Final Proposed Boq - Workshop - Wakra 16.07.2024

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views

Final Proposed Boq - Workshop - Wakra 16.07.2024

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 304

PROPOSED

WAREHOUSE, OFFICES & SHOWROOM


FOR
MR. MOHAMED JASSIM M A AL MAADEED
AT
AL WAKRAH

TENDER DOCUMENTS

VOLUME – 04 BILL OF QUANTITY &


NOTES ON PRICING

REV. 0
04 – 06 – 2020

DESIGN CONSULTANT
BILL OF QUANTITIES
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING
NOTES ON PRICING AND BILL OF QUANTITIES

INDEX

BILL PARTICULARS PAGES REFERENCE

Notes on Pricing NOP/1 to NOP/38


Bill of Quantities
1 PRELIMINARIES 1/1 to 1/11

2 SHOWROOM 2/1/1 to 2/1/3

2.1 EARTHWORKS 2/1/1 to 2/1/3

2.2 CONCRETE WORKS 2/2/1 to 2/2/8


2.3 MASONRY WORKS 2/3/1 to 2/3/3

2.4 ROOFING WORKS 2/4/1 to 2/4/4

2.5 JOINERY WORKS 2/5/1 to 2/5/4

2.6 METAL WORKS 2/6/1 to 2/6/5

2.7 STRUCTURAL STEEL WORKS 2/7/1 to 2/7/5

2.8 PLUMBING & DRAINAGE 2/8/1 to 2/8/10

2.9 FIREFIGHTING WORKS 2/9/1 to 2/9/3

2.10 HVAC WORKS 2/10/1 to 2/10/10

2.11 ELECTRICAL WORKS 2/11/1 to 2/11/13

2.12 ELV WORKS 2/12/1 to 2/12/9

2.13 FINISHES WORKS 2/13/1 to 2/13/7

2.14 PAINTING WORKS 2/14/1 to 2/14/3

2.15 MISCELLANEOUS WORKS 2/14/1 to 2/14/4

3 WORKSHOP

3.1 EARTHWORKS 3/1 to 3/1/3

3.2 CONCRETE WORKS 3/1/1 to 3/2/8

3.3 MASONRY WORKS 3/3/1 to 3/3/3

Tenderers shall check the tender documents provided and shall initial this page in
acknowledgment that all of the pages listed and all of the drawings and other documents
referred to have been allowed for in preparing this tender.

Tenderer’s stamp and initials………………………………………Date……………………....


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING
NOTES ON PRICING AND BILL OF QUANTITIES

INDEX

3.4 JOINERY WORKS 3/4/1 to 3/4/4

3.5 METAL WORKS 3/5/1 to 3/5/4

3.6 STRUCTURAL STEEL WORKS 3/6/1 to 3/6/5

3.7 PLUMBING & DRAINAGE 3/7/1 to 3/7/7

3.8 FIREFIGHTING WORKS 3/8/1 to 3/8/3

3.9 HVAC WORKS 3/9/1 to 3/9/7

3.10 ELECTRICAL WORKS 3/10/1 to 3/10/11

3.11 ELV WORKS 3/11/1 to 3/11/9

3.12 FINISHES WORKS 3/12/1 to 3/13/5

3.13 PAINTING WORKS 3/13/1 to 3/13/3

4 UG IRRIGATION TANK

4.1 EARTHWORKS 4/1 to 4/1/1

4.2 CONCRETE WORKS 4/1/1 to 4/2/3

4.3 MASONRY WORKS 4/3/1 to 4/3/3

5 UG STORM WATER TANK

5.0 EARTHWORKS 5/1 to 5/1/1

5.2 CONCRETE WORKS 5/1/1 to 5/2/3

5.3 ARCHITECTURAL WORKS 5/3/1 to 5/3/3

6 EXTERNAL WORKS

6.1 SITE GRADING WORKS 6/1 to 6/1/3

6.2 HARD LANDSCAPING AND FEATURES 6/1/1 to 6/2/4

6.3 ROAD WORKS 6/3/1 to 6/3/4

6.4 SOFT LANDSCAPING 6/4/1 to 6/4/3

Tenderers shall check the tender documents provided and shall initial this page in
acknowledgment that all of the pages listed and all of the drawings and other documents
referred to have been allowed for in preparing this tender.

Tenderer’s stamp and initials………………………………………Date……………………....


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING
NOTES ON PRICING AND BILL OF QUANTITIES

INDEX

6.5 BOUNDARY WALL AND GATE 6/5/1 to 6/5/3

6.6 SURFACE DRAINAGE WORKS 6/6/1 to 6/6/4

6.7 SITE PLUMBING AND DRAINAGE WORKS 6/7/1 to 6/7/4

6.8 SITE IRRIGATION WORKS 6/8/1 to 3/8/3

6.9 SITE ELECTRICAL WORKS 6/9/1 to 6/9/9

6.10 SITE ELV WORKS 6/10/1 to 6/10/7

6.11 MISCELLANEOUS WORKS 6/11/1 to 6/11/3

Tenderers shall check the tender documents provided and shall initial this page in
acknowledgment that all of the pages listed and all of the drawings and other documents
referred to have been allowed for in preparing this tender.

Tenderer’s stamp and initials………………………………………Date……………………....


Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

NOTES ON PRICING

Page NOP/1
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Contents

1. GENERAL ............................................................................................................................ 3
2. DEMOLITIONS AND ALTERATIONS .................................................................................. 6
3. EXCAVATION AND EARTHWORK ..................................................................................... 6
4. CONCRETE WORK ............................................................................................................. 8
5. BLOCKWORK .................................................................................................................... 10
6. ROOFING .......................................................................................................................... 11
7 CARPENTRY AND JOINERY ............................................................................................ 11
8. STRUCTURAL STEELWORK ........................................................................................... 13
9. METALWORK .................................................................................................................... 13
10. PLUMBING AND ENGINEERING ...................................................................................... 15
11. VENTILATING AND AIR CONDITIONING ........................................................................ 19
12. ELECTRICAL INSTALLATION .......................................................................................... 24
13. FINISHINGS....................................................................................................................... 29
14. GLAZING .......................................................................................................................... 30
15. PAINTING AND DECORATING ........................................................................................ 30
16. DRAINAGE ........................................................................................................................ 30
17. EXTERNAL WORKS ........................................................................................................ 31
18. ROAD WORKS .................................................................................................................. 32
19. EXTERNAL ENGINEERING .............................................................................................. 32
20. POWER SUPPLY AND DISTRIBUTION ........................................................................... 36

Page NOP/2
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

1. GENERAL

1.01 GENERAL NOTES

A. This Bills of Quantities have been prepared in accordance with the Standard Method of
Measurement of Building Works dated 28th February 1973 (25th Muharram 1393) issued by
the Ministry of Public Works, State of Qatar (hereinafter referred to as the QSMM). However,
this is not so in every respect and each and every departure from the QSMM has not been
individually highlighted. The method of measurement therefore as expressed in these
documents must be accepted where applicable. The reference numbers attached to each
Bill of Quantities refers to the applicable Specification Section reference number.

B. The Contractor should note that Bill No.1 – Preliminaries is for the complete works.

C. Notwithstanding the provisions of the several sections of the QSMM some of the general
items to each section have been included as an item in the pricing sections of these Bills of
Quantities. The remaining are deemed to be included within the rates and prices given.

D. The Contractor shall price every item in the pricing sections of the Bills of Quantities. Any
item left un-priced shall be deemed to have been allowed for in the prices of other items. No
claim for payment in respect of un-priced items will be admitted. Lump sums set against
groups of items are not acceptable.

E. Descriptions of work and materials are not necessarily complete in the Bills of Quantities and
reference should be made to the Conditions of Contract, Specifications and to the Drawings
for this information. The prices inserted in the Bills of Quantities must be comprehensive and
should be the full inclusive cost of the work in every respect and of all general liabilities and
obligations set forth or implied in the documents on which the Tender is based. The
completed prices must truly reflect the value of the item described.

F. The rates and prices shall be deemed to include for all costs in respect of local religious
holidays and customs and the provision of all amenities customary in the State of Qatar.

G. The Notes on Pricing are to be read in conjunction with the item descriptions given in the
pricing sections of these Bills of Quantities and shall apply wherever relevant.

H. Rates and prices shall be deemed to include for engineering design for elements as stated in
specifications and drawings, which are Contractor designed.

Page NOP/3
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

I. The Quantities included in the Bills of Quantities are as estimated from the Drawings and are
included to assist the Contractor in the preparation of his Tender. Their accuracy is not
guaranteed. With regard to the priority of the several documents forming the contract as
stated within the first paragraph of Clause 6(2) – Documents Mutually Explanatory, of the
Conditions of Particular Application, Tenderers shall check the descriptions and quantities
and are given the opportunity during the Tender period to communicate any discrepancies,
ambiguities or omissions they find to the Engineer, who will issue a reply to such
communications if he considers appropriate, in the form of a circular letter or telex to all
Tenderers in accordance with Instructions to Tenderers. After the time and date fixed for the
submission of Tenders, the quantities stated in the Bills of Quantities (as may be amended
by circular letters/ telexes issued by the Engineer during the Tender period) will be taken as
the actual and correct quantities for the Works.

1.02 DEFINITIONS

A. The terms "plug", "plugged" and "plugging", shall be deemed to mean plugging concrete or
blockwork by an adequate permanent method of fixing suitable for the situation, material and
article to be fixed.

B. In the description of items for external services or drainage, the word "trench" shall be
deemed to include all excavating, grading bottoms, planking and strutting, backfilling,
compacting earth in layers not exceeding 150 mm thick and disposing of surplus spoil.

1.03 MATERIALS ON SITE

A. Monthly valuations shall certify payment for unfixed materials on site as provided for by
Clause 60 of the Conditions of Contract.

B. Eighty percent (80%) of the stated invoice value (as certified by the Contractor, including all
copies of the relevant invoices) of the unfixed materials at site for the permanent works
supplied by the Contractor but not yet incorporated into the permanent works, less retention
money. Such shall be included in the monthly payment subject to; in the opinion of the
Engineer, such material not having been supplied to construction site permanently and also
that they are adequately stored and protected in order to prevent deterioration or damage
while they are stored on construction site prior to incorporation into the permanent works.

C. The valuation so certified by the Engineer shall be the invoiced cost of the materials, if the
Engineer considers this cost to be realistic, plus any customs duty or other Qatar taxes paid
together with an allowance for port dues and delivery to and unloading at the Site. The
valuation for unfixed materials on site shall be the net reimbursement to the Contractor of the
cost of the materials delivered and unloaded at the site and as such shall be exclusive of any
profit or Contractor's overheads mark-up.

Page NOP/4
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

D. Notwithstanding the foregoing, such net reimbursement to the Contractor for unfixed
Materials on Site shall be less than the total price included by the Contractor in the
Bills of Quantities for both supplying and subsequently fixing the said materials, such that in
the Opinion of the Engineer, a reasonable and sufficient value is retained for payment to
the Contractor in subsequent monthly payments for permanently fixing the materials in
the Works. Maximum amount certified for the Materials on Site shall not exceed 70% of
the BOQ price for supply and fix.

E. Under no circumstances will the Engineer pay for items that are deemed to be consumables,
temporary works, in excess of net installed quantities required, or of minor/civil building
materials such as cement, sand, bar reinforcement, concrete masonry blocks, paints etc.

F. The Contractor shall make due allowance in pricing the Bills of Quantities to take account of
these clauses.

G. Formwork materials including all struts, timber or sheet boarding, all other timber work,
waffle moulds, proprietary shuttering systems and the like shall not be considered as
"unfixed materials on site" for the purposes of monthly valuations. Formwork shall be valued
in accordance with the preambles of the Preliminaries section as "plant" and/or as measured
work, once executed, in accordance with the rules of measurement and these notes.

1.04 PRELIMINARIES

A. Monthly payments for Preliminaries shall only be made for those costs which have been
properly incurred and for which the Contractor has inserted prices against the items in the
Bills of Quantities' Preliminaries Section. Payment for such shall be valued proportionally at
the same rate as the value of permanent work executed in any month bears to the total
value of permanent work included in the Contract.

B. In addition, at the Engineer's discretion and only where priced for by the Contractor in the
Bills of Quantities' Preliminaries section, the actual cost of certain Preliminaries items, for
example, the provision of bonds and insurances, the construction of temporary facilities on
site, etc., may be certified by the Engineer for payment in full when executed. Such
certification shall be the lesser value of:

either (1) The prices given by the Contract in the Preliminaries section of the Bills of
Quantities.

or (2) The net reimbursement to the Contractor of the actual cost incurred provided
always the Engineer considers such cost to be fair and realistic and such cost
shall be exclusive of any profit or Contractor's overhead mark-up.

Where (2) is less than (1) the balance shall be valued for interim payments proportionally
with the permanent works as previously described.

Page NOP/5
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

C. Plant, machinery, transport and other moveable items when provided on site and priced for
in the Bills of Quantities' Preliminaries section shall be valued proportionally with the
permanent work as previously described.

D. Monthly valuations shall certify payment for permanent works executed on site as provided
for by Clause 60 of the Conditions of Contract. No separate earlier payment shall be certified
by the Engineer or shall become due to be paid by the Client for the value of any
Preliminaries costs which may have been included by the Contractor in his rates and prices
for permanent works.

2. DEMOLITIONS AND ALTERATIONS

A. The rates for demolitions and alterations shall include for all shoring, scaffolding,
transportation, and removal and disposal incidental thereto.

B. The following terms shall have the meanings assigned to them:

Remove - shall mean the complete removal by any means at the Contractor's
option, having due regard to the surrounding structure. All incidental
holes, chases, etc., left after removal of an item shall be made good. In
the case of partitions and the like, the finishing shall be extended to
match existing.

Carefully remove - shall indicate that an item may be reused and the rate shall include for
overhauling or maintaining the item so that it will be acceptable when
relocated.

3. EXCAVATION AND EARTHWORK

A. Measurement for all excavation and filling shall be net and no allowance shall be made for
bulking and working spaces.

B. The Contractor shall take and accept all responsibility for the character of the ground and no
extra price will be allowed for excavating in rock, surface concrete, reinforced surface
concrete, paving flags, tarmacadam, loose rocks, debris, rubble, boulders, loose stones, old
foundations, running sand, mud, running water, high water table, etc.

C. Excavation and earthwork has been measured based upon existing ground levels as shown
on the drawings. The Contractor shall satisfy himself as to the accuracy of these levels and
is to allow in his rates for any discrepancies in levels.

D. The Contractor, when and where he considers it expedient to do so, and at the discretion of
the Engineer, may lay an approved filling as required prior to final setting out and excavation
works. In the event of the Contractor adopting this procedure no payment will be made for
excavation in the filling whether compacted or not, and the Contractor shall make due
allowance for this in his rates.

E. Notwithstanding the provisions of the SMM:

Page NOP/6
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

i. Except in the case of external damp-proof membrane to structures, no allowances for


working space have been measured (SMMD2.e)

F. The rates for surplus soil removed from the site are to include for dumping at an approved
Government trip and all charges in connection therewith.

G. Rates for excavation are to include for:

i. Excavating in any material whatsoever encountered and excavating through


previously placed earth filling,

ii. Excavating below the water table,

iii. Allowance for working space and extra space required for earthwork support and
formwork,

iv. Upholding sides of excavation,

v. Levelling or grading and compacting bottoms of excavation and trimming sides to


slopes,

vi. Trimming bottoms and sides of excavation in rock,

vii. Keeping excavations free from all water, howsoever arising, by pumping, temporary
drainage or other suitable means,

viii. Increase in bulk of excavated material,

ix. Multiple handling of excavated material,

x. Temporary spoil heaps,

H. The Contractor shall be deemed to have included for excavating to found on suitable bearing
strata as approved by the Engineer. Any additional excavation in soft or other material
unacceptable to the Engineer together with consequent backfill in mass concrete shall be
entirely at the Contractor's own cost.

I. Blasting will not be permitted.

J. Earth filling is measured in cubic metres as the volume placed after compaction.

K. The rates for filling and backfilling are to include for all costs incurred in obtaining material
from approved sources, multiple handling, loading, transporting, unloading, tipping, using
material arising from excavations including selecting and treating, or using imported filling
material placing, bringing up in stages and spreading and compacting as specified, trimming,
grading and all other labours necessary to ensure that the filling material is correctly placed
to level and profile and to the required degree of compaction.

L. The cost of dewatering site and excavated trenches due to rain or ground water is deemed
to be included in the unit rates.

Page NOP/7
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

4. CONCRETE WORK

A. The rates for concrete are to include for:

Designing mixes,

Any method of pouring, placing, compacting and curing,

Pouring on or against earth or un-blinded hardcore,

Any thickness, cross-sectional area or number of members,

Horizontal, sloping, vertical and curved work,

Placing or finishing to falls and cross-falls,

Basic finish as struck from formwork, and tamped worked finish,

Extra width of concrete or formwork to edges of blinding beds,

Formwork or other form of temporary support to top of sloping upper surfaces of


blinding beds,

Day joints (construction joints) and joints required in the forming of bays including
formwork and treatment of reinforcement crossing the joint,

All labours on concrete including working around pipes or cables, cutting channels,
chases, mortices, pockets and holes and including subsequent grouting or filling and
making good.

B. Concrete blinding has been stated as a nominal thickness. The Contractor is to allow in his
rates for any additional thickness of blinding due to site conditions, over excavation etc.

C. The rates for all reinforcement shall include for rigidly fixing the reinforcement in position and
for all necessary chairs, spacers and other supports required to hold the reinforcement.

D. The rates for concrete shall include for hoisting to any height or lowering to any depth,
compaction by vibrators as required, curing, hacking surfaces for key, all surface treatments
to unset concrete except trowelling, cutting and forming holes for pipes and the like, building
in pipe sleeves, forming and grouting mortices (other than mortices for anchor bolts) and
making good concrete in connection with holes and mortices.

E. The rates for rod reinforcement shall include for preparing schedules for bar bending,
hoisting to any height or lowering to any depth, placing in any position, straightening as
necessary, cutting to lengths, bending to required shapes, tying wire, distance blocks
spacers.

Page NOP/8
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

F. The rates for fabric reinforcement shall include for hoisting to any height or lowering to any
depth, placing in any position, all cutting, distance pieces, bending, holes, notching, tying
wire, chairs, spacers and the like, tying at laps and cost of material in laps.

G. Quantities of reinforcement have been assessed on the basis of weight of reinforcement per
cubic meter of concrete. The Contractor shall deem to have made his own assessment of
the quantities of reinforcement from the details given on the Drawings and to have made due
allowance in his rates for the actual quantities of reinforcement required for the works.

H. There shall be no re-measurement of steel reinforcement except as provided for by the


Variation Clauses of the Conditions of Contract.

I. The rates for formwork shall include for design and construction, all props, struts, stays,
wedges, bolts, all cutting, labours at intersections and overlaps, passing at angles, cutting
and fitting around projections and pipes, any number of concrete members, any number of
separate surfaces in each member, any profile of beam, column up-stand projection or
recess including formwork to ends of such, all stops, chamfers not exceeding 50 mm wide,
splayed internal angles not exceeding 15 mm wide, mould oil, strutting and supporting
formwork any width or height and for easing, striking and removal.

J. The rates for curved formwork shall include for formwork to curved, conical, spherical,
elliptical and other surfaces curved to one or more radius of any radius or radii.

K. The rates for forming channels, chases and kerbs shall include for ends, angles,
intersections and outlets.

L. The rates for precast concrete shall include for all moulds; finishing fair on all exposed faces;
square, rounded and stooped ends, rounded nosing and edges, rebates, angles and ends to
kerbs, etc., holes or notching for pipes, etc., and hoisting, and bedding in position.

M. Expansion joint filler material is measured in square metres, the rates are to include for
sheet material filler, formwork, horizontal, sloping and/or vertical work, any width or depth of
joint.

N. Each type of water bar is measured separately in metres and is deemed to include for all
horizontal, vertical, sloping and curved work, ends angles intersections irrespective of
whether standard, welded or purpose made.

O. Each type of joint sealant is measured separately in metres and is deemed to include
horizontal, vertical sloping and/or curved work, the preparation of surfaces, cleaners,
primers, sealers, backing strips and bond breakers.

P. Damp proof membranes and/or coatings are measured in square metres, measured as the
area in contact with base; no deduction is made for voids less than 1.00 m2.
The rates shall include for:

Primers, bonding compounds, adhesives and keying mixes,


Applying coatings by brush or spray,

Page NOP/9
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Sloping and curved work to coatings,


Work of any width, height or girth,
Work laid to falls and cross-falls, and intersections on sloping work,
Extra material for lapping membranes including adhesive tape,
Internal and external angles, fillets and the like,
Edges, arises and turning into grooves or channels and sealing,
Cutting, notching and bending membranes,
Holes for pipes and the like, forming collars and sealing.

Q. Concrete, reinforcement and formwork quantities pertaining to sunken slabs are included in
the concrete quantities measured in the BOQ.

5. BLOCKWORK

A. Rates for all blockwork shall include for hoisting to any height or lowering to any depth; for
setting in mortar and bonding and cutting including that at irregular angles; for tying at
junctions, abutments and intersections with galvanized steel ties and expanded metal ties as
necessary; for wedging, pinning up to soffits and toothing and bonding to other blockwork;
for building at or to any height of slabs and beams; for raking out joints or cutting grooves in
edges of flashings; for bedding and pointing plates, frames and corrugated sheeting and for
building in door and window frames and the like; for building in or cutting and pinning ends of
lintels, bearing bars, step, timbers, metal sections and the like; for all sundry items such as
cutting or forming holes, mortices, sinkings, chases and the like for any purpose; and for
generally performing all cutting away and making good for all trades.

B. Rates shall also include for use of solid and purpose-made blocks where required and for
adjustments as to the heights of blocks to provide support to lintels, etc., with the minimum
of cutting.

C. Rates shall also include for expansion joints, movement joints and the like including filler
material and pointing.

D. Rates shall also include for fabric or rod reinforcement in walls as required.

E. The rates for hollow blockwork shall include for filling the cavities solid with mortar or
concrete at jambs, end angles, intersections, sills and adjacent to false ceiling perimeters
together with expanded metal support strips and rod reinforcement as required.

Page NOP/10
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

6. ROOFING

A. The rates for slate or tile roofing shall include for all cutting, holes for pipes, standards and
the like, cut courses at eaves, all cutting and bonding at eaves, verges, valleys, hips and
ridges and fitted, filled or fair ends, angles and intersections to hips and ridges and forming
small openings.

B. The rates for corrugated or troughed sheet roofing shall include for all cutting, fixings,
sealing, laps at sides and ends, holes for pipes, standards and the like, and fitted, filled or
fair ends, angles and intersections to hips, ridges, angles, capping or barge boards and
forming small openings.

C. The rates for roof decking and wall cladding shall include for all cutting; for strip sealant at
joints, intersections and at junctions of decking and cladding with adjacent surfaces; and for
holes for pipes, standards and the like and forming small openings.

D. The rates for bitumen-felt, acrylic fibre or other similar bituminous and elastomeric sheet or
roll type roofing shall include for primers, bonding compounds and adhesives, cutting,
notching, bending and lapping, holes for pipes, standards and the like, angles, ends, extra
felt for laps and turning into grooves, forming ends and angles to flashing, skirting, aprons,
gutters, valleys, kerbs and channels, and forming small openings.

E. The rates for metal roofing shall include for all cutting; notching and bending, ends angles
and intersections to rolls, hollows, condensation channels and mouldings and for forming
small openings.

F. The rates for all sheet metal flashings and gutters shall include for angles, intersections,
ends, extra material in laps, seams, passings at ends, dressing to outlets and ends, angles
and intersections to cappings, hollows, channels and mouldings; and for painting with
bituminous paint where in contact with mortar, concrete, blockwork, etc. and other alkaline
surfaces.

G. Notwithstanding the provisions of the Qatar SMM, sheet metal flashings, fittings, etc. where
associated with proprietary troughed sheet roofing have been described as standard
components or assemblies as supplied by the manufacturer.

7 CARPENTRY AND JOINERY

7.01 CARPENTRY

A. The rates for all carpentry work shall include for all raking and circular cutting; joints in
continuous lengths of timber or for providing timbers of any length; all joints; notching and
fitting ends of timbers to metal sections, shoes and heads; mitres, ends and intersections on
all members; holes for pipes, tubes, bars, cables, conduits, ducting, trunking and the like
and for pads, slips and wedges built or wedged in.

B. The rates for rebates, grooves, chamfers, rounded edges, moulded edges and the like
labours shall include for all cross grain and stopped work and all stops, angles and mitres.

Page NOP/11
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

C. The rates for roof boarding shall include for all cutting at intersections on work to cross-falls
and all notches, rounded corners and the like.

D. The rates for carpenter's metalwork shall include for preparing timber for metal (e.g., sinking,
grooving, etc.).

E. The rates for bolts and connectors shall include for holes and countersunk holes and for
plating if required.

7.02 JOINERY

A. Notwithstanding the provisions of the SMM:

i. Labours on woodwork are not measured separately (SMM P1.f, P5, P10, P18, P30
and P38).

ii. Fittings and fixtures are not measured in detail but are enumerated (SMM P37, P40).

iii. Bolts and similar fixings are not measured separately (SMM P51).

B. Rates for joinery generally are to include for:

i. Provision of shop fabrication drawings and fixing details.

ii. Provision of samples as required by the Specification.

iii. Splayed, rounded or moulded angles, ends, grooves, rebates and the like.

iv. Holes, chamfers, notches, sinking, fitted and fair ends, drilling, countersinking and
plating.

v. Scribing to backgrounds and edges and cutting and fitting around obstructions.

vi. Nails, screws, bolts, dowels, cramps, adhesives and other jointing and fixing
accessories.

vii. Plugging or drilling and tapping to backgrounds and making good surfaces disturbed.

viii. Bedding and pointing,

ix. Priming concealed surfaces or treating with preservative before fixing.

Page NOP/12
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

C. The rates for doors, skylights, sashes and casements are to include for fitting and hanging
any type.

D. The rates for handrails shall include for all heading joints, quadrants, ramps and wreaths.

E. Rates for standard or purpose made components are to include for:

i. Manufacture and packing at works or on site in sections suitable for handling and
fixing and applying primer or clear protective finish prior to delivery or fixing,

ii. Site fixing including assembling, temporary fixing and final adjustment and any
packing or cover strips required to make the component fully functional.

F. Rates for ironmongery are to include for fixing to any surface and for all screws and other
fixings and fittings, fixing, including temporary fixing, removal prior to painting and like
operations, re-fixing and final adjustment and making good.

8. STRUCTURAL STEELWORK

A. The rates for structural steelwork shall include for cutting ends of members; cutting to dead
lengths; all cutting on plates, welds; notchings; splay cutting; bevel cutting; cranks; splice
plates; bolts (except anchor bolts); rivets; holes; countersunk and tapped holes; and driving
rivets and counter sinking heads

B. The items and rates for anchor bolts shall be deemed to include building-in temporary boxing
and grouting.

9. METALWORK

A. Notwithstanding the provisions of the SMM, composite units are enumerated and are not
measured in detail.

B. Rates for metalwork generally are to include for:

i. Provision of shop fabrication drawings and fixing details,

ii. Provision of samples as required by the Specification,

iii. Manufacture and packing at works in sections suitable for transportation and
handling on site, including cutting, grinding, assembling, welding, riveting and bolting
and application of works applied finishes,

iv. Fixing on site, including temporary fixing and final adjustment, assembling
components, site drilling, countersinking, riveting or welding, screws, bolts and other
fixing components, plugging or drilling backgrounds for fixing, grouting into mortices,
holes or pockets, anchors, and the like fixings, bedding and pointing and making
good damage to works applied finishes.

Page NOP/13
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

v. All cutting, ends, angles, intersections, ramps and wreaths on frames, handrails, core
rails, arch bars, bearers, stays and the like, assembling and jointing together, all
holes for pipes, tubes, cables, conduits and the like and all other holes, countersunk
holes, tapped holes, slots and the like.

C. The rates for windows, doors and the like are deemed to include for:

frames, mullions, transoms, sills, louvers, doors, opening portions and insect
screens, where supplied with the unit,

glazing beads, gaskets, weather-strip, flashings, architraves, trims and the like
accessories, where supplied with the unit,

Ironmongery and operating equipment, where supplied with the unit,

Fitting and hanging doors,

Finishes, where part of the unit as delivered,

Sub-frames, packing, bearers, grounds and the like,

Fixings and fastenings, bedding, jointing and pointing,

Extra studding and framing where required in ceiling voids to provide top fixing for
screens etc.

D. The rates for metal skirting, duct covers and shall include for all angles, intersections and
ends.

E. The rates for bolts and countersunk bolts shall include for holes and countersunk holes.

Page NOP/14
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

10. PLUMBING AND ENGINEERING

10.01 GENERALLY

A. Notwithstanding the SMM Plumbing and Engineering shall be measured and priced in
accordance with following rules.

B. Pipework and accessories, underground structures, equipment and ancillaries, insulation


and other plumbing work are each given separately under the following section headings:
sanitary drainage and vent system, rain water drainage, sanitary and rain water drainage-
outside buildings, plumbing fixtures, domestic cold water, domestic hot water and fire fighting
system, builders work and electrical work.

C. Plumbing work generally is deemed to include:

Working internally, externally,

Assembling and jointing together component parts of composite units and providing
connecting flanges and jointing material,

Providing everything necessary for jointing,

Patterns, moulds, templates and the like,

Making minor changes and modifications in layout required,

Temporary work including removing and making good after,

Disconnecting, setting aside and re-fixing equipment for the convenience of other
trades,

Cleaning and flushing piping systems,

Disinfection of cold water system,

Priming or painting off site and proprietary finishes or surface treatment applied as
part of the production process,

Painting on site,

Bedding and pointing components or units of equipment, ancillaries and the like,

Testing, commissioning, balancing and adjusting all systems, flushing and


disinfecting and leaving in perfect working order,

Page NOP/15
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Preparing instruction manuals and spare parts lists and submitting required number
of copies,

Training employer's personnel in the operation and maintenance of the systems


including providing instructors.

10.02 PIPEWORK

A. Each kind of pipe is given separately, stating the standard to which it complies.

B. Each diameter of pipe is given separately. Diameters stated are nominal diameters.

C. Pipes are given in metres measured the length over all fittings and branches, fittings on
pipes not exceeding 160 mm diameter are deemed to be included in the rates.

D. Work is deemed to include:

Curved pipes, flexible pipes and extensible pipes,

Flow and return header pipes,

Pipe work required to be temporarily fixed in position, dismantled for chromium


plating or other special finishing and subsequently re-fixed,

Purpose-made pipes and purpose-made fittings,

Labours on pipes,

Providing everything necessary for jointing,

Joints in the running length,

Joints of a special or ornamental character and extra demountable couplers in the


running length,

Bends, tees, crosses, joints, unions, nipples, plugs and flanges,

Pipe fittings including cutting and jointing pipes to fittings,

Screwed sockets, tapping, bosses and welding necks welded to pipes or flanges
including perforating the pipe or flange,

Special connections, special joints and isolated joints in pipes,

Connections to water tanks, reservoirs and chambers,

Expansion loops and expansion compensators,

Page NOP/16
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Manual air vents,

Drain valves and plugs,

Standard pipe supports, non-standard pipe support assembly,

Laying and fixing in ducts, trenches and chases or embedded in insitu concrete or
screeds,

Excavating trenches for buried pipes, including backfilling, disposal of surplus


excavated material and earthwork support,

Wrapping for underground pipes,

Wrapping and waterproofing for exposed insulated pipes,

Pipe sleeves and packing,

Wall, floor and ceiling plates,

Flashing plates, sleeves, escutcheons, flashings and seals.

10.03. ACCESSORIES FOR PIPEWORK

A. Each type of accessory is given separately. Diameters, dimensions and details are stated in
descriptions, where necessary, to identify the work.

B. Accessories are enumerated.

C. Fittings above 50 mm diameter are enumerated.

D. Floor cleanouts, floor drains, roof drains and other drains, vent cowls, back flow preventions
and the like are each given separately.

E. Gratings and frames, where not included with the items to which they relate, are given
separately.

F. Isolating valves, balancing valves, pressure relief valves, automatic air valves, traps and the
like are each given separately.

G. Automatic air valves and the like are deemed to include associated isolating valves.

H. Connections to existing services and breaking into existing pipes are each given separately.

10.04 UNDERGROUND STRUCTURES

A. Manholes, inspection chambers, valve boxes and the like underground structures are each
given separately.

B. Each type is given separately. Dimensions and details are stated in descriptions, where
necessary, to identify the work.

Page NOP/17
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

C. Underground structures are enumerated.

D. Work is deemed to include:

Excavation including backfilling, disposal of surplus excavated material and


earthwork support,

Concrete, reinforcement, formwork and waterproofing,

Blockwork, brickwork and rendering,

Building in ends of pipes including cutting pipes,

Channels, concrete benching and intercepting traps,

Step irons, covers and frames.

10.05 EQUIPMENT AND ANCILLARIES

A. Each kind of equipment (including plumbing fixtures) and ancillaries is given separately,
stating the size and pattern, rated duty, capacity, loading etc. as appropriate. Diameters and
dimensions are stated in descriptions, where necessary, to identify the work.

B. Equipment and ancillaries are enumerated.

C. Work is deemed to include:

Factory assembled components and controls,

Loose equipment supplied by the manufacturer,

Electrical connections,

Valves, strainers, flexible connections, controls, instruments and fittings shown on


the Drawings,

Plate work and supporting steelwork or concrete work,

Supports and fixing,

Insulation and jacketing for cold and hot equipment,

Anti-vibration mountings, including anti-vibration material and sound-insulating


material,
Loose keys, tools, spares (where specified) and the like and racks for holding tools,

Cleaning off protective wrappings.

10.06 INSULATION

Page NOP/18
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

A. Each kind of insulation to pipes is given separately, stating the thickness.

B. Each diameter of pipe is given separately.

C. Insulation to pipes is given in metres.

D. Work is deemed to include:

Smoothing the material and working around supports,

Protective covering,

Special protection or finish at openings through walls, valve chambers and the like,

Insulation to flanged pipe work,

Working non-sectional insulation over flanges and pipe-fittings,

Fitting sectional coverings around pipe fittings,

Insulation boxes,

10.07 BUILDER'S WORK

A. Builder's work in connection with plumbing is given as an item.

B. Work is deemed to include for:

Cutting or leaving holes, chases and mortices in the structure for all services and
making good after

Cutting and fitting and making good all finishes around pipes, fittings and the like

Provision of brackets, bases, supports and the like for all equipment

All other work reasonably to be inferred in connection with the plumbing installations.

10.08 ELECTRICAL WORK

A. Electrical work in connection with plumbing is given as an item.

B. Work is deemed to include all electrical work shown on the Drawings, Described in the
specification or reasonably to be inferred as necessary for the proper execution of the
plumbing work.

11. VENTILATING AND AIR CONDITIONING

11.01 GENERALLY

A. Pipe work and accessories, ductwork and accessories, equipment ancillaries, insulation and
other ventilating and air conditioning work are each given separately.

Page NOP/19
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Pipe work,

Piping accessories,

Ductwork,

Air outlets,

Air handling equipment,

Condensing units,

Controls and instruments,

Insulation,

Electrical work

B. Ventilation work generally is deemed to include:

Working internally,

Assembling and jointing together component parts of composite units and providing
connecting flanges and jointing material,

Providing everything necessary for jointing,

Patterns, moulds, templates and the like,

Making minor changes and modifications in layout required,

Temporary work including removing and making good after,

Disconnecting, setting aside and re-fixing equipment for the convenience of other
trades,

Priming or painting off site and proprietary finishes or surface treatment applied as
part of the production process,

Bedding and pointing components or units of equipment, ancillaries and the like,

Preparing instruction manuals and spare parts and submitting required number of
copies,

Training Employer’s personnel in the operation and maintenance of the systems


including providing instructors,

Temporarily operating each installation (except for testing) including attendants,


insurances and providing fuel and electricity for power and lighting.

Page NOP/20
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

11.02 PIPEWORK

A. Each kind of pipe is given separately, stating the standard to which it complies.

B. Each diameter of pipe is given separately. Diameters stated are nominal diameters.

C. Pipes are given in meters measured the length over all fittings and branches.

D. Work is deemed to include:

Curved pipes, flexible pipes and extensible pipes,

Flow and return header pipes,

Pipe work required to be temporarily fixed in position, dismantled for chromium


plating or other special finishing and subsequently re-fixed,

Purpose –made pipes and purpose –made fittings,

Labours on pipes,

Providing everything necessary for jointing,

Joints in the running length,

Joints of a special or ornamental character and extra demountable couplers in the


running length,

Flanges, unions

Pipe fittings including cutting and jointing pipes to fittings,

Screwed sockets, tapping, bosses and welding necks welded to pipes or flanges
including perforating the pipe or flange,

Special connections, special joints and isolated joints in pipes,

Expansion loops,

Drain valves, plugs and taps,

Drip trays and tundishes,

Connection of condensate pipes to flush tanks,

Standard pipe supports, non-standard pipe support assemblies, spring compensated


components and pipe anchors and guides,

Laying and fixing in ducts, trenches and chases or embedded in in-situ concrete or
screeds,

Page NOP/21
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Pipe sleeves and packing,

Walls, floor & ceiling plate.

11.03 ACCESSORIES FOR PIPEWORK

A. Each type of accessory is enumerated separately. Diameters, dimensions and details are
stated in descriptions, where necessary, to identify the work.

B. Flexible connections are given as an item.

11.04 DUCTWORK

A. Each kind of ducting is given separately stating the type of material, length and cross section
of each duct piece.

B. Work is deemed to include:

Weight of any materials required for seams or welds or for stiffening or jointing,

Stiffeners, joints and sealing,

Joints in the running length,

Providing materials, heat, bolts, nuts, washers and everything necessary for making
joints in ducting,

Cutting and forming openings and jointing ducting to fittings,

Special connections and special joints in ducting including connections between


ducting and equipment,

Ducting turning, splitters and vanes,

Components for supporting ductwork including fixing,

Cowls and terminals

11.05 ACCESSORIES

A. Each type of accessory is enumerated separately. Dimensions are stated in descriptions.

11.06 EQUIPMENT AND ANCILLARIES

A. Each kind of equipment and ancillaries is enumerated separately, stating the size and
pattern, rated duty, capacity, loading etc. as appropriate.

B. Work is deemed to include:

Page NOP/22
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Factory assembled components and controls,

Loose equipment supplied by the manufacturer,

Electrical connections,

Refrigerant piping and accessories for air conditioning split equipment,

Plate work and supporting steelwork or concrete work,

Supports and fixing,

Insulation and jacketing for refrigerant piping and including providing detachable
mattresses and working insulation around special fittings and for ancillaries,

Anti-vibration mountings, including anti-vibration material and sound-insulating


material,

Loose keys, tools, spares (where specified) and the like and racks for holding tools.

Condensing unit supporting and hanging on steel base

11.07 INSULATION

A. Each kind of insulation is given separately, stating the thickness.

B. Work to each diameter of pipe is enumerated separately.

C. Work is deemed to include:

Smoothing the material and working around supports,

Protective covering,

Special protection or finish at openings through walls, valve chambers and the like,

Working non-sectional pipe insulation over flanges and fittings,

Fitting sectional pipe coverings around fittings,

Working duct insulation around fittings,

Working duct insulation around special fittings and for ancillaries.

11.08 WORK IN CONNECTION WITH VENTILATION

A. Builder's work in connection with ventilation installation is given as an item. Work is deemed
to include:

Page NOP/23
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Cutting and fitting and making good all finishes around pipes, fittings and the like

Provision of brackets, bases, supports and the like for all equipment

All other work reasonably to be inferred in connection with the ventilation installation

B. Electrical work in connection with ventilation installation is given as an item, except for motor
control centres and panels which are enumerated, stating the type.

C. Work is deemed to include all electrical work shown on the Drawings, Described in the
Specification or reasonably to be implied as necessary for the proper execution of the
ventilating work.

12. ELECTRICAL INSTALLATION

12.01 GENERAL RULES FOR ELECTRICAL WORK

A. Electrical work generally is deemed to include:

Supply, installation and handing over complete systems,

Co-ordination with other trades including minor approved modifications and additions
to ensure compatibility,

Minor items and accessories required for normal operation and maintenance,

Assembling and jointing together component parts of composite units and providing
any necessary jointing materials,

Patterns, moulds, templates and the like,

Priming or painting off site and proprietary finishes or surface treatments applied as
part of the manufacturing process,

Corrosion protective treatments and coatings to fixings, hangers and supporting


materials,

Sleeves through walls, ceilings and floors including cover plates,

Fire sealants,

Brackets and supports,

Painting on site including colour coding,

Builder’s work in connection, except where measured separately.

12.02 DISTRIBUTION BOARDS, SUBDISTRIBUTION AND FINAL BRANCH CIRCUIT


PANELBOARDS

Page NOP/24
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

A Each kind of distribution board is given separately, stating the reference of equipment.

B Work is deemed to include;

Termination of incoming and outgoing cables to equipment including cable glands,


terminations and accessories,

Fixing and support and materials required for installation of wall or floor mounted
equipment as indicated,

12.03 WIRES, CABLES, FEEDERS AND RELATED ACCESSORIES

A Each kind of wire and cable is given separately (except where required to be included with
other items), stating the type, size and method of installation.

B Wires and cables are given in metres, measured the net length.

C Wires and cables are deemed to include:

Conduits and fittings, draw wires and the like (except where conduit work is required
to be measured separately),

Cable connectors and cable joints (where permitted) including joint boxes, sealing
boxes, shrouds and the like and materials and heat for making the joints,

Allowance in cable length for cables entering fittings and accessories, equipment or
control gear,

Necessary components and accessories for fixing cables on walls, ceilings and on
cable trays.

12.04 CONDUITS, WIREWAYS, SUPPORTING SYSTEMS AND RELATED ACCESSORIES

A Conduits are not measured separately, but are included with items of cables, lighting fittings
etc.

B Cable trunking are each measured separately, stating the size.

C Trunking the like are given in metres:

D Trunking and the like are deemed to include:

Page NOP/25
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Mounting fittings, including cutting and jointing thereto,

Jointing between sections, bends, tees, etc.,

Components for earth continuity,

Adaptors and connections between trunking and items of equipment of control gear
requiring the use of flanges and/or the forming of apertures,

Pin racks for supporting cable,

Supports including fixing.

12.05 EARTHING SYSTEM

A Each kind of earthing system is given separately as an item, stating the type and details, as
appropriate.

B Work is deemed to include a complete system, excluding protective earthing conductors run
with branch circuit wiring and protective earthing cables run with main and sub-feeders
which are required to be measured separately or included with other items.

12.6 GENERAL LIGHTING INSTALLATIONS

A Each kind of lighting fixture is enumerated separately, stating the type.

B Work is deemed to include:

Outlets,

Wires including protective earthing conductors, conduits, trunking and other


raceways and fittings from outlet back to upstream outlet or to final branch circuit
panelboard,

Lamps,

Fixing and supporting material.

12.07 WIRING DEVICES, DISCONNECTS AND LV DISTRIBUTION TRANSFORMERS

A Each kind of wiring device including socket outlets, electrical outlets, switches, disconnecting
switches and the like is given separately (except where stated as included with other items),
stating the type and/ or rating.

B Wiring devices, miscellaneous equipment and the like are enumerated.

C Wiring devices and miscellaneous equipment are deemed to include, as appropriate:

Outlets,

Page NOP/26
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Wires including protective earthing conductors, conduits, trunking and other


raceways and fittings from outlet back to upstream outlet or controlled circuit (for
switches etc.) or to final branch circuit panelboard,

Fixing and supporting material.

D Disconnecting switches rated 80 A and below are deemed to include:

Outlets,

Wires or cables including protective earthing conductors, conduits, and other


raceways and fittings from outlet to panelboard,

Fixing and supporting material.

E Door entrance system.

Equipment of the following types are each given separately:

Chime

Door push –button

Each item of equipment is enumerate, work is deemed to include for wires, conduits
and all fixing and other accessories

12.08 TELEPHONE INSTALLATIONS

A. Telephone outlets are enumerated and are deemed to include:

Outlet box,

Pull wires, conduits, junction boxes (except where required to be measured


separately) or other raceways, from location of outlet back to distribution box/
cabinet.

Telephone cabling are enumerated and are deemed to include for all terminations, glands,
protections and all other accessories.

12.09 MASTER ANTENNA SYSTEM

A TV outlets are enumerated and deemed to include:

Outlets box, Pull wires, junction boxes, conduits or other raceways, from location of
outlet box back to junction box and then to the pull box.

Television cabling are enumerated and are deemed to include for all terminations,
glands, protections and all other accessories.

Page NOP/27
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

12.10 SUNDRIES TO ALL ELECTRICAL WORK

Sundries to all electrical work are given as items for the following:

A Testing and commissioning putting into satisfactory operation and handing over complete
systems

B Provision of maintenance and operation manuals and submitting required number of copies

C Preparing shop and construction drawings and providing the required number of copies of
“as built’ drawings of the electrical installation (plans or diagrams) as detailed in the
specification,

D Plates, labels and tags for the identification of equipment cables, switches and the like,

E Marking the positions of holes, mortices, chases and the like in the structure,

F Temporary works and removing and marking good after,

G Temporarily operating each installation, including attendants, special insurance and


providing power supply.

12.11 BUILDER'S WORK

A Builder's work in connection with electrical installations is deemed to include for all builder’s
work which is not specifically included in the relevant item of electrical work, including:

Provision of brackets, bases, supports and the like for equipment.

Painting exposed conduits, supports etc.

Underground ducts with all fittings and concrete surrounds, (are given in metres)
where appropriate an the like

All other work reasonably to inferred in connection with all electrical installations

B. Cutting away for and making good all work disturbed:

Cutting away for and making good all disturbed work are enumerated as electrical
points, including cutting or leaving all holes, notches, mortices, sinkings and chases
in both the structure and its coverings, also for all making good to them,

Electrical points are deemed to include,

Lighting points: associated switch points are included irrespective of number,

Socket points: power socket outlets

Outlet points: flex outlets with associated DP switch point, connection unit outlets,
telephone and TV outlet boxes etc.

Page NOP/28
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Equipment & Control-gear points: distribution boards, chime isolating switches, etc.

13. FINISHINGS

A. Notwithstanding the provisions of the SMM:

i. All finishes have been measured in square metres,

ii. No labours on finishes have been measured separately,

iii. Metal beads have not been measured separately.

B. Rates for finishes generally are to include for:

i. Finishing to slopes, falls or cross falls,

ii. Fair joints against frames and other finishings,

iii. Fair edges, chamfered, rounded or moulded edges and angles, grooves,
flutes and the like,

iv. Cutting and fitting or working around pipes, conduits, ducting, brackets,
gratings, ventilators, fittings and the like, and laying in recessed covers.

v. Preparing surfaces for finishings or backings, working at or up to any height,


all narrow width and small areas and all cutting.

C. Rates for in situ finishings are to include for:

i. Dubbing out irregular surfaces,

ii. Finishing to slopes, falls or cross falls,

iii. Angle beads, plaster stops and features beads, expanded metal reinforcing
strips at junctions of differing backgrounds.

D. Rates for tile and slab finishes are to include for laying to any pattern.

E. The rates for beds and backings shall include for forming key and all labours.

F. The rates for lathing, baseboard and suspended plain sheet linings with supporting metal
work and fibrous plaster shall include for all labours and cutting.

G. Rates for suspended ceilings are to include for:

i. Setting out and fixing to grid pattern shown on the Drawings or, if not shown, to
symmetrical grid in each room,

ii. Suspension system complete, including fixing grid and hangers to any surface and to
any length,

Page NOP/29
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

iii. Timber framing or stiffeners to vertical work,

iv. Notches, ends, angles, movement joints and the like,

v. Forming access panels, movement joints and the like,

14. GLAZING (Not Applicable)

A. The rates for glazing shall include for all templates and cutting, method of glazing including
providing glazing compounds, tapes, strips, gaskets, sealants, beads channel, aligning
adjacent panes of wired, patterned and decorating glass, and polished and bevelled edges
and drilling holes.

15. PAINTING AND DECORATING

A. The rates for painting shall include for working to or at any height; internal or external work;
rubbing down between coats, work in multi-colours, cutting to line; opening edges of
windows and doors and work on additional surfaces exposed by such opening edges, hooks,
bolts and clips to sheeting and pipe clips, saddles, holderbats and the like.

B. The rates for painting on wood shall include for work on hardwood or softwood and for
knotting.

C. The rates for painting on manufactured board and wood shall include for surface filling.

16. DRAINAGE

A. The relevant rules for measurement and pricing for other sections of the Bills of Quantities
shall apply to these sections, as appropriate.

B. Rates for pipework are to include for:

i. Supplying and laying pipes and couplings,

ii. Assembling pipes and couplings and connecting to fittings and valves,

iii. Bolts, nuts and gaskets for flanged joints,

iv. Cutting, machining, chamfering and the like of standard length pipes to
comply with the Specification,

v. Painting, lining and coating,

vi. Temporary marker posts to locate the ends of pipes, branches, etc. for future
extensions,

C. Pipe trenches are measured as the depth from formation levels (i.e. excavated through filling
previously placed); if the Contractor excavates from existing ground level, the rates for
excavation are to allow for any additional temporary pipe protection or use of higher strength

Page NOP/30
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

pipes, where this method does not provide adequate protection during placing and
consolidation of filling material.

D. Rates for pipe trenches are to include for:

i. Excavating trenches in any material whatsoever encountered including rock,

ii. Excavating for all pipe length, fittings, valves and thrust blocks,

iii. Earthwork support,

iv. Keeping trenches free from water, howsoever arising,

v. Supplying, placing and compacting initial backfill,

vi. Backfilling, compacting and levelling surfaces of trenches to finished level of


adjacent ground and removal of surplus excavated material,

vii. Marker tape for pressure pipelines.

17. EXTERNAL WORKS

A. The relevant rules for measurement and pricing for other sections of the Bills of Quantities
shall apply to this section, as appropriate.

B. Rates for planting shall be deemed to include for:

Providing and cultivating topsoil in planting areas

Setting out planting beds

Drainage of planting areas

Excavating and treating holes including disposal and breaking up bottoms

Cutting and treating roots, pruning and the like, including anti dessicant and tree
would dressings

Planting including backfilling hole with planting soil and firming watering

Watering and fertilizing after planting

Supports to trees including stakes, guys, ties and chafing guards

Trunk wrapping

Labelling

Forking and/or raking soil at completion

Temporary protection

Page NOP/31
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Maintenance and making good defects

C. Paving and associated works have been measured net in accordance with local custom
in Qatar and as described in the Bills of Quantities. Rates shall include for all making
good and fair cutting around pipes, fence posts, bollards, stanchions and the like,
together with dishing to gullies or drainage to outlets and all ends, angles, ramps and
intersections.

D. The rates for kerbs, edgings, channels, blocks and the like shall include fair ends, cut
ends, and other joints and cutting.

Rates for boundary wall shall be deemed to include for:

Excavation and backfilling,

Plain and reinforced concrete complete with formwork and reinforcement,

Blockwalls,

Plaster and paint.

18. ROAD WORKS

A. The rates for bitumen macadam and the like flexible surfaces and the rates for paving flags
and the like tile paving shall include for fair edges, joints to existing works, dishing to gullies
and drainage outlets, ramps, channels and the like and making good around pipes, fence
posts, bollards, stanchions and the like.

B. The rates for kerbs, edgings, channels, blocks and the like shall include fair ends, cut ends,
and other joints and cutting, all making good and fair cutting around pipes, fence posts,
bollards, stanchions and the like, together with dishing to gullies or drainage to outlets and
all ends, angles, ramps and intersections.

19. EXTERNAL ENGINEERING

A. The relevant rules for measurement and pricing for other sections of the Bills of Quantities
shall apply to these sections, as appropriate.

B. Each kind of pipe is given separately.

C. Each diameter of pipe is given separately. Diameters stated are nominal diameters.

D. Sewage house connection pipes are given separately.

E. Pipes are given in meters measured on the centre line between the inner faces of valve
chambers, manholes and inspection chambers and overall fittings.

F. Valves and the like are enumerated.

G. Rates for pipework are to include for:

Page NOP/32
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

i. Supplying and laying pipes and couplings,

ii. Assembling pipes and couplings and connecting to fittings and valves,

iii. Bolts, nuts and gaskets for flanged joints,

iv. Cutting, machining, chamfering and the like of standard length pipes to comply with
the Specification,

v. Painting, lining and coating,

vi. Temporary marker posts to locate the ends of pipes, branches, etc. for future
extensions,

vii. Temporary caps to open ends of pipes,

viii. Laboratory and field tests,

ix. Flushing and disinfection.

H. Pipe trenches are measured as the depth from formation levels (i.e. excavated through filling
previously placed); if the Contractor excavates from existing ground level, the rates for
excavation are to allow for any additional temporary pipe protection or use of higher strength
pipes, where this method does not provide adequate protection during placing and
consolidation of filling material.

I. Rates for pipe trenches are to include for:

i. Excavating trenches in any material whatsoever encountered including rock,

ii. Excavating for all pipe length, fittings, valves and thrust blocks,

iii. Earthwork support,

iv. Keeping trenches free from water, howsoever arising,

v. Supplying, placing and compacting initial backfill,

vi. Backfilling, compacting and levelling surfaces of trenches to finished level of adjacent
ground and removal of surplus excavated material,

viii. Marker tape for pressure pipelines.

Page NOP/33
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

J. Work to existing networks:

i. Each kind of work to existing network is given separately.

K. Type of work, location, sizes and other details are given in descriptions to identify the work.

L. Work is given in meters, enumerated or as an item as appropriate.

M. Rates for work to existing networks are to include for:

a. Temporary diversion or stopping of existing networks,

b. Preparing existing work to receive new work,

c. All new fixing, jointing materials and equipment,

d. Making good all work distributed,

e. Disposal of materials arising.

N. Each type of material in bedding, hunching and encasement to pipes is given separately.

O. Bedding, hunching and encasement are each given separately.

P. Diameter of pipe is stated in description.

Q. Work is given in meters, measured on the centre line between the inner faces of manholes,
inspection chambers, or overall fittings.

R. Rates for bedding are to include for:

a. Any method of placement and compaction,

b. Filling below ground water level,

c. Formwork or other form of temporary support to top of sloping upper surfaces of


hunching and encasements,

d. All labours and plant.

S. Manholes, inspection chambers and the like are enumerated.

T. Rates for manholes are to include for:

a. Excavation in nay type of soil or material, dewatering, backfilling, removing surplus


material,

b. Concreting, benching, blinding, covers and frames, steps, ladders,

c. Waterproofing,

Page NOP/34
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

d. Lining for manholes and coating for chambers, as specified,

e. Backdrops for manholes

EXTERNAL ENGINEERING (IRRIGATION PIPEWORK)

The relevant rules for measurement and pricing for other sections of the Bills of Quantities
shall apply to these sections, as appropriate, with the exception that fittings are given in
numbers for fittings above 100 mm nominal diameter and fittings on pipes of 100 mm
nominal diameter or less are deemed to be included in the rates.

Rates for pipework are to include for:

i. Supplying and laying pipes and couplings,

ii. Assembling pipes and couplings and connecting to fittings and valves,

iii. Bolts, nuts and gaskets for flanged joints,

iv. Cutting, machining, chamfering and the like of standard length pipes to comply with
the Specification,

v. Painting, lining and coating

vi. Temporary marker posts to locate the ends of pipes, branches, etc. for future
extensions,

vii. Temporary caps to open ends of pipes,

viii. Reducers joining pipes, or pipes to fittings, of different diameters

Pipe trenches are measured as the depth from formation levels (i.e. excavated through filling
previously placed); if the Contractor excavates from existing ground level, the rates for
excavation are to allow for any additional temporary pipe protection where this method does
not provide adequate protection during placing and consolidation of filling material.

Rates for pipe trenches are to include for:

ix. Excavating trenches in any material whatsoever encountered in including rock,

x. Excavating for all pipe length, fittings, valves and thrust blocks,

xi. Earthwork support,

xii. Keeping trenches free from water, howsoever arising,

xiii. Supplying, placing and compacting initial backfill,

xiv. Backfilling, compacting and level surfaces of trenches to finished level of adjacent
ground and removal of surplus excavated material,

Page NOP/35
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

xv. Marker tape for pressure pipelines.

20. POWER SUPPLY AND DISTRIBUTION

Notwithstanding the provisions of the Standard Method of Measurement the Power Supply
and distribution system shall be measured and priced in accordance with the following rules:

20.01 GENERAL

A. Power supply and distribution work generally is deemed to include:

Supply, installation, testing, commissioning, putting into satisfactory operation and


handing over complete systems,

Undertaking standard tests on completed cabling/ circuits as required by EWD(E)


current specifications,

Temporary operation of each installation including attendance, special insurance and


power supply,

Co-ordination with other trades including minor approved modifications and additions
to ensure compatibility,

Minor items and accessories required for normal operation and maintenance,

Assembling and jointing together component parts of composite units and providing
any necessary joints materials,

Patterns, moulds, templates and the like,

Priming or painting off site and proprietary finishes or surface treatments applies as
part of the manufacturing process,

Cutting away for making good all work distributed,

Corrosion protective treatments and coatings to fixings, hangers and supporting


materials

Marking the positions of holes, mortices, chases and the like as required,

Temporary works including removal and making good after,

Brackets, bases, supports and fixings,

Painting on site including colour coding,

Preparation of shop and construction drawings,

Builder’s work in connection, except where measured separately,

Page NOP/36
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

Plates, labels and tags for the identification of equipment, cables, switches and the
like,

All other work reasonably to be inferred in connection with the Electrical Installation.

20.02 DISTRIBUTION PANELS

A. Distribution panels are enumerated

B. Work is deemed to include:

Termination of incoming and outgoing cables to equipment including cable glands,


terminations and accessories,

Fixing and support structures and materials required for installation,

Ac or dc power supply for distribution control and operation.

C. Earthing system:

Distribution panel earthing system is given as an item per panel including earth rods,
connection to water pipes, etc. as shown on drawings.

20.03 CABLES, FEEDERS AND RELATED ACCESSORIES

A. Each kind of cable is given separately (except where required to be included with other
items), stating the type, size and method of installation.

B. Cables are given in metres, measured the net length.

C. Cables are deemed to include:

PVC sleeves from trench up to building panel board,

Cable termination on both sides,

Item Coverage for uPVC Ducts in road crossings shall include the provision and installation
in each duct of a polypropylene draw wire, stopper and concrete marker pad of a type to be
approved by the Engineer,

Allowance in cable length for cables entering fittings and accessories, equipment or control
gear,

Trench work including:

i. Excavation in any material whatsoever encountered, including suitable material, rock,


unsuitable material and artificial hard material.

ii. Preparation of excavated surfaces.

iii. Additional excavation for beds, surrounds, foundations and blinding as applicable.

Page NOP/37
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing

iv. Upholding sides of excavations by whatever means necessary.

v. Keeping the excavations free form water, howsoever arising, including ground water.

vi. All excavation and backfilling carried out in trenches and pits by the Contractor in
excess of the net measurements described in the Contract.

vii. Backfilling.

viii. Disposal of surplus excavated material.

ix. Compacting and levelling surfaces of trenches and excavations to finished level of
adjacent ground.

x. Stockpiling and storage of excavated material including double handling.

xi. Removal of soft spots below formation level of trenches and pits and backfilling with
either compacted desert fill or concrete as directed by the Engineer.

xii. Supply and laying of protective tiles and cable marking.

Page NOP/38
BILL OF QUANTITIES - 1.0 - PRELIMINARIES
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 1
PRELIMINARIES & GENERAL MATTERS

PRELIMINARIES

The following costs are for those preliminaries


required for the complete execution of the whole
of the WORK

CONTRACT PARTICULARS

Allow for all obligations and liabilities in


accordance with the following Clauses of the
General and Particular Conditions of Contract

A Performance Bond Item

B Advance Guarantee Bond Item


Included
C Insurance Cost specific to the CONTRACT Item

a) Loss/damage to Client property Item

b) Workmen's Compensation Policy Item

c) Third Party Liability Item

d) CONTRACTOR's All-Risks Policy Item

D CONTRACTOR Allowance for Compliance:

CONTRACTOR is deemed to have allowed for


compliance with the remainder of the provisions
of the Conditions of Contract (which have a
preliminary financial impact).

CONTRACTOR has inserted below any other


Article which, in his opinion, attach a financial
consideration, listing the Article number, heading
and the price of complying therewith in the
amount column. (CONTRACTOR to specify)

E Article No.____________ Item

F Article No.____________ Item

To Collection QR.

BOQ: Page 1/1


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Quantity Unit Rate (QR) Amount (QR)

SPECIFICATION

The Specification is the Qatar Construction


Specification (QCS 2014) issued by the Ministry
of Environment, State of Qatar and as extended
or amended herein.

Allow for compliance with all obligations and


liabilities in accordance with the following
General Clauses of Section 1 of Qatar
Construction Specification and as amended in
Contract Documents:

PART 1. INTRODUCTION

A 1.1 General Item

B 1.2 Compliance Item

Included
C 1.3 Standards Item

D 1.4 Terms and definitions Item

E 1.5 Abbreviations and symbols Item

F 1.6 Language Item

PART 2. USE AND MAINTENANCE OF THE


SITE

G 2.1 General Item

H 2.2 Use of the site Item

J 2.3 Maintenance of the site Item

PART 3. SITE ACCESS AND ENTRY ONTO


THE SITE

K 3.1 General Item

To Collection QR.

BOQ: Page 1/2


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Quantity Unit Rate (QR) Amount (QR)

Specification (Cont'd)

PART 3. SITE ACCESS AND ENTRY ONTO


THE SITE (Cont'd)

A 3.2 Access Roads Item

B 3.3 Site entry Item

PART 4. PROTECTION

C 4.1 General Item

D 4.2 Protection of the Works Item

E 4.3 Protection of other Works Item


Included
F 4.4 Watching and lighting Item

G 4.5 Hoarding Item

PART 5. INTERFERENCE

H 5.1 General Item

J 5.2 Interference Item

PART 6. PROJECT MEETINGS

K 6.1 General Item

L 6.2 Pre-construction meeting Item

M 6.3 Progress meeting Item

N 6.4 Pre-start up meeting Item

P 6.5 Post-construction meeting Item

Q 6.6 Record of meetings Item

To Collection QR.

BOQ: Page 1/3


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Quantity Unit Rate (QR) Amount (QR)

Specification (Cont'd)

PART 7. SUBMITTALS

A 7.1 General Item

B 7.2 Definitions Item

C 7.3 Submittal procedures Item

D 7.4 Programme Item

E 7.5 Organisation Charts Item

F 7.6 Plans Item Included

G 7.7 Site diary Item

H 7.8 Reports Item

J 7.9 Photographs Item

K 7.10 Drawings Item

L 7.11 Materials approvals Item

M 7.12 Instruction Manuals Item

N 7.13 Survey and Layout details Item

P 7.14 Method statements Item

Q 7.15 Applications and invoices for completed


Item
works

To Collection QR.

BOQ: Page 1/4


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Quantity Unit Rate (QR) Amount (QR)

Specification (Cont'd)

PART 9. MATERIALS

A 9.1 General Item

B 9.2 Materials Item

C 9.3 Testing of materials Item

D 9.4 Special materials Item

PART 10. HEALTH AND SAFETY

E 10.1 General Item

F 10.2 Contractor Occupational Health &


Item
Safety Plan Included

G 10.3 Emergency Response Plan (ERP) Item

H 10.4 Earthquake Emergency Management


Item
Plan

J 10.5 Special Safety Requirements and


Item
Precautions

K 10.6 First Aid Item

L 10.7 Fire Precaution and Prevention Item

M 10.8 Safety of the Public Item

N 10.9 Welfare, Safety and Protection of Workmen Item

P 10.10 Labour Accommodation Item

To Collection QR.

BOQ: Page 1/5


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Quantity Unit Rate (QR) Amount (QR)

Specification (Cont'd)

PART 11 ENGINEER’S SITE FACILITIES

A 11.1 General Item

B 11.2 Engineer’s site offices Item

C 11.3 Utility Connections Item

D 11.4 Provision of equipment and supplies Item

E 11.5 Attendance Item

PART 12. CONTRACTOR'S SITE FACILITIES

F 12.1 General Item


Included

G 12.2 Contractor's site facilities Item

H 12.3 Project sign board Item

J 12.4 Advertising Item

K 12.5 Provision of HAMAD MEDICAL


Item
CORPORATION Ambulance Spoke Station

PART 13. SETTING OUT OF THE WORKS

L 13.1 General Item

M 13.2 Site information and inspection Item

N 13.3 Levels and reference grid Item

P 13.4 Surveying Item

Q 13.5 Setting out Item

To Collection QR.

BOQ: Page 1/6


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Quantity Unit Rate (QR) Amount (QR)

Specification (Cont'd)

PART 14. TEMPORARY WORKS AND


EQUIPMENT

A 14.1 General Item

B 14.2 Temporary works Item

C 14.3 Temporary equipment Item

D 14.4 Test certificates for cranes and lifting


Item
tackle

PART 15. TEMPORARY CONTROLS

E 15.1 General Item

F 15.2 Temporary controls Item

PART 16. TRAFFIC DIVERSIONS Included

G 16.1 General Item

H 16.2 Temporary traffic diversions Item

PART 17. PROJECT CO-ORDINATION

J 17.1 General Item

K 17.2 Co-ordination Item

PART 18. OTHER CONTRACTORS

L 18.1 General Item

M 18.2 Access for other Contractors Item

N 18.3 Co-operation and Co-ordination with Item


th
P 18.4 Facilities for other Contractors Item

To Collection QR.

BOQ: Page 1/7


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Quantity Unit Rate (QR) Amount (QR)

Specification (Cont'd)

PART 19. REGULATORY REQUIREMENT

A 19.1 General Item

B 19.2 Notices Item

C 19.3 Miscellaneous Item

D 19.4 Provision for persons with disabilities Item

E 19.5 Thermal Comfort Item

F 19.6 Thermal Insulation Item

G 19.7 Acoustical Control Item

H 19.8 Waste Management Item


Included

PART 20. CLEARANCE OF SITE

J 20.1 General Item

K 20.2 Final clearing Item

PART 21. INSPECTION AND HANDOVER


PROCEDURES

L 21.1 General Procedures for Inspection and


Item
Handover.

M 21.2 Items to be provided by the Contractor Item

N 21.3 Mechanical and Electrical works Item

P 21.4 Project record documents Item

To Collection QR.

BOQ: Page 1/8


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Quantity Unit Rate (QR) Amount (QR)

GENERAL MATTERS

Mobilisation and Demobilisation

A Mobilisation of all supervision, labour, plant,


materials and equipment necessary for the Item
proper execution of the WORK.

B De-mobilisation of all supervision, labour, plant,


materials and equipment necessary for the Item
proper execution of the WORK.

Contractor's project management

C Provision, of contractor's supervision and


management team for the proper execution of Item
the WORK.
Included

D Provision, of maintenance and removal of


contractor's Plant and Equipment for the proper Item
execution of the WORK.

Facilities for Subcontractor

F Provision of facilites giving for any subcontractor


(nominated by Client ) as required for the proper Item
execution of the WORK.

Temporary Works

G Provision of all temporary works as required for


Item
the proper execution of the WORK.

Authority approvals

H Allow for obtaining all necessary approvals from


the Government Departments. Item

To Collection QR.

BOQ: Page 1/9


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Quantity Unit Rate (QR) Amount (QR)

Quality Assurance and Quality Control

A Allow for compliance with requirements of


Quality Assurance and Quality Control, as per
QCS-2014, Section-2.

Specified Requirement

B Provision of daily, weekly and monthly Progress


Reports. Item

C Training of Employer's personnel in the


operation and maintenance of the mechanical,
electrical and air conditioning systems. Item

Additional Items

Included
CONTRACTOR is deemed to have allowed for
compliance with the reminder of the provisions
of CONTRACT with respect to General Matters
which have a financial impact and inserted
below any provision, which in his opinion , attach
a financial consideration. CONTRACTOR to list
such provisions (CONTRACTOR to specify)

D Soil Investigation report (Water table level) Item

E Enabling works for storm water tank which


include excavation ( open/cut) method and Item
dewatering system

F Design and Execution raft piles for storm water


Item
tank

To Collection QR.

BOQ: Page 1/10


PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 1/1

Page 1/2

Page 1/3

Page 1/4

Page 1/5

Page 1/6

Page 1/7

Page 1/8

Page 1/9

Page 1/10

PRELIMINARIES & GENERAL MATTERS To General Summary QR 287,000

BOQ: Page 1/11


BILL OF QUANTITIES - 2.0 - SHOWROOM
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 2/1


EARTHWORK

Excavate pits/trenches

A Excavation not exceeding 2.00m deep 500 m³ 25 12,500

Disposal

B Remove surplus excavated material from site 6,000


500 m³ 12

Filling.

C Approved desert fill material around foundations


; laid in layers of 150 mm thickness, watered, 6,012
334 m³ 18
rolled and compacted to 97% proctor value in
compaction.

TERMITE CONTROL

Emulsive concentrate termiticide consists of


chloropyrifos or linden chemical elements, dilute
and apply as per the manufacturer
recommendations with soil treatment solutions
as specified.

D Anti-termite treatment 03 2,541


847 m²

To Collection QR. 27,053.00

BOQ;Page 2/1/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
so ever.

(i) Item

(ii) Item

(iii) Item Included

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 2/1/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection :

Page 2/1

Page 2/2

TOTAL FOR EARTHWORK To Summary QR 27,053.00

BOQ;Page 2/1/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 2/2


CONCRETE WORKS

CONCRETE-SUBSTRUCTURE

Plain in-situ concrete Grade SRC 20 with gabbro


aggregate conforming to BS EN 12620 to the
approval of the ENGINEER; finish to receive
waterproofing membrane/ paint (measured
separately)

A Blinding; 75 mm thick (minimum), horizontal or 19,450.00


389 m² 50
sloping not exceeding 45o.

Reinforced in-situ concrete Grade OPC 40 with


gabbro aggregate conforming to BS EN 12620
to the approval of the ENGINEER.

B Individual footing 126 m³ 900 113,400.00

C Columns 9 m³ 1150 10,350.00

D Grade slab including thickening 167 m³ 500 83,500.00

E Grade beams 16 m³ 1150 18,400.00

F Lift wall 3 m³ 1200 3,600.00

Mass in-situ concrete Grade OPC 40 with


gabbro aggregate conforming to BS EN 12620
to the approval of the ENGINEER

G 1350 33,750.00
Steps and Ramps 25 m³

To Collection QR. 282,450.00

BOQ;Page 2/2/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

CONCRETE-SUPERSTRUCTURE

Reinforced in-situ concrete Grade OPC 35 with


gabbro aggregate conforming to BS EN 12620
to the approval of the ENGINEER.

A Beams, drop-beams, tie-beams, inverted-beam,


copping-beam, band-beams ,parapet beams
1150 28,750.00
and the like including beam-projections and 25 m³
thickening; horizontal and slopping not
exceeding 150 from horizontal

B Suspended solid floors horizontal and slopping 1000 2,000.00


2 m³
not exceeding 150 from horizontal

C Column 24 m³ 1150 27,600.00

D Lift wall 15 m³ 1200 18,000.00

DECKING SLAB

E Design,supply and construction of decking


slab(Approaximate 1188 m2)including decking
1 Item 47,520 47,520.00
sheet, shear studs and rienforcement with all
associated builder's work as necessary

To Collection QR. 123,870.00

BOQ;Page 2/2/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

REINFORCEMENT-SUBSTRUCTURE

Steel fabric reinforcement to BS 4449; include


for all laps, cutting and fitting

A BRC mesh ref. A-393 1,568 m²

High yield strength uncoated deformed bars with


a minimum characteristic strength of 500 N/mm²
as supplied by Qatar Steel Company (QASCO),
unless otherwise specified.

B Bars in assorted diameters to concrete


20,115 kg

REINFORCEMENT-SUPERSTRUCTURE

High yield strength uncoated deformed bars with


a minimum characteristic strength of 500 N/mm²
as supplied by Qatar Steel Company (QASCO),
unless otherwise specified.

C Bars in assorted diameters to concrete Included


16,125 kg

To Collection QR.

BOQ;Page 2/2/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

PRECAST / IN SITU CONCRETE

Precast/ in situ reinforced concrete lintel/sill


grade 35 OPC including reinforcement,
formwork, fixing in positions as shown on
drawings, bedded and jointed in cement-sand
mortar as specified.

A Lintels as required. Included


Item

To Collection QR.

BOQ;Page 2/2/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

FORMWORK-SUBSTRUCTURE.

Formwork; smooth face finish for concrete to


receive waterproofing membrane /paint

A To vertical or battering sides of footing 137 m²

B To vertical or battering sides of columns 59 m²

C To vertical or battering sides of grade beam 155 m²

D To vertical or battering sides of lift wall 21 m²

Included
E To vertical or battering sides of steps and 40 m²
ramps

FORMWORK-SUPERSTRUCTURE.

Formwork; smooth face finish for concrete to


receive cement sand render

F To sides and soffits of beams with proppings


exceeding 3.5m high but not exceeding 7.0m 289 m²
high.

G To horizontal soffits of suspended solid slab with


proppingsexceeding 3.5m high but not 6 m²
exceeding 7.0m high.

H To vertical or battering sides of column


297 m²

J To vertical or battering sides of lift wall


144 m²

To Collection QR.

BOQ;Page 2/2/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES

Approved waterproofing membrane (minimum


4mm thick) with 150 mm (minimum) laps
including primer as specified and lay in
accordance with manufacturer's
recommendations .

A To horizontal surfaces of concrete 645 m


2

B To vertical surfaces of concrete. 400 m


2

6 mm thick servipak protection board or similar


approved to comply with the Project
Specification and conform to BS 8102:2009 ;
suitably bonded to retain position

C To horizontal surfaces of concrete. 283 m²

D To vertical surfaces of concrete. 400 m²

Cement sand screed as specified Included

E 40 mm thick cement sand screed. 351 m²

Polyethylene sheet to BS 2782 as manufactured


by 'Qatar National Plastic Factory'; laid in
accordance with the manufacturer's
recommendation.

F Approved Polyethylene Sheet 793 m²

Expansion joint filler as specified and shown on


Drawings .

G 12 mm thick korkpak or other approved board,


51 m²
set vertically between concrete members

H 12 x 10 mm approved polysulphide sealant 265 m

To Collection QR. 98,000.00

BOQ;Page 2/2/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
so ever.

(i) Item

(ii) Item

(iii) Item

Included
(iv) Item

(v) Item

To Collection QR.

BOQ;Page 2/2/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection :

Page 2/1

Page 2/2

Page 2/3

Page 2/4

Page 2/5

Page 2/6

Page 2/7

TOTAL FOR CONCRETE WORKS To Summary QR 504,320.00

BOQ;Page 2/2/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY AND PARTITION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 2/3


MASONRY & PARTITION WORKS

PRE-INSULATED WALL

Pre insulated blocks, bedded and jointed in Class


1 cement mortar with and including concrete
bond, expansion joints and necessary fixing and
accessories as specified.

A 200 mm thick Pre-insulated block walls 705 m2 130 91,650.00

HOLLOW BLOCK WALL

Hollow concrete blocks, bedded and jointed in


Class 1 cement mortar with and including
concrete bond, expansion joints and necessary
fixing and accessories as specified.

B 200 mm thick hollow concrete block walls 530 m2 65 34,450.00

SOLID BLOCK WALL

Solid concrete blocks, bedded and jointed in


Class 1 cement mortar with and including
concrete bond, expansion joints and necessary
fixing and accessories as specified.

C 200 mm thick solid concrete block Parapet walls 175 m2 120 21,000.00

D Decorative works above parapet wall ;750mm 145 m 70 10,150.00

DRY WALL PARTITION/GYPSUM LINING


WORK
Drywall partition comprising of 12.5 mm thick
approved gypsum board on both sides and rock
wool insulation in between, fixed with steel studs,
including runners, corner beads, fixing
accessories etc. as specified and shown on
Drawings
D 100 mm thick dry wall up to 2.5m Height 15 m2 150 2,250.00

E Gypsum lining to cover steel column 250 m2 150 37,500.00

TOILET PARTITION WORK

F Toilet Cubicle partitions at Toilets, 2.3 m high 30 m2 1500 45,000.00

To Collection QR. 242,000.00

BOQ;Page 2/3/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY AND PARTITION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item

(ii) Item Included

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 2/3/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY AND PARTITION WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 2/3/1

Page 2/3/2

TOTAL FOR MASONRY & PARTITION WORKS To Summary QR 242,000.00

BOQ;Page 2/3/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROOFING WORKS

Amount
Item Description Quantity Unit Rate (QR)
(QR)

BILL NO. 2/4


ROOFING

BUILT-UP ROOFING

SURFACING

Cement and sand screeded bed as specified.

A Screeded bed; trowelled finished to falls and


cross-falls; minimum 50 mm thick 730 m2

B 50 x 50mm Angle fillet. 145 m

BITUMENOUS ROOF-COVERING

4 mm thick polymer modified (APP), reinforced


non-woven polyester cored torch applied Included
waterproofing membrane, conforming to Section
14 of Project Specification; laid in accordance
with the manufacturer's recommendations.

C Covering on trowelled bed laid to falls. 730 m2

4 mm thick polymer modified (APP), reinforced


non-woven polyester cored torch applied
reinforced waterproofing membrane with mineral
finish, conforming to Section 14 of Architectural
Specification; laid in accordance with the
manufacturer's recommendations.

D Skirting 300-600 mm girth; one end dressed over


angle fillet, other end dressed into and including
25 x 25 mm groove; sealed with approved UV
resistant polyurethane sealant. 145 m

E Dress membrane into rainwater outlet. 5 No

To Collection QR.

BOQ;Page 2/4/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROOFING WORKS

Amount
Item Description Quantity Unit Rate (QR)
(QR)

A Waterproofing over and sides of plinths 25 m2

B Aluminium Flashing 145 m

INSULATION AND PROTECTION

Approved extruded close cell polystyrene


insulation board with rebated edges.

C 50 mm thick (density 32-35 Kg/m3) Insulation laid


loose with tight, staggered joints on
waterproofing membrane. 730 m2

Permeable filter membrane conforming to


Included
Project Specification;laid in accordance with the
manufacturer's recommendation.

D 1000 guage filter membrane laid on insulation. 730 m2

Protective cement sand screed as specified.

E 50 mm thick screed laid over filter membrane. 730 m2

TESTING

G Allow for water test of the work as per Project


Specification. Item

To Collection QR. 75,000.00

BOQ;Page 2/4/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROOFING WORKS

Amount
Item Description Quantity Unit Rate (QR)
(QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
so ever.

(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

Inlcuded

To Collection QR.

BOQ;Page 2/4/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROOFING WORKS

Amount
Item Description Quantity Unit Rate (QR)
(QR)

Collection

Page 2/4/1

Page 2/4/2

Page 2/4/3

TOTAL FOR ROOFING WORKS To Summary QR 75,000.00

BOQ;Page 2/4/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 2/5


CARPENTRY/JOINERY WORKS

SEMISOLID CORE FLUSH DOORS

Single leaf, semi solid core wooden flush door, faced


6mm thick commercial plywood on both faces with
paint finish with fixed wooden frame (full wall width
profile) including ironmongery; complete with all
accessories: all as specified and as shown in the
Drawings and to the approval of Engineer.

A Door D1 of size 1000 X 2200 mm ;located at


Electrical room,Service Provider Room,Stair
case,Manager Office,Accounts Room & roof 7 No. 1800 12,600.00

B Door D2 of size 800 X 2200 mm ; located at GF Male


and Female toilet ,MF-Toilet 1&2 4 No. 1800 7,200.00

FIRE RATED WOODEN DOORS

Single leaf, solid core 90 mints fire rated wooden flush


door, faced with 6mm thick commercial plywood
flushed with laminate & 2 layer of 6mm thick supalux
board, with fixed on solid wooden frame (full wall
width profile) including ironmongery; complete with
all accessories: all as specified and as shown in the
Drawings and to the approval of Engineer

C Door FD1 of size 1000 X 2200 mm , 90 minutes fire


rated ;located at Spare parts room ,Staircase , Server
Room, CCTV 6 No. 2500 15,000.00

D Door FD2 of size 1800 X 2200 mm , 90 minutes fire


rated ; located at Spare parts room 1 No. 4250 4,250.00

E Door FD3 of size 800 X 2200 mm , 90 minutes fire


rated ; located at Pantry 1 No. 2500 2,500.00

To Collection QR. 41,550.00

BOQ;Page 2/5/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

PANTRY CABINET

Supply and fix Pantry cabinets comprising 18mm


marine ply with 1mm laminate for doors,
drawers, shelves, complete with base supports,
bearers, backings, framing, door and drawer
ironmongery etc.; all as specified, as shown in
drawings 3331-AR-B1-5-002-02 and to the
approval of ENGINEER. Allow for 30 mm thick
granite counter top with rounded edges and 100
mm high coved backsplash. (Sink measured
Separately)

BU-1;Base unit, U-shaped; Overall Size 100mm L


A 2 No.
x 600mm W x 850mm H; located at Pantry

BU-2;Base unit, U-shaped; Overall Size 450mm L


B 3 No.
x 600mm W x 850mm H; located at Pantry

WU-1;Base unit, U-shaped; Overall Size 1000


C 2 No.
mm L x 350mm W x 700mm H; located at Pantry

WU-1;Base unit, U-shaped; Overall Size 450 mm


D 3 No.
L x 350mm W x 700mm H; located at Pantry

VANITY COUNTER

Supply and fix Vanity tops; consist of granite


counter top with cut for wash basin with rounded
edge including 300 mm high facia, 50 mm high
back splash; fixed with adhesive on 12 mm thick
WBP ply screwed to MS angle frame; complete
with end stops, sealant, corners and all other
accessories fixing to concrete or blockwork; as
detailed in Drawings 3331-AR-B1-5-002 series Included

Vanity counter top (1375 x 600 mm) with 2no


E 1 No.
aperture at Male Toilet in GF

Vanity counter top (1650 x 600 mm) with 2no


F 1 No.
aperture at Female Toilet in GF

Vanity counter top (800 x 600 mm) with 1no


G 1 No.
apertureat toilet in MF

Vanity counter top (2790 x 600 mm) with 3no


H 1 No.
aperture at toilet in MF

To Collection QR. 35,000.00

BOQ;Page 2/5/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item

(ii) Item

Included
(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 2/5/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 2/5/1

Page 2/5/2

Page 2/5/3

TOTAL FOR JOINERY WORKS To Summary QR 76,550.00

BOQ;Page 2/5/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 2/6


METAL WORKS

ALUMINIUM GLAZED WINDOWS

Aluminium windows in 2mm thick (80 micron)


polyester powder coated finished frame system
from approved manufacturer; complete with 24
mm thick hermetically sealed double glazing
consisting of 6 mm thick solar reflective float
glass to interior pane, 12 mm thick sealed air
space and 6 mm thick clear float glass to interior
pane including ironmongery as specified; fixing
frames to concrete or blockwork and sealing all
around with approved sealant all as specified
and shown on DrawingNo. 3331-AR-B1-6-002-01
and to the approval of ENGINEER.

A Window Type W1; Double glazed aluminium fixed


window; overall opening size 3200 x 4100 mm
located at GF . 2 No.

B Window Type W2; Double glazed aluminium fixed


window; overall opening size 3600x6650 mm
located at GF 2 No.

C Window Type W3; Double glazed thermal break


aluminium sliding windowwith one side fixed Included
panel; overall opening size 1500x1750 mm
located at GF-Spare parts room & Staircase, MF-
Spare parts room,Accounts room,CCTV
room,Staircase and manager room 7 No.

D Window Type W4; Double glazed thermal break


aluminium sliding windowwith one side fixed
panel; overall opening size 2000x1200 mm
located at GF-Lift Lobby,MF-Spareparts
room,Reception and Manager room 4 No.

E Window Type W5; Double glazed aluminium fixed


window; overall opening size 3850x3200 mm
located at GF 2 No.

To Collection QR. 88,000.00

BOQ;Page 2/6/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

GLASS DOOR

Glass doors patch fixed from approved


manufacturer; complete with 12 mm thick
toughened clear glazing including ironmongery as
specified; fixing frames to concrete or blockwork
and sealing all around with approved sealant all
as specified and shown on Drawing No. 3331-AR-
B1-6-002-01 and to the approval of ENGINEER.

A Door Type GD1; Glazed Swing door; overall


opening size 4500 x 3000 mm located at 1 No.

ELECTRIC ROLLER SHUTTERS

Overhead approved 43 A electrically operated


Included
galvanized steel roller shutter doors and frames
as specified in Project Specifications; complete
with with thermal insulated galvanized steel strip
curtain, bottom bar, hood, curtain jamb guides,
weather sealing and lock, internal electro
mechanical brake and chain for manual operation
etc; allow for all accessories, associated wiring
and connections to local power outlet, paint
finishes; all as specified and shown in the
Drawing No. 3331-AR-B1-6-002-01 and to the
approval of the Engineer.

B Proprietary Rolling shutter Ref. RS1: overall size


4700 x 3000 mm high; located at Show room rear
entrance. 1 No.

INTERNAL SIGNAGE

Internal Signage as specified and shown in


drawing ; fixing block work or door as with
approved sealant to the approval of the
ENGINEER.

C Internal door/lobby/corridor signages Item

To Collection QR. 22,000.00

BOQ;Page 2/6/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

HANDRAIL AND BALUSTRADES

Supply and fix 50mm Ø SS handrails and


balustrades, from an approved manufacturer as
specified and detailed on Drawing 3331-AR-B1-5-
001-01; 5nos 25mm Ø SStube fixed on
balustrades at 100mm spacing,complete with
rose, baseplate, anchor bolt and other fixing
accessories; fixed to concrete or blockwork in
accordance with the manufacturer's
recommendations.

A Stair mounted handrails and balustrades, 900


mm high; horizontal and racking 20 m Included

B Wall mounted SS railing 35 m

To Collection QR. 36,000.00

BOQ;Page 2/6/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item
Included
(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 2/6/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 2/6/1

Page 2/6/2

Page 2/6/3

Page 2/6/4

TOTAL FOR METAL WORKS To Summary QR 146,000.00

BOQ;Page 2/6/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 2/7


STEEL WORKS

DESIGN AND CONSTRUCTION OF PRE-


ENGINEERED STEEL BUILDING

Note: The scope of works comprises the design


and construction of pre-engineered structures
comprising steel rigid framed structure with
lightweight insulated sheeting for roof and side
cladding as detailed in Drawings and
Specification.

Design ,supply and construct Pre-engineered


steel structured building frame in accordance with
AISC; complete with hot rolled steel sections to
ASTM A572 Grade 50/S355 or equivalent , cold
formed Z-section purlins and girts, eave structs
etc with a minimum yield strength of 355 MN/m2
withstands to all specified design loads; allow for
welding in accordance with AWS D1.1; all as
specified and to the approval of the ENGINEER.

A Design ,supply (delivered to site) and installation


of Pre-engineered steel structured building
including staircases as specified and indicated on
Item Included
drawings

To Collection QR.

BOQ;Page 2/7/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

PAINTING

A All steel surfaces shall be painted as per


specifications and approved life safety documents Item

FOUNDATION

Note: The sizes of the foundation pertaining to the


pre-engineered structure of proposed building is
given as indicative only, the quantities of which
are measured seperately in the BOQ Concrete
Section 2. No variation will be entertained for the
quantity changes of foundation sizes,
reinforcement etc, as per the actual reaction from
pre engineered supplier. Contractor is required
to re-design the foundation as per the required
loads of Pre-engineered structure.

B Allow for re-design of foundation and if it's any


variation in the quantities of proposed building in
Item
accordance with actual reaction of the pre-
engineered structure.
Included

To Collection QR.

BOQ;Page 2/7/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES

A Allow for all anchor bolts inserts and steel


embedded parts. Item

B Allow for all associated builders work as


necessary Item

Drawings.

C Allow for preparation, submission and obtaining


the Engineer's approval of the fabrication and
erection drawings as specified. Item

Certificate and testing

D Allow for provision of certificates, samples and


tests as required by QCS. Item

Guarantee.

E Allow for providing guarantees for the complete Included


Pre-Engineered Building as required by the
Specification. Item

Service provision

F Allow for all supports, accessories, cutouts


required for services Item

To Collection QR. 460,000.00

BOQ;Page 2/7/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item

(ii) Item

(iii) Item

(iv) Item Inlcuded


(v) Item

To Collection QR.

BOQ;Page 2/7/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 2/7/1

Page 2/7/2

Page 2/7/3

Page 2/7/4

TOTAL FOR STEEL WORKS To Summary QR 460,000.00

BOQ;Page 2/7/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO 2/8

PLUMBING & DRAINAGE INSTALLATIONS

RAINWATER INSTALLATION.

uPVC pipes and fittings to BS 4514 with solvent


welded joints ; exposed, clipped to wall or hanged
from soffit on and including supports.

A 110 mm diameter pipe and fittings Item

B Extra ; bends, branches / tees Item

Accessories installed complete as specified.

PVC roof rainwater outlet; deck drain type with gravel


C guard; jointing to 110 mm diameter pipe work 5 No

TOILET FOUL WATER DRAINAGE

Supplly, Installation, Testing and commissioning of


Included
Drainage pipe of uPVC material and fittings to BS
5255 with solvent welded joints and supports etc.,

D 50 mm diameter soil, waste and vent pipes 71 m

Supply, Installation, Testing and Commissioning of


Below Ground Drainage Pipe of uPVC Materials and
fittings to BS 4660 with solvent welded joints and
supports etc.,

B 82 mm diameter soil, waste and vent pipes 28 m

C 110 mm diameter soil, waste and vent pipes 45 m

D Extra ; bend Item

E Extra ; connections to floor gully. 1 No.

F Extra ; connections to floor clean out 1 No.

G Extra ; connections to W.C 2 Item

To Collection QR.

BOQ;Page 2/8/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

SANITARY AND FOUL WATER DRAINAGE


INSTALLATION (CONT…D)

Trapped floor gulley; uPVC body, with waste inlet


and outlet complete with 'P' or 'S' trap, 150 x 150 mm
uPVC frame and cover as specified; jointing to waste
and drain pipe work.

A Floor gulley, 110 mm outlet; Type FG 1 No

Floor clean outs; cast iron body, complete with heavy


duty solid cast stainless steel covers as specified;
jointing to pipework.

B Floor clean out, 110 mm outlet; Type FCO 1 No


Included

Vent cowls, uPVC type slotted cap for solvent


welding,

C Vent cowl; 110 mm 2 No

D Vent cowl; 82 mm 1 No

E Vent cowl; 50 mm 1 No

To Collection QR.

BOQ;Page 2/8/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

SANITARY WARE AND ACCESSORIES

Sanitary fittings as manufactured by from approved


manufacture; installed complete with all traps and
waste fittings; include for connections to water and
waste services complete with service valves; sealing
all round with silicone mastic to the approval of the
ENGINEER

A Ref.SW1: Approved vitreous china wash down W.C.


with seat and cover 4.5 liters capacity cistern with
push bottom and closed coupled bottom outlet. W.C. 5 No.
pipe shall have conversion bend suitable for 100 mm
uPVC floor soil pipe outlet.

B Ref.SW2: Approved vitreous china counter top wash


basin with tap hole mounted , with 32mm pop up
8 No.
waste and chrome plates 32mm bottle trap with
Included
75mm seal

C Ref.SW3:Urinal 2 No.

D Ref.SW4:Urinal partition 2 No.

E Ref.SW5: Heavy duty Janitor Sink with weir over


1 No.
flow with stainless steel bucket grating

F Ref.SSDB:Pantry Sink 1 No.

To Collection QR.

BOQ;Page 2/8/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

Sanitary accessories from and approved


manufacture; installed complete as specified.

A Ref.SWA1: Perineal spray NIMBUS 12mm Inclined


5 No.
BIB tap flexible hose jet and wall hook

B Ref.SWA2:Toilet paper roll holder 5 No.

C Ref SWA3:Wash Basin Mixer 8 No.

D Ref SWA4: Wall Mounted Soap Dispenser 4 No.

E Ref SWA5: Mirror Concealed fixing 2000x700 1 No

F Ref SWA5a: Mirror Concealed fixing 1400x700 1 No

G Ref SWA5b: Mirror Concealed fixing 1200x700 1 No

H Ref SWA5b: Mirror Concealed fixing 600x700 1 No Included

J Ref SWA6: Stainless steel Wall mounted towel bar 1 No

K Ref SWA7: Soap Tray 1 No

L Ref SWA8: Paper Holder 1 No

M Ref SWA9: Waste Bin 3 No

N Ref SWA10: SS Coat Hooks 5 No

P Janitor Mixer 1 No

Q Pantry Sink Mixer 1 No

To Collection QR.

BOQ;Page 2/8/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

POTABLE WATER SUPPLY INSTALLATION

DOMESTIC HOT & COLD WATER SUPPLY

Copper pipes to BSEN 1057, Part 1 Table Y and


fittings to BS 864 Part 2 with capillary joints; covered
with factory bonded polythene sleeve; concealed in
wall or running through floor screed; fixed with
brackets, clips on and including supports, plugged
and screwed to concrete or blockwork

A 15 mm Diameter pipes including fittings. 25 m

B 22 mm Diameter pipes including fittings. 35 m

Supply and Installation, Testing and commissioning


of Domestic Water supply of Copper pipes to BSEN
1057, Part 1 Table X; and fittings to BS 864 Part 2;
Included
exposed with capillary joints; fixed with brackets,
clips on and including supports, plugged and screwed
to concrete/ blockwork or hanged from slab

C 22 mm Diameter pipes including fittings. 200 m

D 28mm Diameter pipes including fitting 17 m

E 35 mm Diameter pipes including fittings. 75 m

To Collection QR.

BOQ;Page 2/8/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

Isolating valve and the like complete as specified


with screwed / flanged ends; jointing to Copper

A 22 mm Diameter pipes 3 No.

B 28 mm Diameter pipes 2 No.

C 35 mm Diameter pipes 5 No.

Water Hammer Arrestors complete with screwed or


flanged ends as specified
Included
D 22 mm Diameter 13 No.

Bib tap chromium plated brass with cross heads,


E complete with backplate elbow or wall flange along 2 No.
with back flow preventor

To Collection QR.

BOQ;Page 2/8/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

WATER HEATERS

Horizontal mounted water heater; thermal storage,


cylindrical type comprising inner water container,
pressure gauges, thermometers, safety thermostat,
anti vacuum valve, temperature /pressure relief
valve, safety valves, outer casing and end covers,
electric immersion heater, wall mounting brackets;
connection to local cold and hot water outlets and
connections to local power outlets.

Wall mounted water heater; storage capacity 30 ltrs; Included


A Ref no. EWH-B1-GF-01 & 02 4 No.
EWH-B1-MF-02 & 03

Wall mounted water heater; storage capacity 50 ltrs;


B 1 No.
Ref no. EWH-B1-MF-01

To Collection QR.

BOQ;Page 2/8/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

WATER TANKS

Potable cold water storage Panel Ttanks as


specified complete with, hinged access cover ;
including low / high level interlock switches, Strainer,
Float valve, non-return valve, Solenoid valve and
associated cabling including connections to local
outlets ; complete with air vent with insect guard,
combined drain / overflow with insect guard as
specified ; allow for connections to cold water supply
and discharge pipe work; installed on prepared bases
(measured separately)

A Roof water storage tank; capacity 1600 US gallons 2 No.


Included
PUMPS

Supply, installation, testing and commissioning of


PACKAGED TYPE BOOSTER PUMPSET- VFD
TYPE, Vertical, in-line multistage centrifugal pump,
cast iron casing, stainless steel impeller, stainless
steel shaft, carbon shaft seal and T.E.F.C electric
motor and controls complete with suction and
delivery manifolds and factory wired control panel,
isolating valves, non-return valves, strainers, flexible
connections including all necessary accessories and
connecting to cold water suction and delivery pipe
work and Pressure Vessel with Isolation valve to the
approval of Engineer at site.

Potable water booster pump set Ref: CWBP-B1-RF-


01 & 02; comprising 1 no. duty pump and 1 no. of
B 1 Set
standby pump; 100lts pressure vessel and flow rate
1.0 lps at 2.0 bar located at roof.

To Collection QR.

BOQ;Page 2/8/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES

Marking, position of and leaving or forming all holes,


A Item
mortices, chases and the like required in the structure

Identification of Plumbing system above ground


including plates, discs, labels, tapes, symbols or
B Item
numbers, bands, charts or diagrams and other works
as Project Specification

Testing and commissioning including required fuel


C Item
and power for testing and issuing test certificates

Preparation drawings of working drawings and as


D Item
fitted drawings

E Handing over of operation manuals and instructions Item

OTHER ITEMS
Included
F Allow for any items necessary for the proper
completion of the works in this section of, but not
covered else where in the BOQ whether arising from
the quantum of work, specification or condition of
contract or any other matters what so ever.

(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 2/8/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

COLLECTION

Page 2/8/1

Page 2/8/2

Page 2/8/3

Page 2/8/4

Page 2/8/5

Page 2/8/6

Page 2/8/7

Page 2/8/8

Page 2/8/9

TOTAL FOR PLUMBING AND DRAINAGE 65,000.00


To Summary QR
SYSTEM INSTALLATIONS

BOQ;Page 2/8/10
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO 2/9

FIREFIGHTING WORKS

Ceiling mount Automatic Fire Extinguishers as


A 6 No
specified and as shown in drawing

B Fire blankets. 1 No

Portable fire extinguishers complete as specified,


including supports and fixing brackets where Included
necessary.

Fire extinguisher, Dry chemical powder, wall


C 16 No
mounted; 6.0Kg, UL listed. (FE-1)

Fire extinguisher, Dry chemical powder, wall


D 1 No
mounted; 5.0Kg, UL listed. (FE-1)

To Collection QR.

BOQ;Page 2/9/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES IN CONNECTION WITH FIRE


FIGHTING INSTALLATION

Allow for the following

Marking the position of holes, mortises, chases and


the like in the structure. Plates, discs, labels and
A Item
charts for identification of plant, equipment, pipes
valves and necessary accessories.
Included
Testing and Commissioning of fire protection
B Item
provisions

OTHER ITEMS

C Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising from
the quantum of work, specification or condition of
contract or any other matters what so ever.

(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 2/9/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING

Item Description Quantity Unit Rate (QR) Amount (QR)

COLLECTION

Page 2/9/1

Page 2/9/2

TOTAL FOR FIRE FIGHTING SYSTEM 9,000.00


To Summary QR
INSTALLATIONS

BOQ;Page 2/9/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO 2/10

HVAC INSTALLATIONS

PACKAGED TYPE AHU

Rooftop Packaged Air Conditioning Unit from an


approved manufacturer, with thermal insulation
suitable for outdoor installation, dual refrigeration
circuit, centrifugal fans, fan motors, cooling coils,
pre-filter, bag filter, controls and other
components as specified; include for anti
vibration mountings, electrical connections to
local isolators /control panels, connection to
ductwork and condensate drainage; installed on
prepared bases in accordance with the
manufacturer's recommendations including all
associated builder's works and as specified.

Roof Top Packaged Air Conditioning Unit; Air


A flow Rate: 4985 lps. as shown in drawing, 1 No
schedule.
Included
SPLIT AC (DX TYPE)

Split air-conditioning unit comprising wall


mounted indoor unit, consisting of cooling coils,
fans, washable filters, thermostat and air-cooled
remote out-door unit suitable for outdoor
installation @ 46 0C ambient temperature
complete with all accessories, interconnecting
insulated refregerent copper pipe works,
CFC/HCFC free refrigerant, anti-vibration
isolators, electrical connection etc. as specified in
local standards and guideline, as shown in
schedule and drawing

Split air-conditioning unit; cooling capacity 2.1


B 1 No
KW

Split air-conditioning unit; cooling capacity 4.0


C 1 No
KW

To Collection QR.

BOQ;Page 2/10/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

VARIABLE REFRIGERANT FLOW SYSTEM


(VRF)

Supply Installation, testing and commissioning of


Modulating outdoor units, with multi scroll
compressors (minimum two compressors) with
one capacity controlling compressor and other
constant speed type compressor, special pre-
coated fins, panel, inverter based condenser fan
M.S. hot dip galvanised stands / supports,
electrical & microprocessor panel, isolating valves
and all the necessary accessories for proper
functioning of the units as per the technical
specification suitable for operation on R410A
refrigerantetc. as specified in local standards and
guideline, as shown in schedule and drawing

A ODU - 42.7KW 1 No
Included
VRF INDOOR UNITS

HIGHWALL UNIT

Split air-conditioning unit; cooling capacity 2.1


B 1 No
KW

Split air-conditioning unit; cooling capacity 2.4


C 1 No
KW

Split air-conditioning unit; cooling capacity 4.0


D 1 No
KW

Split air-conditioning unit; cooling capacity 3.7


E 1 No
KW

CEILING SUSPENDED CASSETTE UNIT

Split air-conditioning unit; cooling capacity 3.1


F 2 Nos.
KW

Split air-conditioning unit; cooling capacity 2.6


G 1 No
KW

Split air-conditioning unit; cooling capacity 4.4


H 1 No
KW

Split air-conditioning unit; cooling capacity 4.9


J 1 No
KW

K 25mm uPVC Condensate Drain Pipe Item

To Collection QR.

BOQ;Page 2/10/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

TREATED FRESH AIR

VRF type Treated Fresh Air handling Unit with pre


filter, bag filter, cooling coils, fan section all as
specified and as shown in drawing.

Fresh air handling unit ; total cooling capacity


A 1 No
12.4 KW and air flow 150lps

Sound attenuator including all accessories


complete as specified and indicated on the
drawings; jointing to ductwork as shown in
drawing.
Included
Sound attenuator connecting to PACU supply
B 1 No
duct size 1550 x 600 x 1200.

Sound attenuator connecting to PACU return duct


C 1 No
size 1600 x 600 x 1200.

VENTILATION EQUIPMENTS

Ducted inline exhaust fans switch


operated,complete with motor, statically or
dynamically balanced die-cast-in-aluminium
impeller; rolled steel channel supporting frames,
anti-vibration mountings, acoustic lining enclosure
etc., complete as specified and indicated on the
drawings; connections to local power outlets;
installed on as shown on the drawings

D Inline Exhaust Fan Air flow 210 lps , Ref; EF-01 1 No

E Inline Exhaust Fan Air flow 35 lps , Ref; EF-02 1 No

Fire rated smoke exhaust fan, ducted inline axial


type; complete with backdraft damper as
specified in local standards and guideline, as
shown in the schedule and drawing

Ducted inline axial type Smoke Exhaust fan; air


F 1 No
flow 29600 lps

To Collection QR.

BOQ;Page 2/10/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

AIR-CONDITIONING DUCTWORK

Galvanized sheet metal air-conditioning ductwork


and fittings conforming to the latest HVCA
/ASHRAE/ SMACNA duct construction standards
complete as specified and indicated on the
drawings; including test holes, turning vanes,
splitters, dampers, stiffeners, transformation
pieces, spigot box, access panels and doors,
plenum chambers, etc. ; on and including
supports as shown in drawing.

Over 201mm but not exceeding 750mm wide


A 360 m2
ducts including fittings and accessories.

Over 751mm but not exceeding 1350mm wide


B 225 m2
ducts including fittings and accessories.

Over 1351mm but not exceeding 2100mm wide


C 60 m2
ducts including fittings and accessories.

AIR-CONDITIONING DUCTWORK INSULATION

Included
Rigid fiber glass insulation 96 kg / m³ density and
50mm thick; wrapped with reinforced aluminum
foil and covered with high quality canvass cloth
200 gm/m³ soaked in weatherproofing compound
and sealed with vapor barrier seal on roof top.

Insulation to air-conditioning ductwork outside


D 280 m2
building.

Rigid fibre glass insulation 48 kg / m³ density; 25


mm thick wrapped with reinforced aluminium foil
with galvanized sheet metal corner binded with 1
mm diameter galvanized wire to ductwork within
the building.

Insulation to air-conditioning ductwork within the


E 450 m2
building.

Anodized aluminium sheet cladding as specified

Aluminim cladding to air-conditioning ductworks


F 280 m2
outside the building

G Ø200 Flexible Duct 60 RMT

25mm thick Accoustic Insulation for air-


H 100 m2
conditioning inside ductworks as per specification

To Collection QR.

BOQ;Page 2/10/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

VENTILATION DUCTWORK

Galvanized sheet metal ventilation ductwork and


fittings conforming to the latest HVCA /ASHRAE/
SMACNA duct construction standards complete
as specified and indicated on the drawings;
including test holes, turning vanes, splitters,
dampers, stiffeners, transformation pieces, spigot
box, access panels and doors, plenum chambers,
etc. ; on and including supports as detailed on
design drawings

Not over 300mm wide ducts including fittings and


A 20 m2
accessories.

Galvanized sheet metal fire rated ventilation


ductwork and fittings conforming to the latest
HVAC /ASHRAE /SMACNA duct construction
standards complete as specified and indicated on
the drawings; stiffeners, transformation pieces,
access, panels and doors, Insulation, etc. on and
including supports.

B
Over 500mm but not exceeding 1000mm wide
40 m2 Included
ducts including fittings.

C Over 1500mm wide ducts including fittings. 130 m2

AIR-CONDITIONING DUCTWORK
ACCESSORIES

Fire Damper / Volume Control Damper /


Motorized Damper

Volume control damper, sturdy corrossion


resistance construction with multi-leaf double skin
aerofoil section opposed blade including all
accessories complete as specified and indicated
on the drawings as shown in drawing

Supply, install, test and commission all volume


D control dampers of all sizes as stipulated in the 31 Nos.
drawings and as per specifications

Supply, install, test and commission all buterfly


E dampers of Ø200 as stipulated in the drawings 54 Nos.
and as per specifications

To Collection QR.

BOQ;Page 2/10/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Motorized Smoke & Fire Dampers.

Supply, installation of louver type motorised


fire/smoke dampers confirm to SMACNA/NFPA
with access door, actuator, matching flanges,
gaskets & bolts, etc., The item shall be complete
including all the fittings and accessories as
detailed in drawings and technical specifications.
The actuator shall be ON/OFF type. The actuator
shall be capable of accepting 240 V AC supply,
the controller shall be BMS compatible and
suitable for BACNET protocal with
communication port. The item should be
complete in all respect including all fittings,
supports and accessories required for its
complete installation and proper functioning as
per standards, equipment schedule, technical
specifications as specified and indicated on
drawing

A MFD-01- 2300X1200 1 No

B MD-01 - 1250X400 1 No
Included
Supply, Install, Testing and Commisioning of
Fusible link Fire damper, galvanized steel curtain
type including all accessories, access doors,
complete as specified and indicated on the
drawings; jointing to ductwork as shown in
drawing.

C 1150 X 400 2 Nos.

D 1150 X 500 2 Nos.

E 500 X 550 1 No.

F 250 X 200 2 Nos.

G 300 X 200 1 No.

H 100 X 100 2 Nos.

J 150 X 100 2 Nos.

K 250 X 150 2 Nos.

To Collection QR.

BOQ;Page 2/10/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

AIR INLETS AND OUTLETS

Supply and return air grilles/diffusers as specified,


extruded aluminium construction with powder
coated finish to approved colour ; complete with
supports, plenum boxes and flexible connections;
fixing in position including connections to
ductwork as shown in drawing.

A 25mm Linear 2 slot supply diffuser 1000x250 54 Nos.

25mm Linear 4 slot return diffuser (Continuous


B 65 m
RLD as shown in drawing) Included
C 200mm dia Jet diffusers 3 Nos.

D 4-way, Exhaust air diffuser size 150x150mm 7 Nos.

Supply, install, test and commission of circular


inline type air curtains complete with supports as
E 2 Nos.
stipulated in the drawings and as per
specifications

To Collection QR.

BOQ;Page 2/10/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

ELECTRICAL WORK

All other electrical work in connection with


Ventilating and Air Conditioning and between
A Item
MCC’s, isolating switches and mechanical
equipment

BUILDER'S WORK IN CONNECTION WITH


HVAC INSTALLATIONS

Allow for the following.

Supply, installation of sleeves with fire retardant


Included
B sealing material shall be provided for pipes & Item
ducts crossing fire rated walls.

Allow for any other builder's work deemed


C necessary for the completion of HVAC Item
INSTALLATIONS.

Holes openings, chases, cutting back, building in


D pipes, ductwork, sleeves, lintels over openings Item
and making good finishing as necessary.

To Collection QR.

BOQ;Page 2/10/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES

Allow for marking the position of holes, mortises,


A Item
chases and the like

Allow for providing shop-drawings, and obtain


B Item
approvals, as specified

Allow for providing record documents and


C Item
operation and maintenance manuals as specified

Allow for painting all steelwork In connection with


D Item
supports for pipes as specified

Allow for identification and name plates as


E Item
specified

Allow for testing and commissioning the entire


F Item
Installation as specified

G Allow for cleaning and flushing Item


Included
H Allow for providing training as specified Item

OTHER ITEMS

J Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 2/10/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

COLLECTION

Page 2/10/1

Page 2/10/2

Page 2/10/3

Page 2/10/4

Page 2/10/5

Page 2/10/6

Page 2/10/7

Page 2/10/8

Page 2/10/9

TOTAL FOR HVAC INSTALLATIONS To Summary QR 350,000.00

BOQ;Page 2/10/10
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

BILL NO. 2

ELECTRICAL SERVICES

Note : The works included hereunder shall


comprise supply, installation, testing, comissioning
and setting to work for all items which are
necessary for a complete operational system as
outlined in the Drawings and in the specifications,
obtaining necessary Government approvals etc.
completely.

MAIN AND SUBMAIN INSTALLATIONS


Sub Main Distribution Board in dust and vermin
proof enclosure, including busbars (Fault rating
25kA for 3sec to comply with IEC 439-1 / 1999),
main incoming and outgoing moulded case
interrupter/circuit breakers, instrumentation, fuses,
switches, earthing, fixing bracket and all
necessary provisions for incoming and outgoing
cable terminations, Ammeter, Voltmeter, Selector
switch and Phase Indicator lamps and all as
specified including support frame with earthing etc.
with Energy Meter
Included
A 10 way-TPN Sub Main Switch Board SMB-SH with
160 amp TP MCCB for incoming supply, 160amp
4P+E copper bus bar and all other accessories etc
including outgoing MCCB's. (As measured below)
Ref Dwg No-3331-EL-B0-6-001
1 No

100 amp TP MCCB outgoing.-1 Nos

63 amp TP MCCB outgoing.-2 Nos

40 amp TP MCCB outgoing.-5 Nos

To Collection QR.

BOQ;Page 2/11/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

A 8 way-TPN Sub Main Switch Board ESMB with


160 amp TP MCCB for incoming supply, 160amp
4P+E copper bus bar and all other accessories etc
1 No
including outgoing MCCB's. (As measured below)
Ref Dwg No-3331-EL-B0-6-001

100 amp TP MCCB outgoing.-1 Nos Included

63 amp TP MCCB outgoing.-2 Nos

16 amp TP MCCB outgoing.-4 Nos

B 160 amp ATS with Enclosed Box 1 No

To Collection QR.

BOQ;Page 2/11/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

DISTRIBUTION BOARD

Supply & install Lighting/power panel boards in


dust and vermin proof enclosure, complete with
bus bars, incoming MCCB with outgoing MCBs,
RCBOs and spare MCB's as shown on Drwg.
including connection, fixing accessories, earthing
etc.

A 18 ways TPN distribution board, Ref. SH-GF-


LPDB with 40 Amp TPN isolator for incoming 1 No Included
supply.

B 14 ways TPN distribution board, Ref. SH-MF-


LPDB with 40 Amp TPN isolator for incoming 1 No
supply.

C 6 ways SPN distribution board, Ref. DB- QTEL


1 No
with 125 Amp SPN isolator for incoming supply.

D 4 ways TPN distribution board, Ref. DB- UPS with


1 No
40 Amp TPN isolator for incoming supply.

To Collection QR.

BOQ;Page 2/11/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

POWER CABLES

Supply & install 600/1000 volts, copper


conductors, insulated cables type as indicated in
drawing, direct burried in trenches or pulled inside
sleeves or installed on cable tray and clIPped to
wall or in PVC duct complete with all jointing and
termination kits, sleeves, conduits, laying of
marker tape and protection tiles etc. as per Kahra-
maa latest QCS specifications and shown on
drawings.(Civil work meassured elesewhere).
A 4C-95 mm2 /FIRE RATED CABLE + 1x1C-50
10 m
mm2 PVC/ECC cables

B 4C-50mm2 CU/FIRE RATED CABLE + 1x1C-25


35 m
mm2 PVC/ECC cables

C 4C-50 mm2 XLPE/SWA/PVC + 1x1C-25 mm2


40 m
PVC/ECC cables

D 4C-25 mm2 XLPE/SWA/PVC + 1x1C-16 mm2


60 m
PVC/ECC cables Included

E 4C-16 mm2 XLPE/SWA/PVC + 1x1C-16 mm2


105 m
PVC/ECC cables

F 4C-10 mm2 XLPE/SWA/PVC + 1x1C-10 mm2


55 m
PVC/ECC cables

G 4C-6 mm2 XLPE/SWA/PVC + 1x1C-6 mm2


107 m
PVC/ECC cables

H 4C-4 mm2 PVC/SWA/PVC + 1x1C-4 mm2


75 m
PVC/ECC cables

To Collection QR.

BOQ;Page 2/11/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

CABLE TRAY

Supply & install Galvanized steel cable trays and


fittings complete with purpose made sunshade/
protection covers, bends and junctions as
specified and shown on drgs, including supports,
fixings and associated builders works as
necessary as detailed in drawings.

A Allow for Cable Tray and accessories. 1 Item

CABLE TRUNKING / CONDUIT

Supply & install Galvanized steel cable trunking or


PVC conduit & fitting complete with protection
Included
covers as specified including supports, fixings,
junction boxes and assocaited builder's work as
necessary as detailed in drawings.

E Allow for GI trunking and accessories. 1 Item

To Collection QR.

BOQ;Page 2/11/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

EARTHING SYSTEM

Earthing and bonding shall be carried out


incompliance to BS-7430, QCS Section 21.22 and
Kahramaa Regulation. The work shall include
complete earthing installation including Earth bar,
Earth cable with test link connecting to earthing
network, earth electrode, earth pit, earth chamber
with cover, clIPs, raceways, fittings and all related
accessories as shown in the drawing.

A Clean Earthing Pit of Telecom/ELV EquIPments 2 Item Included

B 1C x 25mm2 Y/G ECC (Earth pit to Earth Bar &


40 m
Earth Bar to Earth Bar)

C 50 x 6mm copper earth bar with test link-4 ways 2 No

BONDING

D Allow for complete bonding to trunking, tray, water


heaters, equIPment etc. in full compliance to 1 Item
KAHRAMAA standards.

To Collection QR.

BOQ;Page 2/11/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

LIGHTNING PROTECTION SYSTEM

Lightning protection system shall be carried in


compliance to latest revision of BS-EN 62305- and
BS-7430, QCS and Kahramaa regulation. The
system shall include lightning arresters, copper
tape for horizontal rum on the roof and vertical
drop to down conductor including all fitting and
related accessories. The work shall also include
independent earth electrode with earth pit and
chamber with cover. The earth electrode shall be
interconnected to the main earth grid.

A 15mm∅ Dia high conductivity hard drawn copper


3 No
Air rod with base rod-2 meter long

B Down Conductor 8 No Included

C 25x3mm Bare copper tape in screed and parapet


450 m
wall

D 25x3mm Bare copper tape as down conductor


38 m
connected to earthing network

E Lightning protection earth pits 4 No

F Test Clamp 4 No

G 95 sqmm Bare Copper Cable. 240 m

To Collection QR.

BOQ;Page 2/11/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

LIGHTING INSTALLATION

Supply and install luminaires complete including all


lamps, tubes, fittings, supports, control gear,
diffusers, flexible connections, ceiling roses and
wiring with 450 / 750 volt PVC insulated cable in
concealed or exposed G.I conduit with necessary
earthing and all associated accessories; fixing in
position including final connections and
terminations as specified and as per luminaire
schedule.

A Type A1, 31W LED Recessed Mounted Lighting


26 No
Fixture IP20

B Type A1+E , 31W LED Recessed Mounted


Lighting Fixture IP20, With Self Contained Battery 9 No
Backup
Included
C Type D1, 22W LED Recessed Mounted Lighting
9 No
Fixture IP44

D Type D1,+E 22W LED Recessed Mounted Lighting


Fixture IP44, With Self Contained Battery Backup 7 No

E Type D2, 14W LED Recessed Mounted Lighting


8 No
Fixture IP44

F Type D2+E, 14W LED Recessed Mounted Lighting


Fixture IP44, With Self Contained Battery Backup 4 No

G Type D3, 33W LED Recessed Mounted Lighting


31 No
Fixture IP44

D Type D3+E 33W LED Recessed Mounted Lighting


5 No
Fixture IP44, With Self Contained Battery Backup

H Type D5, 2x33W LED Recessed Mounted


40 No
Lighting Fixture IP20

To Collection QR.

BOQ;Page 2/11/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

LIGHTING INSTALLATION Cont..

A Type D5+E, 2x33W LED Recessed Mounted


Lighting Fixture Ip20, With Self Contained Battery 8 No
Backup

B Type L1, 36WLED Surface Mounted Lighting


14 No
Fixture IP44,

C Type L1+E , 36W LED Surface Mounted Lighting


Fixture IP44, With Self Contained Battery Backup 6 No

D Type M1,9W LED Mirror Light 8 No

Supply & install 240 volt flush mounted


accessories / lighting switches, completely
installed including boxes, plates, conduit boxes,
accessories etc.; all as specified and wiring with Included
450 / 750 volt in PVC conduit concealed or
exposed G.I conduit with necessary earthing;
fixing in position including final connections and
terminations as specified and as per luminaire
schedule.

E General lighting switch, one way, one gang. 17 No

F General lighting switch, one way, two gang. 5 No

G General lighting switch, two way, one gang. 12 No

H General lighting Push button control 2 No

To Collection QR.

BOQ;Page 2/11/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

SMALL POWER INSTALLATION

Supply & install 240/415 volt flush mounted


accessories completely installed including boxes,
plates, conduit boxes, necessary supports, cable
tray and accessories etc, and wiring with 450 / 600
volt PVC insulated cable to BS 6004/ BS 4607 in
concealed or exposed conduit or through trunking
including all fittings and necessary earthing.

A 13 amp switched Single socket outlet. 26 No

B 13 amp switched Single socket outlet. WP 3 No

C 13 amp switched Twin socket outlet. 17 No


Included
D 45A Flex outlet. 12 No

E 20A Double Pole switch. 12 No

F 13A Unswitched Spur Unit With Neon Indicator. 1 No

G 13A switched Spur Unit With Neon Indicator. 10 No

H Floor Mounted Box (1no Twin Rj45 Outlet + 1no


13 No
Twin Power Sockets)

J Floor Mounted Box Outlet (2 Nos Twin Power


11 No
Sockets)

K 16A Single Phase Industrial socket outlet. 2 No

To Collection QR.

BOQ;Page 2/11/10
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

Isolators as specified complete with steel supports,


sunshade and protection covers where necessary;
and wiring with 450 / 600 volt PVC insulated cable
to BS 6004/ BS 4607 in concealed or exposed
conduit or through trunking including all fittings
and necessary earthing.

A 100A TPN Isolator, IP-65. 2 No.

B 16A TPN Isolator, IP-65. 1 No.


Included
C 63A TPN Isolator, IP-65. 3 No.

D 16A DP Isolator, IP-65. 2 No.

UNINTTERUPTED POWER SUPPLY (UPS)

E 10 KVA UPS with 60 minutes battery back up, with


maintenance bypass and change over switch with 1 No.
interlock facility as specified.

BUILDERS WORK IN CONNECTION WITH ALL


ELECTRICAL/ELV INSTALLATIONS.

F Holes, chases, Cutting back, building in, provision


of pipe sleeves, fire barriers and making good Item
finishes as necessary.

G Allow for sleeves/ducts for encasing electrical


cables passing beneath roads, paved areas and Item
structures.

H Isolator supports, equipment supports, sunshades


including paint finishing and associated builders Item
work as necessary.

o Collection QR

BOQ;Page 2/11/11
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

SUNDRIES IN CONNECTION WITH ALL


ELECTRICAL/ELV INSTALLATIONS.

A Marking the position of holes, mortises, chases


Item
and the like in the structure.

B Plates, discs, labels, and charts for identification of


Item
equipment, panel bords like.

C Loose keys, tools and spare parts as specified. Item

D Testing and Commissioning. Item

OTHER ITEMS Included

D Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

o Collection QR

BOQ;Page 2/11/12
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item DescrIPtion Quantity Unit Rate (QR) Amount (QR)

Collection

Page 2/11/1

Page 2/11/2

Page 2/11/3

Page 2/11/4

Page 2/11/5

Page 2/11/6

Page 2/11/7

Page 2/11/8

Page 2/11/9

Page 2/11/10

Page 2/11/11

TOTAL FOR SITE ELECTRICAL INSTALLATION 99,000.00


To Summary QR.

BOQ;Page 2/11/13
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

BILL NO. 2/12

ELV WORKS

FIRE ALARM SYSTEM

The works include under this section shall comprise


supply, installation, testing, commissioning and
setting to work for all items which are necessary for a
complete operational fire alarm system as outlined in
the drawings, scope of work and in the specifications
and shall be carried out by a specialized sub
contractor.

Supply & install Fire alarm fittings and accessories


and wiring with 2C x 1.5 mm2 and 2C x 2.5 mm2 fire
resistant cables in PVC/GI conduits or through cable
trunking complete with glands and terminations
complets as specified and indicated in the
drawingsno.3331-EF-B1-1-001,3331-EF-B1-1-002,
3331-EF-B0-6-001

A Active type Fire alarm repeater panel with Power


supply unit and all accessories including wiring, 1 No
conduiting, etc.complete as required

B Addressable Smoke detector 48 Nos

C Remote Indicator 23 Nos


Included
D Addressable Manual Alarm Call Point 5 Nos

E Addressable Manual Alarm Call Point, Weather proof


1 No

F Addressable Heat Detector 1 No

G Addressable output control module 11 Nos

H Addressable input monitor module 12 Nos

J Duct Detector 2 Nos

K Sounder with Flasher - Wall mounted 6 Nos

L Sounder with Flasher - Wall mounted, Weather proof 3 Nos

To Collection QR.

BOQ;Page 2/12/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

FIRE ALARM SYSTEM (Cont..)

Final connection to points including wiring, conduits


and ancillary installations complete including
containment and terminations as necessary.

A To Addressable Smoke detector 48 Nos

B To Remote Indicator 23 Nos

C To Addressable Manual Alarm Call Point 5 Nos

D To Addressable Manual Alarm Call Point, Weather


1 Nos
proof

E To Addressable Heat Detector 1 Nos

F To Addressable output control module 11 No

G To Addressable input monitor module 12 Nos

H To Duct Detector 2 Nos


Included
J To Sounder with Flasher - Wall mounted. 6 Nos

K To Sounder with Flasher - Wall mounted, Weather


3 Nos
proof

Allow for the following

L Allow for the integration of necessary third party


Item
interfaces with fire alarm system

M Allow for the Repeater panel connection from the


Workshop building Fire alarm control panel with
Item
necessary connecting cabling, accessories and
terminations and also all related builders work

N Allow for Loop connecion from the Workshop


building Fire alarm control panel with necessary
Item
connecting cabling, accessories and terminations
and also all related builders work

To Collection QR.

BOQ;Page 2/12/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

IT & TELECOM INSTALLATION

Note : The works include under this section shall


comprise supply, installation, cabling, testing,
commissioning and setting to work for all items
which are necessary for a complete operational IT &
Telephone System as outlined in the scope of works,
drawings and in specifications and shall be carried
out by a OOREDOO approved specialized Sub-
Contractor as per OOREDOO's standard and
regulations and as per drawing.

Supply & installation of Telephone and Data outlets


and fittings and accessories complete as specified
and indicated in the drawings no. 3331-ET-B1-1-
Included
001,3331-ET-B0-6-001 including GI/PVC conduits
or in cable trunking.

A 42U N/W Rack (Floor Stand) with Fiber Optic patch


panel, Access/Edge switch with POE/POE+, Fibre
switch, Data patch panel, Fiber & Copper Patch
Cords, Power distribution unit and all accessories 1 No
with necessary inter connecting cabling etc. Located
in Showroom building Mezzanine floor Server room

B RJ45 Single Data Point 2 Nos.

C RJ45 Twin Data Point 10 Nos.

D WiFi Access Point 9 Nos.

E Twin Data for WiFi 9 Nos.

F Floor mounted Box (RJ45 Twin Data Point ) 14 Nos.

To Collection QR.

BOQ;Page 2/12/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

IT & TELECOM INSTALLATION (Cont..)

Final connection to outlets including wiring (Cat 6A


F/FTP), conduits and ancillary installations complete;
including containment and terminations as
necessary.

A To RJ45 Single Data Point 2 Nos.

B To RJ45 Twin Data Point 10 Nos.

C To Twin Data for WiFi 9 Nos.

D To Floor mounted Box (RJ45 Twin Data Point ) 14 Nos.

Allow for the following Included

E Allow for the cable trunking for IT system as shown


Item
on the drawing

F Allow for the fiber connectivity from the Main telecom


room(Service Provider) in Showroom building at Item
ground floor

G Allow for all the active components required for


Item
complete operational telecommunication system

To Collection QR.

BOQ;Page 2/12/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

CCTV SYSTEM

Note: The work included in this section shall include


supply, installation, testing, commissioning and
setting to work of all items which are necessary for
the complete operational CCTV and access control
system including all necessary cabling as outlined in
the Drawings, scope of work and in the specifications
and shall be carried out by a MOI-SSD approved
specialized Sub-Contractor as per MOI-SSD's
standard and regulations.

CCTV camera, accessories and equipments;


complete with fittings, flexible conduit, cable
connection to data outlet point with connector as
specified and shown in drawings no 3331-EC-B1-1-
001, 3331-EC-B1-1-002, 3331-EC-B0-6-001

A 42 U N/W Rack (Loc: CCTV Room) with Fiber Optic


patch panel,Network switch with POE/POE+, Fibre
switch, Copper patch panel, Fibre Patch cords,
1 No.
Copper Patch Cords, NVR, Power distribution unit
and all accessories with necessary inter connecting
cabling etc.

B Outdoor Bullet Fixed camera 4 Nos. Included


C Indoor Dome Fixed camera 13 Nos.

D Single RJ45 outlet for CCTV cameras 17 Nos.

E CCTV workstation with 2 nos of 23" Desktop Monitor


Item
with necessary accessories & joystick

To Collection QR.

BOQ;Page 2/12/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

CCTV SYSTEM INSTALLATION (Cont..)

Final connection to outlets including wiring (Cat 6A


F/FTP) , conduits and ancillary installations
complete; including containment and terminations as
necessary.

A To RJ45 Single Data outlet for CCTV cameras 17 Nos.

Allow for the following


Inlcluded
B Allow for the cable trunking for CCTV system as
Item
shown on the drawing.

Allow for any other works which are necessary for


C Item
completion of CCTV system

To Collection QR.

BOQ;Page 2/12/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

BUILDERS WORK IN CONNECTION WITH ALL


ELV INSTALLATIONS.

A Holes, chases, Cutting back, building in, provision of


pipe sleeves, fire barriers and making good finishes Item
as necessary.

B Allow for sleeves/ducts for encasing electrical cables


passing beneath roads, paved areas and structures. Item

C Isolator supports, equipment supports, sunshades


including paint finishing and associated builders work Item
as necessary. Included
D SUNDRIES IN CONNECTION WITH ALL
ELECTRICAL/ELV INSTALLATIONS.

E Marking the position of holes, mortises, chases and


Item
the like in the structure.

F Plates, discs, labels, and charts for identification of


Item
equipment, panel bords like.

G Loose keys, tools and spare parts as specified. Item

H Testing and Commissioning. Item

To Collection QR.

BOQ;Page 2/12/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
A covered else where in the BOQ whether arising from
the quantum of work, specification or condition of
contract or any other matters what so ever. Included

(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 2/12/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

Collection:

Page 2/12/1

Page 2/12/2

Page 2/12/3

Page 2/12/4

Page 2/12/5

Page 2/12/6

Page 2/12/7

Page 2/12/8

TOTAL FOR SITE ELV INSTALLATIONS To Summary QR 37,000.00

BOQ;Page 2/12/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 2/13


FINISHING WORKS

PLASTER AND RENDERING

Two coats render comprising cement, sand and


lime (1: 4.5: 0.5) under coat, and cement, sand
and lime (1: 6 : 1) finish coat, to concrete or
blockwork include all necessary beads, expanded
metal lathing and control joints; all as specified

A 15 mm thick (minimum) to internal wall &columns


1,460 m2

B 15 mm thick (minimum) to internal Ceiling 150 m2

C 20 mm thick (minimum) to external walls,


columns, projections, soffit parapet etc. 1,300 m2

SCREEDS AND FLOOR TOPPINGS

Included
Cement and sand (1:3) screed as specified,
trowelled finish ; to concrete base.

D Screeded bed to receive porcelain tile (measured


separately) 790 m2

E Screeded bed to receive ceramic tile (measured


separately) 47 m2

F Screeded bed to receive Carpet Flooring


(measured separately) 110 m2

G Screeded bed to receive Granite flooring to


(measured separately) 21 m2

H Screeded bed to receive Epoxy Flooring


(measured separately) 18 m2

J Screeded bed to receive Granite flooring to


Staircase (measured separately) 150 m2

To Collection QR. 140,000.00

BOQ;Page 2/13/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

FLOOR FINISHES

PORCELAIN FLOORING

Supply & Install Porcelain tiles from an approved


manufacturer; bedded in latex modified
waterproof adhesive, grouted with epoxy grouting
over cement sand screeded bed (measured
seperately) laid to slope, jointed, pointed and
decorative finished; all as specified and indicated
on drawings and to the approval of the
ENGINEER.

A Ref.FF1; Porcelain floor tile size 600 x 600 x


10mm thick; located at Spare parts rooms ,CCTV
& Server room 160 m2

B Ref.FF6A; Empress polished Porcelain floor tile


(Colour 1) size 300 x 300 x 10mm thick; located
at Showroom 420 m2
Included
C Ref.FF6B; Empress polished Porcelain floor tile
(Colour 2) size 300 x 300 x 10mm thick; located
at Showroom 210 m2

CERAMIC FLOORING

Supply & Install anti slip Ceramic tiles from an


approved manufacturer; bedded in latex modified
waterproof adhesive, grouted with epoxy grouting
over cement sand screeded bed (measured
seperately) laid to slope, jointed, pointed and
decorative finished; all as specified and indicated
on drawings and to the approval of the
ENGINEER

D Ref.FF2; Ceramic floor tile size 300 x 300 x


10mm thick; located at GF-M.Toilet, F.Toilet, MF-
Toilet & Pantry 47 m2

CARPET FLOORING

Supply and fix Carpet flooring from an approved


manufacturer; laid on 100mm cement sand
screed (measured separately); bedded, jointed,
pointed and decorative finished; all as specified
and indicated on drawings and to the approval of
the ENGINEER.

E Ref.FF3;Carpet flooring;located at
Accounts,Manger room ,Reception & Admin 110 m2
To Collection QR. 115,000.00

BOQ;Page 2/13/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

FLOOR FINISHES - Cont'd.

GRANITE FLOORING

Supply and fix Granite flooring from an approved


manufacturer; laid on cement sand screed
(measured separately); bedded, jointed, pointed
and decorative finished; all as specified and
indicated on drawings and to the approval of the
ENGINEER.

A Ref.FF.4; 30mm Granite for Tread size 1200


x300mm ;located at Staircase. 43 No

B Ref.FF.4; 20mm Granite for Riser size 1200


x161.53mm ;located at Staircase GF. 29 No

C Ref.FF.4; 20mm Granite for Riser size 1200


x159.09mm ;located at Staircase MF. 22 No Included

D Ref.FF.4; 30mm Granite for landingslab & GF-


staircase room ;located at Staircase. 40 m2

E Ref.FF.7; 30mm Granite for Ramp & Staff


entrance step; located at show room sides. 21 m2

SKIRTING FINISHES

D Ref.SK1; 100mm high porcelain skirting. 240 m

E Ref.SK.2;100mm high 20mm thick granite skirting m

F Ref.SK3;100mm high merati wood skirting 70 m

G 150 mm high skirting in between two tiles inside


showroom 110 m

WET AREA WATERPROOFING

J Solvent free SBS elastomeric bitumen emulsion


water-proofing system laid in wet areas under
floor finishes 47 m2

To Collection QR. 70,000.00

BOQ;Page 2/13/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

CEILING FINISHES

SUSPENDED GYPSUM BOARD /GRID CEILING

Supply & Installation of Suspended gypsum


board/tile ceiling in 12.5 mm thick gypsum board
(paint measured separately); complete with metal
framework and suitable suspension system;
including bulkheads, vertical panels and access
panels; allow for additional suspension, supports
and hangers to accomodate services and
associated fittings; fixing to concrete; all as
shown on Drawing 3331-AR-B2-4-001-01 and to
the approval of the ENGINEER.

A Ref.CF1; Gypsum Decorative ceiling with gypsum


cornice at showroom, lift lobby,Spareparts
counter,Managers office, Reception & Admin
270 m2

B Ref.CF2; 600X600 mm Gypsum board ceiling at Included


GF- Spareparts room,MF-Spareparts room &
account dept 151 m2

C Ref.CF5; Textured Gypsum decorative ceiling


(white colour) at Showroom 335 m2

D Ref.CF6; Gypsum decorative ceiling smooth


finish (red colour) at Showroom 85 m2

METAL PANEL CEILING

600 x 600 mm metal grid ceiling constructed from


aluminium with Electrostatically applied power
coating on visible side, finish is to be of colour as
selected by the Engineer from manufacturer's full
range, suspension system shall be
manufacturer's standard exposed recessed grid
systm, wide grids, constructed from corrision
resistant material and baked enamel finish and
comprising main and cross runners in grid from
suspension wires of 6mm minimum diameter
adjasting springs and post installed anchors
complete to structural slab all as shown on
drawing 3331-AR-B2-4-001-01 and to the
approval of ENGINEER
A Ref.CF3; 600X600 mm Metal grid ceiling at GF-
M.Toilet, F.Toilet, MF-Toilet & Pantry 47 m2

To Collection QR. 243,420.00

BOQ;Page 2/13/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

CEILING FINISHES Cont'd

VENEERED WOOD LINEAR CEILING

Veneered wood ceiling,from approved Vendor's,


comprising main and cross runners ,suspension
wires of 6mm minimum diameter adjasting
springs and post installed anchors complete to
structural slab all as shown on drawing 3331-AR-
B2-4-001-01 and to the approval of ENGINEER.

A Ref.CF7; Wood linear ceiling at showroom 50 m2

INTERNAL WALL FINISHES

PORCELAIN WALL TILES Included

Supply and fix glazed Ceramic wall tiles from an


approved manufacturer, complying with the
Project Specification; bedded in latex modified
waterproof adhesive, grouted with polyurethane
grouting; laid on rendered wall (measured
separately)/dry wall including different colour
boarders, coves, corners, edge strips etc. all as
specified and to the approval of the ENGINEER.

B Ref.WF2; 300x300x8 mm Porcelain wall tileat GF-


M.Toilet, F.Toilet, MF-Toilet & Pantry 47 m2

ACP CLADDING

Internal as specified and shown in drawing 3331-


AR-B1-5-003-01;fixed on 200x200mm mullion
and steel runners as per specalist to the approval
of the ENGINEER.

C Ref.WF3;ACP cladding above main entrance


door 5 m2

To Collection QR. 18,500.00

BOQ;Page 2/13/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

Included
(i)
Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 2/13/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 2/13/1

Page 2/13/2

Page 2/13/3

Page 2/13/4

Page 2/13/5

Page 2/13/6

TOTAL FOR FINISHES WORKS To Summary QR 586,920.00

BOQ;Page 2/13/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 2/14


PAINTING WORKS

EPOXY FLOOR COATING

Supply and apply self levelling epoxy flooring with


screed (measured separately) over Concrete slab
from an approved manufacturer, as specified and
to the approval of the Engineer

A Ref.FF5; epoxy flooring at Electrical room,


Service provider room and external step 18 m2

SKIRTING FINISHES

B SK4; 100mm high epoxy paint skirting match the


flooring. 18 m

CEILING PAINT

Supply and apply suitable ceiling paint systems


over gypsum ceiling as specified and to the
approval of the Engineer Included

C CF1; Paint finish to the Gypsum ceiling 270 m2

C CF5; Paint finish to the Gypsum ceiling 335 m2

C CF6; Paint finish to the Gypsum ceiling 85 m2

Supply and apply ceiling paint systems; 2 coat of


acrylic emulsion paint over skim coat over primer
; over plaster(measured separately) as specified
and to the approval of the Engineer

D CF4; Paint finish to the Concrete slab soffit 150 m2

INTERNAL WALL PAINT

Prepare and apply 1 coat of primer sealer ,1


undercoat & 2 coat of acrylic emulsion paint
system over plastered wall(measured separately)
as specified and to the approval of the Engineer

E WF1; Emulsuion wall paint 1460 m2

To Collection QR. 65,000.00

BOQ;Page 2/14/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

EXTERNAL WALL PAINT

Prepare and apply exterior quality paint(wather


shield) system;1 coat of primer sealer ,1
undercoat & 2 coat of acrylic emulsion paint
system over plastered wall(measured separately)
as specified and to the approval of the Engineer

A EX1; Exterior quality Emulsuion wall paint 1,300 m2


Included
OTHER ITEMS

B Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR. 26,000.00

BOQ;Page 2/14/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 2/14/1

Page 2/14/2

TOTAL FOR PAINTING WORKS To Summary QR 91,000.00

BOQ;Page 2/14/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MISCELLANEOUS WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 2/15


MISCELLANEOUS WORK

ELEVATORS

Machine Room Less Elevators; manufactured by


a specialized and approved manufacturer strictly
in accordance with the relevant British Standards
and Qatar Elevator Codes ; complete with motor,
hoist, counter weights, guides and associated
accessories; lift cars complete with ventilation,
lighting, doors, floor, wall and ceiling finishings,
ceiling access hatches, indicator panels,
emergency device, safety systems and
additional features as specified ; include for
electrical connections to local isolators / controls
; assembling and fixing in vertical lift shaft; all as
specified in Architectural Specifications and
Drawings 3331-AR-B1-5-004-01

A Passenger lift; Speed 1.0 m/s, car size 2000 x


1900 x 2100 mm, 2 stops and 2 openings 1 No. Included

WALL MOUNTED SIGN BOARD

Supply and fix 40mm thick back lit Acrylic 3D


logo , from approved suppliers as specified and
detailed on Drawing 3331-AR-B0-5-003-01;
complete fixing accessories; fixed to concrete or
blockwork in accordance with the vendor's
recommendations
B Ref WS1;40mm thick red colour acrylic 3D text
logo of client 200 wide x 1045mm high 1 No.

C 40mm thick 3D acrylic letter Signage "AL BADI


TRADING & CONTRACTING CO LTD" in Red
colour RAL-3002; 200 high 1 No.

To Collection QR. 60,000.00

BOQ;Page 2/15/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MISCELLANEOUS WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

EXTERNAL DESIGN FEATURES-FALSE


WINDOW

GRC Design features from approved


manufacture; installed complete with fittings;
include for connections to wall to the approval of
the ENGINEER

A GRC masharabia 2700mmx1950mm located at


1 No.
Showroom front side

B GRC masharabia 1500mmx2750mm located at


2 No.
Showroom front side

C FW;GRC false window 1500mmx1750mm


2 No.
located at Showroom front side

D FW;GRC false window with mashrabia


1500mmx4350mm located at Showroom side 4 No.
above windows/doors

E FW;GRC false window with middle mashrabia


6 No.
1500mmx6100mm located at Showroom sides

F FW;GRC false window 1500mmx2750mm


6 No.
located at Showroom sides

F FW;GRC false window 8000mmx3200/2200mm


1 No.
located at Showroom sides

G FW;GRC mashrabia 1600mmx6275mm located


4 No.
at Showroom side including rear side

H FW;GRC mashrabia 1500mmx4000mm located


1 No
at Showroom side

J FW;GRC mashrabia 1500mmx3850mm located


4 No
at Showroom side

K FW;GRC mashrabia 1300mmx2000mm located


1 No
at Showroom rear side under window

L FW;GRC false window with mashrabia


1500mmx3850mm located at Showroom rear 1 No.
side above rolling shutter

M Decorative design 600 mm high; around


87 m
showroom

N Decorative design trapezoidal shape


1 No
700/500mm x 650mm high; at showroom front

To Collection QR. 32,000.00

BOQ;Page 2/15/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MISCELLANEOUS WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

WATER TANK ROOF

Supply, installation of Sunshade for roof water


tank;as shown on the drawing 3331-AR-B1-1-
002 and to the approval of the ENGINEER.

A Watar tank roof size 7230mmx6250mm 1 No

OTHER ITEMS

B Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
so ever.

To Collection QR. 14,800.00

BOQ;Page 2/15/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MISCELLANEOUS WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 2/15/1

Page 2/15/2

Page 2/15/3

TOTAL FOR MISCELLANEOUS WORKS To Summary QR 106,800.00

BOQ;Page 2/15/4
BILL 2 - PROPOSED SHOWROOM

GENERAL SUMMARY

Item Description Reference Amount (QR)

1 EARTHWORKS Page 2/1/3 27,053.00

2 CONCRETE WORKS Page 2/2/8 504,320.00

3 MASONRY WORKS Page 2/3/3 242,000.00

4 ROOFING WORKS Page 2/4/4 75,000.00

5 JOINERY WORKS Page 2/5/4 76,550.00

6 METAL WORKS Page 2/6/5 146,000.00

7 STRUCTURAL STEEL WORKS Page 2/7/5 460,000.00

8 PLUMBING & DRAINAGE Page 2/8/10 65,000.00

9 FIREFIGHTING WORKS Page 2/9/3 9,000.00

10 HVAC WORKS Page 2/10/10 350,000.00

11 ELECTRICAL WORKS Page 2/11/12 99,000.00

12 ELV WORKS Page 2/12/9 37,000.00

13 FINISHES WORKS Page 2/13/7 586,920.00

14 PAINTING WORKS Page 2/14/3 91,000.00

15 MISCELLANEOUS WORKS Page 2/15/4 106,800.00

To General Summary
TOTAL COST FOR BILL 2- PROPOSED SHOWROOM (QR)
QR
2,875,643.00

BOQ;Page 2/16/1
BILL OF QUANTITIES - 3.0 - WORKSHOP
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 3/1


EARTHWORK

Excavate pits/trenches

A Excavation not exceeding 2.00m deep 472 m³ 25 11,800.00

Disposal

B Remove surplus excavated material from site 12


472 m³ 5,664.00

Filling.

C Approved desert fill material around foundations


; laid in layers of 150 mm thickness, watered,
586 m³ 18 10,548.00
rolled and compacted to 97% proctor value in
compaction.

TERMITE CONTROL

Emulsive concentrate termiticide consists of


chloropyrifos or linden chemical elements, dilute
and apply as per the manufacturer
recommendations with soil treatment solutions
as specified.

D Anti-termite treatment
975 m² 3 2,925.00

To Collection QR. 30937.00

BOQ;Page 3/1/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
so ever.

(i) Item Included

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 3/1/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection :

Page 3/1/1

Page 3/1/2

TOTAL FOR EARTHWORK To Summary QR 30,937.00

BOQ;Page 3/1/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 3/2


CONCRETE WORKS

CONCRETE-SUBSTRUCTURE

Plain in-situ concrete Grade SRC 20 with gabbro


aggregate conforming to BS EN 12620 to the
approval of the ENGINEER; finish to receive
waterproofing membrane/ paint (measured
separately)

A Blinding; 75 mm thick (minimum), horizontal or


479 m² 50 23,950.00
sloping not exceeding 45o.

Reinforced in-situ concrete Grade OPC 40 with


gabbro aggregate conforming to BS EN 12620
to the approval of the ENGINEER.

B Individual footing 128 m³ 900 115,200.00

C Raft Footing 2 m³ 900 1,800.00

D Pedestel 6 m³ 11.50 6,900.00

E Grade slab including thickening 172 m³ 500 86,000.00

F Grade beams 21 m³ 1150 24,150.00

G RC Wall 3 m³ 1200 3,600.00

H Suspended solid floors horizontal and slopping


1 m³ 1200 1,200.00
not exceeding 15º from horizontal

Mass in-situ concrete Grade OPC 40 with


gabbro aggregate conforming to BS EN 12620
to the approval of the ENGINEER

J Steps and Ramps 21 m³ 1350 28,350.00

To Collection QR. 291,150.00

BOQ;Page 3/2/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

CONCRETE-SUPERSTRUCTURE

Reinforced in-situ concrete Grade OPC 35 with


gabbro aggregate conforming to BS EN 12620
to the approval of the ENGINEER.

A Beams, drop-beams, tie-beams, inverted-beam,


copping-beam, band-beams ,parapet beams
and the like including beam-projections and 26 m³
thickening; horizontal and slopping not
exceeding 150 from horizontal Included

B Column 16 m³

DECKING SLAB

D Design,supply and construction of decking


slab(Approaximate 185 m2)including decking
sheet, shear studs and rienforcement with all Item
associated builder's work as necessary

To Collection QR. 47,000.00

BOQ;Page 3/2/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

REINFORCEMENT-SUBSTRUCTURE

Steel fabric reinforcement to BS 4449; include


for all laps, cutting and fitting

A BRC mesh ref. A-393 1,686 m²

High yield strength uncoated deformed bars with


a minimum characteristic strength of 500 N/mm²
as supplied by Qatar Steel Company (QASCO), Included
unless otherwise specified.

B Bars in assorted diameters to concrete


22,280 kg

REINFORCEMENT-SUPERSTRUCTURE

High yield strength uncoated deformed bars with


a minimum characteristic strength of 500 N/mm²
as supplied by Qatar Steel Company (QASCO),
unless otherwise specified.

C Bars in assorted diameters to concrete


10,695 kg

To Collection QR.

BOQ;Page 3/2/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

PRECAST / IN SITU CONCRETE

Precast/ in situ reinforced concrete lintel/sill


grade 35 OPC including reinforcement,
formwork, fixing in positions as shown on
drawings, bedded and jointed in cement-sand
mortar as specified.

A Lintels as required.
Item Included

To Collection QR.

BOQ;Page 3/2/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

FORMWORK-SUBSTRUCTURE.

Formwork; smooth face finish for concrete to


receive waterproofing membrane /paint

A To vertical or battering sides of Isolated footing 135 m²

B To vertical or battering sides of Raft footing 3 m²

C To vertical or battering sides of pedestel 43 m²

D To vertical or battering sides of grade beam Included


209 m²

E To vertical or battering sides of RC Wall 27 m²

F To vertical or battering sides of steps and 15 m²


ramps

G To horizontal soffits of suspended solid slab with


proppingsexceeding 3.5m high but not 3 m²
exceeding 5.00m high.

FORMWORK-SUPERSTRUCTURE.

Formwork; smooth face finish for concrete to


receive cement sand render

H To sides and soffits of beams with proppings


exceeding 3.5m high but not exceeding 7.0m 302 m²
high.

J To vertical or battering sides of column 213 m²

To Collection QR.

BOQ;Page 3/2/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES

Approved waterproofing membrane (minimum


4mm thick) with 150 mm (minimum) laps
including primer as specified and lay in
accordance with manufacturer's
recommendations .

A To horizontal surfaces of concrete 724 m


2

B To vertical surfaces of concrete. 351 m


2

6 mm thick servipak protection board or similar


approved to comply with the Project
Specification and conform to BS 8102:2009 ;
suitably bonded to retain position

C To horizontal surfaces of concrete. 286 m²


Included

D To vertical surfaces of concrete. 351 m²

Cement sand screed as specified

E 40 mm thick cement sand screed. 401 m²

Polyethylene sheet to BS 2782 as manufactured


by 'Qatar National Plastic Factory'; laid in
accordance with the manufacturer's
recommendation.

F Approved Polyethylene Sheet 843 m²

Expansion joint filler as specified and shown on


Drawings .

G 12 mm thick korkpak or other approved board,


56 m²
set vertically between concrete members

H 12 x 10 mm approved polysulphide sealant 270 m

To Collection QR. 96,000.00

BOQ;Page 3/2/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
so ever.

(i) Item

(ii) Item Included

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 3/2/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection :

Page 3/2/1

Page 3/2/2

Page 3/2/3

Page 3/2/4

Page 3/2/5

Page 3/2/6

Page 3/2/7

TOTAL FOR CONCRETE WORKS To Summary QR 434,150.00

BOQ;Page 3/2/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 3/3


MASONRY WORKS

Hollow concrete blocks, bedded and jointed in


Class 1 cement mortar with and including
concrete bond, expansion joints and necessary
fixing and accessories as specified.

A 200 mm thick hollow concrete block walls


300 m2 65 19,500.00

B 200 mm thick hollow concrete block walls ; 11,440.00


Parapet
176 m2 65

Pre insulated blocks, bedded and jointed in Class


1 cement mortar with and including concrete
bond, expansion joints and necessary fixing and
accessories as specified.

C 200 mm thick pre insulated block walls 642 m2 130 83,460.00

D Allow for firesealant works to the fire rated


masonry partitions Item

To Collection QR. 114,400.00

BOQ;Page 3/3/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i) Included
Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 3/3/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 3/3/1

Page 3/3/2

TOTAL FOR MASONRY WORKS To Summary QR 114,400.00

BOQ;Page 3/3/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 3/4


CARPENTRY/JOINERY WORKS

Supply and fix following Doors with frames,


ironmongery and other fixing accessories. Refer
Drawing 3331-AR-B2-6-002 SHT.01 to 03.

A Door Type D1: Double leaf door to suite overall


opening size 1500 x 2200 mm, semi-solid core
wooden flush door, with 6mm thick commercial
plywood with 1.5mm thick laminated teak veneer
in both faces, with fixed wooden frame. 1 No.

B Door Type D2: Single leaf door to suite overall


opening size 1000 x 2200 mm, semi-solid core
wooden flush door, with 6mm thick commercial
plywood with 1.5mm thick laminated teak veneer
in both faces, with fixed wooden frame. 2 No. Included

D Door Type D3: Single leaf door to suite overall


opening size 800 x 2200 mm, semi-solid core
wooden flush door, with 6mm thick commercial
plywood with 1.5mm thick laminated teak veneer
in both faces, with fixed wooden frame. 2 No.

E Door Type FD1: Single leaf solid core wooden


flush door to suite overall opening size 1000 x
2200 mm, 90 minutes fire rated, with 6mm thick
commercial plywood flushed with laminate and 2
layers of 6mm thick Supalux board in both sides. 1 No.

BASE UNIT

Base unit comprising counter top including doors,


drawers, shelves and interior carcasing;complete
with base supports, bearers,backings, framing,
skirting, door and drawer ironmongery, mastic
seal etc all as specified, fixed to concrete or
blockwork to ENGINEER approval.

Base unit,; overall size 2150 L x 600 D mm x 800


F 1 No.
H at Mechanics rest room

To Collection QR. 14,250.00

BOQ;Page 3/4/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

WALL UNIT

Wall unit comprising, doors, drawers, shelves and


interior carcasing complete with self supports,
bearers,backings, framing, door and drawer
ironmongery, mastic seal etc.all as specified,
fixed to concrete or blockwork to ENGINEER
approval.

A Wall unit,; overall size 3475 L x 600 D mm x 700


H at Mechanics rest room 1 No. 4800.00

To Collection QR. 4,800.00

BOQ;Page 3/4/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item Included

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 3/4/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 3/4/1

Page 3/4/2

Page 3/4/3

TOTAL FOR JOINERY WORKS To Summary QR 19,050.00

BOQ;Page 3/4/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 3/5


METAL WORKS

ALUMINIUM DOORS

Supply and fix following Aluminium Windows with


frames and other fixing accessories. Refer
Drawing 3331-AR-B2-6-002 SHT.01 to 03

A Window Type W1: Double glazed thermal break


powder coated sliding window with fixed glazed
panels on one side to suite overall opening size
2000 x 1200 mm 2 No.

B Window Type W2: Double glazed thermal break


powder coated sliding window with fixed glazed
panels on one side to suite overall opening size
1500 x 1200 mm
3 No.

C Window Type W3: Double glazed thermal break


powder coated sliding window with fixed glazed
panels on one side to suite overall opening size
1400 x 1200 mm 1 No.
Included
ELECTRICAL ROLLER SHUTTER

Supply and fix following approved Grade 43 A


Electrically operated Roller shutter with thermal
insulated glavanised steel strip curtain, Internal
electro mechanical brake and chain for manual
operation, and fixing with other accessories.
Refer Drawing 3331-AR-B2-6-002 SHT.01 to 03

D Roller shutter type RS1 : , overall size 6000 x


4400 mm 1 No.

E Roller shutter type RS2 : , overall size 8200 x


4400 mm 2 No.

F Roller shutter type RS3 : , overall size 7500 x


4400 mm 1 No.

G Roller shutter type RS4 : , overall size 2000 x


3000 mm 2 No.

H Roller shutter type RS5 : , overall size 5900 x


3000 mm 1 No.

I Roller shutter type RS6 : , overall size 5000 x


3000 mm 1 No.

J Roller shutter type RS7 : , overall size 4700 x


3000 mm 2 No.
To Collection QR.

BOQ;Page 3/5/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

ALUMINIUM LOUVERED VENTILATOR


Supply and fix following Aluminium louvered
ventilators, complete with fixing and all other
accessories. Refer Drawing 3331-AR-B2-6-002
SHT.01 to 03

A Louvered Ventlator type LV1 : , overall size 5000


x 1000 mm 13 No.

B Louvered Ventlator type V1 : , overall size 600 x


750 mm 2 No.

HAND RAILS & BALUSTERS

C Supply and fix 900 mm high stainless steel


handrails and balustrades at Entrance steps 6 m
Included
SIGNAGES

D Supply and fix External & internal signages as


specified and shown on drawings Item

WALL & ROOF METAL SHEETING

Supply and fix 100 mm thick Aluminium insulated


wall and roof cladding complete with opening for
exhaust fans, edge trims, closure, sealants,
washers, screws, bolts, edge angles, flashing
including other accessories as required , as
specified to approval of the ENGINEER.

E Metal Sheeting to roof laid to slope 900 m2

F Metal Sheeting to wall 350 m2

CRANE

Supply and Installation of Monorail track and


1.5 Ton Crane on structural slab with
G 1 No.
accessories and etc as per specification and
approval of Engineer.

To Collection QR. 821,116.00

BOQ;Page 3/5/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

RAINWATER GUTTER & DOWN PIPE

Supply and Install painted and profiled Rain water


gutters and down pipes minimum thickness
0.5mm with necessary supports and accessories

A Rain water gutter minimum size 150x150mm 93 m

B Rain water Down pipe 45 m

OTHER ITEMS

C Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Included
Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 3/5/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 3/5/1

Page 3/5/2

Page 3/5/3

TOTAL FOR METAL WORKS To Summary QR 821,116.00

BOQ;Page 3/5/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 3/6


STEEL WORKS

DESIGN AND CONSTRUCTION OF PRE-


ENGINEERED STEEL BUILDING

Note: The scope of works comprises the design


and construction of pre-engineered structures
comprising steel rigid framed structure with
lightweight insulated sheeting for roof and side
cladding as detailed in Drawings and
Specification.

Design ,supply and construct Pre-engineered


steel structured building frame in accordance with
AISC; complete with hot rolled steel sections to
ASTM A572 Grade 50/S355 or equivalent , cold
formed Z-section purlins and girts, eave structs
etc with a minimum yield strength of 355 MN/m2
withstands to all specified design loads; allow for
welding in accordance with AWS D1.1; all as
specified and to the approval of the ENGINEER.

A Design ,supply (delivered to site) and installation Included


of Pre-engineered steel structured building
Item
including staircases as specified and indicated on
drawings

To Collection QR.

BOQ;Page 3/6/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

PAINTING

A All steel surfaces shall be painted as per


specification and approved life safety documents Item

FOUNDATION

Note: The sizes of the foundation pertaining to the


pre-engineered structure of proposed building is
given as indicative only, the quantities of which
are measured seperately in the BOQ Concrete
Section 2. No variation will be entertained for the
quantity changes of foundation sizes,
reinforcement etc, as per the actual reaction from
pre engineered supplier. Contractor is required
to re-design the foundation as per the required
loads of Pre-engineered structure.

B Allow for re-design of foundation and if it's any


variation in the quantities of proposed building in
Item
accordance with actual reaction of the pre- Included
engineered structure.

To Collection QR.

BOQ;Page 3/6/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES

A Allow for all anchor bolts inserts and steel


embedded parts. Item

B Allow for all associated builders work as


necessary Item

Drawings.

C Allow for preparation, submission and obtaining


the Engineer's approval of the fabrication and
erection drawings as specified. Item

Certificate and testing

D Allow for provision of certificates, samples and


tests as required by QCS. Item
Included
Guarantee.

E Allow for providing guarantees for the complete


Pre-Engineered Building as required by the
Specification. Item

Service provision

F Allow for all supports, accessories, cutouts


required for services Item

To Collection QR.

BOQ;Page 3/6/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item
Included
(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 3/6/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 3/6/1

Page 3/6/2

Page 3/6/3

Page 3/6/4

TOTAL FOR STEEL WORKS To Summary QR 382,000.00

BOQ;Page 3/6/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO 3/7

PLUMBING & DRAINAGE INSTALLATIONS

TOILET FOUL WATER DRAINAGE


INSTALLATION

Supplly, Installation, Testing and commissioning of


Drainage pipe of uPVC material and fittings to BS
5255 with solvent welded joints and supports etc.,

A 50 mm diameter soil, waste and vent pipes 17 m

Supply, Installation, Testing and Commissioning of


Below Ground Drainage Pipe of uPVC Materials and
fittings to BS 4660 with solvent welded joints and
supports etc.,

B 75 mm diameter soil, waste and vent pipes 15 m

C 82 mm diameter soil, waste and vent pipes 28 m

D 110 mm diameter soil, waste and vent pipes 15 m


Included
E 160 mm diameter soil, waste and vent pipes 60 m

F Extra ; bend Item

G Extra ; connections to floor gully. 5 No.

H Extra ; connections to floor clean out 2 No.

J Extra ; connections to W.C 2 Item

To Collection

BOQ;Page 3/7/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

SANITARY AND FOUL WATER DRAINAGE


INSTALLATION (CONT…D)

Trapped floor gulley; uPVC body, with waste inlet


and outlet complete with 'P' or 'S' trap, 150 x 150 mm
uPVC frame and cover as specified; jointing to waste
and drain pipe work.

A Floor gulley, 110 mm outlet; Type FG 5 No

Floor clean outs; cast iron body, complete with heavy


duty solid cast stainless steel covers as specified;
jointing to pipework. Included
B Floor clean out, 110 mm outlet; Type FCO 2 No

Vent cowls, uPVC type slotted cap for solvent


welding,

C Vent cowl; 110 mm 1 No

D Vent cowl; 75 mm 3 No

E Vent cowl; 50 mm 1 No

To Collection

BOQ;Page 3/7/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

SANITARY WARE AND ACCESSORIES


Supply and fix Sanitary Ware & fittings from an
approved manufacturer, installed complete with all
traps and waste fittings; include for connections to
water and waste services complete with service
valves; sealing all round with silicone mastic, and all
necessary cuttings/ fillings required to install all
sanitary wares, all other fittings and connects etc. as
per the drawings and details up to the approval of the
Engineer.

A Vitreous china western water closet , Ref: SW1 2 No.

Approved Vitreous China Counter Top Vanity Wash


Basin 560mm Size (Built-In) with Overflow Slot, Ref: 2
B SW2 No.

Hand spray with trigger control complete with wall


2
C holder, hose and angle valve, Ref: SWA1 No.
Included
D Toilet Paper Holder, Ref: SWA2 2 No.

E Washbasin Mixer, Ref: SWA3 2 No.

F Soap Dispenser, Ref: SWA4 2 No.

600x700x8mm Thick Mirror Fixed with plywood


2
G backing using double sided tape, Ref: SWA5 No.

H Tissue paper dispenser, Ref: SWA6 2 No.

I Stainless steel waste bin, Ref: SWA7 2 No.

J Kitchen Sink with mixers at Mechanics rest room 1 No.

To Collection

BOQ;Page 3/7/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

POTABLE WATER SUPPLY INSTALLATION

DOMESTIC HOT & COLD WATER SUPPLY

Copper pipes to BSEN 1057, Part 1 Table Y and


fittings to BS 864 Part 2 with capillary joints; covered
with factory bonded polythene sleeve; concealed in
wall or running through floor screed; fixed with
brackets, clips on and including supports, plugged
and screwed to concrete or blockwork

A 15 mm Diameter pipes including fittings. 28 m

B 22 mm Diameter pipes including fittings. 15 m

Supply and Installation, Testing and commissioning


of Domestic Water supply of Copper pipes to BSEN
Included
1057, Part 1 Table X; and fittings to BS 864 Part 2;
exposed with capillary joints; fixed with brackets,
clips on and including supports, plugged and screwed
to concrete/ blockwork or hanged from slab

C 22 mm Diameter pipes including fittings. 90 m

D 28mm Diameter pipes including fitting 85 m

E 35 mm Diameter pipes including fittings. 25 m

To Collection

BOQ;Page 3/7/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

Isolating valve and the like complete as specified


with screwed / flanged ends; jointing to Copper

A 22 mm Diameter pipes 5 No.

B 28 mm Diameter pipes 4 No.

Water Hammer Arrestors complete with screwed or


C flanged ends as specified
22 mm Diameter 3 No.

Bib tap chromium plated brass with cross heads,


complete with backplate elbow or wall flange along No.
D with back flow preventor 6

WATER HEATERS

Horizontal mounted water heater; thermal storage,


cylindrical type comprising inner water container,
pressure gauges, thermometers, safety thermostat,
anti vacuum valve, temperature /pressure relief
valve, safety valves, outer casing and end covers, Included
electric immersion heater, wall mounting brackets;
connection to local cold and hot water outlets and
connections to local power outlets.

Wall mounted water heater; storage capacity 30 ltrs;


Ref no. EWH-B2-GF-01 TO 03 No.
E 3

To Collection

BOQ;Page 3/7/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES

Marking, position of and leaving or forming all holes,


Item
mortices, chases and the like required in the structure
A

Identification of Plumbing system above ground


including plates, discs, labels, tapes, symbols or
Item
numbers, bands, charts or diagrams and other works
Included
B as Project Specification

Testing and commissioning including required fuel


Item
C and power for testing and issuing test certificates

Preparation drawings of working drawings and as


Item
D fitted drawings

E Handing over of operation manuals and instructions Item

To Collection

BOQ;Page 3/7/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

COLLECTION

Page 3/7/1

Page 3/7/2

Page 3/7/3

Page 3/7/4

Page 3/7/5

Page 3/7/6

TOTAL FOR PLUMBING AND DRAINAGE 32,500.00


To Summary QR
SYSTEM INSTALLATIONS

BOQ;Page 3/7/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO 3/8

FIREFIGHTING WORKS

Portable fire extinguishers complete as specified,


including supports and fixing brackets where
necessary.
Included
Ceiling mount Automatic Fire Extinguisher with
1 No
A FM200 agent as specified and as shown in drawing

Fire extinguisher, Dry chemical powder, wall


7 No
B mounted; 6.0Kg, UL listed.

To Collection

BOQ;Page 3/8/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES IN CONNECTION WITH FIRE


FIGHTING INSTALLATION

Allow for the following

Marking the position of holes, mortises, chases and


the like in the structure. Plates, discs, labels and
Item
charts for identification of plant, equipment, pipes Included
A valves and necessary accessories.

Testing and Commissioning of fire protection


Item
B provisions

To Collection

BOQ;Page 3/8/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING

Item Description Quantity Unit Rate (QR) Amount (QR)

COLLECTION

Page 3/8/1

Page 3/8/2

TOTAL FOR FIRE FIGHTING SYSTEM 9,000.00


To Summary QR
INSTALLATIONS

BOQ;Page 3/8/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO 3/9

HVAC INSTALLATIONS

VARIABLE REFRIGERANT FLOW SYSTEM


(VRF)

Supply Installation, testing and commissioning of


Modulating outdoor units, with multi scroll
compressors (minimum two compressors) with
one capacity controlling compressor and other
constant speed type compressor, special pre-
coated fins, panel, inverter based condenser fan
M.S. hot dip galvanised stands / supports,
electrical & microprocessor panel, isolating valves
and all the necessary accessories for proper
functioning of the units as per the technical
specification suitable for operation on R410A
refrigerantetc. as specified in local standards and
guideline, as shown in schedule and drawing Excluded

A ODU - 28.5 KW 1 No

HIGHWALL UNIT

Split air-conditioning unit; cooling capacity 2.2


B 1 No
KW

Split air-conditioning unit; cooling capacity 3.6


C 1 No
KW

Split air-conditioning unit; cooling capacity 3.0


D 1 No
KW

CEILING SUSPENDED CASSETTE UNIT

Split air-conditioning unit; cooling capacity 3.6


E 1 No
KW

Split air-conditioning unit; cooling capacity 2.4


F 1 No
KW

Split air-conditioning unit; cooling capacity 1.7


G 1 No
KW

To Collection QR.

BOQ;Page 3/9/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

TREATED FRESH AIR UNIT

VRF type Treated Fresh Air handling Unit with pre


filter, bag filter, cooling coils, fan section all as
specified and as shown in drawing.

Fresh air handling unit ; total cooling capacity


A 1 No
12.0 KW and air flow 145lps

SPLIT AC
Split air-conditioning unit comprising wall
mounted indoor unit, consisting of cooling coils,
fans, washable filters, thermostat and air-cooled
remote out-door unit suitable for outdoor
installation @ 46 0C ambient temperature
complete with all accessories, interconnecting
insulated refregerent copper pipe works,
CFC/HCFC free refrigerant, anti-vibration
isolators, electrical connection etc. as specified in
local standards and guideline, as shown in
schedule and drawing

Split air-conditioning unit; cooling capacity 2.1


B 1 No
KW
Excluded
C 25mm uPVC Condensate Drain Pipe Item

VENTILATION EQUIPMENTS
Ducted inline exhaust fans switch
operated,complete with motor, statically or
dynamically balanced die-cast-in-aluminium
impeller; rolled steel channel supporting frames,
anti-vibration mountings, acoustic lining enclosure
etc., complete as specified and indicated on the
drawings; connections to local power outlets;
installed on as shown on the drawings

D Inline Exhaust Fan Air flow 90 lps , Ref; EF-01 1 No

Ducted inline exhaust fans switch operated,


complete with motor, statically or dynamically
balanced die-cast-in-aluminium impeller; rolled
steel channel supporting frames, anti-vibration
mountings, acoustic lining enclosure, suitable for
industrial painting application etc., complete as
specified and indicated on the drawings;
connections to local power outlets; installed on as
shown on the drawings

E Inline Exhaust Fan Air flow 168 lps , Ref; EF-02 1 No

To Collection QR.

BOQ;Page 3/9/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Smoke Extract/Control

Supply, installation, testing and commissioning of


Smoke Exhaust fans of (roof mounted) F400-120
(400˚C - 2hr) or F200-120 (200˚C-2hr)
classification for fire resistance with back draft
damper, louvers as specified and indicated on the
drawing

Smoke Exhaust fan (RF-01 to RF-08), air flow


A 8 Nos. Included
1875 l/s

VENTILATION DUCTWORK

Galvanized sheet metal ventilation ductwork and


fittings conforming to the latest HVCA /ASHRAE/
SMACNA duct construction standards complete
as specified and indicated on the drawings;
including test holes, turning vanes, splitters,
dampers, stiffeners, transformation pieces, spigot
box, access panels and doors, plenum chambers,
etc. ; on and including supports as detailed on
design drawings

Not over 300mm wide ducts including fittings and


B 10 m2
accessories.

To Collection QR.

BOQ;Page 3/9/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

AIR-CONDITIONING DUCTWORK
ACCESSORIES
Fire Damper / Volume Control Damper /
Motorized Damper

Volume control damper, sturdy corrossion


resistance construction with multi-leaf double skin
aerofoil section opposed blade including all
accessories complete as specified and indicated
on the drawings as shown in drawing

Supply, install, test and commission all volume


A control dampers of all sizes as stipulated in the 5 Nos.
drawings and as per specifications
Included
AIR INLETS AND OUTLETS

Supply and return air grilles/diffusers as specified,


extruded aluminium construction with powder
coated finish to approved colour ; complete with
supports, plenum boxes and flexible connections;
fixing in position including connections to
ductwork as shown in drawing.

B Fresh air grill 200x100mm 4 Nos.

C 4-way, Exhaust air diffuser size 150x150mm 2 Nos.

D Exhaust air Grill size 300x200mm 1 Nos.

E Exhaust air louver 150x100as specified. 1 No.

F Exhaust air louver 450x200as specified. 1 No.

Fresh air inlets, extruded aluminum construction


with powder coated finish to approved color,
including external louver, sand trap louver, insect
screen, bird guard, pre filter, volume control
damper etc. as specified and indicated on the
drawing

G Fresh air louver 400x400 as specified. 1 No

To Collection QR.

BOQ;Page 3/9/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

ELECTRICAL WORK

All other electrical work in connection with


Ventilating and Air Conditioning and between
A Item
MCC’s, isolating switches and mechanical
equipment

BUILDER'S WORK IN CONNECTION WITH


HVAC INSTALLATIONS

Allow for the following.

Supply, installation of sleeves with fire retardant Included


B sealing material shall be provided for pipes & Item
ducts crossing fire rated walls.

Allow for any other builder's work deemed


C necessary for the completion of HVAC Item
INSTALLATIONS.

Holes openings, chases, cutting back, building in


D pipes, ductwork, sleeves, lintels over openings Item
and making good finishing as necessary.

To Collection QR.

BOQ;Page 3/9/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES

Allow for marking the position of holes, mortises,


A Item
chases and the like

Allow for providing shop-drawings, and obtain


B Item
approvals, as specified

Allow for providing record documents and


C Item
operation and maintenance manuals as specified

Allow for painting all steelwork In connection with


D Item Included
supports for pipes as specified

Allow for identification and name plates as


E Item
specified

Allow for testing and commissioning the entire


F Item
Installation as specified

G Allow for cleaning and flushing Item

H Allow for providing training as specified Item

To Collection QR.

BOQ;Page 3/9/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

COLLECTION

Page 3/9/1

Page 3/9/2

Page 3/9/3

Page 3/9/4

Page 3/9/5

Page 3/9/6

TOTAL FOR HVAC INSTALLATIONS To Summary QR 150,00.00

BOQ;Page 3/9/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

BILL NO. 3/10


ELECTRICAL INSTALLATIONS

ELECTRICAL SERVICES

Note : The works included hereunder shall comprise


supply, installation, testing, comissioning and setting
to work for all items which are necessary for a
complete operational system as outlined in the
Drawings and in the specifications, obtaining
necessary Government approvals etc. completely.

MAIN AND SUBMAIN INSTALLATIONS

Sub Main Distribution Board in dust and vermin proof


enclosure, including busbars (Fault rating 25kA for
3sec to comply with IEC 439-1 / 1999), main Included
incoming and outgoing moulded case
interrupter/circuit breakers, instrumentation, fuses,
switches, earthing, fixing bracket and all necessary
provisions for incoming and outgoing cable
terminations, Ammeter, Voltmeter, Selector switch
and Phase Indicator lamps and all as specified
including support frame with earthing etc.

MAIN AND SUBMAIN INSTALLATIONS

A 10 way-TPN Sub Main Switch Board MDB with 160


amp TP MCCB for incoming supply, 160amp 4P+E
copper bus bar and all other accessories etc 1 No
including outgoing MCCB's. (As measured below)
Ref Dwg No-3331-EL-B0-6-001

63 amp TP MCCB outgoing.-2 Nos

40 amp TP MCCB outgoing.-5 Nos

32 amp TP MCCB outgoing.-1 Nos

To Collection QR.

BOQ;Page 3/10/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

DISTRIBUTION BOARD

Supply & install Lighting/power panel boards in dust


and vermin proof enclosure, complete with bus bars,
incoming MCCB with outgoing MCBs, RCBOs and
spare MCB's as shown on Drwg. including
connection, fixing accessories, earthing etc.

16 ways TPN distribution board, Ref. WS-GF-LPDB1 Included


A with 40 Amp TPN isolator for incoming supply. 1 No

B 20 ways TPN distribution board, Ref. WS-GF-PDB1


1 No
with 63 Amp TPN isolator for incoming supply.

C 14 ways SPN distribution board, Ref. DB- WS with


1 No
63 Amp SPN isolator for incoming supply.

D 4 ways TPN distribution board, Ref. DB- UPS with 32


1 No
Amp TPN isolator for incoming supply.

To Collection QR.

BOQ;Page 3/10/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

POWER CABLES

Supply & install 600/1000 volts, copper conductors,


insulated cables type as indicated in drawing, direct
burried in trenches or pulled inside sleeves or
installed on cable tray and clIPped to wall or in PVC
duct complete with all jointing and termination kits,
sleeves, conduits, laying of marker tape and
protection tiles etc. as per Kahra-maa latest QCS
specifications and shown on drawings.(Civil work
meassured elesewhere).

4C-25 mm2 XLPE/SWA/PVC + 1x1C-16 mm2


A 35 m
PVC/ECC cables

B 4C-16 mm2 XLPE/SWA/PVC + 1x1C-10 mm2


30 m
PVC/ECC cables

C 4C-10 mm2 XLPE/SWA/PVC + 1x1C-10 mm2


100 m
PVC/ECC cables

CABLE TRAY

Supply & install Galvanized steel cable trays and Included


fittings complete with purpose made sunshade/
protection covers, bends and junctions as specified
and shown on drgs, including supports, fixings and
associated builders works as necessary as detailed
in drawings.

D Allow for Cable Tray and accessories. 1 Item

CABLE TRUNKING / CONDUIT

Supply & install Galvanized steel cable trunking or


PVC conduit & fitting complete with protection covers
as specified including supports, fixings, junction
boxes and assocaited builder's work as necessary
as detailed in drawings.

E Allow for GI trunking and accessories. 1 Item

To Collection QR.

BOQ;Page 3/10/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

EARTHING SYSTEM

Earthing and bonding shall be carried out


incompliance to BS-7430, QCS Section 21.22 and
Kahramaa Regulation. The work shall include
complete earthing installation including Earth bar,
Earth cable with test link connecting to earthing
network, earth electrode, earth pit, earth chamber
with cover, clIPs, raceways, fittings and all related
accessories as shown in the drawing.

A General Earthing Pit for electrical Equipments,


1 Item
panels, MCC's etc Included

B Clean Earthing Pit of Telecom/ELV EquIPments 1 Item

C 1C x 70mm2 Y/G ECC (Earth pit to Earth Bar &


40 m
Earth Bar to Earth Bar)

D 50 x 6mm copper earth bar with test link-8 ways 1 No

E 50 x 6mm copper earth bar with test link-4 ways 1 No

BONDING

F Allow for complete bonding to trunking, tray, water


heaters, equIPment etc. in full compliance to 1 Item
KAHRAMAA standards.

To Collection QR.

BOQ;Page 3/10/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

LIGHTNING PROTECTION SYSTEM

Lightning protection system shall be carried in


compliance to latest revision of BS-EN 62305- and
BS-7430, QCS and Kahramaa regulation. The
system shall include lightning arresters, copper tape
for horizontal rum on the roof and vertical drop to
down conductor including all fitting and related
accessories. The work shall also include
independent earth electrode with earth pit and
chamber with cover. The earth electrode shall be
interconnected to the main earth grid.

A Down Conductor 8 No

B 25x3mm Bare copper tape in screed and parapet


450 m
wall

C 25x3mm Bare copper tape as down conductor


38 m
connected to earthing network
Included
D Lightning protection earth pits 4 No

E Test Clamp 4 No

F 95 sqmm Bare Copper Cable. 240 m

To Collection QR.

BOQ;Page 3/10/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

LIGHTING INSTALLATION

Supply and install luminaires complete including all


lamps, tubes, fittings, supports, control gear,
diffusers, flexible connections, ceiling roses and
wiring with 450 / 750 volt PVC insulated cable in
concealed or exposed G.I conduit with necessary
earthing and all associated accessories; fixing in
position including final connections and
terminations as specified and as per luminaire
schedule.

A Type A1, 31W LED Recessed Mounted Lighting


3 No
Fixture IP20
Included
B Type A1+E , 31W LED Recessed Mounted Lighting
1 No
Fixture IP20, With Self Contained Battery Backup

C Type D1, 22W LED Recessed Mounted Lighting


2 No
Fixture IP44

D Type D1,+E 22W LED Recessed Mounted Lighting


3 No
Fixture IP44, With Self Contained Battery Backup

E Type D2, 14W LED Recessed Mounted Lighting


6 No
Fixture IP44

F Type D2+E, 14W LED Recessed Mounted Lighting


4 No
Fixture IP44, With Self Contained Battery Backup

G Type H1,80W Suspended/Surface Mounted, LED


28 No
Highbay, IP-65

h Type EM1, 7W LED Recessed mounted light fixture,


14 No
IP-44, with self contained battery backup

To Collection QR.

BOQ;Page 3/10/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

LIGHTING INSTALLATION Cont..

A Type L1, 36WLED Surface Mounted Lighting Fixture


1 No
IP44,

B Type L1+E , 36W LED Surface Mounted Lighting


1 No
Fixture IP44, With Self Contained Battery Backup

C Type M1,9W LED Mirror Light 2 No

Supply & install 240 volt flush mounted accessories / Included


lighting switches, completely installed including
boxes, plates, conduit boxes, accessories etc.; all
as specified and wiring with 450 / 750 volt in PVC
conduit concealed or exposed G.I conduit with
necessary earthing; fixing in position including final
connections and terminations as specified and as
per luminaire schedule.

D General lighting switch, one way, one gang. 8 No

E General lighting Push button control 2 No

To Collection QR.

BOQ;Page 3/10/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

SMALL POWER INSTALLATION

Supply & install 240/415 volt flush mounted


accessories completely installed including boxes,
plates, conduit boxes, necessary supports, cable tray
and accessories etc, and wiring with 450 / 600 volt
PVC insulated cable to BS 6004/ BS 4607 in
concealed or exposed conduit or through trunking
including all fittings and necessary earthing.

A 13 amp switched Single socket outlet. 12 No

B 13 amp switched Twin socket outlet. 10 No

C 45A Flex outlet. 9 No

D 20A Double Pole switch. 9 No


Included
E 13A switched Spur Unit With Neon Indicator. 6 No

F Floor Mounted Box (1no Twin Rj45 Outlet + 1no


1 No
Twin Power Sockets)

G 16A Singe Phase Industrial Socket 2 No

H 32A Three Phase Industrial Socket 2 No

I 1No. 32A 4P+E (3PH+N+E) Fused + 1No. 16A


2 No
2P+E (1PH+N+E) Fused

To Collection QR.

BOQ;Page 3/10/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

Isolators as specified complete with steel supports,


sunshade and protection covers where necessary;
and wiring with 450 / 600 volt PVC insulated cable to
BS 6004/ BS 4607 in concealed or exposed conduit
or through trunking including all fittings and
necessary earthing.

A 63A TPN Isolator, IP-65. 1 No.

B 40A TPN Isolator, IP-65. 1 No. Included

C 20A TPN Isolator, IP-65. 2 No.

D 16A TPN Isolator, IP-65. 10 No.

UNINTTERUPTED POWER SUPPLY (UPS)

E 5 KVA UPS with 60 minutes battery back up, with


maintenance bypass and change over switch with 1 No.
interlock facility as specified.

To Collection QR.

BOQ;Page 3/10/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising from
the quantum of work, specification or condition of
contract or any other matters what so ever. Included
(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 3/10/10
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

Collection:

Page 3/10/1

Page 3/10/2

Page 3/10/3

Page 3/10/4

Page 3/10/5

Page 3/10/6

Page 3/10/7

Page 3/10/8

Page 3/10/9

Page 3/10/10

TOTAL FOR ELECTRICAL INSTALLATIONS To Summary QR. 59,400.00

BOQ;Page 3/10/11
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

BILL NO. 3/11

ELV WORKS

FIRE ALARM SYSTEM

The works include under this section shall comprise


supply, installation, testing, commissioning and
setting to work for all items which are necessary for a
complete operational fire alarm system as outlined in
the drawings, scope of work and in the specifications
and shall be carried out by a specialized sub
contractor.

Supply & install Fire alarm fittings and accessories


and wiring with 2C x 1.5 mm2 and 2C x 2.5 mm2 fire
resistant cables in PVC/GI conduits or through cable
trunking complete with glands and terminations
complets as specified and indicated in the
drawingsno.3331-EF-B2-1-001, 3331-EF-B0-6-001
Included

4 Loop Analogue addressable fire alarm panel


(FACP) expandable with built in battery & battery
charger (sealed lead acid,minimum 24 hours
duration battery backup, 30 minutes for alarm),
A 1 No
Power supply unit and all accessories including
wiring, conduiting and connection to the power
supply (Location at Workshop building ground floor
Wating / Lobby Area)

B Addressable Smoke detector 9 Nos

C Remote Indicator 3 Nos

D Addressable Manual Alarm Call Point 2 Nos

E Beam Detector set (Transiver and Receiver ) 2 No

F Addressable output control module 5 Nos

G Addressable input monitor module 5 Nos

H Sounder with Flasher - Wall mounted 2 Nos

J Sounder with Flasher - Wall mounted, Weather proof 2 Nos

To Collection QR.

BOQ;Page 3/11/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

FIRE ALARM SYSTEM (Cont..)

Final connection to points including wiring, conduits


and ancillary installations complete including
containment and terminations as necessary.

A To Addressable Smoke detector 9 Nos

B To Remote Indicator 3 Nos

C To Addressable Manual Alarm Call Point. 2 Nos

D To Beam Detector set (Transiver and Receiver ) 2 Nos

E To Addressable output control module 5 No

F To Addressable input monitor module 5 Nos

G To Sounder with Flasher - Wall mounted. 2 Nos Included

H To Sounder with Flasher - Wall mounted, Weather


2 Nos
proof

Allow for the following

J Allow for the integration of necessary third party


Item
interfaces with fire alarm system

K CAMS Dialer Item

To Collection QR.

BOQ;Page 3/11/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

IT & TELECOM INSTALLATION

Note : The works include under this section shall


comprise supply, installation, cabling, testing,
commissioning and setting to work for all items
which are necessary for a complete operational IT &
Telephone System as outlined in the scope of works,
drawings and in specifications and shall be carried
out by a OOREDOO approved specialized Sub-
Contractor as per OOREDOO's standard and
regulations and as per drawing.

Supply & installation of Telephone and Data outlets


and fittings and accessories complete as specified
and indicated in the drawings no. 3331-ET-B2-1-
001,3331-ET-B0-6-001 including GI/PVC conduits
or in cable trunking. Included

A 12U N/W Rack (Wall Mount) with Fiber Optic patch


panel, Access/Edge switch with POE/POE+, Data
patch panel, Fiber & Copper Patch Cords, Power
1 No
distribution unit and all accessories with necessary
inter connecting cabling etc. Located in Workshop
building Ground floor Electrical room

B RJ45 Single Data Point 1 No

C RJ45 Twin Data Point 3 Nos

D WiFi Access Point 1 Nos

E Twin Data for WiFi 1 Nos

F Floor mounted Box (RJ45 Twin Data Point ) 1 Nos

To Collection QR.

BOQ;Page 3/11/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

IT & TELECOM (Cont..)

Final connection to outlets including wiring (Cat


6A F/FTP), conduits and ancillary installations
complete; including containment and
terminations as necessary.

A To RJ45 Single Data Point 1 No.

B To RJ45 Twin Data Point 3 Nos.

C To Twin Data for WiFi 1 Nos.

D To Floor mounted Box (RJ45 Twin Data Point ) 1 Nos.

Allow for the following


Included
E Allow for the cable trunking for IT system as shown
Item
on the drawing

F Allow for the backbone cabling (6 Core Armored


SMF) from Main IT rack in Showroom Building
Item
mezzanine floor Server room including all required
civil works

G Allow for all the active components required for


Item
complete operational telecommunication system

To Collection QR.

BOQ;Page 3/11/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

CCTV SYSTEM

Note: The work included in this section shall include


supply, installation, testing, commissioning and
setting to work of all items which are necessary for
the complete operational CCTV and access control
system including all necessary cabling as outlined in
the Drawings, scope of work and in the specifications
and shall be carried out by a MOI-SSD approved
specialized Sub-Contractor as per MOI-SSD's
standard and regulations.
CCTV camera, accessories and equipments;
complete with fittings, flexible conduit, cable
connection to data outlet point with connector as
specified and shown in drawings no 3331-EC-B2-1-
001, 3331-EC-B0-6-001

12 U N/W Rack (Wall Mount in Electrical Room) with


Fiber Optic patch panel, Access switch with
Included
POE/POE+, Data patch panel, Fibre Patch cords,
A 1 No.
Fiber & Copper Patch Cords, Power distribution unit
and all accessories with necessary inter connecting
cabling etc.

B Outdoor Bullet Fixed camera 3 Nos.

C Indoor Dome Fixed camera 5 Nos.

D Single RJ45 outlet for CCTV cameras 8 Nos.

Final connection to outlets including wiring (Cat 6A


F/FTP) , conduits and ancillary installations
complete; including containment and terminations as
necessary.

E To RJ45 Single Data outlet for CCTV cameras 8 Nos.

To Collection QR.

BOQ;Page 3/11/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

CCTV SYSTEM (Cont..)

Allow for the following

Allow for the cable trunking for CCTV system as


A Item
shown on the drawing.
Included
Allow for the backbone cabling (6 Core Armored
SMF) from Showroom Building mezzanine floor
B Item
CCTV room in Main CCTV rack including all required
civil works

Allow for any other works which are necessary for


C Item
completion of CCTV system

To Collection QR.

BOQ;Page 3/11/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

BUILDERS WORK IN CONNECTION WITH ALL


ELV INSTALLATIONS.

A Holes, chases, Cutting back, building in, provision of


pipe sleeves, fire barriers and making good finishes Item
as necessary.

B Allow for sleeves/ducts for encasing electrical cables


passing beneath roads, paved areas and structures. Item

C Isolator supports, equipment supports, sunshades


including paint finishing and associated builders work Item
as necessary.

SUNDRIES IN CONNECTION WITH ALL


ELECTRICAL/ELV INSTALLATIONS.
Included
D Marking the position of holes, mortises, chases and
Item
the like in the structure.

E Plates, discs, labels, and charts for identification of


Item
equipment, panel bords like.

F Loose keys, tools and spare parts as specified. Item

G Testing and Commissioning. Item

To Collection QR.

BOQ;Page 3/11/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising from
the quantum of work, specification or condition of
Included
contract or any other matters what so ever.

(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 3/11/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS

Item Description Qty Unit Rate (QR) Amount (QR)

Collection:

Page 3/11/1

Page 3/11/2

Page 3/11/3

Page 3/11/4

Page 3/11/5

Page 3/11/6

Page 3/11/7

Page 3/11/8

TOTAL FOR ELV INSTALLATIONS To Summary QR 00.00

BOQ;Page 3/11/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 3/12


FINISHING WORKS

FLOOR FINISHES

SCREEDS AND FLOOR TOPPINGS

Cement and sand (1:3) screed as specified,


trowelled finish ; to concrete base.

A Screeded bed to receive finishes (measured


separately) 844 m2

PORCELAIN FLOORING

Supply & Install fully vitrified extruded Porcelain


tiles from an approved manufacturer; bedded in
latex modified waterproof adhesive, grouted with
epoxy grouting over cement sand screeded bed
(measured seperately) laid to slope, jointed,
pointed and decorative finished; all as specified
and indicated on drawings and to the approval of
the ENGINEER.

B Ref.FF1 ; Porcelain floor tile size 600 x 600 x Included


10mm thick; located at Waiting room, Office-1 &
Mechanics rest room. 61 m2

C Ref.FF2 ; Anti-slip Porcelain floor tile size 300 x


300 x 10mm thick; located at Waiting room,
Office-1 & Mechanics rest room. 11 m2

SKIRTING FINISHES

D SK.1; 100 mm high porcelain tile skirting at


Waiting area, Office-1, mechanics rest room &
etc. 51 m

E SK.4; 100 mm high epoxy paint skirting at


Workshop, Electrical room, painting room, &
Engineering overhauling room 1 & 2. 137 m

WET AREA WATERPROOFING

F Solvent free SBS elastomeric bitumen emulsion


water-proofing system laid in wet areas under
floor finishes 12 m2

To Collection QR. 53,240.00

BOQ;Page 3/12/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

CEILING FINISHES

SUSPENDED GYPSUM PLASTERBOARD


CEILING

Supply & Installation of Suspended gypsum


plasterboard/tile ceiling in 12.5 mm thick gypsum
board; complete with metal framework and
suitable suspension system; including bulkheads,
vertical panels and access panels; allow for
additional suspension, supports and hangers to
accomodate services and associated fittings;
fixing to concrete; all as shown on Drawing and to
the approval of the ENGINEER.

A Ref. CF1, gypsum decorative ceiling with gypsum Included


cornice at waiting area. 19 m2

B Ref. CF2, 600x600 mm gypsum board ceiling at


Ofiice -1 and Mechanics rest room 42 m2

METAL GRID CEILING

Supply & Installation of metal grid ceiling;


complete with metal framework and suitable
suspension system; including bulkheads, vertical
panels and access panels; allow for additional
suspension, supports and hangers to
accomodate services and associated fittings;
fixing to concrete; all as shown on Drawing and to
the approval of the ENGINEER.

C Ref. CF3, 600x600 mm metal grid ceiling at


11 m2
toilets

To Collection QR. 5,480.00

BOQ;Page 3/12/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

WALL FINISHES

PLASTER AND RENDERING

Two coats render comprising cement, sand and


lime (1: 4.5: 0.5) under coat, and cement, sand
and lime (1: 6 : 1) finish coat, to concrete or
blockwork include all necessary beads, expanded
metal lathing and control joints; all as specified

A 15 mm thick (minimum) to internal wall 1,255 m2

B 20 mm thick (minimum) to external wall 825 m2

GLAZED CERAMIC TILES

Supply and fix glazed ceramic wall tiles from an


approved manufacturer, complying with the
Project Specification; bedded in latex modified
waterproof adhesive, grouted with polyurethane
grouting; laid on rendered wall (measured
separately)/dry wall including different colour
Included
boarders, coves, corners, edge strips etc. all as
specified and to the approval of the ENGINEER.

B Ref.WF2; 300x300 mm glazed ceramic wall tiles


at Toilets 58 m2

GRC

Supply and Installation of GRC as per Drawings


and specified and approved by Engineer.

C GRC panel ; size 1500*4950 mm 6 No.

D GRC panel ; size 5000*8500 mm 1 No.

E GRC panel type -1 ; size 1500*6320 mm 2 No.

F GRC panel type - 2 ; size 1500*6320 mm 2 No.

G GRC on parapet ; 1650 mm high Item

93,060.00
To Collection QR.

BOQ;Page 3/12/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
Included
condition of contract or any other matters what so
ever.

(i)
Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 3/12/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 3/12/1

Page 3/12/2

Page 3/12/3

Page 3/12/4

TOTAL FOR FINISHES WORKS To Summary QR 151,780.00

BOQ;Page 3/12/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PAINTING WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 3/13


PAINTING WORKS

PLASTER AND RENDERING

Prepare and apply One coat primer sealer, One


under coat and two coats of acrylic emulsion
paint system or equal & approved system as per
specification, from approved manufacturer and to
the approval of the ENGINEER.

A Ref: WF1,To the rendered internal walls 1,198 m2

Prepare and apply One coat primer sealer, One


textured paint and two coats of exterior quality
(weather sheild) acrylic emulsion paint system or
equal & approved system as per specification,
from approved manufacturer and to the approval
of the ENGINEER.

Included
B Ref: EX-1, To the rendered external walls 825 m2

C Grooves as per specifications Item

Prepare and apply One coat primer sealer, One


skim coat and two coats of acrylic emulsion paint
system or equal & approved system as per
specification, from approved manufacturer and to
the approval of the ENGINEER.

D Ref:CF4, To internal slab and ceilings 94 m2

EPOXY FLOORING

E Ref.FF.5; Floor to receive self leveling Epoxy


paint on Screed (screed measured elsewhere) 772 m2

To Collection QR. 72,000.00

BOQ;Page 3/13/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PAINTING WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever. Included

(i)
Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 3/13/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PAINTING WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 3/13/1

Page 3/13/2

TOTAL FOR PAINTING WORKS To Summary QR 72,000.00

BOQ;Page 3/13/3
BILL 3 - PROPOSED WORKSHOP

GENERAL SUMMARY

Item Description Reference Amount (QR)

1 EARTHWORKS Page 3/1/3 30,937.00

2 CONCRETE WORKS Page 3/2/8 434,150.00

3 MASONRY WORKS Page 3/3/3 114,400.00

4 JOINERY WORKS Page 3/4/4 19,050.00

5 METAL WORKS Page 3/5/4 821,116.00

6 STRUCTURAL STEEL WORKS Page 3/6/5 382,000.00

7 PLUMBING & DRAINAGE Page 3/7/7 32,500.00

8 FIREFIGHTING WORKS Page 3/8/3 9,000.00

9 HVAC WORKS Page 3/9/7 150,000.00

10 ELECTRICAL WORKS Page 3/10/11 59,400.00

11 ELV WORKS Page 3/11/9 0.00

12 FINISHES WORKS Page 3/13/5 151,780.00

13 PAINTING WORKS Page 3/13/3 72,000.00

To General Summary
TOTAL COST FOR BILL 3- PROPOSED WORKSHOP (QR) 2,276,333.00
QR

BOQ;Page 3/14/1
BILL OF QUANTITIES - 4.0 - UG IRRIGATION TANK
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 4/1


EARTHWORK

Excavate pits/trenches

A Excavation not exceeding 4.50m deep 45 m³

Disposal

B Remove surplus excavated material from site


45 m³
Included
Filling.

C Approved desert fill material around foundations


; laid in layers of 150 mm thickness, watered,
8 m³
rolled and compacted to 97% proctor value in
compaction.

TERMITE CONTROL

Emulsive concentrate termiticide consists of


chloropyrifos or linden chemical elements, dilute
and apply as per the manufacturer
recommendations with soil treatment solutions
as specified.

D Anti-termite treatment
9 m²

To Collection QR.

BOQ;Page 4/1/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
so ever.
Included

(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR. -

BOQ;Page 4/1/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection :

Page 4/1/1 -

Page 4/1/2

TOTAL FOR EARTHWORK To Summary QR 0.00

BOQ;Page 4/1/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 4/2


CONCRETE WORKS

CONCRETE-SUBSTRUCTURE

Plain in-situ concrete Grade SRC 20 with gabbro


aggregate conforming to BS EN 12620 to the
approval of the ENGINEER; finish to receive
waterproofing membrane/ paint (measured
separately)
Included
A Blinding; 75 mm thick (minimum), horizontal or
10 m²
sloping not exceeding 45o.

Reinforced in-situ concrete Grade OPC 40 with


gabbro aggregate conforming to BS EN 12620
to the approval of the ENGINEER.

B Raft footing 4 m³

C RC Wall 14 m³

D Slab 3 m³

To Collection QR.

BOQ;Page 4/2/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

REINFORCEMENT-SUBSTRUCTURE

High yield strength uncoated deformed bars with


a minimum characteristic strength of 500 N/mm²
as supplied by Qatar Steel Company (QASCO),
unless otherwise specified.

A Bars in assorted diameters to concrete


4,590 kg Included

To Collection QR.

BOQ;Page 4/2/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

FORMWORK-SUBSTRUCTURE.

Formwork; smooth face finish for concrete to


receive waterproofing membrane /paint

A To vertical or battering sides of Footing 5 m²


Included

B To vertical or battering sides of RC Wall 99 m²

C To vertical or battering sides of Slab 8 m²

To Collection QR.

BOQ;Page 4/2/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES

Approved waterproofing membrane (minimum


4mm thick) with 150 mm (minimum) laps
including primer as specified and lay in
accordance with manufacturer's
recommendations .

A To horizontal surfaces of concrete 17 m


2

Included
B To vertical surfaces of concrete. 45 m
2

6 mm thick servipak protection board or similar


approved to comply with the Project
Specification and conform to BS 8102:2009 ;
suitably bonded to retain position

C To horizontal surfaces of concrete. 8 m²

D To vertical surfaces of concrete. 45 m²

Cement sand screed as specified

E 40 mm thick cement sand screed. 9 m²

F Water stop/Water Bar 19 m²

To Collection QR. -

BOQ;Page 4/2/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising Included
from the quantum of work, specification or
condition of contract or any other matters what
so ever.

(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 4/2/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection :

Page 4/2/1

Page 4/2/2

Page 4/2/3

Page 4/2/4

TOTAL FOR CONCRETE WORKS To Summary QR -

BOQ;Page 4/2/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 4/3


ARCHITECTURAL WORKS

PLASTER AND RENDERING

Two coats render comprising cement, sand and


lime (1: 4.5: 0.5) under coat, and cement, sand
and lime (1: 6 : 1) finish coat, to concrete or
blockwork include all necessary beads, expanded
metal lathing and control joints; all as specified

A 15 mm thick (minimum)to all the surface of tanks 60 m2

WATER-PROOF PAINT
Included
Waterproof paint-2 coats of acrylic modified
cementious sealing slurry, cresit CR72-henkel or
equivalent laid on plaster

B To all Internal surfaces of Water tank 60 m2

MANHOLE COVER & LADDER

Heavy duty manhole cover and ladder fixed to the


concrete wall or ceiling include all necessary
accessories; all as specified

C 600mmx600mm Manhole of Water tank 2 No

D Ladder for Water tank 2 No

To Collection QR. -

BOQ;Page 4/3/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

Included
(i)
Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 4/3/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 4/3/1

Page 4/3/2

TOTAL FOR FINISHES WORKS To Summary QR

BOQ;Page 4/3/3
BILL 4 - PROPOSED UG IRRIGATION TANK

GENERAL SUMMARY

Item Description Reference Amount (QR)

1 EARTHWORKS Page 4/1/1

2 CONCRETE WORKS Page 4/2/3

3 MASONRY WORKS Page 4/3/3

TOTAL COST FOR BILL 4- PROPOSED UG IRRIGATION To General Summary


48,000.00
TANK (QR) QR

BOQ;Page 4/4/1
BILL OF QUANTITIES - 5.0 - STORM WATER TANK
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 5/1


EARTHWORK

Excavate pits/trenches

A Excavation not exceeding 8.00m deep 216 m³

Disposal
Included
B Remove surplus excavated material from site
216 m³

Filling.

C Approved desert fill material around foundations


; laid in layers of 150 mm thickness, watered,
25 m³
rolled and compacted to 97% proctor value in
compaction.

TERMITE CONTROL

Emulsive concentrate termiticide consists of


chloropyrifos or linden chemical elements, dilute
and apply as per the manufacturer
recommendations with soil treatment solutions
as specified.

D Anti-termite treatment
27 m²

To Collection QR.

BOQ;Page 5/1/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
so ever.

Included
(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR. -

BOQ;Page 5/1/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection :

Page 6/1 -

Page 6/2

TOTAL FOR EARTHWORK To Summary QR 0.00

BOQ;Page 5/1/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 5/2


CONCRETE WORKS

CONCRETE-SUBSTRUCTURE

Plain in-situ concrete Grade SRC 20 with gabbro


aggregate conforming to BS EN 12620 to the
approval of the ENGINEER; finish to receive
waterproofing membrane/ paint (measured
separately)

A Blinding; 75 mm thick (minimum), horizontal or


29 m²
sloping not exceeding 45o.
Included
Reinforced in-situ concrete Grade OPC 40 with
gabbro aggregate conforming to BS EN 12620
to the approval of the ENGINEER.

B Raft footing 11 m³

C RC Wall 63 m³

D Slab 8 m³

To Collection QR.

BOQ;Page 5/2/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

REINFORCEMENT-SUBSTRUCTURE

High yield strength uncoated deformed bars with


a minimum characteristic strength of 500 N/mm²
as supplied by Qatar Steel Company (QASCO),
unless otherwise specified.

Included
A Bars in assorted diameters to concrete
14,420 kg

To Collection QR.

BOQ;Page 5/2/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

FORMWORK-SUBSTRUCTURE.

Formwork; smooth face finish for concrete to


receive waterproofing membrane /paint

A To vertical or battering sides of Footing 10 m² Included

B To vertical or battering sides of RC Wall 320 m²

C To vertical or battering sides of Slab 25 m²

To Collection QR.

BOQ;Page 5/2/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

SUNDRIES

Approved waterproofing membrane (minimum


4mm thick) with 150 mm (minimum) laps
including primer as specified and lay in
accordance with manufacturer's
recommendations .

A To horizontal surfaces of concrete 52 m


2

Included
B To vertical surfaces of concrete. 167 m
2

6 mm thick servipak protection board or similar


approved to comply with the Project
Specification and conform to BS 8102:2009 ;
suitably bonded to retain position

C To horizontal surfaces of concrete. 25 m²

D To vertical surfaces of concrete. 167 m²

Cement sand screed as specified

E 40 mm thick cement sand screed. 27 m²

F Water stop/Water Bar 42 m²

To Collection QR. -

BOQ;Page 5/2/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
so ever.

(i) Item

(ii) Item

Included
(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 5/2/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection :

Page 6/1

Page 6/2

Page 6/3

Page 6/4

TOTAL FOR CONCRETE WORKS To Summary QR -

BOQ;Page 5/2/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 5/3


ARCHITECTURAL WORKS

PLASTER AND RENDERING

Two coats render comprising cement, sand and


lime (1: 4.5: 0.5) under coat, and cement, sand
and lime (1: 6 : 1) finish coat, to concrete or
blockwork include all necessary beads, expanded
metal lathing and control joints; all as specified

A 15 mm thick (minimum)to all the surface of tanks 180 m2


Included
WATER-PROOF PAINT

Waterproof paint-2 coats of acrylic modified


cementious sealing slurry, cresit CR72-henkel or
equivalent laid on plaster

B To all Internal surfaces of Water tank 180 m2

MANHOLE COVER & LADDER

Heavy duty manhole cover and ladder fixed to the


concrete wall or ceiling include all necessary
accessories; all as specified

C 1000mmx1000mm Manhole of Water tank 2 No

D Ladder for Water tank 2 No

To Collection QR. -

BOQ;Page 5/3/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item

(ii) Item
Included
(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 5/3/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 5/3/1

Page 5/3/2

TOTAL FOR FINISHES WORKS To Summary QR

BOQ;Page 5/3/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BOQ;Page 5/3/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BOQ;Page 5/3/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BOQ;Page 5/3/6
BILL 5 - PROPOSED UG STORM WATER TANK

GENERAL SUMMARY

Item Description Reference Amount (QR)

1 EARTHWORKS Page 5/1/1

2 CONCRETE WORKS Page 5/2/3

3 ARCHITECTURAL WORKS Page 5/3/3

TOTAL COST FOR BILL 5- PROPOSED UG STORM To General Summary 152,000.00


WATER TANK (QR) QR

BOQ;Page 5/4/1
BILL OF QUANTITIES - 6.0 - EXTERNAL WORKS
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE GRADING WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 6/1


SITE GRADING WORKS

Site clearance, grading, filling, disposal and


compact ground level to achieve reference level
site formation for all civil, hard and soft
landscaping, and infrastructure work in
accordance with the Drawings and
specifications.

A Cutting of existing ground level above reference


level. Item

B Backfilling using selected excavated material,


laid in layers of 150 mm thickness, watered,
rolled and compacted to 98% M.D.D. in
compaction. Item
Included
C Backfilling with approved imported fill materials;
laid in layers of 150 mm thickness, watered,
rolled and compacted to 98% M.D.D. in
compaction. Item

D Disposal/Remove debris/unsuitable excavated


material from site and dumped at designated
tipping areas as directed by Government Item

To Collection QR.

BOQ;Page 6/1/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE GRADING WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
so ever.

(i) Item

(ii) Item
Included

(iii) Item

(iv) Item

(v) Item

To Collection QR. -

BOQ;Page 6/1/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE GRADING WORK

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection :

Page 6/1/1 -

Page 6/1/2

TOTAL FOR SITE GRADING WORK To Summary QR 0.00

BOQ;Page 6/1/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HARDSCAPING WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 6/2


HARD LANDSCAPING AND FEATURES

Refer Drawing 3331-AR-B0-G-003-01 for


Landscape

CONCRETE PAVIOURS

200 x 100 x 60 mm thick coloured interlocking


type precast concrete paviours set to patterns as
shown on drawings and/or specified in
specifications; laid on and including 50 mm sand
bed over 300 mm thick subgrade as specified
and shown on as shown on drawings 3331-AR-
B0-5-001-02 and/or specified in specifications

A Pavement for Walkway 290 m2 Included

PAVIOURS

Permeable green type paviours set to patterns ;


laid on and including 50 mm washed sand bed
over 150 mm thick bedding 60% gravel,20% soil
,20% sand over 150mm compacted aggregate
over subgrade as specified and shown on
Drawing No.3331-AR-B0-5-001-02

B Pavement for Carparking 85 m2

To Collection QR.

BOQ;Page 6/2/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HARDSCAPING WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

ROAD KERB

Hydraulically pressed precast concrete Grade


SRC 20 road kerb as specified; bedding and
jointing in Class 1 cement mortar bed on and
including concrete foundation; haunched with
dowel bars; include for blinding, waterproofing,
excavation, disposal of surplus excavated
materials from site etc; as detailed in Drawing
3331-AR-B0-5-001-02

A Road Kerbs; 150x150x300 mm high 151 m

FLUSH KERB

Hydraulically pressed precast concrete Grade


SRC 20 garden kerb as specified; bedding and
jointing in Class 1 cement mortar bed on and Included
including mass concrete foundation; include for
blinding, waterproofing, excavation, disposal of
surplus excavted materials from site etc., as
detailed in Drawing

B Kerbs; 150x150x250 mm high 15 m

GARDEN KERB

Hydraulically pressed precast concrete Grade


SRC 20 garden kerb as specified; bedding and
jointing in Class 1 cement mortar bed on and
including mass concrete foundation; include for
blinding, waterproofing, excavation, disposal of
surplus excavted materials from site etc., as
detailed in Drawing

C Kerbs; 75 x 300 mm high 87 m

To Collection QR.

BOQ;Page 6/2/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HARDSCAPING WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
Included
so ever.

(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 6/2/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HARDSCAPING WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection :

Page 6/2/1

Page 6/2/2

Page 6/2/3

TOTAL FOR HARDSCAPING WORKS To Summary QR 38,000.00

BOQ;Page 6/2/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROAD WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 6/3


ROAD WORKS

PAVEMENT

Preparation of sub-grade

A Grade, water and compact as specified the


existing sub-grade, 300 mm thick, CBR at 95%
MDD, as to receive granular sub base. 800 m2

B Granular filling (quarry scalping) 800 m2

150 mm thick granular sub-base course, Class-B;


to fall, cross-falls and cambers; laid on prepared
sub-grade laid in layers

C Bitumenous flexible paving as specified 800 m2 Included

Bitumenous prime coat (MC1); laid on sub base

D 130 mm thick asphalt base course (MD1); laid on


prime coat 800 m2

E Bitumenous tack coat; laid on asphalt base-


course 800 Item

J 40 mm wearing course layer of asphalt (MD4);


laid over MD1 800 m2

To Collection QR.

BOQ;Page 6/3/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROAD WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

TRAFFIC SIGNS

Standard reflectorised Class 1 (Hi-Intensity) traffic


signs as per Qatar Traffic Manual and as shown
on Drawing 3331-AR-B0-G-005-01; mounted on
one tubular galvanized steel post fixed to
concretre work, complete including all fixing
accessories and builder's works. (Reference of
the sign are given as per the referred drawings
and relevant Code No. of Qatar Traffic Manual)

Parking sign - Ref. 405P 1 No

Exit sign -Ref 413 2 No Included

Stop sign -Ref R 102 3 No

One Way Street- Ref. 213 1 No

No left turn sign- Ref. R 116-L 1 No

No entry sign- Ref. 225 5 No

Speed limit sign- Ref. R 148 1 No

ROAD MARKINGS

Road markings in spray hot applied reflectorised


thermosplastic paint and additional spherical
beads in accordances with QCS as specified and
shown on Drawing 3331-AR-B0-G-005-01;
Reference of the sign are given as per the
referred drawings and relevant Code No. of Qatar
Traffic Manual.
Stop lines; (White Colour) Ref. 500. 12 m

Give way triangle ; Ref. 503. 1 No

Edge of carriage way marking ; Ref. 511. 151 m

Lane arrows, straight-Ref. 514 2 No

Lane arrows-Ref. 515 1 No

Lane arrows-Ref. 516 2 No

Car parking lines; 100 mm wide Ref. 529. 22 m

Road Hump marking Ref. 531. 1 No

marking ; Ref. M105. 23 m


To Collection QR.

BOQ;Page 6/3/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROAD WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item

(ii) Item
Included
(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 6/3/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROAD WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 6/3/1

Page 6/3/2

Page 6/3/3

TOTAL FOR ROADWORKS To Summary QR 144,000.00

BOQ;Page 6/3/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SOFTSCAPING WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 6/4


SOFT LANDSCAPING WORKS

Soft Landscaping Works: Complete with supply


and plant all plants including earthworks, planting
medium, supports, drainage layers, filter
membrane etc. Allow for maintaining, protecting,
watering and replacing plants as necessary
during the course of the Contract and until end of
Maintenance Period

PLANTING MEDIUM

Tree pit including excavation and disposal of


excavated materials, filling with imported
agricultural sweet soil mixed with industrial
compost or vegetable multch as specified,
including
A For ground cover; 400 mm deep 95 m
3

GROUND COVER
Included

Supply and plant following ground cover as


specified

B Cynodon dactylon (Bermuda Grass -high salt 2


tolerant) 248 m

MAINTENANCE

C Allow for maintaining, protecting, watering and


replacing plants as necessary during the course
of the Contract and until the end of Maintenance
Period Item

To Collection QR.

BOQ;Page 6/4/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SOFTSCAPING WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item

(ii) Item Included

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 6/4/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SOFTSCAPING WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 6/4/1

Page 6/4/2

TOTAL FOR SOFTSCAPING WORKS To Summary QR 22,000.00

BOQ;Page 6/4/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING BOUNDARY WALL AND GATE

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 6/5


BOUNDARY WALL AND GATES

BOUNDARY WALL

Decorative Tubular Metal grill 700/900 mm high


fixed on 1800/900mm blockwork including
300x300 RCC columns at 3.3 c/c with expansion
joint and foundation at 3.3c/c ,Blinding,Protection
Earthwork,render and paint all finished complete
as indicated on drg no.3331-AR-B0-G-002-01&
3331-AR-B0-5-002-01

A 2000 mm high Boundary Wall with design in front


side 31 m

B 2500 mm high Boundary Wall 155 m

GATE

Decorative gate fixed as indicated on drg no.3331-


AR-B0-G-002-01 &3331-AR-B0-5-002-01

C Metal Sigle leaf Sliding Gate 5m Wide 1 No.

Included
C Metal Double leaf Sliding Gate,each leaf 3.5m
Wide 1 No.

D Exit Swing Gate 5500mm wide 1 No

E Entry Double leaf Sliding Gate;each leaf 7500mm


wide 1 No

To Collection QR. 180,000.00

BOQ;Page 6/5/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING BOUNDARY WALL AND GATE

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item Included

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 6/5/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING BOUNDARY WALL AND GATE

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 6/5/1

Page 6/5/2

TOTAL FOR BOUNDARY WALL To Summary QR 180,000.00

BOQ;Page 6/5/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SURFACE DRAINAGE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 6/6


SURFACE DRAINAGE WORKS

Note : The works included hereunder shall


comprise supply, installation, testing,
comissioning, all builder's works, sundries, loose
keys, tools and spare parts, setting to work for all
items which are necessary for a complete
operational system as outlined in the Drawings
and in the specifications, obtaining necessary
Government approvals etc. completely.

Refer Drawing No. 3331-AR-B0-G-007-01 for


Storm Water Drainage layout

uPVC pipes and fittings to BS 4660 with solvent


welded joints ; laid in trenches, complete with
excavation, grading bottom, earthwork supports,
part backfilling with selected fill material,
compacting and removal of surplus excavated
material from site, 150 mm thick Plain in-situ
concrete Grade SRC 20 beds under road, 150
mm thick Granular material bed etc. as specified.
Included

A 110 mm Diameter pipes. 150 m

B 160 mm Diameter pipes. 37 m

C 200 mm Diameter pipes. 98 m

D 300 mm Diameter pipes. 25 m

CHANNEL GRATING

Channel gratings as specified in drawing

E Channel grating approximate size 5500mm x


300mm at Exit gate 1 No

F Channel grating approximate size 14500mm x


300mm at Entrance 1 No

G Channel grating approximate size 6000mm x


300mm at Entrance/ Exit gate 1 No

H Channel grating approximate size 4300mm x


300mm at Entrance/ Exit gate 1 No

J Channel grating approximate size 7000mm x


300mm at Entrance/ Exit gate 1 No

To Collection QR.

BOQ;Page 6/6/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SURFACE DRAINAGE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

CATCH PIT

Catch pit in pre-cast concrete complete with cast


iron frames and hinged gratings /with out grating
to BS EN 124, Class D-400 and shown on
Drawing 3331-AR-B0-G-007-01 ; include for
bedding and surrounds in plain in-situ concrete,
excavation, disposal etc. and all associated
builder's works.

A 600x600 mm Catch pit with grating 13 No

B 750x750 mm Catch pit 6 No

MANHOLE

Manhole installed complete with precast concrete


perforated chamber rings on insitu concrete
footings, precast concrete cover slab with in-situ Included
haunching; all as specified and indicated on
Drawing including prepared openings for pipe
connections, insitu concrete blinding, gravel
surround geotextile fabric external lining ,250mm
dia borehole ,GI step; allow for excavation,
disposal etc. and all builder's works.

C 1200 mm diameter Soakaways for surface water


drainage complete with heavy duty ductile iron
covers and frames to EN 124; as detailed in
Drawing 3331-AR-B0-G-007-01 1 No

To Collection QR.

BOQ;Page 6/6/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SURFACE DRAINAGE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item Included

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 6/6/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SURFACE DRAINAGE WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 6/6/1

Page 6/6/2

Page 6/6/3

TOTAL FOR SURFACE DRINAGE WORKS To Summary QR 27,000.00

BOQ;Page 6/6/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 6/7


SITE PLUMBING AND DRAINAGE SYSTEM

MANHOLE AND THE LIKES IN CONNECTION


WITH SANITARY DRAINAGE AND CHEMICAL
WASTE INSTALLATION

Supply, Installation, Testing and Commissioning of


Below Ground Drainage Pipe of uPVC Materials and
fittings to BS 4660 with solvent welded joints and
supports etc.,

A 160 mm diameter soil, waste and vent pipes 142 m


Included
B Floor clean out with chamber, 160 mm outlet; FCO 2 No

C Floor clean out with chamber, 110 mm outlet; FCO 1 No

D Floor clean out with chamber, 820 mm outlet; FCO 1 No

Manhole for sewer waste; installed complete with


SRC 35 insitu reinforced concrete base, reinforced
concrete wall and SRC 35 reinforced concrete cover
slab as detailed in drawing; including blinding,
waterproofing, benching, channels and prepared
openings for pipe connections; allow for excavation,
disposal, earthwork supports, dewatering etc. and all
builder's works.

Inspection Chamber with double sealed, heavy duty


type ductile iron covers and frames (675 x 675 mm)
E to BS EN 124 (Class D400) with GRP sealing plate; 4 Nos.
internal size 675 x 675 mm and 750-900 mm depth
to invert level; ( For foul drainage)

Man Hole Chamber with double sealed, heavy duty


type ductile iron covers and frames (750 x 750 mm)
F to BS EN 124 (Class D400) with GRP sealing plate; 6 Nos.
internal size 900 to 1200 mm diameter and 900-
1800 mm depth to invert level; ( For foul drainage)

Supply, installation of uPVC Gully trap seal (inline


Type) mounted at soffit level; jointing to drainage
pipe work. Etc..,approved by the engineer and
complete as specified

Gully Trap 450x450mm with Minimum 75mm deep


G 2 No
water Seal

Supply, installation of Oil Intercepter with complete


D 3 Nos.
fittings as specified and as shown in drawing

To Collection QR.

BOQ;Page 6/7/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

EXTERNAL POTABLE WATER SUPPLY


INSTALLATIONS

Copper pipes to BSEN 1057, Part 1 Table Y and


fittings to BS 864 Part 2 with capillary joints; covered
with factory bonded polythene sleeve; concealed in
wall or running through floor screed; fixed with
brackets, clips on and including supports, plugged
and screwed to concrete or blockwork

A 28mm Diameter pipes including fitting 105 m

B 35 mm Diameter pipes including fittings. 18 m

Water meter Cabinet installed complete with as per


Kahraamaa requirement with all associated builder's
work as specified and shown in Drawing No. 3331-
MP-B0G-001

C Water Meter Cabinet 1 No. Included

PUMPS

Supply, installation, testing and commissioning of


PACKAGED TYPE BOOSTER PUMPSET- VFD
TYPE, Vertical, in-line multistage centrifugal pump,
cast iron casing, stainless steel impeller, stainless
steel shaft, carbon shaft seal and T.E.F.C electric
motor and controls complete with suction and
delivery manifolds and factory wired control panel,
isolating valves, non-return valves, strainers, flexible
connections including all necessary accessories and
connecting to cold water suction and delivery pipe
work and Pressure Vessel with Isolation valve to the
approval of Engineer at site.

Potable water booster pump set Ref: CWBP-B1&B2-


GF-01&02; comprising 2 no. duty pump and 1 no. of
D `1 Set
standby pump; 100lts pressure vessel and flow rate
2.5 lps at 5.0 bar located at ground level.

To Collection QR.

BOQ;Page 6/7/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising from
the quantum of work, specification or condition of
contract or any other matters what so ever.

(i)
Item

(ii) Item Included

(iii) Item

(iv) Item

(v) Item

To Collectio QR.

BOQ;Page 6/7/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE PLUMBING AND DRAINAGE SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

COLLECTION

Page 6/7/1

Page 6/7/2

Page 6/7/3

TOTAL FOR EXTERNAL PLUMBING AND 14,000.00


To Summary QR
DRAINAGE SYSTEM INSTALLATIONS

BOQ;Page 6/7/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE IRRIGATION SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 6/8


IRRIGATION SYSTEMS

Irrigation Systems sprinklers and the like

A Pop Up spray-0.9 to 1.2m Radius at 2 bar Van 58 Nos.

B Pop Up spray-1m to 1.8m Radius at 2 bar Van 10 Nos.

C Pop Up spray- 3 to 3.6m Radius at 2 bar Van Nozzle 11 Nos.

D Pop Up spray- 4 to 4.5m Radius at 2 bar Van Nozzle 3 Nos.

E Solenoid Valve for Pop up spray system 3 Nos.

Irrigation systems Pipelines, fittings, pumps,


tanks and ancillaries
Included
F 25mm Dia uPVC Irrigation Pipe to BS 3505- Class E 195 m

G 40mm Dia uPVC Irrigation Pipe to BS 3505-Class E 36 m

H 50mm Dia uPVC Irrigation Pipe to BS 3505- Class E 94 m

Irrigation main incomer

J 28mm Dia OD HDPE Pipe to DIN 8074/8075 8 m

K 28mm Dia Isolation Valve - Bronze to BS 5154 4 Nos.

L 28mm Dia Non-return valve - Bronze to BS 5154 1 No.

M 28mm Dia Float Valve - Bronze to BS 5154 2 Nos.

28mm Dia Water Meter - Bronze with Service


N 1 No.
Cabinet with AMI compatible-Kahramaa Approved

Inline Vertical Multistage Package Booster pumpset


P with all valves and control panel and pressure vessel - 1 Set
Capacity 1.5 lps @ 3.5 bar Head (1 duty + 1 standby)

65mm Dia OD HDPE pipe Class PE 100 SDR-17 to


Q 6 m
DIN 8074/8075

65mm dia DI Gate Valves with Flanged end to BS


R 2 Nos.
EN 1074

S 65mm dia Strainer with Flanged end to BS EN 1563 2 Nos.

T Allow of TSE water Tie-in connection Item

To Collection QR.

BOQ;Page 6/8/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE IRRIGATION SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising from
the quantum of work, specification or condition of
contract or any other matters what so ever.

(i)
Item Included

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collectio QR.

BOQ;Page 6/8/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE IRRIGATION SYSTEM

Item Description Quantity Unit Rate (QR) Amount (QR)

COLLECTION

Page 6/8/1

Page 6/8/2

TOTAL FOR EXTERNAL IRRIGATION SYSTEM


To Summary QR 12,000.00
INSTALLATIONS

BOQ;Page 6/8/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 6/9


ELECTRICAL INSTALLATIONS

SITE ELECTRICAL WORKS

Note : The works included hereunder shall


comprise supply, installation, testing, comissioning
and setting to work for all items which are
necessary for a complete operational system as
outlined in the Drawings and in the specifications,
obtaining necessary Government approvals etc.
completely.

ELECTRICAL SUPPLY AND DISTRIBUTION of


L.V NETWORK

A Co-ordinate with Kahramaa for obtaining approval


of schemes, execution of scheme; complete as
per Kahramaa Standard / Specifications for
obtaining power supply to the premises from
nearby KM Substation 1 Item Included

B Electrical incomer, Kahramaa cutout & and kW / hr


meter within electrical service cabinet.
1 Item

C Kahramaa Tie-in Substation to Service Cabinet


Cable connetion 1 Item

EMERGENCY POWER SYSTEM.

Diesel driven Generators and all other associated


accessories as specified and as shown in drawing;
including all associated builder's work and testing
and commissioning.

D Standby Generator, Diesel Engine driven; capacity


100 KVA, 415V, 50Hz complete with control panel,
silencer piping, skid mounted tank for 8 hrs full load
operations. 1 No

To Collection QR.
BOQ;Page 6/9/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

MAIN AND SUBMAIN INSTALLATIONS

Sub Main Distribution Board in dust and vermin


proof enclosure, including busbars (Fault rating
25kA for 3sec to comply with IEC 439-1 / 1999),
main incoming and outgoing moulded case
interrupter/circuit breakers, instrumentation, fuses,
switches, earthing, fixing bracket and all necessary
provisions for incoming and outgoing cable
terminations, Ammeter, Voltmeter, Selector switch
and Phase Indicator lamps and all as specified
including support frame with earthing etc. with
Energy Meter

A 8 way-TPN Sub Main Switch Board FP-MDB with


400/355 amp TP MCCB for incoming supply,
400amp 4P+E copper bus bar and all other
accessories etc including outgoing MCCB's. (As
measured below) Ref Dwg No-3331-EL-B0-6-
001(Outdoor Type) 1 No Included

160 amp TP MCCB outgoing.-3 Nos

125 amp TP MCCB outgoing.-1 Nos

63 amp TP MCCB outgoing.-1 Nos

40 amp TP MCCB outgoing.-3 Nos

To Collection QR.

BOQ;Page 6/9/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

DISTRIBUTION BOARD

Supply & install Lighting/power panel boards in dust


and vermin proof enclosure, complete with bus
bars, incoming MCCB with outgoing MCBs, RCBOs
and spare MCB's as shown on Drwg. including
connection, fixing accessories, earthing etc.

A 4 ways TPN distribution board, Ref. DB- EX with 40


Amp TPN isolator for incoming supply with
contactor and time, external photocell with
accessories. 1 No Included

To Collection QR.
BOQ;Page 6/9/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

POWER CABLES

Supply & install 600/1000 volts, copper conductors,


insulated cables type as indicated in drawing, direct
burried in trenches or pulled inside sleeves or
installed on cable tray and clipped to wall or in PVC
duct complete with all jointing and termination kits,
sleeves, conduits, laying of marker tape and
protection tiles etc. as per Kahra-maa latest QCS
specifications and shown on drawings.(Civil work
meassured elesewhere).

A 2Rx4C-150 mm2CU/ XLPE/SWA/PVC + 1x1C-150


mm2 PVC/ECC cables 67 m

B 4C-150 mm2CU/ XLPE/SWA/PVC + 1x1C-95


mm2 PVC/ECC cables 47 m

C 4C-95 mm2 CU/FIRE RATED CABLE + 1x1C-50


mm2 PVC/ECC cables 119 m

D 4C-50 mm2 CU/XLPE/SWA/PVC + 1x1C-25 mm2


PVC/ECC cables 69 m
Included
E 4C-50 mm2 CU/FIRE RATED CABLE + 1x1C-25
mm2 PVC/ECC cables 35 m

F 4C-16 mm2 CU/FIRE RATED CABLE + 1x1C-16


mm2 PVC/ECC cables 90 m

G 4C-10 mm2 CU/PVC/SWA/PVC + 1x1C-10 mm2


PVC/ECC cables 82 m

H 4C-6 mm2 CU/FIRE RATED CABLE + 1x1C-6


mm2 PVC/ECC cables 107 m

I 4C-4 mm2 CU/FIRE RATED CABLE + 1x1C-4


mm2 PVC/ECC cables 75 m

To Collection QR.
BOQ;Page 6/9/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BUILDERS WORK IN CONNECTION WITH ALL


ELECTRICAL INSTALLATIONS.

Excavating trenches for cables or ducts not


exceeding 2 m total depth including grading
bottom, earth work supports, part back filling with
selected excavated material, compacting and
removal of surplus excavated material from site as
per drawing number:

A Allow for excavation for minimum 600 mm deep for


direct buried electrical cables. 240 m

B Allow for trench minimum 600 mm depth for direct


buried elctrical feeder cables for Street Lights and
Earth cable. 160 m

PVC rigid pipe ducts and fittings including draw


wires left in; laid in trenches.

C 150 mm Diameter ducts for Electrical cables 70 m Included

ELECTRICAL MANHOLE

Electrical Manhole installed complete with


reinforced concrete bed, cover slab and wall; all as
specified and indicated on Drawing, allow for
excavation, disposal, protection, finishes etc. and
all builder's works.

D Electrical Manhole with heavy duty ductile iron


covers and frames to BS 497 ; internal size; 750
mm L x 750 mm W x 800 mm D; including
prepared openings for duct passing, Ref; Emh-1 2 No

To Collection QR.
BOQ;Page 6/9/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

EARTHING SYSTEM

Earthing and bonding shall be carried out


incompliance to BS-7430, QCS Section 21.22 and
Kahramaa Regulation. The work shall include
complete earthing installation including Earth bar,
Earth cable with test link connecting to earthing
network, earth electrode, earth pit, earth chamber
with cover, clips, raceways, fittings and all related
accessories as shown in the drawing.

A General Earthing for electrical Equipments, panels,


MCC's etc 1 Item Included

BONDING

B Allow for complete bonding to trunking, tray, water


heaters, equipment etc. in full compliance to
KAHRAMAA standards. 1 Item

To Collection QR.
BOQ;Page 6/9/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

LIGHTING INSTALLATION

Supply & install Outdoor pole lights completely


installed on a concrete base including concrete
base as required for light poles; power feeder
cabling from feeder pillar, GI pole with necessary
control gears, fittings and wiring from control gear
to the lamp as required with necessary earthing,
cable, connections as per specification, drawing &
engineer approval and with all accessories.

A Type W1; 16W LED Wall mounted light, 1844lm, IP-


65. 36 No

B Type PL1 55W LED Single Arm 8M Height pole


street light IP-65. 1 No
Included
C Type PL1 55W LED Double Arm 8M Height pole
street light IP-65. 2 No

Isolators as specified complete with steel supports,


sunshade and protection covers where necessary;
and wiring with 450 / 600 volt PVC insulated cable
to BS 6004/ BS 4607 in concealed or exposed
conduit or through trunking including all fittings
and necessary earthing.

D 16A TPN Isolator, IP-65. 1 No.

To Collection QR.
BOQ;Page 6/9/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BUILDERS WORK IN CONNECTION WITH ALL


ELECTRICAL/ELV INSTALLATIONS.

A Holes, chases, Cutting back, building in, provision


of pipe sleeves, fire barriers and making good
finishes as necessary. Item

B Allow for sleeves/ducts for encasing electrical


cables passing beneath roads, paved areas and
structures. Item

C Isolator supports, equipment supports, sunshades


including paint finishing and associated builders
work as necessary. Item

SUNDRIES IN CONNECTION WITH ALL


ELECTRICAL/ELV INSTALLATIONS.

D Marking the position of holes, mortises, chases and Included


the like in the structure. Item

E Plates, discs, labels, and charts for identification of


equipment, panel bords like. Item

F Loose keys, tools and spare parts as specified. Item

G Testing and Commissioning. Item

OTHER ITEMS

H Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i) Item

(ii) Item

(iii) Item

(iv) Item

(v) Item

To Collection QR.
BOQ;Page 6/9/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection:

Page 6/9/1

Page 6/9/2

Page 6/9/3

Page 6/9/4

Page 6/9/5

Page 6/9/6

Page 6/9/7

Page 6/9/8

TOTAL FOR ELECTRICAL INSTALLATIONS To Summary QR. 32,000.00


BOQ;Page 6/9/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 6/12


CCTV SYSTEM

Note: The work included in this section shall


include supply, installation, testing,
commissioning and setting to work of all items
which are necessary for the complete operational
CCTV and access control system including all
necessary cabling as outlined in the Drawings,
scope of work and in the specifications and shall
be carried out by a MOI-SSD approved
specialized Sub-Contractor as per MOI-SSD's
standard and regulations.
CCTV camera, accessories and equipments;
complete with fittings, flexible conduit, cable
connection to data outlet point with connector as
specified and shown in drawings no 3331-EC-B0-
G-002, 3331-EC-B0-6-001

A Outdoor Bullet Fixed camera 6 No.

B Outdoor PTZ camera 2 No.

C ANPR camera 2 No.

D Single RJ45 outlet for CCTV cameras 10 No.

Final connection to outlets including wiring (Cat Included


6A F/FTP), conduits and ancillary installations
complete; including containment and terminations
as necessary.

E To RJ45 Single Data outlet for CCTV cameras 10 No.

Allow for the following

F Allow for the plot boundary CCTV camera


connection to Showroom and Workshop building
respective CCTV rack as shown in schematic
diagram including all required civil works Item

G Allow for any other works which are necessary for


completion of CCTV system Item

To Collection QR.

BOQ;Page 6/10/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BUILDERS WORK FOR OOREDOO SYSTEM


NETWORK CABLING

Note : The works include under this section shall


comprise supply, installation, testing,
commissioning and setting to work for all items
which are necessary for a complete operational
Telephone System as outlined in the drawings
and in specifications and shall be carried out by a
OOREDOO/VODAFONE/ QNBN approved
specialized Sub-Contractor as per
QOOREDOO's/VODAFONE/QNBN standard and
regulations and as per drawings.(3331-EC-B0-G-
002)

Excavating trenches for telecom cables or ducts


not exceeding1.5 m total depth including grading
bottom, earth work supports, part back filling with Included
selected excavated material, compacting and
removal of surplus excavated material from site.

A Trench average 600 mm depth 2 No. 90 mm


diameter duct. 72 m

Plain in-situ concrete Grade SRC 20.

B Beds and surrounds 150 mm thick to 2 No.ducts


90 mm diameter. 72 m

OOREDOO/VODAFONE/QNBN Approved LSF


rigid pipe ducts and fittings including draw ropes
inside as specified; laid in trenches.

C 90 mm diameter ducts 144 m

To Collection QR.

BOQ;Page 6/10/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

TELECOM NETWORK CABLING


(Cont..)

Underground jointing / draw boxes; complete


including all internal accessories, covers,
finishes; allow for excavation, disposal,
protection etc., complete as per OOREDOO/
VODAFONE/QNBN standards and
regulations

A Jointing / draw box, Type JRC-12 2 No. Included

B Allow for the service provider tie-in from the


Main telecom room(Service Provider)
including fiber optic cables and all necessary
terminations.
Item

To Collection QR.

BOQ;Page 6/10/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BUILDERS WORK FOR ELV NETWORK


CABLING.

Note : The works include under this section


shall comprise supply, installation, testing,
commissioning and setting to work for all
items which are necessary for a complete
operational CCTV System as outlined in the
drawings and in specifications and shall be
carried out by a MOI approved Contractor as
per MOI standard and regulations and as
per drawings. (3331-EC-B0-G-002)

ELV Manhole installed complete with


reinforced concrete bed, cover slab and wall;
all as specified and indicated on Drawing;
allow for excavation, disposal, protection, Included
finishes etc. and all builder's works.

A ELV Manhole with heavy duty ductile iron


covers and frames to BS 497 ; internal size
600 mm L x 600 mm W x 850 mm D;
including prepared openings for duct
passing 4 No

Excavating trenches for cables or ducts not


exceeding 1.5 m total depth including
grading bottom, earth work supports, part
back filling with selected excavated material,
compacting and removal of surplus
excavated material from site as indicated in
Drawings

B Trench average 600 mm deep for 4 No. 100


mm diameter ducts, for duct bank. 108 m

C Trench average 600 mm deep for 1 No. 50


mm diameter ducts, for duct bank. 135 m

To Collection QR.

BOQ;Page 6/10/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

CCTV NETWORK CABLING (Cont..)

Plain in-situ concrete Grade SRC 20.

A Beds and surrounds 150 mm thick for 4


Nos. 100 mm diameter ducts in trenches, for
duct bank. 81 m

B Beds and surrounds 150 mm thick for 1


Nos. 100 mm diameter ducts in trenches, for
duct bank. 12 m Included

C Beds and surrounds 150 mm thick for 1


Nos. 50 mm diameter ducts in trenches, for
duct bank. 41 m

Approved PVC rigid pipe ducts and fittings


including draw wires left in; laid in trenches.

D 100 mm diameter ducts 391 m

E 50 mm diameter ducts 150 m

To Collection QR.

BOQ;Page 6/10/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

A Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what so
ever.

(i)
Item

(ii) Item Included

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 6/10/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection

Page 6/10/1

Page 6/10/2

Page 6/10/3

Page 6/10/4

Page 6/10/5

Page 6/10/6

TOTAL FOR ELV INSTALLATIONS To Summary QR 14,000.00

BOQ;Page 6/10/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE MISCELLANEOUS WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

BILL NO. 6/11


MISCELLANEOUS WORKS

WHEEL STOPPER

Precast concrete wheel stopper; fix to pavior


surface with M20 stainless steel built-in fixing
studs and anchor bolt; include for grounting and
all builder's works and fixing accessories as
required on site, all as shown on Drawing
details 3331-AR-B0-5-001-02

A Wheel stopper; size 1800 x 150 x 150 mm high. 5 No

POTABLE WATER TANK PLINTH

Plinth for watertank all works includiing


excavation
,backfilling,shuttering,reinforcement,concretewor
k,protection,waterproofing etc as required on
site, all and as shown on Drawing details 3331-
AR-B3-1-001-01

B Tank plinth; size 9300 x 2500. 1 No Included

GUARD ROOM PLINTH

Plinth for Guardroom (supplied by client) all


works includiing excavation ,backfilling
,shuttering,
reinforcement,concretework,protection,waterpro
ofing etc all as required on site,and all as
shown on Drawing details 3331-AR-B3-1-001-
01& 3331-ST-B4-1-001

C Tank plinth; size 2200 x 1800. 1 No

TENSILE SHADE

Tensile shade with foundation ; all works


includiing excavation ,backfilling etc all as
required on site,and all as shown on Drawing
3331-AR-B3-1-001-01

D Tensile shade for external Pump and potable


1 No
tank-1

To Collection QR.

BOQ;Page 6/11/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE MISCELLANEOUS WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

OTHER ITEMS

Allow for any items necessary for the proper


completion of the works in this section of, but not
covered else where in the BOQ whether arising
from the quantum of work, specification or
condition of contract or any other matters what
so ever.

(i) Item

(ii) Item Included

(iii) Item

(iv) Item

(v) Item

To Collection QR.

BOQ;Page 6/11/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE MISCELLANEOUS WORKS

Item Description Quantity Unit Rate (QR) Amount (QR)

Collection :

Page 6/11/1

Page 6/11/2

TOTAL FOR MISCELLANEOUS WORKS To Summary QR 00.00

BOQ;Page 6/11/3
BILL 6 - EXTERNAL WORKS

SUMMARY

Item Description Reference Amount (QR)

1 SITE GRADING WORKS Page 6/1/3 00.00

2 HARD LANDSCAPING AND FEATURES Page 6/2/4 38,000.00

3 ROAD WORKS Page 6/3/4 144,000.00

4 SOFT LANDSCAPING Page 6/4/3 22,000.00

5 BOUNDARY WALL AND GATE Page 6/5/3 180,000.00

6 SURFACE DRAINAGE WORKS Page 6/6/4 27,000.00

7 SITE PLUMBING AND DRAINAGE WORKS Page 6/7/4 14,000.00

8 SITE IRRIGATION WORKS Page 6/8/3 12,000.00

9 SITE ELECTRICAL WORKS Page 6/9/9 32,000.00

10 SITE ELV WORKS Page 6/10/7 14,000.00

11 MISCELLANEOUS WORKS Page 6/11/3 -

To General Summary
TOTAL COST FOR BILL 6- EXTERNAL WORKS (QR)
QR
483,000.00

BOQ;Page 6/12/1
GENERAL SUMMARY
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ GENERAL SUMMARY
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING

Item Description Page Reference Amount (QR)

GENERAL SUMMARY

1 PRELIMINARIES Page 1/11 287,000.00

2 PROPOSED SHOW ROOM Page 2/16/1 2,875,643.00

3 PROPOSED WORKSHOP Page 3/14/1 2,276,333.00

4 PROPOSED IRRIGATION WATER TANK Page 4/4/1 48,000.00

5 PROPOSED STORM WATER TANK Page 5/4/1 152,000.00

6 EXTERNAL WORK Page 6/12/1 483,000.00

GROSS AMOUNT FOR PROPOSED SHOWROOM,


OFFICES & WORKSHOP @AL WAKRAH FOR AL 6,121,976.00
BADI TRADING & CONTRACTING : CARRIED TO
FORM OF TENDER (QR)

DISCOUNT (221,976.00)

FINAL OFFER FOR PROPOSED SHOWROOM, OFFICES


& WORKSHOP @AL WAKRAH FOR AL BADI TRADING & 5,900,000.00
CONTRACTING : CARRIED TO FORM OF TENDER (QR)

BOQ : Page GS/1