand)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 877.77
Add water charges 1% 8.78
Total 886.55
Add CPOH @ 15% 132.98
Cost of 1 Sqm 1,019.53

9.1.2 15mm Thickness


Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 13.1.1 Details of cost for 1 Sqm.
MATERIAL:
Lime mortar1: 3(1 Lime:3 coarse
3.9 Cum 0.0174 7,588.17 132.03
sand)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 839.83
Add water charges 1% 8.40
Total 848.23
Add CPOH @ 15% 127.23
Cost of 1 Sqm 975.47
9.1.3 12mm Thickness
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm.
MATERIAL:
Lime mortar1: 3(1 Lime:3 coarse
3.9 Cum 0.0144 7,588.17 109.27
sand)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 817.07
Add water charges 1% 8.17
Total 825.24
Add CPOH @ 15% 123.79
Cost of 1 Sqm 949.02
9.2 Lime plaster 1:1:1 (1 slaked lime :1 surkhi: 1 fine sand)

9.2.1 20mm Thickness Double Coat


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm.
MATERIAL:
Lime mortar1:1:1 (1 Lime:1 surkhi:1
3.2 Cum 0.022 8,232.80 181.12
fine sand)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 888.92
Add water charges 1% 8.89
Total 897.81
Add CPOH @ 15% 134.67
Cost of 1 Sqm 1,032.48

9.2.2 15mm Thickness


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm.
MATERIAL:
Lime mortar1:1:1 (1 Lime:1 surkhi:1
3.2 Cum 0.01725 8,232.80 142.02
fine sand)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 849.81
Add water charges 1% 8.50
Total 858.31
Add CPOH @ 15% 128.75
Cost of 1 Sqm 987.06

9.2.3 12mm Thickness


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm.
MATERIAL:
Lime mortar1:1:1 (1 Lime:1 surkhi:1
3.2 Cum 0.0138 8,232.80 113.61
fine sand)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 821.41
Add water charges 1% 8.21
Total 829.63
Add CPOH @ 15% 124.44
Cost of 1 Sqm 954.07
9.3 Lime plaster 1:2 :1(1 lime putty : 2 coarse sand:1surkhi)
9.3.1 20mm Thickness
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm.
MATERIAL:
Lime mortar 1:2:1 (1 slaked lime: 2
3.10 Cum 0.0224 6,397.70 143.31
coarse sand:1 surkhi)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 851.11
Add water charges 1% 8.51
Total 859.62
Add CPOH @ 15% 128.94
Cost of 1 Sqm 988.56

9.3.2 15mm Thickness


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm.
MATERIAL:
Lime mortar 1:2:1 (1 slaked lime: 2
3.10 Cum 0.018 6,397.70 115.16
coarse sand:1 surkhi)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 822.96
Add water charges 1% 8.23
Total 831.19
Add CPOH @ 15% 124.68
Cost of 1 Sqm 955.86

9.3.3 12mm Thickness


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm.
MATERIAL:
Lime mortar 1:2:1 (1 slaked lime: 2
3.10 Cum 0.0144 6,397.70 92.13
coarse sand:1 surkhi)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 799.93
Add water charges 1% 8.00
Total 807.92
Add CPOH @ 15% 121.19
Cost of 1 Sqm 929.11
9.4 Lime plaster 1:2 (1 lime putty : 2 surkhi)
9.4.1 20mm Thickness
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm.
MATERIAL:
Lime plaster 1:2 (1 lime putty : 2
3.5 Cum 0.0224 6,565.11 147.06
surkhi)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 854.86
Add water charges 1% 8.55
Total 863.41
Add CPOH @ 15% 129.51
Cost of 1 Sqm 992.92

9.4.2 15mm Thickness


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm.
MATERIAL:
Lime plaster 1:2 (1 lime putty : 2
3.5 Cum 0.01725 6,565.11 113.25
surkhi)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 821.05
Add water charges 1% 8.21
Total 829.26
Add CPOH @ 15% 124.39
Cost of 1 Sqm 953.65

9.4.3 12mm Thickness


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm.
MATERIAL:
Lime plaster 1:2 (1 lime putty : 2
3.5 Cum 0.0138 6,565.11 90.60
surkhi)
LABOUR
DSR 0123 Mason First Class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 798.40
Add water charges 1% 7.98
Total 806.38
Add CPOH @ 15% 120.96
Cost of 1 Sqm 927.34
9.5 Lime plaster 1:2(1 lime putty : 2 coarse Sand)
20mm Thickness First Coat of 12mm and second coat 8mm in each coat
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm.
MATERIAL:
Lime mortar1:1 (1 Lime1:2 coarse
3.7 Cum 0.0224 7,005.52 156.92
sand)
LABOUR
DSR 0155 Mason First class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 864.72
Add water charges 1% 8.65
Total 873.37
Add CPOH @ 15% 131.01
Cost of 1 Sqm 1,004.37

Lime punning with lime putty mixed with Gur,Bilgri,Urd and other ingredients
9.6
followed by grinding to fine paste for smooth finish
Code Description Unit Quantity Rate in Rs Amount in Rs
MATERIAL:
DSR 13.18Marble Powder Cum 0.05 1,000.00 50.00
& ISOR Lime Quintal 0.05 800.00 40.00
DSR 9999 Dal LS 9 1.70 15.30
DSR 9999 Gur & Belgiri LS 15 1.70 25.50
LABOUR
DSR 0155 Mason (Average) day 0.324 377.00 122.15
DSR 0115 Coolie day 0.324 297.00 96.23
DSR 9999 Scaffolding and Sundries LS 9.672 1.70 16.44
Total 365.62
Add water charges 1% 3.66
Total 369.27
Add CPOH @ 15% 55.39
Cost of 1 Sqm 424.67

Preparing and applying of lime mortar plaster 1 Lime:2 fine sand up to a thickness of
9.7
3mm over the lime mortar plaster laid.
Code Description Unit Quantity Rate in Rs Amount in Rs
MATERIAL:
Lime Mortar 1 lime: 2 Fine stand Cum 0.005 8,256.64 41.28
DSR 9999 Gur & Belgiri LS 4 1.70 6.80
LABOUR
DSR 0123 Mason First class day 0.27 393.00 106.11
DSR 0115 Coolie day 0.27 297.00 80.19
DSR 9999 Scaffolding and Sundries LS 9.672 1.70 16.44
Total 250.83
Add water charges 1% 2.51
Total 253.33
Add CPOH @ 15% 38.00
Cost of 1 Sqm 291.33
Plastering of the dome in lime mortar 1:2:1(1 Lime:2 coarse sand:1 surkhi ) up to
9.8
20mm thickness
Code Description Unit Quantity Rate in Rs Amount in Rs
MATERIAL
ISOR 11.8 Lime mortar 1:2:1 Cum 0.025 6,397.70 159.94
LABOUR
DSR 0155 Mason (Average) day 0.1608 377.00 60.62
DSR 0115 Coolie day 1.08 297.00 320.76
DSR 0114 Bhisti day 1.32 328.00 434.53
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 1,001.58
Add water charges 1% 10.02
Total 1,011.60
Add CPOH @ 15% 151.74
Cost of 1 Sqm 1,163.34

9.9 Mud plaster 1:3:1(1 lime slaked : 3 Mud:1 coarse sand)


20mm Thickness First Coat of 12mm and second coat 8mm in each coat
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 13.16 Details of cost for 1 Sqm.
MATERIAL:
Mud mortar1:3:1 (1 Lime1:3 mud:1
Cum 0.0224 4,989.45 111.76
coarse sand)
LABOUR
DSR 0123 Mason First class day 0.134 393.00 52.66
DSR 0115 Coolie day 0.90 297.00 267.30
DSR 0101 Bhisti day 1.10 328.00 362.11
DSR 9999 Scaffolding and Sundries LS 15.132 1.70 25.72
Total 819.56
Add water charges 1% 8.20
Total 827.76
Add CPOH @ 15% 124.16
Cost of 1 Sqm 951.92

ORNAMENTAL PLASTER WORK

Making cornice band with ornamental design as per the conservation Architect's
9.10
design with lime plaster (1lime:3 finesand)
Size 150mm wide and 50mm average
9.10.1
thick
Code Description Unit Quantity Rate in Rs Amount in Rs
ISOR 1.12 Details of cost for 10m.
MATERIAL
Lime plaster 1:3 (1 lime putty : 3 Fine
3.13 Cum 0.5 8,782.53 4,391.26
sand)
M Rate Bonding Agent (Nitobond SBR) Lit 0.5 400.00 200.00

DSR 0006 Spray Machine for water jet spray day 0.5 250.00 125.00
Labour
M Rate Conservator day 0.05 1,650.00 82.50
Mason (for ornamental stone work)
DSR 0126 day 2 393.00 786.00
1 st class
DSR 0114 Beldar day 2.5 297.00 742.50
DSR 0128 Mate day 1 328.00 328.00
DSR 9999 Scaffolding and Sundries LS 100 1.70 170.00
Total 6,825.26
Add water charges 1% 68.25
Total 6,893.52
Add CPOH @ 15% 1,034.03
Cost of 10 m 7,927.54
Cost of 1 m 792.75

Size 100mm wide and 50mm average


9.10.2
thick
Code Description Unit Quantity Rate in Rs Amount in Rs
ISOR 1.12 Details of cost for 10m.
MATERIAL
Lime plaster 1:3 (1 lime putty : 3 Fine
3.13 Cum 0.3 8,782.53 2,634.76
sand)
M Rate Bonding Agent (Nitobond SBR) Lit 0.35 400.00 140.00

DSR 0006 Spray Machine for water jet spray day 0.35 250.00 87.50
Labour
M Rate Conservator day 0.05 1,650.00 82.50
Mason (for ornamental stone work)
DSR 0126 day 2 393.00 786.00
1 st class
DSR 0114 Beldar day 2.5 297.00 742.50
DSR 0128 Mate day 1 328.00 328.00
DSR 9999 Scaffolding and Sundries LS 100 1.70 170.00
Total 4,971.26
Add water charges 1% 49.71
Total 5,020.97
Add CPOH @ 15% 753.15
Cost of 10 m 5,774.12
Cost of 1 m 577.41

Size 75mm wide and 50mm average


9.10.3
thick
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 10m.
MATERIAL
Lime plaster 1:3 (1 lime putty : 3 Fine
3.13 Cum 0.3 8,782.53 2,634.76
sand)
M Rate Bonding Agent (Nitobond SBR) Lit 0.3 400.00 120.00

DSR 0006 Spray Machine for water jet spray day 0.3 250.00 75.00
Labour
M Rate Conservator day 0.05 1,650.00 82.50
Mason (for ornamental stone work)
DSR 0126 day 2 393.00 786.00
1 st class
DSR 0114 Beldar day 2.5 297.00 742.50
DSR 0128 Mate day 1 328.00 328.00
DSR 9999 Scaffolding and Sundries LS 100 1.70 170.00
Total 4,938.76
Add water charges 1% 49.39
Total 4,988.15
Add CPOH @ 15% 748.22
Cost of 10 m 5,736.37
Cost of 1 m 573.64

Repairing ornamental plaster works to match with the existing design using lime
9.11
plaster (1lime putty:1surkhi:1 Fine sand)

Code Description Unit Quantity Rate in Rs Amount in Rs


ISOR 1.13 Details of cost for 10Sqm.
MATERIAL
Lime plaster 1:1:1(1 lime putty : 1
3.2 Cum 0.486 8,232.80 4,001.14
Surkhi:1 Fine sand)
Labour
M Rate Conservator day 1 1,650.00 1,650.00
M Rate Designer for arts day 4 1,000.00 4,000.00
Mason (for ornamental stone work)
DSR 0126 day 25 393.00 9,825.00
1 st class
DSR 0114 Beldar day 14 297.00 4,158.00
DSR 0128 Mate day 10 328.00 3,280.00
Scaffolding and Sundries, natural
DSR 9999 LS 851 1.70 1,446.70
additives
Total 28,360.84
Add water charges 1% 283.61
Total 28,644.45
Add CPOH @ 15% 4,296.67
Cost of 10 m 32,941.12
Cost of 1 m 3,294.11

Stucco work in lime, surkhi(1:2) as per traditional practices and design, the mortar
9.12 should be prepared by grinding mill only. The thickness varies from 10mm to 100mm
as per design.
Code Description Unit Quantity Rate in Rs Amount in Rs
ISOR 7.4 Details of cost for 10Sqm.
MATERIAL
Lime plaster 1:2(1 lime putty : 2
3.5 Cum 0.0972 6,565.11 638.13
Surkhi)
Labour
M Rate Conservator day 2 1,650.00 3,300.00
Mason (for ornamental stone work)
DSR 0126 day 20 393.00 7,860.00
1 st class
DSR 0114 Beldar day 20 297.00 5,940.00
DSR 0128 Mate day 1 328.00 328.00
DSR 9999 Scaffolding and Sundries LS 2500 1.70 4,250.00
Total 22,316.13
Add water charges 1% 223.16
Total 22,539.29
Add CPOH @ 15% 3,380.89
Cost of 10 m 25,920.18
Cost of 1 m 2,592.02
LIME POINTING
Raised and cut lime pointing 1:2 (1
9.13
Lime:2 surkhi)
9.13.1 In Stonework
Code Description Unit Quantity Rate in Rs Amount in Rs
ISOR 2.22 Details of cost for 10 Sqm.
Materials
3.5 Lime mortar 1 lime putty:2 surkhi Cum 0.04 6,565.11 262.60
Labour
DSR 0123 Mason (brick layer) 1 st class day 3 393.00 1,179.00
DSR 0115 Coolie day 2.96 297.00 879.12
DSR 0101 Bhisti day 1.00 328.00 328.00
DSR 9999 Sundries LS 8.50 1.70 14.45
Total 2,663.17
Add water charges 1% 26.63
Total 2,689.81
Add CPOH @ 15% 403.47
Cost of 10 Sqm 3,093.28
Cost of 1 Sqm 309.33

9.13.2 In Brick work


Code Description Unit Quantity Rate in Rs Amount in Rs
DSR Details of cost for 10 Sqm.
Materials
3.5 Lime mortar 1 lime putty:2 surkhi Cum 0.05472 6,565.11 359.24
Labour
DSR 0123 Mason (brick layer) 1 st class day 2 393.00 786.00
DSR 0115 Coolie day 2 297.00 594.00
DSR 0101 Bhisti day 1.80 328.00 590.40
Sundries,Scaffolding and racking out
DSR 9999 LS 175.00 1.70 297.50
joints
Total 2,627.14
Add water charges 1% 26.27
Total 2,653.41
Add CPOH @ 15% 398.01
Cost of 10 Sqm 3,051.43
Cost of 1 Sqm 305.14

9.14 Recessed lime pointing 1:2 (1 Lime:2 surkhi)


9.14.1 In Stonework
Code Description Unit Quantity Rate in Rs Amount in Rs
ISOR 2.36 Details of cost for 10 Sqm.
Materials
3.5 Lime mortar 1 lime putty:2 surkhi Cum 0.03 6,565.11 196.95
Labour
DSR 0123 Mason (brick layer) 1 st class day 1 393.00 393.00
DSR 0115 Coolie day 1.75 297.00 519.75
DSR 0101 Bhisti day 1.25 328.00 410.00
Sundries for raking out joints,
DSR 9999 LS 155.00 1.70 263.50
cleaning etc
Total 1,783.20
Add water charges 1% 17.83
Total 1,801.04
Add CPOH @ 15% 270.16
Cost of 10 Sqm 2,071.19
Cost of 1 Sqm 207.12

9.14.2 In Brick Work


Code Description Unit Quantity Rate in Rs Amount in Rs
9.12.2 Details of cost for 10 Sqm.
Materials
3.5 Lime mortar 1 lime putty:2 surkhi Cum 0.02 6,565.11 131.30
Labour
DSR 0123 Mason (brick layer) 1 st class day 0.92 393.00 361.56
DSR 0115 Coolie day 0.92 297.00 273.24
DSR 0101 Bhisti day 1.67 328.00 549.07
Sundries for raking out joints,
DSR 9999 LS 125.00 1.70 212.50
cleaning etc
Total 1,527.67
Add water charges 1% 15.28
Total 1,542.95
Add CPOH @ 15% 231.44
Cost of 10 Sqm 1,774.39
Cost of 1 Sqm 177.44

9.15 Flush Pointing with lime surkhi mortar 1:2 (1 lime putty :2 Surkhi)
9.15.1 In stone Work
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 10 Sqm.
Materials
3.5 Lime mortar 1 lime putty:2 surkhi Cum 0.04 6,565.11 262.60
Labour
DSR 0123 Mason (brick layer) 1 st class day 2 393.00 786.00
DSR 0115 Coolie day 2.5 297.00 742.50
DSR 0101 Bhisti day 0.97 328.00 316.52
DSR 9999 Sundries LS 155 1.70 263.50
Total 2,371.12
Add water charges 1% 23.71
Total 2,394.84
Add CPOH @ 15% 359.23
Cost of 10 Sqm 2,754.06
Cost of 1 Sqm 275.41

9.15.2 In Brick Work


Code Description Unit Quantity Rate in Rs Amount in Rs
DSR
Details of cost for 10 Sqm.
13.31.1
Materials
3.5 Lime mortar 1 lime putty:2 surkhi Cum 0.036 6,565.11 236.34
Labour
DSR 0123 Mason (brick layer) 1 st class day 1 393.00 393.00
DSR 0115 Coolie day 1 297.00 297.00
DSR 0101 Bhisti day 1.25 328.00 410.00
Sundries,Scaffolding and racking out
DSR 9999 LS 143 1.70 243.10
joints
Total 1,579.44
Add water charges 1% 15.79
Total 1,595.24
Add CPOH @ 15% 239.29
Cost of 10 Sqm 1,834.52
Cost of 1 Sqm 183.45

9.16 Ruled Pointing on brickwork with lime surkhi mortar 1:2 (1 lime putty :2 Surkhi)
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 10 Sqm.
Materials
3.5 Lime mortar 1 lime putty:2 surkhi Cum 0.3 6,565.11 1,969.53
Labour
DSR 0123 Mason (brick layer) 1 st class day 0.85 393.00 334.05
DSR 0115 Coolie day 0.85 297.00 252.45
DSR 0114 Beldar day 0.20 297.00 59.40
DSR 9999 Scaffolding, pumps for watering 8% 209.2
DSR 9999 Sundries & Contingencies 3% 78.45
Total 2,903.08
Add water charges 1% 29.03
Total 2,932.11
Add CPOH @ 15% 439.82
Cost of 10 Sqm 3,371.93
Cost of 1 Sqm 337.19

Struck or weathered Pointing on brickwork with lime surkhi mortar 1:2 (1 lime putty
9.17
:2 Surkhi)
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 10 Sqm.
Materials
3.5 Lime mortar 1 lime putty:2 surkhi Cum 0.3 6,565.11 1,969.53
Labour
DSR 0123 Mason (brick layer) 1 st class day 1 393.00 393.00
DSR 0115 Coolie day 0.9 297.00 267.30
DSR 0114 Beldar day 0.20 297.00 59.40
Scaffolding, pumps for watering 155.3868
Sundries & Contingencies 74.6
Total 2,919.22
Add water charges 1% 29.19
Total 2,948.41
Add CPOH @ 15% 442.26
Cost of 10 Sqm 3,390.67
Cost of 1 Sqm 339.07
Repointing of raked out joints of Random rubble masonry by using lime mortar 1:1:1
9.18
(1Lime:1coarse sand:1Brick jeera)
Code Description Unit Quantity Rate in Rs Amount in Rs
ISOR 11.4 Details of cost for 10 Sqm.
Materials
DSR 0982 Coarse sand Cum 0.11 1,120.00 123.20
DSR 1182 Brick Jeera Cum 0.11 700.00 77.00
DSR 0773 Lime Quintal 0.69 800.00 552.00
DSR 9999 Gur & Belgiri LS 33 1.70 56.10
Labour
DSR 0123 Mason (brick layer) 1 st class day 3.05 393.00 1,198.65
DSR 0114 Beldar day 3.00 297.00 891.00
Extra Labour for mixing
DSR 0115 Coolie day 1 297.00 297.00
DSR 0101 Bhisti day 1.00 328.00 328.00
DSR 9999 Sundries LS 34.00 1.70 57.80
Total 3,580.75
Add water charges 1% 35.81
Total 3,616.56
Add CPOH @ 15% 542.48
Cost of 10 Sqm 4,159.04
Cost of 1 Sqm 415.90

Repointing of raked out joints of Ashlar masonry by using lime mortar 1:1:1
9.19
(1Lime:1coarse sand:1 Surkhi)
Code Description Unit Quantity Rate in Rs Amount in Rs
ISOR 11.9 Details of cost for 10 Sqm.
Materials
DSR 0773 Lime mortar 1:1:1 Cum 0.1 6,806.02 680.60
Labour
DSR 0123 Mason (brick layer) 1 st class day 2.5 393.00 982.50
DSR 0114 Beldar day 3.00 297.00 891.00
DSR 9999 Sundries LS 125.00 1.70 212.50
Total 2,766.60
Add water charges 1% 27.67
Total 2,794.27
Add CPOH @ 15% 419.14
Cost of 10 Sqm 3,213.41
Cost of 1 Sqm 321.34
10.0 STONE WORKS

Stone work (Machine cut edges) for wall lining (Veneer work) upto 10m height, backing filled with a grout
of average 12 mm thick lime mortar 1:2 (1 lime : 2 coarse sand) including pointing in lime mortar and an
10.1
admixtureof pigment matching the stone shade : (To be secured to the backing and the sides by means of
cramps and pins which shall be paid for separately) :
Red Sand stone -Exposed face fine dressed with rough
backing
10.1.1 70mm thick
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL:
Finished work 70cudm + add wastage 33.3% =23.31 . Total
DSR 1160 10 cudm 93.31 65.00 606.52
93.31
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 stone slab @ 2.30kg/cudm = 93.31x2.30 =214.61 kg = 0.215 tonne 0.22 94.80 20.38
t
DSR 9999 Extra for using Sand dust powder and polimer LS 123.00 1.70 209.10
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.35 361.00 487.35
DSR 0102 Blacksmith 1st Class day 0.03 393.00 12.58
DSR 0114 Beldar day 0.22 297.00 66.53
DSR 0115 Coolie day 0.11 297.00 33.26
DSR 0100 Bandhani day 0.22 328.00 73.47
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 55.00 1.70 93.50
Total 2,488.08
Add water charges 1% 24.88
Total 2,512.96
Add CPOH @ 15% 376.94
Cost of 1 Sqm 2,889.90

10.1.2 60mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL
Finished work 60cudm + add wastage 33.3% =19.98 . Total=
DSR 1160 10 cudm 80.00 65.00 520.00
80
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.18 94.80 17.44
stone slab @ 2.30kg/cudm = 80x2.30 =184 kg = 0.184 t
DSR 9999 Extra for using Sand dust powder and polimer LS 118.00 1.70 200.60
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.35 361.00 487.35
DSR 0102 Blacksmith 1st Class day 0.03 393.00 12.58
DSR 0114 Beldar day 0.22 297.00 66.53
DSR 0115 Coolie day 0.11 297.00 33.26
DSR 0100 Bandhani day 0.22 328.00 73.47
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 50.00 1.70 85.00
Total 2,381.63
Add water charges 1% 23.82
Total 2,405.44
Add CPOH @ 15% 360.82
Cost of 1 Sqm 2,766.26

10.1.3 50mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL
Finished work 50cudm + add wastage 33.3% =16.65 . Total=
DSR 1160 10 cudm 66.70 65.00 433.55
66.65
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.15 94.80 14.54
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder and polimer LS 105.00 1.70 178.50
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.35 361.00 487.35
DSR 0102 Blacksmith 1st Class day 0.03 393.00 12.58
DSR 0114 Beldar day 0.22 297.00 66.53
DSR 0115 Coolie day 0.11 297.00 33.26
DSR 0100 Bandhani day 0.22 328.00 73.47
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 23.71 1.70 40.31
Total 2,225.49
Add water charges 1% 22.25
Total 2,247.74
Add CPOH @ 15% 337.16
Cost of 1 Sqm 2,584.90

10.1.4 40mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL:
DSR 1160 Finished work 40cudm + add wastage 33.3% 10 cudm 53.32 65.00 346.58
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.12 94.80 11.63
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder LS 32.29 1.70 54.90
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.35 361.00 487.35
DSR 0102 Blacksmith 1st Class day 0.03 393.00 12.58
DSR 0114 Beldar day 0.22 297.00 66.53
DSR 0115 Coolie day 0.11 297.00 33.26
DSR 0100 Bandhani day 0.22 328.00 73.47
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 23.71 1.70 40.31
Total 2,012.00
Add water charges 1% 20.12
Total 2,032.12
Add CPOH @ 15% 304.82
Cost of 1 Sqm 2,336.93

10.1.5 30mm thick


Details of cost for 1 Sqm
MATERIAL:
DSR 1160 Finished work 30cudm + add wastage 33.3% 10 cudm 39.99 65.00 259.94
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.09 94.80 8.72
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder LS 32.29 1.70 54.90
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.35 361.00 487.35
DSR 0102 Blacksmith 1st Class day 0.03 393.00 12.58
DSR 0114 Beldar day 0.22 297.00 66.53
DSR 0115 Coolie day 0.11 297.00 33.26
DSR 0100 Bandhani day 0.22 328.00 73.47
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 23.71 1.70 40.31
Total 1,922.44
Add water charges 1% 19.22
Total 1,941.67
Add CPOH @ 15% 291.25
Cost of 1 Sqm 2,232.92
Red Sand stone -Exposed face machine cut and table
10.2
rubbed with rough backing
10.2.1 70mm thick
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL
DSR 1160 Finished work 70cudm + add wastage 33.3% 10 cudm 93.31 65.00 606.52
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.21 94.80 20.35
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder and polimer LS 190.00 1.70 323.00
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 2.70 361.00 974.70
DSR 0102 Blacksmith 1st Class day 0.06 393.00 25.15
DSR 0114 Beldar day 0.45 297.00 133.06
DSR 0115 Coolie day 0.22 297.00 66.53
DSR 0100 Bandhani day 0.45 328.00 146.94
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding and sundries L.S 95.00 1.70 161.50
Total 3,343.13
Add water charges 1% 33.43
Total 3,376.56
Add CPOH @ 15% 506.48
Cost of 1 Sqm 3,883.05

10.2.2 60mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL:
DSR 1160 Finished work 60cudm + add wastage 33.3% 10 cudm 79.98 65.00 519.87
3.1.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.18 94.80 17.44
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder and polimer LS 175.00 1.70 297.50
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 2.70 361.00 974.70
DSR 0102 Blacksmith 1st Class day 0.06 393.00 25.15
DSR 0114 Beldar day 0.45 297.00 133.06
DSR 0115 Coolie day 0.22 297.00 66.53
DSR 0100 Bandhani day 0.45 328.00 146.94
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding and sundries L.S 75.00 1.70 127.50
Total 3,194.08
Add water charges 1% 31.94
Total 3,226.02
Add CPOH @ 15% 483.90
Cost of 1 Sqm 3,709.93

10.2.3 50mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL:
Finished work 50cudm + add wastage 33.3% =16.65 . Total=
DSR 1160 10 cudm 66.65 65.00 433.23
66.65
3.1.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.15 94.80 14.53
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder and polimer LS 169.00 1.70 287.30
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 2.70 361.00 974.70
DSR 0102 Blacksmith 1st Class day 0.06 393.00 25.15
DSR 0114 Beldar day 0.45 297.00 133.06
DSR 0115 Coolie day 0.22 297.00 66.53
DSR 0100 Bandhani day 0.45 328.00 146.94
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
DSR 1237 Cutting sand stone slab up to 50 mm thick by mechanical m 4.00 9.00 36.00
DSR 9999 Scaffolding and sundries L.S 65.00 1.70 110.50
Total 3,077.33
Add water charges 1% 30.77
Total 3,108.10
Add CPOH @ 15% 466.22
Cost of 1 Sqm 3,574.32

10.2.4 40mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL:
DSR 1160 Finished work 40cudm + add wastage 33.3% 10 cudm 53.32 65.00 346.58
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.12 94.80 11.63
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder and polimer LS 153.00 1.70 260.10
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 2.70 361.00 974.70
DSR 0102 Blacksmith 1st Class day 0.06 393.00 25.15
DSR 0114 Beldar day 0.45 297.00 133.06
DSR 0115 Coolie day 0.22 297.00 66.53
DSR 0100 Bandhani day 0.45 328.00 146.94
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding and sundries L.S 35.00 1.70 59.50
Total 2,909.58
Add water charges 1% 29.10
Total 2,938.67
Add CPOH @ 15% 440.80
Cost of 1 Sqm 3,379.48

10.2.5 30mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL:
DSR 1160 Finished work 30cudm + add wastage 33.3% 10 cudm 39.99 65.00 259.94
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.09 94.80 8.72
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder and polimer LS 148.00 1.70 251.60
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 2.70 361.00 974.70
DSR 0102 Blacksmith 1st Class day 0.06 393.00 25.15
DSR 0114 Beldar day 0.45 297.00 133.06
DSR 0115 Coolie day 0.22 297.00 66.53
DSR 0100 Bandhani day 0.45 328.00 146.94
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 30.00 1.70 51.00
Total 2,803.03
Add water charges 1% 28.03
Total 2,831.06
Add CPOH @ 15% 424.66
Cost of 1 Sqm 3,255.72

10.3 White Sand stone -Exposed face fine dressed with rough backing
Code Description Unit Quantity Rate in Rs Amount in Rs
10.3.1 70mm thick
Details of cost for 1 Sqm
MATERIAL
DSR 1161 Finished work 70cudm + add wastage 33.3% 10 cudm 93.31 70.00 653.17
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 stone slab @ 2.30kg/cudm = 93.31x2.30 =214.61 kg = 0.215 tonne 0.21 94.80 20.35
t
DSR 9999 Extra for using Sand dust powder and polimer LS 180.00 1.70 306.00
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.35 361.00 487.35
DSR 0102 Blacksmith 1st Class day 0.03 393.00 12.58
DSR 0114 Beldar day 0.22 297.00 66.53
DSR 0115 Coolie day 0.11 297.00 33.26
DSR 0100 Bandhani day 0.22 328.00 73.47
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 90.00 1.70 153.00
Total 2,691.10
Add water charges 1% 26.91
Total 2,718.01
Add CPOH @ 15% 407.70
Cost of 1 Sqm 3,125.71

10.3.2 60mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL:
DSR 1161 Finished work 60cudm + add wastage 33.3% =19.98 . 10 cudm 79.98 70.00 559.86
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.18 94.80 17.44
stone slab @ 2.30kg/cudm = 80x2.30 =184 kg = 0.184 t
DSR 9999 Extra for using Sand dust powder and polimer LS 165.00 1.70 280.50
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.35 361.00 487.35
DSR 0102 Blacksmith 1st Class day 0.03 393.00 12.58
DSR 0114 Beldar day 0.22 297.00 66.53
DSR 0115 Coolie day 0.11 297.00 33.26
DSR 0100 Bandhani day 0.22 328.00 73.47
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 80.00 1.70 136.00
Total 2,552.38
Add water charges 1% 25.52
Total 2,577.91
Add CPOH @ 15% 386.69
Cost of 1 Sqm 2,964.59

10.3.3 50mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL
DSR 1161 Finished work 50cudm + add wastage 33.3% =16.65 . 10 cudm 66.65 70.00 466.55
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.15 94.80 14.53
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder and polimer LS 162.00 1.70 275.40
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.35 361.00 487.35
DSR 0102 Blacksmith 1st Class day 0.03 393.00 12.58
DSR 0114 Beldar day 0.22 297.00 66.53
DSR 0115 Coolie day 0.11 361.00 40.43
DSR 0100 Bandhani day 0.22 328.00 73.47
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 75.00 1.70 127.50
Total 2,449.73
Add water charges 1% 24.50
Total 2,474.23
Add CPOH @ 15% 371.13
Cost of 1 Sqm 2,845.36

10.3.4 40mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL
DSR 1161 Finished work 40cudm + add wastage 33.3% 10 cudm 53.32 70.00 373.24
3.1.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.12 94.80 11.63
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder and polimer LS 155.00 1.70 263.50
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.35 361.00 487.35
DSR 0102 Blacksmith 1st Class day 0.03 393.00 12.58
DSR 0114 Beldar day 0.22 297.00 66.53
DSR 0115 Coolie day 0.11 297.00 33.26
DSR 0100 Bandhani day 0.22 328.00 73.47
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 65.00 1.70 110.50
Total 2,317.45
Add water charges 1% 23.17
Total 2,340.62
Add CPOH @ 15% 351.09
Cost of 1 Sqm 2,691.72
10.3.5 30mm thick
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL
DSR 1161 Finished work 30cudm + add wastage 33.3% 10 cudm 39.99 70.00 279.93
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
DSR 2216 Carriage of stone blocks white & red sand stone & kota tonne 0.09 94.80 8.72
DSR 9999 Extra for using Sand dust powder and polimer LS 150.00 1.70 255.00
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.35 361.00 487.35
DSR 0102 Blacksmith 1st Class day 0.03 393.00 12.58
DSR 0114 Beldar day 0.22 297.00 66.53
DSR 0115 Coolie day 0.11 297.00 33.26
DSR 0100 Bandhani day 0.22 328.00 73.47
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 60.00 1.70 102.00
Total 2,204.23
Add water charges 1% 22.04
Total 2,226.27
Add CPOH @ 15% 333.94
Cost of 1 Sqm 2,560.22

10.4 White Sand stone -Exposed face machine cut and table rubbed with rough backing
10.4.1 70mm thick
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL:
DSR 1161 Finished work 70cudm + add wastage 33.3% 10 cudm 93.31 70.00 653.17
3.1.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.21 94.80 20.35
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder and polimer LS 195.00 1.70 331.50
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 2.70 361.00 974.70
DSR 0102 Blacksmith 1st Class day 0.06 393.00 25.15
DSR 0114 Beldar day 0.45 297.00 133.06
DSR 0115 Coolie day 0.22 297.00 66.53
DSR 0100 Bandhani day 0.45 328.00 146.94
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
DSR 1237 Cutting sand stone slab up to 50 mm thick by mechanical m 4.00 9.00 36.00
DSR 9999 Scaffolding L.S 85.00 1.70 144.50
Total 3,381.29
Add water charges 1% 33.81
Total 3,415.10
Add CPOH @ 15% 512.27
Cost of 1 Sqm 3,927.37

10.4.2 60mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL
DSR 1161 Finished work 60cudm + add wastage 33.3% 10 cudm 79.98 70.00 559.86
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.18 94.80 17.44
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder and polimer LS 185.00 1.70 314.50
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 2.70 361.00 974.70
DSR 0102 Blacksmith 1st Class day 0.06 393.00 25.15
DSR 0114 Beldar day 0.45 297.00 133.06
DSR 0115 Coolie day 0.22 297.00 66.53
DSR 0100 Bandhani day 0.45 328.00 146.94
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 78.00 1.70 132.60
Total 3,256.17
Add water charges 1% 32.56
Total 3,288.73
Add CPOH @ 15% 493.31
Cost of 1 Sqm 3,782.04

10.4.3 50mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL
Finished work 50cudm + add wastage 33.3% =16.65 . Total=
DSR 1160 10 cudm 66.65 70.00 466.55
66.65
3.7 Extra for using Sand dust powder and polimer Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.15 94.80 14.53
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder LS 175.00 1.70 297.50
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 2.70 361.00 974.70
DSR 0102 Blacksmith 1st Class day 0.06 393.00 25.15
DSR 0114 Beldar day 0.45 297.00 133.06
DSR 0115 Coolie day 0.22 297.00 66.53
DSR 0100 Bandhani day 0.45 328.00 146.94
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 75.00 1.70 127.50
Total 3,137.86
Add water charges 1% 31.38
Total 3,169.23
Add CPOH @ 15% 475.39
Cost of 1 Sqm 3,644.62

10.4.4 40mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL
DSR 1161 Finished work 40cudm + add wastage 33.3% 10 cudm 53.32 70.00 373.24
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.12 94.80 11.63
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder LS 165.00 1.70 280.50
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 2.70 361.00 974.70
DSR 0102 Blacksmith 1st Class day 0.06 393.00 25.15
DSR 0114 Beldar day 0.45 297.00 133.06
DSR 0115 Coolie day 0.22 297.00 66.53
DSR 0100 Bandhani day 0.45 328.00 146.94
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 65.00 1.70 110.50
Total 3,007.64
Add water charges 1% 30.08
Total 3,037.72
Add CPOH @ 15% 455.66
Cost of 1 Sqm 3,493.37

10.4.5 30mm thick


Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 1 Sqm
MATERIAL
DSR 1161 Finished work 30cudm + add wastage 33.3% 10 cudm 39.99 70.00 279.93
3.7 Mortar for laying and pointing Cum 0.02 7,005.52 151.32
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.09 94.80 8.72
stone slab @ 2.30kg/cudm
DSR 9999 Extra for using Sand dust powder LS 157.00 1.70 266.90
LABOUR
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 2.70 361.00 974.70
DSR 0102 Blacksmith 1st Class day 0.06 393.00 25.15
DSR 0114 Beldar day 0.45 297.00 133.06
DSR 0115 Coolie day 0.22 297.00 66.53
DSR 0100 Bandhani day 0.45 328.00 146.94
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.54 361.00 194.07
DSR 0100 Bandhani day 0.40 328.00 132.25
DSR 0114 Beldar day 0.40 297.00 119.75
DSR 0115 Coolie day 0.40 297.00 119.75
DSR 0101 Bhisti day 0.40 328.00 132.25
Cutting sand stone slab up to 50 mm thick by mechanical
DSR 1237 m 4.00 9.00 36.00
device
DSR 9999 Scaffolding L.S 63.00 1.70 107.10
Total 2,894.42
Add water charges 1% 28.94
Total 2,923.37
Add CPOH @ 15% 438.50
Cost of 1 Sqm 3,361.87

Stone work (Machine cut edges) for wall lining (Veneer work) upto 10m height, backing filled with a grout
of average 20 mm thick lime mortar 1:2 (1 lime : 2 coarse sand) including pointing in lime mortar 1:2 (1 lime
10.5
: 2 stone dust) with an admixtureof pigment matching the stone shade : (To be secured to the backing and
the sides by means of cramps and pins which shall be paid for separately) :
25 mm thick Kota stone slabs exposed face dressed and
rubbed
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 10 sqm.
MATERIAL
DSR 1169 Kota stone slab 25mm thick (rough chiseled) Sqm 11.50 210 2,415.00
3.7 Limemortar 1:2 (1 Lime :2 Coarse sand) Cum 0.24 7,005.52 1,681.32
DSR 9999 Lime mortar for pointing LS 235.00 1.70 399.50
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.66 94.80 62.69
stone slab @ 2.30kg/cudm
LABOUR
DSR 0125 Mason (for plain stone work) 2nd class day 7.80 361.00 2,815.80
DSR 0114 Beldar day 7.80 297.00 2,316.60
DSR 0115 Coolie day 5.16 297.00 1,532.52
DSR 0139 Skilled Beldar (For floor rubbing etc) day 12.96 328.00 4,250.88
DSR 9999 Sundries LS 133.85 1.70 227.54
Total 15,701.85
Add water charges 1% 157.02
Total 15,858.87
Add CPOH @ 15% 2,378.83
Cost of 10 Sqm 16,015.89
Cost of 1 Sqm 1,601.59

Wall lining butch work upto 10 m height with Dholpur stone 40 mm thick rough facing on the exposed
surface with stone strips of minimum length 300 mm and required width, including embedding every tenth
layer and bottom most layer in masonry or concrete after making necessary chases of size 75x75 mm and
10.6
by providing layer of 75 mm thick strips i/c 20 mm thick bed of lime mortar 1:3 (1 lime : 3 coarse sand) i/c
ruled pointing in lime mortar 1:2 (1 lime : 2 stone dust) with an admixture of pigment to match the shade
of stone complete as per direction of Engineer-incharge
40 mm thick Dholpur stone slabs
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 7.36 Details of cost for 1 sqm.
MATERIAL
Dholpur stone 40mm thick Wall face = 1.00sqm. Deduct for
DSR 1165 Sqm 0.94 215 201.80
embed within 3x0.04x0.10=0.012 sqm
DSR 1163 White sand stone slab 75 mm thick (un-dressed) Sqm 0.13 300 39.00

Carriage of stone blocks white & red sand stone & kota
DSR 2216 stone slab @ 2.30kg/cudm 0.94x0.04 =0.0376 cum. tonne 0.11 94.80 10.38
0.13x0.075 =0.01 cum=0.0476 Cum=47.6 cudm
Cutting marble or sand stone slab up to 50mm thick by
mechanical device assuming 50mm thick strips 20x1.0 =
DSR 1237 20metre lime mortar with coarse sand 1:2 for (a) stone m 20.00 9.00 180.00
backing 12mm thick = 0.0144 cum (b) for fixing of stone =
0.40/25 = 0.0160 cum Total = 0.0304 cum

3.7 Limemortar 1:2 (1 Lime :2 Coarse sand) 20mm thickness Cum 0.03 7,005.52 212.97
Making chases up to 7.5x7.5 cm in walls including making
DSR 18.78 good and finishing with matching surface after housing G.I. m 3.00 77.65 232.95
pipe etc
DSR 9999 Lime mortar for pointing LS 48.52 1.70 82.48
LABOUR
DSR 0126 Mason (for ornamental stone work) 1 st class day 0.30 393.00 117.90
DSR 0125 Mason (for plain stone work) 2nd class day 0.30 361.00 108.30
DSR 0114 Beldar day 0.60 297.00 178.20
DSR 0101 Bhisti day 0.04 328.00 11.81
DSR 9999 Sundries and scaffolding brushes etc LS 32.29 1.70 54.90
Total 1,430.68
Add water charges 1% 11.98
Total 1,442.65
Add CPOH @ 15% 181.46
Cost of 1 Sqm 1,624.11

Marble work gang saw cut (polished and machine cut) of thickness 18 mm for wall lining (veneer work),
backing filled with a grout of average 20 mm thick in lime mortar 1:3 (1 lime : 3 coarse sand), including
10.7
pointing with lime mortar 1:2 (1 lime : 2 marble dust) with an admixture of pigment to match the marble
shade (To be secured to the backing by means of cramps, which shall be paid for separately).

Code Description Unit Quantity Rate in Rs Amount in Rs


DSR 8.1.1.2 Details of cost for 1 sqm.
MATERIAL
Raj nagar plain white marble (table rubbed and polished) 18
DSR 7453 Sqm 1.20 1,100.00 1,320.00
mm thick (slab area more than 0.50 sqm)
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.06 94.80 5.69
stone slab
3.9 Limemortar 1:3 (1 Lime :3 Coarse sand) 20mm thickness Cum 0.03 7,588.17 254.96
LABOUR
DSR 0126 Mason (for ornamental stone work) 1 st class day 0.80 393.00 315.97
DSR 0100 Bandhani day 0.80 328.00 263.71
DSR 0114 Beldar day 0.80 297.00 238.79
DSR 0115 Coolie day 0.80 297.00 238.79
DSR 0128 Mate day 0.40 328.00 129.89
DSR 0102 Blacksmith 1st class day 0.32 393.00 127.33
DSR 9999 Sundries and scaffolding LS 32.29 1.70 54.90
Total 2,950.03
Add water charges 1% 29.50
Total 2,979.53
Add CPOH @ 15% 446.93
Cost of 1 Sqm 3,426.46

Marble work gang saw cut (polished and machine cut) of thickness 18 mm for cladding over dome (veneer
work), backing filled with a grout of average 20 mm thick in lime mortar 1:3 (1 lime : 3 coarse sand),
10.8
including pointing with lime mortar 1:2 (1 lime : 2 marble dust) with an admixture of pigment to match the
marble shade (To be secured to the backing by means of cramps, which shall be paid for separately).

Code Description Unit Quantity Rate in Rs Amount in Rs


DSR 8.1.1.2 Details of cost for 1 sqm.
MATERIAL
Raj nagar plain white marble (table rubbed and polished) 18
DSR 7453 Sqm 1.40 1,100.00 1,540.00
mm thick (slab area more than 0.50 sqm)
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.06 94.80 5.69
stone slab
3.9 Limemortar 1:3 (1 Lime :3 Coarse sand) 20mm thickness Cum 0.04 7,588.17 305.95
LABOUR
DSR 0126 Mason (for ornamental stone work) 1 st class day 1.01 393.00 394.97
DSR 0100 Bandhani day 1.01 328.00 329.64
DSR 0114 Beldar day 1.01 297.00 298.49
DSR 0115 Coolie day 1.01 350.00 351.75
DSR 0128 Mate day 0.50 120.00 59.40
DSR 0102 Blacksmith 1st class day 0.41 510.00 206.55
DSR 9999 Sundries and scaffolding LS 32.29 1.70 54.90
Total 3,547.33
Add water charges 1% 35.47
Total 3,582.80
Add CPOH @ 15% 537.42
Cost of 1 Sqm 4,120.22

Providing and fixing red sand stone brackets 55x22.5x45 cm sunk and moulded including providing and
10.12
fixing with 4 Nos gun metal cramp 25x6 mm 30 cm long and dowel bars 7.5 cm long 6 mm dia as per design

Code Description Unit Quantity Rate in Rs Amount in Rs


DSR 7.31 Details of cost for 1 bracket
MATERIAL
Quantity of stone for 1 bracket 1 x 55 x 22.5 x 45cm =
61.26
0.056cum or 56 cudm. Considering 10% wastage
DSR 1160 Red sand stone block 10 cudm 61.26 65.00 398.17
3.7 lime Mortar 1:2 (1lime:2 coarse sand)for laying and pointing Cum 0.21 7,005.52 147.12
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.14 94.80 13.36
stone slab @ 2.30kg/cudm
LABOUR:
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.79 361.00 647.13
DSR 0102 Blacksmith 1 st class day 0.04 393.00 14.54
DSR 0114 Beldar day 0.27 297.00 80.49
DSR 0115 Coolie day 0.14 297.00 40.24
DSR 0100 Bandhani day 0.27 328.00 88.89
DSR 0373 Cramp Gun metal 25x6x300 mm Each 4.00 80.00 320.00
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.30 361.00 106.74
DSR 0102 Blacksmith 1 st class day 0.04 393.00 15.85
DSR 0114 Beldar day 0.15 297.00 43.91
DSR 0115 Coolie day 0.15 297.00 43.91
DSR 0100 Bandhani day 0.15 328.00 48.49
DSR 0101 Bhisti day 0.15 328.00 48.49
Extra labour for ornamental finish Mason (for ornamental
DSR 0126 day 1.14 393.00 448.02
stone work) 1 st class
DSR 9999 Sundries and scaffolding brushes etc LS 265.00 1.70 450.50
Total 2,955.83
Add water charges 1% 29.56
Total 2,985.39
Add CPOH @ 15% 447.81
Cost of 1 Sqm 3,433.20

Providing and fixing sloping chajja of stone 40 mm thick and upto 80 cm wide beyond the wall as measured
along the slope in lime mortar 1:1:1 (1 lime : 4 coarse sand) with 12 mm diameter anchoring steel bar, 45
10.13 cm long, fixed in each stone and supported on and including with bricks cove in lime mortar 1:4 (1lime : 4
coarse sand), including pointing in lime mortar 1:2 (1 lime cement : 2 stone dust) with an admixture of
pigment matching the stone shade
10.12.1 Red sand stone
Code Description Unit Quantity Rate in Rs Amount in Rs
MATERIAL
DSR 7.28.1 Details of cost for a chajja of 2.00 sqm (finished work)
Chisel dressed 80cm sloping length plus 20cm bearing Area
= 2.5xl.00=2.50sqm
DSR 1164 Red sand stone slab 40 mm thick (un-dressed) Sqm 2.75 190.00 522.50
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.25 94.80 23.98
stone slab @ 2.30kg/cudm
LABOUR:
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.50 361.00 180.50
Anchoring steel bars 12mm dia. 45cm long 5 Nos. @
0.80kg/m = 0.02q
DSR 1002 Mild steel round bar 12 mm dia and below quintal 0.02 4,500.00 90.00
DSR 9999 Cutting threads and cost of nuts, washers, etc LS 67.34 1.70 114.48
DSR 9999 Pigment LS 25.00 1.70 42.50
DSR 9999 Extra for using lime LS 98.00 1.70 166.60
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.20 361.00 433.20
DSR 0114 Beldar day 1.80 297.00 534.60
DSR 9999 Sundries and scaffolding brushes etc LS 355.00 1.70 603.50
Brick cover support 4 courses with bricks of class
designation 75 4x7+5+5=38cm girth 2.5m length
DSR 9999 Cost of Brick cover support. LS 175.00 1.70 297.50
Brick work in triangular gap above cover with bricks of class
5.6.1 designation 7.5 in lime mortar 1:1:1(1lime:1 surkhi:1 fine Cum 0.02 9,613.35 207.65
sand)-1/2x2.5x0.2x0.07=0.018cum
Total 3,217.01
Add water charges 1% 30.09
Total 3,247.10
Add CPOH @ 15% 455.92
Cost of 2 Sqm 3,703.02
Cost of 1 Sqm 1,851.51

10.12.2 White sand stone


Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 7.28.2 Details of cost for a chajja of 2.00 sqm (finished work)
Chisel dressed 80cm sloping length plus 20cm bearing Area
= 2.5xl.00=2.50sqm
DSR 1165 white sand stone slab 40 mm thick (un-dressed) Sqm 2.75 215.00 591.25

Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.25 94.80 23.98
stone slab @ 2.30kg/cudm
LABOUR:
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.50 361.00 180.50
Anchoring steel bars 12mm dia. 45cm long 5 Nos. @
0.80kg/m = 0.02q
DSR 1002 Mild steel round bar 12 mm dia and below quintal 0.02 4,500.00 90.00
DSR 9999 Cutting threads and cost of nuts, washers, etc LS 67.34 1.70 114.48
DSR 9999 Pigment LS 25.00 1.70 42.50
DSR 9999 Extra for using lime LS 98.00 1.70 166.60
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.20 361.00 433.20
DSR 0114 Beldar day 1.80 297.00 534.60
DSR 9999 Sundries and scaffolding brushes etc LS 355.00 1.70 603.50
Brick cover support 4 courses with bricks of class
designation 75 4x7+5+5=38cm girth 2.5m length
=38cmx2.5m=95cm
DSR 9999 Cost of Brick cover support. LS 175.00 1.70 297.50
Brick work in triangular gap above cover with bricks of class
5.6.1 designation 7.5 in lime mortar 1:1:1(1lime:1 surkhi:1 fine Cum 0.02 9,613.35 207.65
sand)-1/2x2.5x0.2x0.07=0.018cum
Total 3,285.76
Add water charges 1% 30.78
Total 3,316.54
Add CPOH @ 15% 466.33
Cost of 2 Sqm 3,782.88
Cost of 1 Sqm 1,891.44

Providing and fixing horizontal chajja of stone 40 mm thick and upto 80 cm wide projection in lime mortar
10.14 1:3 (1 lime : 3 coarse sand) including pointing in lime mortar 1:2 (1 lime cement : 2 stone dust) with an
admixture of pigment matching the stone shade
10.14.1 Red sand stone
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 7.29.1 Details of cost for (2.5x0.75m)= 1.875 sqm
MATERIAL
Taking 2.5mx75cm projection + 15cm bearing = 2.5x0.9 =
2.25 sqm
DSR 1164 Red sand stone slab 40 mm thick (un-dressed) Sqm 2.25 190.00 427.50

Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.21 94.80 19.62
stone slab @ 2.30kg/cudm
LABOUR:
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.45 361.00 162.45
DSR 9999 Pigment LS 6.25 1.70 10.63
DSR 9999 Extra for using lime LS 26.91 1.70 45.75
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.72 361.00 259.92
DSR 0114 Beldar day 0.96 297.00 285.12
DSR 9999 Sundries and scaffolding brushes etc LS 415.00 1.70 705.50
Total 1,916.49
Add water charges 1% 19.16
Total 1,935.65
Add CPOH @ 15% 290.35
Cost of 1.875 Sqm 2,226.00
Cost of 1 Sqm 1,187.20

10.14.2 White sand stone


Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 7.29.2 Details of cost for (2.5x0.75m)= 1.875 sqm
MATERIAL
Taking 2.5mx75cm projection + 15cm bearing = 2.5x0.9 =
2.25 sqm
DSR 1165 White sand stone slab 40 mm thick (un-dressed) Sqm 2.25 215.00 483.75
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.21 94.80 19.62
stone slab @ 2.30kg/cudm
LABOUR:
Dressing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.45 361.00 162.45
DSR 9999 Pigment LS 6.25 1.70 10.63
DSR 9999 Extra for using lime LS 26.91 1.70 45.75
Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 0.72 361.00 259.92
DSR 0114 Beldar day 0.96 297.00 285.12
DSR 9999 Sundries and scaffolding brushes etc LS 478.00 1.70 812.60
Total 2,079.84
Add water charges 1% 20.80
Total 2,100.63
Add CPOH @ 15% 315.10
Cost of 1.875 Sqm 2,415.73
Cost of 1 Sqm 1,288.39

30 mm red sand stone sun-shade (chisel-dressed) supported on red sand stone brackets, fixed in walls with
10.15
lime mortar 1:3 (1 lime : 3coarse sand), including finishing complete
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 7.30 Details of cost for window 1.6m length and 0.70m width = 1.12 sqm
MATERIAL
overall width 0.70+0.15=0.85 metres. Total area =
1.6x0.85=1.36sqm
Red stone brackets (chisel dressed) 30mm average
thickness over all width of brackets 0.53+0.23=0.76m
2x0.3x0.76=0.46 Total 1.36+0.46 =1.82sqm Add wastage
@10% = 0.18sqm. Total = 2.00
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.14 94.80 13.08
stone slab @ 2.30kg/cudm
3.9 Lime Mortar 1:3(1 Lime: 3 Coarse sand) Cum 0.01 7,588.17 68.29
LABOUR:
Dressing & Fixing charges
DSR 0125 Mason (for plain stone work) 2nd class day 1.03 361.00 372.55
DSR 0114 Beldar day 0.60 297.00 178.20
DSR 9999 Sundries and scaffolding brushes etc LS 286.00 1.70 486.20
Total 1,378.33
Add water charges 1% 13.78
Total 1,392.11
Add CPOH @ 15% 208.82
Cost of 1 Sqm 1,600.93

Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in lime mortar
10.16 1:1:1 (1 lime : 1Surkhi:1 Fine sand), including pointing with lime mortar 1:2 (1 lime : 2 stone dust) with an
admixture of pigment matching the stone shade
10.16.1 Red Sand stone
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 7.32.1 & Details of cost for cornices (30cm long 30cm deep and
ISOR 2.19 7.5cm project-iron) = 6.75cudm or 0.00675 cum.
MATERIAL:
6.6.1.1 Rate as per Item Number 6.6.1.1 of SH: cum 0.01 30,640.50 206.82
Extra for using stone dust powder and labour for making
DSR 9999 L.S 6.40 1.70 10.87
cornices
LABOUR
DSR 0125 Mason (for plain stone work) 2nd class day 0.15 361.00 54.15
DSR 0114 Beldar day 0.15 297.00 44.55
Total 109.57
Add water charges 1% 1.10
Total 110.67
Add CPOH @ 15% 16.60
127.27
Cost of 0.00675 Cum 334.09
Cost of 1 Cum 49,495.21

10.16.2 White Sand stone


Details of cost for cornices (30cm long 30cm deep and
DSR 7.32.2
7.5cm project-iron) = 6.75cudm or 0.00675 cum.
MATERIAL:
6.6.2.2 Rate as per Item Number 6.6.1.2 of SOR: cum 0.01 31,316.52 211.39
Extra for using stone dust powder and labour for making
DSR 9999 L.S 6.40 1.70 10.87
cornices
LABOUR
DSR 0125 Mason (for plain stone work) 2nd class day 0.16 361.00 55.96
DSR 0114 Beldar day 0.16 297.00 46.04
Total 112.86
Add water charges 1% 1.13
Total 113.99
17.10
Add CPOH @ 15%
131.09
Cost of 0.00675 Cum 342.48
Cost of 1 Cum 50,737.35

Providing and fixing stone jali 40 mm thick throughout in lime mortar 1:3 (1 lime : 3 coarse sand), including
10.17 pointing in lime mortar 1:2 (1 lime : 2 stone dust) with an admixture of pigment, matching the stone
shade, jali slab without any chamfers etc
10.17.1 Red sand stone
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 7.33.1 Details of cost for 1 sqm.
MATERIAL
DSR 1164 Red sand stone slab 30 mm thick (un-dressed) Sqm 1.10 190.00 209.00
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.10 94.80 9.59
stone slab @ 2.30kg/cudm
3.9 Lime Mortar 1:3(1 Lime: 3 Coarse sand) Cum 0.02 7,588.17 113.82
LABOUR:
DSR 0125 Mason (for plain stone work) 2nd class day 21.59 361.00 7,793.99
DSR 0114 Beldar day 14.37 297.00 4,266.41
DSR 9999 Sundries LS 80.73 1.70 137.24
Total 12,530.05
Add water charges 1% 125.30
Total 12,655.35
Add CPOH @ 15% 1,898.30
Cost of 1 Sqm 14,553.66

10.17.2 White sand stone


C Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 7.33.2 Details of cost for 1 sqm.
MATERIAL
DSR 1165 White sand stone slab 30 mm thick (un-dressed) Sqm 1.10 215.00 236.50
Carriage of stone blocks white & red sand stone & kota
DSR 2216 tonne 0.10 94.80 9.59
stone slab @ 2.30kg/cudm
3.9 Lime Mortar 1:3(1 Lime: 3 Coarse sand) Cum 0.02 7,588.17 113.82
LABOUR
DSR 0125 Mason (for plain stone work) 2nd class day 21.72 361.00 7,839.84
DSR 0114 Beldar day 14.45 297.00 4,291.50
DSR 9999 Sundries LS 80.73 1.70 137.24
Total 12,628.50
Add water charges 1% 126.28
Total 12,754.78
Add CPOH @ 15% 1,913.22
Cost of 1 Sqm 14,668.00

Sandstone flooring as a plinth protection around the building using sand stone of 50mm thick & 1:1:1 lime
10.18
mortar (1 lime:1surkhi:1 coarse sand) for filling up the joints.
10.18.1 Red Sand stone
C Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 11.28.1 Details of cost for 10 sqm
Material
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm
DSR 1174 Red sand stone slab 45 mm to 50 mm thick (un-dressed) Sqm 11.00 172.00 1,892.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:(1 Lime:1 surkhi: 1 Coarse sand)
i. For bedding 0.22
ii. For Joining 0.03
3.3 Lime mortar 1:1:1 (1 Lime:1 surkhi: 1 Coarse sand) 0.25 6,806.02 1,701.50
LABOUR
DSR 0123 Mason Brick I Class day 5.43 393.00 2,132.03
DSR 0100 Bandhani day 1.93 328.00 631.40
DSR 0115 Coolie day 0.96 297.00 285.86
DSR 0114 Bhisti day 0.47 297.00 140.33
DSR 9999 Sundries LS 150.00 1.70 255.00
Total 7,096.03
Add water charges 1% 70.96
Total 7,166.99
Add CPOH @ 15% 1,075.05
Cost of 10 Sqm 8,242.03
Cost of 1 Sqm 824.20

10.18.2 White Sand stone


C Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 11.28.2 Details of cost for 10 sqm
Material
Finished work = 10sqm
Add wastage 10% =1.00sqm
Total = 11.00 sqm
DSR 1175 Red sand stone slab 45 mm to 50 mm thick (un-dressed) Sqm 11.00 225.00 2,475.00
DSR 9999 Carriage LS 34.06 1.70 57.90
Lime mortar 1:(1 Lime:1 surkhi: 1 Coarse sand)
i. For bedding 0.22
ii. For Joining 0.03
3.3 Lime mortar 1:1:1 (1 Lime:1 surkhi: 1 Coarse sand) 0.25 6,806.02 1,701.50
DSR 0123 Mason Brick I Class day 5.43 393.00 2,132.03
DSR 0100 Bandhani day 1.93 328.00 631.40
DSR 0115 Coolie day 0.96 297.00 285.86
DSR 0114 Bhisti day 0.47 297.00 140.33
DSR 9999 Sundries LS 150.00 1.70 255.00
Total 7,679.03
Add water charges 1% 76.79
Total 7,755.82
Add CPOH @ 15% 1,163.37
Cost of 10 Sqm 8,919.19
Cost of 1 Sqm 891.92
11.0 REPAIRS AND RECONSTRUCTION

Repairs to plaster of thickness 10 mm to 30 mm in patches of area 2.5 sq. meters and under,
including cutting the patch in proper shape, raking out joints and preparing and plastering the
11.1 surface of the walls complete, preparation of mortar by traditional practice (by hand grinder) in
3 course & loi, tamping, beating, till the shrinkage cracks are disappear disposal of rubbish to
the dumping ground within 50 metres lead with lime moratr 1:2 (1 lime: 2 surkhi)

10 to 30mm thick
Code Description Unit Quantity Rate in Rs Amount in Rs
ISOR 4.2 Details of cost for 2.5Sqm.
MATERIAL
3.7 Lime plaster 1:2 (1 lime putty : 2 Coarse sand) Cum 0.23 7,005.52 1,611.27
LABOUR
DSR 0155 Mason (Average) day 1.21 377.00 456.17
DSR 0114 Beldar day 1.83 297.00 543.51
DSR 0101 Bhisti day 0.92 328.00 301.76
DSR 9999 Scaffolding and Sundries LS 1.88 1.70 3.20
Total 2,915.90
Add water charges 1% 29.16
Total 2,945.06
Add CPOH @ 15% 441.76
Cost of 10 Sqm 3,386.82
Cost of 1 Sqm 1,354.73

Regrading terracing of mud phaska covered with tiles or brick, in lime by dismantling tiles or
bricks, removing mud plaster, preparing the surface of mud phaska to proper slope, relaying
mud plaster gobri leaping and tiles or bricks, grouted in lime mortar 1:3 (1 lime : 3 fine sand),
11.2
including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable
material to the dumping ground (the cost of the new tiles or brick excluded) within 50 metres
lead.
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 14.13 Details of cost of 10 Sqm
MATERIAL
(i) Dismantling tiles/bricks in lime mortar including removing mud plaster and cleaning the
LABOUR
DSR 0123 Mason First Class day 0.54 393.00 212.22
DSR 0114 Beldar day 0.54 297.00 160.38
(ii) Preparing the surface, for mud phuska to proper slope, relaying mud plaster gobri leeping
DSR 0155 Mason First Class day 0.27 393.00 106.11
MATERIAL
DSR 3.18 Mud mortar Cum 0.24 366.20 87.89
DSR 0308 Bhusa Quintal 0.08 400.00 33.60
Gobri mortar
DSR 3.18 Mud mortar Cum 0.12 366.20 43.94
LABOUR
DSR 0114 Beldar day 0.25 297.00 74.25
(iii) relaying tiles/bricks including lime mortar 1:3 (1 lime: 3 fine sand) for grouting
3.12 lime mortar 1:3 (1 lime: 3 fine sand) Cum 0.09 8,782.53 803.60
DSR 0123 Mason First Class day 1.80 393.00 707.40
DSR 0114 Beldar day 2.25 297.00 668.25
DSR 0101 Bhisti day 1.50 328.00 492.00
DSR 9999 Disposal for mulba LS 15.00 1.70 25.50
DSR 9999 Sundries LS 155.00 1.70 263.50
Total 3,678.64
Add water charges 1% 36.79
Total 3,715.43
Add CPOH @ 15% 557.31
Cost of 10 Sqm 4,272.74
Cost of 1 Sqm 427.27

Removing brick tiles in 5 to 6 cm thick lime terracing from existing roof and relaying an average
thickness 7.5 cm laid to fall with 25mm nominal brick size aggregate and 50% lime mortar 1:2
(lime putty : 2surkhi) rammed and finished with gur and belgiri treatment complete and covered
with flat brick tiles of class designation 100 or 50mm thick red sand stone grouted with lime
11.3
mortar 1:3(1 lime : 3 fine sand) mixed with 2% of integral water proofing compound by weight
of lime, over 12mm layer of lime mortar 1:3(1lime:3 fine sand) or 25mm thick lime surkhi mortar
1:1:1(1 lime:1 surkhi:1fine sand) including filling the joints in rich lime mortar mixed with water
proofing compound and pigment to match the shade of stone and finished neat.

Code Description Unit Quantity Rate in Rs Amount in Rs


DSR 14.13 Details of cost of 10 Sqm
LABOUR
13.1.2 (i) Removing Brick tiles from existing roof Sqm 10.00 140.43 1,404.31
(ii) Preparing the surface, for lime mortar to
proper slope, relaying lime mortar 1:2 (1lime
putty: 2 Surkhi)
DSR 0123 Mason First Class day 0.35 393.00 137.55
MATERIAL
8.1 Lime mortar 1:2 (1 lime: 2surkhi) Cum 1.01 9,341.38 9,458.15
(iii) relaying tiles/bricks including lime mortar 1:2 (1 lime: 2 fine sand) for grouting
Flat brick/ terracotta tiles with lime mortar 1:2 (1
8.2 Sqm 10.50 624.91 6,561.55
lime: 2 fine sand)
DSR 9999 Disposal for mulba LS 35.00 1.70 59.50
DSR 9999 Sundries LS 125.00 1.70 212.50
Total 17,833.56
Add water charges 1% 178.34
Total 18,011.90
Add CPOH @ 15% 2,701.78
Cost of 10 Sqm 20,713.68
Cost of 1 Sqm 2,071.37

Replacing Red/white sand stone slabs in roofing, laid in lime mortar 1:3 (1 lime : 3 coarse sand),
11.4 including necessary repairs and lime pointing with same mortar complete, including disposal of
rubbish to dumping ground within 50 metres of lead :
11.4.1 Red/ White Sand stone
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 14.14 Details of cost of 10 Sqm
LABOUR
Dismantling existing stone, slabs roofing 1x10.00
sqmx0.05m = 0.50 cum
DSR 0114 Beldar day 0.95 297.00 282.15
DSR 0115 Coolie day 0.45 297.00 133.65
DSR 9999 Sundries LS 25.00 1.70 42.50
DSR 9999 Cleaning the surface including necessary repairs LS 55.00 1.70 93.50
MATERIAL
Red sand stone slab 45 mm to 50 mm thick (un-
DSR 1174 Sqm 11.00 172.00 1,892.00
dressed)
Carriage of stone blocks white & red sand stone
DSR 2216 Sqm 1.39 94.80 131.91
& kota stone slab
3.1.9 Lime mortar 1:3(1lime:3 coarse sand) Cum 0.11 7,588.17 849.87
LABOUR
DSR 0123 Mason First class day 3.50 393.00 1,375.50
DSR 0100 Bandhani day 4.00 328.00 1,312.00
DSR 0115 Coolie day 3.50 297.00 1,039.50
DSR 0101 Bhisti day 1.50 328.00 492.00
DSR 9999 Sundries LS 125.00 1.70 212.50
DSR 2264 Carriage of rubbish Cum 0.50 106.64 53.32
Total 7,910.41
Add water charges 1% 79.10
Total 7,989.51
Add CPOH @ 15% 1,198.43
Cost of 10 Sqm 9,187.94
Cost of 1 Sqm 918.79
11.4.2 Granite/ Marble stone
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 14.14 Details of cost of 10 Sqm
LABOUR
Dismantling existing stone, slabs roofing 1x10.00
sqmx0.05m = 0.50 cum
DSR 0114 Beldar day 0.95 297.00 282.15
DSR 0115 Coolie day 0.45 297.00 133.65
DSR 9999 Sundries LS 25.00 281.45 7,036.25
DSR 9999 Cleaning the surface including necessary repairs LS 55.00 1.70 93.50
MATERIAL
Granite of any colour, 30 mm thick (slab area
DSR 7296 Sqm 11.00 2,300.00 25,300.00
upto 0.50 sqm)
Carriage of stone blocks white & red sand stone
DSR 2216 Sqm 1.39 94.80 131.91
& kota stone slab
3.9 Lime mortar 1:3(1lime:3 coarse sand) Cum 0.11 7,588.17 849.87
LABOUR
DSR 0123 Mason First class day 0.85 393.00 334.05
DSR 0100 Bandhani day 1.00 328.00 328.00
DSR 0115 Coolie day 0.75 297.00 222.75
DSR 0101 Bhisti day 0.50 328.00 164.00
DSR 9999 Sundries LS 98.00 1.70 166.60
DSR 2264 Carriage of rubbish Cum 0.50 106.64 53.32
Total 35,096.06
Add water charges 1% 350.96
Total 35,447.02
Add CPOH @ 15% 5,317.05
Cost of 10 Sqm 40,764.07
Cost of 1 Sqm 4,076.41
Providing post dated Damp Proof Course (DPC) by raking out mortar from brickwork atleast
75mm deep from both faces of wall at plinth height. The cavities formed must be cleaned by
flushing with clean water. The clean surface with open cavities are next treated with limewater
11.5
to attempt to consolidate the friable areas. The consolidation treatment is followed by pressure
grouting with a line of close-spaced drilling (average 150mm centres) to be made and silicone
solutions in solvent and the siliconate/latex mixture are pumped in under pressure.
Code Description Unit Quantity Rate in Rs Amount in Rs
ISOR 8.1 Details of cost of 10 m
MATERIAL
DSR 0773 Lime for plaster work on both sides Quintal 2.00 800.00 1,600.00
DSR 0773 Lime to consolidate the fabric Quintal 2.00 800.00 1,600.00
Lime for cleaning after racing out the existing
DSR 0773 Quintal 0.50 800.00 400.00
pointing
DSR 0983 fine sand including wastage Cum 4.20 650.00 2,730.00
Equipment
DSR 0006 Gusmer for spray of chemicals Days 4.00 250.00 1,000.00
M Rate Grouting Machine Days 4.00 1,000.00 4,000.00
LABOUR
M rate Conservator Days 1.00 1,650.00 1,650.00
DSR 0123 Mason 1st class Days 10.00 393.00 3,930.00
DSR 0114 Beldar Days 10.00 297.00 2,970.00
DSR 0128 Mate Days 8.00 328.00 2,624.00
DSR 9999 Labour for drilling holes LS 130.00 1.70 221.00
DSR 9999 Sundries & Scaffolding LS 250.00 1.70 425.00
Total 23,150.00
Add water charges 1% 231.50
Total 23,381.50
Add CPOH @ 15% 3,507.23
Cost of 10 m 26,888.73
Cost of 1 m 2,688.87

Stone consolidation-removing the loose/damaged stone and reconsolidating with new


11.6
stone/reusable stone with lime mortar(1:3) wherever necessary
C Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 11.28.1 Details of cost for 1cum
Material
DSR 1157 Stone for masonry work Cum 0.61 700.00 423.50
DSR 1154 Through and bond stone 100 nos. 3.00 1,200.00 36.00
DSR 2215 Carriage LS 1.37 125.47 171.89
3.3 Lime mortar 1:3(1 Lime:3 Coarse sand) 0.30 7,588.17 2,276.45
LABOUR
DSR 0123 Mason Brick I Class day 2.86 361.00 1,031.02
DSR 0100 Bandhani day 1.91 328.00 625.82
DSR 0115 Coolie day 0.85 297.00 253.04
DSR 0114 Bhisti day 0.11 328.00 35.42
DSR 9999 Sundries LS 3.00 1.70 5.10
Total 4,858.25
Add water charges 1% 48.58
Total 4,906.84
Add CPOH @ 15% 736.03
Cost of 1 Cum 5,642.86
12.0 TREATMENT OF CRACKS

Repairing of .5mm to 5 mm wide open joints / cracks in all types of sand stone masonry work
including scrapping of loose jointing material from cracks. The inner side to be filled/pointed
with lime mortar with wooden trowel and fixing grouting nipple from outer side as directed by
Architect. Then apply lime mortar by injection grouting through 5mm diameter nozzle through
12.1
the pre fix nipple up to total thickness of existing stone wall and removing the PVC nipple pipe,
lime moratr of mix lime & sand 1:1 mix with polymer using katha or other additives to achieve
require matching colour and including cost of all materials, labour, machinery, equipment,
curing and cleaning the site as directed.

Code Description Unit Quantity Rate in Rs Amount in Rs


ISOR 9.1 Details of cost of 10 lit
MATERIAL
3.3 Lime mortar 1:1:1 Cum 0.03 6,806.02 204.18
Equipment
DSR 0006 sprayer for chemicals Days 0.05 250.00 12.50
M Rate Grouting Machine Days 0.01 1,000.00 10.00
M Rate Stone cutter machine Days 0.05 650.00 32.50
LABOUR
Mrate Conservator Days 0.01 1,650.00 16.50
DSR 0123 Mason 1st class Days 0.25 393.00 98.25
DSR 0114 Beldar Days 0.25 297.00 74.25
DSR 0128 Mate Days 0.05 328.00 16.40
DSR 9999 Sundries , Polimer & Scaffolding LS 89.00 1.70 151.30
Total 615.88
Add water charges 1% 6.16
Total 622.04
Add CPOH @ 15% 93.31
Cost of 10 lit 715.35
Cost of 1 lit 71.53

Providing and fixing chicken wire mesh (6mm x 6mm) of 24 gauge 200 mm wide along the joints
12.2 of R.C.C. work and brick work with hooks/nails etc. complete so as to receiving the plastering
work over chicken mesh as per the direction of Engineer-in-charge.

Code Description Unit Quantity Rate in Rs Amount in Rs


Rate for 1 sqm.
DSR 8737 Stainless steel Wire mesh sqm 1.02 830.00 846.60
DSR 8666 Stainless steel screws 100 Nos 120.00 32.00 38.40
Labour for cutting and fixing at any height.
DSR 0123 Mason day 0.05 393.00 19.65
DSR 0114 Beldar day 0.05 297.00 14.85
DSR 9999 Sundries LS 48.00 1.70 81.60
Total 1,001.10
Add water charges 1% 10.01
Total 1,011.11
Add CPOH @ 15% 151.67
Cost of 1 Sqm 1,162.78
Steel-rod stitching incracked stone patties, beam,and lintels.Providing and fixing
stainless steel rods of 90cms length of which 15cm on either side and cold bending at
90degrees. The stainless steel clamps to be fixed perpendicular to the crack by
drilling in stone and fixing with cement and aradite mixture in such a way that the
12.3
entire length of the rod is in complete contact of the stone and the bent ends are fully
inserted in the cracked stone. Use 316 grade stainless steel charge per hole.steel rod
charges are counted per kg.Holes with 6mm, 8mm, 10mm or 12mm dia.as per
requirement of position.
Code Description Unit Quantity Rate in Rs Amount in Rs
Rate of Each Rod
Steel rods of 8mm Quintol 0.01 4,200.00 21.00
Labour for drilling the hole, bending and fixing
and fixing at any height.
DSR 0123 Mason day 0.09 393.00 35.37
DSR 0114 Beldar day 0.09 297.00 26.73
DSR 9999 Sundries, white cement araldite mixture LS 48.00 1.70 81.60
Total 164.70
Add water charges 1% 1.65
Total 166.35
Add CPOH @ 15% 24.95
Cost of Each rod 191.30

Stitching of cracks in brick masonry with stone lintels of 450x 200x50 mm . Chasing,
12.4 grooving the brick masonry and inserting the stone lintel. All around the stone, lime
mortar should be properly packed .
Code Description Unit Quantity Rate in Rs Amount in Rs
Rate of Each
Stone lintel of size 450x200x50 No 1.00 150.00 150.00
Labour for chasing and grooving the brick surface and inserting the stone lintel over the lime
mortar
DSR 0123 Mason First class day 0.05 393.00 19.65
DSR 0114 Beldar day 0.05 297.00 14.85
DSR 9999 Sundries, lime mortar,etc LS 20.00 1.70 34.00
Total 218.50
Add water charges 1% 2.19
Total 220.69
Add CPOH @ 15% 33.10
Cost of Each stone 253.79
Propping with steel to support the leaned structure ( roof and wall) using pipes, channels,
12.5
angles, girders , wooden wages to prevent further leaning/ collapse
Code Description Unit Quantity Rate in Rs Amount in Rs
Rate for 1 sqm.
Materials
Pipes, Shannels, girders, Wooden wages, etc LS 225.00 1.70 382.50
Labour
DSR 0114 Beldar day 0.70 297.00 207.90
DSR 0115 Coolie day 0.80 297.00 237.60
DSR 9999 Sundries LS 10.00 1.70 17.00
Total 845.00
Add water charges 1% 8.45
Total 853.45
Add CPOH @ 15% 128.02
Cost of 1Sqm 981.47
13.0 DISMANTLING WORKS

Dismantling tile work in floors and roofs laid in lime mortar including stacking material within
13.1
50m lead for thickness of tiles.
13.1.1 For thickness of tiles above 10mm to 25 mm
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 15.23.1 Details of cost for 10 Sqm
LABOUR
DSR 0123 Mason Brick layer first class day 1.00 393.00 393.00
DSR 0114 Beldar day 0.75 297.00 222.75
DSR 0115 Coolie day 0.85 297.00 252.45
DSR 9999 Sundries L.S 55.00 1.70 93.50
Total 961.70
Add water charges 1% 9.62
Total 971.32
Add CPOH @ 15% 145.70
Cost of 10 Sqm 1,117.01
Cost of 1 Sqm 111.70

13.1.2 For thickness of tiles above 25 mm and up to 40 mm


Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 15.23.1 Details of cost for 10 Sqm
LABOUR
DSR 0123 Mason Brick layer first class day 1.30 393.00 510.90
DSR 0114 Beldar day 1.00 297.00 297.00
DSR 0115 Coolie day 0.95 297.00 282.15
DSR 9999 Sundries L.S 70.00 1.70 119.00
Total 1,209.05
Add water charges 1% 12.09
Total 1,221.14
Add CPOH @ 15% 183.17
Cost of 10 Sqm 1,404.31
Cost of 1 Sqm 140.43

Careful removal of existing deteriorated/ damaged/ weathered lime plaster without damaging
13.2
the surface below it.
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 15.23.1 Details of cost for 10 Sqm
LABOUR
DSR 0123 Mason First class day 1.00 393.00 393.00
DSR 0114 Beldar day 1.00 297.00 297.00
DSR 0115 Coolie day 1.25 297.00 371.25
DSR 9999 Sundries and scaffolding L.S 700.00 1.70 1,190.00
Consumables like Hand gloves, safety glass and
DSR 9999 L.S 150.00 1.70 255.00
belt, helmet
Total 2,506.25
Add water charges 1% 25.06
Total 2,531.31
Add CPOH @ 15% 379.70
Cost of 10 Sqm 2,911.01
Cost of 1 Sqm 291.10
Raking out the joints of country/Nankshahi brick, scooping out dead and decayed mortar very
13.3 slowly and carfully with scooping rods, then washing complete with hand spray pump.
Preparing the surface for replastering including disposal of rubbish with 250m lead
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost for 10 Sqm.
Labour for Raking
DSR 0114 Beldar day 2.25 297.00 668.25
Labour for Washing
DSR 0114 Beldar day 2.75 393.00 1,080.75
Scaffolding, pumps for watering 141.93
Sundries & Contingencies @ 4% 68.12
Total 1,959.05
Add water charges 1% 19.59
Total 1,978.64
Add CPOH @ 15% 296.80
Cost of 10 Sqm 2,275.44
Cost of 1 Sqm 227.54
Raking out joints of brick masonry surface to the required width and depth, with due care and
precaution, by mechanical / manual means, including preparing and cleaning the surface for re-
13.4
pointing/ refilling of joints, including disposal of rubbish to the dumping ground within 50 metre
lead.
Code Description Unit Quantity Rate in Rs Amount in Rs
DSR 15.23.1 Details of cost for 10 Sqm
LABOUR
DSR 0123 Mason First class day 1.20 393.00 471.60
DSR 0114 Beldar day 1.00 297.00 297.00
DSR 0115 Coolie day 1.00 297.00 297.00
DSR 0101 Bhisti day 0.70 377.00 263.90
DSR 9999 Sundries and scaffolding L.S 300.00 1.70 510.00
Total 1,839.50
Add water charges 1% 18.40
Total 1,857.90
Add CPOH @ 15% 278.68
Cost of 10 Sqm 2,136.58
Cost of 1 Sqm 213.66
14.0 WOOD REPAIR WORKS
14.1 Reinforcing timber beams with steel plates of size 100 x300x12 mm with bolts and nuts
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost of each steel plate
MATERIAL
DSR 1010 Mild Steel Plates Quintal 0.03 4,700.00 159.39
DSR 1024 Galvanised steel bolts & nuts Each 8.00 12.00 96.00
LABOUR
DSR 0111 Carpenter I st class Days 0.10 297.00 29.70
DSR 0114 Beldar Days 0.20 297.00 59.40
DSR 9999 Sundries & Scaffolding LS 12.00 1.70 20.40
Total 364.89
Add water charges 1% 3.65
Total 368.54
Add CPOH @ 15% 55.28
Cost of Each plate 423.82

Reinforcing timber beams with flitch plates that is sandwiched between two timber members o
14.2
increase the strenght of beams
Code Description Unit Quantity Rate in Rs Amount in Rs
Details of cost of 1m
MATERIAL
DSR 1010 Mild Steel Plates Quintal 0.11 4,700.00 531.29
DSR 1024 Galvanised steel bolts & nuts Each 25.00 12.00 300.00
LABOUR
DSR 0111 Carpenter I st class Days 0.50 297.00 148.50
DSR 0114 Beldar Days 0.50 297.00 148.50
DSR 9999 Sundries & Scaffolding LS 24.00 1.70 40.80
Total 1,169.09
Add water charges 1% 11.69
Total 1,180.78
Add CPOH @ 15% 177.12
Cost of 1m 1,357.90

Reinforcement of existing wooden beams with L shape Angles 70x70x6 at the bottom of the
14.3
beam
Code Description Unit Quantity Rate Amount
Details of cost of 1m
MATERIAL
DSR 1010 L angle structural steel Quintal 0.08 4,700.00 355.32
DSR 1024 Galvanised steel bolts & nuts Each 25.00 12.00 300.00
LABOUR
DSR 0111 Carpenter I st class Days 0.50 297.00 148.50
DSR 0114 Beldar Days 0.50 297.00 148.50
DSR 9999 Sundries & Scaffolding LS 24.00 1.70 40.80
Total 993.12
Add water charges 1% 9.93
Total 1,003.05
Add CPOH @ 15% 150.46
Cost of 1m 1,153.51

Consolidation of woodwork with sawdust and polyster resin of low viscosity, wherein the work
14.4 needs to completed in similar application and then smoothen and finished as per the Engineer
incharge.
Code Description Unit Quantity Rate Amount
Details of cost of 3 Sqm
MATERIAL
DSR 2402 Epoxy resin Kg 4.00 150.00 600.00
DSR 9999 Saw dust LS 93.00 1.70 158.10
LABOUR
M Rate Conservator Days 0.75 1,650.00 1,237.50
DSR 0111 Carpenter Class I Days 0.50 393.00 196.50
DSR 0114 Beldar Days 2.00 297.00 594.00
DSR 9999 Sundries & Scaffolding LS 24.00 1.70 40.80
Total 2,826.90
Add Tools and Planks 1% 28.27
Total 2,855.17
Add CPOH @ 15% 428.28
Cost of 3 Sqm 3,283.44
Cost of 1 Sqm 1,094.48
References
1. Building Construction, Sushil Kumar
2. Practical Handbook on Building Construction, NABHI Publication.
3. What are Lime Mortars, GurmeetS.Rai, ParomitaDesarkar, INTACH
Publication
4. Why use Lime? Sangeeta Bias, INTACH Publication
5. Conservation Manual, Sir.John Marshall, Published by Calcutta
Superintendent Government Printing India, 1923
6. Delhi schedule of Rates 1972, CPWD Publication
7. Delhi schedule of Rates 1985, CPWD Publication
8. Delhi schedule of Rates 2013, CPWD Publication
9. Basic Schedule of Rates 2011, Department of Archaeology and Museums,
Rajasthan – Jaipur
10. IS 2118-1980 Construction of Jack Arch Type of Built-Up Floor or Roof
11. IS 2250-1981 Preparation and Use of Masonry Mortars
12. IS 2394-1984 Application of Lime Plaster Finish
13. IS 3036 -1992 Laying Lime concrete for a Waterproofed Roof Finish
14. IS 3620-1979 Specification for Laterite stone Block for Masonry
15. IS 13935-2009 Seismic Evaluation, Repair and Strengthening of Masonry
Building
16. Estimation of INTACH’s Projects
17. Schedule of Rates Mohanani ASI Engineer
Annexure I
Cintec Anchor Rate List

S.No. Item Qty. Unit Rate (Rs/Unit)

Providing and placing of anchors in cored holes of predefined


lengths, diameters & locations obtained as output from
analysis of the simulated model of the bridge using existing
material properties and geometrical conditions Coring should
be done by use of high speed low vibratory coring machine
with diamond core bits. It should impart minimal or no
vibration to the structure being strengthened. The coring
motor & bit should be capable to core at least upto 3m in
straight line.

Each patented anchor will comprise of three


components(Except Cintec RAC anchor which does not contain
any separate grout delivery pipe) detailed as below:
(a) Reinforcing Member:- Stainless steel Rebar/studd/tube of
Grade 304 conforming to BS 6323/6744/6105 & ASTM
A554/A312 as per applicability. The diameter and size of the
reinforcing members will based upon the structural
requirement of structure.
(b) Presstec Grout:- The Presstec grout is a one component dry
powder mix. Its basic ingredient includes natural mineral and
portland product with graded aggregates, including sand and
lime. The constituents, when proportioned with water,
produce a pumpable, non-shrinking grout. The grout does not
contain any epoxy & resin binders. Presstec grout is a
proprietary, pure mineral grout, conforming to German DIN
standards.
(i) DIN 1045
(ii) DIN 18200
(iii) DIN 18555
(iv) DIN 18557

(c) Sock:- This should be a specially woven polyester based


tubular sock with expansion properties to suit the diameter of
the bore hole in the substrate. The sock should have property
to expand in lateral direction only. The mesh of the sock is to
be designed to contain the aggregates of mixed grout while
still allowing the milk of grout to flow from its pores.
(d) Grout Delivery Pipe:- A 10-12mm dia. PVC hollow pipe for
delivery of grout under pressure inside the sock & around the
reinforcing rebar/stud such that the grout inflates the sock all
arond the rebar/stud starting from far inside end, moving
outward towards the front & forming mechanical bond
between rebar/stud & substrate.

Cintec RAC Anchor of 10mm diameter hollow stainless steel


1 tube in cored hole of 32mm diameter and upto maximum 1 meter 18720
length of 1000mm.
Cintec Anchor of 10mm diamter Rebar/studd in cored hole of
2 1 meter 42720
32mm diameter.
Cintec Anchor of 10mm diamter Rebar/studd in cored hole
3 1 meter 44460
between 32mm and 40mm diameter.
Cintec Anchor of 10mm diamter Rebar/studd in cored hole
4 1 meter 46200
between 40mm and 50mm diameter
Cintec Anchor of 10mm diamter Rebar/studd in cored hole
5 1 meter 47940
between 50mm and 55mm diameter
Cintec Anchor of 12mm diamter Rebar/studd in cored hole of
6 1 meter 49680
32mm
Cintec Anchor of 12mm diamter Rebar/studd in cored hole
7 1 meter 51420
between 32mm and 40mm diameter
Cintec Anchor of 12mm diamter Rebar/studd in cored hole
8 1 meter 53160
between 40mm and 50mm diameter
Cintec Anchor of 12mm diamter Rebar/studd in cored hole
9 1 meter 54900
between 50mm and 55mm diameter
Cintec Anchor of 12mm diamter Rebar/studd in cored hole
10 1 meter 56640
between 55mm and 60mm diameter
Cintec Anchor of 12mm diamter Rebar/studd in cored hole
11 1 meter 58380
between 60mm and 65mm diameter
Cintec Anchor of 20mm diamter Rebar/studd in cored hole of
12 1 meter 58500
40mm diameter
Cintec Anchor of 20mm diamter Rebar/studd in cored hole
13 1 meter 60240
between 40mm and 50mm diameter
Cintec Anchor of 20mm diamter Rebar/studd in cored hole
14 1 meter 61980
between 50mm and 55mm diameter
Cintec Anchor of 20mm diamter Rebar/studd in cored hole
15 1 meter 63720
between 55mm and 60mm diameter
Cintec Anchor of 20mm diamter Rebar/studd in cored hole
16 1 meter 65460
between 60mm and 65mm diameter
Cintec Anchor of 20mm diamter Rebar/studd in cored hole
17 1 meter 67200
between 65mm and 70mm diameter
Cintec Anchor of 20mm diamter Rebar/studd in cored hole
18 1 meter 68940
between 70mm and 75mm diameter
Cintec Anchor of 20mm diamter Rebar/studd in cored hole
19 1 meter 70680
between 75mm and 80mm diameter
Cintec Anchor of 20mm diamter Rebar/studd in cored hole
20 1 meter 72420
between 80mm and 85mm diameter
Cintec Anchor of 20mm diamter Rebar/studd in cored hole
21 1 meter 74160
between 85mm and 90mm diameter
Cintec Anchor of 20mm diamter Rebar/studd in cored hole
22 1 meter 75900
between 90mm and 100mm diameter
Cintec Anchor of 25mm diamter Rebar/studd in cored hole of
23 1 meter 76200
50mm diameter
Cintec Anchor of 25mm diamter Rebar/studd in cored hole
24 1 meter 77940
between 50mm and 55mm diameter.
Cintec Anchor of 25mm diamter Rebar/studd in cored hole
25 1 meter 79680
between 55mm and 60mm diameter
Cintec Anchor of 25mm diamter Rebar/studd in cored hole
26 1 meter 81420
between 60mm and 65mm diameter
Cintec Anchor of 25mm diamter Rebar/studd in cored hole
27 1 meter 83160
between 65mm and 70mm diameter
Cintec Anchor of 25mm diamter Rebar/studd in cored hole
28 1 meter 84900
between 70mm and 75mm diameter
Cintec Anchor of 25mm diamter Rebar/studd in cored hole
29 1 meter 86640
between 75mm and 80mm diameter.
Cintec Anchor of 25mm diamter Rebar/studd in cored hole
30 1 meter 88380
between 80mm and 85mm diameter.
Cintec Anchor of 25mm diamter Rebar/studd in cored hole
31 1 meter 90120
between 85mm and 90mm diameter.
Cintec Anchor of 25mm diamter Rebar/studd in cored hole
32 1 meter 91860
between 90mm and 100mm diameter.
Cintec Anchor of 25mm diamter Rebar/studd in cored hole
33 1 meter 94320
between 100mm and 120mm diameter.
Cintec Anchor of 25mm diamter Rebar/studd in cored hole
34 1 meter 97320
between 120mm and 150mm diameter.
Cintec Anchor of 32mm diamter Rebar/studd in cored hole of
35 1 meter 96000
65mm diameter.
Cintec Anchor of 32mm diamter Rebar/studd in cored hole
36 1 meter 97740
between 65mm and 70mm diameter
Cintec Anchor of 32mm diamter Rebar/studd in cored hole
37 1 meter 99480
between 70mm and 75mm diameter
Cintec Anchor of 32mm diamter Rebar/studd in cored hole
38 1 meter 101220
between 75mm and 80mm diameter
Cintec Anchor of 32mm diamter Rebar/studd in cored hole
39 1 meter 102960
between 80mm and 85mm diameter
Cintec Anchor of 32mm diamter Rebar/studd in cored hole
40 1 meter 104700
between 85mm and 90mm diameter
Cintec Anchor of 32mm diamter Rebar/studd in cored hole
41 1 meter 106440
between 90mm and 100mm diameter
Cintec Anchor of 32mm diamter Rebar/studd in cored hole
42 1 meter 108900
between 100mm and 120mm diameter
Cintec Anchor of 32mm diamter Rebar/studd in cored hole
43 1 meter 111900
between 120mm and 150mm diameter
Cintec Anchor of 32mm diamter Rebar/studd in cored hole
44 1 meter 117900
between 150mm and 300mm diameter

Final length & dia of anchor for strengthening of a distress, is


characterstic to distress in the structure hence, the same will
be decided on case to case basis. The above is inclusive of the
cost of manufacturing the tailor made anchors as per
structural requirements, packing of material and freight from
UK to India, custom duty and all other applicable taxes, etc.
Anchor prices are chargeable in intervals of 0.5meter. Hence if
anchor length of specific dimensions is say 6.30 meters, the
anchor rate will be calculated for 6.5meters.

NOTE:

1 The above rates are inclusive of all applicable taxes as per prevailing Government regulations.

Facilities which are required to be provided free of cost for execution of the work within 50m of
2
work area are as below:

(a) Godown at site for storage of material. Min. space required is 200sqft & maximum space
may vary based of quantity of anchor material requrired for the project.

(b) Power supply for all site work including but not limiting to lighting, coring & anchor
intallation.
( c) Water as required to carry out the work.
(d) Accomodation for atleast 10 persons.
3 The above rates are valid for a period of 1 year from the date of this schedule.
Base exchange rate considered at 100INR = 1 GBP. Incase of fluctuation beyond 5%, the
4 differential rate as applicable, increase or decrease will be applicable upon 66% of the above
quoted cost.
It may be kindly be noted that the aforesaid job will be executed through our authorised
5
applicators only.

We will also like to add that since our technology is tailor made, in some cases certain
6
additional investigative analysis may be required for which charges will be as per actuals.

You might also like