IT For Upstand Concret
IT For Upstand Concret
NEW CAPITAL
INSPECTION AND TEST PLAN
upstand concrete
approved shop
4 form work for up stand visual inspection IR H H
drawings
6 pouring IR s s
CONSTRUCTION
DISTRIBUTION: CONSULT OTHER
MANAGER
ANT S ABBREVIATIONS : VERIFICATION CODES
SC - Subcontractor H-HOLD
C - Contractor W - WITNESS
RA - Regulatory Authority S-Surveillance
T-TEST