ANNEXURE II
UPDATED SALIENT FEATURES OF PARE HEP – 110 MW (2X55 MW)
Name of the Project Pare Hydroelectric Project
Installed Capacity 2X55 MW Type of Development Run of River Location Papum Pare District, Arunachal Pradesh Latitude and Longitude Dam: Lat - 27º14’20”N, Long - 93º48’42.30”E Power House: Lat - 27º12’43”N, Long - 92º48’17.64”E (As per Google Earth) River Dikrong River Hydrology At 90% dependable year 1980 - 81 Annual Inflow (Mm3) 3254.90 Flood Flow (PMF) (Cumec) 5000 Catchment Area (sq.km) 824 Reservoir Maximum Water Level (m) 246.215 Full Reservoir Level (m) 245.150 Minimum Drawdown Level (m) 240.000 Gross Storage at FRL (MCM) 19.63 Live Storage (MCM) 5.20 Dead Storage (MCM) 14.43 Water spread at FRL (Ha) 111.6 Dam Type Concrete Gravity Dam Top Elevation (m) 248 Length of Dam (m) 134.275 Height (m) 63 Width at Dam Top (m) 8 Average River Bed Level (m) 197 Deepest Foundation Level (m) 185 Spillway No. of Gates 3 Size of Gates 10.4m(W) X 14 m(H) Crest Level (m) 216 Height of breast wall (m) 18 Intake Gate No & Size (m) 2 & 6.5(W) x 7.5(H) Head Race Tunnel Diameter (m) 7.5 Shape Modified Horseshoe Shaped Length (m) 2818.73 Design Discharge (Cumec) 185 Surge Shaft Type Restricted Orifice, Non- Overflow Dia. & Height 18m Dia., 57.29m high (from EL. 215.8m to EL. 273m) Orifice Dia. 2.9m Pressure Shaft Diameter (m) 6.4 m Length (m) 225.0 m Bifurcated (penstock) Diameter 4.5 m (m) ANNEXURE II
Tariff (Paisa / kWh) as per 562 (First year); 577 (Levelised)
proposed RCE Revised (as per proposed RCE) March 16 Unit wise commissioning date Unit I Unit II Design Energy (MU) 506.42 Average Energy - Generated /annum (MU) - Firm Power (MW) 27.73