Hong Kong Standard Method of Measurement of Building Works - Fourth Edition
Authorised between
The Hong Kong Institute of Surveyors,
The Hong Kong Construction Association
Ltd.,
The Hong Kong Government Architectural Services Department,
The Hong Kong Institution of Engineers,
The Hong Kong Electrical & Mechanical Contractors’
Association, The Chartered Institution of Building Services
Engineers, and The Association of Cost Engineers (Hong Kong
Region).
ISBN:988-98402-4-3
All rights reserved. No part of this publication covered by the above copyright may be reproduced, stored in a retrieval system or
transmitted in any form or by any means without the prior permission of the copyright owners.
Preface to Fourth Edition 2005 i
The Hong Kong Standard Method of Measurement of Building Works, since its first Edition in 1962, has evolved to meet the changing methods of construction
and contracting procedures, through the second edition in 1966 and the third edition in 1979. This fourth edition, initiated by The Royal Institution of Chartered
Surveyors (Hong Kong Branch) was subsequently prepared under the auspices of The Hong Kong Institute of Surveyors. It includes sections for Building
Services, which were previously published as a separate document in its first edition in 1993.
The new tabulated format for this fourth edition is based upon the United Kingdom SMM 7, but the Elemental format used in SMM 7 has, by general consent,
not been followed and the Trade Section maintained as being more suitable for the Hong Kong Contracting and Sub-contracting procedures.
It is hoped that the systematic tabulated format will make for easy reference and facilitate the compilation of standard phraseology for libraries of descriptions
and for computerisation.
November, 2005.
ii
Preface to First Edition 1962 iii
The vast development of the building industry in Hong Kong during the past decade has created a wide-spread realisation of the importance and usefulness of Bills of
Quantities. Local conditions have not justified the adoption of the English Standard Method of Measurement, which nevertheless has been followed in a general sense in
Government and private practice and adapted mainly by including most labours with the relative items. Adaptation, however, has been completely arbitrary, depending upon
the discretion or inclination of the individual surveyor. The Services have for some while had their own “Rules of Measurement” for the Far East which is restricted in general
use and application in Hong Kong. Building Contractors, while becoming more and more “B.Q. conscious”, have at the same time been faced with a growing diversity of
methods of measurement which has not only been deleterious to scientific estimating but has in fact resulted in the occurrence of serious errors.
The time, then, has clearly arrived for the introduction of a local standard method of measurement. To this end a meeting of Chartered Quantity Surveyors appointed a Sub
committee to consider ways and means of procedure. This Sub-Committee was subsequently joined by representatives of the local building industry to form a Joint Committee
which has now produced this First Edition. In general the procedure was as follows:-
(a) the surveyor members prepared a preliminary draft to be handed trade-by-trade to the builder members for reference to their association for comment or amendment;
(b) the full committee met from time to time to discuss and agree progressively a secondary draft;
(c) the secondary draft was distributed to all interested parties for comment and suggestions;
(d) the full committee considered all suggestions received for adoption or rejection and agreed a final draft.
No attempt has been made to cover every possible item which could arise but rather to produce in the first instance a document ensuring consistency of measurement of those
items normally encountered in the Colony.
It is recommended by the Joint Committee that this document be reviewed annually to consider any revisions or addenda that may become advisable.
H. Miller (Chairman)
R. B. Hanna
C. R. Holmes
J. A. Lilley
J. V. Moore
K. E. N. Goodbourn (vice C. R. Holmes)
S. K. Ho
W. L. Yau
January, 1962.
Preface to Second Edition 1966
The First Edition of this Standard Method of Measurement, published in January 1962, was very well received by quantity surveyors and building contractors and has done
much to foster a growing confidence in Hong Kong in the system of tendering on Bills of Quantities. The document has been adopted for use by all professional surveyors
throughout the Colony and has now been recognised by The Royal Institution of Chartered Surveyors as a basis for local professional examinations.
After the First Edition had been in use for some three years a Standing Joint Committee, comprising equal representation from surveyors and the building industry, was
appointed to keep under review possible amendments and revisions. Suggestions were invited from all local quantity surveyors and building contractors and the Committee
wishes to express its thanks to all who by their response have contributed towards the publication of this Second Edition. It is gratifying to note that, after careful consideration
of all suggestions received, the actual number of revisions incorporated is small and of a minor nature and will therefore cause little disturbance in adopting the later edition.
H. Miller (Chairman)
K. E. N. Goodbourn
D. G. Levett
S. K. Ho
W. L. Yau
G. Yeh
Mr. R. B. Hanna and Mr. G. Luk kindly served on the committee during the temporary absence of Mr. H. Miller and Mr. W. L. Yau respectively.
June, 1966.
iv
Preface to Third Edition 1979 v
The Standard Method of Measurement as first published in 1962 and revised in 1966 has provided a standard for the preparation of Bills of Quantities for a large volume of
building works both in the Public and Private sectors; it is incorporated into the Conditions of Contract for Public Works and the Standard Form of Building Contract issued
under the sanction of The Hong Kong Institute of Architects, The Royal Institution of Chartered Surveyors (Hong Kong Branch) and The Society of Builders, Hong Kong; it is
recognised by The Royal Institution of Chartered Surveyors as a basis for local professional examinations; and it has been translated into Chinese and published as an
ancillary document.
In view of the advancement in engineering technology and architectural design and the ever increasing sophistication of the construction industry in Hong Kong it was decided
that it was necessary to publish a revised edition. ■
The Committee appointed to administer revisions to the Standard Method of Measurement invited local quantity surveyors and building contractors to submit suggestions for
the improvement and amplification of the document in the light of their experience in its use. All of the suggested alterations were carefully considered, revisions were made
where applicable and new sections such as Demolitions and Alterations, Piling and Caissons, Prestressed Concrete Work and Proprietary Demountable Partitions were
incorporated.
In addition the opportunity was taken to re-edit the document completely to remove uncertainties in interpretation whilst retaining the original intent.
Whilst an appreciable number of alterations have been made, there are very few which involve fundamental changes in the previously prescribed methods of measurement,
the majority of the changes are to update the document in line with the developments in building methods; to make clear the intention, where there appears to be possibility
of misinterpretation; to improve the style or to remove inconsistencies within the document.
The proposal to change from the present system of measurement of mixed earth and rock excavation to a system where rock is measured separately as an “extra over” item
was discussed at length without resolution, the Committee being divided in its views of the practicality of the separate measurement of rock in the Hong Kong situation. The
item was left for further consideration by the Committee when preparing the next Edition.
The Third Edition will become operative on 1st February 1979 and is post dated accordingly.
In view of the decision to adopt the use of the Metric System in the construction industry for all new projects initiated after 1 st April 1977 the Third Edition has been published
in metric. It was considered unwarranted to produce an Imperial version as well as the Metric version, although a limited number of contracts already in various stages of
planning will be based upon Imperial Units after this edition becomes operative.
Bills of Quantities prepared after 31st January 1979 in Imperial measurement will be based on this Third Edition, but units of measurement, and any staging or sizes required
to be stated, shall be as detailed in Appendix A.
The Committee expresses its gratitude to the Surveyors and Builders who submitted suggestions for the improvement of the document and to those Specialists who
contributed to the re-drafting of the insurance clauses and the drafting of the piling clauses.
The Committee expresses its special gratitude to the Sub-Committee responsible for carrying out so enthusiastically and so thoroughly the monumental task of translating the
Second Edition into Chinese. The members of this Sub-Committee were :-
B. J. White (Chairman)
K. E. N. Goodbourn
D. G. Levett
John H. P. Lok
Charles C. C. Wong
John W. L. Loo
Other gentlemen who have served on the Committee during the preparation of this edition are -
H. Miller, the Chairman of the Joint Committee from its inception until his retirement from Hong Kong, R. B. Hanna and Geoffrey M. T. Yeh.
September, 1978.
vi
SUMMARY OF CONTENTS vii
viii
ix
DETAILED CONTENTS (continued)
XIII WOOD WORKS 99 (j) Metal Profiled Sheet Roof Coverings and Wall Claddings 131
(a) Structural Timber 99 (k) Fixed Partitions and Demountable Partitions 133
(b) General Clauses 100 (I) Toilet Cubicle Partitions and Office Cubicle Partitions and Fittings 135
(c) Flooring 101 (m) Suspended Ceilings 136
(d) Raised Access Floors 102 (n) Windows and Glazed Doors 138
(e) Sheet Linings / Claddings, Timber Suspended Ceilings, (o) Shop Fronts 139
Unframed Trims, Insulation, Proofing Works and Fire Stops 103 (P) Curtain Walling 141
(f) Profiled Sheet Roof Coverings and Wall Claddings 107 (q) Furniture, Fittings, Shelving, Racks, Playground Equipment etc. 142
(g) Fixed Partitions and Demountable Partitions 108 XVI PLASTERING AND PAVING 143
(h) Toilet Cubicle Partitions, Office Cubicle Partitions and Fittings 110 (a) Spatterdash 143
(i) Doors, Hatches, Ventilators and the like and Frames and Linings 111 (b) Lathing and Plasterboard 143
(j) Stairs, Handrails and Balustrades 113 (c) General Clauses 144
(k) Furniture, Fittings, Shelving, Racks, Playground Equipment etc. 114 (d) In-situ Surface Finishes and Screeds or Backings 145
(0 Minor Buildings and Structures mainly of Timber Construction 115 (e) Tile and Slab Finishes 148
(m) Insulation / Proofing Works / Fire Stops 116 (f) Rubber and Plastic Sheet or Carpet Sheet / Tile Finishes
XIV IRONMONGERY 117 and the like 151
XV STEEL AND METAL WORKS 119 XVII MECHANICAL INSTALLATIONS 153
(a) Structural Steel 119 (a) General Clauses 153
(b) Linings, Coverings and Cladding 122 (b) Equipment 154
(c) Roofing and Flashings etc. 123 (c) Sanitary and Laboratory Fittings 155
(d) Doors, Gates, Shutters, Grilles and Hatches 124 (d) Pipework 156
(e) Framed Work, Stairs, Handrails and Balustrades 125 (e) Gutters 160
(f) Fencing and Gates 127 (f) Ductwork 161
(g) Minor Buildings and Structures mainly of Metal Construction 128 (g) Insulation 164
(h) Sundries 129 (h) Protective Coverings and Finishings 166
(i) Raised Access Floors 131 (i) Sundries 169
DETAILED CONTENTS (continued)
x
I USE OF TABULATED FORMAT 1
4. SUPPLEMENTARY RULES
6.2 An asterisk within a cross-reference represents all entries in the column in which it appears.
4.1 Measurement rules set out when work shall be measured and the method by which
quantities shall be computed. 6.3 The digit 0 within a cross-reference represents no entry in the column in which it appears.
4.2 Definition rules define the extent and limits of the work represented by a word or expression
used in the rules and in a Bill of Quantities prepared in accordance with the rules.
UK SIMIMV 4
11 GENERAL PRINCIPLES 3
2.2 The method of measurement for work not covered by the clauses of this Standard Method of > = Greater than/exceeding
Measurement, and also deviations from, or qualifications to, this Standard Method of < = Equal to or less than/not exceeding
Measurement, shall be stated in the Preambles to the Bills of Quantities or in the description of
the items to which they apply. The method adopted for work not covered shall, as far as < = Less than
possible, conform to that given in this document for similar work. dia. = Diameter
min. = Minimum
3.1 The methods of measurement laid down shall equally apply to the preparation of Bills Prov’ = Provisional
of Quantities before the work is commenced and to the measurement of finished work.
(e) Items enumerated - number or sets, as applicable; 7.1 Where the unit of billing is the metre, quantities shall be billed to the nearest whole unit.
Fractions of a unit less than half shall be disregarded and all other fractions shall be
(f) Items given by time may be given in “Days” or “Hours” - if these items are used, they regarded as whole units.
should be defined.
7. UNITS OF BILLING (continued) 12. MINIMUM DEDUCTIONS
7.2 Where the unit of billing is the kilogram, quantities shall be billed to the nearest whole unit. 12.1 Where minimum deductions of voids are dealt with in this document they shall refer only to
Fractions of a unit less than half shall be disregarded and all other fractions shall be regarded as openings or wants detached from the boundaries of the space measured.
whole units.
12.2 Openings and wants caused by projections from the boundary of the space measured shall
7.3 Where the application of this Clause would cause an entire item to be eliminated, such item always be the subject of deduction, irrespective of size.
shall be billed as one whole unit.
7.4 When billing items of variation or remeasurement in adjustment of accounts, omissions and
additions of items where the unit of billing is the metre shall be billed to the nearest one tenth of a 13. PIPE OR TUBING SIZES
whole unit, and where the unit of billing is the kilogram shall be billed to the nearest whole unit. 13.1 Pipes or tubing (which terms shall be synonymous for these rules of measurement) shall be
Where, however, one whole unit has been billed in conformity with rule 7.3 above, and the original described by their nominal sizes unless otherwise stated.
quantity has been deducted, then the whole unit shall be omitted.
14. DAYWORKS
8. WORK MEASURED NET
14.1 As Contractors have differing practices in:
8.1 Unless otherwise stated, all work shall be measured net as fixed in its place.
( a) the number of hours included in a normal working day;
( b) payment of overtime rates for hours worked in excess of a normal working day;
9. ORDER OF DIMENSIONS
( c) payment of overtime rates for Sundays and Labour Holidays,
9.1 In giving dimensions the order should be consistent, and generally in the sequence of
some provision should be made in Dayworks Schedules for the differentials to be priced,
length, width and height.
probably as percentage on-costs over the normal working days and normal working hours 08:00
to 18:00 hours. Where ‘shift’ work is envisaged that should be separately provided for.
10.1 Notwithstanding these principles of measurement, proprietary items may be measured in - Normal Working Days
a manner appropriate to the manufacturer's tariff or customary practice. - Sundays
10.2 The descriptions of items in Bills of Quantities may refer to other documents or drawings and any - Labour Holidays
reference to such information shall be understood to fulfil any requirements of these principles of
measurement; alternatively, reference may be made to published information. and at times:
- 08:00 to 18:00 hours
- 18:00 to 24:00 hours
11. COSTS HELD TO BE INCLUDED IN ITEMS
- 00:00 to 04:00 hours
11.1 Each item shall, unless otherwise stated, be held to include:
- 04:00 to 08:00 hours
(a) Labour and all costs in connection therewith;
(b) Materials, goods and all costs in connection therewith (e.g. conveyance,
delivery, unloading, storing, returning packings, handling, hoisting, lowering);
(c) Fitting and fixing materials and goods in position;
(d) Use of plant;
(e) All cutting and waste;
(f) Establishment charges, overhead charges and profit.
MKX SMM 4 4
II GENERAL PRINCIPLES
14. DAYWORKS (continued) 15. PROVISIONAL AND PRIME COST SUMS (continued)
14.2 Labour shall be paid for on an hourly basis, in the manner suggested above. There should be (b) The term ‘Prime Cost Sum’ shall mean a sum provided for work or services to be executed
no further percentage addition on , the quoted labour rates which will be deemed to include for: by a Nominated Sub-Contractor or for materials or goods to be obtained from a Nominated
Supplier. Such sum shall be deemed to be exclusive of any profit or attendance required by
(a) Wages, bonuses and all allowances paid to operatives directly engaged on dayworks
the Contractor and provision shall be made for the addition thereof.
(including gangers and charge hands working with their gangs and those operating
mechanical plant and transport) in accordance with the appropriate employment
agreement, or where no such agreement exists, the actual payments made to the
work people concerned; 16. WORK UNDER RESERVOIR, RIVER OR SEA WATER
(b) Site supervision, including the cost of foremen and walking gangers and staff insurances; 16.1 All work executed in or under reservoir, river or sea water shall be given separately stating the
levels of high and low water where applicable.
(c) Establishment charges, overhead charges and profit;
(d) Use and maintenance of small hand tools and appliances, non-mechanical plant and
equipment, such as ladders, trestles, stages, bankers, scaffolding, temporary track, 17. WORK IN COMPRESSED AIR
wagons, skips, tarpaulins and all similar items.
17.1 All work required to be carried out in compressed air shall be given separately.
14.3 The costs of materials in dayworks shall be the nett invoiced costs, including delivery to site.
A schedule may be given containing provisional quantities of different materials for the work to
be carried out on a dayworks basis. 18. WORK OUTSIDE THE CURTILAGE OF THE SITE
A percentage item shall be given to enable the Contractor to quote for the inclusion of 18.1 Work outside the curtilage of the site shall be separately identified.
establishment charges, overhead charges and profit.
14.4 The costs of construction plant and vehicles (excluding the cost of operators and drivers who
19. WORK IN EXISTING BUILDINGS
shall be included in labour above) shall be paid for at the rates entered in the schedule for the net
working hours during which the plant is engaged on dayworks, and excluding any standing or 19.1 Work in existing buildings shall be separately identified. Such work is defined as work on, or in, or
idle time, except that plant held on standby by written request from the Architect shall be paid for. immediately under work existing before the current project.
The quoted rates will be deemed to include for; 19.2 Where the premises are occupied, this shall be stated and any restrictions on access or timing or
(a) Transportation costs for plant not already available on the site; disposal of debris, and disposition of plant and materials, shall be given.
(b) Site supervision, hire charges, insurances, consumable stores, fuel and maintenance. 19.3 Where the Contractor is required to arrange access to tenanted areas, separately with each
tenant, this shall be stated and the work kept separate from the work in common areas.
A percentage item shall be given to enable the Contractor to quote for the inclusion of
establishment charges, overhead charges, profit and for any further costs imposed by the above
limitations.
20. TEMPORARY WORKS
20.1 Where the Contractor is required to provide, or to take over existing, temporary works,
15. PROVISIONAL AND PRIME COST SUMS descriptions shall include, where appropriate, references to provision and erecting or taking over
and repairing, maintaining (duration stated), adapting (details stated), handing over to the
15.1 The use of the terms ‘Provisional Sums’ and ‘Prime Cost Sums’ shall be made in conformity with Employer or succeeding Contractor or clearing away and making good all works disturbed.
the following definitions unless otherwise provided in the Conditions of Contract:
(a) The term ‘Provisional Sum’ shall mean a sum provided for work or for costs which cannot
be entirely foreseen, defined or detailed at the time the tendering documents are
issued;
6
NK MM 4
11 GENERAL PRINCIPLES 7
APPENDIX “A” to Section 11 - GENERAL PRINCIPLES
Being Classification of Building Services Works into Systems for Billing Purposes.
Systems, together with their equipment, pipework, ductwork, insulation, trunking, ducting, cable trays, conduits and sundries shall be classified as follows and given under appropriate
headings. The wordings in this list are for reference only, and actual wording should follow those used in the drawings and specifications.
DISPOSAL SYSTEMS VENTILATION/AIR-CONDITIONING/HEATING/REFRIGERATION SYSTEMS
Laboratory/Industrial Waste Drainage Sea Water
Sewage Pumping/Treatment Cooling Water
Incineration Plant Chilled Water
Condensate Drainage
PLUMBING AND WATER SUPPLY, AIR, PETROL, FUEL OIL AND GAS SYSTEMS
General Supply/Extract
Sanitary & Laboratory Fittings
Toilet Extract ■
Soil, Waste, Ventilation and Rainwater Pipes
Kitchen Extract
Gutters
Car Parking Extract
Potable Water
Smoke Extract/Smoke Control
Hot and Cold Water
Safety Cabinet/Fume Cupboard Extract
Pressurised Water
Fume Extract
Flushing Water
Anaesthetic Gas Extract
Irrigation
Dust Collection
Grey Water
Air-Conditioning
Fountains/Water Features
Window/Wall/Split Type Air-Conditioning Units
Treated/Deionised/Distilled Water
Air Curtains
Swimming Pool Water Treatment
Air and Gas Supply and Distribution ELECTRICAL SUPPLY/POWER/LIGHTING SYSTEMS
Compressed/Instrument Air Electrical Generation Plant
Medical/Laboratory Gas HV Supply/Distribution/Public Utility Supply
Natural Gas LV Supply/Public Utility Supply
Liquid Petroleum Gas General Lighting and Small Power
Vacuum Extra Low Voltage Supply
Steam DC Supply
Uninterrupted Power Supply
FIRE SERVICES INSTALLATION
Electric Underfloor Heating
Fire Hose Reels
Local Electric Heating Units
Wet Risers
Earthing/Lightning Protection and Bonding
Sprinklers
Deluge
Fire Hydrants
Gas Fire Fighting
Foam Fire Fighting
Fire Detection and Alarm
APPENDIX “A” to Section 11 - GENERAL PRINCIPLES (continued)
Being Classification of Building Services Works into Systems for Billing Purposes.
Systems, together with their equipment, pipework, ductwork, insulation, trunking, ducting, cable trays, conduits and sundries shall be classified as follows and given under appropriate
headings. The wordings in this list are for reference only, and actual wording should follow those used in the drawings and specifications.
COMMUNICATIONS/SECURITY/CONTROL SYSTEMS
Telecommunications
Staff Paging/Location
Public Address/Sound Amplification
Centralised Dictation
Radio/TV/CCTV
Projection ’
Advertising Display
Clocks
Data Transmission
Access Control
Security Detection and Alarm
Earthing and Bonding
Lightning Protection
Electromagnetic Screening
Building Automation including Central Control
HKX SMM 4 8
Ill PRELIMINARIES 9
(See Section 11 — General Principles)
WK SGMM 4 10
Ill PRELIMINARIES 11
(c) General Matters
items shall be given in respect of the following unless they are already covered in the Schedule of Clause Headings given in accordance with item III (b).5.I hereof.
HK MB 4 12
Ill PRELIMINARIES 13
14
Ill PRELIMINARIES 15
29. Removal of Water 1. Keeping the site and all 1. Water levels, where Item C.1 applies. S.1 Dewatering
excavations thereon free known, are stated. requirements, where not
from storm and percolating at the discretion of the
water by pumping or Contractor
otherwise, including any
necessary temporary
drainage and disposal of
water
2. Where springs or Prov’l
running water are likely Sum
to be encountered.
Prov’l
nr of
pumping
hours.
30. Water 1. Water for the Works, Item 1. If made available by the C.1 applies.
including that for Employer, details and
Nominated Sub conditions are stated.
contractors and any
necessary temporary
plumbing and storage
31. Lighting and Power 1. Lighting and power for Item
the Works, including that
for Nominated Sub
contractors and any
necessary temporary
wiring and meters
HDIXCSDUMA4 16
Ill PRELIMINARIES
HX SMIMM 4 18
IV DEMOLITIONS AND ALTERATIONS 19
(See Section 11 — General Principles)
a) Demolitions
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Works involving the D.1 Old materials arising C.1 Giving notice to S.1 Setting aside and
removal of materials from demolitions shall Government Departments storing on site materials
(a) The location of existing buildings to be demolished shall be shown on tender drawings.
containing asbestos, become the property of and Public Utility remaining the property of
(b) Where buildings to be demolished contain prestressed members this shall be stated. toxic, dangerous or other the Contractor unless Companies, if their the Employer or those for
hazardous materials are otherwise stated. installations will be re-use
each given separately affected, and for the
S.2 Method of operation
under a heading. disconnection of services
where by specific means
are deemed to be
M.2 Where old materials
included in the rates. S.3 Employer’s
which have become the
restrictions on methods
property of the Contractor C.2 The rates for works
of disposal of materials
as stated in D.1. hereof involving the removal of
are permitted to be used asbestos, toxic, dangerous S.4 Method of temporary
in work is measured as or other hazardous supports and scaffolding
new, they are so materials are deemed to where of specific means
described. No adjustment include for the provision
S.5 Employer’s
is made to the measured and subsequent removal
restrictions or
quantities of or rates for of protective screens and
requirements in
new work in which such enclosures, unless
sequence of demolitions
old materials are used. separately measured, and
provision of protective
M.3 Shoring and
measures for workmen,
scaffolding incidental to
the public and adjoining
demolitions are given in
properties.
the descriptions of the
items. Other shoring, e.g. C.3 The rates for clearing
to old buildings left away old materials and
standing is given in debris containing asbestos
accordance with item or asbestos products,
IV (d).1 hereof. toxic, dangerous or other
hazardous materials are
deemed to include for
their being deposited in a
dump site approved for
the purpose.
a) Demolitions (continued)
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally (continued) 0.4 Demolition items are
deemed to include:
(a) disposal of materials
other than those
remaining the property of
the Employer or those for
re-use
(b) temporary support
incidental to demolitions.
Other shoring, e.g. to old
buildings left standing
shall be given in
accordance with item
IV (d).1 hereof
2. Demolishing 1. Description of the 1. The level to which Item 1. Materials remaining the M.4 Only temporarily
individual structures structure given, stating structures are to be property of the Employer diverting, maintaining or
the overall dimensions, demolished stated (e.g. sealing off existing
3. Demolishing parts of 2. Materials for re-use
number of storeys, nature down to the top surface services is measured
structures
of the general construction of concrete at the lowest 3. Making good structures under this rule.
4. Clearing the site of and any other relevant floor level).
4. Leaving parts of
all structures details
existing walls temporarily
in position to act as
buttresses
5. Temporarily diverting,
maintaining or sealing off
existing services
HKMM 4 20
IV DEMOLITIONS AND ALTERATIONS 21
(b) Alterations
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 for Demolitions D.1 Old materials arising C. 1, C.2 and 0.3 for S.1 to S.5 for Demolitions
applies equally to this from alterations shall Demolitions apply equally apply equally to this
(a) The scope and location of the work relative to the existing layout, indicating the existing buildings,
Sub-section. become the property of to this Sub-section. Sub section.
shall be shown on tender drawings.
the Contractor unless
M.2 Alterations works C.4 Shoring, scaffolding,
(b) Where buildings in which structural alterations are required contain prestressed members, this shall be otherwise stated. Old
which the Surveyor working platforms and
stated. materials permitted to be
considers would be most temporary supports
used in work measured
conveniently priced on incidental to alterations is
as new are so described.
the site are grouped’ deemed included in the
No adjustment is made to
together and given under items.
the measured quantities
an appropriate sub
of or rates for new work C.5 Alterations works are
heading.
in which such old deemed to include for all
M.3 Alterations works are materials are used. new fixing or jointing
described or grouped materials required.
D.2 Location is stated
according to location.
relative to existing
M.4 Shoring to old building.
buildings etc. left standing
is given in accordance
with Sub-section (d)
hereof.
2. Cutting or enlarging 1. Nominal finished size of 1. Extending finishings Item 1. Treatment around the M.5 Details stated for
openings in old the opening and the type and making good all opening (e.g. inserting inserting new work are
structures and thickness of the old works disturbed is given trimmers, lintols, arches, the equivalent of those
structure stated, enlarged in the description. sills and the like; quoining details required by the
openings are fully up jambs) stated rules for the measurement
described. of the same in other
trades.
M.6 New doors and
windows and the like are
measured in detail in
accordance with the
appropriate rules.
3. Blocking up, or 1. Size of the opening and 1. Extending finishings Item 1. Taking out thresholds, M.5 applies.
partially blocking up the nature and thickness and making good all lintols, arches, cills and
openings in old of the new work stated, works disturbed is given the like, bonding or
structures partially blocked up in the description. otherwise securing the
openings are fully new work to the old
described. structure is given in the
description.
b) Alterations (continued)
CLASSIFICATION TABLE . MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
USS MM 4 22
IV DEMOLITIONS AND ALTERATIONS 23
1. Temporary screens 1. Dimensioned m2 1. Providing and erecting S.1 Design details, where
and temporary roofs description not at the discretion of
2. Maintaining, duration
the Contractor
stated
nr
S.2 Specific requirements
3. Adapting, details stated
in respect of fire ratings,
4. Clearing away and waterproof and dust
making good proofing stated
5. Disposing of rainwater,
details stated
6. Providing temporary
door and window
openings, details
stated
(d) Shoring
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Shoring 1. Position and type of Item 1. Providing and erecting D.1 Shoring is other than C.1 Obtaining licenses S.1 Design details, where
shoring stated, and the temporary support and paying fees and not at the discretion of
2. Taking over existing
nature of the structure to incidental to demolitions providing all necessary the Contractor
shoring and repair as
be shored with sufficient or alterations. wedges, cramps,
necessary
details for identification fastenings and bolts,
stated 3. Maintaining, duration welding and painting is
stated deemed to be included.
4. Adapting, details stated
5. Clearing away and
making good all works
disturbed
6. Cutting holes in the
structure, details stated
HK Mi 4
24
V PILING AND CAISSONS 25
(See Section 11 — General Principles)
(a ) Piling General
(Clauses applicable to all Piling sections)
■ ■4 26
V PILING AND CAISSONS 27
MX SMM 4 28
V PILING AND CAISSONS 29
HK SMMM 4 30
V PILING AND CAISSONS 31
TRIAL PILES
12. Trial piles M.5 Trial piles are C.4 Movement of piling frames S.3 If retention on site of
measured in accordance into position and about the site, Trial Pile Equipment is
with the rules for any necessary excavation or required this is stated.
production piles. filling required to place the
frames, raising or lowering the
frames and any staging, barges
or the like required to support
the frames, are deemed to be
included.
(d ) Cast In-Situ Concrete Piles in Driven Casings (continued)
TEST LOADING PILES
13. Test loading of piles 1. Type of pile and test nr 1. First test loading C.5 Temporary pile caps
load to be applied stated and provision of all
2. Subsequent test
anchors, platforms,
loadings
loading materials and the
like are deemed to be
included.
M SMM 4 32
V PILING AND CAISSONS 33
(e) Bored Piles
(See Section V (a) Piling General)
3. Permanent linings 1. Size, thickness and m M.2 Measured from the C.2 This work is deemed S.2 Backfilling materials
material stated designed level to include:
(a) Fabricating
(b) Protective coating or
surface treatment
(c) Handling, pitching
and installing
(d) Filling voids between
linings and excavated
faces
4. Concrete filling 1. Mix of concrete and m M.3 Measured from the C.3 Any filling required
size of bore cross-section (nr bottom of the bore to the above cut-off level is
stated stated) cut-off level of the pile deemed to be included
/
e) Bored Piles (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
TRIAL PILES
9. Trial piles M.6 Trial plies are C.6 Movement of piling S.5 if retention on site of
measured in accordance frames into position and Trial Pile Equipment is
with the rules for about the site, any required this is stated.
production piles. necessary excavation or
filling required to place the
frames, raising or lowering
the frames and any
staging, barges or the like
required to support the
frames, are deemed to be
included in the item.
HKX SOMMA 4, 34
V PILING AND CAISSONS 35
(e) Bored Piles (continued)
TESTING
HK SBAM 4 36
V PILING AND CAISSONS 37
5. Dollying piles below 1. Size of piles state. m 1. Raking piles measured C.2 The rates are deemed
ground (nr separately and degree of to include for provision
stated) rake stated and use of dollies.
11. Test loading of piles 1. Type of pile and test nr 1. First test loading C.6 Temporary pile caps
load to be applied and provision of all
2. Subsequent test
stated anchors, platforms,
loadings
loading materials and the
like are deemed to be
included.
OX SMMM 4 38
V PILING AND CAISSONS 39
g) Caissons
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
CAISSON EXCAVATION
CAISSON LININGS
5. Caisson linings 1. Fully described with the m M.3 Linings are measured
minimum internal from the level at which
diameter stated shaft excavation
commences.
6. Bottom kerbs 1. Fully described nr
7. Steel rings at bottom 1. Fully described nr
8. Linings to enlarged 1. Fully described nr
bases
9. Breaking up the 1. Minimum internal m C.3 Any necessary
lining above finished diameter of the lining (nr excavation and clearing
casting level of the stated stated) away is deemed to be
concrete core included in the item.
HKK MM 4 40
V PILING AND CAISSONS 41
(g) Caissons (continued)
CAISSON CORES
14. Test loading of 1. Type of caisson and test nr 1. First test loading C.6 Temporary caisson
caissons load to be applied stated caps and provision of all
2. Subsequent test
anchors, platforms,
loadings
loading materials and the
like are deemed to be
included in the item.
42
V PILING AND CAISSONS 43
h) Diaphragm Walling
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally
The following general information, where available, shall be given:
(a) Ground level in relation to high and low water tables and Ordinance Principal Datum
(b) Soil investigation reports, nature of strata and details of any bore holes
(c) The various levels from which work is expected to begin
(d) Irregular ground is so described
(e) Conditions under which Contractors will be permitted to carry out their own soil investigations during
the tender period
(f) Details of special provisions in respect of noise suppression, noisy working and time limitations
other than Statutory requirements
(g) Any particular requirement regarding phasing or sequence of working
4. Items extra over 1. Breaking out bedrock m3 C.3 This work is deemed
excavation to include for any over
excavation to be filled with
material as specified.
5. Walls 1. Concrete 1. Thickness of wall stated m3 M.2 Measured from S.3 Materials and mix
specified cut-off level to details
founding level S.4 Tests
6. Reinforcement M.3 Reinforcement is
measured in accordance
with the rules for reinforced
concrete in Section VII
Concrete Works
7. Cutting off to 1. Thickness of wall stated m C.4 Cutting off to specified
specified level level is deemed to include
for provision and filling of
working space and
disposal.
8. Trimming and 1. Details stated m2
cleaning face of
diaphragm wall
9. Waterproof joints 1. Type and method stated m M.4 Waterproof joints are
only measured where
they are specifically
required.
10. Guide walls 1. One side 1. Limitations on design m M.5 The lengths measured C.5 Excavation, disposal, S.5 Limitations on
and construction stated for guide walls are those support, concrete, methods of disposal
2. Both sides
of the diaphragm walls. reinforcement, formwork
and the like deemed to be
included.
C.6 Removal and disposal
of guide walls and any
consequent excavation,
backfilling or removal
deemed to be included.
11. Ancillary work in 1. Preparing cast in nr C.7 Preparing cast in
connection with pockets or chases at pockets or chases is
diaphragm walling junctions, details stated deemed to include for
m removing formwork and
preparing cast in
reinforcement.
12. Tests 1. Details stated nr S.6 Timing and details of
tests
MKX SGVMJ 4 44
VI EXCAVATION 45
(See Section 11 — General Principles)
a) Excavation
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Site clearance 1. Cutting down trees 1. Girth 0.60 -0.90 m nr M.1 Tree girths are C.1 This work is deemed S.4 Filling materials
measured at a height of to include;
2. Cutting down trees 2. Girth in further stages
1.00 m above ground.
which are not in an open of 0.30 m (a) Grubbing up roots
site area or are in an area
(b) Disposal of materials
without vehicular access,
details stated (c) Filling voids
3. Removal of existing tree 1. Described nr
stumps, where trees have
been cut down by others
4. Clearing site of tall 1. Approximate area stated Item
grass, shrubs, bushes,
and the like and trees <
0.60 m girth
5. Cutting turf to be 1. Average depth stated m2 1. Method of storing and
preserved preservation and location
where turf is required to
be stacked stated.
6. Stripping top soil for m2 1. Method of storage and
preservation location stated
a) Excavation (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Site clearance 7. Disposal of existing 1. Removal from site to a Item C.2 This work is deemed
(continued) spoil heaps or rubbish specified dumping area to include for:
dumps left by previous provided by Employer
(a) Excavating from the
contractors
2. Removal from site to a spoil heaps
tip provided by Contractor
(b) All multi-handling to
and from temporary spoil
heaps as and if
necessary
(c) Transport to specified
dump area; or provision
of, and transport to
shoot, dump or tip
3. Excavating 1. Surface excavation < 1. Average depth stated m2 M.2 In measurement of D.1 The term planking C.3
0.20 m in average depth excavation, an additional and strutting means
(a) This work is deemed
allowance for working everything requisite to
to include for excavating in
space is included as uphold the face of
any ground encountered,
follows: excavation other than
getting out excavated
shoring as required to be
(a) 0.25 m from the face materials by any means
measured under item
of concrete requiring necessary, all levelling or
formwork where the (a).5 hereof and covers
grading and ramming
formwork does not exceed the Contractor’s
bottoms, trimming sides,
0.60 m in height responsibility for
planking and strutting and
upholding and maintaining
(b) 0.60 m from the face any extra excavation
the sides of earthwork by
of concrete requiring required therefor.
whatever means are
formwork where the considered necessary. (b) See item (a).5 hereof
formwork exceeds 0.60 m
for temporary shoring and
in height and the bottom
supports for excavation
of the formwork exceeds
into banks for retaining
0.60 m below the starting
walls and similar
level of the excavation
constructions with a face
(c) 0.60 m from the height > 1.50 m.
finished face of work
below ground level where (c) Any additional
externally applied damp excavation for working
proof coverings or space, to that included in
protection walls are M.2, that the Contractor
required or where the may consider necessary
method of construction and for the subsequent
requires workmen to backfilling.
operate from the outside
M.3 Disposal of excavated
materials are measured
separately.
SUK MM 4 46
VI EXCAVATION 47
a) Excavation (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3. Excavating 2. Excavation to reduce m3 M.2 and M.3 apply. D.1 applies. C.3 applies.
(continued) levels over site > 0.20 m
M.4 The quantities given
in average depth
are the bulk before
excavating and no
allowance is made for
subsequent variations to
bulk or for extra space
beyond the allowances
made below.
3. Excavation to reduce m3 M.2, M.3 and M.4 apply
levels into sides of banks
4. Basements and similar 1. In successive stages of m3 1. Commencing levels M.2, M.3 and M.4 apply.
excavations 1.50m stated.
M.5 Basements and
similar excavations are
measured to the outside
of the foundations,
subject to M.2 (working
space clause) hereof;
existing voids are
deducted.
5. Surface trenches m3 M.2, M.3 and M.4 apply.
M.6 Where trenches
exceed 1.00 m in depth a
minimum width of 0.75 m
is measured.
6. Trenches below m3 M.2, M.3, M.4 and M.5
basement level apply-
7. Excavation for column m3 M.2, M.3 and M.4 apply.
or stanchion bases,
M.7 Where these
isolated piers, manholes
excavations exceed
and the like, each given
1.50 m in depth a
separately
minimum measurement
on plan of 1.25 m x 1.25 m
is taken for excavation.
8. Post holes < 0.30 m3 nr C.3 applies. S.2 applies.
C.4 Backfilling and
disposal of surplus
excavated material are
deemed to be included.
a) Excavation (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3. Excavating 9. Trenches for curbs and 1. Average depth stated in m 1. Trenches for curbs and D.1 applies. 0.3 and C.4 apply. S.2 applies.
(continued) the like multiples of 0.25 m the like without beds, and
those to be laid on beds
2. Size of curbs and the
are each measured
like stated ■
separately, and
commencing levels
stated.
10. Trenches for service 1. Average depth stated in m 1. Trenches for pipes NOTE: Trenches for drain
pipes, cables and the like multiples of 0.25 m without beds, and those to pipes and for pipe ducts
be laid on beds are each are measured under
2. Pipes or cables < 55
measured separately and Section IX Drainage.
mm diameter
commencing levels
3. Pipes or cables > 55 stated.
mm and < 110 mm
diameter
4. Pipes or cables > 110
mm diameter, sizes stated
HR SIMIMI 4 48
VI EXCAVATION 49
a) Excavation (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
5. Temporary shoring 1. For sides of excavation 1. Minimum and maximum Item C.6 This work is deemed S.2 applies.
and supports into banks for retaining face heights above to include for any extra
walls or similar reduced level and excavation required
constructions, with face approximate overall therefor and for the
height > 1.50 m length stated subsequent backfilling.
6. Disposal 1. Of excavated material 1. Deposited on site m3 1. Specified locations, M.4 applies. C.7 The work is deemed
details stated to include for all multi
2. Of existing spoil heaps
handling to and from
or rubbish dumps left by
temporary spoil heaps as
previous contractors
and if necessary.
2. Removed from site to a m3 1. Dumping area stated C.8 This work is deemed
specified dumping area to include for:
provided by Employer
(a) All multi-handling to
and from temporary spoil
heaps as and if necessary
(b) Transport to specified
dump area
3. Removed from site to a m3 C.9 This work is deemed
tip provided by Contractor to include for:
(a) All multi-handling to
and from temporary spoil
heaps as and if necessary
(b) Provision of, and
transport to, shoot, dump
or tip
a) Excavation (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
7. Backfilling to 1. < 0.30 m in depth, 1. Arising from excavation m2 1. Selected, details stated M.8 Filling into C.7 applies. S.5 Method of
excavation average depth stated excavations is measured compaction
2. Obtained from materials 2. Special filling materials,
2. > 0.30 m in depth as equal to the void to be
on site details stated S.6 If deposited and
m3 filled.
(where part exceeds 0.30 compacted in layers this
3. Obtained from specified 3. Top soil
m in depth, the whole is is stated, giving thickness
off-site area
given cube) 4. Fabricated, details of layers.
4. To be provided by stated
Contractor from his own
sources
8. Filling to make up m2 M.9 Filling to make up
levels or for forming levels or for forming
embankments or m3 embankments or terraces
terraces is measured after
9. Filling into planters m3
compaction.
and the like, positions
stated if not at ground
level
10. Hardcore or granular 1. < 0.30 m in depth 1. Beds m2 M.9 applies. S.5 and S.6 apply.
filling
2. > 0.30 m in depth, 2. Handpacked vertical m3 M.10 Thickness of beds S.7 Kind and quality of
(where part exceeds 0.30 beds and filling to make up material
m in depth, the whole is levels etc. is measured
3. Handpacked beds
given cube) after compaction.
sloping > 15° from the
horizontal
4. Filling to make up levels
11. Handpacking slopes m2
and vertical faces of
hardcore or other filling
materials
12. Blinding to surfaces m2 1. Materials to be used
of hardcore or other stated
filling materials
NDX Mi 4 50
VI EXCAVATION 51
HOKX SMM 4 52
VI EXCAVATION 53
(b) Underpinning
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Underpinning work,
including concrete,
A description of the work to be underpinned shall be given, stating the length, the depth of the underpinning
brickwork, tanking and
and the limit of the length to be carried out in one operation.
the like is given under a
separate heading.
3. Excavation 1. Preliminary excavation 1. In successive stages of m3 1. From one side only M.2 and M.4 of Sub-section D.1 of Sub-section (a) C.3 of Sub-section (a) S.2 Physical restrictions
down to the base of work 1.50 m, commencing (a) hereof apply. hereof applies. hereof applies. if known and any
2. From both sides
to be underpinned levels stated design constraints
M.2 Allowances for D.2 The commencing
stated
2. Excavation below the working space are made level is defined as the
base of work to be in measurement of commencing level of the
underpinned excavation. The width of preliminary excavation.
the working space
(measured horizontally
from the face of the wall
to be underpinned, or
where projecting
foundations are to be
retained, from the face of
such projection) shall be
related to the depth of the
excavation (measured
from the commencing
levels to the underside of
the underpinning work).
The allowances are made
as follows, irrespective of
any physical restriction or
design constraints:
(a) 1.00 m from the wall
or projecting foundation
where the total depth of
the excavation does not
exceed 1.50 m
(b) 1.50 m from the wall
or projecting foundation
where the total depth of
excavation exceeds
1.50 m but does not
exceed 3.00 m
(c) 2.00 m from the wall
or projecting foundation
where the total depth of
the excavation exceeds
3.00 m
OK SMAM44 54
VI EXCAVATION 55
b) Underpinning (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES . INFORMATION
1. Generally M.1 Labours to existing C.1 Each item of concrete S.1 Composition and mix
work are measured. work is deemed to include (or strength requirement)
for forming grooves (other of the concrete
M.2 All concrete work is
than in fair faced concrete
measured cube except S.2 Particulars of any
to form ornamental
as hereinafter provided. tests required, both of
features), chases, mortices,
materials and the finished
M.3 Thickness of beds, grouting in balusters,
work
slabs, walls and the like bolts, dowels and the like
is stated. with cement, holes for S.3 Requirements for
pipes, etc., < 150 mm compaction
M.4 Any treatment of the
diameter, openings < S.4 Requirements for
face of concrete, other
0.025 m2 sectional area, placing in position by a
than that required by
and the required steel particular method, or
Sub section (d) C.3
trimming bars to these pouring at stated speeds.
hereof, beyond ordinary
holes and openings and Work to which these
depositing, spreading and
making good and any requirements apply given
levelling are measured
separately and given other sundry items of a separately
super. like nature.
C.2 Reinforced concrete
M.5 Reinforced concrete
is deemed to include for
and watertight reinforced
vibration.
concrete are each given
separately.
M.6 Concrete in casing to
structural steelwork is
given separately.
M.7 Plain concrete
required to be vibrated is
so described.
(a) Concrete (continued)
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
HK SMMIM 4 58
VII CONCRETE WORKS 59
HK SMIM 4 60
VII CONCRETE WORKS 61
HK SMM 41 62
VII CONCRETE WORKS
28. Structural movement 1. Between two wall faces 1. Descriptions include m2 1. Plane M.20 Water stops in
joints steel dowels, formwork, structural movement
2. Curved
fillers, temporary fillets joints are measured
and surface coatings and separately under item
formation of rebates or (a).31 hereof.
other labours.
2. In beds 1. Sizes stated, m 1. Straight
descriptions include steel
3. In suspended slabs 2. Curved
dowels, formwork, fillers,
4. In walls temporary fillets and
surface coatings and
5. In beams
formation of rebates or
6. In columns other labours.
7. Across beams 1. Sizes stated, or where nr
there are a large number
8. Across curbs
of similar items, the items
9. Similar items may be grouped in ranges
of sizes, descriptions to
include steel dowels,
formwork, fillers,
temporary fillets and
surface coatings and
formation of rebates or
other labours.
32. Accessories and 1. Bonding ties 1. Dimensioned description m2 1. Spacing dimensions M.22 Cast-in accessories D.3 Cast-in accessories C.11 Perforations or S.5 Kind and quality of
sundry items cast into stated are normally enumerated. exclude reinforcement, recesses in formwork materials and sizes or
2. Steel angle column m
in-situ concrete Linear or area measure tying wire, distance deemed to be included manufacturer’s
guards
may be used provided blocks, spacers, chairs, references
nr
3. Spout or weep pipes that any appropriate structural steelwork,
spacing dimensions are hollow blocks and fillers
4. Step irons
given in descriptions. blocks, permanent
5. Others, details stated formwork, joints and all
components around which
concrete is cast, but
which are not fixed by the
Concretor (e.g. electrical
and plumbing
components, doors and
windows etc.).
HKG SUM 4, 64
VII CONCRETE WORKS 65
(c) Reinforcement
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Bar reinforcement 1. Nominal size stated 1. General reinforcement kg 1. Round bars C.1 Variations in weight
due to rolling margin
2. General reinforcement 2. Indented bars
deemed to be included
> 12 m in length, given in
3. Square bars
stages of 3 m C.2 Cutting to lengths,
and bending deemed to
3. Links, stirrups and
be included
binders
C.3 Tying wire, precast
4. Spacers and chairs
concrete or proprietary
designed by the Engineer
spacer blocks and chairs
5. Helical reinforcement and supports (other than
spacers, chairs and
6. Reinforcement bent to
supports designed by the
curve
Engineer) and ordinary
spacer rods deemed to
be included
1. Generally M.1 Except where D.1 Formwork left-in is C.1 All formwork is S.1 Kind and quality of
otherwise stated, that which is not designed deemed to include all materials and propping
formwork is measured to to remain in position but is necessary materials and requirements for
concrete surfaces of the nonetheless impossible to work for erection, permanent formwork
finished structure which remove. supporting, easing,
S.2 Construction and/or
require support during striking and removal, and
D.2 Permanent formwork lining of formwork which
casting. for re-propping as
is that which is designed is not at the discretion of
required.
M.2 Formwork is to remain in position. the Contractor.
measured super except C.2 Coating with release
S.3 Kind and quality of
as hereinafter provided. agents is deemed to be
the formed finishes
included in the rates for
M.3 No deductions made required
formwork.
for openings < 1.00 m2.
S.4 ‘Formwork to produce
C.3 'Formwork to produce
M.4 Formwork left-in and formed finishes’ being
a formed finish’ is deemed
permanent formwork are formwork required to
in addition to include for
each measured produce certain
all necessary sheet lining
separately, except where standards of finishes
materials, forms or linings
more detail is required in
and treating the face of S.5 ‘Specified Formwork'
item (d).5 and 6 hereof.
the concrete to produce being formwork which is
M.5 Formwork to produce the required formed finish. not at the discretion of
a formed finish is the Contractor, i.e. the
C.4 Formwork is deemed
measured separately and Engineer/Architect may
to include for splayed
the finish described. specify the construction
edges, notchings,
and/or lining materials.
allowance for overlaps
and passings at angles,
battens, fillets for chases,
recesses, chamfered
edges and the like and
splayed angles.
HKK SMMIMMU 4 66
VII CONCRETE WORKS
2 . Soffits of slabs 1. Slab thickness < 200 1. Horizontal m2 1. Height to soffit < 3.50 m M.6 The heights of soffits D.3 Formwork to soffits of
mm 2. Thereafter in 1.50 m are measured from the slabs includes formwork
3 Soffits of landings 2. Sloping
structural concrete level, to landings occurring at
2. Slab thickness > 200 stages
3. Curved or from the existing floor levels.
mm - thickness stated in
ground, or formation level
further stages of 100 mm 4. Curved in more than
immediately below the
one direction
soffit.
HK SMM 4 68
VII CONCRETE WORKS
11. Edges and soffits of 1. Straight 1. Girth stated in stages of m M.11 Where these
copings, cills, strings, 100 mm features occur as
2. Curved
cornices, eaves projections on walls,
overhangs, and the like beams and similar
< 0.50 metre wide, surfaces the formwork to
grouped together them is measured as
extra over the formwork
to the principal surface
from which they project.
12. Rounded or moulded m C.5 Stops deemed to be
edges of concrete included
13. Fillets planted on 1. Described and size m
form work to form stated
grooves
14. Small surfaces such 1. These small items to be nr
as cantilever ends, covered by the general
brackets, ends of steps, description and all added
caps and bases to together
pilasters and columns
and the like
15. Forming holes for 1. Thickness of concrete nr
pipes, cables and the and size of pipe or cable
like, > 150 mm etc. stated
diameter
16. Boxings for 1. Thickness of concrete nr
openings > 0.025 m2 and size in stages of
and < 1.00 m2 sectional 0.10 m2.
area
17. Formwork in complex 1. Dimensioned nr
shapes description
2. Dimensioned diagram
e) Precast Concrete Work
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Reinforcement is C.1 All moulds are S.1 Bedding and fixing
described and included deemed to be included in
S.2 Surface finishes
with the item. the item.
M.2 All units > 2.00 m long C.2 Precast concrete
are given separately and items are deemed to
the number stated. include for any additional
reinforcement not
detailed but deemed
necessary by the
Contractor for handling
purposes.
HK SDMM 4 70
VII CONCRETE WORKS 71
3. Ducts and grouting 1. Number and size of 1. Sheathing or other m 1. Straight ducts M.5 Ducts over 6.00 m C.1 Provision of supports
ducts stated, number and material used in the long are so described to the material used in the
2. Curved ducts
diameter of tendons to be formation of the ducts stating the length in formation of ducts, and
enclosed stated described and details of further stages of 3.00 m. the forming and grouting
grouting given of air holes deemed to be
included
4. Tendons 1. Supplying tendons, kg . M.6 Measured net lengths
ultimate strength and between outer faces of
size of tendon stated anchorages
M.7 Each size given
separately
2. Fixing tendons, length, nr C.2 Degreasing,
size and type stated and straightening, cutting to
type of sheathing (if any) lengths and assembling
stated tendons deemed to be
included
3. Tensioning each nr 1. Tensioned from one end C.3 Cutting off ends
tendon, size, length and deemed to be included
2. Tensioned from both
jacking force stated
ends
HDIXCSOBV4 72
VII CONCRETE WORKS 73
NKK SMOM 4 74
VIII BRICKWORK AND BLOCKWORK 75
(See Section 11 — General Principles)
HKXC SMMA 41 76
VIII BRICKWORK AND BLOCKWORK 77
17. Cutting and bonding 1. Both walls described m C.5 Work is deemed to
walls of different include for additional
construction materials and all cuttings.
18. Labours to existing 1. Labour and materials 1. Thickness and nature m M.7 Labours to existing
brickwork or in cutting, toothing and of walls stated brickwork or blockwork
blockwork bonding new walls to are given separately.
existing
2. Preparation of existing
walls for raising
19. Reinforcement in 1. Material and width m
brickwork or blockwork stated
20. Damp-proof courses 1. Material and thickness 1. Courses > 225 mm m2 1. Horizonta
(except asphalt) stated wide
2. Vertical
3. On curved walls
(description includes all
extra cutting)
2. Courses < 225 mm m
wide, width stated
21. Flues 1. Flue linings, described 1. Description includes for m M.8 No deduction is made
all bends and easings for flues, lined flues or
formed by cutting flue blocks where the
brick flue is < 0.25 m2 in
sectional area
22. Firebrick linings to 1. Thickness stated 1. Description includes m2
flues etc. and describes bonding
to backing if required
23. Sundry items built in 1. Building in sundry items, 1. Thickness of wall nr 1. Dimensioned S.19 Kind and quality of
or attached to brickwork described stated, description description materials and sizes or
or blockwork, type or includes formation of manufacturer’s reference
2. Plugging and screwing
name stated opening and lintol
sundry items to brickwork
or blockwork, described
3. Shot firing sundry items
to brickwork or blockwork,
described
UK SMMI 4 78
VIII BRICKWORK AND BLOCKWORK 79
1. Generally M.2 of Sub-section (a) C.1 The work is deemed S.1 Kind and quality of
hereof applies. to include: materials
(a) Fair joints S.2 Size, shape and
thickness of units
(b) Working over and
around obstructions S.3 Nature of base
(c) Cutting S.4 Preparatory work
(d) Bedding mortars S.5 Bedding
(e) Grouting S.6 Treatment of joints
HKWW
IX DRAINAGE (including Underground Pipe Ducts) 81
(See Section II — General Principles)
2. Excavating trenches 1. Pipes < 200 mm diameter 1. Total depth stated in m 1. Trench for pipes C.1 Grading bottoms, filling in S.5 Description of any
for drain pipes stages of 1.50 m, (i.e. < without beds and ramming, disposal of special backfilling
2. Pipes > 200 mm diameter,
1.50 m total depth, > surplus excavated material materials required
size stated 2. Trench for pipes on
1.50 m and < 3.00 m and any planking and strutting
beds
3. More than one pipe, pipe total depth, etc.) required are deemed to be
sizes stated average depth stated 3. Trench for pipes on included.
in multiples of 0.25 m, beds and surrounds
3. Excavating trenches 1. Pipes < 200 mm diameter m
and commencing level
for pipe ducts
2. Pipes > 200 mm diameter, stated
sizes stated
3. Multiple pipes or clusters
of pipes described
4. Concrete beds 1. Diameter of pipe and 1. Details and spacing m C.2 Beds, haunchings and
dimensions of concrete of any movement coverings are deemed to
5. Concrete benchings
stated joints stated include for formwork.
6. Concrete coverings
2. If more than one pipe, the
dimensions of each pipe
stated
3. Multiple pipes or clusters
of pipes described
7. Drain pipes 1. Intrenches 1. Nominal size given m 1. Description given of M.1 Pipes are measured C.3 Work is deemed to S.6 Method of jointing
any wrapping required net length as laid, over all include for short lengths and and supports for pipes
2. In ducts below ground or
bends, junctions and jointing, provision of loose and ducts
below floors
similar fittings. collars and similar items, for
jointing materials and pipe
supports.
8. Pipe service ducts m C.3 applies.
C.4 Pipe service ducts are
deemed to include for slow
bends and for draw wires.
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
9. Items extra over the 1. Bends 1. Dimensioned description, nr C.5 Pipe fittings are S.7 Method of jointing
pipes in which they any wrapping described deemed to include for fittings to pipes
2. Junctions
occur extra joints and cutting on
3. Diminishing pipes pipes.
4. Connectors
5. Adapters
6. Mechanical ball joints
7. Puddle flanges
8. Other fittings
10. Pipe accessories 1. Gullies 1. Dimensioned description nr D.1 Accessories include C.6 Accessories are S.8 Method of jointing
given gullies, traps, grease deemed to include for accessories to pipes
2. Traps
interceptors, inspection connections to drains and
3. Others shoes, fresh air inlets, bedding in concrete.
non-return flaps and the
like.
11. Brick or concrete 1. Dimensioned description nr
piers given
12. Concrete thrust
blocks
13. Manholes nr M.2 Where of a standard C.7 Items are deemed to
design, these items include:
14. Inspection chambers
enumerated and fully
(a) Connections of drains,
15. Soakaways described, description
and cutting
includes covers, step
16. Others
irons and intercepting (b) Bedding and
traps. haunching manhole cover
frames and setting the
M.3 Alternatively, where
covers
not of standard design
they are measured in the (c) Bedding and
same way as items 17 to surrounding intercepting
22 hereof. traps with concrete and
setting stoppers in lime
cement
MTXSMAD4 82
IX DRAINAGE (including Underground Pipe Ducts) 83
24. Items extra over any 1. Breaking up and 1. The thickness, if known, m2 C.10 This work is deemed
type of excavation removing pavings, surface stated to include for additional
concrete and the like cost of disposal.
2. Breaking up and m3 1. Extra over any
removing brickwork or excavation irrespective of
blockwork and the like depth
met with in excavation
3. Breaking up and m3
removal of stone masonry
walls or slab foundations
and the like met with in
excavations
4. Breaking up m3
unreinforced concrete
and the like met with in
excavations
5. Breaking up reinforced m3
concrete met with in
excavations
25. Connections with Prov’l
public sewers
Sum
26. Testing drains Item S.9 Details stated
HR SMMIM 4 84
X WATERPROOFING (See Section II — General Principles) 85
(a) Asphalt
b) Liquid Membrane Waterproofing
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Work required to be C.1 Work is deemed to S.1 For asphalt work, the
carried out in sections, include: kind and quality of
such as in underpinning (a) Carrying out the work materials including
and to retaining walls, is at any height underlays and
given separately. (b) All temporary rules reinforcement, thickness
(c) Laying to falls and and number of coats and
M.2 No deduction is made
currents, and intersections preparation of underlying
for voids < 0.50 m2.
to work to falls and surfaces
currents
S.2 For liquid membrane
(d) All narrow widths,
work materials are fully
arrises, fair and rounded
described including
edges and turn-ins
priming, number of coats,
(e) Laps, cutting, notching bonding between coats,
and bending of underlay preparation of underlying
and reinforcement surface and any surface
(f) Work carried out in treatment of final coat.
sections is deemed to
include for jointing
between sections
(g) Working to metal or
other flashings and
working against frames of
manhole covers, duct
covers and the like
2. Coverings to 1. Tanking and m2 1. Horizontal M.3 Work is measured the D.1 Work in confined C.2 Roof ventilators S.3 Details and spacing
surfaces damp proofing net area covered. situations is defined as deemed to be included of roof ventilators
2. Sloping
where at least 0.60 m
2. Roof coverings
3. On soffits working space cannot be
provided.
4. Vertical
D.2 Work inclined to more
5. Curved
than 15° to the horizontal
6. Executed overhand is described as sloping, if
not more than 150 it is
7. Executed in confined
included with horizontal.
situations
(a ) Asphalt (continued)
b) Liquid Membrane Waterproofing (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
HK Wi 4 86
X WATERPROOFING 87
(a ) Asphalt (continued)
b) Liquid Membrane Waterproofing (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
19. Solar protection by 1. Application rates of 1. Size of stone chippings m2 S.4 Method of application
dressing with bitumen bitumen and stone stated
and application of stone chippings stated
chippings
20. Application of 1. Number of coats stated m2
reflective paint to
asphalt surfaces
21. Testing Item S.5 Details stated
(c) Felt Roofing
(d) Sheet Membrane Waterproofing
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 No deduction is made C.1 Work is deemed to S.1 Kind and quality of
for voids < 0.50 m2. include: materials, including
underlays, description of
(a) Carrying out the work
each layer, type of
at any height
bonding between layers,
(b) All narrow widths nature and preparation of,
and method of fixing to,
(c) Laying to falls and
the underlying surface
currents
(d) Laps, cutting, notching
and bending of underlay,
felt and membranes and
turn-ins
NK Mi 4 88
X WATERPROOFING
(c) Felt Roofing (continued)
d) Sheet Membrane Waterproofing (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Labours to existing C.1 Stone works are S.1 Kind and quality of
work are measured. deemed to include all materials, and for rubble
cuttings and labours, walling whether random
M.2 Curved work is
hoisting, setting, jointing or squared stones, built
measured the mean
and pointing. with or without mortar. If
length.
built dry, without mortar,
C.2 Uncoursed work is
M.3 Granite, marble or whether the interstices
deemed to include
slate tiling is measured in are filled with stone
levelling the top.
accordance with Section chippings or spalls
XVI (e). C.3 Work is deemed to
S.2 The nature of the
include bedding and
face finish
pointing frames.
S.3 Composition and mix
of mortar
S.4 Thickness of joints
and type of pointing
2. Walling 1. Wall thickness stated 1. Walis faced one side m2 1. Random rubble M.4 Building against other C.4 Walls built against
work is measured where other work are deemed to
2. Walls faced both sides 2. Random rubble brought
the other work is existing include for all necessary
up to courses (average
3. Curved walls or consists of a differing cutting.
height of courses stated)
4. Built against other work material.
C.5 The finish on exposed
3. Squared and coursed
M.5 Deductions are edges of walls are deemed
rubble walling, (height of
measured the nett sizes to be included.
courses stated, if in
of openings and recesses.
regularly diminishing
No deductions is made
courses the maximum
for openings < 0.10 m2.
and minimum height of
Deductions are made for
courses stated)
string courses, cills, lintols
4. Dressed walling, and the like > 100 mm
described high.
3. Items measured 1. Attached columns or 1. Width and depth of m
extra over walling piers projection stated
(a) Stone Construction (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
HX SMUBV 4 92
XI STONE WORKS 93
(b) Stone Facings to Structural Backgrounds (including Cast Stone, Marble and Granite)
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Work is measured, D.1 Internal and external C.1 The work is deemed S.1 Kind and quality of
unless otherwise stated, work are each measured to include: materials
the nett unplastered area separately. (a) Fair joints S.2 Size, shape and
covered. (b) Working over and thickness of units
D.2 The thickness stated
M.2 No deductions are is the thickness exclusive around obstructions S.3 Nature of base
made for voids < 0.50 m2. of keys, grooves and the (c) Additional labour for S.4 Preparatory work,
like. overhand work bonding agents and
M.3 Work to ceilings and
(d) Cutting coating backs
beams over 3.50 m
above floor (measured to (e) Drainage holes S.5 Nature of finished
ceiling level in both (f) Preparatory work, surface, including any
cases) is so described, bedding mortars, sealing and/or polishing
stating the height in adhesives, bonding S.6 Treatment of joints
further 1.50 m stages. agents and additives S.7 Layout of joints
M.4 Curved work is so (g) Fixing devices S.8 Mechanical fixing
described. (h) Coating backs and devices with spacing
cleaning, sealing and stated
polishing faces S.9 Adhesives
HDX WM 4 94
XI STONE WORKS 95
(b) Stone Facings to Structural Backgrounds (including Cast Stone, Marble and Granite) (continued)
8. Strings 1. Height or width stated 1. Girth on face stated m C.5 Strings and aprons
are deemed to include
9. Aprons
for fair edges, rounded
and bullnosed edges,
ends, angles and ramps.
10. Linings to channels 1. Horizontal m C.6 Linings to channels
are deemed to include
2. To falls
arrises, rounded edges,
coves, ends, angles,
intersections and outlets.
11. Skirtings 1. Height stated m 1. Raking C.7 Skirtings and kerbs
are deemed to include fair
12. Kerbs 1. Height and width stated m 2. Following profile of
edges, rounded edges,
treads and risers
ends, angles and ramps.
13. Bands in walls 1. Decorative bands 1. Described m 1. If set in walls or floors
of a different material
14. Bands in floors 2. Bands recessed from
this is stated
general surface
3. Bands projecting from
general surface
4. Bands of differing
finished surface from
general surface
15. Panels in walls 1. Decorative panels nr
16. Panels in floors 2. Panels recessed from
general surface
3. Panels projecting from
general surface
4. Panels of differing
finished surface from
general surface
17. Split or polished M.5 Measured in
granite, marble or slate accordance with Section
tiling XVI (e)
(b) Stone Facings to Structural Backgrounds (including Cast Stone, Marble and Granite) (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Manufacturer’s
reference
19. Items extra over the 1. Special units m D.3 Special units include
work in which they non-standard units to
2. Access units
occur produce fair edges,
nr
3. Isolated special units internal and external
angles, moulded edges
and coved junctions.
IMii 96
XII ROOF TILING 97
(See Section 11 — General Principles)
2. Roof tiling 1. The base on which the 1. Pitch, lap and mix of m2 1. Single course, single C.2 Work is deemed to
tiling is laid and method mortar stated layer include:
of fixing stated
2. Single course, double (a) All cutting at
layer abutments, top edges,
verges and the like
3. Double course, single
layer (b) Bedding and pointing
eaves, verges and the
4. Double course, double
like
layer
(c) Fitting and making
good around outlets,
pipes and the like
3. Items measured as 1. Eaves courses m C.3 Work is deemed to
extra over tiling include fair ends, stop
2. Ridges
ends, intersections and
3. Hips the like.
4. Valleys
5. Verges
-
4. Ornamental tiles 1. Fully described nr
(b) Proprietary Roof Tiling
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Work is measured C.1 Each item is deemed S.1 Kind, quality and size
nett area covered. to include for carrying of materials
out the work at any
M.2 Sloping work, vertical
height and for all narrow
work and curved work are
widths.
each given separately.
M.3 No deduction is made
for voids < 0.50 m2.
HKC MM 41 98
XIII WOOD WORKS 99
(See Section 11 — General Principles)
1. Generally M.1 All sizes stated are S.1 Thickness, kind and
finished sizes. quality of materials
M.2 No deduction is made S.2 Preservative
in items measured treatments applied as
superficially for voids < part of the production
0.50m2. processes
M.3 Curved work is so S.3 Matching grains
described.
S.4 Work to be selected
M.4 Sawn and wrought and/or kept clean for
timbers are each given staining and polishing
separately.
M.5 Unless otherwise
stated, all work is
measured nett as fixed in
place and no allowance is
made in measurement for
laps and joints.
HDX MM 4 100
XIII WOOD WORKS 101
(c) Flooring
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Block flooring 1. Sizes of blocks or 1. Traversing for and m2 M.3 Floors are measured C.1 Floors bedded in S.1 Nature of base
parquet fingers, pattern, nature of polishing stated nett area covered mastic or adhesive are stated
2. Parquet flooring
method of jointing and (measured over borders deemed to include the
bedding materials stated as item (c).6 hereof). mastic or adhesive.
3. Parquet flooring in 1. Sizes of fingers, pattern, m2 C.2 Where described as
preformed panels method of jointing, size on backing and/or
and description of panels moisture resisting
and bedding materials membranes, these are
stated deemed included.
4. Strip flooring 1. Width and thickness of 1. Where strip flooring is C.3 Sub-bases and batten
m2
strips, method of jointing fixed to battens, the systems are deemed to be
and fixing to sub-base battens and method of included.
material, bedding fixing them and fixing the
materials or battens strips to the battens is
described.
2. Alternatively, where the
batten system is a
proprietary one a
catalogue reference is
given.
5. Nosings 1. Described, if tongued to m
flooring this is stated
6. Items measured extra 1. Borders 1. Described m M.4 Borders are measured
over block parquet or the mean girth.
strip flooring
7. Accessories 1. Movement joints 1. Dimensioned m D.1 Movement joints S.2 Method of fixing
description include expansion joints.
2. Cover strips
3. Dividing strips
8. Access traps 1. Described nr
9. Mat wells
(d) Raised Access Floors
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Floors 1. Thickness of panels 1. Height of cavity stated m2 1. Patterned, details stated C.1 Raised access floors S.1 Supporting systems
stated are deemed to include:
S.2 Frames to panels
(a) Panels, supporting
S.3 Method of fixing
structures, adhesives,
2. Ramps 1. Thickness, length and nr M.2 The height stated for bearing pads and the like
width stated ramps is the height at (b) Cutting and notching
each end. and extra supports
3. Items measured 1. Special panels 1. Dimensioned description nr
extra over the floors in
which they occur
4. Skirtings 1. Dimensioned m M.3 Skirtings and C.2 Skirtings and
description perimeter edge trims not perimeter edge trims are
5. Perimeter edge trims
executed as part of the deemed to include ends
access floors are and angles.
measured in items
(e).13 and 19 hereof.
(e) Sheet Linings/Claddings, Timber Suspended Ceilings, Unframed Trims, Insulation, Proofing Works and Fire Stops
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Where grounds and/ D.1 Insulation/proofing C.1 All work is deemed to
or backings are included work/fire stops include: include nailing, adhesives,
in the item this is stated. screwing, cutting, splayed
Flexible sheets, insulating
or rounded edges,
M.2 Work fixed with plugs boards and other
notching, holes, housing
and screws or with screws materials, where not
ends, ship-lap joints,
and cups is so described. specified as part of
mitres, ends, and shaped
another section, laid,
M.3 Where work is fixed ends, angles, junctions,
hung, or fixed horizontally,
with screws other than heading joints, short
sloping or vertically as
ordinary steel, or if lengths and the like.
waterproofing, vapour
pelleting is required, it is
barriers, fire stops, fire
so stated.
barriers, isolating
M.4 Work to ceilings and membranes, sound
beams over 3.50 m above insulation or thermal
floor (measured to ceiling insulation.
level in both cases) except
to staircase areas, it is so
described stating the
height in further 1.50 m
stages.
(e) Sheet Linings/Claddings, Timber Suspended Ceilings, Unframed Trims, Insulation, Proofing Works and Fire Stops (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Sheet linings 1. To walls m2 M.5 No deduction is made D.2 Internal and external
for voids < 0.50 m2. work are each measured
3. Sheet claddings 2. To ceilings and slides
separately.
and soffits of beams M.6 Sides and soffits of
beams are included in the
3. To roofs
item of ceilings and sides
4. To fittings and soffits of beams.
5. Others M.7 Where work is to be in
panels to design it is
4. Laminated plastic 1. Backing and adhesive m 2
measured separately
sheeting stated
and described.
M.8 Where work requires
tongued angles, chamfers,
rebates, grooves and the
like, this is stated.
(e) Sheet Linings/Claddings, Timber Suspended Ceilings, Unframed Trims, Insulation, Proofing Works and Fire Stops (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
7. Supports for m2
upstands in suspended
ceilings
8. Ceiling tiles or 1. Described m2 S.1 Required fire ratings,
panels fixed to wood decibel reduction ratings,
framing etc. are stated.
9. Acoustic linings 1. Described 1. Sheets m2 1. Plain areas M.6, M.7 and M.8 apply. D.2 applies. S.2 Extent of laps, where
not at the discretion of the
10. Insulation linings 2. Quilts 2. Across members, M.9 Insulation linings, D.3 Horizontal includes
Contractor
centres of members proofing works and fire the upper surface of any
11. Proofing linings 3. Boards
stated stops are only measured sloping structure < 45°
12. Fire stops 4. Loose fill independently in this Sub from the horizontal.
3. Between members,
section where not
centres of members D.4 Vertical includes the
specified as part of
stated upper surface of any
another work section.
sloping structure > 45°
4. Horizontal
from the horizontal.
5. Vertical
D.5 To soffits includes the
6. To soffits underside of any
horizontal or sloping
7. To structural steel
structure.
framing
(e) Sheet Linings/Claddings, Timber Suspended Ceilings, Unframed Trims, Insulation, Proofing Works and Fire Stops (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Work is measured D.1 Work is deemed C.1 All integral S.1 Kind ad quality of
mean lengths as fixed. internal unless otherwise components, holes, etc, materials
The following information shall be provided:
described. performed at factory but
M.2 Curved work is so S.2 Method of
(a) Scope and location of the work excluding trims fixed on
described construction
site
(b) The services to be located within the partitions
M.3 Work obstructed by S.3 Required fire ratings,
C.2 Cutting and fitting
integral services is so decibel reduction ratings,
around obstructions etc.
described. etc.
and holes, additional
M.4 Factory applied bridging members, S.4 Layout of joints
finishes and site applied blockings and flanges etc.
S.5 Method of bedding,
finishes are only for services
jointing and pointing
measured where not at
C.3
the Contractor’s S.6 Details of
discretion. (a) Head and cill fixings ironmongery, glass,
linings or the like to be
(b) All angles,
included
intersections, ends
and abutments etc. S.7 Proprietary partitions
have catalogue numbers
(c) Bedding and pointing
stated
frames as required
1. Fixed partitions 1. Height and thickness 1. Factory applied finish m 1. Partitions with sloping M.5 Insulation, sealants, S.8 Insulation to limit
stated cills and/or heads are so vapour barriers, isolating sound transmission
2. Demountable 2. Site applied finish
described. membranes, moisture
partitions 2. For fully glazed or S.9 Moisture resistant
resistant treatment and
semi glazed partitions, 2. Open framing or treatment and the like
the like are included in
height and thickness unfinished framing above
the item.
stated, semi-glazed ceilings is described in
partitions have height the item. M.6 No deduction is made
and position of glazing for voids in partitions
described measured linearly other
than those voids which
extend the full height, full
girth or full width.
UK SDRMM 4 108
XIII WOOD WORKS 109
4. Openings measured 1. Blank openings 1. Dimensioned description nr D.3 Openings is a general C.4 Openings are deemed S.10 Details of glass
extra over the partitions term for breaks in the to include additional fixing
2. Doors
in which they occur general construction of integral components.
3. Windows, with number partitions and includes
C.5 Openings are deemed
of lights stated the components filling the
to include ironmongery,
openings.
4. Hatches glass, glazing beads,
linings or the like but
5. Glazed panels, with
exclude trim.
number of lights stated
6. Access panels
5. Fixings for heavy 1. Sinks nr D.4 Heavy fittings are C.6 Fixings for heavy S.11 Type of additional
fittings in fixed those requiring additional fittings are deemed to support
2. Cupboards
partitions support. include additional
3. Others, details stated supports and any cutting
of boarding, trim or
jointing.
6. Sliding and folding M.7 Sliding and folding
partitions partitions are measured in
accordance with the rules
for sliding and folding
doors in Sub-section (i)
hereof.
7. Holes in glass panels M.8 Holes in glass panels
are measured in
accordance with Section
XX Glazing.
h) Toilet Cubicle Partitions, Office Cubicle Partitions and Fittings
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
M SBJM 4 110
XIII WOOD WORKS 111
(i) Doors, Hatches, Ventilators and the like and Frames and Linings
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Flush doors 1. Size, thickness and 1. Single leaf doors nr 1. Rebated stiles, rounded M.1 Glass and glazing C.1 All doors are deemed S.1 Surface treatment
construction stated, and stiles, meeting stiles, beads are measured to include fitting and applied as part of the
2. Folding doors
facings and applied Sets beads and mouldings separately. hanging. production process
mouldings etc. described 3. Swinging doors stated
M.2 Folding doors are C.2 Folding doors include S.2 Bedding, jointing and
4. Sliding doors measured separately, the labours to meeting stiles. pointing compounds
extreme width of each
5. Sliding and folding C.3 Swinging doors
leaf is stated in the
doors include rounded edges to
description.
stiles.
M.3 Doors with shaped
C.4 All items are deemed
heads are so described,
to include bedding and
measured the extreme
pointing frames as
size as square and given
required.
separately.
2. Items measured 1. Openings for glass 1. Size and edge treatment nr 1. Louvres have
extra over flush doors stated dimensioned description
2. Louvered openings
3. Framed and panelled 1. Sectional sizes of stiles, 1. Single leaf doors nr 1. Rebated stiles, rounded
doors rails, transoms, muntins, stiles, meeting stiles,
2. Folding doors
panels and the like given Sets beads and mouldings are
and size and number of 3. Swinging doors described
panels and glazed or
4. Sliding doors
iouvred panels stated 2. Doors with diminished
5. Sliding and folding stiles so described
doors
3. Doors with panels of
unusual shaped or
arrangement are so
described.
4. Fire rated doors and 1. Dimensioned description 1. Ironmongery described Sets 1. Fire rating stated M.4 Fire rated doors are
frames of doors, frames and/or measured complete with
linings frames and ironmongery
and glazing etc.
(i) Doors, Hatches, Ventilators and the like and Frames and Linings (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
5. Louvres and frames 1. Size, thickness and 1. Louvres have nr 1. Sectional sizes of
construction stated dimensioned description frames stated
6. Service hatches and nr
frames
7. Duct access doors, nr
panels and trapdoors
and frames
8. Door frames 1. Overall sizes of doors 1. Solid and built-up nr 1. Frames incorporating
or door sets given, and frames or linings given fanlights or side lights
9. Door linings
cross-section of members separately, grounds or given separately and the
stated backings described and fanlight or sidelight
included in the item described
2. Rebated heads and
jambs or hollowed jambs
described
10. Trims and architraves M.5 Trims and architraves
are measured in
accordance with Sub
section (e) hereof.
HXSMW4 112
XIII WOOD WORKS 113
2. Wood facings to nr
stairs of construction
, other than timber
3. Handrails 1. Dimensioned description m
with method of jointing
handrail stated. If
hollowed for and screwed
to metal core this is
stated
4. Items measured 1. Ramps nr 0.1 Plain ends deemed to
extra over handrails be included
2. Wreaths
3. Bends
4. Ornamental ends
5. Balustrades 1. Dimensioned description m
with spacing of balusters
stated
6. Items measured 1. Ramps nr 0.1 applies.
extra over balustrades
2. Wreaths
3. Bends
4. Ornamental ends
5. Opening portions,
details stated
6. Method of jointing
handrail stated
k) Furniture, Fittings, Shelving, Racks, Playground Equipment etc.
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Furniture 1. Drawing reference and/ 1. Description includes nr 1. Where these items are M.1 Alternatively these C.1 For items provided by S.1 Such information as
or dimensioned ironmongery and/or metal to be provided by the items may be measured the Employer, accepting is appropriate to the
2. Fittings
description as appropriate fittings, glass panels etc. Employer for the in detail in accordance delivery on site, storing procurement, design,
3. Shelving with background for fixing which are to be included Contractor to fix, the with the appropriate rules. and handling are deemed execution, supply and/or
stated in the item. method of fixing is stated. to be included. manufacture of the item
4. Racks
and its incorporation in
2. For items provided by
5. External furniture the Works
the Employer, the
and equipment
provision by the S.2 Finishes and surface
6. Sign boards and Contractor of any treatments applied in
signage additional components, manufacture or off site
etc. is stated.
7. Playground S.3 Finishes and surface
equipment treatments applied on
site
8. Others
HR SMIM 4 114
XIII WOOD WORKS 115
1. Minor buildings 1. Drawing reference and/ Item 1. Providing and erecting M.1 Alternatively these C.I Work is deemed to S.1 Such information as
or dimensioned items may be measured include for obtaining is appropriate to the
2. Other structures 2. Taking over existing and
description as in detail in accordance permission/licenses, procurement, design,
repairing as necessary
appropriate with the appropriate rules. payment of rates, fees execution, supply and/or
3. Maintaining, duration and charges related manufacture of the item
stated thereto. or component parts and
their incorporation in the
4. Adapting, details stated
Works
5. Clearing away and
S.2 Finishes and surface
making good all works
treatments applied in
disturbed
manufacture or off site
S.3 Finishes and surface
treatments applied on
site
(m) Insulation/Proofing Works/Fire Stops
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
116
XIV IRONMONGERY 117
(See Section II — General Principles)
1. Generally M.1 Ironmongery supplied C.1 Ironmongery and S.1 Kind and quality of
separately and included fixing only of ironmongery materials and fixings
in a Prime Cost Sum is supplied under a separate
S.2 Surface finish
measured separately Prime Cost Item are
under a heading. deemed to include: S.3 Requirements for
identification tags on
M.2 Ironmongery is only (a) Fitting, cutting, sinking,
keys
measured independently boring and morticing
in this Section where it is
(b) Supplying and
not specified as part of
screwing with screws to
another works section.
match
M.3 Ironmongery fixed to
(c) Drilling for and
metal work, or plugged
provision of plugs where
and screwed, is so
required
described.
C.2 Locksets are deemed
to include provision of
keys and identification
tags to keys
HK MM 4, 118
XV STEEL AND METAL WORKS 119
(See Section 11 — General Principles)
(a) Structural Steel
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Columns 1. Framing, fabrication 1. Joists kg 1. Castellated M.1 The items listed in the D.1 Wires, cables, rods C.1 Items for fabrication
and erection 1st column are headings and bars include sag and erection are deemed
3. Beams 2. Channels 2. Tapered
under which the various rods, ties and the like. to include for:
4. Bracing 3. Angles 3. Curved sections in the 3rd
(a) Shop and site rivets
column are measured.
5. Purlins and cladding 4. Tees 4. Cambered and black bolts, nuts and
rails M.2 The mass of framing washers
5. Tubular sections 5. Weights of sections
members is measured
6. Grillages stated (b) Welding, welding
6. Plates from their overall lengths
tests and X-rays
7. Built-up columns, with no deductions for
7. Wires
trestles and towers splay cuts or mitred ends (c) Performance tests
8. Cables or of the mass of metal
8. Built-up trusses and (d) Packings where
removed to form notches
girders 9. Rods required for connections,
and holes.
caps and bases
10. Bars
M.3 No allowance is made
(e) Wedging and grouting
11. Others for the mass of weld
under bases
fillets, black bolts, nuts,
washers, rivets and
protective coatings for
rolling margins.
9. Overhead crane rails 1. Framing, fabrication 1. Joists kg 1. Curved M.4 Where structural steel
and erection is not a major part of the
2. Channels 2. Weight of sections structure it shall be
2. Details of fixing clips stated grouped according to
3. Angles
and resilient pads and bearing levels for hoisting
fittings stated 4. Tees and fixing which shall be
5. Tubular sections stated in stages of 3.00 m
above ground level.
6. Plates
M.5 Cleats, brackets,
7. Others plates and packings etc.
10. Connections kg are not separately
described and are added
together to arrive at the
mass for this item.
HKX WB 4 120
XV STEEL AND METAL WORKS 121
11. Fittings 1. Fabrication and 1. Joists kg 1. Weight of sections M. 1, M.2, M.3, M.4and D.1 applies. C.1 applies.
erection stated M.5 apply.
2. Channels
M.6 Fittings are only
3. Angles
measured separately from
4. Tees the structural units where
they are of a different type
5. Tubular sections
and/or grade of material.
6. Plates
7. Wires
8. Cables
9. Rods
10. Bars
11. Others
12. Proprietary sections 1. Type and method of m
fixing stated
13. Filling hollow 1. Size, materials and nr
sections methods stated
14. Holding down bolts 1. Details stated nr
or assemblies
15. Special bolts or nr D.2 Special bolts and
fasteners fasteners are those other
than black bolts and
holding down bolts or
assemblies.
16. Space frames and 1. Dimensions stated nr
geodetic structures
2. Details of design criteria
and restrictions stated
17. Surface preparation 1. Described m2 C.2 The areas given are
deemed to include for
works to additional
surface areas of cleats
and brackets etc. in
connections.
18. Surface treatment m2
(b) Linings, Coverings and Claddings
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Curved work is so C.1 All work is deemed to S.1 Thickness and quality
described. include bending to shape, of materials
adhesives, screwing,
M.2 Where grounds and/ S.2 Finish
cuttings, notching, holes,
or backings are included
angles, joints and the S.3 Method of fixing
in the item this is stated.
like.
M.3 Work to ceilings and
beams over 3.50 m
above floor (measured
to ceiling level in both
cases) except to
staircase areas, is so
described stating the
height in further 1.50 m
stages.
HK SMJM 4 122
XV STEEL AND METAL WORKS 123
1. Doors 1. Dimensioned description 1. Frames, linings, tracks nr 1. Ironmongery and M.1 Frames and linings, C.1 Doors are deemed to S.1 Kind and quality of
(where the item is for and rails described accessories described. tracks, rails and shutter include fitting and material
2. Sliding folding
doors and frames, the Alternatively these items hoods are included in the hanging.
partitions S.2 Surface treatments
size of the doors is may be measured item.
C.2 Items include: applied as part of the
3. Hatches stated), reference to separately.
M.2 Wicket and access production process
drawing or reference to (a) Ironmongery and
4. Strong room doors doors are described and
manufacturer’s catalogue accessories, except where S.3 Method of jointing or
included in the item.
5. Grilles, screens and stated to have been form of construction
louvres measured separately
S.4 Method of fixing
6. Gates (b) Operating equipment
S.5 Bedding, jointing and
7. Rolling Grilles 1. Dimensioned description 1. Frames, linings, tracks nr (c) Fixings and fastenings pointing compounds
(giving the clear opening and rails and shutter (d) Bedding and pointing S.6 Type of operating
8. Rolling Shutters
size), reference to hoods described frames equipment if required
9. Folding Doors drawing or reference to
manufacturer’s catalogue S.7 For fire doors and fire
10. Folding Shutters shutters the fire rating is
11. Collapsible Gates stated.
124
XV STEEL AND METAL WORKS 125
1. Generally M.1 Bars, flats, rods, C.1 Each item is deemed S.1 Kind and quality of
angles, tees, channels to include for cutting to materials
and the like are each correct lengths, splay cut
S.2 Grade and external
given separately and the ends and all drilling.
diameter of tubular
size stated.
members
M.2 Curved work is so
S.3 Surface treatment
described.
applied as part of the
production process
S.4 Method of jointing or
form of construction
S.5 Method of fixing
where not at discretion
of the Contractor
S.6 Strippable protective
coverings or coatings
HDX WM 4 126
XV STEEL AND METAL WORKS 127
1. Generally M.1 Where fencing and D.1 The height of fencing C.1 Work is deemed to S.1 Kind and quality of
gates consist of wire is measured from the include: materials
mesh, railings or other surface of the ground (or (a) Excavating holes for
S.2 Method of
infill material supported other stated base) to the supports, special supports
Construction
by metal framing it is top of the infilling or and independent gate
measured in accordance where there is no infilling, posts in any ground met S.3 Surface treatments
with Sub-section (e) to the top wire. with, including breaking up applied as part of the
hereof. and removing any production process or
obstructions applied before delivery
(b) Backfilling and disposal to site
of surplus materials S.4 Surface treatment
(c) Earthwork support applied on site
(d) Supports
(e) Making good existing S.5 Size and nature of
hard pavings backfilling
1. Minor buildings 1. Drawing reference and/ Item 1. Providing and erecting M.1 Alternatively these C.1 Work is deemed to 1. Such information as is
or dimensioned items may be measured include for obtaining appropriate to the
2. Other structures 2. Taking over existing and
description as appropriate in detail in accordance permission/licenses, procurement, design,
repairing as necessary
with the appropriate rules. payment of rates, fees execution, supply and/or
3. Maintaining, duration and charges related manufacture of the item
stated thereto. or component parts and
their incorporation in the
4. Adapting, details stated
Works
5. Clearing away and
2. Kind and quality of
making good all works
materials
disturbed
3. Thickness of materials
4. Finishes and surface
treatments applied in
manufacture or off site
5. Finishes and surface
treatments applied on
site
HK MM 4 128
XV STEEL AND METAL WORKS 129
(h) Sundries
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
8. Pressed, folded or 1. Dimensioned description 1. Background for fixing m 1. For duct skirtings or C.4 Mitres, ends and the S.5 Proprietary items
extruded metal skirtings stated rails, the number of like are deemed to be have catalogue numbers
compartments stated included. stated.
9. Pressed, folded or
extruded metal rails
10. Pressed or folded 1. Dimensioned description nr C.5 Stripping protective S.6 Method of fixing
metal window and door coverings or coatings
S.7 Strippable protective
surrounds
coatings
HX SMD 4 130
XV STEEL AND METAL WORKS 131
1. Generally M.1 No deduction is made C.1 Raised access floors S.1 Kind and quality of
for voids < 0.50 m2. are deemed to include: materials
(a) Panels, supporting S.2 Supporting systems
structures, adhesives,
S.3 Frames to panels
bearing pads and the like
S.4 Method of fixing
(b) Cutting and notching
and extra supports
2. Roof coverings 1. Pitch stated m2 1. Curved, radii stated M.1 No deduction is made C.1 Coverings and S.3 Minimum side and
for voids < 1.00 m2. claddings are deemed to end laps
3. Wall claddings 2. Fixed through
include:
underlinings S.4 Jointing or sealing
(a) Work in forming voids
<1.00 m2 S.5 Nature, thickness
and spacing of structural
(b) Holes for pipes, supports
standards and the like
(c) Integral underlay
4. Abutments 1. Dimensions cross m 1. Raking M.2 Work to edges of C.2 Boundary work is
5. Eaves section description voids is only measured deemed to include for
2. Curved, radii stated
where the void is > bedding, pointing, ends,
6. Verges
1.00 m2 angles and intersections
7. Ridges
8. Hips
9. Vertical angles
10. Valleys
11. Expansion joints
12 Barge boards
13. Skirtings
14. Flashings
15. Aprons and sills
16. Gutters and linings
17. Jambs
18. Filler pieces
19. Sleeves and/or 1. Dimensioned description nr
flashings to holes for
pipes etc.
20. Items extra over roof 1. Translucent sheets 1. Dimensioned description nr
coverings 2. Sheets with soaker
21. Items extra over wall flanges
cladding 3. Roof light units
4. Sheets with louvre
blades
5. Ventilators
6. Junctions
22. Cutting 1. Raking m
2. Curved
23. Fire stops 1. Dimensioned description m
1. Generally M.1 Work is measured D.1 Work is deemed C.1 Partitions are deemed S.1 Kind and quality of
mean lengths as fixed. internal unless described to include all integral materials
The following information shall be provided:
as external. components, holes, etc.
M.2 Curved work is so S.2 Method of
(a) Scope and location of the work preformed at factory but
described. construction
exclude trims.
(b) The services to be located within the partitions
M.3 Work obstructed by S.3 Required fire ratings,
C.2 Work is deemed to
integral services is so decibel reduction ratings,
include cutting and fitting
described. etc. are stated
around obstructions etc.
M.4 Factory applied and holes for services. S.4 Layout of joints
finishes and site applied
C.3 Partitions are deemed S.5 Method of bedding,
finishes are only
to include: jointing and pointing
measured where not at
the Contractor’s (a) Head and cill fixings S.6 Details of
discretion. ironmongery, glass,
(b) All angles,
linings or the like to be
intersections, ends and
included
abutments etc.
S.7 Proprietary partitions
(c) Bedding and pointing
have catalogue numbers
frames as required
stated
5. Openings measured 1. Blank openings 1. Dimensioned description nr D.3 Openings is a general C.4 Openings are deemed S.10 Details of glass
extra over the partitions term for breaks in the to include additional fixing
2. Doors
in which they occur general construction of integral components.
S.11 Type of additional
3. Windows, with number partitions and included
C.5 Openings are deemed support
of lights stated the components filling
to include ironmongery,
the openings.
4. Hatches glass, linings or the like,
but exclude trim.
5. Glazed panels, with
number of lights stated
6. Access panels
6. Fixings for heavy 1. Sinks nr D.4 Heavy fittings are C.6 Fixings for heavy
fittings in fixed those requiring additional fittings are deemed to
2. Cupboards
partitions support. include additional
3. Others, details stated supports and any cutting
of cladding, trim or
jointing.
7. Holes in glass panels M.7 Holes in glass are
measured in accordance
with Section XX Glazing.
134
XV STEEL AND METAL WORKS 135
(1) Toilet Cubicle Partitions and Office Cubicle Partitions and Fittings
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Soffit linings fixed to D.1 All work is deemed C.1 Ceilings are deemed S.1 Kind and quality of
soffits or on wooden internal unless described to include: materials
The following information shall be provided:
support framework and as external.
(a) Rails, hangers, S.2 Method of
(a) Scope and location of the work hangers are measured in
spacers and the like construction and fixing to
Section XIII Wood Works.
(b) The services to be located within the ceiling void structure
(b) Ceiling tiles or panels
M.2 Suspended ceilings
or metal strips and the S.3 Proprietary ceiling
of plasterboard or of
like systems have catalogue
plastered metal lathing
numbers stated
are measured in Section (c) Working over and
XVI Plastering and around obstructions S.4 Integral diffuser and
Paving. ventilation, lighting,
(d) Supports and
speaker and other fittings
M.3 Work over 3.50 m accessories for fittings
above floor (measured to S.5 Vapour barriers
(e) Bridgings to support
ceiling soffit level) is so
fittings or where trunking S.6 Insulation materials
described stating the
in ceiling space obstructs
height in further stages of
the standard grids
1.50 m stages.
C.2 Work incorporating
integral fittings is deemed
to include additional
hangers, framing etc.
1. Generally
The following information shall be provided:
(a) Scope and location of the work
HK SMMIMU 4 138
XV STEEL AND METAL WORKS 139
o) Shop Fronts
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Work is measured D.1 Work is deemed C.1 Shop fronts are S.1 Kind and quality of
net lengths as fixed. internal unless described deemed to materials
The following information shall be provided:
as external. include:
M.2 Curved work is so S.2 Size or standard of
(a) Scope and location of the work
described. (a) All integral sections
components, holes etc.
S.3 Surface treatment
preformed at factory, but
applied as part of the
exclude trims
production process
(b) All screws and bolt
S.4 Strippable protective
fixings, shot fired
coverings or coatings
fixings and fixing lugs
S.5 Method of
(c) Glass and linings or
construction and layout
solid panels
of joints
(d) Cutting and fitting
S.6 Joint sealing, bedding
around obstructions etc.
and pointing materials
and holes for services
S.7 Details of
(e) Sealing all joints and
ironmongery, glass,
bedding and pointing
linings and the like to be
frames as required
included
(f) Stripping protective
S.8 Proprietary systems
coverings or coatings
have catalogue numbers
C.2 Aluminium shop fronts stated
are deemed to include
sealant or separator to
surfaces in contact with
concrete, plaster or
brickwork.
(o) Shop Fronts (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Shop fronts 1. Dimensioned description 1. Cill boards and fascia nr 1. Shop fronts with sloping M.3. There is provision 0.3 Enumerated shop
(Enumerated) and drawing reference panels etc. have heads and/or cills so here for shop fronts to be fronts are deemed to
stated, open framing or dimensioned descriptions. described and the average measured either by include:
partition above ceiling height stated enumeration as item (o).2
(a) Head and cill fixings
described in the item hereof, or linear
measurement as item (o). (b) All angles,
3 hereof at the Surveyor's intersections, ends and
discretion. If linear abutments etc.
measurement is used
then item (o).6 hereof
3. Shop fronts (Linear must be used instead of
m 0.4 Shop fronts measured
measurement) item (o).5 hereof.
linear are deemed to
include for head and cill
fixings.
4. Trims 1. Dimensioned description m D.2 Trims are separate
items fixed on site as
cover pieces to edges
and joints.
5. Items measured 1. Door openings 1. Dimensioned description nr M.4 Item (o).5 is only D.3 “Openings” is a 0.5 Openings are deemed
extra over the used in respect of general term for breaks in to include additional
2. Other openings
enumerated shop fronts enumerated shop fronts. the general construction integral components.
in which they occur of shop fronts and
C.6 Openings are deemed
includes the components
to include ironmongery,
linings or the like, but
exclude trim.
0.7 Doors are deemed to
include for easing and
adjusting doors and oiling
fittings.
6. Items measured 1. Angles nr M.5 item (o).6 is used only
extra over the shop in respect of linearly
2. Intersections
fronts measured m measured shop fronts.
linearly in which they 3. Ends
occur
4. Abutments
5. Mullions
6. Door openings
7. Other openings
1. Generally M.1 No deduction is made D.1 Curtain walling C.1 Curtain walling is S.1 Kind and quality and
for voids < 1.00 m2. comprises non deemed to include all thickness of materials
The following information shall be provided:
loadbearing walls of metal framing and fixing at
S.2 Surface treatments
(a) Scope and location of the work. framing, fixed as an perimeters, angles and
applied as part of the
integrated assembly, closers for fire stops and
production process
complete with windows intersections etc.
and opening lights, S.3 Strippable protective
C.2 Curtain walling is
glazing and infill panels. coverings or coatings
deemed to include all
cleats, brackets, bolts S.4 Method of jointing or
and fixings. form of construction
a) Spatterdash
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Metal lathing 1. Mesh stated 1. To walls and columns M.1 Work to ceilings is C.1 All work is deemed to S.1 Kind and quality and
m2
measured to the area include: finish of materials
2. Laps stated 2. To ceilings and sides
between structural walls, (a) Narrow widths and
and soffits of beams S.2 Background and
deductions for columns small quantities method of fixing
3. To sloping ceilings and the like are measured
including sides and soffits the structural size. (b) All holes, notchings S.3 Jointing and skim
of beams and any other sundry coat on plasterboard
M.2 Curved work is so items of a like nature described
4. To fascias and described.
upstands C.2 Plasterboard nailed to
M.3 No deduction is made wood framing is deemed
2. Plasterboard 1. Thickness stated 5. To sloping soffits of m2 for voids < 0.50 m2, nor to include provision of
stairs for voids < 300 mm wide. timber framing to support
6. To flewing soffits of M.4 Work to ceilings and board ends as required.
stairs beams, where the ceiling
is > 3.50 m from the floor
7. On and including
is given separately and
support system suspended
so described, the height
from concrete ceiling,
being stated in stages of
support system described
1.50 m.
and depth below ceiling
given
3. Stop beads 1. Described or m
manufacturer’s reference
4. Angle beads
stated
c) General Clauses Applicable to the Following Sub-sections (d), (e) and (f)
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Preparation of D.1 All work is deemed C.1 Work is deemed to S.1 Kind, quality,
surfaces is included in the internal unless described include: composition and mix of
appropriate Sub-section. as external. materials, including
(a) Narrow widths and
Preparation of old bonding agents,
D.2 Base, in M.3, refers to small quantities
surfaces is given waterproofing agents and
the structural background,
separately in Section XVI (b) Laying or executing other admixtures (except
metal lathing or plaster
Plastering and Pavings. work in bays or where at the Contractor’s
board.
between strips discretion)
M.2 Work to floors and
ceilings is measured to (c) Temporary formwork S.2 Nature of surface
the area between and rules treatment, including wax
structural walls, polishing or sealing
(d) Joints between
deductions for columns coats and the like
different types of work
and the like are measured
and between new and old
the structural size.
work
M.3 Work to walls and the (e) Intersections of curved
like is measured to the surfaces
area of the base.
(f) Ali making good
M.4 Curved work is so
described. C.2 Work to floors and
pavings is deemed to
M.5 No deduction is made
include for laying or
for voids <0.50 m2, nor
finishing to slopes, falls
for voids < 300 mm wide.
and currents and
M.6 Work to ceilings and intersections in slopes
beams where the ceiling and falls.
is > 3.50 m from the floor
is given separately and
so described, the height
being stated in stages of
1.50 m.
M.7 Work in confined
spaces is so described.
M.8 Work in repairs is
measured separately.
MK SMMM 4 144
XVI PLASTERING AND PAVING 145
1. Walls and columns 1. Thickness and number 1. Patterned or grooved m2 1. Work in repairs stating M.1 Work measured in D.1 The thickness stated C.1 Work is deemed to S.1 Method of application
of coats stated work, details stated, the approximate thickness this Sub-section includes is the nominal thickness include:
2. Ceilings and sides
coloured work, colour or of dubbing required rendering, plastering, excluding keys, grooves
and soffits of beams 2. On plasterboard, (a) Internal angles,
colour group stated. For screeding, granolithic or open joints in brickwork
thickness and number of 2. Work carried out in one arrises, throats, drips and
3. Sloping ceilings and screeds, the material to terrazzo, bitumen or lathing.
coats stated operation with concrete is the like
sides and soffits of be received is stated. emulsion and asphaltic
so described.
beams 3. On metal lathing, concrete or macadam (b) Coves and rounded
thickness and number of and the like. Each type external angles < 25 mm
4. Sloping soffits of
coats stated of work is grouped radius
stairs
under a separate
(c) Angles, stops,
5. Flewing soffits of heading.
intersections, fair ends,
stairs
junctions, wreathed
6. Floors corners and the like on
coves, skirtings, channels,
7. Roofs
strings, curbs and the like
8. To treads and risers
9. Others
10. Roads and paving 1. Thickness stated m2 M.2 Bitumen emulsion, D.2 The thickness stated S.2 Method of
asphaltic concrete, is that after consolidation
macadam base courses, consolidation.
wearing courses and tack
coats, are each measured
separately.
(d) in-situ Surface Finishes and Screeds or Backings (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
11. Items measured 1. Coloured margins 1. Width and depth stated m 1. In coloured work, colour
extra over the or colour group stated.
2. Coloured bands
foregoing Items 1 to 10
3. Fillings to pipe trench
covers
4. Shallow channels within
the thickness of the
screed, flooring or paving
5. Finish to channels
formed in floor or roof
finish of a similar type.
6. Filling to recessed nr
manhole covers, and the
like size stated
7. Filling to shaped insets,
described
8. Filling to mat sinkings,
size stated
12. Speed bumps 1. Dimensions stated m
(nr
stated)
13. Rounded angles > 25 m
mm radius
14. Coves > 25 mm
radius
15. Skirtings 1. Fully described, height 1. Level m
above finished floor
2. Sloping
stated
3. Sloping with stepped
base
4. Stepped following profile
of treads and risers
16. Wall strings 1. Thickness and average m
height or width stated
17. Open strings
18. Curbs 1. Thickness and girth m
stated
19. Curb strings
20. Channels, not of 1. Width and depth stated m
similar finish to floor
21. Movement joints 1. Dimensioned description m D.3 Movement joints S.3 Method of fixings
include expansion joints.
22. Cover strips
23. Division strips
24. Non-slip inserts m
nr
e) Tile and Slab Finishes
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally ' M.1 Work measured under C.1 Each item of work in S.1 Kind and quality of
this Sub-section includes this section is deemed to materials
ceramic, synthetic rubber, include for, except where
S.2 Size, shape and
granite, marble or slate special tiles or fittings are
thickness of units
tiling, mosaic tiling, required:
precast items, and the S.3 Nature of base
(a) Internal angles and
like. Each type of work is
arrises. S.4 Preparatory work
grouped under a
separate heading. (b) Cutting and fitting up S.5 Method of fixing and
to frames and metalwork width of and treatment of
M.2 Granite, marble, slate
and around pipes and joints
etc. slabs are measured
bracket ends and the like
in accordance with
Section XI Stone Works (c) Mitres, stops,
Sub-section (b). intersections, fair ends,
junctions, wreathed
corners and the like on
mouldings, coves,
skirtings, gutters, channels,
strings, curbs and similar
C.2 All work is deemed to
include:
(a) Bedding materials or
adhesive
(b) Treatment of joints
17. Movement joints 1. Dimensioned description m D.1 Movement joints S.6 Method of fixing
include expansion joints.
18. Cover strips
19. Division strips
20. Non-slip inserts 1. Described m
21. Filling in to trench 1. Width and thickness m 1. Where jointing is
covers stated required to line with
adjoining work it is so
22. Filling in to insets, 1. Sizes stated nr
stated.
manhole covers and
mat sinkings
23. Accessories 1. Nosings 1. Dimensioned m C.5 Nosings are deemed
description to include working
2. Cover strips
finishes thereto.
3. Dividing strips
C.6 Mitred regular and
irregular angles are
deemed to be included.
NKX Mi 4 150
XVI PLASTERING AND PAVING 151
f) Rubber and Plastic Sheet or Carpet Sheet/Tile Finishes and the like
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Work measured under D.1 Rounded internal and C.1 Work is deemed to S.1 Kind and quality and
this Sub-section includes external angles > 100 mm include: size of materials
synthetic rubber, radius are classified as S.2 Nature and number of
(a) Rounded internal and
linoleum, cork, rubber, curved work. underlays
external angles < 100 mm
vinyl sheeting, fibreglass
radius S.3 Nature of base
membrane, ball court
finishes, acoustic (b) Seams and fair joints S.4 Method of fixing and
sheetings, carpet and treatment of joints
(c) Fixing at perimeter
carpet tiles, artificial
turfing, and the like. Each (d) Cutting and fitting up S.5 Extent of laps
type of work is grouped to frames and metalwork S.6 Types of seams
under a separate and around pipes and
heading. bracket ends and the like S.7 Pattern, width and
laying direction of
materials
S.8 Surface treatment
8. Skirtings 1. Height stated 1. Flush m 1. Fattened, details stated C.5 Work to skirtings and
kerbs is deemed to
9. Kerbs 2. Raking 2. Inserts, size or section include fair, rounded,
2. Height and width stated
stated beaded and moulded
3. Vertical
edges, coved junctions,
ends, angles and ramps.
f) Rubber and Plastic Sheet or Carpet Sheet/Tile Finishes and the like (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
10. Movement joints 1. Dimensioned description m D.2 Movement joints S.9 Method of fixing
include expansion joints.
11. Cover strips
12. Division strips
13. Non-slip inserts 1. Described m
14. Filling in to pipe 1. Width stated 1. Where jointing is m
trench covers required to line with
adjoining work it is so
15. Filling in to insets, 1. Sizes stated nr
stated.
manhole covers and
mat sinkings
16. Line marking on m M.2 Where paint type to S.10 Method of application
sports pavings be measured in if not at the Contractor’s
accordance with the discretion
17. Letters or figures on nr
rules for Section XXI
sports pavings
Painting.
18. Accessories 1. Nosings 1. Dimensioned description m C.6 Nosings are deemed
to include:
(a) Working finishes
thereto
(b) Mitred regular and
irregular angles
2. Cover strips m
3. Dividing strips
4. Stair rods and similar nr
fixings
152
XVII MECHANICAL INSTALLATIONS 153
(See Section 11 — General Principles)
(a) General Clauses Applicable to all Mechanical Sections
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Where composite D.1 Bonding is defined as C.I Assembling and S.1 Any regulations,
units are supplied by the permanent joining of jointing together the rules, bye-laws and the
(a) A general description of the installations shall be given where it is not evident from the
others, particulars are metallic parts to form an component parts of like with which the
drawings required to be provided by this document.
included in the description electrically conductive composite units, including installations are required
(b) Detailed specifications shall be provided together with drawings indicating the scope of the work. of any assembly work path which will assure providing any necessary to comply
involved. electrical continuity and connecting flanges and
S.2 Kind and quality of
has the capacity to jointing materials are
M.2 Work is identified materials
conduct safely any deemed to be included.
whether internal, external
current likely to be S.3 Gauge or thickness
or in plant rooms. C.2 All necessary drilling
imposed. and substance of
of the background and
M.3 Temporary work and materials
provision of fixings, nails,
removal of temporary
bolts, nuts, holes, screws, S.4 Any tests with which
work and making good
plugs, shot fired pins and materials, plant and
shall each be so
the like are deemed to be equipment are required
described.
included. to comply
M.4 in the event that only
0.3 Plates, discs and S.5 Pressure and
a performance
labels for identification of temperature ratings
specification is available,
plant, equipment, S.6 Priming and/or
preamble clauses are
appliances, pipes, valves painting off site and
included in the bills,
and the like are deemed proprietary finishes or
stating that the rates are
to be included. surface treatment applied
to include for all costs of,
and costs in connection C.4 Instruction notices, as part of the production
with, the design, supply warning signs for plant, process are described
and installation of the equipment, appliances, stating whether applied
complete installation. pipes, valves and the like before or after fabrication
are deemed to be or assembly.
M.5 Systems, together
included.
with their equipment,
pipework, ductwork, C.5 Brackets and methods
insulation and sundries, of support are deemed to
are classified as shown in be included.
Appendix "A” to Section II
C.6 Bonding is deemed to
General Principles.
be included in the items in
which they occur. Where
items of equipment are
supplied by others the
bonding is deemed to be
included in the items of
fixing the equipment.
(b) Equipment
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Chillers 1. Type and duty stated 1. Cross-reference to nr C.1 Each item is deemed
drawings or specification to include:
2. Cooling towers
(a) All necessary
3. Air handling units
assembly
4. Fans
(b) Orientation
5. Boilers
(c) Alignment
6. Chimneys
(d) Levelling and bolting
7. Tanks down
8. Heat exchangers (e) Provision of shims
and packing pieces
9. Pumps
(f) Clocking of couplings
10. Others
between drivers and
rotating equipment
(g) Anti-vibration
mountings
(h) Anti-vibration
materials in bases
(i) Sound Insulation in
bases
HK SMIM 41 154
XVII MECHANICAL INSTALLATIONS 155
1. Fittings, accessories 1. Type, size and pattern, 1. Cross-reference to nr 1. Ancillaries included with C.1 Items are deemed to
capacity and method of drawings and/or fittings, details stated include:
fixing and supports stated specifications or
(a) Providing everything
manufacturer’s reference
necessary, including
couplers, enlarged pipe
sockets, W.C. connectors
and adapters for jointing
to services, overflow and
soil and waste pipes
(b) Sealing or pointing
around fittings
(c) Fixings and supports
2. Ancillaries not nr 1. Details stated C.2 Jointing ancillaries to
included with fittings fittings is deemed to be
included.
(d) Pipework
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Composite supports D.1 Pipes run in chases, C.1 Work is deemed to S.1 Method of jointing
are measured in kg and unless otherwise include:
(a) Any regulations, rules, bye-laws and the like with which the installations are required to comply. S.2 Method of fixing and
the nubmer stated. described, do not
(a) Joints in the running brackets and methods of
include cutting away
lengths support
and making good.
(b) Joints between pipes S.3 Wall floor and ceiling
of differing materials plates
(c) Connections of
pipework to equipment
(d) Everything necessary
for all jointing
(e) Cutting and jointing to
puddle flanges
(f) Wall floor and ceiling
plates
2. Pipework 1. Type, size and method m 1. Laid in ducts M.2 Pipework is measured D.2 Final supports are C.2 Pipework is deemed
of jointing over all in-line fittings, any element between the to include:
2. Laid in trenches
short running lengths and structure or the support
(a) Fittings for pipes < 50
3. Laid in chases branches, but not through structure and the pipe.
mm diameter (or 54 mm
items of ancillaries,
4. Embedded in in-situ D.3 The term ‘pipework diameter in the case of
headings and trapping
concrete fittings’ is deemed to copper pipes), including
sets.
include: connections
5. Embedded in screeds
M.3 Where an in-line
(a) Bends (b) Any flanges, unions or
6. Suspended reduction in diameter
other devices used solely
occurs at a reducer or tee (b) Elbows
7. Fixed to walls or for erection purposes
etc., the largest diameter
columns (c) Branches
shall be measured the full (c) Final supports
8. Laid on floors length of the fitting. (d) Reducers
(d) Made bends
9. Others M.4 Where pipes pass (e) Tees
(e) Pipe anchors and
through roofs or vertical
(f) Reducing bends guides
cladding the requisite
slates, aprons and (g) Reducing tees C.3 Cutting and jointing
flashings are measured in pipes to fittings are
(h) Caps
accordance with Section deemed to be included.
XIII Wood Works and (i) Flanges and the like
Section XV Steel and
Metal Works Sub
sections (c) or (j).
(d) Pipework (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3. Extra over pipework, 1. Bends nr M.5 Reducing fittings are C.4 The rates for reducing
other than copper, for 2. Elbows identified by the largest fittings are deemed to
fittings > 50 mm 3. Branches diameter. include additional
diameter reducing fittings to attain
4. Reducers
the required sizes.
5. Tees
6. Reducing bends
7. Reducing tees
4. Extra over copper 8. Caps
pipes for fittings > 54 9. Flanged ends
mm diameter 10. Others
5. Extra over pipes
other than circular
6. Accessories 1. Gullies 1. Type and size stated nr M.6 Gratings may C.5 Cutting and fitting to
2. Roof outlets alternatively be included pipes and fittings are
3. Floor outlets in the description of the deemed to be included.
enumerated item to which
4. Rainwater heads
they relate.
5. Aprons
6. Cowls
7. Gratings to outlets and
rainwater heads
8. Traps
9. Puddle flanges
10. Others
7. Ancillaries 1. Valves nr M.7 Controls, including
2. Flow meters conduit and wiring are
3. Flow switches measured elsewhere
unless otherwise stated.
4. Strainers
5. Others
8. Flexible and 1. Type, size and length nr
extensible pipework stated
9. Expansion loops 1. Type and size stated nr
and compensators
10. Flow and return 1. Length and size stated nr M.8 Flow and return S.4 Method of
header pipes and number and size of header pipes forming part construction and method
each branch stated of plant or equipment are of jointing ends
included with the plant or
equipment.
NK SMJMV 4 158
XVII MECHANICAL INSTALLATIONS 159
11. Special joints and 1. Type and method of 1. Nominal size stated nr D.4 Special joints or
connections jointing stated where different from pipe connections are joints
in which joint or which differ from those
connection occurs generally occurring in the
running length or are
connections to pipes of a
different profile or
material, connections to
existing pipes, sanitary
fittings or equipment.
12. Screwed sockets 1. Size and kind of pipe or nr C.6 Perforating the
flange concerned pipework or flange is
13. Tappings
deemed to be included.
14. Bosses
15. Welding necks 1. Size and kind of both nr
welded to pipes or pipes stated
flanges
16. Instrumentation 1. Thermostat complete 1. Size of pipe or flange nr M.7 applies.
with cock concerned
2. Pressure gauges
complete with cock
17. Connections to Prov’l
public mains, making Sum
good highway and any
other work which may
be carried out by a
Public Utility Company
or Local Authority
(e) Gutters
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Gutters 1. Straight 1. Type, nominal size m M.1 Gutters are measured C.1 Gutters are deemed S.1 Kind and quality of
over all fittings and to include: materials
2. Curved
branches (a) Short lengths and S.2 Gauge, thickness or
joints in the running length substance of materials
(b) Fixings and supports
2. Extra over gutters 1. Angles nr M.2 Reducing fittings are C.2 Cutting and jointing
for fittings measured extra over the gutters to fittings are
2. Stopped ends
largest gutters in which deemed to be included.
3. Outlets they occur.
4. Others
3. Special joints and 1. Type and method of nr D.1 Special joints and
connections jointing stated connections are joints
which differ from those
generally occurring in the
running lengths or are
connections to existing
gutters or gutters of a
differing profile or
material.
HKC MB 4 160
XVII MECHANICAL INSTALLATIONS 161
(f) Ductwork
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Composite supports D.1 Final supports are C.1 Work is deemed to S.1 Method of jointing
are measured in kg and any element between the include:
(a) Any regulations, rules, bye-laws and the like with which the installations are required to comply. S.2 Method of fixing and
the number stated. structure or support
(a) Any necessary drilling brackets and all methods
structure and the
of the background and of support including
ductwork.
provision of nails, bolts, proprietary and specialist
nuts, holes, screws, support systems and
plugs, shot-fired pins and spring compensated
the like components
(b) Provision and
installation of stiffeners
and all straps and
hangers, rods, test holes,
bungs and the like
including proprietary and
specialist support
systems and spring
compensated components
(c) All joints, including
joints between ducts of
differing materials
(d) Everything necessary
for all jointing
(e) Final supports
(f) Expansion joints
(g) Flexible connections
between ducts and plant,
including transformation
pieces and special duct
fittings
(h) Air turning vanes, test
points, cleaning eyes,
access doors and the like
(f) Ductwork (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY .
RULES INFORMATION
2. Ductwork rectangular 1. Size, gauge or 1. Type of material m2 M.2 Ductwork rectangular C.2 Work is deemed to
in section thickness and type stated in section is measured include all in-line fittings.
over all in-line fittings,
C.3 Work is deemed to
short running lengths and
include all cutting of
branches, (but not
ductwork to fittings,
through items of in-line
equipment and ancillaries,
equipment).
and providing all
M.3 Where an in-line necessary materials, heat,
reduction in size (given by bolts, nuts, washers and
circumference/perimeter) everything necessary for
occurs at a reducer or tee making joints and
etc., the largest size shall connections.
be measured for the full
length of the fitting.
3. Ductwork circular or 1. Size and type stated m M.3 applies. C.3 applies.
oval in section
4. In-line fittings to 1. Bends nr M.4 Reducing fittings,
circular or oval ducts, 2. Branches tapers and transformation
measured extra over 3. Elbows pieces are identified by
the ducts in which they the largest sectional size.
4. Tees
occur
5. Reducers
6. Reducing branches
7. Reducing tees
8. Transformation pieces
9. Tapers
10. Offsets
11. Spigot outlets
12. Others
5. Ancillaries 1. Silencers 1. Size and type and nr
2. Flow meters specification stated
3. Plenums
4. Nozzles
5. Cowls
6. Grilles
7. Diffusers
8. Louvres
9. Fire Dampers
10. Splitter dampers
11. Volume control
dampers
12. Others
NX SBM 4, 162
XVII MECHANICAL INSTALLATIONS 163
6. Flexible ductwork 1. Type, size and length, in nr M.5 The length of flexible
stages of 0.50 m stated and extensible ductwork
7. Extensible ductwork
is measured as it is fully
extended.
8. Isolated joints which 1. Size, kind of duct and nr M.6 Alternatively these
differ from those given method of jointing stated items may be included in
in the description of the description of another
the ducts enumerated item.
(g) Insulation
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 External insulation C.1 Work is deemed to S.1 Kind and quality of
and internal lining are include: materials
(a) Any regulations, rules, bye-laws and the like with which the installations are required to comply. (a) All fixings and
measured separately. S.2 Size, thickness and
adhesives
(b) Forming laps, finish of materials
welts, cut outs, S.3 Method of application
recesses and the like
(c) Pointing, sealing,
trowelling smooth,
chamfered and sealed
edges and the like
(d) Working around
supports, small
drains, vents or
similar obstructions
(e) Special insulation of
load bearing density at
pipe supports
HKG WB 4 164
XVII MECHANICAL INSTALLATIONS 165
6. Insulation to 1. Type and thickness of m2 1. Vapour barrier described M.3 Insulation to C.4 Work is deemed to
rectangular ductwork insulation stated rectangular ductwork is include:
measured the nett area in
(a) Working around
contact with the base of
ducting fittings, stiffeners,
all ducting as installed
joints and the like
and overall ducting fittings
and joints. (b) Forming of angles
and other labours
7. Insulation to circular 1. Type and thickness of m C.5 Work is deemed to
or oval ductwork insulation and size and include working insulation
shape of ductwork stated around joints.
8. Items measured 1. Bends 1. Type and thickness of nr M.4 Extra over insulation C.3 applies.
extra over insulation to insulation for working around
2. Branches
circular or oval reducing fittings, tapers
ductwork in which they 3. Elbows and transformation fittings
occur for working the etc. are identified by the
4. Reducers
insulation around in largest sectional size.
line fittings 5. Tees .
6. Others
9. Insulation to 1. Silencers 1. Details and size of nr
ductwork ancillaries equipment stated, and
2. Plenums
type and thickness of
3. Others insulation to equipment
given
10. Insulation to 1. Details, size and type of nr M.5 Alternatively where
equipment ancillaries and type and equipment is contained in
thickness of insulation to casings of specified
ancillaries given dimensions the insulation
may be given by
superficial measurement.
Or the insulation may be
included in the description
of the item of equipment.
11. Extra over insulation 1. Detachable insulation nr M.6 Alternatively these
items in which they mattresses items may be included in
occur for the description of
enumerated items of the
insulation in which they
occur.
(h) Protective Coverings and Finishings
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally D.1 Protective coverings 0.1 Work is deemed to S.1 Kind and quality of
include cladding, include: materials
(a) Any regulations, rules, bye-laws and the like with which the coverings and finishings are required to
plastering and painted (a) All fixings and
comply. S.2 Size, thickness and
finishes and the like adhesives
finish of materials
(b) Forming laps, welts,
cut outs, recesses and S.3 Method of application
the like
(c) Pointing, sealing,
trowelling smooth,
chamfered and sealed
edges and the like
(d) Working around
supports, small
drains, vents or
similar obstructions
NX 4 166
XVII MECHANICAL INSTALLATIONS 167
6. Protective coverings 1. Type and thickness of m2 M.3 Protective coverings 0.3 Work is deemed to
and finishings to protective coverings and and finishings to include:
insulated rectangular finishings, type and insulated rectangular
(a) Working around
ductwork thickness of insulation ductwork is measured
ducting fittings, stiffeners,
stated the nett area in contact
joints and the like
with the base of all
ducting as installed and (b) Forming of angles and
overall ducting fittings other labours
and joints.
7. Protective coverings 1. Type and thickness of m 0.4 Work is deemed to
and finishings to protective coverings and include working cladding
insulated circular or finishings, type and around joints.
oval ductwork thickness of insulation
and size and shape of
ductwork stated
8. Items measured 1. Bends nr M.4 Extra for coverings
extra over protective and finishings to reducing
2. Branches
coverings and fittings are identified by
finishings to insulated 3. Elbows the largest sectional area.
circular or oval
4. Reducers
ductwork in which they
occur for working the 5. Tees
protective coverings
6. Others
and finishings around
in-line fittings
9. Protective coverings 1. Type and thickness of nr M.5 Alternatively where
and finishings to protective coverings and equipment is contained in
insulated equipment finishings, type and casings of specified
thickness of insulation dimensions the protective
and details and size of coverings and finishings
equipment stated may be given by
superficial measurement.
Or the protective
coverings and finishings
may be included in the
description of the item of
equipment.
(h) Protective Coverings and Finishings (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
10. Extra over protective 1. Detachable protective nr M.6 Alternatively these
coverings and coverings and finishings items may be included in
finishings items in to insulated mattresses the description of
which they occur for enumerated items of the
protective coverings and
finishings in which they
occur.
« SMM 4 168
XVII MECHANICAL INSTALLATIONS 169
(i) Sundries
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
HK SDFDML 4 170
XVIII ELECTRICAL INSTALLATIONS 171
(See Section II — General Principles)
1. Generally M.1 Where composite D.1 Bonding is defined as C.1 Assembling and S.1 Any regulations,
units are supplied by the permanent joining of jointing, together the rules, bye-laws and the
(a) A general description of the installations shall be given where it is not evident from the drawings
others, particulars are metallic parts to form an component parts of like with which the
required to be provided by this document.
included in the description electrically conductive composite units including installations are required
(b) Detailed specifications shall be provided together with drawings indicating the scope of the work. of any assembly work path which will assure providing any necessary to comply
involved. electrical continuity and connecting flanges, and
S.2 Kind and quality of
has the capacity to jointing materials are
M.2 Work is identified materials
conduct safely any deemed to be included.
whether internal, external
current likely to be S.3 Gauge or thickness
or in plant rooms. 0.2 All necessary drilling
imposed. and substance of
of the background and
M.3 Temporary work and materials
provision of fixings, nails,
removal of temporary
bolts, nuts, holes, screws, S.4 Any tests with which
work and making good
plugs, shot fired pins and materials, plant and
shall each be so described.
the like are deemed to be equipment are required
M.4 In the event that only included. to comply
a performance
C.3 Plates, discs and S.5 Type and voltage of
specification is available,
labels for the identification main electricity supply
preamble clauses are
of plant, equipment, stating the location of the
included in the bills
cables, switches and the main supply point
stating that the rates are
like are deemed to be S.6 Priming and/or
to include for all costs of,
included. painting off site and
and costs in connection
with the design, supply C.4 Instruction notices, proprietary finishes or
and installation of the warning signs for plant, surface treatment applied
complete system. equipment, cables, as part of the production
switches and the like are process are described
M.5 Systems, together
deemed to be included. stating whether applied
with their equipment,
before or after fabrication
trunking, ducting, cable C.5 Brackets and methods
or assembly
trays and sundries are of support are deemed to
classified as shown in be included.
Appendix "A” to Section II
C.6 Bonding is deemed to
General Principles.
be included in the items in
which they occur. Where
items of equipment are
supplied by others, the
bonding is deemed
included in the item of
fixing equipment.
(b) Equipment and Switchgear
(See Section XVIII(a) — General Clauses)
1. Switchgear and 1. Prime movers 1. Type, rated capacity nr 1. Particulars of M.1 Type, SPN/TPN, C.1 Connecting cable
equipment and reference to drawing component parts and number of ways and rated ends or cable tails are
2. Motors
or specification given details of any materials capacity are given where deemed to be
3. Fans required for assembly are appropriate. included.
given.
4. Mechanical drives C.2 Couplings to, and .
forming holes for
5. Batteries
conduit entry are
6. Rectifiers deemed to be included.
7. Circuit breakers C.3 Connections between
trunking and equipment
8. Feeder pillars
and switchgear, including
9. Transformers the use of flanges and/or
forming apertures are
10. Fuse & link
deemed to be included.
disconnecting boxes
C.4 Connections between
11. Isolating switches
busbar trunking,
12. Change-over switches equipment and
switchgear are deemed
13. Switch-fuses
to be included.
14. Fused-switches
C.5 Links, fuses, circuit
15. Distribution boards breakers, gland plates,
terminal boxes and the
16. Contactors
like, which form part of
17. Starters the items are deemed
to be included.
18. Busbar chambers
19. Others
MX SMM 4 172
XVIII ELECTRICAL INSTALLATIONS 173
(c) Conduits (except in Final Circuits)
(See Section XVIII(a) — General Clauses)
1. Conduits 1. Type and external size 1. On surface m M.1 Conduit is measured D.1 Concealed conduits C.1 Draw wires, draw
stated, where draw wires, over all conduit fittings, are deemed to include cables, conduit boxes,
2. Concealed
draw cables and the like boxes, short running conduits embedded in conduit fittings and the
to be provided for use by 3. Run in chase lengths and branches. concrete or in floor like, except those required
others they are given in screeds. to be measured under
4. Others
the description item (c).2 hereof, are
D.2 Conduits run in
deemed to be included.
chases, unless otherwise
stated, do not include C.2 Bending, cutting,
cutting away and making screwing and provision of
good. all conduit fixings and
fittings (except those
D.3 The term 'conduit
required under item (c).2
fittings and fixings’ is
hereof, are deemed to be
deemed to include
included.
saddles, tees, elbows,
bends, cover plates, C.3 Components and the
bushes, locknuts, forming of holes for
stopping plugs, reducing making connections of
bushesand the like. conduit into trunking and
the like are deemed to
be included.
2. Items measured as 1. Outlet boxes 1. Type and size stated nr C.3 applies
extra over the conduit 2. Adaptable boxes C.4 Cutting and jointing to
in which they occur 3. Floor trap boxes conduits are deemed to
4. Purpose made boxes be included.
5. Junction boxes C.5 Cover plates to boxes
6. Boxes required for are deemed to be
drawing in cables included.
7. Flameproof boxes
8. Expansion joints
9. Pedestal boxes
10. Others
3. Flexible conduits 1. Size and type stated 1. Overall length stated nr M.2 Flexible conduits are C.3 applies
and adaptors described in stages of 0.50 m measured fully extended.
C.6 Cutting, jointing and
providing all conduit
fittings are deemed to be
included.
(d) Trunking and Busbar Trunking
(See Section XVIII(a) — General Clauses)
1. Trunking 1. Size and type of m M.1 Trunking is measured C.1 All supports and joints
trunking stated,number over all short lengths and and jointing are deemed
and size of any branches. to be included.
compartments given,
C.2 Cutting and jointing
type of covers and
trunking or busbar
method of jointing stated.
trunking to fittings is
Pin racks, where
deemed to be
required stated in the
included.
description
2. Items measured extra 1. Bends nr
over the trunking in
2. Reducing bends
which they occur
3. Tees
4. Reducing tees
5. Crosses
6. Reducin’gcrosses
7. Reducers
8. Fire barriers
9. Others
3. Busbar trunking 1. Capacity and type of 1. Type, number and rated m D.1 Busbar trunking is
trunking stated capacity of conductors defined as including
stated busway and the like.
4. Items measured as 1. Elbows nr
extra over the busbar
2. Tees
trunking in which they
occur 3. Reducers
4. Expansion fittings
5. Others
5. Busbar trunking 1. Tap-off units 1. Type, size and rated nr
fittings and accessories capacity where
2. Feeder units
applicable, stated
3. Flanged ends
4. Special fittings
5. Special supports
6. Fire barriers
7. Others
1. Trays 1. Type and size stated m M.1 Trays and ladders are C.1 All joints are deemed
measured over all short to be included.
2. Ladders
running lengths and
C.2 Cutting and jointing
branches.
trays and ladders to
3. Items measured extra 1. Stop ends nr M.2 Reducing fittings are fittings are deemed to be
over trays in which they identified by the larger included.
2. Bends
occur size of tray or ladder.
C.3 Cutting openings in
3. Tees
4. Items measured extra trays is deemed to be
over ladders in which 4. Reducing tees included.
they occur
5. Crosses
6. Offsets
7. Reducers
8. Others
(f) Cables (except in Final Circuits)
(See Section XVIII(a) — General Clauses)
1. Cables 1. Laid in trench 1. Type, size, number and m M.1 Cables are measured C.1 Colour coding or other
size of cores and rating the net length between identification markings are
2. Laid in open duct
stated. Components for equipment, control gear, deemed to be included.
3. Laid on arm or hanger supporting cables given fittings, accessories and
in the description. (See C.2 Determining circuits
4. Fixed to cable tray, the like, except that the
however alternative and lacing into circuit
ladder or other surface following standard
measurement in item groups are deemed to be
5. Drawn into allowances are added for
(f).7 hereof.) included.
underground pipe duct tails:
(nett length of pipe duct (a) 0.30 m on each cable
measured) entering fittings and
6. Laid or drawn into accessories
trunking (b) 0.60 m on each cable
7. Drawn into conduit entering equipment and
8. Suspended from switch gear
insulators or catenaries
9. Wrapped around
pipework or equipment
10. Drawn into existing
conduits
11. Drawn into existing
ducts
12. Drawn into existing
trunking
2. Cable joints 1. Type and size of cable nr C.3 Materials and heat for
stated. Joint-boxes, making the joints are
sealing-boxes and the like deemed to be included.
given in the description
3. Line taps 1. Size and type of cable nr
C.4 Shrouds, if required,
stated are deemed to be included.
4. Cable termination nr
C.5 Shrouds, locknuts,
glands
bushes, earth tags and
cable lugs are deemed to
be included.
5. Cable termination 1. Type of box and type nr
C.6 Insulating materials,
boxes and size of cable being
jointing materials, lock nuts,
terminated stated
bushes and the like are
deemed to be included.
NX SMM 4, 176
XVIII ELECTRICAL INSTALLATIONS 177
6. Special boxes for 1. Type and size of cable nr C.7 Connecting cable tails
future use or for use by stated to connector blocks and
others covers to boxes are
deemed to be included.
7. D-irons 1. Type of component and nr
type and size of cable
8. Insulators
stated
9. Other components
10. Connections to Prov’l
public mains, making Sum
good highway and any
other work which may
be carried out by a
Public Utility Company
or Local Authority
(g) Final Circuits (Cables etc. in Final Circuits)
(See Section XVIII(a) - General Clauses)
1. Generally
Distribution diagrams and drawings, showing the layout of points, shall be provided, accompanying the Bills
of Quantities.
NX SDMM 4 178
XVIII ELECTRICAL INSTALLATIONS 179
(h) Fittings and Accessories
(See Section XVIH(a) — General Clauses)
HIX MM 4 180
XVIII ELECTRICAL INSTALLATIONS 181
G) SUNDRIES
(See Section XVIH(a) — General Clauses)
1. Generally M.1 Where composite D.1 Bonding is defined as C.1 Assembling and S.1 Any regulations,
units are supplied by the permanent joining of jointing, together the rules, bye-laws and the
(a) A general description of the installations shall be given where it is not evident from the drawings
others, particulars are metallic parts to form an component parts of like with which the
required to be provided by this document.
included in the description electrically conductive composite units, including installations are required
(b) Detailed specifications shall be provided together with drawings indicating the scope of the work. of any assembly work path which will assure providing any necessary to comply
involved. electrical continuity and jointing materials and
S.2 Kind and quality of
has the capacity to connecting flanges is
M.2 Temporary work, materials
conduct safely any deemed to be included.
removal of temporary
current likely to be S.3 Gauge or thickness
work and making good C.2 All necessary drilling
imposed. and substance of
are each so described. of the background and the
materials
provision of fixings, nails,
M.3 Systems, together
bolts, nuts, holes, screws, S.4 Any tests with which
with their trunking,
plugs, shotfired pins and materials, plant and
ducting, cable trays and
the like are deemed to be equipment are required
conduits (unless
included. to comply
associated with more than
one installation) are 0.3 Plates, discs and S.5 Priming and/or
classified as shown in labels for the identification painting off site and
Appendix “A” to Section II of plant, equipment, proprietary finishes or
General Principles. cables, switches and the surface treatment applied
like are deemed to be as part of the production
M.4 Work is identified
included. process are described
whether internal, external
stating whether applied
or in plant rooms. C.4 Instruction notices,
before or after fabrication
warning signs for control
M.5 In the event that only or assembly
equipment, cable
a performance
equipment control
specification is available,
switches, accessories
preamble clauses shall
and the like are deemed
be included in the bills
to be included.
stating that the rates are
to include for all costs of, C.5 Brackets and methods
and costs in connection of support are deemed to
with, the design, supply be included.
and instalation of the
C.6 Bonding is deemed to
complete system.
be included in the items in
which they occur. Where
items of equipment are
supplied by others the
bonding is deemed
included in the item of
fixing equipment.
(b) Equipment
(See Section XIX(a) — General Clauses)
1. Central equipment 1. Central processing units 1. Described (or referred nr C.1 interfacing, connecting,
to in the equipment interconnecting cables,
2. Master stations
schedule/ appropriate jointing and making all
3. Operator stations specification clause) busbar, cable, conduit,
trunking and cable tray
4. Control console
connections and the like
5. Display units and the provision of all
6. Printers associated components is
deemed to be included in
7. Disc drive units the items of equipment.
8. Amplifiers C.2 Cable and conduit
9. Others connections from power
source/UPS units to all
2. Peripheral equipment 1. Data gathering panels nr
equipment are deemed
2. Splitters included in the equipment
items.
3. Distribution
process units
4. Others
3. Provision of all Item D.1 Software includes C.3 Fees and charges for
software, including those for the operating software patents and
back-up copies systems and applications. licenses are deemed to be
included in the item.
4. Uninterruptible 1. Units including batteries Item
power supply units and chargers, all supply
(UPS) and interconnecting wiring
etc., battery type, standby
time and rated capacity
stated
HK SIIML 4 184
XIX COMMUNICATIONS/SECURITY/CONTROL SYSTEMS 185
(c) Distribution and Principal Interconnections
(See Section XIX(a) — General Clauses)
1. Signal/Control Item
circuits, including
approved cable,
conduit, trunking and
accessories etc. from
central equipment to
all peripheral
equipment, including
master station
2. Signal/Control Item
circuits including
approved cable,
conduit, trunking and
accessories etc.
between peripheral
equipment
M.1 These items are
3. Cable trunking, trays measured separately in
and ladders specifically accordance with Section
detailed in the tender XVII(e).1,2and 3.
drawings
(d) Final Circuit Points
(See Section XIX(a) — General Clauses)
1. B.M.S. final circuits 1. Analogue input points 1. Described, description nr C.1 Cables and conduit
includes the type of connections from power
2. Security final circuits 2. Analogue output points
circuits, point of origin, source/UPS units to all
3. Communications 3. Digital input points function and location or systems are deemed to be
final circuits schedule reference. included in the equipment
4. Digital output points
items.
C.2 Each item is deemed
to include:
(a) Cables, conduits and
flexible conduits
(b) Adapters, outlet
boxes, junction boxes,
including special boxes
and the like
(c) All fixings, bending,
cutting, screwing and
jointing
(d) Laying in trunking or
fixing in trays and ladders
(e) All earth continuity
requirements
NK SMM 4 186
XIX COMMUNICATIONS/SECURITY/CONTROL SYSTEMS 187
HK SMM 4 188
XIX COMMUNICATIONS/SECURITY/CONTROL SYSTEMS 189
(e) Sundries
(See Section XIX(a) — General Clauses)
1. Generally M.1 Glass measured in C.1 Work is deemed to S.1 Kind, quality and
this Sub-section is for include: thickness of glass
general glazing to
(a) Putty or glazing S.2 Kind and quality of
windows, doors etc.
compounds glazing compounds and
M.2 Glass in the following sealants
(b) Sprigs or glazing clips
positions are measured
S.3 Method of glazing
in the appropriate Sub (c) Bedding in glazing
sections of Section XIII tape, wash leather, S.4 Method of securing
Wood Works and XV rubber, neoprene, butyl or including details of
Steel and Metal Works: other plastic and the like gaskets, glazing strips
where so described and channels
(a) Fixed and
demountable partitions (d) Where bedded in S.5 Nature of frame or
wood frames with wooden surround
(b) Office partitions
beads the taking off and
S.6 Fire rated panes
(c) Shop fronts replacing the beads
have fire rating stated
(d) Curtain walling (e) Drilling or forming all
holes for fixing or for
(e) Furniture and fittings
ironmongery and the
etc.
like
2. Glazing 1. Panes area <0.15 m2 m2 1. In irregular shapes M.3 Panes of irregular C.2 Glazing is deemed to
(measured square) shape are measured the include raking and curved
3. Sealed double 2. Panes area > 0.15 m2
smallest rectangle from cutting.
glazing units and < 4.00 m2 2. In flat panes set to
which the pane can be
curve
3. Panes area > 4.00 m2 obtained.
M.4 Glass which is
brilliant cut or bent or in
which holes are cut or
formed, is enumerated.
5. Panes of glass with 1. Dimensioned description 1. Number, size and type nr 1. Irregular shapes D.1 Cut or formed holes C.2 applies.
cut or formed holes of holes stated (measured square) are holes other than
those included by the
application of C.1 (e)
hereof.
6. Brilliant cut panes 1. Decoration described nr
7. Bent panes 1. Bent in short direction, nr
radius stated
2. Bent in long direction,
radius stated
3. Bent in both directions,
radii stated
8. Polished edges 1. Plain edges m 1. Curved edges M.5 Labours on glass are C.3 Edges are deemed to
grouped with the glass to include mitres.
2. Rounded edges 2. Bent panes
which they relate.
3. Bevelled edges, width
of bevel stated
9. Grinding 1. Plain work 1. Panes partly obscured m2 M.6 Grinding,
sandblasting and
10. Sandblasting 2. Panes wholly obscured
embossing are measured
11. Embossing over the whole area of
the panes.
12. Engraving
2. Design work 1. Dimensioned nr D.2 Design work includes
description art work, lettering and the
like.
2. Mirrors 1. Dimensioned description 1. Polished or bevelled nr 1. If drilled, number, size C.1 Work is deemed to S.2 Details of silvering
edges described and type of holes stated include fixings, backings and protective backing
and framing.
S.3 Method of fixing
S.4 Fixing through
vulnerable materials
S.4 Metal framing and
plywood or other
backings
3. Shelves nr C.2 Work is deemed to S.5 Method of fixing and
include brackets, supports brackets
and fixings.
1. Generally M.1 Work on concrete, D.1 Work is deemed to be C.1 All work shall be S.1 Kind and quality of
brick, plaster, stone, internal unless otherwise deemed to include: materials
metal, wood or other described.
(a) Multicoloured work S.2 . Materials required to
surface is in each case
D.2 Multi-coloured work is and cutting to line be applied and/or
given separately.
defined as the application finished by a particular
(b) Preliminary
M.2 The area or girth of more than one colour method stated
preparatory work before
measured is the area or on an individual surface.
application S.3 Preliminary
girth covered including On walls and columns
preparation work before
allowances for the extra and on ceilings and (c) Rubbing down
application
girth of edges, mouldings, beams, it is defined as between coats
panels, sinkings, the application, in one
(d) Painting on beads,
corrugations, flutings, room, of more than one
hinges and other fittings,
carvings, enrichments colour on walls and
brackets, bolts, lugs and
and the like unless columns, or on ceilings
the like, and attached
otherwise provided for and beams.
pipework and conduits
herein. painted at the same time
M.3 Work on existing and in the same material
surfaces is given and colour as the surface
separately and to which they are attached
preparatory treatment of
existing decoration such
as washing down,
burning off, stripping and
the like is stated in the
description.
a) General Clauses Applicable to the following Sub-sections (b) through (e) (continued)
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Painting 1. General surfaces 1. Girth > 300 mm m2 M.1 Plain, open type C.1 Work on grilles,
balustrades, fencing, louvres and the like is
2. On walls and columns 2. Surfaces, girth < 300 m
gates, railings and the deemed to include for
(grouped together) mm
like are described finish to all surfaces.
3. On ceilings and beams 3. Isolated surfaces < nr according to size of C.2 Work on windows,
(grouped together) 0.50 m2, irrespective of individual members. glazed screens and
girth
4. On concrete grilles and M.2 Each side of mesh glazed doors shall be
the like, measured flat covered or ornamental deemed to include
overall on both sides, railings and gates is opening edges, and all
stating thickness of grille measured and, surfaces of frames,
notwithstanding the mullions, transomes, cills
5. On members of roof
general measurement and the like.
trusses, lattice steelwork
and the like rule M.6 above is
measured overall
6. On corrugated surfaces regardless of voids.
and the like, measured
flat
i
7. On windows, glazed
screens and glazed
doors, measured flat on
both sides
8. On mesh covered or
ornamental fencing,
railings, gates and the
like, measured flat overall
both sides
9. On grilled or louvred
surfaces, measured
flat overall on both
sides
10. On individual
members of plain, open
type balustrades,
fencing, gates, railings
and the like
11. Others
(b) Painting and Similar Work (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Painting on pipes 1. Bore >100 mm, m C.3 Work is deemed to
and conduits diameter stated include painting on pipe
clips, holders, hangers,
conduit boxes and the
like.
2. Bore > 50 mm and <
100 mm diameter
3. Bore < 50 mm,
diameter
3. Painting on eaves 1. Size stated m
gutters
4. Painting on sundry 1. Airbricks nr
items
2. Rainwater heads
3. Ventilating gratings
4. Others
1. Polishing or clear 1. Timber floors 1. Girth > 300 mm m2 M.1 Type of finish and D.1 This Sub-section (c)
finishing preparatory work (e.g. includes wax and shellac
2. General 2. Isolated surfaces, girth m
staining, bodying in and polishing, cellulose,
surfaces of < 300 mm
the like) is given in the polyurethane and epoxy
woodwork in joinery
description. clear finishes and the like.
3. General surfaces of
marble or polished granite
and the like
HK Mi 4 198
XXI PAINTING 199
(d) Signwriting
(See Section XXI (a) — General Clauses)
s-
HKX IBM 4
200
XXII LANDSCAPING 201
(See Section 11 — General Principles)
1. Soiling for turfing or 1. Average thickness 1. Type of soil to be used m2 M.1 Thickness is S.1 Timing of operations
grass seeding stated and method of measured after
S.2 Details of post
preparation stated compaction.
planting watering,
2. Turfing 1. Spot turfing or sprigging 1. Types of grass, size m2 1. Details of pre-turfing fertilisation, cultivation
and spacing of sprigs fertiliser, top dressing and and cutting and of
stated rolling stated replacement
requirements
2. Close turfing on level or 1. Turves previously cut m2 1. Details of pre-turfing
to slopes < 1 in 7 and stored on site fertilizer, and top
dressing stated
3. Close turfing to slopes 2. Type of grass and size
>1 in 7 and thickness of turves 2. If fixed with pegs,
stated spacing stated
3. Broadcast seeding 1. Grass seed mix to be m2 1. Details of pre-seeding
for grassed areas used and rate of fertilizers, mulches and
application stated top dressings to be
included stated
4. Hydroseeding for 1. Details of mix to be m2 1. Details of protective
grassed areas used, including details of layer to be applied and
seed mix, mulch, fertiliser method of securing in
soil binding agent and position stated
dye incorporated and
rate and method of
application stated
5. Metal or other edging 1. Described m
to grassed areas
(c) Planting
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Cultivating 1. Depth and maximum m2 1. Weeding, details stated D.1 Types of surface C.1 Cultivating is deemed S.1 Timing of operations
size of stones permitted applications include to include the removal of
S.2 Method of cultivating
to remain stated herbicides, selective stones above the
and degree of tilth .
weedkillers, peat, maximum permitted size
fertilisers, compost, limit. S.3 Kind, quality and
mulch, ameliorants and composition of materials
C.2 Surface applications
the like.
are deemed to be S.4 Definitions of size
included working in if designation required
required.
2. Surface applications 1. Type and rate stated m2 S.5 Size and type of pits,
holes or trenches
3. Trees 1. Botanical name 1. Size designation nr 1. Supplying only. D.2 Removing surplus C.3 Items include for
excavated or formed
2. Planting in existing excavated materials excavating or forming pits,
2. Girth, height and clear
means removing from holes or trenches, refilling, S.6 Type of supports and
stem and root system cultivated or grassed
site unless otherwise watering in, removing ties
stated areas or cultivated or
described. surplus excavated
grassed areas prepared S.7 Special materials for
material and labelling.
by others, details stated refilling
C.4 Refilling is deemed to
3. Initial cut-back, details S.8 Labelling
include all necessary
stated
multiple handling. S.9 Colouration of leaves
4. Shrubs 1. Height and root system nr 4. Transplanted trees, or blossoms stated in
stated C.5 Planting in cultivated
including provision of specification
or grassed areas prepared
temporary storage
2. Height and root system m2 by others is deemed to
stated and spacing of 5. Collecting and include all necessary
plants or number per m2 transplanting trees from reinstatement.
stated another source
C.6 Planting trees in
5. Bamboos 1. Size, number of shoots nr 6. Supports and ties paved areas is deemed to
and size of contained in include lifting tree grilles
which grown described 7. Refilling with special and setting aside and
materials, details stated subsequent relaying and
6. Herbaceous plants 1. Size stated nr
8. Watering, details stated replacing any damaged or
7. Ground cover plants 2. Size and number per m2 m2 lost tree grilles.
stated 9. Where trees are planted
in paved areas this is
8. Climbers 1. Size stated nr stated
2. Size and number of
shoots stated
HK SMN4 202
XXII LANDSCAPING 203
c) Planting (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
(d) Boulders
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Boulders 1. Supplied and placed 1. Type of boulder, nr S.1 Source and quality of
dimensioned description, boulders
2. Selected from boulders
method of placing and
on site and placed
securing in position
Framed Works, Metal XV P.125 Lathing XVI P.143 Partitions, Toilet Cubicle XIII P.110
Frames & Linings, Wood XIII p.111 Lightning Protection XVIII P.180 Partitions, Wood, Glazed XIII P.108
Furniture, Metal XV P.142 Linings, Sheet Metal XV P.122 Pipework XVII P.156
Furniture, Wood XIII P.114 Liquid Membrane Waterproofing X P.85 Pipework, Accessories XVII P.158
G Luminaires XVIII P.179 Pipework, Ancillaries XVII P.158
Gates, Collapsible Gates, Metal XV P.124 M Pipework Supports XVII P.157
Glass Shelves XX P.194 Macadam XVI P.145 Planking & Strutting, incl Excavation VI P.46
Glass Balustrades & Parapets XX P.193 Marble Facings XI P.94 Plant Pots & Containers XXII P.203
Glass Block Walls & Panels VIII P.77 Marble Tiling XVI P.148 Planting XXII P.202
Glass Wall Linings XX P.193 Mechanical Equipment XVII P.153 Plasterboard XVI P.143
Glazed Wood Partitions XIII P.108 Mechanical Installations, Sundries XVII P.169 Plastering XVI P.143
Glazing - General Glazing XX P.191 Mechanical Installations XVII P.153 Plastic Sheet Finishes XVI P.151
Granite Facings XI P.94 Mechanical Section General Clauses XVII P.153 Playground Equipment, Wood XIII P.114
Granite Tiling XVI P.148 Metal Doors, Gates, Shutters, Grilles XV P.124 Playground Equipment, Metal XV P.142
Granolithic Finishes, Terrazzo XVI P.145 Metal Hatches XV P.124 Polishing & Clear Finishing XXI P.198
Grass Seeding & Turfing XXII P.201 Metal Works for Structural Timber XVII P.99 Polycarbonate Sheet Glazing XX P.191
Grilles, Screens & Louvres, Metal XV P.124 Minimum Deductions II P.4 Precast Concrete VII P.70
Gun Applied Reinforced Concrete VII P.64 Minor Buildings & Structures, Metal XV P.128 Precast Concrete Piles V P.28
Gutters XVII P.160 Minor Buildings & Structures, Wood XIII P.115 Precast Prestressed Concrete VII P.73
H Mirror Wall Linings XX P.193 Prestressed Concrete VII P.71
Handrails, Metal XV P.125 Mirrors XX P.194 Prime Cost Sums II P.5
Handrails, Wood XIII P.113 Moon Gates, Stone XI P.93 Profiled Metal Sheet Roof Coverings XV P.131
Hardcore & Granular Filling VI P.50 Mosaic Tiling XVI P.148 Profiled Sheet Roof & Wall Claddings XIII P.107
Hatches, Wood XIII P.111 Mulching Planting Areas XXII P.203 Profiled Metal Sheet Wall Claddings XV P.131
Heat Exchangers XVII P.154 N Proprietary Roof Tiling XII P.98
Hydroseeding XXII P.201 0 Protective Coverings & Finishings XVII P.166
1 Office Cubicle Partitions, Metal XV P.135 Provisional Sums II P.5
In-situ Surface Finishes & Screeds XVI P.145 Office Cubicle Partitions, Wood XIII P.110 Pumps XVII P.154
Insulation to Ductwork XVII P.165 Overhead Crane Rails XV P.120 Q
Insulation to Equipment XVII P.165 P R
Insulation to Pipework XVII P.164 Painting, General Clauses XXI P.195 Racks, Wood XIII P.114
Insulation to Wall Linings, Claddings etc. XIII P.103 Paperhanging including Sheet Plastic & Fabric Linings Raised Access Floors, Metal XV P.131
Ironmongery XIV P.117 XXI P.199 Raised Access Floors, Wood XIII P.102
J Parquet Flooring XIII P.101 Removal of Water III P.16
K Partitions, Demountable, Wood XIII P.108 Rendering XVI P.145
L Partitions, Fixed, Wood XIII P.108 Reservoir, Works Under II P.5
Laboratory & Sanitary Fittings XVII P.155 Partitions, Office Cubicle XIII P.110 River, Works Under II P.5
Landscaping XXII P.201 Partitions, Sliding and Folding XIII P.109 Roads & Paving XVI P.145
NX SMM 4 206
ALPHABETICAL INDEX (continued) 207
Roof Tiling XII P.97 Stone Copings, Curbs, Steps etc. XI P.92 Wood Balustrades XIII P.113
Roofing and Flashings, Sheet Metal XV P.123 Stone Facings to Structural Backgrounds XI P.94 Wood Block Flooring XIII P.101
Rubber Sheet Finishes XVI P.151 Stone Moon Gates XI P.93 Wood Handrails XIII P.113
s Stone Pitching to Slopes XI P.92 Wood Doors XIII P.111
Sanitary & Laboratory Fittings XVII P.155 Stone Walling XI P.91 Wood Framed Suspended Ceilings XIII P.103
Sea Water, Works Under 11 P.5 Structural Timber XIII P.99 Wood Frames & Linings XIII P.111
Security Systems XIX P.183 Structural Steel XV P.119 Wood Hatches XIII P.111
Security Systems, Equipment XIX P.184 Surface Finishes & Screeds, In-situ XVI P.145 . Wood Stairs XIII P.113
Security Systems, Final Circuits XIX P.186 Surface Water Channels VII P.59 Wood Strip Flooring XIII P.101
Security Systems, Sundries XIX P.189 Suspended Ceiling, Metal XV P.136 Wood Trims XIII P.103
Septic Tanks IX P.83 Suspended Concrete Slabs VII P.61 Wood Ventilators XIII P.111
Service Ducts IX P.81 Switchgear & Equipment XVIII P.172 Working Space, for Excavation VI P.46
Sheet Linings & Claddings XIII P.103 Symbols and Abbreviations II P.3 Work in Compressed Air II P.5
Sheet Membrane Waterproofing X P.88 Synthetic Rubber Tiling XVI P.148 Work in Existing Buildings II P.5
Sheet Plastic Paperhanging XXI P.199 T Work outside the Site II P.5
Shelving, Wood XIII P.114 Tanks XVII P.154 Work under Reservoir, River or Sea Water II P.5
Shelving, Racks, Metal XV P.142 Temporary Roofs IV P.23 X
Shop Fronts, Metal XV P.139 Temporary Screens IV P.23 Y
Shoring IV P.23 Temporary Shoring for Bank Excavation VI P.49 Z
Shutters, Folding, Rolling, Metal XV P.124 Terrazzo Finishes XVI P.145
Sign Boards & Signage, Wood XIII P.114 Tile & Slab Finishes XVI P.148
Sign Boards & Signage, Metal XV P.142 Toilet Cubicle Partitions, Wood XIII P.110
Signwriting XXI P.199 Toilet Cubicle Partitions, Metal XV P.133
Site Clearance VI P.45 Trays & Ladders XVIII P.173
Slate Tiling , XVI P.148 Trenches for Pipe Ducts IX P.81
Sliding and Folding Partitions XIII P.109 Trenches for Drain Pipes IX P.81
Spatterdash . XVI P.143 Trunking & Busbar Trunking XVIII P.174
Specification, Used for BQ preparation 11 P.3 Turfing & Grass Seeding XXII P.201
Sprayed Concrete to Slopes VI P.51 U
Squash Court Armoured Glass Walls XX P.193 Underpinning VI P.53
Stairs, Wood XIII P.113 Uninterruptible Power Supply (UPS) XIX P.184
Stairs, Metal XV P.125 Units of Billing II P.3
Steel & Metal, Sundries XV P.129 Units of Measurement II P.3
Steel Piles V P.36 V
Steel Sheet Piling V P.25 Ventilators, Woods XIII P.111
Stone Arches XI P.93 W
Stone Beds & Sides to Water Courses XI P.92 Walling, Diaphragm V P.43