Final Proposed Boq - Workshop - Wakra 16.07.2024
Final Proposed Boq - Workshop - Wakra 16.07.2024
TENDER DOCUMENTS
REV. 0
04 – 06 – 2020
DESIGN CONSULTANT
BILL OF QUANTITIES
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING
NOTES ON PRICING AND BILL OF QUANTITIES
INDEX
3 WORKSHOP
Tenderers shall check the tender documents provided and shall initial this page in
acknowledgment that all of the pages listed and all of the drawings and other documents
referred to have been allowed for in preparing this tender.
INDEX
4 UG IRRIGATION TANK
6 EXTERNAL WORKS
Tenderers shall check the tender documents provided and shall initial this page in
acknowledgment that all of the pages listed and all of the drawings and other documents
referred to have been allowed for in preparing this tender.
INDEX
Tenderers shall check the tender documents provided and shall initial this page in
acknowledgment that all of the pages listed and all of the drawings and other documents
referred to have been allowed for in preparing this tender.
NOTES ON PRICING
Page NOP/1
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Contents
1. GENERAL ............................................................................................................................ 3
2. DEMOLITIONS AND ALTERATIONS .................................................................................. 6
3. EXCAVATION AND EARTHWORK ..................................................................................... 6
4. CONCRETE WORK ............................................................................................................. 8
5. BLOCKWORK .................................................................................................................... 10
6. ROOFING .......................................................................................................................... 11
7 CARPENTRY AND JOINERY ............................................................................................ 11
8. STRUCTURAL STEELWORK ........................................................................................... 13
9. METALWORK .................................................................................................................... 13
10. PLUMBING AND ENGINEERING ...................................................................................... 15
11. VENTILATING AND AIR CONDITIONING ........................................................................ 19
12. ELECTRICAL INSTALLATION .......................................................................................... 24
13. FINISHINGS....................................................................................................................... 29
14. GLAZING .......................................................................................................................... 30
15. PAINTING AND DECORATING ........................................................................................ 30
16. DRAINAGE ........................................................................................................................ 30
17. EXTERNAL WORKS ........................................................................................................ 31
18. ROAD WORKS .................................................................................................................. 32
19. EXTERNAL ENGINEERING .............................................................................................. 32
20. POWER SUPPLY AND DISTRIBUTION ........................................................................... 36
Page NOP/2
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
1. GENERAL
A. This Bills of Quantities have been prepared in accordance with the Standard Method of
Measurement of Building Works dated 28th February 1973 (25th Muharram 1393) issued by
the Ministry of Public Works, State of Qatar (hereinafter referred to as the QSMM). However,
this is not so in every respect and each and every departure from the QSMM has not been
individually highlighted. The method of measurement therefore as expressed in these
documents must be accepted where applicable. The reference numbers attached to each
Bill of Quantities refers to the applicable Specification Section reference number.
B. The Contractor should note that Bill No.1 – Preliminaries is for the complete works.
C. Notwithstanding the provisions of the several sections of the QSMM some of the general
items to each section have been included as an item in the pricing sections of these Bills of
Quantities. The remaining are deemed to be included within the rates and prices given.
D. The Contractor shall price every item in the pricing sections of the Bills of Quantities. Any
item left un-priced shall be deemed to have been allowed for in the prices of other items. No
claim for payment in respect of un-priced items will be admitted. Lump sums set against
groups of items are not acceptable.
E. Descriptions of work and materials are not necessarily complete in the Bills of Quantities and
reference should be made to the Conditions of Contract, Specifications and to the Drawings
for this information. The prices inserted in the Bills of Quantities must be comprehensive and
should be the full inclusive cost of the work in every respect and of all general liabilities and
obligations set forth or implied in the documents on which the Tender is based. The
completed prices must truly reflect the value of the item described.
F. The rates and prices shall be deemed to include for all costs in respect of local religious
holidays and customs and the provision of all amenities customary in the State of Qatar.
G. The Notes on Pricing are to be read in conjunction with the item descriptions given in the
pricing sections of these Bills of Quantities and shall apply wherever relevant.
H. Rates and prices shall be deemed to include for engineering design for elements as stated in
specifications and drawings, which are Contractor designed.
Page NOP/3
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
I. The Quantities included in the Bills of Quantities are as estimated from the Drawings and are
included to assist the Contractor in the preparation of his Tender. Their accuracy is not
guaranteed. With regard to the priority of the several documents forming the contract as
stated within the first paragraph of Clause 6(2) – Documents Mutually Explanatory, of the
Conditions of Particular Application, Tenderers shall check the descriptions and quantities
and are given the opportunity during the Tender period to communicate any discrepancies,
ambiguities or omissions they find to the Engineer, who will issue a reply to such
communications if he considers appropriate, in the form of a circular letter or telex to all
Tenderers in accordance with Instructions to Tenderers. After the time and date fixed for the
submission of Tenders, the quantities stated in the Bills of Quantities (as may be amended
by circular letters/ telexes issued by the Engineer during the Tender period) will be taken as
the actual and correct quantities for the Works.
1.02 DEFINITIONS
A. The terms "plug", "plugged" and "plugging", shall be deemed to mean plugging concrete or
blockwork by an adequate permanent method of fixing suitable for the situation, material and
article to be fixed.
B. In the description of items for external services or drainage, the word "trench" shall be
deemed to include all excavating, grading bottoms, planking and strutting, backfilling,
compacting earth in layers not exceeding 150 mm thick and disposing of surplus spoil.
A. Monthly valuations shall certify payment for unfixed materials on site as provided for by
Clause 60 of the Conditions of Contract.
B. Eighty percent (80%) of the stated invoice value (as certified by the Contractor, including all
copies of the relevant invoices) of the unfixed materials at site for the permanent works
supplied by the Contractor but not yet incorporated into the permanent works, less retention
money. Such shall be included in the monthly payment subject to; in the opinion of the
Engineer, such material not having been supplied to construction site permanently and also
that they are adequately stored and protected in order to prevent deterioration or damage
while they are stored on construction site prior to incorporation into the permanent works.
C. The valuation so certified by the Engineer shall be the invoiced cost of the materials, if the
Engineer considers this cost to be realistic, plus any customs duty or other Qatar taxes paid
together with an allowance for port dues and delivery to and unloading at the Site. The
valuation for unfixed materials on site shall be the net reimbursement to the Contractor of the
cost of the materials delivered and unloaded at the site and as such shall be exclusive of any
profit or Contractor's overheads mark-up.
Page NOP/4
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
D. Notwithstanding the foregoing, such net reimbursement to the Contractor for unfixed
Materials on Site shall be less than the total price included by the Contractor in the
Bills of Quantities for both supplying and subsequently fixing the said materials, such that in
the Opinion of the Engineer, a reasonable and sufficient value is retained for payment to
the Contractor in subsequent monthly payments for permanently fixing the materials in
the Works. Maximum amount certified for the Materials on Site shall not exceed 70% of
the BOQ price for supply and fix.
E. Under no circumstances will the Engineer pay for items that are deemed to be consumables,
temporary works, in excess of net installed quantities required, or of minor/civil building
materials such as cement, sand, bar reinforcement, concrete masonry blocks, paints etc.
F. The Contractor shall make due allowance in pricing the Bills of Quantities to take account of
these clauses.
G. Formwork materials including all struts, timber or sheet boarding, all other timber work,
waffle moulds, proprietary shuttering systems and the like shall not be considered as
"unfixed materials on site" for the purposes of monthly valuations. Formwork shall be valued
in accordance with the preambles of the Preliminaries section as "plant" and/or as measured
work, once executed, in accordance with the rules of measurement and these notes.
1.04 PRELIMINARIES
A. Monthly payments for Preliminaries shall only be made for those costs which have been
properly incurred and for which the Contractor has inserted prices against the items in the
Bills of Quantities' Preliminaries Section. Payment for such shall be valued proportionally at
the same rate as the value of permanent work executed in any month bears to the total
value of permanent work included in the Contract.
B. In addition, at the Engineer's discretion and only where priced for by the Contractor in the
Bills of Quantities' Preliminaries section, the actual cost of certain Preliminaries items, for
example, the provision of bonds and insurances, the construction of temporary facilities on
site, etc., may be certified by the Engineer for payment in full when executed. Such
certification shall be the lesser value of:
either (1) The prices given by the Contract in the Preliminaries section of the Bills of
Quantities.
or (2) The net reimbursement to the Contractor of the actual cost incurred provided
always the Engineer considers such cost to be fair and realistic and such cost
shall be exclusive of any profit or Contractor's overhead mark-up.
Where (2) is less than (1) the balance shall be valued for interim payments proportionally
with the permanent works as previously described.
Page NOP/5
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
C. Plant, machinery, transport and other moveable items when provided on site and priced for
in the Bills of Quantities' Preliminaries section shall be valued proportionally with the
permanent work as previously described.
D. Monthly valuations shall certify payment for permanent works executed on site as provided
for by Clause 60 of the Conditions of Contract. No separate earlier payment shall be certified
by the Engineer or shall become due to be paid by the Client for the value of any
Preliminaries costs which may have been included by the Contractor in his rates and prices
for permanent works.
A. The rates for demolitions and alterations shall include for all shoring, scaffolding,
transportation, and removal and disposal incidental thereto.
Remove - shall mean the complete removal by any means at the Contractor's
option, having due regard to the surrounding structure. All incidental
holes, chases, etc., left after removal of an item shall be made good. In
the case of partitions and the like, the finishing shall be extended to
match existing.
Carefully remove - shall indicate that an item may be reused and the rate shall include for
overhauling or maintaining the item so that it will be acceptable when
relocated.
A. Measurement for all excavation and filling shall be net and no allowance shall be made for
bulking and working spaces.
B. The Contractor shall take and accept all responsibility for the character of the ground and no
extra price will be allowed for excavating in rock, surface concrete, reinforced surface
concrete, paving flags, tarmacadam, loose rocks, debris, rubble, boulders, loose stones, old
foundations, running sand, mud, running water, high water table, etc.
C. Excavation and earthwork has been measured based upon existing ground levels as shown
on the drawings. The Contractor shall satisfy himself as to the accuracy of these levels and
is to allow in his rates for any discrepancies in levels.
D. The Contractor, when and where he considers it expedient to do so, and at the discretion of
the Engineer, may lay an approved filling as required prior to final setting out and excavation
works. In the event of the Contractor adopting this procedure no payment will be made for
excavation in the filling whether compacted or not, and the Contractor shall make due
allowance for this in his rates.
Page NOP/6
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
F. The rates for surplus soil removed from the site are to include for dumping at an approved
Government trip and all charges in connection therewith.
iii. Allowance for working space and extra space required for earthwork support and
formwork,
vii. Keeping excavations free from all water, howsoever arising, by pumping, temporary
drainage or other suitable means,
H. The Contractor shall be deemed to have included for excavating to found on suitable bearing
strata as approved by the Engineer. Any additional excavation in soft or other material
unacceptable to the Engineer together with consequent backfill in mass concrete shall be
entirely at the Contractor's own cost.
J. Earth filling is measured in cubic metres as the volume placed after compaction.
K. The rates for filling and backfilling are to include for all costs incurred in obtaining material
from approved sources, multiple handling, loading, transporting, unloading, tipping, using
material arising from excavations including selecting and treating, or using imported filling
material placing, bringing up in stages and spreading and compacting as specified, trimming,
grading and all other labours necessary to ensure that the filling material is correctly placed
to level and profile and to the required degree of compaction.
L. The cost of dewatering site and excavated trenches due to rain or ground water is deemed
to be included in the unit rates.
Page NOP/7
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
4. CONCRETE WORK
Designing mixes,
Day joints (construction joints) and joints required in the forming of bays including
formwork and treatment of reinforcement crossing the joint,
All labours on concrete including working around pipes or cables, cutting channels,
chases, mortices, pockets and holes and including subsequent grouting or filling and
making good.
B. Concrete blinding has been stated as a nominal thickness. The Contractor is to allow in his
rates for any additional thickness of blinding due to site conditions, over excavation etc.
C. The rates for all reinforcement shall include for rigidly fixing the reinforcement in position and
for all necessary chairs, spacers and other supports required to hold the reinforcement.
D. The rates for concrete shall include for hoisting to any height or lowering to any depth,
compaction by vibrators as required, curing, hacking surfaces for key, all surface treatments
to unset concrete except trowelling, cutting and forming holes for pipes and the like, building
in pipe sleeves, forming and grouting mortices (other than mortices for anchor bolts) and
making good concrete in connection with holes and mortices.
E. The rates for rod reinforcement shall include for preparing schedules for bar bending,
hoisting to any height or lowering to any depth, placing in any position, straightening as
necessary, cutting to lengths, bending to required shapes, tying wire, distance blocks
spacers.
Page NOP/8
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
F. The rates for fabric reinforcement shall include for hoisting to any height or lowering to any
depth, placing in any position, all cutting, distance pieces, bending, holes, notching, tying
wire, chairs, spacers and the like, tying at laps and cost of material in laps.
G. Quantities of reinforcement have been assessed on the basis of weight of reinforcement per
cubic meter of concrete. The Contractor shall deem to have made his own assessment of
the quantities of reinforcement from the details given on the Drawings and to have made due
allowance in his rates for the actual quantities of reinforcement required for the works.
I. The rates for formwork shall include for design and construction, all props, struts, stays,
wedges, bolts, all cutting, labours at intersections and overlaps, passing at angles, cutting
and fitting around projections and pipes, any number of concrete members, any number of
separate surfaces in each member, any profile of beam, column up-stand projection or
recess including formwork to ends of such, all stops, chamfers not exceeding 50 mm wide,
splayed internal angles not exceeding 15 mm wide, mould oil, strutting and supporting
formwork any width or height and for easing, striking and removal.
J. The rates for curved formwork shall include for formwork to curved, conical, spherical,
elliptical and other surfaces curved to one or more radius of any radius or radii.
K. The rates for forming channels, chases and kerbs shall include for ends, angles,
intersections and outlets.
L. The rates for precast concrete shall include for all moulds; finishing fair on all exposed faces;
square, rounded and stooped ends, rounded nosing and edges, rebates, angles and ends to
kerbs, etc., holes or notching for pipes, etc., and hoisting, and bedding in position.
M. Expansion joint filler material is measured in square metres, the rates are to include for
sheet material filler, formwork, horizontal, sloping and/or vertical work, any width or depth of
joint.
N. Each type of water bar is measured separately in metres and is deemed to include for all
horizontal, vertical, sloping and curved work, ends angles intersections irrespective of
whether standard, welded or purpose made.
O. Each type of joint sealant is measured separately in metres and is deemed to include
horizontal, vertical sloping and/or curved work, the preparation of surfaces, cleaners,
primers, sealers, backing strips and bond breakers.
P. Damp proof membranes and/or coatings are measured in square metres, measured as the
area in contact with base; no deduction is made for voids less than 1.00 m2.
The rates shall include for:
Page NOP/9
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Q. Concrete, reinforcement and formwork quantities pertaining to sunken slabs are included in
the concrete quantities measured in the BOQ.
5. BLOCKWORK
A. Rates for all blockwork shall include for hoisting to any height or lowering to any depth; for
setting in mortar and bonding and cutting including that at irregular angles; for tying at
junctions, abutments and intersections with galvanized steel ties and expanded metal ties as
necessary; for wedging, pinning up to soffits and toothing and bonding to other blockwork;
for building at or to any height of slabs and beams; for raking out joints or cutting grooves in
edges of flashings; for bedding and pointing plates, frames and corrugated sheeting and for
building in door and window frames and the like; for building in or cutting and pinning ends of
lintels, bearing bars, step, timbers, metal sections and the like; for all sundry items such as
cutting or forming holes, mortices, sinkings, chases and the like for any purpose; and for
generally performing all cutting away and making good for all trades.
B. Rates shall also include for use of solid and purpose-made blocks where required and for
adjustments as to the heights of blocks to provide support to lintels, etc., with the minimum
of cutting.
C. Rates shall also include for expansion joints, movement joints and the like including filler
material and pointing.
D. Rates shall also include for fabric or rod reinforcement in walls as required.
E. The rates for hollow blockwork shall include for filling the cavities solid with mortar or
concrete at jambs, end angles, intersections, sills and adjacent to false ceiling perimeters
together with expanded metal support strips and rod reinforcement as required.
Page NOP/10
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
6. ROOFING
A. The rates for slate or tile roofing shall include for all cutting, holes for pipes, standards and
the like, cut courses at eaves, all cutting and bonding at eaves, verges, valleys, hips and
ridges and fitted, filled or fair ends, angles and intersections to hips and ridges and forming
small openings.
B. The rates for corrugated or troughed sheet roofing shall include for all cutting, fixings,
sealing, laps at sides and ends, holes for pipes, standards and the like, and fitted, filled or
fair ends, angles and intersections to hips, ridges, angles, capping or barge boards and
forming small openings.
C. The rates for roof decking and wall cladding shall include for all cutting; for strip sealant at
joints, intersections and at junctions of decking and cladding with adjacent surfaces; and for
holes for pipes, standards and the like and forming small openings.
D. The rates for bitumen-felt, acrylic fibre or other similar bituminous and elastomeric sheet or
roll type roofing shall include for primers, bonding compounds and adhesives, cutting,
notching, bending and lapping, holes for pipes, standards and the like, angles, ends, extra
felt for laps and turning into grooves, forming ends and angles to flashing, skirting, aprons,
gutters, valleys, kerbs and channels, and forming small openings.
E. The rates for metal roofing shall include for all cutting; notching and bending, ends angles
and intersections to rolls, hollows, condensation channels and mouldings and for forming
small openings.
F. The rates for all sheet metal flashings and gutters shall include for angles, intersections,
ends, extra material in laps, seams, passings at ends, dressing to outlets and ends, angles
and intersections to cappings, hollows, channels and mouldings; and for painting with
bituminous paint where in contact with mortar, concrete, blockwork, etc. and other alkaline
surfaces.
G. Notwithstanding the provisions of the Qatar SMM, sheet metal flashings, fittings, etc. where
associated with proprietary troughed sheet roofing have been described as standard
components or assemblies as supplied by the manufacturer.
7.01 CARPENTRY
A. The rates for all carpentry work shall include for all raking and circular cutting; joints in
continuous lengths of timber or for providing timbers of any length; all joints; notching and
fitting ends of timbers to metal sections, shoes and heads; mitres, ends and intersections on
all members; holes for pipes, tubes, bars, cables, conduits, ducting, trunking and the like
and for pads, slips and wedges built or wedged in.
B. The rates for rebates, grooves, chamfers, rounded edges, moulded edges and the like
labours shall include for all cross grain and stopped work and all stops, angles and mitres.
Page NOP/11
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
C. The rates for roof boarding shall include for all cutting at intersections on work to cross-falls
and all notches, rounded corners and the like.
D. The rates for carpenter's metalwork shall include for preparing timber for metal (e.g., sinking,
grooving, etc.).
E. The rates for bolts and connectors shall include for holes and countersunk holes and for
plating if required.
7.02 JOINERY
i. Labours on woodwork are not measured separately (SMM P1.f, P5, P10, P18, P30
and P38).
ii. Fittings and fixtures are not measured in detail but are enumerated (SMM P37, P40).
iii. Bolts and similar fixings are not measured separately (SMM P51).
iii. Splayed, rounded or moulded angles, ends, grooves, rebates and the like.
iv. Holes, chamfers, notches, sinking, fitted and fair ends, drilling, countersinking and
plating.
v. Scribing to backgrounds and edges and cutting and fitting around obstructions.
vi. Nails, screws, bolts, dowels, cramps, adhesives and other jointing and fixing
accessories.
vii. Plugging or drilling and tapping to backgrounds and making good surfaces disturbed.
Page NOP/12
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
C. The rates for doors, skylights, sashes and casements are to include for fitting and hanging
any type.
D. The rates for handrails shall include for all heading joints, quadrants, ramps and wreaths.
i. Manufacture and packing at works or on site in sections suitable for handling and
fixing and applying primer or clear protective finish prior to delivery or fixing,
ii. Site fixing including assembling, temporary fixing and final adjustment and any
packing or cover strips required to make the component fully functional.
F. Rates for ironmongery are to include for fixing to any surface and for all screws and other
fixings and fittings, fixing, including temporary fixing, removal prior to painting and like
operations, re-fixing and final adjustment and making good.
8. STRUCTURAL STEELWORK
A. The rates for structural steelwork shall include for cutting ends of members; cutting to dead
lengths; all cutting on plates, welds; notchings; splay cutting; bevel cutting; cranks; splice
plates; bolts (except anchor bolts); rivets; holes; countersunk and tapped holes; and driving
rivets and counter sinking heads
B. The items and rates for anchor bolts shall be deemed to include building-in temporary boxing
and grouting.
9. METALWORK
A. Notwithstanding the provisions of the SMM, composite units are enumerated and are not
measured in detail.
iii. Manufacture and packing at works in sections suitable for transportation and
handling on site, including cutting, grinding, assembling, welding, riveting and bolting
and application of works applied finishes,
iv. Fixing on site, including temporary fixing and final adjustment, assembling
components, site drilling, countersinking, riveting or welding, screws, bolts and other
fixing components, plugging or drilling backgrounds for fixing, grouting into mortices,
holes or pockets, anchors, and the like fixings, bedding and pointing and making
good damage to works applied finishes.
Page NOP/13
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
v. All cutting, ends, angles, intersections, ramps and wreaths on frames, handrails, core
rails, arch bars, bearers, stays and the like, assembling and jointing together, all
holes for pipes, tubes, cables, conduits and the like and all other holes, countersunk
holes, tapped holes, slots and the like.
C. The rates for windows, doors and the like are deemed to include for:
frames, mullions, transoms, sills, louvers, doors, opening portions and insect
screens, where supplied with the unit,
glazing beads, gaskets, weather-strip, flashings, architraves, trims and the like
accessories, where supplied with the unit,
Extra studding and framing where required in ceiling voids to provide top fixing for
screens etc.
D. The rates for metal skirting, duct covers and shall include for all angles, intersections and
ends.
E. The rates for bolts and countersunk bolts shall include for holes and countersunk holes.
Page NOP/14
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
10.01 GENERALLY
A. Notwithstanding the SMM Plumbing and Engineering shall be measured and priced in
accordance with following rules.
Assembling and jointing together component parts of composite units and providing
connecting flanges and jointing material,
Disconnecting, setting aside and re-fixing equipment for the convenience of other
trades,
Priming or painting off site and proprietary finishes or surface treatment applied as
part of the production process,
Painting on site,
Bedding and pointing components or units of equipment, ancillaries and the like,
Page NOP/15
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Preparing instruction manuals and spare parts lists and submitting required number
of copies,
10.02 PIPEWORK
A. Each kind of pipe is given separately, stating the standard to which it complies.
B. Each diameter of pipe is given separately. Diameters stated are nominal diameters.
C. Pipes are given in metres measured the length over all fittings and branches, fittings on
pipes not exceeding 160 mm diameter are deemed to be included in the rates.
Labours on pipes,
Screwed sockets, tapping, bosses and welding necks welded to pipes or flanges
including perforating the pipe or flange,
Page NOP/16
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Laying and fixing in ducts, trenches and chases or embedded in insitu concrete or
screeds,
A. Each type of accessory is given separately. Diameters, dimensions and details are stated in
descriptions, where necessary, to identify the work.
D. Floor cleanouts, floor drains, roof drains and other drains, vent cowls, back flow preventions
and the like are each given separately.
E. Gratings and frames, where not included with the items to which they relate, are given
separately.
F. Isolating valves, balancing valves, pressure relief valves, automatic air valves, traps and the
like are each given separately.
G. Automatic air valves and the like are deemed to include associated isolating valves.
H. Connections to existing services and breaking into existing pipes are each given separately.
A. Manholes, inspection chambers, valve boxes and the like underground structures are each
given separately.
B. Each type is given separately. Dimensions and details are stated in descriptions, where
necessary, to identify the work.
Page NOP/17
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
A. Each kind of equipment (including plumbing fixtures) and ancillaries is given separately,
stating the size and pattern, rated duty, capacity, loading etc. as appropriate. Diameters and
dimensions are stated in descriptions, where necessary, to identify the work.
Electrical connections,
10.06 INSULATION
Page NOP/18
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Protective covering,
Special protection or finish at openings through walls, valve chambers and the like,
Insulation boxes,
Cutting or leaving holes, chases and mortices in the structure for all services and
making good after
Cutting and fitting and making good all finishes around pipes, fittings and the like
Provision of brackets, bases, supports and the like for all equipment
All other work reasonably to be inferred in connection with the plumbing installations.
B. Work is deemed to include all electrical work shown on the Drawings, Described in the
specification or reasonably to be inferred as necessary for the proper execution of the
plumbing work.
11.01 GENERALLY
A. Pipe work and accessories, ductwork and accessories, equipment ancillaries, insulation and
other ventilating and air conditioning work are each given separately.
Page NOP/19
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Pipe work,
Piping accessories,
Ductwork,
Air outlets,
Condensing units,
Insulation,
Electrical work
Working internally,
Assembling and jointing together component parts of composite units and providing
connecting flanges and jointing material,
Disconnecting, setting aside and re-fixing equipment for the convenience of other
trades,
Priming or painting off site and proprietary finishes or surface treatment applied as
part of the production process,
Bedding and pointing components or units of equipment, ancillaries and the like,
Preparing instruction manuals and spare parts and submitting required number of
copies,
Page NOP/20
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
11.02 PIPEWORK
A. Each kind of pipe is given separately, stating the standard to which it complies.
B. Each diameter of pipe is given separately. Diameters stated are nominal diameters.
C. Pipes are given in meters measured the length over all fittings and branches.
Labours on pipes,
Flanges, unions
Screwed sockets, tapping, bosses and welding necks welded to pipes or flanges
including perforating the pipe or flange,
Expansion loops,
Laying and fixing in ducts, trenches and chases or embedded in in-situ concrete or
screeds,
Page NOP/21
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
A. Each type of accessory is enumerated separately. Diameters, dimensions and details are
stated in descriptions, where necessary, to identify the work.
11.04 DUCTWORK
A. Each kind of ducting is given separately stating the type of material, length and cross section
of each duct piece.
Weight of any materials required for seams or welds or for stiffening or jointing,
Providing materials, heat, bolts, nuts, washers and everything necessary for making
joints in ducting,
11.05 ACCESSORIES
A. Each kind of equipment and ancillaries is enumerated separately, stating the size and
pattern, rated duty, capacity, loading etc. as appropriate.
Page NOP/22
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Electrical connections,
Insulation and jacketing for refrigerant piping and including providing detachable
mattresses and working insulation around special fittings and for ancillaries,
Loose keys, tools, spares (where specified) and the like and racks for holding tools.
11.07 INSULATION
Protective covering,
Special protection or finish at openings through walls, valve chambers and the like,
A. Builder's work in connection with ventilation installation is given as an item. Work is deemed
to include:
Page NOP/23
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Cutting and fitting and making good all finishes around pipes, fittings and the like
Provision of brackets, bases, supports and the like for all equipment
All other work reasonably to be inferred in connection with the ventilation installation
B. Electrical work in connection with ventilation installation is given as an item, except for motor
control centres and panels which are enumerated, stating the type.
C. Work is deemed to include all electrical work shown on the Drawings, Described in the
Specification or reasonably to be implied as necessary for the proper execution of the
ventilating work.
Co-ordination with other trades including minor approved modifications and additions
to ensure compatibility,
Minor items and accessories required for normal operation and maintenance,
Assembling and jointing together component parts of composite units and providing
any necessary jointing materials,
Priming or painting off site and proprietary finishes or surface treatments applied as
part of the manufacturing process,
Fire sealants,
Page NOP/24
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
A Each kind of distribution board is given separately, stating the reference of equipment.
Fixing and support and materials required for installation of wall or floor mounted
equipment as indicated,
A Each kind of wire and cable is given separately (except where required to be included with
other items), stating the type, size and method of installation.
B Wires and cables are given in metres, measured the net length.
Conduits and fittings, draw wires and the like (except where conduit work is required
to be measured separately),
Cable connectors and cable joints (where permitted) including joint boxes, sealing
boxes, shrouds and the like and materials and heat for making the joints,
Allowance in cable length for cables entering fittings and accessories, equipment or
control gear,
Necessary components and accessories for fixing cables on walls, ceilings and on
cable trays.
A Conduits are not measured separately, but are included with items of cables, lighting fittings
etc.
Page NOP/25
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Adaptors and connections between trunking and items of equipment of control gear
requiring the use of flanges and/or the forming of apertures,
A Each kind of earthing system is given separately as an item, stating the type and details, as
appropriate.
B Work is deemed to include a complete system, excluding protective earthing conductors run
with branch circuit wiring and protective earthing cables run with main and sub-feeders
which are required to be measured separately or included with other items.
Outlets,
Lamps,
A Each kind of wiring device including socket outlets, electrical outlets, switches, disconnecting
switches and the like is given separately (except where stated as included with other items),
stating the type and/ or rating.
Outlets,
Page NOP/26
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Outlets,
Chime
Each item of equipment is enumerate, work is deemed to include for wires, conduits
and all fixing and other accessories
Outlet box,
Telephone cabling are enumerated and are deemed to include for all terminations, glands,
protections and all other accessories.
Outlets box, Pull wires, junction boxes, conduits or other raceways, from location of
outlet box back to junction box and then to the pull box.
Television cabling are enumerated and are deemed to include for all terminations,
glands, protections and all other accessories.
Page NOP/27
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Sundries to all electrical work are given as items for the following:
A Testing and commissioning putting into satisfactory operation and handing over complete
systems
B Provision of maintenance and operation manuals and submitting required number of copies
C Preparing shop and construction drawings and providing the required number of copies of
“as built’ drawings of the electrical installation (plans or diagrams) as detailed in the
specification,
D Plates, labels and tags for the identification of equipment cables, switches and the like,
E Marking the positions of holes, mortices, chases and the like in the structure,
A Builder's work in connection with electrical installations is deemed to include for all builder’s
work which is not specifically included in the relevant item of electrical work, including:
Underground ducts with all fittings and concrete surrounds, (are given in metres)
where appropriate an the like
All other work reasonably to inferred in connection with all electrical installations
Cutting away for and making good all disturbed work are enumerated as electrical
points, including cutting or leaving all holes, notches, mortices, sinkings and chases
in both the structure and its coverings, also for all making good to them,
Outlet points: flex outlets with associated DP switch point, connection unit outlets,
telephone and TV outlet boxes etc.
Page NOP/28
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Equipment & Control-gear points: distribution boards, chime isolating switches, etc.
13. FINISHINGS
iii. Fair edges, chamfered, rounded or moulded edges and angles, grooves,
flutes and the like,
iv. Cutting and fitting or working around pipes, conduits, ducting, brackets,
gratings, ventilators, fittings and the like, and laying in recessed covers.
iii. Angle beads, plaster stops and features beads, expanded metal reinforcing
strips at junctions of differing backgrounds.
D. Rates for tile and slab finishes are to include for laying to any pattern.
E. The rates for beds and backings shall include for forming key and all labours.
F. The rates for lathing, baseboard and suspended plain sheet linings with supporting metal
work and fibrous plaster shall include for all labours and cutting.
i. Setting out and fixing to grid pattern shown on the Drawings or, if not shown, to
symmetrical grid in each room,
ii. Suspension system complete, including fixing grid and hangers to any surface and to
any length,
Page NOP/29
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
A. The rates for glazing shall include for all templates and cutting, method of glazing including
providing glazing compounds, tapes, strips, gaskets, sealants, beads channel, aligning
adjacent panes of wired, patterned and decorating glass, and polished and bevelled edges
and drilling holes.
A. The rates for painting shall include for working to or at any height; internal or external work;
rubbing down between coats, work in multi-colours, cutting to line; opening edges of
windows and doors and work on additional surfaces exposed by such opening edges, hooks,
bolts and clips to sheeting and pipe clips, saddles, holderbats and the like.
B. The rates for painting on wood shall include for work on hardwood or softwood and for
knotting.
C. The rates for painting on manufactured board and wood shall include for surface filling.
16. DRAINAGE
A. The relevant rules for measurement and pricing for other sections of the Bills of Quantities
shall apply to these sections, as appropriate.
ii. Assembling pipes and couplings and connecting to fittings and valves,
iv. Cutting, machining, chamfering and the like of standard length pipes to
comply with the Specification,
vi. Temporary marker posts to locate the ends of pipes, branches, etc. for future
extensions,
C. Pipe trenches are measured as the depth from formation levels (i.e. excavated through filling
previously placed); if the Contractor excavates from existing ground level, the rates for
excavation are to allow for any additional temporary pipe protection or use of higher strength
Page NOP/30
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
pipes, where this method does not provide adequate protection during placing and
consolidation of filling material.
ii. Excavating for all pipe length, fittings, valves and thrust blocks,
A. The relevant rules for measurement and pricing for other sections of the Bills of Quantities
shall apply to this section, as appropriate.
Cutting and treating roots, pruning and the like, including anti dessicant and tree
would dressings
Planting including backfilling hole with planting soil and firming watering
Trunk wrapping
Labelling
Temporary protection
Page NOP/31
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
C. Paving and associated works have been measured net in accordance with local custom
in Qatar and as described in the Bills of Quantities. Rates shall include for all making
good and fair cutting around pipes, fence posts, bollards, stanchions and the like,
together with dishing to gullies or drainage to outlets and all ends, angles, ramps and
intersections.
D. The rates for kerbs, edgings, channels, blocks and the like shall include fair ends, cut
ends, and other joints and cutting.
Blockwalls,
A. The rates for bitumen macadam and the like flexible surfaces and the rates for paving flags
and the like tile paving shall include for fair edges, joints to existing works, dishing to gullies
and drainage outlets, ramps, channels and the like and making good around pipes, fence
posts, bollards, stanchions and the like.
B. The rates for kerbs, edgings, channels, blocks and the like shall include fair ends, cut ends,
and other joints and cutting, all making good and fair cutting around pipes, fence posts,
bollards, stanchions and the like, together with dishing to gullies or drainage to outlets and
all ends, angles, ramps and intersections.
A. The relevant rules for measurement and pricing for other sections of the Bills of Quantities
shall apply to these sections, as appropriate.
C. Each diameter of pipe is given separately. Diameters stated are nominal diameters.
E. Pipes are given in meters measured on the centre line between the inner faces of valve
chambers, manholes and inspection chambers and overall fittings.
Page NOP/32
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
ii. Assembling pipes and couplings and connecting to fittings and valves,
iv. Cutting, machining, chamfering and the like of standard length pipes to comply with
the Specification,
vi. Temporary marker posts to locate the ends of pipes, branches, etc. for future
extensions,
H. Pipe trenches are measured as the depth from formation levels (i.e. excavated through filling
previously placed); if the Contractor excavates from existing ground level, the rates for
excavation are to allow for any additional temporary pipe protection or use of higher strength
pipes, where this method does not provide adequate protection during placing and
consolidation of filling material.
ii. Excavating for all pipe length, fittings, valves and thrust blocks,
vi. Backfilling, compacting and levelling surfaces of trenches to finished level of adjacent
ground and removal of surplus excavated material,
Page NOP/33
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
K. Type of work, location, sizes and other details are given in descriptions to identify the work.
N. Each type of material in bedding, hunching and encasement to pipes is given separately.
Q. Work is given in meters, measured on the centre line between the inner faces of manholes,
inspection chambers, or overall fittings.
c. Waterproofing,
Page NOP/34
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
The relevant rules for measurement and pricing for other sections of the Bills of Quantities
shall apply to these sections, as appropriate, with the exception that fittings are given in
numbers for fittings above 100 mm nominal diameter and fittings on pipes of 100 mm
nominal diameter or less are deemed to be included in the rates.
ii. Assembling pipes and couplings and connecting to fittings and valves,
iv. Cutting, machining, chamfering and the like of standard length pipes to comply with
the Specification,
vi. Temporary marker posts to locate the ends of pipes, branches, etc. for future
extensions,
Pipe trenches are measured as the depth from formation levels (i.e. excavated through filling
previously placed); if the Contractor excavates from existing ground level, the rates for
excavation are to allow for any additional temporary pipe protection where this method does
not provide adequate protection during placing and consolidation of filling material.
x. Excavating for all pipe length, fittings, valves and thrust blocks,
xiv. Backfilling, compacting and level surfaces of trenches to finished level of adjacent
ground and removal of surplus excavated material,
Page NOP/35
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Notwithstanding the provisions of the Standard Method of Measurement the Power Supply
and distribution system shall be measured and priced in accordance with the following rules:
20.01 GENERAL
Co-ordination with other trades including minor approved modifications and additions
to ensure compatibility,
Minor items and accessories required for normal operation and maintenance,
Assembling and jointing together component parts of composite units and providing
any necessary joints materials,
Priming or painting off site and proprietary finishes or surface treatments applies as
part of the manufacturing process,
Marking the positions of holes, mortices, chases and the like as required,
Page NOP/36
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
Plates, labels and tags for the identification of equipment, cables, switches and the
like,
All other work reasonably to be inferred in connection with the Electrical Installation.
C. Earthing system:
Distribution panel earthing system is given as an item per panel including earth rods,
connection to water pipes, etc. as shown on drawings.
A. Each kind of cable is given separately (except where required to be included with other
items), stating the type, size and method of installation.
Item Coverage for uPVC Ducts in road crossings shall include the provision and installation
in each duct of a polypropylene draw wire, stopper and concrete marker pad of a type to be
approved by the Engineer,
Allowance in cable length for cables entering fittings and accessories, equipment or control
gear,
iii. Additional excavation for beds, surrounds, foundations and blinding as applicable.
Page NOP/37
Proposed showroom,offices and workshop @
Al wakrah for Al Badi Trading and Contracting Notes On Pricing
v. Keeping the excavations free form water, howsoever arising, including ground water.
vi. All excavation and backfilling carried out in trenches and pits by the Contractor in
excess of the net measurements described in the Contract.
vii. Backfilling.
ix. Compacting and levelling surfaces of trenches and excavations to finished level of
adjacent ground.
xi. Removal of soft spots below formation level of trenches and pits and backfilling with
either compacted desert fill or concrete as directed by the Engineer.
Page NOP/38
BILL OF QUANTITIES - 1.0 - PRELIMINARIES
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.1: PRELIMINARIES
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING
BILL NO. 1
PRELIMINARIES & GENERAL MATTERS
PRELIMINARIES
CONTRACT PARTICULARS
To Collection QR.
SPECIFICATION
PART 1. INTRODUCTION
Included
C 1.3 Standards Item
To Collection QR.
Specification (Cont'd)
PART 4. PROTECTION
PART 5. INTERFERENCE
To Collection QR.
Specification (Cont'd)
PART 7. SUBMITTALS
To Collection QR.
Specification (Cont'd)
PART 9. MATERIALS
To Collection QR.
Specification (Cont'd)
To Collection QR.
Specification (Cont'd)
To Collection QR.
Specification (Cont'd)
To Collection QR.
GENERAL MATTERS
Temporary Works
Authority approvals
To Collection QR.
Specified Requirement
Additional Items
Included
CONTRACTOR is deemed to have allowed for
compliance with the reminder of the provisions
of CONTRACT with respect to General Matters
which have a financial impact and inserted
below any provision, which in his opinion , attach
a financial consideration. CONTRACTOR to list
such provisions (CONTRACTOR to specify)
To Collection QR.
Collection
Page 1/1
Page 1/2
Page 1/3
Page 1/4
Page 1/5
Page 1/6
Page 1/7
Page 1/8
Page 1/9
Page 1/10
Excavate pits/trenches
Disposal
Filling.
TERMITE CONTROL
BOQ;Page 2/1/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK
OTHER ITEMS
(i) Item
(ii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 2/1/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK
Collection :
Page 2/1
Page 2/2
BOQ;Page 2/1/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
CONCRETE-SUBSTRUCTURE
G 1350 33,750.00
Steps and Ramps 25 m³
BOQ;Page 2/2/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
CONCRETE-SUPERSTRUCTURE
DECKING SLAB
BOQ;Page 2/2/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
REINFORCEMENT-SUBSTRUCTURE
REINFORCEMENT-SUPERSTRUCTURE
To Collection QR.
BOQ;Page 2/2/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
To Collection QR.
BOQ;Page 2/2/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
FORMWORK-SUBSTRUCTURE.
Included
E To vertical or battering sides of steps and 40 m²
ramps
FORMWORK-SUPERSTRUCTURE.
To Collection QR.
BOQ;Page 2/2/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
SUNDRIES
BOQ;Page 2/2/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
OTHER ITEMS
(i) Item
(ii) Item
(iii) Item
Included
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 2/2/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
Collection :
Page 2/1
Page 2/2
Page 2/3
Page 2/4
Page 2/5
Page 2/6
Page 2/7
BOQ;Page 2/2/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY AND PARTITION WORKS
PRE-INSULATED WALL
C 200 mm thick solid concrete block Parapet walls 175 m2 120 21,000.00
BOQ;Page 2/3/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY AND PARTITION WORKS
OTHER ITEMS
(i)
Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 2/3/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY AND PARTITION WORKS
Collection
Page 2/3/1
Page 2/3/2
BOQ;Page 2/3/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROOFING WORKS
Amount
Item Description Quantity Unit Rate (QR)
(QR)
BUILT-UP ROOFING
SURFACING
BITUMENOUS ROOF-COVERING
To Collection QR.
BOQ;Page 2/4/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROOFING WORKS
Amount
Item Description Quantity Unit Rate (QR)
(QR)
TESTING
BOQ;Page 2/4/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROOFING WORKS
Amount
Item Description Quantity Unit Rate (QR)
(QR)
OTHER ITEMS
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
Inlcuded
To Collection QR.
BOQ;Page 2/4/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROOFING WORKS
Amount
Item Description Quantity Unit Rate (QR)
(QR)
Collection
Page 2/4/1
Page 2/4/2
Page 2/4/3
BOQ;Page 2/4/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS
BOQ;Page 2/5/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS
PANTRY CABINET
VANITY COUNTER
BOQ;Page 2/5/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS
OTHER ITEMS
(i)
Item
(ii) Item
Included
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 2/5/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS
Collection
Page 2/5/1
Page 2/5/2
Page 2/5/3
BOQ;Page 2/5/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS
BOQ;Page 2/6/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS
GLASS DOOR
INTERNAL SIGNAGE
BOQ;Page 2/6/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS
BOQ;Page 2/6/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS
OTHER ITEMS
(i)
Item
Included
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 2/6/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS
Collection
Page 2/6/1
Page 2/6/2
Page 2/6/3
Page 2/6/4
BOQ;Page 2/6/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS
To Collection QR.
BOQ;Page 2/7/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS
PAINTING
FOUNDATION
To Collection QR.
BOQ;Page 2/7/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS
SUNDRIES
Drawings.
Guarantee.
Service provision
BOQ;Page 2/7/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS
OTHER ITEMS
(i)
Item
(ii) Item
(iii) Item
To Collection QR.
BOQ;Page 2/7/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS
Collection
Page 2/7/1
Page 2/7/2
Page 2/7/3
Page 2/7/4
BOQ;Page 2/7/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
BILL NO 2/8
RAINWATER INSTALLATION.
To Collection QR.
BOQ;Page 2/8/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
D Vent cowl; 82 mm 1 No
E Vent cowl; 50 mm 1 No
To Collection QR.
BOQ;Page 2/8/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
C Ref.SW3:Urinal 2 No.
To Collection QR.
BOQ;Page 2/8/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
P Janitor Mixer 1 No
To Collection QR.
BOQ;Page 2/8/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
To Collection QR.
BOQ;Page 2/8/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
To Collection QR.
BOQ;Page 2/8/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
WATER HEATERS
To Collection QR.
BOQ;Page 2/8/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
WATER TANKS
To Collection QR.
BOQ;Page 2/8/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
SUNDRIES
OTHER ITEMS
Included
F Allow for any items necessary for the proper
completion of the works in this section of, but not
covered else where in the BOQ whether arising from
the quantum of work, specification or condition of
contract or any other matters what so ever.
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 2/8/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
COLLECTION
Page 2/8/1
Page 2/8/2
Page 2/8/3
Page 2/8/4
Page 2/8/5
Page 2/8/6
Page 2/8/7
Page 2/8/8
Page 2/8/9
BOQ;Page 2/8/10
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING
BILL NO 2/9
FIREFIGHTING WORKS
B Fire blankets. 1 No
To Collection QR.
BOQ;Page 2/9/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING
OTHER ITEMS
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 2/9/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING
COLLECTION
Page 2/9/1
Page 2/9/2
BOQ;Page 2/9/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
BILL NO 2/10
HVAC INSTALLATIONS
To Collection QR.
BOQ;Page 2/10/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
A ODU - 42.7KW 1 No
Included
VRF INDOOR UNITS
HIGHWALL UNIT
To Collection QR.
BOQ;Page 2/10/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
VENTILATION EQUIPMENTS
To Collection QR.
BOQ;Page 2/10/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
AIR-CONDITIONING DUCTWORK
Included
Rigid fiber glass insulation 96 kg / m³ density and
50mm thick; wrapped with reinforced aluminum
foil and covered with high quality canvass cloth
200 gm/m³ soaked in weatherproofing compound
and sealed with vapor barrier seal on roof top.
To Collection QR.
BOQ;Page 2/10/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
VENTILATION DUCTWORK
B
Over 500mm but not exceeding 1000mm wide
40 m2 Included
ducts including fittings.
AIR-CONDITIONING DUCTWORK
ACCESSORIES
To Collection QR.
BOQ;Page 2/10/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
A MFD-01- 2300X1200 1 No
B MD-01 - 1250X400 1 No
Included
Supply, Install, Testing and Commisioning of
Fusible link Fire damper, galvanized steel curtain
type including all accessories, access doors,
complete as specified and indicated on the
drawings; jointing to ductwork as shown in
drawing.
To Collection QR.
BOQ;Page 2/10/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
To Collection QR.
BOQ;Page 2/10/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
ELECTRICAL WORK
To Collection QR.
BOQ;Page 2/10/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
SUNDRIES
OTHER ITEMS
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 2/10/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
COLLECTION
Page 2/10/1
Page 2/10/2
Page 2/10/3
Page 2/10/4
Page 2/10/5
Page 2/10/6
Page 2/10/7
Page 2/10/8
Page 2/10/9
BOQ;Page 2/10/10
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
BILL NO. 2
ELECTRICAL SERVICES
To Collection QR.
BOQ;Page 2/11/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
To Collection QR.
BOQ;Page 2/11/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
DISTRIBUTION BOARD
To Collection QR.
BOQ;Page 2/11/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
POWER CABLES
To Collection QR.
BOQ;Page 2/11/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
CABLE TRAY
To Collection QR.
BOQ;Page 2/11/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
EARTHING SYSTEM
BONDING
To Collection QR.
BOQ;Page 2/11/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
F Test Clamp 4 No
To Collection QR.
BOQ;Page 2/11/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
LIGHTING INSTALLATION
To Collection QR.
BOQ;Page 2/11/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
To Collection QR.
BOQ;Page 2/11/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
To Collection QR.
BOQ;Page 2/11/10
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
o Collection QR
BOQ;Page 2/11/11
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
o Collection QR
BOQ;Page 2/11/12
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
Collection
Page 2/11/1
Page 2/11/2
Page 2/11/3
Page 2/11/4
Page 2/11/5
Page 2/11/6
Page 2/11/7
Page 2/11/8
Page 2/11/9
Page 2/11/10
Page 2/11/11
BOQ;Page 2/11/13
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
ELV WORKS
To Collection QR.
BOQ;Page 2/12/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
To Collection QR.
BOQ;Page 2/12/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
To Collection QR.
BOQ;Page 2/12/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
To Collection QR.
BOQ;Page 2/12/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
CCTV SYSTEM
To Collection QR.
BOQ;Page 2/12/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
To Collection QR.
BOQ;Page 2/12/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
To Collection QR.
BOQ;Page 2/12/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
OTHER ITEMS
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 2/12/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
Collection:
Page 2/12/1
Page 2/12/2
Page 2/12/3
Page 2/12/4
Page 2/12/5
Page 2/12/6
Page 2/12/7
Page 2/12/8
BOQ;Page 2/12/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
Included
Cement and sand (1:3) screed as specified,
trowelled finish ; to concrete base.
BOQ;Page 2/13/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
FLOOR FINISHES
PORCELAIN FLOORING
CERAMIC FLOORING
CARPET FLOORING
E Ref.FF3;Carpet flooring;located at
Accounts,Manger room ,Reception & Admin 110 m2
To Collection QR. 115,000.00
BOQ;Page 2/13/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
GRANITE FLOORING
SKIRTING FINISHES
BOQ;Page 2/13/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
CEILING FINISHES
BOQ;Page 2/13/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
ACP CLADDING
BOQ;Page 2/13/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
OTHER ITEMS
Included
(i)
Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 2/13/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
Collection
Page 2/13/1
Page 2/13/2
Page 2/13/3
Page 2/13/4
Page 2/13/5
Page 2/13/6
BOQ;Page 2/13/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS
SKIRTING FINISHES
CEILING PAINT
BOQ;Page 2/14/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS
(i)
Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
BOQ;Page 2/14/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS
Collection
Page 2/14/1
Page 2/14/2
BOQ;Page 2/14/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MISCELLANEOUS WORKS
ELEVATORS
BOQ;Page 2/15/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MISCELLANEOUS WORKS
BOQ;Page 2/15/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MISCELLANEOUS WORKS
OTHER ITEMS
BOQ;Page 2/15/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: SHOW ROOM
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MISCELLANEOUS WORKS
Collection
Page 2/15/1
Page 2/15/2
Page 2/15/3
BOQ;Page 2/15/4
BILL 2 - PROPOSED SHOWROOM
GENERAL SUMMARY
To General Summary
TOTAL COST FOR BILL 2- PROPOSED SHOWROOM (QR)
QR
2,875,643.00
BOQ;Page 2/16/1
BILL OF QUANTITIES - 3.0 - WORKSHOP
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK
Excavate pits/trenches
Disposal
Filling.
TERMITE CONTROL
D Anti-termite treatment
975 m² 3 2,925.00
BOQ;Page 3/1/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK
OTHER ITEMS
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 3/1/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK
Collection :
Page 3/1/1
Page 3/1/2
BOQ;Page 3/1/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
CONCRETE-SUBSTRUCTURE
BOQ;Page 3/2/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
CONCRETE-SUPERSTRUCTURE
B Column 16 m³
DECKING SLAB
BOQ;Page 3/2/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
REINFORCEMENT-SUBSTRUCTURE
REINFORCEMENT-SUPERSTRUCTURE
To Collection QR.
BOQ;Page 3/2/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
A Lintels as required.
Item Included
To Collection QR.
BOQ;Page 3/2/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
FORMWORK-SUBSTRUCTURE.
FORMWORK-SUPERSTRUCTURE.
To Collection QR.
BOQ;Page 3/2/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
SUNDRIES
BOQ;Page 3/2/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
OTHER ITEMS
(i) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 3/2/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
Collection :
Page 3/2/1
Page 3/2/2
Page 3/2/3
Page 3/2/4
Page 3/2/5
Page 3/2/6
Page 3/2/7
BOQ;Page 3/2/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY WORKS
BOQ;Page 3/3/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY WORKS
OTHER ITEMS
(i) Included
Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 3/3/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING MASONRY WORKS
Collection
Page 3/3/1
Page 3/3/2
BOQ;Page 3/3/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS
BASE UNIT
BOQ;Page 3/4/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS
WALL UNIT
BOQ;Page 3/4/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS
OTHER ITEMS
(i)
Item Included
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 3/4/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING JOINERY WORKS
Collection
Page 3/4/1
Page 3/4/2
Page 3/4/3
BOQ;Page 3/4/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS
ALUMINIUM DOORS
BOQ;Page 3/5/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS
CRANE
BOQ;Page 3/5/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS
OTHER ITEMS
(i)
Included
Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 3/5/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING METAL WORKS
Collection
Page 3/5/1
Page 3/5/2
Page 3/5/3
BOQ;Page 3/5/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS
To Collection QR.
BOQ;Page 3/6/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS
PAINTING
FOUNDATION
To Collection QR.
BOQ;Page 3/6/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS
SUNDRIES
Drawings.
Service provision
To Collection QR.
BOQ;Page 3/6/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS
OTHER ITEMS
(i)
Item
Included
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 3/6/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORK SHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING STEEL WORKS
Collection
Page 3/6/1
Page 3/6/2
Page 3/6/3
Page 3/6/4
BOQ;Page 3/6/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
BILL NO 3/7
To Collection
BOQ;Page 3/7/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
D Vent cowl; 75 mm 3 No
E Vent cowl; 50 mm 1 No
To Collection
BOQ;Page 3/7/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
To Collection
BOQ;Page 3/7/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
To Collection
BOQ;Page 3/7/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
WATER HEATERS
To Collection
BOQ;Page 3/7/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
SUNDRIES
To Collection
BOQ;Page 3/7/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PLUMBING AND DRAINAGE SYSTEM
COLLECTION
Page 3/7/1
Page 3/7/2
Page 3/7/3
Page 3/7/4
Page 3/7/5
Page 3/7/6
BOQ;Page 3/7/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING
BILL NO 3/8
FIREFIGHTING WORKS
To Collection
BOQ;Page 3/8/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING
To Collection
BOQ;Page 3/8/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FIREFIGHTING
COLLECTION
Page 3/8/1
Page 3/8/2
BOQ;Page 3/8/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
BILL NO 3/9
HVAC INSTALLATIONS
A ODU - 28.5 KW 1 No
HIGHWALL UNIT
To Collection QR.
BOQ;Page 3/9/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
SPLIT AC
Split air-conditioning unit comprising wall
mounted indoor unit, consisting of cooling coils,
fans, washable filters, thermostat and air-cooled
remote out-door unit suitable for outdoor
installation @ 46 0C ambient temperature
complete with all accessories, interconnecting
insulated refregerent copper pipe works,
CFC/HCFC free refrigerant, anti-vibration
isolators, electrical connection etc. as specified in
local standards and guideline, as shown in
schedule and drawing
VENTILATION EQUIPMENTS
Ducted inline exhaust fans switch
operated,complete with motor, statically or
dynamically balanced die-cast-in-aluminium
impeller; rolled steel channel supporting frames,
anti-vibration mountings, acoustic lining enclosure
etc., complete as specified and indicated on the
drawings; connections to local power outlets;
installed on as shown on the drawings
To Collection QR.
BOQ;Page 3/9/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
Smoke Extract/Control
VENTILATION DUCTWORK
To Collection QR.
BOQ;Page 3/9/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
AIR-CONDITIONING DUCTWORK
ACCESSORIES
Fire Damper / Volume Control Damper /
Motorized Damper
To Collection QR.
BOQ;Page 3/9/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
ELECTRICAL WORK
To Collection QR.
BOQ;Page 3/9/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
SUNDRIES
To Collection QR.
BOQ;Page 3/9/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HVAC WORKS
COLLECTION
Page 3/9/1
Page 3/9/2
Page 3/9/3
Page 3/9/4
Page 3/9/5
Page 3/9/6
BOQ;Page 3/9/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
ELECTRICAL SERVICES
To Collection QR.
BOQ;Page 3/10/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
DISTRIBUTION BOARD
To Collection QR.
BOQ;Page 3/10/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
POWER CABLES
CABLE TRAY
To Collection QR.
BOQ;Page 3/10/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
EARTHING SYSTEM
BONDING
To Collection QR.
BOQ;Page 3/10/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
A Down Conductor 8 No
E Test Clamp 4 No
To Collection QR.
BOQ;Page 3/10/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
LIGHTING INSTALLATION
To Collection QR.
BOQ;Page 3/10/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
To Collection QR.
BOQ;Page 3/10/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
To Collection QR.
BOQ;Page 3/10/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
To Collection QR.
BOQ;Page 3/10/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
OTHER ITEMS
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 3/10/10
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELECTRICAL WORKS
Collection:
Page 3/10/1
Page 3/10/2
Page 3/10/3
Page 3/10/4
Page 3/10/5
Page 3/10/6
Page 3/10/7
Page 3/10/8
Page 3/10/9
Page 3/10/10
BOQ;Page 3/10/11
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
ELV WORKS
To Collection QR.
BOQ;Page 3/11/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
To Collection QR.
BOQ;Page 3/11/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
To Collection QR.
BOQ;Page 3/11/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
To Collection QR.
BOQ;Page 3/11/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
CCTV SYSTEM
To Collection QR.
BOQ;Page 3/11/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
To Collection QR.
BOQ;Page 3/11/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
To Collection QR.
BOQ;Page 3/11/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
OTHER ITEMS
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 3/11/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.2: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ELV WORKS
Collection:
Page 3/11/1
Page 3/11/2
Page 3/11/3
Page 3/11/4
Page 3/11/5
Page 3/11/6
Page 3/11/7
Page 3/11/8
BOQ;Page 3/11/9
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
FLOOR FINISHES
PORCELAIN FLOORING
SKIRTING FINISHES
BOQ;Page 3/12/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
CEILING FINISHES
BOQ;Page 3/12/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
WALL FINISHES
GRC
93,060.00
To Collection QR.
BOQ;Page 3/12/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
OTHER ITEMS
(i)
Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 3/12/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
Collection
Page 3/12/1
Page 3/12/2
Page 3/12/3
Page 3/12/4
BOQ;Page 3/12/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PAINTING WORKS
Included
B Ref: EX-1, To the rendered external walls 825 m2
EPOXY FLOORING
BOQ;Page 3/13/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PAINTING WORKS
OTHER ITEMS
(i)
Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 3/13/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.3: WORKSHOP
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING PAINTING WORKS
Collection
Page 3/13/1
Page 3/13/2
BOQ;Page 3/13/3
BILL 3 - PROPOSED WORKSHOP
GENERAL SUMMARY
To General Summary
TOTAL COST FOR BILL 3- PROPOSED WORKSHOP (QR) 2,276,333.00
QR
BOQ;Page 3/14/1
BILL OF QUANTITIES - 4.0 - UG IRRIGATION TANK
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK
Excavate pits/trenches
Disposal
TERMITE CONTROL
D Anti-termite treatment
9 m²
To Collection QR.
BOQ;Page 4/1/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK
OTHER ITEMS
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR. -
BOQ;Page 4/1/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK
Collection :
Page 4/1/1 -
Page 4/1/2
BOQ;Page 4/1/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
CONCRETE-SUBSTRUCTURE
B Raft footing 4 m³
C RC Wall 14 m³
D Slab 3 m³
To Collection QR.
BOQ;Page 4/2/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
REINFORCEMENT-SUBSTRUCTURE
To Collection QR.
BOQ;Page 4/2/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
FORMWORK-SUBSTRUCTURE.
To Collection QR.
BOQ;Page 4/2/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
SUNDRIES
Included
B To vertical surfaces of concrete. 45 m
2
To Collection QR. -
BOQ;Page 4/2/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
OTHER ITEMS
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 4/2/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
Collection :
Page 4/2/1
Page 4/2/2
Page 4/2/3
Page 4/2/4
BOQ;Page 4/2/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
WATER-PROOF PAINT
Included
Waterproof paint-2 coats of acrylic modified
cementious sealing slurry, cresit CR72-henkel or
equivalent laid on plaster
To Collection QR. -
BOQ;Page 4/3/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
OTHER ITEMS
Included
(i)
Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 4/3/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.4: UG IRRIGATION TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING FINISHES WORKS
Collection
Page 4/3/1
Page 4/3/2
BOQ;Page 4/3/3
BILL 4 - PROPOSED UG IRRIGATION TANK
GENERAL SUMMARY
BOQ;Page 4/4/1
BILL OF QUANTITIES - 5.0 - STORM WATER TANK
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK
Excavate pits/trenches
Disposal
Included
B Remove surplus excavated material from site
216 m³
Filling.
TERMITE CONTROL
D Anti-termite treatment
27 m²
To Collection QR.
BOQ;Page 5/1/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK
OTHER ITEMS
Included
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR. -
BOQ;Page 5/1/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING EARTHWORK
Collection :
Page 6/1 -
Page 6/2
BOQ;Page 5/1/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
CONCRETE-SUBSTRUCTURE
B Raft footing 11 m³
C RC Wall 63 m³
D Slab 8 m³
To Collection QR.
BOQ;Page 5/2/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
REINFORCEMENT-SUBSTRUCTURE
Included
A Bars in assorted diameters to concrete
14,420 kg
To Collection QR.
BOQ;Page 5/2/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
FORMWORK-SUBSTRUCTURE.
To Collection QR.
BOQ;Page 5/2/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
SUNDRIES
Included
B To vertical surfaces of concrete. 167 m
2
To Collection QR. -
BOQ;Page 5/2/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
OTHER ITEMS
(i) Item
(ii) Item
Included
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 5/2/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING CONCRETE WORKS
Collection :
Page 6/1
Page 6/2
Page 6/3
Page 6/4
BOQ;Page 5/2/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS
To Collection QR. -
BOQ;Page 5/3/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS
OTHER ITEMS
(i)
Item
(ii) Item
Included
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 5/3/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS
Collection
Page 5/3/1
Page 5/3/2
BOQ;Page 5/3/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS
BOQ;Page 5/3/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS
BOQ;Page 5/3/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.5: UG STORM WATER TANK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ARCHITECTURAL WORKS
BOQ;Page 5/3/6
BILL 5 - PROPOSED UG STORM WATER TANK
GENERAL SUMMARY
BOQ;Page 5/4/1
BILL OF QUANTITIES - 6.0 - EXTERNAL WORKS
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE GRADING WORK
To Collection QR.
BOQ;Page 6/1/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE GRADING WORK
OTHER ITEMS
(i) Item
(ii) Item
Included
(iii) Item
(iv) Item
(v) Item
To Collection QR. -
BOQ;Page 6/1/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE GRADING WORK
Collection :
Page 6/1/1 -
Page 6/1/2
BOQ;Page 6/1/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HARDSCAPING WORKS
CONCRETE PAVIOURS
PAVIOURS
To Collection QR.
BOQ;Page 6/2/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HARDSCAPING WORKS
ROAD KERB
FLUSH KERB
GARDEN KERB
To Collection QR.
BOQ;Page 6/2/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HARDSCAPING WORKS
OTHER ITEMS
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 6/2/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING HARDSCAPING WORKS
Collection :
Page 6/2/1
Page 6/2/2
Page 6/2/3
BOQ;Page 6/2/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROAD WORKS
PAVEMENT
Preparation of sub-grade
To Collection QR.
BOQ;Page 6/3/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROAD WORKS
TRAFFIC SIGNS
ROAD MARKINGS
BOQ;Page 6/3/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROAD WORKS
OTHER ITEMS
(i)
Item
(ii) Item
Included
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 6/3/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING ROAD WORKS
Collection
Page 6/3/1
Page 6/3/2
Page 6/3/3
BOQ;Page 6/3/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SOFTSCAPING WORKS
PLANTING MEDIUM
GROUND COVER
Included
MAINTENANCE
To Collection QR.
BOQ;Page 6/4/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SOFTSCAPING WORKS
OTHER ITEMS
(i)
Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 6/4/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SOFTSCAPING WORKS
Collection
Page 6/4/1
Page 6/4/2
BOQ;Page 6/4/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING BOUNDARY WALL AND GATE
BOUNDARY WALL
GATE
Included
C Metal Double leaf Sliding Gate,each leaf 3.5m
Wide 1 No.
BOQ;Page 6/5/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING BOUNDARY WALL AND GATE
OTHER ITEMS
(i)
Item Included
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 6/5/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING BOUNDARY WALL AND GATE
Collection
Page 6/5/1
Page 6/5/2
BOQ;Page 6/5/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SURFACE DRAINAGE WORKS
CHANNEL GRATING
To Collection QR.
BOQ;Page 6/6/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SURFACE DRAINAGE WORKS
CATCH PIT
MANHOLE
To Collection QR.
BOQ;Page 6/6/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SURFACE DRAINAGE WORKS
OTHER ITEMS
(i)
Item Included
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 6/6/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SURFACE DRAINAGE WORKS
Collection
Page 6/6/1
Page 6/6/2
Page 6/6/3
BOQ;Page 6/6/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE PLUMBING AND DRAINAGE SYSTEM
To Collection QR.
BOQ;Page 6/7/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE PLUMBING AND DRAINAGE SYSTEM
PUMPS
To Collection QR.
BOQ;Page 6/7/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE PLUMBING AND DRAINAGE SYSTEM
OTHER ITEMS
(i)
Item
(iii) Item
(iv) Item
(v) Item
To Collectio QR.
BOQ;Page 6/7/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE PLUMBING AND DRAINAGE SYSTEM
COLLECTION
Page 6/7/1
Page 6/7/2
Page 6/7/3
BOQ;Page 6/7/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE IRRIGATION SYSTEM
To Collection QR.
BOQ;Page 6/8/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE IRRIGATION SYSTEM
OTHER ITEMS
(i)
Item Included
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collectio QR.
BOQ;Page 6/8/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE IRRIGATION SYSTEM
COLLECTION
Page 6/8/1
Page 6/8/2
BOQ;Page 6/8/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS
To Collection QR.
BOQ;Page 6/9/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS
To Collection QR.
BOQ;Page 6/9/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS
DISTRIBUTION BOARD
To Collection QR.
BOQ;Page 6/9/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS
POWER CABLES
To Collection QR.
BOQ;Page 6/9/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS
ELECTRICAL MANHOLE
To Collection QR.
BOQ;Page 6/9/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS
EARTHING SYSTEM
BONDING
To Collection QR.
BOQ;Page 6/9/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS
LIGHTING INSTALLATION
To Collection QR.
BOQ;Page 6/9/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS
OTHER ITEMS
(i) Item
(ii) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 6/9/8
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELECTRICAL WORKS
Collection:
Page 6/9/1
Page 6/9/2
Page 6/9/3
Page 6/9/4
Page 6/9/5
Page 6/9/6
Page 6/9/7
Page 6/9/8
To Collection QR.
BOQ;Page 6/10/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS
To Collection QR.
BOQ;Page 6/10/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS
To Collection QR.
BOQ;Page 6/10/3
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS
To Collection QR.
BOQ;Page 6/10/4
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS
To Collection QR.
BOQ;Page 6/10/5
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS
OTHER ITEMS
(i)
Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 6/10/6
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6: EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE ELV WORKS
Collection
Page 6/10/1
Page 6/10/2
Page 6/10/3
Page 6/10/4
Page 6/10/5
Page 6/10/6
BOQ;Page 6/10/7
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE MISCELLANEOUS WORKS
WHEEL STOPPER
TENSILE SHADE
To Collection QR.
BOQ;Page 6/11/1
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE MISCELLANEOUS WORKS
OTHER ITEMS
(i) Item
(iii) Item
(iv) Item
(v) Item
To Collection QR.
BOQ;Page 6/11/2
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ BILL NO.6:EXTERNAL WORK
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING SITE MISCELLANEOUS WORKS
Collection :
Page 6/11/1
Page 6/11/2
BOQ;Page 6/11/3
BILL 6 - EXTERNAL WORKS
SUMMARY
To General Summary
TOTAL COST FOR BILL 6- EXTERNAL WORKS (QR)
QR
483,000.00
BOQ;Page 6/12/1
GENERAL SUMMARY
PROPOSED SHOWROOM,OFFICES AND WORKSHOP @ GENERAL SUMMARY
AL WAKRAH FOR AL BADI TRADING AND CONTRACTING
GENERAL SUMMARY
DISCOUNT (221,976.00)