Easa b1.1 Logbook
Easa b1.1 Logbook
MTO-QP13F-50
This logbook is supported by EASA and Mid-East Aviation Academy MAA It provides the recommended means of recording basic practical maintenance training in order to
support an application to the authority for the issue or variation of an Aircraft Maintenance License in accordance with EASA Part-66 and related guidance. Its structure guides the
applicant's recordings in view of a quick and accurate assessment of his/ her training and technical knowledge. In order to make it a widely used reference, this document provides evidence
of practical Training gained on the mentioned aircraft/ Workshop / category/module.
Full address:
License Category applied for (EASA Form…) your category is B1.1 The required tasks for the encircled category have
Been performed and assessed where appropriate.
Name and signature of approved Assessor
Logbook Owner’s Signature:
Date:
General Information
1. All entries in this logbook shall be made in ink.
2. When used in support of an application for a license, any false entry in the logbook will constitute a legal offence.
3. Entries in the logbook shall be made personally by the logbook holder and confirmed / certified by an authorised person
(e.g., instructor or assessor, Part-147, -145, authorised person).
Completion of the Log pages: The log pages of this book have the following general format:
Part 66 License Category A/C Registration Date
Index ATA Task/ Competence Instructor / Assessor and Company
Module B1.1 or Workshop (ddmmyy)
The following information and instruction for each column shall be observed:
43. ---- 7.6 Demonstrate / explain use of feeler gauge B1.1 B737-200 2
Drill and ream perpendicular holes in ferrous and non-ferrous
44. ---- 7.6
material
B1.1 Sheetmetal shop 2
45. ---- 7.6 Drill and tap a threaded hole B1.1 Sheetmetal shop 2
46. ---- 7.6 Fit and remove thread inserts B1.1 Sheetmetal shop 2
47. ------ 7.7 Perform wire splicing B1.1 Av. Workshop 1 3
48. ------ 7.7 Using crimping tool to insert terminal lug or splices. B1.1 Av. Workshop 1 3
49. 7.7 Carry out pre –use checks of digital multi-meter B1.1 Av. Workshop1 3
To check wires continuity in looms or connector using multi-
50. ------ 7.7
meter.
B1.1 Av. Workshop 1 3
Extract electrical inserts (pins) in a variety of electrical
51. 20 7.7
connectors
B1.1 Av. Workshop 1 3
52. 20 7.7 Insert electrical inserts(pins)in electrical connectors B1.1 Av. Workshop 1 3
Contact crimping& insert/ extract electrical inserts (pins) in
53. ------ 7.7
electrical connectors
B1.1 Av. Workshop 1 4
54. Reserved
Inspect Electrical Cable Looms and Bundles condition And
55. 20 7.7
Correct Them If Necessary
B1.1 B737-200 2
56. ----- 7.7 Install Heat Shrink Sleeves in Cables B1.1 Av. Workshop 1 4
57. 20 7.7 Installation of split sleeve for protection of a wire harness B1.1 Av. Workshop 1 2
58. 20 7.7 Replacement of a Damaged Cable. B1.1 Av. Workshop 1 4
59. ----- 7.7 Install wiring clamp B1.1 Av. Workshop 1 2
60. ----- 7.7 Continuity Checking for wires and circuit B1.1 Av. Workshop 1 4
Interpret typical electrical wiring diagrams and schematics
61. ----- 7.7
circuits
B1.1 Av. Workshop 1 3
62. 20 7.7 Repair or replace an electrical connector locking wire. B1.1 Av. Workshop 1 2
63. ----- 7.7 Wire stripping for soldering B1.1 Av. Workshop 1 2
64. ----- 7.7 Joining Wires Together with Solder B1.1 Av. Workshop 1 3
Use pneumatic drill & tools to perform riveting holes in sheet
65. ---- 7.8
metal
B1.1 Sheetmetal shop 3
66. ---- 7.8 Identify arrange of solid and blind rivets and fasteners B1.1 Sheetmetal shop 2
67. ---- 7.8 Perform Patch repair on a metal sheet B1.1 Sheetmetal shop 8
68. ---- 7.8 Install universal and countersunk rivets in aluminum sheet using B1.1 Sheetmetal shop 4
various methods
69. ---- 7.8 Riveting inspection for improper forming (defective) B1.1 Sheetmetal shop 1
70. ---- 7.8 Remove defective rivets without causing further damage to skin B1.1 Sheetmetal shop 4
71. ---- 7.9 Bending a rigid pipe B1.1 Sheetmetal shop 2
72. ---- 7.9 Flaring rigid pipe B1.1 Sheetmetal shop 2
73. ---- 7.10 Visual inspection of springs condition B1.1 Sheetmetal shop 2
74. ---- 7.11 Inspection of Ball/Roller Bearings B1.1 Sheetmetal shop 2
75. ---- 7.11 Lubricate aircraft main landing gear B1.1 Sheetmetal shop 2
Chain visually inspection for cracks, wear, corrosion, damage,
76. ---- 7.12
twist
B1.1 Sheetmetal shop 2
77. ---- 7.13 Visual inspection of control cable systems and pulleys B1.1 Sheetmetal shop 2
78. ---- 7.14 Bending metal sheet using bend bar B1.1 Sheetmetal shop 2
79. ---- 7.14 Sheet metal cutting B1.1 Sheetmetal shop 3
80. ---- 7.14 Cutting, drilling, reaming and thread cutting metal sheet B1.1 Sheetmetal shop 5
81. ---- 7.14 Practice the correct procedure when using hacksaw B1.1 Sheetmetal shop 2
82. ---- 7.14 Smoothing metal edges by using file or grinder B1.1 Sheetmetal shop 2
83. ---- 7.15 Perform welding / Soldering B1.1 Paint &Welding shop 2
84. ---- 7.15 Perform bonding method B1.1 Sheetmetal shop 3
85. Reserved
86. ---- 7.16 Prepare aircraft for weighing B1.1 A/C Sama 4
87. ---- 7.17 Aircraft jacking B1.1 A/C Sama 6
88. ---- 7.17 Park, chock and grounding the aircraft B1.1 A/C Sama 4
89. ---- 7.17 Perform long time parking B1.1 A/C Sama 4
90. ---- 7.17 Aircraft towing B1.1 A/C Sama 2
91. ---- 7.17 Aircraft refueling \defueling B1.1 A/C Sama 4
92. --- 7.17 Hydraulic ground servicing filter Removal / installation B1.1 B737-200 3
93. 12 7.17 Perform lubrication of bearing (flight control /landing gear) B1.1 B737-200 3
94. 54 7.17 Engine-to-wing forward fairing - removal/installation B1.1 B737-200 3
95. 36 7.17 Remove and install ducts and clamps B1.1 B737-200 3
96. ---- 7.18 Adjust, Set and Use Torque for Tightening of Bolts B1.1 B737-200 1
Identify part and serial numbers from a component overhaul
97. 56 7.18
manual or IPC
B1.1 B737-200 1
98. 20 7.18 Lock Wire–removal and installation B1.1 Airframe & general shop 1
Measure shafts, bores, and adjacent surfaces using precision
99. ---- 7.18
measuring instruments
B1.1 Sheetmetal shop 2
100. 74 7.18 Inspect engine using borescope B1.1 Engine shop 2 2
101. 5 7.18 Visual Dimension Inspections for Tires, Wheels B1.1 Airframe shop 2 1
Hard landing or high drag / side load landing condition
102. 5 7.19
inspection
B1.1 B737-200 2
Explain the required inspection following a lightning strike or
103. 5 7.19
static discharges
B1.1 B737-200 2
104. ---- 7.20 Perform the procedure for material storage B1.1 MAA Store 2
105. 71 7.20 Perform 50 hrs inspection B1.1 A/C Sama 6
Total = 215
Module 11
106. 27 11.1 Flight control description B1.1 B737-200 3
107. 27 11.1 Aileron balance tab – removal installation B1.1 Airframe shop 2 3
108. 52 11.2 Galley servicing door insp. B1.1 B737-200 3
109. 52 11.2 Tire burst protector - removal/installation B1.1 B737-200 3
110. 52 11.3 Inspection /check of cargo compartment doors B1.1 B737-200 2
111. 25 11.3 1st observers seat removal /installation B1.1 B737-200 2
112. 21 11.4 Air mix valve - removal/installation B1.1 B737-200 3
113. 21 11.4 Modulating and shutoff valve - Removal/Installation B1.1 B737-200 3
114. 21 11.4 Pressure regulator - Removal/Installation B1.1 B737-200 2
115. 21 11.4 Air cleaner purge valve - Removal/Installation B1.1 B737-200 3
116. 21 11.4 Air cycle machine (ACM) - removal/installation B1.1 B737-200 12
117. 21 11.4 Water separator - removal/installation B1.1 B737-200 3
118. 34 11.5 Air Data computers removal /installation B1.1 B737-200 2
119. 23 11.5 HF communication description B1.1 B737-200 3
120. 23 11.5 Vhf antenna removal/installation B1.1 B737-200 3
121. 23 11.5 VHF communication systems - description and operation B1.1 B737-200 3
122. 34 11.5 VHF NAV control panel - removal/installation B1.1 B737-200 3
123. 34 11.5 GPWS control module - removal/installation B1.1 B737-200 2