The procedure for weather tiles or Kerala Terracotta tiles removing and
laying work or as follows:
1. First we started the work with removing the entire existing weather tiles
and Debris completely using breaker machine .Then we cleaned the entire
area completely of 11500 square feet . The complete work is done by
nandagopal and his team.
2. Secondly we attend the crack and damage work on the roof slab of temple.
we started developing the existing crack on the slab and fill up with the
cement mortar and waterproofing chemical to arrest water .The work is
done by local civil team
4. Finally the tiles laying work it is also classified into four parts .The first
part is filling of cement mortar cement mortar is filled up with the size of
25 mm of ratio 1:4. The second part is applying cement water on the top of
the cement Mortar. The third part is lying of whether tail work with the
spacing of 10 mm. The fourth part is applying tiles grout with the spacing
of 10mm in between the tiles. The grout is also added with waterproofing
chemicals. The tiles laying work of 11500 sq.ft is fully done by jothy and
his team
1. Make sure the water drain area is clean and zero blockage.
2. 3 to 4 years once apply damp proof paint on the top of the whether tiles.
4. Clean dust and leaves monthly once in the tile area to avoid blocks.
SPECIFICATIONS
3. Sand - M.sand
PROPORTIONS
b) Waterproofing chemicals - 1: 10
c) Spacing - 10mm
1. I would like to thank Mr Arumugam sir (EX MLA) who plays vital