SP 2

Uploaded by

muralee7ge
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 23

Incremental Model: When to Use

• Large projects where requirements are not understood


• Working in unfamiliar technical arenas
• Changing requirements due to rapidly changing technology, such as leading-edge
applications
• Business user can be moderately to heavily engaged
• Need functional requirements turned into something tangible quickly
Spiral Model
Spiral Model
• Combination of linear and iterative
• Focuses heavily on risk assessment
• Minimized risk by breaking a project into smaller segments
• Each cycle begins with identifying stakeholders and what success looks like
• Each cycle ends with a review and a commitment
Spiral Model
Spiral Model
+ Accurately manages and mitigates risks
+ Issues are identified and solved early
+ Estimates near the end of the project are very accurate
+ Early involvement from developers increases successful design

- Long time to get to finished product


- High cost
- Relies on special skills to identify and mitigate risks
- Very customized solution limits reusability
Spiral Model: When to Use
• Risk identification and mitigation are extremely important
• Medium to high risk projects
• Users are unsure of their needs
• Prototypes are needed
• Requirements are complex
• Time and cost are not as important
• Little to no experience in project’s area
Scrum Model (Agile)
Scrum Model (Agile)
• Uses iterative approach called sprints
• Flexible and adaptable, great for the unknown
• Values individuals and interactions over processes and tools
• Values working software over comprehensive documentation
• Values customer collaboration over contract negotiation
• Values responding to change over following a plan

One of many different Agile methods including; Extreme


Programming, Crystal Clear, Feature Driven, etc.
Scrum Model (Agile)
• Project team completes sprints
• A short iteration from analysis, development, testing and possibly to deployment of
a product. (14-30 days long)
• Uses a subset of prioritized requirements that form a sprint backlog. Requirements
are derived from a product backlog
• The project team is made of Product Owner, Scrum Dev Team, and Scrum
Master
• Product Owner is responsible for the return on investment (ROI).
• Focuses on the requirements, the “what”
• Scrum Dev Team is cross-functional.
• Collaborates to build the product each sprint, the “how”
• Scrum Master is the team facilitator, but has no power.
• Removes roadblocks, sets timeframes, and provides visibility.
Scrum Model (Agile): Artifacts
• Product Backlog
• List of features that the business wants, force ranked by the Product
Owner (one #1)
• Anyone can add items, could be user stories or use cases
• Does not contain tasks

• Sprint Backlog
• Committed features that will be completed within the current sprint
• Has a deadline to complete
• Tasks are tracked as
• Not started
• In Progress
• Completed
Scrum Model (Agile): Meetings
• Sprint Planning – Commit items to the sprint backlog
• Daily Scrum – Daily, 15 minutes. Yesterday, today, roadblocks
• Sprint Review – Demonstrate product, get feedback
• Sprint Retrospective – Inspect last sprint. Lessons learned
• Product Backlog Refinement – Adjust, split, and determine dependencies of backlog
items
Scrum Model (Agile)
+ Flexible and adaptable to changing requirements
+ Gets workable product in-front of the business quicker
+ Promotes collaboration between business and development teams
+ Daily feedback on progress and roadblocks, stops “spinning wheels”

- Leads to scope creep due to no defined end date


- Relies on commitment of all team members
- Challenging to initially adopt and train in an organization
- Changing or leaving team members can have a drastically negative effect
Scrum Model (Agile): When to Use
• The project is unpredictable and will have changing requirements
• Using or creating leading edge technology
• Organization as an experienced Scrum Master
• Business has experienced resource that can dedicate time to the project
• Pressure to produce a tangible product quickly
• Little to no concerns on length of project or budget
• Development team doesn’t have resource constraints
Rapid Application Development (RAD)
Rapid Application Development (RAD)
• Incremental approach
• Components and functions are developed in parallel
• Developments have tight timeframes
• The mini projects are assembled into a working prototype
• Feedback is received and prototype is refined
• Repeated until product fully meets requirements
Rapid Application Development (RAD)
Rapid Application Development (RAD)

3
Rapid Application Development (RAD)
+ Reduced time to develop
+ Increased reusability of components
+ Encourages customer feedback
+ Tackling integration early avoids later issues

- Need strong team to identify business requirements


- System must be able to be modularized
- High dependency on modeling skills
- Requires highly skilled developers and designers
RAD: When to Use
• Need a system that can be modularized and completed in 2-3 months
• High availability of quality designers for modeling
• Large budget
• Resources with high business knowledge are available to dedicate to project
Prototyping
Prototyping
• Iterative progression
• Used in conjunction with Spiral, Rapid Application
Development (RAD), and Incremental models
• Breaks project into segments and creates small-scale mock-ups
of the system, called prototypes
• Prototypes are iterated until they meet the requirements
• Final prototype usually discarded
• Business user is involved in the full process
Prototype Model
+ Gives business users a visual of their wants and needs
+ Promotes user participation and communication
+ Allows progress even when unclear requirements
+ Encourages innovation

- Very loose approval and control process


- Non-functional requirements are tough to identify
- Can lead to poorly designed systems
- False expectations thinking the system is complete from prototype
Prototype Model: When to Use
• Project objectives are unclear
• High pressure to implement “something”
• Frequent requirement changes
• Minimal resource constraints
• No strict approval processes needed
• Innovative, flexible designs that need to accommodate future changes