Term Project
Term Project
Activates
Procurement Phase:
• Contractor Selection
• Material Procurement
• Equipment Acquisition
Construction Phase:
• Site Preparation
• Earthworks
Civil Engineering • Bridge Construction
project • Pavement Laying
• Drainage Systems
• Signage and TraFic Control
• Landscaping
Testing and Commissioning:
• Load Testing for Bridges
• Pavement Testing
• System Functionality Testing
Table 2: Electrical Engineering activities
Activates
Procurement Phase:
• Selection of Contractors and Suppliers
• Procurement of Materials (e.g., conductors, insulators,
transformers)
• Acquisition of Equipment (e.g., switchgear, protective relays)
Construction Phase:
• Site Preparation for Transmission Line and Grid Station
• Tower Erection and Stringing of Conductors
Electrical
• Civil Works for Grid Station (e.g., foundations, buildings)
Engineering Project
• Installation of Electrical Equipment in Grid Station
• Laying of Control and Communication Cables
Testing and Commissioning:
• Functional Testing of Transmission Line and Grid Station
• Protection System Testing
• Power Transformer Testing
• Switchgear and Breaker Testing
Phase 1: A) Define the activities based on the project related to your area of
specialties.
B) Sequence the activates based on dependency.
C) Give three estimates for each activity including:
a. Optimistic Performance Time (a)
b. Most Likely Time (m)
c. Pessimistic Performance Time (b)
D) Find the mean (te), standard deviation (𝜎! ), and variance (𝑣! )
Note: At the end of this stage, you might be able to fill up the following table
Activity Activity Depends Time in Weeks Statistics
Code on a m b te 𝜎! 𝑣!
Phase 2: A) For each activity organize the information as following format and
Sketch Activity on node (AON)
ES Floating EF
time
Activity code
LS Mean time (te) LF
variance (𝒗𝒕 )
B) Find the total mean time of project duration (𝑇# ) and the project
standard deviation (𝜎! ).
C) Obtain the normal distribution curve by plugging those values in the
following curve.