MBSE - Infographic
MBSE - Infographic
Trends
240 Long-Range
Strike (est.)
220
Design, Investigation and testing (months)
200
GRO 78
OMV
160 TDRSS
IRAS
%Overrun
HST
GALL
120 TETH
LAND 76 EDO (Recent Start)
ACT ERB 77
80 COBE
MAG STS
LAND 78
GRO 82 HEAD
40 SEASAT
UARS
VOYAGER
DE ULYSES
SMM PIONVEN IUE ISEE
0
0 5 10 15 20 25
%Spent on Systems Engineering
Source: www.sebokwiki.org/wiki/Economic_Value_of_Systems_Engineering
8
Cost of Process Definition Early Defect Detection
7
Infrastructure Cost Reuse
6
Training Cost Risk Reduction
5
Model Development Improved Communication
Model Verification 4 Usage in Supply Chain
Model Curation 3
MBSE Product line Definition
Configuration Management 2 Standard Conformance & Traceability
TRADITIONAL SE
1
0
Factors related to 0 2 4 6 8 10 Factors related to
MBSE investment MBSE Gains
Conceptual Preliminary Detailed Manufacturing and
Design Design Design Acquisition
Time
Source: www.mdpi.com/journal/systems
…orchestrate the technical content and scope of …continuously monitor with real-time access
your program throughout the entire lifecycle? to key technical performance indicators?
PROGRAM
MBSE
Requirements System System Software Verification
Digital
Management Modeling Safety Development Management
Thread
Program Management
Supplier Management
Intelligent Manufacturing Product Support
Drive scope by moving from system modeling to the comprehensive MBSE digital thread