PHEP SFeature

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views3 pages

PHEP SFeature

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

ANNEXURE II

UPDATED SALIENT FEATURES OF PARE HEP – 110 MW (2X55 MW)

Name of the Project Pare Hydroelectric Project


Installed Capacity 2X55 MW
Type of Development Run of River
Location Papum Pare District, Arunachal Pradesh
Latitude and Longitude Dam: Lat - 27º14’20”N, Long - 93º48’42.30”E
Power House: Lat - 27º12’43”N, Long - 92º48’17.64”E
(As per Google Earth)
River Dikrong River
Hydrology
At 90% dependable year 1980 - 81
Annual Inflow (Mm3) 3254.90
Flood Flow (PMF) (Cumec) 5000
Catchment Area (sq.km) 824
Reservoir
Maximum Water Level (m) 246.215
Full Reservoir Level (m) 245.150
Minimum Drawdown Level (m) 240.000
Gross Storage at FRL (MCM) 19.63
Live Storage (MCM) 5.20
Dead Storage (MCM) 14.43
Water spread at FRL (Ha) 111.6
Dam
Type Concrete Gravity Dam
Top Elevation (m) 248
Length of Dam (m) 134.275
Height (m) 63
Width at Dam Top (m) 8
Average River Bed Level (m) 197
Deepest Foundation Level (m) 185
Spillway
No. of Gates 3
Size of Gates 10.4m(W) X 14 m(H)
Crest Level (m) 216
Height of breast wall (m) 18
Intake
Gate No & Size (m) 2 & 6.5(W) x 7.5(H)
Head Race Tunnel
Diameter (m) 7.5
Shape Modified Horseshoe Shaped
Length (m) 2818.73
Design Discharge (Cumec) 185
Surge Shaft
Type Restricted Orifice, Non- Overflow
Dia. & Height 18m Dia., 57.29m high
(from EL. 215.8m to EL. 273m)
Orifice Dia. 2.9m
Pressure Shaft
Diameter (m) 6.4 m
Length (m) 225.0 m
Bifurcated (penstock) Diameter 4.5 m
(m)
ANNEXURE II

Tariff (Paisa / kWh) as per 562 (First year); 577 (Levelised)


proposed RCE
Revised (as per proposed RCE) March 16
Unit wise commissioning date Unit I Unit II
Design Energy (MU) 506.42
Average Energy -
Generated /annum (MU) -
Firm Power (MW) 27.73