0% found this document useful (0 votes)
13 views

Performance Certificate RVNL

Uploaded by

arpits05
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Performance Certificate RVNL

Uploaded by

arpits05
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PERFORMANCE CERTIFICATE

(To whomsoever it may concern)


This is to certify that the work of New Line from Mau-Ghazipur-Tarighat (51 Km) in Uttar Pradesh under
the jurisdiction of North Eastern Railway & East Central Railway was transferred to Rail Vikas Nigam
Limited, 1st Floor August Kranti Bhawan, Bhikaji Cama Place, New Delhi -110066 for execution on
Turnkey basis. The details of the work completed so far is furnished below: -

1 Name of Work: - Ghazipur-Tarighat New BG Line including construction of Rail cum


road bridge & its Railway & road approaches
2 Name of Agency: Rail Vikas Nigam Limited, 1st Floor August Kranti Bhawan, Bhikaji
Cama Place, New Delhi -110066
3 Value of work as on Rs.
26.04.2024
5 Date of 23.12.2016
Commencement
6 Scope of work & Construction of Rail cum Road bridge
present status Total length: -1027.5 Mtr.
Span arrangement: - (43.5 m x 1 + 85.5 m x 11 + 43.5 m x 1)
 Foundation: -
1. Well Foundation – 14 Nos Double 'D' Type (Dimension: -
18.50m x 8.50m & Depth 45.0 m approx.).: - Completed
 Sub-structure: -
1. Solid RCC Rectangular Wall Type Pier of 13.30 m x 2.60 m x
17.0 m height along with fenders.: - Completed
 Super-structure: -
1. Fabrication & erection of open Web Girder of Span of 85.5 &
43.5 Mtr with both side gangway and trolley refuge.: -
Completed
2. Road deck on top with 10.500 Mtr carriage way & 2.25 Mtr
footpath on both sides including concrete crash barrier & hand
railing.: - Completed
 Bearings: -
1. Fixing of Spherical bearings.: - Completed
 Rail Linking: -
1. Fixing of galvanized steel Channel sleeper with 52KG guard
Rail & galvanized steel chequered plates. Rail Linking with
90UTS, 60KG Rail of 26Mtr each length.

Special features: -
1. The fabrication of 15,844 MT superstructure members was
completed in three fabrication workshops. This includes
14,319.69 MT for (11 x 85.5 Mtr) spans, 1,149.17 MT for (2 x
43.5 Mtr) spans, and 375.177 MT for gangway and trolley
refuge. The same structures were erected on-site using the
trestle, cantilever erection, and push launching methods.
2. Use of E-410 B0 Cu grade High tensile structural steel to
maintain required strength with reduced dead load/weight of
Super-Structure.
3. Use of 12.67 Lakhs (Approx) HSFG bolts of 10.9 S Grade.

Approach Viaducts of Rail cum road bridge: -


Total length of Railway Viaducts: - 3.413 Km.
Total length of earthwork & blanketing work: - 7.719 Km.
 Foundation: -
1. 23,855 m Pile foundation of 1200 mm RCC bored cast in-
situ piles
 Sub-Structure: -
1. RCC Pile cap, pier shaft & pier cap with variable size as per
span & load criteria
 Super-structure: -
Ghazipur City & Ghazipur Ghat (Non-standard & RDSO
standard Composite Girder)
 73 Nos X 30.5 m – Completed.
 2 Nos X 12.2 m – Completed.
 5 No X 24.4 m – Completed.
Tarighat (Composite Girder)
 20 Nos X 30.5 m – Completed.
 14 Nos X 24.4 m – Completed.
 Bearing
1. Elastomeric bearing as per RDSO standard
 Earthwork (cumulative in GCT-TRG & GZT-TRG section)
1. 6,48,072 cum
 Blanketing work: -59,694 cum

Year wise breakup of quantity executed


Sl Activity UO Total Quantity executed in financial year Total
No M scop Quantity
. e 2017- 2018- 2019- 2020- 2021- 2022-
2018 2019 2020 2021 2022 2023
1. Earthwork in Cum 82502
filling of
formation/subgrad
e
2. Blanketing in Cum
formation
3. 1200 mm dia pile RM
(RCC-M35)
Well Sinking work
(18.5 M x 8.5 M
dia)
For depth up to 10 14940.32 5486.28
M

For depth from 10 Cum 17752.85 1287.05


M to 25 M

For depth from Cum 14248.18 14693.8


25M to 2
40M

For depth beyond Cum 1335.36 2872.86


40M

4. Concrete Works
1. M-25 Grade to Cum 40129.81 31102.1 2037.18 4903.46 4000.50 714.65 82347.79
M-40 Grade 0 9 1 5 0 1 7
2. Above M-40 Cum NIL 7866.44 8.892 13.338 57.85 NIL 7946.522
Grade 2
5. Fabrication &
Erection of Girder
including
Pathway/Gangway
(85.5mx11Nos &
43.5mx2No)
1. Fabrication MT NIL 5085.3 7141.38 3234.57 382.75 15843.95
2. Erection MT NIL 912.01 4303.06 7716.11 1140.7 15843.95

Year wise execution of different works :-

Steel work
Quantity of structural steel in MT
Financial Year Rail Cum Road
Approach Viaduct Total Quantity
Bridge
2020-2021 7716.11 1155.42 8871.53
2021-2022 2911.44 2310.84 5222.28
2022-2023 3613.63 3613.63